PETA LAPORAN HASIL KEGIATAN MAPPING DAN PENGAMBILAN SAMPLE BATUBARA

PADA LOKASI IUP PRODUKSI PT. ANUGERAH RIZKIE GUNUNG DI DESA PELAWAN
KECAMATAN SANGKULIRANG KABUPATEN KUTAI TIMUR PROVINSI KALIMANTAN TIMUR

BANJARBARU
2018
JETTY PT GAM
SEAM B (TEBAL RATA-RATA 7 M)
JARAK DI IUP PRODUKSI ±7 KM
JARAK DI HUTAN PRODUKSI ±1,1 KM
JARAK DI DALAM SAWIT ±2 KM

SEAM I, J1 & J2
JARAK DI IUP PRODUKSI ±4 KM
JARAK DI HUTAN PRODUKSI ±1,2 KM

HUTAN PRODUKSI

CROPLINE SEAM J1&J2

CROPLINE SEAM I

CROPLINE SEAM B

JARAK
PIT SEAM B KE JETTY ± 2,5 KM
PIT SEAM I DAN J ±4 KM
SU05
SEAM J2

SU06
SEAM J2

SU04
SEAM I DAN J

SU01, SU02 DAN SU03 SEAM B


- DARI HASIL INTERPRETASI ANTARA DATA BOR LAMA DAN SINGKAPAN-SINGKAPAN TERDAPAT 11 SEAM BATUBARA PADA AREA PT. ARG
YAITU SEAM A – SEAM K, TETAPI YANG REASONABLE UNTUK DI EKSPLOITASI ADALAH :
• SEAM B DENGAN KETEBALN RATA – RATA 7 METER
• SEAM F DENGAN KETEBALAN RATA – RATA 1 METER
• SEAM G DENGAN KETEBALAN RATA – RATA 2,5 METER
• SEAM I DENGAN KETEBALAN RATA – RATA 2,5 METER
• SEAM J1 DAN J2 DENGAN KETEBALAN RATA – RATA 1,5 DAN 0,9 METER
• SEAM K DENGAN KETEBALAN RATA – RATA 2 METER
- JARAK DARI PIT SEAM B KE JETTY ± 2,5 KM DAN PIT SEAM I DAN J ±4 KM
- JARAK DARI JETTY KE LAUTAN LEPAS ±48 KM
- UNTUK AMPLE BATUBARA DILAKUKAN DENGAN CARA PENEGAMBILAN MULAI DARI ROOF BATUBARA SAMPAI FLOOR YAITU
• SU01, SU02, DAN SU03 UNTUK MEWAKILI SAMPLE SEAM B
• SU04A UNTUK MEWAKILI SAMPLE SEAM I
• SU04B UNTUK MEWAKILI SAMPLE SEAM J1 DAN SU06 UNTUK SAMPLE SEAM J2
• UNTUK SU05 TIDAK DAPAT DIAMBIL SAMPLE KARENA AIR SUNGAI MASUK KE DALAM SUMUR UJI.
- PADA LOKASI PT. ARG MEMILIKI PERMUKAAN BERBUKIT SEDANG DAN TINGGI, DISARANKAN UNTUK PENGHITUNGAN SUMBER DAYA
PERLU DILAKUKAN TOPOGRAPHY AGAR PERHITUNGAN STRIPPING RATIO MENDEKATI KEADAAN SEBENARNYA
- PERLU DILAKUKAN PENAMBAHAN BOR UNTUK BAGIAN BARAT YANG TERKENA HUTAN PRODUKSI DAN SEBELAH TIMUR DALAM IUP
PRODUKSI.