Anda di halaman 1dari 1

3.

Bill of Quantity (BoQ)

Proyek Pekerjaan
Pembangunan Fitting Out Kantor BNI 88 Office Kecamatan Jatinegara,
Kota Jakarta Timur, DKI Jakarta

Satuan Qty VOLUME HARGA JUMLAH


No. Item Barang/Jasa
P L M2 Kg/M2 Kg SATUAN HARGA
KANOPI KIDS POOL
1 reng hollow 30x60x2,3 mm 6 m 1.5 171 256.5 2.17 555.75 26,000 14,449,500
2 pipa dia 75 mm Rolled 3.8 8 30.4 5.08 154.43 26,000 4,015,180
3 Siku uk. 30x30x3 0.08 296 23.68 1.36 30.19 26,000 784,940
KANOPI SHOWER AREA
1 Holow 30x60x2.3 mm 3 75 225 2.17 487.5 26,000 12,675,000
2 Holow 50x60x2,3 mm 23.66 1 23.66 6.59 156 26,000 4,056,000
3 Holow 60x60x2,3 mm 13.91 1 13.91 5.28 73.59 26,000 1,913,340
4 Siku uk 30x30x3 0.03 84 2.52 1.36 3.43 26,000 89,180
5 Base flate Baja T = 5 mm 0.002 7 0.014 39.36 26,000 1,023,360
SUB. JUMLAH 39,006,500

JMLH P VOL HARGA JUMLAH


No. Item Barang/Jasa SAT
(a) (b) (axb) SATUAN HARGA
KAYU BENGKIRAI
1 Sandaran tempat duduk kids pool 148 1.2 177.6 ml 151,250 26,862,000
2 pintu akses outdoor VRV uk.30x60 22 2.3 50.6 ml 175,500 8,880,300
3 Gagang pintu akses uk .30x60 2 0.8 1.6 ml 650,000 1,040,000
TOTAL VOLUME BENGKIRAI 229.80 ml
SUB. JUMLAH 36,782,300

JUMLAH TOTAL 75,788,800

Anda mungkin juga menyukai