TAHUN : 2020 SSH HARGA NO DESKRIPSI KODE SATUAN KEPWAL (Rp) 2019 TENAGA KERJA 1 Pekerja L.01 OH 133.600 103.550 2 Tukang Batu L.02 OH 167.000 122.550 3 Tukang Kayu L.02 OH 200.500 122.550 4 Kepala Tukang L.03 OH 200.500 140.550 5 Mandor L.04 OH 234.100 158.550 MATERIAL 1 Batu Pecah M.18 m3 183.000 2 Pasir Pasang M.12 m3 180.000 3 Pasir Urug M.11 m3 95.000 4 Paku Biasa M.71 kg 15.000 5 Semen Portland M.15 zak 55.000 kg 1.500 6 Kayu Kaso 5/7 M.35 m3 1.600.000 7 Kayu Papan 3/20 M.37 m3 950.000 SEWA ALAT 1 Cocrete Mixer E jam 2 Concrete Vibrator E jam