Rev. 1.0
NO
URAIAN PEKERJAAN
A
A.1
SATUAN
A.2
A.3
A.4
A.5
A.5
A.5
A.6
A.7
A.8
A.9
A.10
meter
HARGA SATUAN
VOLUME
(Rp)
1,800
113,400.00
5,400,000.00
6
600
1,800,000.00
132,300.00
set
7,290,000.00
set
810,000.00
unit
72
81,000.00
set
unit
6
72
1,800,000.00
1,800,000.00
unit
242,326,500.00
unit
128,742,000.00
unit
10,500,000.00
1,800
32,400.00
set
set
meter
MATERIAL PENDUKUNG
B.1
B.2
Main Hole
Ukuran 120cm X 100cm (p x l)
Tebal bibir main hole 10cm
Kedalaman 150cm
set
7,200,000.00
B.3
set
3,600,000.00
B.4
lot
72,000,000.00
1,800
1,800
1,800
6
27,000.00
27,000.00
108,000.00
7,200,000.00
1
1
1
10,800,000.00
9,000,000.00
14,400,000.00
meter
meter
meter
meter
set
lot
lot
lot
SUB TOTAL INSTALASI, TESTING & DOKUMENTASI
TOTAL
PPN 10%
GRAND TOTAL (termasuk PPN)
NO
URAIAN PEKERJAAN
SATUAN
VOLUME
HARGA SATUAN
(Rp)
HARGA TOTAL
(Rp)
204,120,000.00
32,400,000.00
10,800,000.00
79,380,000.00
43,740,000.00
4,860,000.00
5,832,000.00
10,800,000.00
129,600,000.00
484,653,000.00
514,968,000.00
63,000,000.00
1,584,153,000.00
58,320,000.00
43,200,000.00
21,600,000.00
72,000,000.00
195,120,000.00
48,600,000.00
48,600,000.00
194,400,000.00
43,200,000.00
10,800,000.00
9,000,000.00
14,400,000.00
369,000,000.00
2,148,273,000.00
214,827,300.00
2,363,100,300.00
HARGA TOTAL
(Rp)