RAB Mapping
RAB Mapping
COST UNIT Satuan Harga Pemakaian SATUAN JUMLAH HARGA TOTAL-IDR KETERANGAN
Transportasi
1 Tiket Pesawat Kendari - Ternate 2 org Rp 2,200,000.00 /org 2 kali/Pulang Pergi Rp 8,800,000.00 Kendari - Ternate PP
2 Sewa Mobil Avanza 1 unit Rp 5,000,000.00 /bulan 1 bulan Rp 5,000,000.00 Operasional
3 Sewa Speed Ternate - Sofifi 2 org Rp 70,000.00 /org/pergi 2 kali/ Pulang Pergi Rp 280,000.00
4 BBM Kendaraan Operasional 20 ltr/hari Rp 8,000.00 /liter 15 hari Rp 2,400,000.00 BBM Kendaraan Operasional
Rp 16,480,000.00
Upah Tenaga Kerja
1 Geologist 2 org Rp - Karyawan/Overhead
2 Crew Mapping 5 org Rp 150,000.00 /hari 10 hari Rp 7,500,000.00
Rp 7,500,000.00
Konsumsi
1 Geologist 2 org Rp 90,000.00 /3x makan 15 hari Rp 2,700,000.00 Direct/Konsumsi Project
2 Crew Mapping PT. FMI 5 org Rp 30,000.00 /1x makan 10 hari Rp 1,500,000.00 Direct/Konsumsi Project
Rp 4,200,000.00
Supporting Supplies
1 Sewa Penginapan 1 Kamar Rp 300,000.00 /malam 1 hari Rp 300,000.00 Ternate
2 Sewa Rumah/Mesh 1 Lokasi Rp 250,000.00 /hari 10 hari Rp 2,500,000.00 Untuk Mesh
3 GPS 1 pcs -
4 Baterai Alkaline (GPS) 3 pcs Rp 35,000.00 / pcs 1 project Rp 105,000.00 1 pcs (isi 3 pasang)
5 Flagging Tape 2 pcs Rp 20,000.00 /pcs 1 project Rp 40,000.00
6 Tali Rafia 1 gulung Rp 30,000.00 1 project Rp 30,000.00
7 Plastik Sample 1 pack Rp 90,000.00 /pack 1 project Rp 90,000.00 1 pack (isi 40 plastik sample)
8 Karung Sample 1 Ikat Rp 85,000.00 /ikat 1 project Rp 85,000.00 1 ikat (isi 50 lembar)
9 Sepatu Boot Geos 2 pcs Rp 150,000.00 /pcs 1 project Rp 300,000.00
10 Sepatu Boot Crew Mapping 5 pcs Rp 150,000.00 /pcs 1 project Rp 750,000.00
11 Sarung Tangan 1 lusin Rp 35,000.00 /lusin 1 project Rp 35,000.00
12 Spidol Permanent/Whiteboard 5 pcs Rp 10,000.00 /pcs 1 project Rp 50,000.00
13 Parang 1 pcs Rp 150,000.00 /pcs 1 project Rp 150,000.00
14 Tenda Camping (kapasitas 6 orang) 1 set Rp 1,000,000.00 /set 1 project Rp 1,000,000.00 Persiapan kalau Flycamp
Rp 4,435,000.00
Biaya Tak Terduga/lain-lain
1 Biaya Tak Terduga Rp 2,000,000.00
Rp 2,000,000.00
Dana dapat di transfer via Rek BCA. 791 1019900 A.N Aditya Nugroho
Aditya Nugroho
Geologist
RENCANA ANGGARAN BIAYA SURVEY MAPPING GEOLOGI IUP PT. FORWARD MATRIX INDONESIA
PERIODE : 3 MINGGU
A. Detail Mapping
COST UNIT Satuan Harga Pemakaian SATUAN JUMLAH HARGA TOTAL-IDR KETERANGAN
Kendaraan
1 LV 1 unit Rp 350,000.00 /hari 30 hari Rp 10,500,000.00 Sewa/Rental
Fuel/BBM
1 LV 20 Liter/hari Rp 10,000.00 /liter 30 hari Rp 6,000,000.00
Rp 6,000,000.00
Supporting Supplies
1 GPS 1 pcs 30 hari Rp -
2 Baterai Alkaline (GPS) 5 pcs (isi 3 pasang) Rp 30,000.00 /pcs 30 hari Rp 150,000.00
3 Tali Rafia 1 gulung Rp 30,000.00 3 hari Rp 30,000.00
Rp 180,000.00
Biaya Tak Terduga/lain-lain
1 BBM Solar Alat Berat 2 unit Rp 320,000.00 /Jerigen 32 Ltr 4 Jerigen/hari Rp 7,680,000.00 BBM untuk 3 hari
2 Biaya perjalanan dari kendari ke site Rp 1,000,000.00
Rp 8,680,000.00