Anda di halaman 1dari 3

JADWAL PELAKSANAAN PEKERJAAN

SCHEDULE (KURVA - S)

KEGIATAN : PEMBANGUNAN JALAN DAN JEMBATAN DINAS PUPR ACEH


NAMA PAKET : PEMBANGUNAN JALAN DUA JALUR KAWASAN INDUSTRI ACEH (KIA) LADONG KAB. ACEH BESAR 2.34 0.39 18.44 3.58 3.5839
NO. KONTRAK : 09-AC/BANG/PUPR/APBA/2022 0.06 0.22 28
TANGGAL : 13 APRIL 2022 -28

KONTRAK AWAL KONTRAK ADDENDUM II J A N G K A W A K T U P E L A K S A N A A N = 210 H A R I K A L EN D E R ( 30 M I N G G U )


HARGA JUMLAH BOBOT HARGA JUMLAH BOBOT T A H U N A N G G A R A N 2022
NO. URAIAN
KUANTITAS
SATUAN HARGA TOTAL
KUANTITAS
SATUAN HARGA TOTAL APRIL 2022 MEI 2022 JUNI 2022 JULI 2022 AGUSTUS 2022 SEPTEMBER 2022 OKTOBER 2022 NOV 2022 %
(Rp.) (Rp.) (%) (Rp.) (Rp.) (%) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
15 - 22 23 - 29 30 - 06 07 - 13 14 - 21 22 - 28 29 - 04 05 - 11 12 - 18 19 - 25 26 - 02 03 - 09 10 - 16 17 - 23 24 - 30 31 - 06 07 - 13 14 - 20 21 - 27 28 - 03 04 - 10 11 - 17 18 - 24 25 - 01 02 - 08 09 - 15 16 - 22 23 - 29 30 - 05 06 - 10

DIVISI 1. UMUM
1.2 Mobilisasi 1.00 LS 33,325,000.00 33,325,000.00 0.23 1.00 LS 33,325,000.00 33,325,000.00 0.24 0.03 0.03 0.03 0.03 0.03 Chart
Chart
0.03 Title
Title 0.03 0.03 100
1.8.(1) Manajemen dan Keselamatan Lalu Lintas 1.00 LS 29,400,000.00 29,400,000.00 0.21 1.00 LS 29,400,000.00 29,400,000.00 0.21 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01
1.19 Keselamatan dan Kesehatan Kerja 1.00 LS 39,315,000.00 39,315,000.00 0.28 1.00 LS 39,315,000.00 39,315,000.00 0.28 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01
90
DIVISI 2. DRAINASE

HARI RAYA IDUL FITRI

HARI RAYA IDUL ADHA


2.3.(31) Saluran Berbentuk U Tipe DS 5a (dengan tutup) 895.00 M' 1,307,484.00 1,170,198,180.00 8.22 363.80 M' 1,307,484.00 475,662,679.20 3.37 0.48 0.48 0.48 0.48 0.48 0.48 0.48 KONTRAK ADDENDUM II
80
DIVISI 3. PEKERJAAN TANAH DAN GEOSINTETIK
3.1.(1a) Galian Biasa 5,042.10 M3 63,389.86 319,618,013.11 2.24 9,374.97 M3 63,389.86 594,278,035.80 4.21 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 1.05 1.05

MASA PERSIAPAN PHO


3.2.(1b) Timbunan Biasa dari Hasil Galian 2,617.89 M3 159,261.05 416,927,910.18 2.93 371.54 M3 159,261.05 59,171,850.52 0.42 0.59 0.33 0.33 0.33 0.33 0.33 70
3.2.(2a) Timbunan Pilihan dari Sumber Galian 280.00 M3 211,839.60 59,315,088.00 0.42 1,836.51 M3 211,839.60 389,045,543.80 2.76 0.08 0.08 0.08 0.08 0.08 0.78 0.78 0.77
3.3.(1) Penyiapan Badan Jalan 8,584.90 M2 4,756.12 40,830,814.59 0.29 5,969.60 M2 4,756.12 28,392,133.95 0.20 0.14 0.14
60

1443 H
KONTRAK AWAL

1443 H
DIVISI 5. PERKERASAN BERBUTIR DAN PERKERASAN BETON SEMEN
5.1.(1) Lapis Pondasi Agregat Kelas A 902.22 M3 634,404.81 572,372,707.68 4.02 622.54 M3 634,404.81 394,942,370.42 2.80 0.45 0.45 0.45 0.45 0.51 0.51
50
DIVISI 7. STRUKTUR
7.1.(5a) Beton Struktur fc' 30 Mpa (sedikit perancah) 1,603.99 M3 2,416,526.09 3,876,083,683.10 27.22 1,839.47 M3 2,416,526.09 4,445,127,246.77 31.50 3.50 3.50 3.50 3.50 3.04 3.04 3.04 3.50 3.50
7.1.(6a) Beton Struktur fc' 25 Mpa 1,193.87 M3 2,275,258.44 2,716,362,793.76 19.08 874.09 M3 2,275,258.44 1,988,780,649.82 14.10 0.64 0.64 1.27 1.27 1.28 1.28 1.28 1.28 1.28 1.28 1.28 1.28 40
7.1.(8) Beton mutu rendah fc’15 Mpa 204.88 M3 1,512,672.51 309,916,343.85 2.18 75.45 M3 1,512,672.51 114,131,140.88 0.81 0.40 0.40
7.1.(10) Beton fc’10 Mpa 541.33 M3 1,077,299.63 583,174,608.71 4.10 593.45 M3 1,077,299.63 639,323,465.42 4.53 0.51 0.36 0.36 0.36 0.36 0.36 0.56 0.56 0.56 0.56
7.3.(1) Baja Tulangan Polos BjTP 280 123,871.19 Kg 22,825.00 2,827,359,911.75 19.86 123,871.19 Kg 22,825.00 2,827,359,911.75 20.04 1.42 0.42 0.42 0.84 0.84 0.84 0.84 0.84 0.84 0.84 0.84 0.84 1.28 1.28 1.28 1.28 1.28 1.28 1.28 1.28 30
Baja Tulangan Polos BjTP 280 (Negosiasi) 71,365.29 Kg 19,989.00 1,426,520,781.81 10.11 1.26 1.26 1.26 1.26 1.03 1.26 1.03 1.26
7.4.(1b) Penyediaan Baja Struktur Grade 345 (Titik Leleh 345 Mpa) 221.19 Kg 35,670.56 7,889,971.17 0.06
7.4.(2) Pemasangan Baja Struktur 221.19 Kg 5,297.79 1,171,818.17 0.01
20
7.16.(3c) Pipa Drainase PVC Air Limbah Dia. 500 mm (20 Inchi) 654.00 M' 1,052,315.00 688,214,010.00 4.83 324.00 M' 1,052,315.00 340,950,060.00 2.42 0.35 0.35 0.35 0.35 0.35 0.35 0.35

10
DIVISI 9. PEKERJAAN HARIAN DAN PEKERJAAN LAIN-LAIN
9.2.(10)a Kerb Pracetak Jenis 1 (Peninggi/Mountable) 2,080.00 M' 169,253.10 352,046,448.00 2.47 1,390.80 M' 169,253.10 235,397,211.48 1.67 0.21 0.21 0.21 0.21 0.21 0.21 0.21 0.21
9.2.15 Unit Lampu Penerangan Jalan Lengan Ganda, Tipe LED 8.00 Buah 24,311,850.70 194,494,805.60 1.37 2.00 Buah 24,311,850.70 48,623,701.40 0.34 0.17 0.17
0

Jumlah Harga Pekerjaan Rp. 14,238,017,107.66 Rp. 14,109,746,783.02


Jumlah Bobot Pekerjaan 100.00 100.00
Kemajuan Pekerjaan Mingguan (%) 0.03 0.04 0.01 0.18 0.39 2.76 0.77 1.13 1.16 1.58 1.65 2.03 0.01 1.56 3.14 2.73 3.98 3.37 4.99 4.55 6.23 5.84 7.25 6.45 6.81 7.09 7.90 8.62 7.74 0.00
RENCANA TOTAL Kemajuan Pekerjaan Kumulatif (%) ### 0.03 0.07 0.08 0.27 0.66 3.42 4.19 5.32 6.49 8.07 9.71 11.75 11.76 13.32 16.47 19.20 23.17 26.54 31.53 36.08 42.30 48.15 55.40 61.85 68.66 75.74 83.64 92.26 100.00 100.00
RENCANA TOTAL
Kemajuan Pekerjaan Mingguan (%) 0.03 0.04 0.01 0.18 0.39 2.76 0.77 1.13 1.16 1.58 1.65 2.03 0.01 1.56 3.14 2.73 3.98 3.37 10.65 10.47 9.23 7.90 7.77 7.44 7.77 7.90 3.73 0.40 0.21 0.00
ADD. II Kemajuan Pekerjaan Kumulatif (%) 0.03 0.07 0.08 0.27 0.66 3.42 4.19 5.32 6.49 8.07 9.71 11.75 11.76 13.32 16.47 19.20 23.17 26.54 37.19 47.65 56.88 64.78 72.55 79.99 87.76 95.66 99.39 99.79 100.00 100.00
Kemajuan Pekerjaan Mingguan (%)
REALISASI TOTAL Kemajuan Pekerjaan Kumulatif (%) ### S-C-M- 1 (21 HARI)

Disetujui Oleh : Diperiksa Oleh : Banda Aceh, 16 Agustus 2022


PPTK PEMBANGUNAN JALAN DAN JEMBATAN Konsultan Pengawas, Penyedia,
WILAYAH III (ACEH BESAR - 3) PT. ARTEK UTAMA PT. CITRA AGUNG UTAMA

FITRIADI, ST IDRIS, ST BONIE HENDRAWAN JONI, BA


NIP. 19820716 200901 1 006 Supervision Engineer Direktur Utama
LAPORAN PROGRES MINGGUAN

KEGIATAN : PEMBANGUNAN JALAN DAN JEMBATAN


PEKERJAAN : PEMBANGUNAN JALAN DUA JALUR KAWASAN INDUSTRI ACEH (KIA) LADONG KAB. ACEH BESAR
LOKASI : ACEH BESAR
NOMOR KONTRAK : 09-AC/BANG/PUPR/APBA/2022
TANGGAL KONTRAK : 13 APRIL 2022
SUMBER DANA : APBA - OTSUS ACEH
TAHUN ANGGARAN : 2022
25 Agustus 2022
KONTRAK AWAL KONTRAK KONTRAK ADDENDUM II MINGGU INI S/D MINGGU INI KET.
ADDENDUM II
No. Mata URAIAN Sat.
Pembayaran BOBOT Jumlah Harga BOBOT Jumlah Harga BOBOT
Kuantitas Kuantitas Kuantitas BOBOT (%) Kuantitas Kuantitas
(%) (Rupiah) (%) (Rupiah) (%)

DIVISI 1. UMUM
1.2 Mobilisasi LS 1.00 0.23 1.00 1.00 0.24 - - 0.61 20,250,000.00 0.14
1.8.(1) Manajemen dan Keselamatan Lalu Lintas LS 1.00 0.21 1.00 1.00 0.21 - - 0.59 17,300,000.00 0.12
1.19 Keselamatan dan Kesehatan Kerja LS 1.00 0.28 1.00 1.00 0.28 - - 0.72 28,215,000.00 0.20
0.72 0.72 - - 65,765,000.00 0.47
DIVISI 2. DRAINASE
2.3.(31) Saluran Berbentuk U Tipe DS 5a (dengan tutup) M' 895.00 8.22 895.00 363.80 3.37 - - - - -
8.22 3.37 - - - -
DIVISI 3. PEKERJAAN TANAH
3.1.(1a) Galian Biasa M3 5,042.10 2.24 5,042.10 9,374.97 4.21 137.50 8,716,105.75 0.06 2,559.13 162,222,575.47 1.15
3.2.(1b) Timbunan Biasa dari Hasil Galian M3 2,617.89 2.93 2,617.89 371.54 0.42 - - - - -
3.2.(2a) Timbunan Pilihan dari Sumber Galian M3 280.00 0.42 280.00 1,836.51 2.76 - - - - -
3.3.(1) Penyiapan Badan Jalan M2 8,584.90 0.29 8,584.90 5,969.60 0.20 - - - - -
5.88 7.59 8,716,105.75 0.06 162,222,575.47 1.15
DIVISI 5. PERKERASAN BERBUTIR
5.1.(1) Lapis Pondasi Agregat Kelas A M3 902.22 4.02 902.22 622.54 2.80 - - - - -
4.02 2.80 - - - -
DIVISI 7. STRUKTUR
7.1.(5a) Beton Struktur fc' 30 Mpa (sedikit perancah) M3 1,603.99 27.22 1,603.99 1,839.47 31.50 13.75 33,227,233.74 0.24 169.74 410,169,055.89 2.91
7.1.(6a) Beton Struktur fc' 25 Mpa M3 1,193.87 19.08 1,193.87 874.09 14.10 46.25 105,230,702.85 0.75 326.69 743,298,491.62 5.27
7.1.(8) Beton mutu rendah fc’15 Mpa M3 204.88 2.18 204.88 75.45 0.81 - - - - -
7.1.(10) Beton fc’10 Mpa M3 541.33 4.10 541.33 593.45 4.53 - - 119.00 128,198,655.97 0.91
7.3.(1) Baja Tulangan Polos BjTP 280 Kg 123,871.19 19.86 123,871.19 123,871.19 20.04 6,764.73 154,404,989.64 1.09 101,038.36 2,306,200,475.70 16.34
Baja Tulangan Polos BjTP 280 (Negosiasi) Kg 71,365.29 10.11 - - - -
7.4.(1b) Penyediaan Baja Struktur Grade 345 (Titik Leleh 345 Mpa) Kg 221.19 0.06 221.19
7.4.(2) Pemasangan Baja Struktur Kg 221.19 0.01 221.19
7.16.(3c) Pipa Drainase PVC Air Limbah Dia. 500 mm (20 Inchi) M' 654.00 4.83 654.00 324.00 2.42 - - - - -
77.33 83.50 292,862,926.23 2.08 3,587,866,679.17 25.43
DIVISI 9. PEKERJAAN HARIAN DAN PEKERJAAN LAIN-LAIN
9.2.(10)a Kerb Pracetak Jenis 1 (Peninggi/Mountable) M' 2,080.00 2.47 2,080.00 1,390.80 1.67 - - - - -
9.2.15 Unit Lampu Penerangan Jalan Lengan Ganda, Tipe LED Buah 8.00 1.37 8.00 2.00 0.34 - - - - -
3.84 2.01 - - - -

REALISASI 100.00 100.00 301,579,031.98 2.14 3,815,854,254.65 27.04

PAJAK PERTAMBAHAN NILAI (PPN) 30,157,903.20 381,585,425.46

TOTAL HARGA (DIBULATKAN) 331,736,000.00 4,197,439,000.00

RENCANA 10.65 37.19

DEVIASI (8.51) (10.14)


JADWAL PELAKSANAAN PEKERJAAN

SCHEDULE (KURVA - S)

KEGIATAN : PEMBANGUNAN JALAN DAN JEMBATAN DINAS PUPR ACEH


NAMA PAKET : PEMBANGUNAN JALAN DUA JALUR KAWASAN INDUSTRI ACEH (KIA) LADONG KAB. ACEH BESAR
NO. KONTRAK : 09-AC/BANG/PUPR/APBA/2022
TANGGAL : 13 APRIL 2022

KONTRAK AWAL KONTRAK ADDENDUM II REALISASI (25/08/2022) RENCANA (25/08/2022) DEVIASI (25/08/2022) TARGET (15/09/2022)
HARGA JUMLAH BOBOT HARGA JUMLAH BOBOT
NO. URAIAN SATUAN HARGA TOTAL SATUAN HARGA TOTAL
KUANTITAS KUANTITAS KUANTITAS BOBOT (%) KUANTITAS BOBOT (%) KUANTITAS BOBOT (%) KUANTITAS BOBOT (%)
(Rp.) (Rp.) (%) (Rp.) (Rp.) (%)

DIVISI 1. UMUM
1.2 Mobilisasi 1.00 LS 33,325,000.00 33,325,000.00 0.23 1.00 LS 33,325,000.00 33,325,000.00 0.24 0.61 0.14 0.74 0.18 0.14 0.03 0.87 0.21
1.8.(1) Manajemen dan Keselamatan Lalu Lintas 1.00 LS 29,400,000.00 29,400,000.00 0.21 1.00 LS 29,400,000.00 29,400,000.00 0.21 0.59 0.12 0.60 0.13 0.02 0.00 0.74 0.15
1.19 Keselamatan dan Kesehatan Kerja 1.00 LS 39,315,000.00 39,315,000.00 0.28 1.00 LS 39,315,000.00 39,315,000.00 0.28 0.72 0.20 0.65 0.18 - 0.06 - 0.02 0.76 0.21
-
DIVISI 2. DRAINASE -
2.3.(31) Saluran Berbentuk U Tipe DS 5a (dengan tutup) 895.00 M' 1,307,484.00 1,170,198,180.00 8.22 363.80 M' 1,307,484.00 475,662,679.20 3.37 3.38 365.21 3.38 365.21 3.38
-
DIVISI 3. PEKERJAAN TANAH DAN GEOSINTETIK -
3.1.(1a) Galian Biasa 5,042.10 M3 63,389.86 319,618,013.11 2.24 9,374.97 M3 63,389.86 594,278,035.80 4.21 2,559.13 1.15 6,840.78 3.07 4,281.65 1.92 9,184.55 4.13
3.2.(1b) Timbunan Biasa dari Hasil Galian 2,617.89 M3 159,261.05 416,927,910.18 2.93 371.54 M3 159,261.05 59,171,850.52 0.42 - 2,001.32 2.26 2,001.32 2.26 2,001.32 2.26
3.2.(2a) Timbunan Pilihan dari Sumber Galian 280.00 M3 211,839.60 59,315,088.00 0.42 1,836.51 M3 211,839.60 389,045,543.80 2.76 - 797.15 1.20 797.15 1.20 1,827.81 2.74
3.3.(1) Penyiapan Badan Jalan 8,584.90 M2 4,756.12 40,830,814.59 0.29 5,969.60 M2 4,756.12 28,392,133.95 0.20 - 8,507.56 0.29 8,507.56 0.29 8,507.56 0.29
0.00 - 0.00
DIVISI 5. PERKERASAN BERBUTIR DAN PERKERASAN BETON SEMEN - 0.00 - 0.00
5.1.(1) Lapis Pondasi Agregat Kelas A 902.22 M3 634,404.81 572,372,707.68 4.02 622.54 M3 634,404.81 394,942,370.42 2.80 - 509.96 2.29 509.96 2.29 622.54 2.80
- 0.00 -
DIVISI 7. STRUKTUR - 0.00 -
7.1.(5a) Beton Struktur fc' 30 Mpa (sedikit perancah) 1,603.99 M3 2,416,526.09 3,876,083,683.10 27.22 1,839.47 M3 2,416,526.09 4,445,127,246.77 31.50 169.74 2.91 204.39 3.50 34.65 0.59 817.54 14.00
7.1.(6a) Beton Struktur fc' 25 Mpa 1,193.87 M3 2,275,258.44 2,716,362,793.76 19.08 874.09 M3 2,275,258.44 1,988,780,649.82 14.10 326.69 5.27 316.31 5.10 - 10.38 - 0.17 555.36 8.96
7.1.(8) Beton mutu rendah fc’15 Mpa 204.88 M3 1,512,672.51 309,916,343.85 2.18 75.45 M3 1,512,672.51 114,131,140.88 0.81 - 37.73 0.40 37.73 0.40 75.45 0.81
7.1.(10) Beton fc’10 Mpa 541.33 M3 1,077,299.63 583,174,608.71 4.10 593.45 M3 1,077,299.63 639,323,465.42 4.53 119.00 0.91 374.68 2.86 255.68 1.95 447.60 3.42
7.3.(1) Baja Tulangan Polos BjTP 280 123,871.19 Kg 22,825.00 2,827,359,911.75 19.86 123,871.19 Kg 22,825.00 2,827,359,911.75 20.04 101,038.36 16.34 68,491.84 11.08 - 32,546.52 - 5.26 92,225.85 14.92
Baja Tulangan Polos BjTP 280 (Negosiasi) 71,365.29 Kg 19,989.00 1,426,520,781.81 10.11 - 8,920.66 1.26 8,920.66 1.26 35,682.65 5.06
7.4.(1b) Penyediaan Baja Struktur Grade 345 (Titik Leleh 345 Mpa) 221.19 Kg 35,670.56 7,889,971.17 0.06 - -
7.4.(2) Pemasangan Baja Struktur 221.19 Kg 5,297.79 1,171,818.17 0.01 - -
7.16.(3c) Pipa Drainase PVC Air Limbah Dia. 500 mm (20 Inchi) 654.00 M' 1,052,315.00 688,214,010.00 4.83 324.00 M' 1,052,315.00 340,950,060.00 2.42 - - 0.00 - - 138.86 1.04
-
DIVISI 9. PEKERJAAN HARIAN DAN PEKERJAAN LAIN-LAIN - -
9.2.(10)a Kerb Pracetak Jenis 1 (Peninggi/Mountable) 2,080.00 M' 169,253.10 352,046,448.00 2.47 1,390.80 M' 169,253.10 235,397,211.48 1.67 - - 0.00 - - 347.70 0.42
9.2.15 Unit Lampu Penerangan Jalan Lengan Ganda, Tipe LED 8.00 Buah 24,311,850.70 194,494,805.60 1.37 2.00 Buah 24,311,850.70 48,623,701.40 0.34 - - 0.00 - - - 0.00

Jumlah Harga Pekerjaan Rp. 14,238,017,107.66 Rp. 14,109,746,783.02


Jumlah Bobot Pekerjaan 100.00 100.00 27.04 37.19 10.14 64.78
Kemajuan Pekerjaan Mingguan (%) REALISASI RENCANA DEVIASI TARGET
RENCANA TOTAL Kemajuan Pekerjaan Kumulatif (%) TARGET BOBOT SESUAI JADWAL
RENCANA TOTAL
Kemajuan Pekerjaan Mingguan (%) TEST CASE 21 HARI KERJA
ADD. II Kemajuan Pekerjaan Kumulatif (%)
Kemajuan Pekerjaan Mingguan (%)
REALISASI TOTAL Kemajuan Pekerjaan Kumulatif (%)

Disetujui Oleh : Diperiksa Oleh : Diajukan Oleh :


PPTK PEMBANGUNAN JALAN DAN JEMBATAN Konsultan Pengawas, Penyedia,
WILAYAH III (ACEH BESAR - 3) PT. ARTEK UTAMA PT. CITRA AGUNG UTAMA

FITRIADI, ST IDRIS, ST BONIE HENDRAWAN JONI, BA


NIP. 19820716 200901 1 006 Supervision Engineer Direktur Utama