1 Pcs
9 stop kran gate valve 1-1/2"
1 Pcs Socket Drat dalam 1-1/2"
Total
Total
10 Kg
1 Cat minyak merk AVIAN
3 Pcs
2 Roll kuas
Total
an material pemasangan meter air toilet lt 03
Estimasi harga/Satuan Total Remark
PA toilet lantai 03 2519150
4,100,000 4,100,000
Instalasi meter air toilet lt 03 32,600
16,300 32,600
Instalasi meter air toilet lt 03 260,000
26,000 260,000
Instalasi meter air toilet lt 03 112,000
56,000 112,000
Instalasi meter air toilet lt 03 572,000
286,000 572,000
Instalasi meter air toilet lt 03 55,600
27,800 55,600
Instalasi meter air toilet lt 03 37,800
18,900 37,800
Instalasi meter air toilet lt 03 388,000
194,000 388,000
Instalasi meter air toilet lt 03 475,000
475,000 475,000
Instalasi meter air toilet lt 03 30,000
30,000 30,000
Instalasi meter air toilet lt 03 125,000
125,000 125,000
Pemasangan dan instalasi pipa
dikerjakan oleh Vendor 0
1,000,000 1,000,000
6,188,000 4607150
112,000
56,000 112,000
572,000
286,000 572,000 Instalasi Meter air Backwash Kolam
renang lt 03 37,800
18,900 37,800
125,000
125,000 125,000
5,208,800 3642951
75,000 750,000
25,000 75,000
66,000 330,000
1,330,000
1,580,850
1,565,849