NO.
B
PEKERJAAN ELEKTRIKAL
B.1
B.5
JENIS PEKERJAAN
SATUAN
PEKERJAAN ELEKTRIKAL
PEKERJAAN PANEL LISTRIK
Set
Set
Set
Mtr
Unit
Lot
Material bantu
Lot
TESTING COMMISSIONING
ls
VOLUME
HARGA SATUAN
MATERIAL
UPAH
(RP.)
(RP.)
JUMLAH HARGA
MATERIAL
(RP.)
1.00
1.00
1.00
40.00
1.00
1.00
1.00
1.00
SUB TOTAL
JUMLAH HARGA
UPAH
(RP.)
KETERANGAN