Anda di halaman 1dari 1

Site ID-Site Name

Subcon Name PT TIS


Date Pre-CI
Name QE Review
MW CERAGON Near End - Far End Near End Far End

1. INSTALLATION CHECK -NEAR END - FEAR END Item Check Picture Reference ( Siteforge ) Picture Reference ( Actual Photos ) Picture Actual Picture Actual

1.1.B.Ethernet Gland cable available


1.1 Traffic kabel ke eNodeB atau ke existing Port Koneksi 1.1.B.Ethernet Gland cable
(Not Applicable for IDU Integrated) available

1.2.A.RJ45 diPoE dikrimping dgn bnr dan


1.2 Traffic cable & RF Cable di POE atau IDU tdk penyok 1.2.B.Ethernet Gland
(Not Applicable for IDU Integrated) cable available

1.3.A.kabel DC Power trpsg dgn bnr dan


1.3 DC Power Kabel pada POE atau IDU
tdk kendur

1.4.A.Kabel grounding trpsg dgn baik dan


1.4 IDU or POE grounding Cable kencang 1.4.B.Grounding
setiap prgkt terintegrasi k busbar

1.5.A.Grounding PoE trpsg dgn baik dan


1.5 IDU/POE Busbar grouding connection kencang 1.5.A.Grounding
PoE trpsg dgn baik dan kencang

1.6.A.Kabel power terinstall ke MCB BLVD


1.6 IDU or POE Power cable to MCB ( LLVD/BLVD)
ato LLVD2

1.7 IDU atau POE Instalasi sesuai BoM 1.7.A.Inst PoE IDU Module Kabel sesuai DP
dan bnr

2. OUTDOOR INSTALLATION CHECK - NEAR END - FAR END Item Check Picture Reference Picture Reference

2.1.A.Mounting antenna menggunakan


2.1 Mounting Antena MW Instalasi
double nut

NE_2.1

2.2 Stopper antenna MW 2.2.A.Ant stopper trpsg di diameter 0.3


sampai 0.9

NE_2.2

2.3.A.Ethernet SRU di krimping dengan


2.3 Ethernet Instalasi benar 2.3.B.Cable gland
ethernet terpasang

2.4 Grounding RFU 2.4.A.RFU Grounding trpsg dgn kencang


memakai scun

NE_2.4

Anda mungkin juga menyukai