I PEKERJAAN PERSIAPAN
1 Brak Direksi : = 1.00 Set
2 Uitzet / Bowplank : = 1.00 Set
3 Papan Nama Proyek : = 2.00 Set
4 Mobilisasi : = 1.00 Set
7 Penulangan beton :
f 12mm balok : 0.888 x 4.20 x 4.00 ( 2.00 ) = 29.84 kg
f 8mm balok : 0.395 x 0.65 x 20.50 ( 2.00 ) = 10.53 kg
f 12mm pokok : 0.888 x 1.20 x 20.50 ( 1.00 ) = 21.84 kg
f 12mm bengkok : 0.888 x 1.35 x 20.50 ( 1.00 ) = 24.58 kg
f 10mm susut : 0.617 x 1.20 x 20.50 ( 1.00 ) = 15.18 kg
f 10mm bagi : 0.617 x 4.20 x 5.50 ( 2.00 ) = 28.51 kg
= 130.47 kg
Besi terbuang 10% = 13.05 kg
= 143.51 kg
9 Pembersihan lokasi : = LS
IV PEKERJAAN TALUD (STA P.1+170 s/d STA P.1+235 KANAN)
1 Galian tanah : 0.60 x 0.60 x 65.00 ( 1.00 ) = 23.40 m3