PENAMBANGAN BATBARA
HIGH CALORIE DI WIUP PT PPA
KEC. TAPAN – KAB. PESISIR
SELATAN (SUMATERA BARAT)
Seam 02
Seam 02
Seam 03
II. KONSEP KELAYAKAN PROYEK TAMBANG
a. Kajian Konseptual
Batas
Wilyah IUP
SR Cum. 4 : 1
SR Cum. 5 : 1
SR Cum. 3 : 1
Simulasi SR dan NPV (Sumber: Sunarjito dkk. 2008)
BESR 6
Penampang Ilustrasi SR
- Simulasi Ekonomi Tambang Berdasar SR
Price Total Cost
No Kompnen Biaya Unit Cost Variabel Unit M01 M02 M03 M04 M05 M06 M07 M08 M09 M10 M11 M12
Unit 2019
1 Pengupasan overburden US$/bcm SR Kum. 4 2.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00
2 Penggalian batubara US$/ton 1 1.60 1.60 1.70 1.60 1.60 1.60 1.60 1.60 1.60 1.60 1.60 1.60 1.60 1.60
3 Biaya penyaliran tambang (mine dewatering ) US$/ton 1 0.07 0.07 0.15 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07
4 Pengolahan batubara di Stockpile US$/ton 1 1.00 1.00 1.39 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
a. Sub Total 1-4 (1+2+3+4) 10.67 11.24 10.67 10.67 10.67 10.67 10.67 10.67 10.67 10.67 10.67 10.67 10.67
5 Pengangkutan batubara ke PT. Semen Padang US$/ton/km 1 km 0.07 0.00
a. Jarak angkut US$ 150 km 0.07 10.34 10.34 10.34 10.34 10.34 10.34 10.34 10.34 10.34 10.34 10.34 10.34 10.34
b. Jarak angkut US$ 200 km 0.07 13.79 13.79 13.79 13.79 13.79 13.79 13.79 13.79 13.79 13.79 13.79 13.79 13.79
c. Jarak angkut US$ 240 km 0.07 16.55 16.55 16.55 16.55 16.55 16.55 16.55 16.55 16.55 16.55 16.55 16.55 16.55
d. Jarak angkut US$ 250 km 0.07 17.24 17.24 17.24 17.24 17.24 17.24 17.24 17.24 17.24 17.24 17.24 17.24 17.24
6 Coal handling di ROM dan pemuatan batubara US$/ton 1 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00
7 Lingkungan dan rehabilitasi lahan US$/ton 1 0.19 0.19 0.19 0.19 0.19 0.19 0.19 0.19 0.19 0.19 0.19 0.19 0.19 0.19
8 Keselamatan dan kesehatan kerja US$/ton 1 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07
9 Pengembangan dan pemberdayaan masyarakat US$/ton 1 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10
10 Iuran tetap atau deadrent US$/ton 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
11 Biaya Surveyor US$/ton 1 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15
12 Biaya lain-lain atau G&A Cost US$/ton 1 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00
b. Sub Total 6 - 12 (6+7+8+9+10+11+12) US$ 4.51 4.51 4.51 4.51 4.51 4.51 4.51 4.51 4.51 4.51 4.51 4.51 4.51
13 Royalti (5% x Price) US$ 5% 2.79 2.79 2.79 2.79 2.79 2.79 2.79 2.79 2.79 2.79 2.79 2.79 2.79
14 Pajak PPN 10%
a. (1+2+3+4+5a+6) x 10% US$/ton 150 km 2.30 2.30 2.30 2.30 2.30 2.30 2.30 2.30 2.30 2.30 2.30 2.30 2.30
b. (1+2+3+4+5b+6) x 10% US$/ton 200 km 2.65 2.65 2.65 2.65 2.65 2.65 2.65 2.65 2.65 2.65 2.65 2.65 2.65
c. (1+2+3+4+5c+6) x 10% US$/ton 240 km 2.92 2.92 2.92 2.92 2.92 2.92 2.92 2.92 2.92 2.92 2.92 2.92 2.92
d. (1+2+3+4+5d+6) x 10% US$/ton 250 km 2.99 2.99 2.99 2.99 2.99 2.99 2.99 2.99 2.99 2.99 2.99 2.99 2.99
15 Harga Batubara 2019 di PT. Semen Padang US$/ton (adb) 6000 kkal/kg 55.86 55.86 55.86 55.86 55.86 55.86 55.86 55.86 55.86 55.86 55.86 55.86 55.86 55.86
16 Biaya Pokok Operasional FOT (Free on Truck ) US$/ton 150 km 15.97 15.97 15.97 15.97 15.97 15.97 15.97 15.97 15.97 15.97 15.97 15.97 15.97
US$/ton 200 km 15.97 15.97 15.97 15.97 15.97 15.97 15.97 15.97 15.97 15.97 15.97 15.97 15.97
US$/ton 240 km 15.97 15.97 15.97 15.97 15.97 15.97 15.97 15.97 15.97 15.97 15.97 15.97 15.97
US$/ton 250 km 15.97 15.97 15.97 15.97 15.97 15.97 15.97 15.97 15.97 15.97 15.97 15.97 15.97
17 Biaya Pokok Operasional on PT. Semen Padang US$/ton 150 km 30.62 30.62 30.62 30.62 30.62 30.62 30.62 30.62 30.62 30.62 30.62 30.62 30.62
US$/ton 200 km 34.41 34.41 34.41 34.41 34.41 34.41 34.41 34.41 34.41 34.41 34.41 34.41 34.41
US$/ton 240 km 37.45 37.45 37.45 37.45 37.45 37.45 37.45 37.45 37.45 37.45 37.45 37.45 37.45
US$/ton 250 km 38.21 38.21 38.21 38.21 38.21 38.21 38.21 38.21 38.21 38.21 38.21 38.21 38.21
18 Simple Margin FOT (EBT - Earning Before Tax ) US$/ton 39.89 39.89 39.89 39.89 39.89 39.89 39.89 39.89 39.89 39.89 39.89 39.89
19 Simple Margin FOB - Barge (EBT) US$/ton 150 km 79.98 25.24 25.24 25.24 25.24 25.24 25.24 25.24 25.24 25.24 25.24 25.24 25.24
US$/ton 200 km 38.28 21.45 21.45 21.45 21.45 21.45 21.45 21.45 21.45 21.45 21.45 21.45 21.45
US$/ton 240 km 38.16 18.42 18.42 18.42 18.42 18.42 18.42 18.42 18.42 18.42 18.42 18.42 18.42
US$/ton 250 km 38.19 17.66 17.66 17.66 17.66 17.66 17.66 17.66 17.66 17.66 17.66 17.66 17.66
20 Break Even Stripping Ratio (BESR) = (Harga - Biaya Operasi) / Biaya OB Removal
Jarak Angkut 150 km 4.79 4.79 4.16 4.16 4.16 4.16 4.16 4.16 4.16 4.16 4.16 4.16 4.16
200 km 4.36 4.36 3.68 3.68 3.68 3.68 3.68 3.68 3.68 3.68 3.68 3.68 3.68
240 km 4.02 4.02 3.30 3.30 3.30 3.30 3.30 3.30 3.30 3.30 3.30 3.30 3.30
250 km 3.21 3.21 3.21 3.21 3.21 3.21 3.21 3.21 3.21 3.21 3.21 3.21 3.21
- Simulasi Teknik Tambang Outcrop
- Biaya Lain-Lain
Kesimpulan Awal
Diperlukan penyelidikan lebih lanjut untuk
meningkatkan level kepastian dan menurunkan
resiko investasi penambangan, penyelidikan lebih
lanjut tersebut antara lain:
1. Pengeboran untuk memastikan kemenerusan,
tebal, dan kualitas batubara.
2. Pengukuran topografi detail untuk menghitung
kepastian jumlah overburden yang akan dikupas.
3. Pembuatan design Life of Mine untuk menjadi
panduan dalam penambangan.
Potensi batubara yang di WIUP PT. PPA dengan asumsi
sebagai berikut:
1. Tebal total batubara (0.9+1.2+1.4 = 3.5 m), asumsi
loss top & bottom 25% sehingga tebal perhitungan
2.6 m.
2. Asumsi luas kemenerusan batubara seluas +/- 7.1
hektar atau 71000 m2, dan asumsi tidak ada
kemenerusan 50% sehingga luas menjadi 35500 m2.
3. Dari poin 1 dan 2 di atas, potensi sumber daya
batubara di WIUP PT. PPA dengan Berat Jenis 1.3
ton/m3 sebesar 92300 ton.
PENUTUP
Terimakasih