A Barang
I Material Langsung (BahanBaku) 90.884.090,91 90.884.090,91 50,00 90.884.090,91 90.884.090,91
II Peralatan Jadi (Bahan Baku)
Sub Total Barang 90.884.090,91 90.884.090,91 90.884.090,91
B Jasa
I Manajemen Proyek dan Perekayasaan 9.088.409,09 9.088.409,09 5,00 9.088.409,09 9.088.409,09
II Alat Kerja/Fasilitas Kerja 45.442.045,45 45.442.045,45 25,00 45.442.045,45 45.442.045,45
III Konstruksi Fabrikasi 9.088.409,09 9.088.409,09 5,00 9.088.409,09 9.088.409,09
IV Jasa Umum 27.265.227,27 27.265.227,27 15,00 27.265.227,27 27.265.227,27
Sub Total Jasa 90.884.090,91 90.884.090,91