PERINTAH KERJA BUKA (PKB) INSTALASI FOC dan FOT

Nomor :
A. PEMBUKAAN
Nama Pekerjaan : PT KUPANG INTERMEDIA ( SITE NAIKOTEN )

Dasar Pekerjaan :
1. Nomor Kontrak                     :
2. Nomor Sales Order         : PA/ACT/2208/3684/TER
3. Nomor Work Order Internal     :

SATUA
No ITEM JENIS
N

1 Survey jalur kabel (incl. Spotting GPS untuk FOC) Jasa LOT
2 Penarikan FOC ADSS Short Span Jasa M
Galian Penarikan Jalur Tanah Taman (Inc. Patok/Tanda, Perbaikan
3 Jasa M
Tanaman/Aspal/Trotoar, Perapihan Lokasi)
Galian Penarikan Jalur Rojok Alur (Inc. Patok/Tanda, Perbaikan
4 Jasa M
Tanaman/Aspal/Trotoar, Perapihan Lokasi)
5 Handhole 40x40x40 cm (Permanen) Jasa LOT
6 Manhole 80x80x100 cm (Permanen) Jasa LOT
7 Jointing per core (incl. labeling Joint Box) Jasa AU
8 Tracing core (incl. labeling Joint Box) Jasa AU
9 OTDR per core Jasa AU
10 Labeling Joint Box Jasa U
11 Labeling Kabel (1 pole 2 label, khusus perapihan label) Jasa U

12 Labeling In Site Plan (labeling patch cord, labeling perangkat POP dan User) Jasa LOT

13 Instalasi FOT MC (POP-CPE) Jasa AU


14 Instalasi Splitter GPON / ODP / box Jasa AU

15 Perapihan dan Pemasangan Kawat Selling + I-ring per Meter Jasa M

Penarikan FOC under 1.000 m (include Jasa Penarikan, Aksesoris, Jointing,


16 Jasa LOT
OTDR, dan Perijinan diluar Sitac)
17 Pembongkaran kabel ADSS Short Span Jasa M
Galian Penarikan Jalur Boring (Inc. Patok/Tanda, Perbaikan
18 Jasa M
Tanaman/Aspal/Trotoar, Perapihan Lokasi)
19 Penarikan FOC ADSS Long Span (inc. dokumentasi) Jasa M
20 Instalasi material dan aksesoris ADSS LS Jasa AU
21 Jointing ADSS LS per core Jasa AU
22 Redruming kabel eksisting ADSS LS Jasa M
Instalasi CCTV (termasuk survey, instalasi, dan dokumentasi hasil pekerjaan
23 Jasa AU
serta material UTP max 50m)
Instalasi Access Point (termasuk survey, instalasi, dan dokumentasi hasil
24 Jasa AU
pekerjaan serta material UTP max 50m)
Instalasi VMS (Video Management System), termasuk survey,instalasi dan
25 Jasa AU
dokumentasi hasil pekerjaan

26 Instalasi Drop Wire (termasuk Jasa Penarikan, Aksesoris, Jointing, OTDR) Jasa LOT
Instalasi Rack dan Power Supply (rectifier, battery, AC/DCPDB, integrasi,
27 Jasa AU
testcomm)
Fitting Deadend, 6 - 48 core (Inc. Fitting Deadend, Strain clamp, Stop Link,
28 Material U
Steel Band, Labeling)
29 Fitting Suspension, 6-48 core (Inc. Stop Link, Steel Band) Material U
Fitting Deadend, 96 - 144 core (Inc. Fitting Deadend, Strain clamp, Stop Link,
30 Material U
Steel Band, Labeling)
31 Fitting Suspension, 96-144 core (Inc. Stop Link, Steel Band) Material U
32 Bracket Deadend (incl. Steel Band, Stop Link) Material U
33 Bracket Suspension (incl. Steel Band, Stop Link) Material U
34 Splitter Distribusi 1:8 (inc. box ODP) Material U
35 Splitter Distribusi 1:16 (inc. box ODP) Material U
Patch Cord Single Mode (SC/UPC-FC, SC/UPC-LC, SC/UPC-SC/UPC, LC-
36 Material U
LC, FC-LC) 1 pasang 1.5m
Patch Cord Single Mode (SC/UPC-FC, SC/UPC-LC, SC/UPC-SC/UPC, LC-
37 Material U
LC, FC-LC) 1 pasang 3m
Patch Cord Single Mode (SC/UPC-FC, SC/UPC-LC, SC/UPC-SC/UPC, LC-
38 Material U
LC, FC-LC) 1 pasang 5m
Patch Cord Single Mode (SC/UPC-FC, SC/UPC-LC, SC/UPC-SC/UPC, LC-
39 Material U
LC, FC-LC) 1 pasang 10m
Patch Cord Single Mode (SC/UPC-FC, SC/UPC-LC, SC/UPC-SC/UPC, LC-
40 Material U
LC, FC-LC) 1 pasang 15m
Patch Cord Multi Mode (SC/UPC-FC, SC/UPC-LC, SC/UPC-SC/UPC, LC-
41 Material U
LC, FC-LC) 1 pasang 1.5m
Patch Cord Multi Mode (SC/UPC-FC, SC/UPC-LC, SC/UPC-SC/UPC, LC-
42 Material U
LC, FC-LC) 1 pasang 3m
Patch Cord Multi Mode (SC/UPC-FC, SC/UPC-LC, SC/UPC-SC/UPC, LC-
43 Material U
LC, FC-LC) 1 pasang 5m
Patch Cord Multi Mode (SC/UPC-FC, SC/UPC-LC, SC/UPC-SC/UPC, LC-
44 Material U
LC, FC-LC) 1 pasang 10m
Patch Cord Multi Mode (SC/UPC-FC, SC/UPC-LC, SC/UPC-SC/UPC, LC-
45 Material U
LC, FC-LC) 1 pasang 15m
46 Joint Box Closure 96 Core Material U
47 Joint Box Closure 144 Core Material U
48 Joint Box 24 Core Material U
49 Joint Box 48 Core Material U
50 Joint Box 96 Core Material U
51 Joint Box 144 Core Material U
52 ODF Rack Mounted 6 Core (tipe SC upc) Material U
53 ODF Wall Mounted 6 Core (tipe SC upc) Material U
54 ODF Rack Mounted 12 Core (tipe SC upc) Material U
55 ODF Rack Mounted 24 Core (tipe SC upc) Material U

56 ODF Rack Mounted 48 Core (tipe SC upc) (Setara Litech / 3M) Material U

57 ODF Rack Mounted 96 core (tipe SC upc) (Setara Litech / 3M) Material U

58 ODF Rack Mounted 144 core (tipe SC upc) (Setara Litech / 3M) Material U

59 Rack Wall Mounted 12 U Material U


60 Pipa Galvanis 3/4" (2 meter) Material BTG
61 Pipa Galvanis 1/4" (2 meter) Material BTG
62 Pipa PVC 3/4" (3 meter) Material BTG
63 Subduct HDPE outer Ø 50 mm, inner Ø 42 mm Material M
Subduct HDPE untuk Crossing (bisa memuat minimal 3 kabel FA kapasitas
64 Material M
96/144 core)
65 Tiang Besi 7 m (incl Jasa Pasang, Cat, Izin) Material BTG
66 Tiang Besi 9 m (incl Jasa Pasang, Cat, Izin) Material BTG
67 Tiang Beton 12 m (incl Jasa Pasang, Cat, Izin) Material BTG
68 Tiang Beton 13 m (incl Jasa Pasang, Cat, Izin) Material BTG

Rumah Kabel (Adaptor > 1000 or 1442 core I/O, Incl. Pigtail, Adaptor,
69 Material U
Protector Sleeves, Cassette dan Pondasi)

Rumah Kabel (Adaptor 576 core I/O, Incl. Pigtail, Adaptor, Protector Sleeves,
70 Material U
Cassette dan Pondasi)
Rumah Kabel (Adaptor 288 core I/O, Incl. Pigtail, Adaptor, Protector Sleeves,
71 Material U
Cassette dan Pondasi)
Rumah Kabel (Adaptor 144 core I/O, Incl. Pigtail, Adaptor, Protector Sleeves,
72 Material U
Cassette dan Pondasi)
73 I-Ring (4mm x 250mm) Material U
74 Kawat Selling 10mm Material M
75 Tower Fitmen Type H + clamp Material U
76 Tower Fitmen Type I + clamp Material U
77 Tension Fitting ADSS LS 400/600 Material U
78 Tension Fitting ADSS LS 900 Material U
79 Tension Fitting ADSS LS 1200 Material U
80 Suspension Fitting ADSS LS 400/600 Material U
81 Suspension Fitting ADSS LS 900 Material U
82 Suspension Fitting ADSS LS 1200 Material U
83 Spiral Vibration Dumper Material U
84 Corona coil Material U
85 Gantry Box ADSS (stainless steel) 24 core Material U
86 Gantry Box ADSS (stainless steel) 48 core Material U
87 Gantry Box ADSS (stainless steel) 96 core Material U
88 Kabel duct dinding (memuat 2 kabel) Material M
89 Tiang besi 11-12m (include jasa pasang,cat,ijin) Material U

Transportasi Luar Kota untuk minimal 2 Drum atau 150KM (dari kota
90 Jasa LOT
pengambilan ke lokasi penarikan), untuk penarikan ADSS SS

91 Transportasi tim mitra antar regional (Pergi-Pulang) / orang Jasa LOT

Transportasi kabel, tim, dan material untuk jarak >150Km (kabel dihitung per
92 4 drum, dari gudang pengambilan kabel ke lokasi penarikan), untuk penarikan Jasa LOT
ADSS LS

JUMLAH TOTAL JASA


JUMLAH TOTAL MATERIAL
JUMLAH TOTAL PKB
Catatan :  1. Harga sudah termasuk material instalasi
             2. Total harga belum termasuk PPN 11 %
Pelaksana :
Project Team Leader : Fina Ayu Lestari
Waktu Pelaksanaan
Target Pelaksanaan
Selesai
Submit Hasil
Mulai Instalasi: Instalasi :
Survey:

Selesai Pekerjaan
Permohonan QC :
Dokumen : Selesai :

Yang Memberi Perintah : Yang Mene


PT Indonesia Comnet Plus PT KARYA D

Manager KP NTT Project Team Leader Mit


Tanggal :               

T/2208/3684/TER

HARGA QTY QTY TOTAL REAL


Tikod SAP
(Rp) AWAL AKHIR (Rp)

Rp 886,387 1 Rp 886,387 3002650


Rp 3,864 800 Rp 3,091,200 3002651

Rp 75,848 Rp - 3002653

Rp 83,657 Rp - 3002654
Rp 3,823,706 Rp - 3002655
Rp 5,765,808 Rp - 3002656
Rp 48,600 Rp - 3002657
Rp 158,776 Rp - 3002658
Rp 46,980 Rp - 3002659
Rp 10,800 Rp - 3002660
Rp 10,800 Rp - 3002661

Rp 10,800 Rp - 3002662

Rp 1,100,109 1 Rp 1,100,109 3002663


Rp 657,176 Rp - 3002664

Rp 5,400 Rp - 3002665

Rp 5,700,000 1 Rp 5,700,000 3002666

Rp 3,166 Rp - 3002667

Rp 122,799 Rp - 3002668

Rp 6,453 Rp - 3002669
Rp 83,160 Rp - 3002670
Rp 68,402 Rp - 3002671
Rp 4,001 Rp - 3002672

Rp 500,000 Rp - 3002673

Rp 500,000 Rp - 3002674

Rp 500,000 Rp - 3002675

Rp 550,000 Rp - 3002676
Rp 3,000,000 Rp - 3002677

Rp 85,535 Rp - 3002678

Rp 59,329 Rp - 3002679

Rp 98,000 Rp - 3002680

Rp 76,800 Rp - 3002681
Rp 39,050 Rp - 3002682
Rp 62,811 Rp - 3002683
Rp 1,198,165 Rp - 3002684
Rp 1,579,814 Rp - 3002685

Rp 110,011 Rp - 3002686

Rp 122,238 Rp - 3002687

Rp 141,444 6 Rp 848,664 3002688

Rp 182,146 Rp - 3002689

Rp 213,223 Rp - 3002690

Rp 139,919 Rp - 3002691

Rp 153,198 Rp - 3002692

Rp 174,824 Rp - 3002693

Rp 229,246 Rp - 3002694

Rp 274,873 Rp - 3002695

Rp 1,686,085 Rp - 3002696
Rp 1,783,778 Rp - 3002697
Rp 893,139 Rp - 3002698
Rp 1,061,295 Rp - 3002699
Rp 1,606,455 Rp - 3002700
Rp 1,729,722 Rp - 3002701
Rp 810,076 Rp - 3002702
Rp 809,568 1 Rp 809,568 3002703
Rp 1,401,302 Rp - 3002704
Rp 2,264,975 Rp - 3002705

Rp 3,417,893 Rp - 3002706

Rp 5,135,861 Rp - 3002707

Rp 6,447,657 Rp - 3002708

Rp 4,856,408 Rp - 3002709
Rp 186,839 Rp - 3002710
Rp 89,024 Rp - 3002711
Rp 23,917 Rp - 3002712
Rp 18,057 Rp - 3002713

Rp 24,376 Rp - 3002714

Rp 1,949,465 Rp - 3002715
Rp 2,191,176 Rp - 3002716
Rp 5,207,150 Rp - 3002717
Rp 6,224,460 Rp - 3002718

Rp 47,950,000 Rp - 3002719

Rp 35,000,000 Rp - 3002720

Rp 25,400,000 Rp - 3002721

Rp 18,000,000 Rp - 3002722

Rp 12,500 Rp - 3002723
Rp 13,000 Rp - 3002724
Rp 1,314,500 Rp - 3002725
Rp 1,021,725 Rp - 3002726
Rp 740,900 Rp - 3002727
Rp 1,553,500 Rp - 3002728
Rp 1,792,500 Rp - 3002729
Rp 1,445,950 Rp - 3002730
Rp 1,852,250 Rp - 3002731
Rp 2,031,500 Rp - 3002732
Rp 114,720 Rp - 3002733
Rp 418,250 Rp - 3002734
Rp 4,182,500 Rp - 3002735
Rp 4,660,500 Rp - 3002736
Rp 9,560,000 Rp - 3002737
Rp 12,000 Rp - 3002738
Rp 5,307,000 Rp - 3002739

Rp 588,500 Rp - 3002740

Sesuai perhitungan
Rp - 3002741
SPPD ICON+

Rp 9,700,000 Rp - 3002742

Rp 10,777,696
Rp 1,658,232
Rp 12,435,928
No. Handphone  :  

Selesai Tescom :

Lama Pekerjaan : 0 Hari

Yang Menerima Perintah :


PT KARYA DATA KOMUNIKA

Mitra Aktivasi