Anda di halaman 1dari 66

Indoor Hardware

Quality Standard
Prepared By QC Department
www.huawei.com

HUAWEI TECHNOLOGIES CO., LTD.

Content
Rack & Cabinet
Power & Grounding Cables
Fibers
Signal Cables
Labels

Example Inspection Report

HUAWEI TECHNOLOGIES CO., LTD.

Page 2

Rack & Cabinet

HUAWEI TECHNOLOGIES CO., LTD.

Page 3

Cabinet Type

HUAWEI TECHNOLOGIES CO., LTD.

Page 4

Cabinet Type

HUAWEI TECHNOLOGIES CO., LTD.

Page 5

Rack & Cabinet


Indoor Environment

HUAWEI TECHNOLOGIES CO., LTD.

Page 6

Rack & Cabinet


Cabinet Fixation on Cement Floor

4. Insulating Plate

Baut Expansi harus terinstall


dengan baik

HUAWEI TECHNOLOGIES CO., LTD.

Page 7

Rack & Cabinet


Cabinet Fixation on Antistatic Floor

HUAWEI TECHNOLOGIES CO., LTD.

Page 8

Rack & Cabinet


Cabinet Fixation
Cabinet

yang berdampingan
harus
sejajar
dan
lurus
sehingga terlihat rapi.

Cabinet yang mempunyai tinggi

yang sama harus sejajar dan


lurus.
Tidak boleh ada goresan atau

kerusakan pada cabinet, jika


terdapat kerusakan pada cat
maka
harus
dilakukan
pengecatan ulang.
Kesalahan

Cabinet
3 mm.

pada ketinggian
harus kurang dari

Kesalahan

jarak antar rack


cabinet harus kurang dari 5 mm.

HUAWEI TECHNOLOGIES CO., LTD.

Page 9

Rack & Cabinet


Inlet/Outlet

All of the inlet/outlet cable holes of the cabinet should be blocked out.
Antistatic Wrist strap harus dalam keadaan terpasang di lubang instalasi antistatic pada rack.

HUAWEI TECHNOLOGIES CO., LTD.

Page 10

Power & Grounding Cables

HUAWEI TECHNOLOGIES CO., LTD.

Page 11

Power & Grounding Cables


Connection

Kabel Power dan Grounding harus terkoneksi dengan benar dan kuat.
Tidak boleh ada kawat tembaga yang terbuka pada koneksi kabel power dan Grounding.

HUAWEI TECHNOLOGIES CO., LTD.

Page 12

Power & Grounding Cables


Connection

Cabinet
Semua jenis perangkat
dengan keseluruhan atau
sebagian dari metal pada
rack
dan
chassis
harus dihubungkan ke
protection ground dengan
benar dan relative kuat.
Koneksi
Protection
Ground (PGND) dari 1
cabinet
ke
Busbar
Customer di-standardkan
1 (satu) tarikan kabel
seperti ditunjukkan pada
gambar disamping.

PGND BAR

HUAWEI TECHNOLOGIES CO., LTD.

Page 13

Power & Grounding Cables


Connection

Koneksi Grounding cabinet doors harus


terkoneksi dengan benar dan kuat.

HUAWEI TECHNOLOGIES CO., LTD.

Grounding protection pada AC dan DC power


supply harus dikoneksikan pada grounding
bar. GND dan PGND harus dikoneksikan
pada grounding body yang sama.

Page 14

Power & Grounding Cables


Routing & Distribution

Routing Kabel Power dan Ground


harus dilakukan dengan lurus
tanpa bending dan silang serta
diikat dengan kabel Ties

HUAWEI TECHNOLOGIES CO., LTD.

Bila jarak antara Cable Ladder dengan


bagian atas cabinet lebih dari 80 cm, harus
ditambahkan Cable Ladder dengan
menggunakan support yang kuat

Page 15

Power & Grounding Cables


Routing & Distribution

Contoh yang salah (signal cable


dan power cable di ikat
bersamaan)

Contoh yang benar (signal cable dan power cable


di beri jarak 3cm)

Note: Untuk instalasi indoor gunakan tie wrap warna putih. Potong ujung sisa sampai habis.

HUAWEI TECHNOLOGIES CO., LTD.

Page 16

Power & Grounding Cables


When making lugs for the power and ground cables,
the lugs should be soldered or crimped firmly.
1

No Copper Wire naked


(Good Example)

HUAWEI TECHNOLOGIES CO., LTD.

Page 17

Power & Grounding Cables


Dua alasan utama untuk Instalasi Grounding system pada site

(2 Main clause for install grounding system at Site)

1. Untuk mengurangi resiko cedera akibat petir


For decrease risk injury from thunderbolt
2. Untuk memproteksi peralatan pada OptiX yang
disebabkan karena tegangan tinggi dan arus yang
besar yang disebabkan oleh petir
For protect equipment of OptiX causes High voltage
and high current from thunderbolt

HUAWEI TECHNOLOGIES CO., LTD.

Page 18

Fibers

HUAWEI TECHNOLOGIES CO., LTD.

Page 19

Fibers
Common
Distribusi Fibers Kabel tidak cross/menghalangi board sehingga dapat menyulitkan pada saat expand
modul. Label di tempatkan sejajar/rapih

HUAWEI TECHNOLOGIES CO., LTD.

Page 20

Fibers
Common

Apabila terdapat coil box, fiber


cable dapat digulung dengan rapih
di coil box

HUAWEI TECHNOLOGIES CO., LTD.

Distribusi fiber kabel harus menggunakan protection tube apabila di


distribusikan ke luar kabinet
Pada ujung protection tube untuk fiber diberikan insulating tape untuk
mencegah gesekan yang tajam pada Fiber Cable.
Panjang protection tube yang masuk kedalam cabinet tidak lebih dari 10
cm dan diikat dengan kuat.

Page 21

Fibers
Common

The connection point of tail fiber must be clean without any dust.
The unused optical fiber head and board optical port must be
covered with protection caps (plugs).

HUAWEI TECHNOLOGIES CO., LTD.

Page 22

Signal Cables

HUAWEI TECHNOLOGIES CO., LTD.

Page 23

Signal Cables
Routing & Distribution

Routing Subscriber cables must be tidy


Jalur / rute kabel Signal / Kabel E1 harus rapi

HUAWEI TECHNOLOGIES CO., LTD.

Page 24

Signal Cables
Routing & Distribution
Distribution signal cable on DDF

Distribusi signal tidak rapih

Distribusi signal rapih, di


buat spare secukupnya,
hasil pemotongan ujung
kabel di isolasi/ditutup

Signal cable disusun sejajar (tidak saling


cross), dengan label yang jelas

HUAWEI TECHNOLOGIES CO., LTD.

Page 25

Labels

HUAWEI TECHNOLOGIES CO., LTD.

Page 26

Labels
Labels of Cabinet

LABELS RACK

HUAWEI TECHNOLOGIES CO., LTD.

LABELS SUB RACK

Page 27

Labels
Labels of Power Cables & Ground

Horizontal position
Power cable menggunakan label ties.
Diletakan 2 cm setelah konektor.
Di Print, bukan tulis tangan.

Vertical Position

General use Label Ties for Power Cables

HUAWEI TECHNOLOGIES CO., LTD.

Page 28

Labels
Labels of Power Cables & Ground

Explanation to the label example:


The contents of the label on the load cabinet side is A01/B08- 48V2 , indicating that this
power cable is the 48V2 that comes from 8th connecting terminal on the second row of
48V bus bar in the power distribution box, which is located in row A and line 01.
The contents of the label on the power distribution cabinet side is B03- 48V2 ,
indicating that this power cable is the 48V2 that comes from the load cabinet, which is
located in row B and line 03.

The label of power cables are filled in and pasted correctly and reliably.
(Stick cable label at cabinet, power supply and grounding bar: for easy
Identification )
HUAWEI TECHNOLOGIES CO., LTD.

Page 29

Labels
Labels of Power Cables & Ground

The label of power cables are filled in and pasted correctly and reliably.
(Stick cable label at cabinet, power supply and grounding bar: for easy
Identification )
HUAWEI TECHNOLOGIES CO., LTD.

Page 30

Labels
Labels of Signal Cables
General Labels for Signal Cables
Labels for Cable

Posisi Pemasangan Label

Pada label diatas A01-03-01-01 meng-indikasikan bahwa ujung pangkal dari kabel dikoneksikan
dengan Terminal 01 pada Slot 01, Subrack 03 dari kabinet pada Baris A dan Kolom 01.
Sedangkan pada MDF-G01-01-01 meng-indikasikan bahwa ujung sisi yang lain dari kabel
dikoneksikan dengan Terminal pada Baris 01, Kolom 01 dari MDF pada Baris G dan Kolom 01.

HUAWEI TECHNOLOGIES CO., LTD.

Page 31

Labels
Labels of Subscribers Cables

Label untuk Kabel Subcribers dipasang diujung kabel disisi Konektor Equipment MA5605 (Access)
dan diujung kabel disisi Main Distribution Frame (MDF).
Untuk Labels di MDF, cukup jelas.

HUAWEI TECHNOLOGIES CO., LTD.

Page 32

Labels
Labels of Subscribers Cables

MUST BE USE LABELS INFORMATION

HUAWEI TECHNOLOGIES CO., LTD.

Page 33

Labels
Labels of E1 Cables

LABELS NEAR DDF

HUAWEI TECHNOLOGIES CO., LTD.

Page 34

Labels
Labels of E1 Cables

MUST BE USE LABELS INFORMATION

HUAWEI TECHNOLOGIES CO., LTD.

Page 35

Labels
Labels of DDF

LABELS ON DDF

HUAWEI TECHNOLOGIES CO., LTD.

LABELS ON DDF

Page 36

Labels
Labels of Fibers
General Labels for Optical Fibers

Labels for Cable

Posisi Pemasangan Label

Pada label diatas A01-01-05-05-R meng-indikasikan bahwa ujung pangkal dari Optical Fiber
dikoneksikan dengan Interface Penerima (Receiving) Optical 05 pada Slot 05, Frame 01 dari Kabinet
pada Baris A, Kolom 01.
Sedangkan pada G01-01-01-01-T meng-indikasikan bahwa ujung sisi yang lain dari Optical Fiber di
koneksikan dengan Interface Pengirim (Transmitting) Optical 01 pada Slot 01, Frame 01 dari Kabinet
pada Baris G, Kolom 01.

HUAWEI TECHNOLOGIES CO., LTD.

Page 37

Labels
Labels of Fibers

The label of Fibers are filled in and pasted correctly and reliably.

HUAWEI TECHNOLOGIES CO., LTD.

Page 38

Labels
Labels of Fibers

The label of Fibers are filled in and pasted correctly and reliably.

HUAWEI TECHNOLOGIES CO., LTD.

Page 39

Labels
Labels on Alarm Box

The label of Fibers are filled in and pasted correctly and reliably.

HUAWEI TECHNOLOGIES CO., LTD.

Page 40

Examples Hardware
Quality Inspection Report

HUAWEI TECHNOLOGIES CO., LTD.

Page 41

Examples Hardware Quality Inspection Report


No.

Check Content
The labels of rack not yet attached.

Suggestion for Modification

Subcontractor

The labels of rack shall be placed neat and clean

Clause List

Labels

Sample

Location
Cabinet
Status
OPEN
QAM
7
1

Batch
2
Defect Quantity
2
Appraisal

Problem Analysis:
Installation Team still not yet attached

HUAWEI TECHNOLOGIES CO., LTD.

Page 42

Code

7.1.011

Score

0.2

Examples Hardware Quality Inspection Report


No.

Check Content

Suggestion for Modification

Subcontractor

Some materials and redundant cable ties still exist


inside cabinet and on the top of the subrack.

The sundries of redundant cable ties and screws and


other things must not exist inside, or at the bottom, or
on the top of the rack.

Clause List
Rack & Cabinet

Sample

Location
Inside Cabinet
Status
CLOSED
QAM
1
Batch

Sample

Defect Quantity
4
Appraisal

Problem Analysis:
Installation Team still not recheck after finish
installation

HUAWEI TECHNOLOGIES CO., LTD.

Page 43

Code

1.1.009

Score

0.5

Examples Hardware Quality Inspection Report


No.

Check Content

Suggestion for Modification

Subcontractor

Fibers and signal cables not have fixed printed


labels.

The labels of cable are filled in and stuck correctly


and reliably. They must be tidy position and same
direction. They must be stuck on a position 2cm away
from their connectors. They can be made in a uniform
way according to customer requirement.

Clause List
Labels
Location
Signal Cables

Status
OPEN
QAM

Good Sample

7
3

Batch

Good Sample

2
Defect Quantity
4
Appraisal
Good Sample

Problem Analysis:
Installation Team not yet attached

HUAWEI TECHNOLOGIES CO., LTD.

Page 44

Code

7.1.005

Score

0.5

Examples Hardware Quality Inspection Report


No.

Check Content

Suggestion for Modification

Subcontractor

DDF Rack not connected to the protection ground.

The shell of maintenance terminal must be connected


to the protection ground:
1. when the network interface between the
maintenance terminal and major equipment uses a
RJ45 connector, The electric isolation between them
is realized. Thus it does not need to have the same
ground with the major equipment.
2. when the network interface between the
maintenance terminal and major equipment does not
use a RJ45 connector. It needs to have the same
ground with the major equipment.

Dian Karya
Clause List
Power & Grounding Cables
Location
DDF
Status
OPEN
QAM
3

Batch
2
Defect Quantity
1
Appraisal

Problem Analysis:
Installation
installation

Team

not

recheck

HUAWEI TECHNOLOGIES CO., LTD.

after

finish

Page 45

Code

3.1.001

Score

0.5

Examples Hardware Quality Inspection Report


No.

Check Content

Suggestion for Modification

Subcontractor

The DDF and OTB rack not connected to


protection grounding.

All kinds of equipment with a complete or part of


metal shell of rack and chassis must be connected to
the protection ground in a correct and reliable way.

Procon
Clause List
Power & Grounding Cables
Location
On DDF
Status
OPEN
QAM
3
Batch

Good Sample

1
Defect Quantity
1
Appraisal

Problem Analysis:
Installation Team not rechecking after finished
installation

HUAWEI TECHNOLOGIES CO., LTD.

Page 46

Code

3.2.020

Score

Examples Hardware Quality Inspection Report


No.

Check Content

Suggestion for Modification

Subcontractor

Ground cable of cabinet door not reliable and have


no connected.

The ground cable of cabinet door must be connected


in a correct and reliable way.

Clause List
Power & Grounding Cable
Location
Inside Cabinet
Status
OPEN
QAM
3
Batch

2
Defect Quantity
3
Appraisal

Problem Analysis:
Installation Team forget to installed

HUAWEI TECHNOLOGIES CO., LTD.

Page 47

Code

3.2.030

Score

0.5

Examples Hardware Quality Inspection Report


No.

Check Content
Ground cable of cabinet door not reliable.

Suggestion for Modification

Subcontractor

The ground cable of cabinet door must be connected


in a correct and reliable way.

Procon
Clause List
Power & Grounding Cable
Location
Inside Cabinet
Status
OPEN
QAM
3
Batch

1
Defect Quantity
1
Appraisal

Problem Analysis:
Installation
installation

Team

not

recheck

HUAWEI TECHNOLOGIES CO., LTD.

after

finish

Page 48

Code

3.2.030

Score

0.5

Examples Hardware Quality Inspection Report


No.

Check Content

Suggestion for Modification

Subcontractor

Power cable and PGND cables still use temporary


labels or not have fixed labels.

The labels of power cable and ground cable are filled


in and stuck correctly and reliably. They must be in a
tidy position and the same direction. They must be
stuck on a position about 2cm away from their
connectors. They can be made in a uniform way
according to customer requirements, including the
label for power distribution switch.

Clause List
Labels
Location
Power Cables
Status
OPEN
QAM
7
Batch

6
2
Defect Quantity
4
Appraisal

Problem Analysis:
Installation Team still not yet attached

HUAWEI TECHNOLOGIES CO., LTD.

Page 49

Code

7.1.006

Score

0.3 x 3 times
(0.9)

Examples Hardware Quality Inspection Report


No.

Check Content
Many redundant parts of cable ties still not cut.

Suggestion for Modification

Subcontractor

Cables must be tied with uniform spacing and


appropriate tightness. Cable ties must be arranged in
a tidy way. Their redundant parts must be cut from
their bottom after they are tied so that any sharp
edges do not exist.

Clause List
Signal Cables
Location
Cable Ladder
Status
OPEN
QAM
4
Batch

2
Defect Quantity
4
Appraisal

Problem Analysis:
Installation Team not rechecking after finish
installation

HUAWEI TECHNOLOGIES CO., LTD.

Page 50

Code

4.1.014

Score

0.5

Examples Hardware Quality Inspection Report


No.

Check Content
Discarded marking still exist under the floor.

Suggestion for Modification

Subcontractor

The floor gaps around the rack should be blocked up.


Discarded cable ties, screws and other sundries
should not be found under the floor.

Clause List
Site Clean
Location
Under The Floor
Status
OPEN
QAM
19
Batch

2
Defect Quantity
4
Appraisal

Problem Analysis:
Installation Team not rechecking after finish
installation

HUAWEI TECHNOLOGIES CO., LTD.

Page 51

Code

19.1.004

Score

0.2

Examples Hardware Quality Inspection Report


No.

Check Content

Suggestion for Modification

Subcontractor

Discarded marking and packing materials still exist


under the floor.

The floor gaps around the rack should be blocked up.


Discarded cable ties, screws and other sundries
should not be found under the floor.

Clause List
Site Clean
Location
Under The Floor
Status
OPEN
QAM
19
Batch

10

2
Defect Quantity
4
Appraisal

Problem Analysis:
Installation Team not rechecking after finish
installation

HUAWEI TECHNOLOGIES CO., LTD.

Page 52

Code

19.1.004

Score

0.2

Examples Hardware Quality Inspection Report


No.

Check Content
Copper wire naked..

Suggestion for Modification

Subcontractor

No copper wire is naked in the plugs of power cable


and grounding cable. Cable plugs must be installed
according to specification.

Clause List
Power & Grounding Cables
Location
OSN 6800
Status
OPEN

QAM
3
Batch

2
Defect Quantity
1
Appraisal

Problem Analysis:
Installation Team not rechecking after finish
installation

HUAWEI TECHNOLOGIES CO., LTD.

Page 53

Code

3.2.026

Score

0.5

Examples Hardware Quality Inspection Report


No.

Check Content

Suggestion for Modification

Subcontractor

PGND cables and Power cables of battery have


bad arrangement (not tidy).

Power cable and grounding cable arrangement must


accord with engineering design document. Easy to
expansion or maintenance.

Clause List
Power & Grounding Cables
Location
Under Cabinet & Battery
Status
OPEN
QAM
3
Batch

12

4
Defect Quantity
4
Appraisal

Problem Analysis:
Installation Team forget to installed

HUAWEI TECHNOLOGIES CO., LTD.

Page 54

Code

3.2.025

Score

0.5

Examples Hardware Quality Inspection Report


No.

Check Content
Insulation Pad not yet installed.

Suggestion for Modification

Subcontractor

Support parts of rack must be installed correctly and


firmly, all of the bolts must be fixed according with
criterion. If have insulation parts must be also
installed and assure insulation result. The support
made by customer must be installed according to
customers request.

Clause List
Rack & Cabinet
Location
Under Cabinet

Status
OPEN
QAM
1
11

Batch
4
Defect Quantity
4
Appraisal

Problem Analysis:
Installation Team forget to installed

HUAWEI TECHNOLOGIES CO., LTD.

Page 55

Code

1.1.003

Score

1.5

Examples Hardware Quality Inspection Report


No.

Check Content
Wrong battery setting on Rectifier by customer.

Suggestion for Modification

Subcontractor

Re-setting Battery setting become 650 Ah 650 Ah.

Clause List

Rework

Indoor Auxiliary
Location
Rectifier
Status
CLOSED
QAM
2
Batch

13

1
Defect Quantity
1
Appraisal

Battery Capacity 650Ah

Problem Analysis:
Wrong setting

HUAWEI TECHNOLOGIES CO., LTD.

Page 56

Code

Score

Examples Hardware Quality Inspection Report


No.

Check Content

Suggestion for Modification

Subcontractor

Materials unused, rubbish inside MKCS cabinets

The equipment room should be


neatness and tidy. Discarded packing
materials should be cleaned. Spare
parts should be arranged in a tidy
way after installation

PT. Dian Karya


Clause List
19.1.005
Category
MIN
Status
OPEN
QAM

14

19
Batch
2
Defect Quantity
7
Appraisal

HUAWEI TECHNOLOGIES CO., LTD.

Page 57

Code

000000L

Score

0,2

Examples Hardware Quality Inspection Report


No.

Check Content

Inlet outlet cable holes not yet block


properly.

Suggestion for Modification

All of the input/output cable holes of


the rack (except N68E) must be
blocked out

Subcontractor
PT. Dian Karya
Clause List
1.1.007
Category
MED
Status
OPEN
QAM

15

1
Batch
2
Defect Quantity
1
Appraisal

HUAWEI TECHNOLOGIES CO., LTD.

Page 58

Code

000000I

Score

Examples Hardware Quality Inspection Report


No.

Check Content
Labels on DDF & Fibers not yet attached

Suggestion for Modification

Subcontractor

On the DDF, trunk cable labels must be easily viewed


for going to problem location.

Adyawinsa
Clause List
Labels
Location
On DDF
Status
OPEN
QAM
7

16

Batch
1
Defect Quantity
3
Appraisal

Problem Analysis:
Waiting provide Optic Cables by Customer

HUAWEI TECHNOLOGIES CO., LTD.

Page 59

Code

7.1.008

Score

0.3

Examples Hardware Quality Inspection Report


No.

Check Content

Suggestion for Modification

Subcontractor

The labels attached not good or not same direction

The labels of cable are filled in and stuck correctly


and reliably. They must be tidy position and same
direction. They must be stuck on a position 2cm away
from their connectors. They can be made in a uniform
way according to customer requirement.

Adyawinsa
Clause List
Labels
Location
On Cables
Status
OPEN
QAM
7

Batch
1
Defect Quantity
3
Appraisal

Problem Analysis:
Installation Team not rechecking after finish
installation

HUAWEI TECHNOLOGIES CO., LTD.

Page 60

Code

7.1.005

Score

0.5

Examples Hardware Quality Inspection Report


No.

Check Content
Some screws still not tightness

Suggestion for Modification

Subcontractor

The board can be plugged and unplugged smoothly.


Its panel screws must have appropriate tightness if
they exist. The steel wire of spring is perfect

SWATAMA
Clause List
Rack & Cabinet
Location
Inside Cabinet
Status
CLOSED
QAM

1
Batch
1
Defect Quantity

Problem Analysis:
Installation Team not rechecking after finished
installation

2
Appraisal

HUAWEI TECHNOLOGIES CO., LTD.

Page 61

Code

1.1.016

Score

0.5

No.

Check Content
Some panel screws still loosen.

Suggestion for Modification

Subcontractor

The board can be plugged and unplugged smoothly.


Its panel screws must have appropriate tightness if
they exist. The steel wire of spring is perfect.

Procon
Clause List
Rack & Cabinet

Rework

Location
Module Power
Status
CLOSED
QAM
1

Batch
1
Defect Quantity
3
Appraisal

Problem Analysis:
Installation Team not rechecking after finish
installation

HUAWEI TECHNOLOGIES CO., LTD.

Page 62

Code

1.1.016

Score

0.5

No.

Check Content
No covered with the adhesive tape

Suggestion for Modification

Subcontractor

The peeled place of subscriber cable at the MDF


should be covered with the adhesive tape or heatshrinkable tube

Procon
Clause List
Signal Cables

Rework

Location
Cables near DDF
Status
CLOSED
QAM
4

Batch
1
Defect Quantity
3
Appraisal

Problem Analysis:
Installation Team not rechecking after finish
installation

HUAWEI TECHNOLOGIES CO., LTD.

Page 63

Code

4.1.023

Score

0.2

No.

Check Content

Suggestion for Modification

Subcontractor

Labels on the alarm box still not have and also not
yet attached on the door.

Labels must be stuck on the alarm box according to


specifications, easy to maintenance

Adyawinsa
Clause List
Labels
Location
On Alarm Box
Status
OPEN
QAM
7
Batch

1
Defect Quantity
2
Appraisal

Problem Analysis:
Installation not complete yet

HUAWEI TECHNOLOGIES CO., LTD.

Page 64

Code

7.1.007

Score

0.3

No.

Check Content
No Insulating tape of the cut of protection tube.

Suggestion for Modification

Subcontractor

The cut of protection tube for tail fiber must be


smooth. Otherwise, the insulating tape must be used
to avoid hurting anyone.

Adyawinsa
Clause List
Fibers

Rework

Location
Cabinet
Status
CLOSED
QAM
5

Batch
1

Rework

Defect Quantity
2
Appraisal

Problem Analysis:
Installation Team still not yet attached

HUAWEI TECHNOLOGIES CO., LTD.

Page 65

Code

5.1.005

Score

0.5

Thanks
------------------------------------------------------------------------------"Quality is not a result of Inspection,
but a culmination of careful work through the process"
-------------------------------------------------------------------------------

www.huawei.com

Anda mungkin juga menyukai