80,000,000.00
55,000,000.00
15,000,000.00 360,000,000.00
12,500,000.00 250,000,000.00
12,500,000.00 265,000,000.00
35,000,000.00
-
-
-
-
572,500,000
DOWN PAYMENT
66,966,954
89,808,881
3,007,767
8,417,697
98,427
110,449
86,404
98,427
13,226,523
I ASPAL PT. NENEK BLANDE
BUTON
TAHUN IV TAHUN V TAHUN VI TAHUN VII
Biaya Umur
No Uraian
(Rp) (Thn)
A. Fasilitas Tambang
1 Sistem Drainase 2 x 12 x 10 mtr 204,000,000.0 5
204,000,000.0
B. Bangunan
1 Workshop 6 x 10 m² 120,000,000.0 5
3 Rumah Genset 5 x 10 m² 75,000,000.0 5
4 Gudang 5 x 5 m² 37,500,000.0 5
5 Mess Karyawan 2 Rumah 6 x 24 m² 40,000,000.0 5
6 Intalasi Air bersih set 50,000,000.0 5
322,500,000.0
Jumlah 526,500,000.0
Sumber : Rencana Strategis Penambangan PT. NENEK BELANDE
Depresiasi
(Rp)
40,800,000.0
40,800,000.0
24,000,000.0
15,000,000.0
7,500,000.0
8,000,000.0
10,000,000.0
64,500,000.0
105,300,000.0
LAMPIRAN 2
DAFTAR PERALATAN KANTOR DAN K3
PADA PENAMBANGAN ANDESIT DI PT. NENEK BELANDE
Umur Depreasi
(Thn) (Rp)
3 666,666.7
3 3,333,333.3
3 1,666,666.7
3 1,000,000.0
3 4,166,666.7
3 3,333,333.3
3 6,666,666.7
20,833,333.3
1 12,500,000.0
1 2,500,000.0
1 22,500,000.0
1 22,500,000.0
1 9,000,000.0
1 1,000,000.0
70,000,000.0
90,833,333.3
LAMPIRAN 11.1
DAFTAR KEBUTUHAN PERALATAN UTAMA DAN PENDUKUNG PENAM
PADA PENAMBANGAN ASPAL PT. NENEK BELANDE
UMUR
URAIAN MODEL ALAT TAHUN 1
2018
PERALATAN UTAMA PENAMBANGAN
A. Peralatan di Lokasi Penambangan
Penanganan Lapisan Penutup & Lahan Pucuk
Dump Dozer (KOMATSU) D-85ss 10 1
Excavator (KOMATSU) PC 200 5 2
Overburden (DT HINO) PS 220 5 6
Penanganan Aspal
Excavator (Cat) CAT D320 5 1
Excavator + Rock Breaker CAT D320 5 2
B. Peralatan Pengangkutan Aspal
Hauling Truck (DT HINO) PS 130 10 12
PERALATAN PENDUKUNG PENAMBANGAN
Excavator (KOMATSU) PC200-88 5 1
Electricity Generator (GENSET) 50 Kva 5 2
Light Plants 5 1
Water Pump 5 1
PERALATAN TEKNIK DAN MANAJEMEN
Mine Manager Vehicle 4WD 5 1
Safety Vehicle 4WD 5 2
Operation BRV 5 1
Motor Operasional KLX 5 1
Computer (Laptop) Pentium i7 5 4
Computer (Komputer) Pentium i7 5 2
Mine Radio Icom 5 30
Sumber : Rencana Strategis Penambangan PT. NENEK BELANDE
AN 11.1
MA DAN PENDUKUNG PENAMBANGAN
SPAL PT. NENEK BELANDE
Unit
TAHUN
TAHUN 2 TAHUN 3 TAHUN 4 TAHUN 5 TAHUN 6 TAHUN 7
2019 2020 2021 2022 2023 2024
1 1 1 1 1 1
2 2 2 2 2 2
6 6 6 6 6 6
1 1 1 1 1 1
2 2 2 2 2 2
12 12 12 12 12 12
1 1 1 1 1 1
2 2 2 2 2 2
1 1 1 1 1 1
1 1 1 1 1 1
1 1 1 1 1 1
2 2 2 2 2 2
1 1 1 1 1 1
1 1 1 1 1 1
4 4 4 4 4 4
2 2 2 2 2 2
30 30 30 30 30 30
LAMPIRAN 11.2
DAFTAR PEMBELIAN ATAU SEWA PERALATAN UTAMA DAN PENDUKUNG
PADA PENAMBANGAN ASPAL PT. NENEK BELANDE
TAHU
UMUR
URAIAN MODEL TAHUN 0 TAHUN 1
ALAT
2017 2018
PERALATAN UTAMA PENAMBANGAN
A. Peralatan di Lokasi Penambangan
Penanganan Lapisan Penutup & Lahan Pucuk
Dump Dozer (KOMATSU) D-85SS 10 0 1
Excavator (KOMATSU) PC 300 5 0 1
Overburden (DT HINO) PS 220 10 0 2
Penanganan Aspal
Excavator (cat) CAT D320 5 0 2
Excavator + Rock Breaker CAT D320 10 0 2
B. Peralatan Pengangkutan Andesit
Hauling Truck (DT HINO) PS 130 10 0 12
PERALATAN PENDUKUNG PENAMBANGAN
Excavator (KOMATSU) PC200-88 5 0 1
Electricity Generator (GENSET) 50 Kva 5 0 2
Light Plants 5 0 0
Water Pump 5 0 0
PERALATAN TEKNIK DAN MANAJEMEN
Mine Manager Vehicle 4WD 5 1 1
Safety Vehicle 4WD 5 1 2
Operation BRV 5 0 1
Motor Operasional KLX 5 1 0
Computer (Laptop) Pentium i7 5 4 0
Computer (Komputer) Pentium i7 5 2 0
Mine Radio Icom 5 5 15
Sumber : Rencana Strategis Penambangan PT. NENEK BELANDE
N UTAMA DAN PENDUKUNG
NENEK BELANDE
dalam Unit
TAHUN
TAHUN 2 TAHUN 3 TAHUN 4 TAHUN 5 TAHUN 6
2019 2020 2021 2022 2023
1 1 1 1 1
1 1 1 1 1
2 2 2 2 2
2 2 2 2 2
2 2 2 2 2
12 12 12 12 12
1 1 1 1 1
2 2 2 2 2
0 0 0 0 0
0 0 0 0 0
1 1 1 1 1
2 2 2 2 2
1 1 1 1 1
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
DAFTAR PENGGUNAAN ANGG
PADA PENAM
Penanganan Aspal
Excavator (cat) CAT D320 10 400,000.00
Excavator + Rock Breaker CAT D320 10 450,000.00
B. Peralatan Pengangkutan Aspal
Hauling Truck (DT HINO) DT 320 10 12,500,000.00
PERALATAN PENDUKUNG PENAMBANGAN
Excavator (KOMATSU) PC200-88 5 400,000.00
Electricity Generator (GENSET) 50 Kva 5 55,000,000.00
Light Plants 5 35,000,000.00
Water Pump 5 10,500,000.00
PERALATAN TEKNIK DAN MANAJEMEN
Mine Manager Vehicle 4WD 5 15,000,000.00
Safety Vehicle 4WD 5 12,500,000.00
Operation BRV 5 12,500,000.00
Motor Operasional KLX 5 35,000,000.00
Computer (Laptop) Pentium i7 5 12,500,000.00
Computer (Komputer) Pentium i7 5 8,500,000.00
Mine Radio Icom 5 1,375,000.00
Sumber : Rencana Strategis Penambangan PT. NENEK BELANDE
LAMPIRAN 11.3
DAFTAR PENGGUNAAN ANGGARAN UNTUK PERALATAN UTAMA DAN PENDUKUNG
PADA PENAMBANGAN ASPAL PT. NENEK BELANDE
TAHUN
EWH TAHUN 0 TAHUN 1 TAHUN 2 TAHUN 3
2017 2018 2019 2020
9,870,000,000.00
DAFTAR PENGGUNA
PADA PENAM
Penanganan Aspal
Excavator (cat) CAT D320 20 200
Excavator + Rock Breaker CAT D320 20 200
B. Peralatan Pengangkutan Andesit
Hauling Truck (DT HINO) DT 320 17 200
PERALATAN PENDUKUNG PENAMBANGAN
Excavator (KOMATSU) PC200-88 20 200
Electricity Generator (GENSET) 50 Kva 15 182
Light Plants - -
Water Pump 5 91
PERALATAN TEKNIK DAN MANAJEMEN
Mine Manager Vehicle 4WD 150,000.00 30
Safety Vehicle 4WD 150,000.00 30
Operation BRV 150,000.00 30
Motor Operasional KLX 50,000.00 30
Computer (Laptop) Pentium i7 5 -
Computer (Komputer) Pentium i7 5 -
Mine Radio Icom 5 -
Sumber : Rencana Strategis Penambangan PT. NENEK BELANDE
17.44
157.5
4.2
5.81
LAMPIRAN 11.5
DAFTAR PENGGUNAAN FUEL UNTUK PERALATAN UTAMA DAN PENDUKUNG
PADA PENAMBANGAN ANDESIT PT. RAJABASA BATU SENTOSA
TAHUN
HARGA FUEL
(Rp/Liter) TAHUN 0 TAHUN 1 TAHUN 2
2017 2018 2019
6,000.00
523.26 4,000.00
523.26 2,000.00
523.26
174.42
4,000.00
4,000.00
1,744.19
3,400.00
4,000.00
#REF!
2,730.00
#REF!
455.00
360.00
360.00
360.00
360.00
#REF! #NAME?
NG
(Dalam IDR)
TAHUN
TAHUN 3 TAHUN 4 TAHUN 5 TAHUN 6
2020 2021 2022 2023
A. Daftar Infrastruktur
a. Fasilitas Tambang 1 paket 204,000,000.00
b. Bangunan 1 paket 322,500,000.00
B. Peralatan Kantor dan K3
a. Peralatan Kantor 1 paket 62,500,000.00
b. Peralatan K3 1 paket 70,000,000.00
C. Investasi Peralatan
a. Peralatan Utama Penambangan
b. Peralatan Pengangkutan
c. Peralatan Pendukung Penambangan
e. Peralatan Teknik dan Manajemen
D. Persiapan Pre Mining
a. Pembebasan Lahan 10 ha 80,000.00
TOTAL INVESTASI
Modal Kerja
TAHUN
TAHUN 0 TAHUN 1 TAHUN 2 TAHUN 3 TAHUN 4
2017 2018 2019 2020 2021
204,000,000.00 - - - -
322,500,000.00 - - - -
62,500,000.00 - - - -
70,000,000.00 - - - -
8,000,000,000.00 - - - -
8,795,375,000.00 8,280,000,000.00 8,280,000,000.00 8,280,000,000.00 8,280,000,000.00
-
8,795,375,000.00 8,280,000,000.00 8,280,000,000.00 8,280,000,000.00 8,280,000,000.00
9,740,625,000.00
(Dalam Rp)
TAHUN 5 TAHUN 6
2022 2023
- -
- -
- -
- -
6,480,000,000.00 6,480,000,000.00
1,800,000,000.00 1,800,000,000.00
960,000,000.00 960,000,000.00
630,000,000.00 630,000,000.00
- -
8,280,000,000.00 8,280,000,000.00
TOTAL BUDGET SALARY
No Posisi / Jabatan
Personel (Rp) (Rp)
OPERASIONAL PROYEK
1 Project Manager (Kepala Teknik Tambang) 1 26,250,000 26,250,000
2 Kepala Bagian Produksi 1 1,021,000 21,000
> Spv. Tambang - Quary 1 9,450,000 9,450,000
> Spv. Produksi/Processing 1 9,450,000 9,450,000
> Spv. Loading 2 18,900,000 9,450,000
> Foreman 2 13,650,000 6,825,000
> Shippment Administrasi 1 5,250,000 5,250,000
> Field Administrasi 1 5,250,000 5,250,000
> Field Keuangan 1 4,725,000 4,725,000
> Field Adm & Logistik 1 4,725,000 4,725,000
> CSR/Comdev 1 3,150,000 3,150,000
13 101,821,000
MANAGEMEN OFFICE
1 Direktur Utama 1 - -
2 Direktur Keuangan 1 - -
3 Direktur Operasi 1 - -
4 Manager Administrasi & Keuangan 1 28,875,000 28,875,000
5 Manager Teknik 1 28,875,000 28,875,000
5 57,750,000.00
NOTE:
uang makan
> Operator Hydraulic Breake Excavator 2 3,900,000.00 per hari
> Operator Excavator PC 300 2 3,900,000.00 per hari
> Operator Excavator SK 330 2 3,900,000.00 per hari
> Operator Excavator PC 200 2 3,900,000.00 per hari
> Operator Wheel Loader 2 3,900,000.00 per hari
> Operator Bull Dozer 2 3,900,000.00 per hari
> Operator Crashing Plant 2 3,900,000.00 per hari
> Crews Crushing Plant 6 3,900,000.00 per hari
> Sopir Dump Truck Overburden 6 3,900,000.00 per hari
> Sopir Dump Truck Produk Quary 12 3,900,000.00 per hari
GAJI POKOK JAMSOSTEK
(Rp) (Rp)
25,000,000 5% 1,250,000
20,000,000 5% 1,000,000
9,000,000 5% 450,000
9,000,000 5% 450,000
9,000,000 5% 450,000
6,500,000 5% 325,000
5,000,000 5% 250,000
5,000,000 5% 250,000
4,500,000 5% 225,000
4,500,000 5% 225,000
3,000,000 5% 150,000
- 5% -
- 5% -
- 5% -
27,500,000 5% 1,375,000
27,500,000 5% 1,375,000
Gaji bulanan
2,200,000.00
2,200,000.00
2,200,000.00
2,200,000.00
2,200,000.00
2,200,000.00
2,200,000.00
2,200,000.00
2,200,000.00
2,200,000.00
LAMPIRAN 11.6
DAFTAR KEBUTUHAN OPERATOR, CHECKER DAN FORMEN
PADA PENAMBANGAN ANDESIT PT. RAJABASA BATU SENTOSA
TAH
URAIAN MODEL TAHUN 0 TAHUN 1
2017 2018
PERALATAN UTAMA PENAMBANGAN
A. Peralatan di Lokasi Penambangan
Penanganan Lapisan Penutup & Lahan Pucuk
Dump Dozer (KOMATSU) D-85SS 1 2
Excavator (KOMATSU) PC 200 1 2
Overburden (DT HINO) PS 220 3 6
Checker 1 2
Foreman 1 2
Penanganan Andesit
Excavator (HYUNDAI) CAT D320 0 4
Excavator + Rock Breaker CAT D320 0 2
Checker 0 2
Foreman 0 2
2 2 2 2 2
2 2 2 2 2
6 6 6 6 6
2 2 2 2 2
2 2 2 2 2
4 4 4 4 4
2 2 2 2 2
2 2 2 2 2
2 2 2 2 2
12 12 12 12 12
2 2 2 2 2
2 2 2 2 2
2 2 2 2 2
2 2 2 2 2
1 1 1 1 1
1 1 1 1 1
46 46 46 46 46
DAFTAR UPAH OPE
PADA PENAMBAN
TINGKAT UPAH
URAIAN MODEL BULAN
(IDR)
PERALATAN UTAMA PENAMBANGAN
A. Operator Peralatan di Lokasi Penambangan
Penanganan Lapisan Penutup & Top Soil
Operator Dump Dozer (KOMATSU) D-85 4,910,000.00
Operator Excavator (KOMATSU) PC 300 4,910,000.00
Operator Penanganan Overburden (DT HINO) FM 260 Ti 4,910,000.00
Checker 2,500,000.00
Foreman 3,000,000.00
Penanganan Andesit
Excavator (HYUNDAI) CAT D320 4,910,000.00
Excavator + Rock Breaker CAT D320 4,910,000.00
Checker 2,500,000.00
Foreman 3,000,000.00
TOTAL SALARY
Posisi / Jabatan
(Rp)
> Operator Hydraulic Breake Excavator 4,910,000
> Operator Excavator PC 300 4,910,000
> Operator Excavator SK 330 4,910,000
> Operator Excavator PC 200 4,910,000
> Operator Wheel Loader 4,910,000
> Operator Bull Dozer 4,910,000
> Operator Crashing Plant 4,910,000
> Crews Crushing Plant 4,910,000
> Sopir Dump Truck Overburden 4,910,000
> Sopir Dump Truck Produk Quary 4,910,000
NOTE:
uang makan
> Operator Hydraulic Breake Excavator 2,600,000.00
> Operator Excavator PC 300 2,600,000.00
> Operator Excavator SK 330 2,600,000.00
> Operator Excavator PC 200 2,600,000.00
> Operator Wheel Loader 2,600,000.00
> Operator Bull Dozer 2,600,000.00
> Operator Crashing Plant 2,600,000.00
> Crews Crushing Plant 2,600,000.00
> Sopir Dump Truck Overburden 2,600,000.00
> Sopir Dump Truck Produk Quary 2,600,000.00
LAMPIRAN 11.7
DAFTAR UPAH OPERATOR ALAT BERAT, CHECKER DAN FOREMAN
PADA PENAMBANGAN ANDESIT PT. RAJABASA BATU SENTOSA
Gaji bulanan
per hari 2,200,000.00
per hari 2,200,000.00
per hari 2,200,000.00
per hari 2,200,000.00
per hari 2,200,000.00
per hari 2,200,000.00
per hari 2,200,000.00
per hari 2,200,000.00
per hari 2,200,000.00
per hari 2,200,000.00
(Dalam Rp)
AHUN
TAHUN 4 TAHUN 5 TAHUN 6
2021 2022 2023
TAHUN 0 TAHUN 1
Produksi Overburden (BCM)
- 840,000.00
TAHUN
TAHUN 2 TAHUN 3 TAHUN 4 TAHUN 5
2019 2020 2021 2022
TAHUN 3
840,000.00 840,000.00 840,000.00 840,000.00
TAHUN 6
2023
1,080,000,000.00
840,000,000.00
480,000,000.00
2,400,000,000.00
612,000,000.00
408,000,000.00
408,000,000.00 Land Clearing 14,730,000.00 1,473,000.00
1,428,000,000.00 Ob Removal 58,920,000.00 5,892,000.00
117,840,000.00
117,840,000.00
353,520,000.00
589,200,000.00
4,417,200,000.00
5,258.57
TAHUN 5
840,000.00
LAMPIRAN 12.2
PERHITUNGAN BIAYA PENGGALIA
PADA PENAMBANGAN ANDESIT PT. RAJABASA
TAHUN 0 TAHUN 1
Produksi Andesit (Ton)
- 420,000
Catatan :
Jetty + Crushing +Slot 45500
LAMPIRAN 12.2
ERHITUNGAN BIAYA PENGGALIAN
NGAN ANDESIT PT. RAJABASA BATU SENTOSA
(Dalam Rp)
TAHUN
TAHUN 2 TAHUN 3 TAHUN 4 TAHUN 5 TAHUN 6
2019 2020 2021 2022 2023
Rp 4.69072164948454
TA
Uraian TAHUN 0 TAHUN 1
2017 2018
A. Biaya Sewa dan Kepemilikan Peralatan
(Asuransi, Bunga dan Pajak)
Hauling Truck - 1,800,000,000.00
Subtotal - A - 1,800,000,000.00
B. Biaya Operasional
(BBM, Suku Cadang, dan Perawatan)
Hauling Truck - 4,161,600,000.00
Subtotal - B - 4,161,600,000.00
C. Upah Operator
Operator Hauling Truck - 707,040,000.00
Subtotal - C - 707,040,000.00
Total A-B-C - 6,668,640,000.00
Biaya Penganangkutan Andesit (Ton) - 15,877.71
TAHUN 0 TAHUN 1
Produksi Andesit (Ton)
- 420,000
TAHUN
Uraian TAHUN 0 TAHUN 1 TAHUN 2 TAHUN 3 TAHUN 4
2017 2018 2019 2020 2021
A. Biaya Kepemilikan Peralatan
(Asuransi, Bunga dan Pajak)
Excavator (KOMATSU) - 960,000,000.00 960,000,000.00 960,000,000.00 960,000,000.00
Wheel Loader Err:509 Err:509 Err:509 Err:509 Err:509
Electricity Generator (GENSET) - - - - -
Electricity Generator (GENSET) Workshop Err:509 Err:509 Err:509 Err:509 Err:509
Light Plants - - - - -
Water Pump - - - - -
Subtotal - A Err:509 Err:509 Err:509 Err:509 Err:509
B. Biaya Operasional
(BBM, Suku Cadang, dan Perawatan)
Excavator (KOMATSU) - 408,000,000.00 408,000,000.00 408,000,000.00 408,000,000.00
Wheel Loader Err:509 Err:509 Err:509 Err:509 Err:509
Electricity Generator (GENSET) - 556,920,000.00 556,920,000.00 556,920,000.00 556,920,000.00
Electricity Generator (GENSET) Workshop Err:509 Err:509 Err:509 Err:509 Err:509
Light Plants - - - - -
Water Pump 11,602,500.00 46,410,000.00 51,051,000.00 56,156,100.00 61,771,710.00
Subtotal - A Err:509 Err:509 Err:509 Err:509 Err:509
C. Upah Operator
Operator Excavator (KOMATSU) 14,730,000.00 117,840,000.00 117,840,000.00 117,840,000.00 117,840,000.00
Operator Wheel Loader - 117,840,000.00 117,840,000.00 117,840,000.00 117,840,000.00
Operator Electricity Generator (GENSET) 7,500,000.00 60,000,000.00 60,000,000.00 60,000,000.00 60,000,000.00
Operator Electricity Generator (GENSET) Workshop 7,500,000.00 60,000,000.00 60,000,000.00 60,000,000.00 60,000,000.00
Operator Light Plants 7,500,000.00 30,000,000.00 30,000,000.00 30,000,000.00 30,000,000.00
Operator Water Pump 7,500,000.00 30,000,000.00 30,000,000.00 30,000,000.00 30,000,000.00
Subtotal - C 44,730,000.00 415,680,000.00 415,680,000.00 415,680,000.00 415,680,000.00
Total A-B-C Err:509 Err:509 Err:509 Err:509 Err:509
Produksi Andesit (Ton) - Err:509 Err:509 Err:509 Err:509
960,000,000.00 960,000,000.00
Err:509 Err:509
- -
Err:509 Err:509
- -
- -
Err:509 Err:509
408,000,000.00 408,000,000.00
Err:509 Err:509
556,920,000.00 556,920,000.00
Err:509 Err:509
- -
67,948,881.00 74,743,769.10
Err:509 Err:509
117,840,000.00 117,840,000.00
117,840,000.00 117,840,000.00
60,000,000.00 60,000,000.00
60,000,000.00 60,000,000.00
30,000,000.00 30,000,000.00
30,000,000.00 30,000,000.00
415,680,000.00 415,680,000.00
Err:509 Err:509
Err:509 Err:509
TAHUN 5 TAHUN 6
420,000 420,000
LAMPIRAN
DAFTAR DEPRESIASI DAN A
PADA PENAMBANGAN ANDESIT PT.
Umur
Uraian Biaya (Rp) TAHUN 0
(Tahun)
2017
DEPRESIASI
A. Asset Infrastruktur
a. Fasilitas Tambang 5 204,000,000.00 40,800,000.00
b. Jetty Port 10 #NAME? #NAME?
c. Jembatan Timbang 5 #NAME? #NAME?
d. Bangunan 5 322,500,000.00 64,500,000.00
B. Office Equipment
a. Peralatan Kantor 3 Err:509 Err:509
b. Peralatan Kantor Lapangan 3 62,500,000.00 20,833,333.33
c. Peralatan K3 2 70,000,000.00 35,000,000.00
C. Pre Mining
a. Pembebasan Lahan 10 #REF! #REF!
b. Support Team/ Konsultan 0 #REF! -
c. Takeover IUP PT. Sazam 10 #REF! #REF!
d. Biaya Awal Tambang 5 #REF! #REF!
D. Asset Peralatan Utama Penambangan
Peralatan di Lokasi Penambangan
Penanganan Lapisan Penutup & Top Soil
Dump Dozer (KOMATSU) 10 450,000.00 45,000.00
Excavator (KOMATSU) 10 350,000.00 70,000.00
Penanganan Overburden (DT HINO) 3 20,000,000.00 40,000,000.00
Penanganan Andesit
Excavator (HYUNDAI) 10 400,000.00 40,000.00
Excavator + Rockbreaker 10 450,000.00 90,000.00
Peralatan Pengangkutan Batubara
Hauling Truck (DT HINO) 3 12,500,000.00 50,000,000.00
E. Asset Peralatan Pendukung Penambangan
Excavator (KOMATSU) 5 400,000.00 80,000.00
Wheel Loader 5 Err:509 Err:509
Electricity Generator (GENSET) 5 55,000,000.00 22,000,000.00
Electricity Generator (GENSET) Workshop 5 Err:509 Err:509
Light Plants 5 35,000,000.00 7,000,000.00
Water Pump 5 10,500,000.00 2,100,000.00
F. Asset Peralatan Teknik dan Manajemen
Mine Manager Vehicle 5 15,000,000.00 3,000,000.00
Safety Vehicle 5 12,500,000.00 5,000,000.00
Operation 5 12,500,000.00 2,500,000.00
Motor Operasional 5 35,000,000.00 7,000,000.00
Computer (Laptop) 5 12,500,000.00 10,000,000.00
Computer 5 8,500,000.00 3,400,000.00
TOTAL DEPRESIASI Err:509
AMORTISASI
a. Biaya Pengurusan Ijin Prinsip 5 2,000,000,000.00 400,000,000.00
b. Biaya Penyelidikan Umum dan Eksplorasi 5 #REF! #REF!
c. Biaya Pengeboran Geoteknik dan Uji Laboratorium 5 150,000,000.00 30,000,000.00
d. Biaya Pengujian Kulitas Batu Andesit (PT Geoservic 5 15,000,000.00 3,000,000.00
TOTAL AMORTISASI #REF! #REF!
TOTAL DEPRESIASI & AMORTISASI #REF! Err:509
TAHUN
TAHUN 1 TAHUN 2 TAHUN 3 TAHUN 4 TAHUN 5
2018 2019 2020 2021 2022
TAHUN 6
2023
40,800,000.00
#NAME?
#NAME?
64,500,000.00
Err:509
20,833,333.33
35,000,000.00
#REF!
-
#REF!
#REF!
45,000.00
70,000.00
40,000,000.00
40,000.00
90,000.00
50,000,000.00
80,000.00
Err:509
22,000,000.00
Err:509
7,000,000.00
2,100,000.00
3,000,000.00
5,000,000.00
2,500,000.00
7,000,000.00
10,000,000.00
3,400,000.00
Err:509
400,000,000.00
#REF!
30,000,000.00
3,000,000.00
#REF!
Err:509
PERHITUNGAN NILAI SISA PERALATAN
HARGA PERALATAN
URAIAN MODEL TAHUN 0
(Rp)
2017
PERALATAN UTAMA PENAMBANGAN
A. Peralatan di Lokasi Penambangan
Penanganan Tanah Pucuk dan Penutup
Ripping & Dozing (KOMATSU) D-85 450,000.00 0.00
Excavator (KOMATSU) PC 300 350,000.00 0.00
Overburden (DT HINO) FM 320 20,000,000.00 0.00
Penanganan Andesit
Escavator (Hyundai) SK330-8 400,000.00 0.00
Excavator (CAT) + Rockbreaker CAT D320 450,000.00 0.00
B. Peralatan Pengangkutan Andesit
Hauling Truck (DT HINO) DT 320 12,500,000.00 0.00
PERALATAN PENDUKUNG PENAMBANGAN
Excavator (KOMATSU) PC200-88 400,000.00 0.00
Wheel Loader Err:509 Err:509 0.00
Electricity Generator (GENSET) 50 Kva 55,000,000.00 0.00
Electricity Generator (GENSET) Workshop Err:509 Err:509 0.00
Light Plants 35,000,000.00 0.00
Water Pump 10,500,000.00 0.00
PERALATAN TEKNIK DAN MANAJEMEN
Mine Manager Vehicle 4WD 15,000,000.00 0.00
Safety Vehicle 4WD 12,500,000.00 0.00
Operation BRV 12,500,000.00 0.00
Motor Operasional Pentium i7 35,000,000.00 0.00
Computer (Laptop) Panasonic 12,500,000.00 0.00
Computer (Komputer) Motorola 8,500,000.00 0.00
Mine Radio KLX 1,375,000.00 0.00
TAHUN
Uraian TAHUN 0 TAHUN 1 TAHUN 2
2017 2018 2019
A. Biaya Operasi Penambangan Langsung
Biaya Penggalian Andesit - 6,065,520,000.00 6,065,520,000.00
Biaya Pengangkutan Andesit - 6,668,640,000.00 6,668,640,000.00
Biaya Operasional Peralatan Pendukung Err:509 Err:509 Err:509
Biaya Pengupasan Overburden (BCM) 73,650,000.00 4,009,200,000.00 4,417,200,000.00
Subtotal - A Err:509 Err:509 Err:509
B. Biaya Operasi Penambangan Tidak Langsung
Biaya Lingkungan dan Reklamasi - 126,000,000.00 126,000,000.00
Biaya Keselamatan dan Kesehatan Kerja (K-3) - 84,000,000.00 84,000,000.00
Biaya Community Development - 126,000,000.00 126,000,000.00
Biaya Pasca Tambang - 84,000,000.00 84,000,000.00
Subtotal - B - 420,000,000.00 420,000,000.00
Total A-B Err:509 Err:509 Err:509
Produksi Andesit (Ton) - 420,000.00 420,000.00
Biaya Operasi Penambangan Andesit (Rp/Ton) - Err:509 Err:509
Produksi Overburden (BCM) 0 840,000 840,000
Biaya Pengupasan Tanah Penutup (Rp/BCM) - 4,772.86 5,258.57
FOB MV
PRICE 35.00
SR Ekonomis(Balance)
= - (.....% x Balance)
Biaya Pengupasan OB
LAMPIRAN 14.1
BIAYA OPERASI PENAMBANGAN ANDESIT
T. RAJABASA BATU SENTOSA
(Dalam Rp)
TAHUN
TAHUN 3 TAHUN 4 TAHUN 5 TAHUN 6
2020 2021 2022 2023
Uraian TAHUN 0
2017
A. PENDAPATAN (REVENUE)
Penjualan Andesit -
B. BIAYA OPERASI PENAMBANGAN ASPAL
Biaya Operasi Penambangan Langsung Err:509
Biaya Operasi Penambangan Tidak Langsung -
Total Biaya Operasi Penambangan Batubara Err:509
PENDAPATAN KOTOR PRODUKSI Err:509
C. DEPRESIASI DAN AMORTISASI Err:509
D. BIAYA UMUM & ADMINISTRASI
Administrasi Kantor Pusat 150,000,000.00
Administrasi Kantor Tambang 50,000,000.00
Gaji Karyawan Tetap 159,571,000.00
Iuran Tetap (PNPB 3.7%) -
Total Biaya Umum Dan Administrasi 359,571,000.00
E. PENDAPATAN SEBELUM BUNGA DAN PAJAK (EBIT) Err:509
F. PENDAPATAN LAIN DARI NILAI SISA PERALATAN -
PENDAPATAN SEBELUM PAJAK (EBIT) Err:509
G. PAJAK PENGHASILAN PERUSAHAAN (PPH 30%) Err:509
PENDAPATAN BERSIH Err:509
TAHUN 0
Produksi Andesit (Ton)
-
Sumber : Rencana Kerja Strategis PT. Yuman Jaya Tama, 2018-2022
Iuran Tetap
Administrasi di Kator Pusat
Administrasi di Lapangan
LAMPIRAN 14.2
LAPORAN RUGI LABA
PADA PENAMBANGAN ANDESIT PT. RAJABASA BATU SENTOSA
TAHUN
TAHUN 1 TAHUN 2 TAHUN 3 TAHUN 4
2018 2019 2020 2021
4,200,000,000.00
115,000.00
0.20
0.55
120,000.00
26.47
3,500,000,000.00
5,500,000,000.00
(Dalam Rp)
TAHUN 5 TAHUN 6
2022 2023
50,400,000,000.00 50,400,000,000.00
Err:509 Err:509
420,000,000.00 420,000,000.00
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
191,442,234.38 201,014,346.09
63,814,078.13 67,004,782.03
203,657,525.21 213,840,401.47
1,890,000,000.00 1,890,000,000.00
2,348,913,837.71 2,371,859,529.60
Err:509 Err:509
- Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
TAHUN 5 TAHUN 6
420,000 420,000
Err:509 Err:509
Err:509
2,520,000,000.00 -10% 45,360,000,000.00
-5% 47,880,000,000.00
-2.50% 49,140,000,000.00
Aspal Biaya Produksi per MT 0 50,400,000,000.00
#REF! #REF! 2.50% 51,660,000,000.00
#REF! 5% 52,920,000,000.00
7.50% 54,180,000,000.00
10% 55,440,000,000.00
OB Biaya OB per BCM
#REF! #REF!
#REF!
HARGA PRODU
#REF!
#REF! BIAYA OPERA
-10% Err:509
-7.50% Err:509
0 Err:509
2.50% Err:509 Err:509 Err:509
5% Err:509 Err:509 Err:509
7.50%
REVENUE PENDAPATAN KOTOR PRODUKSI
45,360,000,000.00 45,360,000,000.00 45,360,000,000.00 #REF! #REF!
47,880,000,000.00 47,880,000,000.00 47,880,000,000.00 #REF! #REF!
49,140,000,000.00 49,140,000,000.00 49,140,000,000.00 #REF! #REF!
50,400,000,000.00 50,400,000,000.00 50,400,000,000.00 Err:509 Err:509
51,660,000,000.00 51,660,000,000.00 51,660,000,000.00 #REF! #REF!
52,920,000,000.00 52,920,000,000.00 52,920,000,000.00 #REF! #REF!
54,180,000,000.00 54,180,000,000.00 54,180,000,000.00 #REF! #REF!
55,440,000,000.00 55,440,000,000.00 55,440,000,000.00 #REF! #REF!