PROJECT FTTH ICON PLUS TURNKEY 4 - AREA JBB (REGIONAL JAWA BAGIAN BARAT)
BOQ FINAL PEKERJAAN PROJECT : FTTH ICON PLUS PURWAKARTA 19 CLUSTER
NAMA VENDOR PELAKSANA : PT. MUTIARA ANUGERAH KONSTRUKSI STEEL
DETAILS DESCRIPTION
Perizinan RT RW Setempat (include izin penempatan rack OLT, rack FDT dan penarikan kabel)
Jasa Instalasi Rack OLT/ODC (inlude pondasi 80x80x100/50; 1 pipa pvc 2"; 1 pipa pvc 4"; cat hitam)
Jasa Instalasi FDT (include pondasi inlude pondasi 80x80x100; 1 pipa pvc 4"; cat hitam)
Jasa Instalasi FAT (include aksesoris steelband; slack kabel panjang max 15 meter; 4 kabel ties)
Jasa Penyambungan Splicing OLT (POP 24x2 + OLT 16x2 total 80core)
Jasa Penyambungan Splicing FDT (D1: 24c; D2: 48c; D3: 6c total 78core)
Pengadaan Material dan Jasa Instalasi Aksesoris Dead End (per FAT + per 2 tiang)
Pengadaan Material dan Jasa Instalasi Aksesoris Suspen
Pengadaan Material dan Jasa Instalasi Label Kabel (per tiang kanan-kiri) - Mika/Akrilik & Stiker
Pengadaan Material dan Jasa Instalasi Label FAT (per FAT) - Stiker / Cat Pylox
Pengadaan Material dan Jasa Instalasi Label FDT (per FDT) - Stiker / Cat Pylox
Pengadaan Material dan Jasa Instalasi Label OLT (per OLT) - Stiker / Cat Pylox
Jasa Pengurusan Sambungan Baru (PSB) Kwh Meter (include standby 3 bulan)
Pengadaan Material dan Jasa Instalasi Kwh Meter (Include Grounding Rod; Clamp Rod; BC ulir3; 3 Galvanis 2")
Pengadaan Material dan Jasa Instalasi Tiang Kwh Meter (Tiang 9 meter 2,5mm; include pondasi tiang)
Pengadaan Material dan Jasa Instalasi Handhole Ukuran 50x50x40 (Include Tutup 1;Besi-10;K225)
Dokumentasi ATP-BAPS1-BAPS2-BASMP
FTTH ICON PLUS PURWAKARTA 19 CLUSTER
19 Ls
281,200 meter
19 Ls
19 Ls
57,000 meter
66,500 meter
157,700 meter
281,200 meter
19 pcs
19 pcs
1,216 pcs
1,520 core
1,482 core
1,216 core
1,216 core
304 core
456 core
5,624 pcs
4,028 set
1,596 pcs
11,248 pcs
1,216 pcs
19 pcs
19 pcs
19 pcs
19 pcs
19 pcs
19 pcs
19 Ls
TOTAL
NOTES
Data tagging gps, data kmz, report TSSR, data foto ID PLN
per Homepass
Include izin BA penempatan rack OLT, BA rack FDT & BA
penarikan kabel
Include Per Pekerja Helm, Rompi, Sarung Tangan, Sepatu
Safety & Rambu Pekerjaan
Include Gudang/Mess, Transportasi Tim Pekerja & Material
ke Lokasi Kerja
+ - 3000 meter, nilai akhir berdasarkan BoQ Aktual
Pekerjaan
+ - 3500 meter, nilai akhir berdasarkan BoQ Aktual
Pekerjaan
+ - 8300 meter, nilai akhir berdasarkan BoQ Aktual
Pekerjaan
By Maks
By Maks
By Maks
Mandor
Mandor
Mandor
Mandor
Mandor
Mandor
Mandor
Mandor
Mandor
Mandor
Mandor
Mandor
Mandor
Mandor
Mandor
Mandor
Mandor
Mandor
By Maks
By Maks