FORMAT DRAFT RAB/HPS PADA SAAT MENGAJUKAN LELANG KE ULP

No Jenis Barang/Jasa Satuan Vol Satuan 2 Vol 2 Harga Satuan Pajak(%) Total Keterangan
a b c d e f g h i=(d x f x g)+(d x f x g x 10%) j

1 Pondasi Batu Belah M3 12.50 1.00 530000 10.00 7,287,500.00 Analisa 2008 2887 3 6
2 Dinding Bata Camp. 1 : 4 M2 120.50 1.00 125000 10.00 16,568,750.00 Analisa 2008 2887 3 7
3 Plesteran Dinding Camp. 1 : 2 M2 241.00 1.00 34000 10.00 9,013,400.00 Analisa 2008 2887 3 8
4 Galian Pondasi M3 15.63 1.00 35000 10.00 601,755.00 Analisa 2008 2887 3 9
5 Pas. Kusen Pintu dan Jendela M3 0.57 1.00 1500000 10.00 940,500.00 Analisa 2008 2887 3 10
6 Pengecatan M2 241.00 1.00 25000 10.00 6,627,500.00 Analisa 2008 2887 3 11
7 Mobil Unit 5.00 1.00 150000000 10.00 825,000,000.00
8 Printer Unit 4.00 1.00 1500000 10.00 6,600,000.00
9 Ahli Bangunan Sipil Orang 3.00 Bulan 6.00 10000000 10.00 198,000,000.00
10 Ahli Arsitektur Orang 2.00 Bulan 12.00 10000000 10.00 264,000,000.00
TOTAL GENERAL 1,334,639,405.00

KETERANGAN :
- Dalam pembuatan RAB/HPS jangan sampai ada BARIS maupun KOLOM yang di HIDE/DISEMBUNYIKAN
- No. 1 s/d No. 6, merupakan contoh pembuatan RAB/HPS untuk PEKERJAAN KONSTRUKSI
- No. 7 s/d No. 8, merupakan contoh pembuatan RAB/HPS untuk PENGADAAN BARANG
- No. 9 s/d No. 10, merupakan contoh pembuatan RAB/HPS untuk JASA KONSULTANSI dan JASA LAINNYA
- Dalam Pembuatan RAB/HPS untuk PEKERJAAN KONSTRUKSI, Kolom ( e ) dibiarkan KOSONG/TIDAK PERLU DIISI dan Kolom ( f ) diisi dengan ANGKA/NILAI 1 (JANGAN DIBIARKAN KOSONG)
- Dalam Pembuatan RAB/HPS untuk PENGADAAN BARANG, Kolom ( e ) dibiarkan KOSONG/TIDAK PERLU DIISI dan Kolom ( f ) diisi dengan ANGKA/NILAI 1 (JANGAN DIBIARKAN KOSONG)
- Dalam Pembuatan RAB/HPS untuk JASA KONSULTANSI dan JASA LAINNYA, Kolom ( e ) dan Kolom ( f ) diisi sebagaimana Format/Draft Tabel diatas.