PADA LOKASI IUP PRODUKSI PT. ANUGERAH RIZKIE GUNUNG DI DESA PELAWAN
KECAMATAN SANGKULIRANG KABUPATEN KUTAI TIMUR PROVINSI KALIMANTAN TIMUR
BANJARBARU
2018
RENCANA
JETTY ARG
JETTY PT GAM
HUTAN PRODUKSI
SU-05
SU-06
CROPLINE SEAM 1
KEBUN SAWIT
KEBUN SAWIT
JARAK
PIT SEAM 1 KE JETTY ± 2,5 KM
PIT SEAM A DAN B ±4 KM
KEBUN SAWIT
- SU05 (COAL SEAM B1)
- KETEBALAN ± 1.5 METER
PARAMETER ARB ADB
TM (%) 52.81 -
IM (%) - 17.79
ASH (%) 4.67 8.14
VM (%) 22.69 39.53
FC (%) 19.83 34.54
TS (%) 2.07 3.60
GCV (KCAL/KG) 2771 4828
SU-06
SU-05
- SU04 (COAL SEAM A & SEAM B)
- KETEBALAN ± 3.8 METER (SEAM A) & ±2.8 METER (SEAM B)
COAL SEAM SEAM A SEAM B
- SU06 SEAM B2 PARAMETER ARB ADB ARB ADB
- KETEBALAN ±0.9 METER TM (%) 53.92 - 51.75 -
IM (%) - 15.34 - 16.59
ASH (%) 3.83 7.04 3.89 6.73
VM (%) 23.69 43.53 25.56 44.19
FC (%) 18.56 34.09 18.80 32.49
TS (%) 1.62 2.97 1.53 2.64
GCV (KCAL/KG) 2720 4997 3015 5212
- JARAK DARI PIT SEAM 1 KE JETTY ± 2,5 KM DAN PIT SEAM A DAN B ±4 KM
- JARAK DARI JETTY KE TELUK ±48 KM DAN KE LAUTAN LEPAS ±70 KM
- PADA LOKASI PT. ARG MEMILIKI PERMUKAAN BERBUKIT SEDANG DAN TINGGI, DISARANKAN UNTUK PENGHITUNGAN SUMBER DAYA PERLU DILAKUKAN TOPOGRAPHY AGAR
PERHITUNGAN STRIPPING RATIO MENDEKATI KEADAAN SEBENARNYA
- PERLU DILAKUKAN PENAMBAHAN BOR UNTUK BAGIAN BARAT YANG TERKENA HUTAN PRODUKSI DAN SEBELAH TIMUR DALAM IUP PRODUKSI.