No. Jenis Barang/Jasa Satuan Unit Volume Harga Satuan Pekerjaan Total Harga
B. PEMBANGUNAN 1.00
PENGADAAN DAN PEMASANGAN POMPA SUBMERSIBLE, MESIN PENGERAK, LAMPU PANEL SURYA DAN
G. Unit 4.00
ASSESORIS
Unit 106,950,000.00 427,800,000.00
1 Pengadaan Pompa Submersible 5 ltr/dtk s/d 10 ltr/dtk, Head 75 /sd 100 M termasuk kabel pompa dan sling 100 m 4.00
45,000,000.00 180,000,000.00
2 Generator set 30 KVA Unit 4.00
2,000,000.00 8,000,000.00
3 Panel Kontrol Unit 4.00
Ls 1,500,000.00 1,500,000.00
4 Asesoris 1.00
350,000.00 105,000,000.00
5 Pengadaan dan Pemasangan Pipa Penguras GIP Med. SNI Dia. 3 M 300.00
23,000.00 1,012,000.00
6 Socket GIP dia. 3 Bh 44.00
25,000.00 400,000.00
7 Klep dia 3,0 (swing check valve ) Bh 16.00
35,000.00 280,000.00
8 Double Neple GIP dia. 3 Bh 8.00
105,000.00 840,000.00
9 Water Mur GIP dia. 3 Bh 8.00
51,000.00 408,000.00
10 Knee GIP dia 3 bh 8.00
56,000.00 224,000.00
11 Reduser 3 - 4 bh 4.00
45,000.00 180,000.00
12 Tee dia. 3 bh 4.00
350,000.00 8,400,000.00
13 Pipa Riser 3 m 24.00
4,150,000.00 16,600,000.00
14 Pengadaan dan Pemasangan Flow Meter dia 3 unit 4.00
17,023,765.00 68,095,060.00
15 Pengadaan dan Pemasangan Lampu JPU 60 watt unit 4.00
818,739,060.00
JUMLAH 3,990,991,999.82
PPN 11% 439,009,119.98
TOTAL JUMLAH 4,430,001,119.80
SURAT PERJANJIAN KERJA SAMA OPERSIONAL
TIDAK BERMITRA