3 Gate Valve
- dia 80 mm bh 1.00 1,250,000.00 1,250,000.00
4 Material Bantu ls 1.00 2,500,000.00 2,500,000.00
Sub Total Instalasi Indoor Hydrant 159,090,000.00
C Perbaikan outdoor Hydrant
1 Perbaikan Instalasi oudoor hidrant lengkap isolasi gali urug
- dia. 80 mm m 1.00 420,000.00 420,000.00
- dia. 100 mm m 1.00 530,000.00 530,000.00
Sub Total Perbaikan outdoor Hydrant 950,000.00
D Penambahan Instalasi Firealrm
1 Alarm Lamp bh 3.00 800,000.00 2,400,000.00
2 Alarm Bell bh 3.00 900,000.00 2,700,000.00
3 Manual Push Button bh 3.00 75,000.00 225,000.00
Sub Total Penambahan Instalasi Firealrm 2,925,000.00
E TEST COMMISIONING SISTEM PENANGGULANGAN KEBAKARAN ls 1.00 3,000,000.00 3,000,000.00
Sub Total TEST COMMISIONING SISTEM PENANGGULANGAN KEBAKARAN 3,000,000.00