A. URAIAN PERALATAN
1. Jenis Peralatan = DUMP TRUCK 3-4 M3 E-1
2. Tenaga Pw = 115.0 HP
3. Kapasitas Cp = 3.5 Ton
4. Alat Baru : a. Umur Ekonomis A = 6.0 Tahun
b. Jam Kerja Dalam 1 Tahun W = 1,600.0 Jam
c. Harga Alat B = 415,000,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' = 6.0 Tahun
b. Jam Kerja Dalam 1 Tahun W' = 1,600.0 Jam
c. Harga Alat (*) B' = 415,000,000 Rupiah
1. Bahan Bakar Minyak = (0.125 s/d 0.175 Ltr/HP/Jam) x Pw x Rp. Solar H = 259,526.25 Rupiah
= 12.50% x Ltr/HP/Jam x Pw x HDA-02
2. Pelumas, gemuk, hidrolik oil = (0.01-0.02 Ltr/HP/Jam) x Pw x Rp. Pelumas I = 50,831.15 Rupiah
= 1.00% x Ltr/HP/Jam x Pw x HDA-03
F. LAIN - LAIN
1 Tingkat Suku Bunga i = 10.00 % / Tahun
2 Jam kerja efektif per hari Tk = 7.00 Jam
3 Upah Operator / Sopir L-6 = 26,858.00 Rp./Jam
4 Upah Pembantu Operator / Pmb.Sop L-7 = 21,000.00 Rp./Jam
5 Bahan Bakar Bensin MA.1 = 17,877.00 Liter
6 Bahan Bakar Solar MA.2 = 18,054.00 Liter
7 Minyak Pelumas MA.4 = 44,201.00 Liter
8 PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
URAIAN ANALISA ALAT
A. URAIAN PERALATAN
1. Jenis Peralatan : EXCAVATOR 80-140 HP E-2
2. Tenaga Pw = 130.0 HP
3. Kapasitas Cp = 0.90 M3
4. Alat Baru : a. Umur Ekonomis A = 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W = 1,600.0 Jam
c. Harga Alat B = 1,743,900,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' = 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W' = 1,600.0 Jam
c. Harga Alat (*) B' = 1,743,900,000 Rupiah
1. Bahan Bakar Minyak = (0.125 s/d 0.175 Ltr/HP/Jam) x Pw x Rp. Solar H = 293,377.50 Rupiah
= 12.50% x Ltr/HP/Jam x Pw x HDA-02
2. Pelumas, gemuk, hidrolik oil = (0.01-0.02 Ltr/HP/Jam) x Pw x Rp. Pelumas I = 57,461.30 Rupiah
= 1.00% x Ltr/HP/Jam x Pw x HDA-03
F. LAIN - LAIN
1 Tingkat Suku Bunga i = 10.00 % / Tahun
2 Jam kerja efektif per hari Tk = 7.00 Jam
3 Upah Operator / Sopir L-6 = 26,858.00 Rp./Jam
4 Upah Pembantu Operator / Pmb.Sop L-7 = 21,000.00 Rp./Jam
5 Bahan Bakar Bensin MA.1 = 17,877.00 Liter
6 Bahan Bakar Solar MA.2 = 18,054.00 Liter
7 Minyak Pelumas MA.4 = 44,201.00 Liter
8 PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
URAIAN ANALISA ALAT
A. URAIAN PERALATAN
1. Jenis Peralatan : BULLDOZER 100-150 HP E-3
2. Tenaga Pw = 130.0 HP
3. Kapasitas Cp = - -
4. Alat Baru : a. Umur Ekonomis A = 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W = 1,600.0 Jam
c. Harga Alat B = 1,736,250,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' = 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W' = 1,600.0 Jam
c. Harga Alat (*) B' = 1,736,250,000 Rupiah
1. Bahan Bakar Minyak = (0.125 s/d 0.175 Ltr/HP/Jam) x Pw x Rp. Solar H = 293,377.50 Rupiah
= 12.50% x Ltr/HP/Jam x Pw x HDA-02
2. Pelumas, gemuk, hidrolik oil = (0.01-0.02 Ltr/HP/Jam) x Pw x Rp. Pelumas I = 57,461.30 Rupiah
= 1.00% x Ltr/HP/Jam x Pw x HDA-03
F. LAIN - LAIN
1 Tingkat Suku Bunga i = 10.00 % / Tahun
2 Jam kerja efektif per hari Tk = 7.00 Jam
3 Upah Operator / Sopir L-6 = 26,858.00 Rp./Jam
4 Upah Pembantu Operator / Pmb.Sop L-7 = 21,000.00 Rp./Jam
5 Bahan Bakar Bensin MA.1 = 17,877.00 Liter
6 Bahan Bakar Solar MA.2 = 18,054.00 Liter
7 Minyak Pelumas MA.4 = 44,201.00 Liter
8 PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
URAIAN ANALISA ALAT
A. URAIAN PERALATAN
1. Jenis Peralatan : MOTOR GRADER >100 HP E-4
2. Tenaga Pw = 135.0 HP
3. Kapasitas Cp = -
4. Alat Baru : a. Umur Ekonomis A = 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W = 1,600.0 Jam
c. Harga Alat B = 2,337,500,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' = 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W' = 1,600.0 Jam
c. Harga Alat (*) B' = 2,337,500,000 Rupiah
1. Bahan Bakar Minyak = (0.125 s/d 0.175 Ltr/HP/Jam) x Pw x Rp. Solar H = 304,661.25 Rupiah
= 12.50% x Ltr/HP/Jam x Pw x HDA-02
2. Pelumas, gemuk, hidrolik oil = (0.01-0.02 Ltr/HP/Jam) x Pw x Rp. Pelumas I = 59,671.35 Rupiah
= 1.00% x Ltr/HP/Jam x Pw x HDA-03
F. LAIN - LAIN
1 Tingkat Suku Bunga i = 10.00 % / Tahun
2 Jam kerja efektif per hari Tk = 7.00 Jam
3 Upah Operator / Sopir L-6 = 26,858.00 Rp./Jam
4 Upah Pembantu Operator / Pmb.Sop L-7 = 21,000.00 Rp./Jam
5 Bahan Bakar Bensin MA.1 = 17,877.00 Liter
6 Bahan Bakar Solar MA.2 = 18,054.00 Liter
7 Minyak Pelumas MA.4 = 44,201.00 Liter
8 PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
URAIAN ANALISA ALAT
A. URAIAN PERALATAN
1. Jenis Peralatan : VIBRATOR ROLLER 5-8 T. E-5
2. Tenaga Pw = 100.0 HP
3. Kapasitas Cp = 8.00 Ton
4. Alat Baru : a. Umur Ekonomis A = 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W = 1,600.0 Jam
c. Harga Alat B = 1,325,000,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' = 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W' = 1,600.0 Jam
c. Harga Alat (*) B' = 1,325,000,000 Rupiah
1. Bahan Bakar Minyak = (0.125 s/d 0.175 Ltr/HP/Jam) x Pw x Rp. Solar H = 225,675.00 Rupiah
= 12.50% x Ltr/HP/Jam x Pw x HDA-02
2. Pelumas, gemuk, hidrolik oil = (0.01-0.02 Ltr/HP/Jam) x Pw x Rp. Pelumas I = 44,201.00 Rupiah
= 1.00% x Ltr/HP/Jam x Pw x HDA-03
F. LAIN - LAIN
1 Tingkat Suku Bunga i = 10.00 % / Tahun
2 Jam kerja efektif per hari Tk = 7.00 Jam
3 Upah Operator / Sopir L-6 = 26,858.00 Rp./Jam
4 Upah Pembantu Operator / Pmb.Sop L-7 = 21,000.00 Rp./Jam
5 Bahan Bakar Bensin MA.1 = 17,877.00 Liter
6 Bahan Bakar Solar MA.2 = 18,054.00 Liter
7 Minyak Pelumas MA.4 = 44,201.00 Liter
8 PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
URAIAN ANALISA ALAT
A. URAIAN PERALATAN
1. Jenis Peralatan : PNEUMATIC T. ROLLER 8-15 T. E-6
2. Tenaga Pw = 129.0 HP
3. Kapasitas Cp = 8.00 Ton
4. Alat Baru : a. Umur Ekonomis A = 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W = 1,600.0 Jam
c. Harga Alat B = 1,324,300,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' = 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W' = 1,600.0 Jam
c. Harga Alat (*) B' = 1,324,300,000 Rupiah
1. Bahan Bakar Minyak = (0.125 s/d 0.175 Ltr/HP/Jam) x Pw x Rp. Solar H = 291,120.75 Rupiah
= 12.50% x Ltr/HP/Jam x Pw x HDA-02
2. Pelumas, gemuk, hidrolik oil = (0.01-0.02 Ltr/HP/Jam) x Pw x Rp. Pelumas I = 57,019.29 Rupiah
= 1.00% x Ltr/HP/Jam x Pw x HDA-03
F. LAIN - LAIN
1 Tingkat Suku Bunga i = 10.00 % / Tahun
2 Jam kerja efektif per hari Tk = 7.00 Jam
3 Upah Operator / Sopir L-6 = 26,858.00 Rp./Jam
4 Upah Pembantu Operator / Pmb.Sop L-7 = 21,000.00 Rp./Jam
5 Bahan Bakar Bensin MA.1 = 17,877.00 Liter
6 Bahan Bakar Solar MA.2 = 18,054.00 Liter
7 Minyak Pelumas MA.4 = 44,201.00 Liter
8 PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
URAIAN ANALISA ALAT
A. URAIAN PERALATAN
1. Jenis Peralatan : TANDEM ROLER 6-8 T E-7
2. Tenaga Pw = 83.0 HP
3. Kapasitas Cp = 8.00 Ton
4. Alat Baru : a. Umur Ekonomis A = 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W = 1,600.0 Jam
c. Harga Alat B = 1,316,900,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' = 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W' = 1,600.0 Jam
c. Harga Alat (*) B' = 1,316,900,000 Rupiah
1. Bahan Bakar Minyak = (0.125 s/d 0.175 Ltr/HP/Jam) x Pw x Rp. Solar H = 187,310.25 Rupiah
= 12.50% x Ltr/HP/Jam x Pw x HDA-02
2. Pelumas, gemuk, hidrolik oil = (0.01-0.02 Ltr/HP/Jam) x Pw x Rp. Pelumas I = 36,686.83 Rupiah
= 1.00% x Ltr/HP/Jam x Pw x HDA-03
F. LAIN - LAIN
1 Tingkat Suku Bunga i = 10.00 % / Tahun
2 Jam kerja efektif per hari Tk = 7.00 Jam
3 Upah Operator / Sopir L-6 = 26,858.00 Rp./Jam
4 Upah Pembantu Operator / Pmb.Sop L-7 = 21,000.00 Rp./Jam
5 Bahan Bakar Bensin MA.1 = 17,877.00 Liter
6 Bahan Bakar Solar MA.2 = 18,054.00 Liter
7 Minyak Pelumas MA.4 = 44,201.00 Liter
8 PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
URAIAN ANALISA ALAT
A. URAIAN PERALATAN
1. Jenis Peralatan CONCRETE MIXER 0.3-0.6 M3 E-8
2. Tenaga Pw = 10.0 HP
3. Kapasitas Cp = 500.0 Liter
4. Alat Baru : a. Umur Ekonomis A = 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W = 1,600.0 Jam
c. Harga Alat B = 18,000,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' = 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W' = 1,600.0 Jam
c. Harga Alat (*) B' = 18,000,000 Rupiah
1. Bahan Bakar Minyak = (0.125 s/d 0.175 Ltr/HP/Jam) x Pw x Rp. Solar H = 22,567.50 Rupiah
= 12.50% x Ltr/HP/Jam x Pw x HDA-02
2. Pelumas, gemuk, hidrolik oil = (0.01-0.02 Ltr/HP/Jam) x Pw x Rp. Pelumas I = 4,420.10 Rupiah
Peralatan sederhana = 1.00% x Ltr/HP/Jam x Pw x HDA-03
F. LAIN - LAIN
1 Tingkat Suku Bunga i = 10.00 % / Tahun
2 Jam kerja efektif per hari Tk = 7.00 Jam
3 Upah Operator / Sopir L-6 = 26,858.00 Rp./Jam
4 Upah Pembantu Operator / Pmb.Sop L-7 = 21,000.00 Rp./Jam
5 Bahan Bakar Bensin MA.1 = 17,877.00 Liter
6 Bahan Bakar Solar MA.2 = 18,054.00 Liter
7 Minyak Pelumas MA.4 = 44,201.00 Liter
8 PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
URAIAN ANALISA ALAT
A. URAIAN PERALATAN
1. Jenis Peralatan WATER PUMP 70-100 mm E-9
2. Tenaga Pw = 8.0 HP
3. Kapasitas Cp = 30.0 M3/hari
4. Alat Baru : a. Umur Ekonomis A = 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W = 1,600.0 Jam
c. Harga Alat B = 7,500,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' = 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W' = 1,600.0 Jam
c. Harga Alat (*) B' = 7,500,000 Rupiah
1. Bahan Bakar Minyak = (0.125 s/d 0.175 Ltr/HP/Jam) x Pw x Rp. Bensin H = 17,877.00 Rupiah
= 12.50% x Ltr/HP/Jam x Pw x HDA-02
2. Pelumas, gemuk, hidrolik oil = (0.01-0.02 Ltr/HP/Jam) x Pw x Rp. Pelumas I = 3,536.08 Rupiah
Peralatan sederhana = 1.00% x Ltr/HP/Jam x Pw x HDA-03
F. LAIN - LAIN
1 Tingkat Suku Bunga i = 10.00 % / Tahun
2 Jam kerja efektif per hari Tk = 7.00 Jam
3 Upah Operator / Sopir L-6 = 26,858.00 Rp./Jam
4 Upah Pembantu Operator / Pmb.Sop L-7 = 21,000.00 Rp./Jam
5 Bahan Bakar Bensin MA.1 = 17,877.00 Liter
6 Bahan Bakar Solar MA.2 = 18,054.00 Liter
7 Minyak Pelumas MA.4 = 44,201.00 Liter
8 PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
URAIAN ANALISA ALAT
A. URAIAN PERALATAN
1. Jenis Peralatan WATER TANKER 3000-4500 L. E - 10
2. Tenaga Pw = 115.0 HP
3. Kapasitas Cp = 5,000.0 Liter
4. Alat Baru : a. Umur Ekonomis A = 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W = 1,600.0 Jam
c. Harga Alat B = 395,000,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' = 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W' = 1,600.0 Jam
c. Harga Alat (*) B' = 395,000,000 Rupiah
1. Bahan Bakar Minyak = (0.125 s/d 0.175 Ltr/HP/Jam) x Pw x Rp. Solar H = 259,526.25 Rupiah
= 12.50% x Ltr/HP/Jam x Pw x HDA-02
2. Pelumas, gemuk, hidrolik oil = (0.01-0.02 Ltr/HP/Jam) x Pw x Rp. Pelumas I = 50,831.15 Rupiah
Peralatan sederhana = 1.00% x Ltr/HP/Jam x Pw x HDA-03
F. LAIN - LAIN
1 Tingkat Suku Bunga i = 10.00 % / Tahun
2 Jam kerja efektif per hari Tk = 7.00 Jam
3 Upah Operator / Sopir L-6 = 26,858.00 Rp./Jam
4 Upah Pembantu Operator / Pmb.Sop L-7 = 21,000.00 Rp./Jam
5 Bahan Bakar Bensin MA.1 = 17,877.00 Liter
6 Bahan Bakar Solar MA.2 = 18,054.00 Liter
7 Minyak Pelumas MA.4 = 44,201.00 Liter
8 PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
URAIAN ANALISA ALAT
A. URAIAN PERALATAN
1. Jenis Peralatan : CHAIN SAW (MESIN POTONG KAYU) E - 11
2. Tenaga Pw = 10.0 HP
3. Kapasitas Cp = -
4. Alat Baru : a. Umur Ekonomis A = 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W = 1,600.0 Jam
c. Harga Alat B = 5,500,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' = 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W' = 1,600.0 Jam
c. Harga Alat (*) B' = 5,500,000 Rupiah
1. Bahan Bakar Minyak = (0.125 s/d 0.175 Ltr/HP/Jam) x Pw x Rp. Bensin H = 22,346.25 Rupiah
= 12.50% x Ltr/HP/Jam x Pw x HDA-01
2. Pelumas, gemuk, hidrolik oil = (0.01-0.02 Ltr/HP/Jam) x Pw x Rp. Pelumas I = 4,420.10 Rupiah
= 1.00% x Ltr/HP/Jam x Pw x HDA-03
F. LAIN - LAIN
1 Tingkat Suku Bunga i = 10.00 % / Tahun
2 Jam kerja efektif per hari Tk = 7.00 Jam
3 Upah Operator / Sopir L-6 = 26,858.00 Rp./Jam
4 Upah Pembantu Operator / Pmb.Sop L-7 = 21,000.00 Rp./Jam
5 Bahan Bakar Bensin MA.1 = 17,877.00 Liter
6 Bahan Bakar Solar MA.2 = 18,054.00 Liter
7 Minyak Pelumas MA.4 = 44,201.00 Liter
8 PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
URAIAN ANALISA ALAT
A. URAIAN PERALATAN
1. Jenis Peralatan COMPRESSOR 4000-6500 L\M E - 12
2. Tenaga Pw = 80.0 HP
3. Kapasitas Cp = - -
4. Alat Baru : a. Umur Ekonomis A = 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W = 2,000.0 Jam
c. Harga Alat B = 50,000,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' = 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W' = 2,000.0 Jam
c. Harga Alat (*) B' = 50,000,000 Rupiah
1. Bahan Bakar Minyak = (0.125 s/d 0.175 Ltr/HP/Jam) x Pw x Rp. Bensin H = 178,770.00 Rupiah
= 12.50% x Ltr/HP/Jam x Pw x HDA-02
2. Pelumas, gemuk, hidrolik oil = (0.01-0.02 Ltr/HP/Jam) x Pw x Rp. Pelumas I = 35,360.80 Rupiah
Peralatan sederhana = 1.00% x Ltr/HP/Jam x Pw x HDA-03
F. LAIN - LAIN
1 Tingkat Suku Bunga i = 10.00 % / Tahun
2 Jam kerja efektif per hari Tk = 7.00 Jam
3 Upah Operator / Sopir L-6 = 26,858.00 Rp./Jam
4 Upah Pembantu Operator / Pmb.Sop L-7 = 21,000.00 Rp./Jam
5 Bahan Bakar Bensin MA.1 = 17,877.00 Liter
6 Bahan Bakar Solar MA.2 = 18,054.00 Liter
7 Minyak Pelumas MA.4 = 44,201.00 Liter
8 PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
URAIAN ANALISA ALAT
A. URAIAN PERALATAN
1. Jenis Peralatan ASPHALT SPRAYER E - 13
2. Tenaga Pw = 15.0 HP
3. Kapasitas Cp = 800.0 Liter
4. Alat Baru : a. Umur Ekonomis A = 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W = 1,200.0 Jam
c. Harga Alat B = 45,000,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' = 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W' = 1,200.0 Jam
c. Harga Alat (*) B' = 45,000,000 Rupiah
1. Bahan Bakar Minyak = (0.125 s/d 0.175 Ltr/HP/Jam) x Pw x Rp. Solar H = 33,851.25 Rupiah
= 12.50% x Ltr/HP/Jam x Pw x HDA-02
2. Pelumas, gemuk, hidrolik oil = (0.01-0.02 Ltr/HP/Jam) x Pw x Rp. Pelumas I = 6,630.15 Rupiah
Peralatan sederhana = 1.00% x Ltr/HP/Jam x Pw x HDA-03
F. LAIN - LAIN
1 Tingkat Suku Bunga i = 10.00 % / Tahun
2 Jam kerja efektif per hari Tk = 7.00 Jam
3 Upah Operator / Sopir L-6 = 26,858.00 Rp./Jam
4 Upah Pembantu Operator / Pmb.Sop L-7 = 21,000.00 Rp./Jam
5 Bahan Bakar Bensin MA.1 = 17,877.00 Liter
6 Bahan Bakar Solar MA.2 = 18,054.00 Liter
7 Minyak Pelumas MA.4 = 44,201.00 Liter
8 PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
URAIAN ANALISA ALAT
A. URAIAN PERALATAN
1. Jenis Peralatan FARM TRACTOR (ROTARI) M 5000 E - 14
2. Tenaga Pw = 50.0 HP
3. Kapasitas Cp = 2.0 Ton
4. Alat Baru : a. Umur Ekonomis A = 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W = 1,600.0 Jam
c. Harga Alat B = 295,000,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' = 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W' = 1,600.0 Jam
c. Harga Alat (*) B' = 295,000,000 Rupiah
1. Bahan Bakar Minyak = (0.125 s/d 0.175 Ltr/HP/Jam) x Pw x Rp. Solar H = 112,837.50 Rupiah
= 12.50% x Ltr/HP/Jam x Pw x HDA-02
2. Pelumas, gemuk, hidrolik oil = (0.01-0.02 Ltr/HP/Jam) x Pw x Rp. Pelumas I = 22,100.50 Rupiah
Peralatan sederhana = 1.00% x Ltr/HP/Jam x Pw x HDA-03
F. LAIN - LAIN
1 Tingkat Suku Bunga i = 10.00 % / Tahun
2 Jam kerja efektif per hari Tk = 7.00 Jam
3 Upah Operator / Sopir L-6 = 26,858.00 Rp./Jam
4 Upah Pembantu Operator / Pmb.Sop L-7 = 21,000.00 Rp./Jam
5 Bahan Bakar Bensin MA.1 = 17,877.00 Liter
6 Bahan Bakar Solar MA.2 = 18,054.00 Liter
7 Minyak Pelumas MA.4 = 44,201.00 Liter
8 PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
URAIAN ANALISA ALAT
A. URAIAN PERALATAN
1. Jenis Peralatan STAMPER E - 15
2. Tenaga Pw = 5.0 HP
3. Kapasitas Cp = 0.2 Ton
4. Alat Baru : a. Umur Ekonomis A = 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W = 1,200.0 Jam
c. Harga Alat B = 20,000,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' = 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W' = 1,200.0 Jam
c. Harga Alat (*) B' = 20,000,000 Rupiah
1. Bahan Bakar Minyak = (0.125 s/d 0.175 Ltr/HP/Jam) x Pw x Rp. Solar H = 11,173.13 Rupiah
= 12.50% x Ltr/HP/Jam x Pw x HDA-02
2. Pelumas, gemuk, hidrolik oil = (0.01-0.02 Ltr/HP/Jam) x Pw x Rp. Pelumas I = 2,210.05 Rupiah
Peralatan sederhana = 1.00% x Ltr/HP/Jam x Pw x HDA-03
F. LAIN - LAIN
1 Tingkat Suku Bunga i = 10.00 % / Tahun
2 Jam kerja efektif per hari Tk = 7.00 Jam
3 Upah Operator / Sopir L-6 = 26,858.00 Rp./Jam
4 Upah Pembantu Operator / Pmb.Sop L-7 = 21,000.00 Rp./Jam
5 Bahan Bakar Bensin MA.1 = 17,877.00 Liter
6 Bahan Bakar Solar MA.2 = 18,054.00 Liter
7 Minyak Pelumas MA.4 = 44,201.00 Liter
8 PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
URAIAN ANALISA ALAT
A. URAIAN PERALATAN
1. Jenis Peralatan WHELL LOADER E - 16
2. Tenaga Pw = 95.0 HP
3. Kapasitas Cp = 1.5 M3
4. Alat Baru : a. Umur Ekonomis A = 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W = 1,600.0 Jam
c. Harga Alat B = 1,820,000,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' = 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W' = 1,600.0 Jam
c. Harga Alat (*) B' = 1,820,000,000 Rupiah
1. Bahan Bakar Minyak = (0.125 s/d 0.175 Ltr/HP/Jam) x Pw x Rp. Solar H = 214,391.25 Rupiah
= 12.50% x Ltr/HP/Jam x Pw x HDA-02
2. Pelumas, gemuk, hidrolik oil = (0.01-0.02 Ltr/HP/Jam) x Pw x Rp. Pelumas I = 41,990.95 Rupiah
Peralatan sederhana = 1.00% x Ltr/HP/Jam x Pw x HDA-03
F. LAIN - LAIN
1 Tingkat Suku Bunga i = 10.00 % / Tahun
2 Jam kerja efektif per hari Tk = 7.00 Jam
3 Upah Operator / Sopir L-6 = 26,858.00 Rp./Jam
4 Upah Pembantu Operator / Pmb.Sop L-7 = 21,000.00 Rp./Jam
5 Bahan Bakar Bensin MA.1 = 17,877.00 Liter
6 Bahan Bakar Solar MA.2 = 18,054.00 Liter
7 Minyak Pelumas MA.4 = 44,201.00 Liter
8 PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
URAIAN ANALISA ALAT
A. URAIAN PERALATAN
1. Jenis Peralatan ASPHALT FINIZHER E - 17
2. Tenaga Pw = 144.0 HP
3. Kapasitas Cp = - -
4. Alat Baru : a. Umur Ekonomis A = 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W = 1,600.0 Jam
c. Harga Alat B = 1,977,960,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' = 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W' = 1,600.0 Jam
c. Harga Alat (*) B' = 1,977,960,000 Rupiah
1. Bahan Bakar Minyak = (0.125 s/d 0.175 Ltr/HP/Jam) x Pw x Rp. Solar H = 324,972.00 Rupiah
= 12.50% x Ltr/HP/Jam x Pw x HDA-02
2. Pelumas, gemuk, hidrolik oil = (0.01-0.02 Ltr/HP/Jam) x Pw x Rp. Pelumas I = 63,649.44 Rupiah
Peralatan sederhana = 1.00% x Ltr/HP/Jam x Pw x HDA-03
F. LAIN - LAIN
1 Tingkat Suku Bunga i = 10.00 % / Tahun
2 Jam kerja efektif per hari Tk = 7.00 Jam
3 Upah Operator / Sopir L-6 = 26,858.00 Rp./Jam
4 Upah Pembantu Operator / Pmb.Sop L-7 = 21,000.00 Rp./Jam
5 Bahan Bakar Bensin MA.1 = 17,877.00 Liter
6 Bahan Bakar Solar MA.2 = 18,054.00 Liter
7 Minyak Pelumas MA.4 = 44,201.00 Liter
8 PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
URAIAN ANALISA ALAT
A. URAIAN PERALATAN
1. Jenis Peralatan GENERATOR ZET E - 18
2. Tenaga Pw = 50.0 HP
3. Kapasitas Cp = - -
4. Alat Baru : a. Umur Ekonomis A = 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W = 1,200.0 Jam
c. Harga Alat B = 35,000,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' = 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W' = 1,200.0 Jam
c. Harga Alat (*) B' = 35,000,000 Rupiah
1. Bahan Bakar Minyak = (0.125 s/d 0.175 Ltr/HP/Jam) x Pw x Rp. Solar H = 112,837.50 Rupiah
= 12.50% x Ltr/HP/Jam x Pw x HDA-02
2. Pelumas, gemuk, hidrolik oil = (0.01-0.02 Ltr/HP/Jam) x Pw x Rp. Pelumas I = 22,100.50 Rupiah
Peralatan sederhana = 1.00% x Ltr/HP/Jam x Pw x HDA-03
F. LAIN - LAIN
1 Tingkat Suku Bunga i = 10.00 % / Tahun
2 Jam kerja efektif per hari Tk = 7.00 Jam
3 Upah Operator / Sopir L-6 = 26,858.00 Rp./Jam
4 Upah Pembantu Operator / Pmb.Sop L-7 = 21,000.00 Rp./Jam
5 Bahan Bakar Bensin MA.1 = 17,877.00 Liter
6 Bahan Bakar Solar MA.2 = 18,054.00 Liter
7 Minyak Pelumas MA.4 = 44,201.00 Liter
8 PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
URAIAN ANALISA ALAT
A. URAIAN PERALATAN
1. Jenis Peralatan ASPHAL MIXING PLANT (AMP) E - 19
2. Tenaga Pw = 150.0 HP
3. Kapasitas Cp = 30.0 Ton/Jam
4. Alat Baru : a. Umur Ekonomis A = 10.0 Tahun
b. Jam Kerja Dalam 1 Tahun W = 1,600.0 Jam
c. Harga Alat B = 3,179,000,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' = 10.0 Tahun
b. Jam Kerja Dalam 1 Tahun W' = 1,600.0 Jam
c. Harga Alat (*) B' = 3,179,000,000 Rupiah
2. Pelumas, gemuk, hidrolik oil = (0.01-0.02 Ltr/HP/Jam) x Pw x Rp. Pelumas I = 99,452.25 Rupiah
Peralatan sederhana = 1.50% x Ltr/HP/Jam x Pw x HDA-03
F. LAIN - LAIN
1 Tingkat Suku Bunga i = 10.00 % / Tahun
2 Jam kerja efektif per hari Tk = 7.00 Jam
3 Upah Operator / Sopir L-6 = 26,858.00 Rp./Jam
4 Upah Pembantu Operator / Pmb.Sop L-7 = 21,000.00 Rp./Jam
5 Bahan Bakar Bensin MA.1 = 17,877.00 Liter
6 Bahan Bakar Solar MA.2 = 18,054.00 Liter
7 Minyak Pelumas MA.4 = 44,201.00 Liter
8 PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
URAIAN ANALISA ALAT
A. URAIAN PERALATAN
1. Jenis Peralatan EXCAVATOR MINI + BLADE E - 20
2. Tenaga Pw = 50.0 HP
3. Kapasitas Cp = - -
4. Alat Baru : a. Umur Ekonomis A = 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W = 1,600.0 Jam
c. Harga Alat B = 554,400,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' = 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W' = 1,600.0 Jam
c. Harga Alat (*) B' = 554,400,000 Rupiah
2. Pelumas, gemuk, hidrolik oil = (0.01-0.02 Ltr/HP/Jam) x Pw x Rp. Pelumas I = 22,100.50 Rupiah
Peralatan sederhana = 1.00% x Ltr/HP/Jam x Pw x HDA-03
F. LAIN - LAIN
1 Tingkat Suku Bunga i = 10.00 % / Tahun
2 Jam kerja efektif per hari Tk = 7.00 Jam
3 Upah Operator / Sopir L-6 = 26,858.00 Rp./Jam
4 Upah Pembantu Operator / Pmb.Sop L-7 = 21,000.00 Rp./Jam
5 Bahan Bakar Bensin MA.1 = 17,877.00 Liter
6 Bahan Bakar Solar MA.2 = 18,054.00 Liter
7 Minyak Pelumas MA.4 = 44,201.00 Liter
8 PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
URAIAN ANALISA ALAT
A. URAIAN PERALATAN
1. Jenis Peralatan = FULVI MIXER E - 21
2. Tenaga Pw = 345.0 HP
3. Kapasitas Cp = - Ton
4. Alat Baru : a. Umur Ekonomis A = 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W = 1,600.0 Jam
c. Harga Alat B = 800,000,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' = 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W' = 1,600.0 Jam
c. Harga Alat (*) B' = 800,000,000 Rupiah
1. Bahan Bakar Minyak = (0.125 s/d 0.175 Ltr/HP/Jam) x Pw x Rp. Solar H = 778,578.75 Rupiah
= 12.50% x Ltr/HP/Jam x Pw x HDA-02
2. Pelumas, gemuk, hidrolik oil = (0.01-0.02 Ltr/HP/Jam) x Pw x Rp. Pelumas I = 152,493.45 Rupiah
= 1.00% x Ltr/HP/Jam x Pw x HDA-03
F. LAIN - LAIN
1 Tingkat Suku Bunga i = 10.00 % / Tahun
2 Jam kerja efektif per hari Tk = 7.00 Jam
3 Upah Operator / Sopir L-6 = 26,858.00 Rp./Jam
4 Upah Pembantu Operator / Pmb.Sop L-7 = 21,000.00 Rp./Jam
5 Bahan Bakar Bensin MA.1 = 17,877.00 Liter
6 Bahan Bakar Solar MA.2 = 18,054.00 Liter
7 Minyak Pelumas MA.4 = 44,201.00 Liter
8 PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan : MILLING MACHINE E - 22
2. Tenaga Pw = 428.0 HP
3. Kapasitas Cp = - M3
4. Alat Baru : a. Umur Ekonomis A = 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W = 1,600.0 Jam
c. Harga Alat B = 6,500,000,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' = 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W' = 1,600.0 Jam
c. Harga Alat (*) B' = 6,500,000,000 Rupiah
1. Bahan Bakar Minyak = (0.125 s/d 0.175 Ltr/HP/Jam) x Pw x Rp. Solar H = 965,889.00 Rupiah
= 12.50% x Ltr/HP/Jam x Pw x HDA-02
2. Pelumas, gemuk, hidrolik oil = (0.01-0.02 Ltr/HP/Jam) x Pw x Rp. Pelumas I = 189,180.28 Rupiah
= 1.00% x Ltr/HP/Jam x Pw x HDA-03
F. LAIN - LAIN
1 Tingkat Suku Bunga i = 10.00 % / Tahun
2 Jam kerja efektif per hari Tk = 7.00 Jam
3 Upah Operator / Sopir L-6 = 26,858.00 Rp./Jam
4 Upah Pembantu Operator / Pmb.Sop L-7 = 21,000.00 Rp./Jam
5 Bahan Bakar Bensin MA.1 = 17,877.00 Liter
6 Bahan Bakar Solar MA.2 = 18,054.00 Liter
7 Minyak Pelumas MA.4 = 44,201.00 Liter
8 PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan : CEMENT SPREADER E - 23
2. Tenaga Pw = 155.0 HP
3. Kapasitas Cp = - -
4. Alat Baru : a. Umur Ekonomis A = 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W = 1,600.0 Jam
c. Harga Alat B = 2,500,000,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' = 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W' = 1,600.0 Jam
c. Harga Alat (*) B' = 2,500,000,000 Rupiah
1. Bahan Bakar Minyak = (0.125 s/d 0.175 Ltr/HP/Jam) x Pw x Rp. Solar H = 349,796.25 Rupiah
= 12.50% x Ltr/HP/Jam x Pw x HDA-02
2. Pelumas, gemuk, hidrolik oil = (0.01-0.02 Ltr/HP/Jam) x Pw x Rp. Pelumas I = 68,511.55 Rupiah
= 1.00% x Ltr/HP/Jam x Pw x HDA-03
3. Perawatan dan perbaikan = (12,5 % - 17,5 %) x B (pendekatan) K = 195,312.50 Rupiah
W'
= 12.50% x B
W'
F. LAIN - LAIN
1 Tingkat Suku Bunga i = 10.00 % / Tahun
2 Jam kerja efektif per hari Tk = 7.00 Jam
3 Upah Operator / Sopir L-6 = 26,858.00 Rp./Jam
4 Upah Pembantu Operator / Pmb.Sop L-7 = 21,000.00 Rp./Jam
5 Bahan Bakar Bensin MA.1 = 17,877.00 Liter
6 Bahan Bakar Solar MA.2 = 18,054.00 Liter
7 Minyak Pelumas MA.4 = 44,201.00 Liter
8 PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan : ADDITIVE SPREADER E - 24
2. Tenaga Pw = 95.0 HP
3. Kapasitas Cp = -
4. Alat Baru : a. Umur Ekonomis A = 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W = 1,600.0 Jam
c. Harga Alat B = 1,260,000,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' = 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W' = 1,600.0 Jam
c. Harga Alat (*) B' = 1,260,000,000 Rupiah
1. Bahan Bakar Minyak = (0.125 s/d 0.175 Ltr/HP/Jam) x Pw x Rp. Solar H = 214,391.25 Rupiah
= 12.50% x Ltr/HP/Jam x Pw x HDA-02
2. Pelumas, gemuk, hidrolik oil = (0.01-0.02 Ltr/HP/Jam) x Pw x Rp. Pelumas I = 41,990.95 Rupiah
= 1.00% x Ltr/HP/Jam x Pw x HDA-03
F. LAIN - LAIN
1 Tingkat Suku Bunga i = 10.00 % / Tahun
2 Jam kerja efektif per hari Tk = 7.00 Jam
3 Upah Operator / Sopir L-6 = 26,858.00 Rp./Jam
4 Upah Pembantu Operator / Pmb.Sop L-7 = 21,000.00 Rp./Jam
5 Bahan Bakar Bensin MA.1 = 17,877.00 Liter
6 Bahan Bakar Solar MA.2 = 18,054.00 Liter
7 Minyak Pelumas MA.4 = 44,201.00 Liter
8 PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan : BABY ROLLER E - 25
2. Tenaga Pw = 10.0 HP
3. Kapasitas Cp = 2.00 Ton
4. Alat Baru : a. Umur Ekonomis A = 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W = 1,200.0 Jam
c. Harga Alat B = 145,000,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' = 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W' = 1,200.0 Jam
c. Harga Alat (*) B' = 145,000,000 Rupiah
1. Bahan Bakar Minyak = (0.125 s/d 0.175 Ltr/HP/Jam) x Pw x Rp. Solar H = 22,567.50 Rupiah
= 12.50% x Ltr/HP/Jam x Pw x HDA-02
2. Pelumas, gemuk, hidrolik oil = (0.01-0.02 Ltr/HP/Jam) x Pw x Rp. Pelumas I = 4,420.10 Rupiah
= 1.00% x Ltr/HP/Jam x Pw x HDA-03
F. LAIN - LAIN
1 Tingkat Suku Bunga i = 10.00 % / Tahun
2 Jam kerja efektif per hari Tk = 7.00 Jam
3 Upah Operator / Sopir L-6 = 26,858.00 Rp./Jam
4 Upah Pembantu Operator / Pmb.Sop L-7 = 21,000.00 Rp./Jam
5 Bahan Bakar Bensin MA.1 = 17,877.00 Liter
6 Bahan Bakar Solar MA.2 = 18,054.00 Liter
7 Minyak Pelumas MA.4 = 44,201.00 Liter
8 PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan : 0 E - 26
2. Tenaga Pw = 0.0 HP
3. Kapasitas Cp = 0.00 Ton
4. Alat Baru : a. Umur Ekonomis A = 0.0 Tahun
b. Jam Kerja Dalam 1 Tahun W = 0.0 Jam
c. Harga Alat B = 0 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' = 0.0 Tahun
b. Jam Kerja Dalam 1 Tahun W' = 0.0 Jam
c. Harga Alat (*) B' = A>15th ?? Rupiah
1. Bahan Bakar Minyak = (0.125 s/d 0.175 Ltr/HP/Jam) x Pw x Rp. Solar H = 0.00 Rupiah
= 12.50% x Ltr/HP/Jam x Pw x HDA-02
2. Pelumas, gemuk, hidrolik oil = (0.01-0.02 Ltr/HP/Jam) x Pw x Rp. Pelumas I = 0.00 Rupiah
= 1.00% x Ltr/HP/Jam x Pw x HDA-03
F. LAIN - LAIN
1 Tingkat Suku Bunga i = 10.00 % / Tahun
2 Jam kerja efektif per hari Tk = 7.00 Jam
3 Upah Operator / Sopir L-6 = 26,858.00 Rp./Jam
4 Upah Pembantu Operator / Pmb.Sop L-7 = 21,000.00 Rp./Jam
5 Bahan Bakar Bensin MA.1 = 17,877.00 Liter
6 Bahan Bakar Solar MA.2 = 18,054.00 Liter
7 Minyak Pelumas MA.4 = 44,201.00 Liter
8 PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan : 0 E - 27
2. Tenaga Pw = 0.0 HP
3. Kapasitas Cp = 0.00 Ton
4. Alat Baru : a. Umur Ekonomis A = 0.0 Tahun
b. Jam Kerja Dalam 1 Tahun W = 0.0 Jam
c. Harga Alat B = 0 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' = 0.0 Tahun
b. Jam Kerja Dalam 1 Tahun W' = 0.0 Jam
c. Harga Alat (*) B' = A>15th ?? Rupiah
1. Bahan Bakar Minyak = (0.125 s/d 0.175 Ltr/HP/Jam) x Pw x Rp. Solar H = 0.00 Rupiah
= 12.50% x Ltr/HP/Jam x Pw x HDA-02
2. Pelumas, gemuk, hidrolik oil = (0.01-0.02 Ltr/HP/Jam) x Pw x Rp. Pelumas I = 0.00 Rupiah
= 1.00% x Ltr/HP/Jam x Pw x HDA-03
F. LAIN - LAIN
1 Tingkat Suku Bunga i = 10.00 % / Tahun
2 Jam kerja efektif per hari Tk = 7.00 Jam
3 Upah Operator / Sopir L-6 = 26,858.00 Rp./Jam
4 Upah Pembantu Operator / Pmb.Sop L-7 = 21,000.00 Rp./Jam
5 Bahan Bakar Bensin MA.1 = 17,877.00 Liter
6 Bahan Bakar Solar MA.2 = 18,054.00 Liter
7 Minyak Pelumas MA.4 = 44,201.00 Liter
8 PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan 0 E - 28
2. Tenaga Pw = 0.0 HP
3. Kapasitas Cp = 0.0 0.0
4. Alat Baru : a. Umur Ekonomis A = 0.0 Tahun
b. Jam Kerja Dalam 1 Tahun W = 0.0 Jam
c. Harga Alat B = 0 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' = 0.0 Tahun
b. Jam Kerja Dalam 1 Tahun W' = 0.0 Jam
c. Harga Alat (*) B' = A>15th ?? Rupiah
1. Bahan Bakar Minyak = (0.125 s/d 0.175 Ltr/HP/Jam) x Pw x Rp. Solar H = 0.00 Rupiah
= 12.50% x Ltr/HP/Jam x Pw x HDA-02
2. Pelumas, gemuk, hidrolik oil = (0.01-0.02 Ltr/HP/Jam) x Pw x Rp. Pelumas I = 0.00 Rupiah
Peralatan sederhana = 1.00% x Ltr/HP/Jam x Pw x HDA-03
F. LAIN - LAIN
1 Tingkat Suku Bunga i = 10.00 % / Tahun
2 Jam kerja efektif per hari Tk = 7.00 Jam
3 Upah Operator / Sopir L-6 = 26,858.00 Rp./Jam
4 Upah Pembantu Operator / Pmb.Sop L-7 = 21,000.00 Rp./Jam
5 Bahan Bakar Bensin MA.1 = 17,877.00 Liter
6 Bahan Bakar Solar MA.2 = 18,054.00 Liter
7 Minyak Pelumas MA.4 = 44,201.00 Liter
8 PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan 0 E - 29
2. Tenaga Pw = 0.0 HP
3. Kapasitas Cp = 0.0 0.00
4. Alat Baru : a. Umur Ekonomis A = 0.0 Tahun
b. Jam Kerja Dalam 1 Tahun W = 0.0 Jam
c. Harga Alat B = 0 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' = 0.0 Tahun
b. Jam Kerja Dalam 1 Tahun W' = 0.0 Jam
c. Harga Alat (*) B' = A>15th ?? Rupiah
1. Bahan Bakar Minyak = (0.125 s/d 0.175 Ltr/HP/Jam) x Pw x Rp. Bensin H = 0.00 Rupiah
= 12.50% x Ltr/HP/Jam x Pw x HDA-02
2. Pelumas, gemuk, hidrolik oil = (0.01-0.02 Ltr/HP/Jam) x Pw x Rp. Pelumas I = 0.00 Rupiah
Peralatan sederhana = 1.00% x Ltr/HP/Jam x Pw x HDA-03
F. LAIN - LAIN
1 Tingkat Suku Bunga i = 10.00 % / Tahun
2 Jam kerja efektif per hari Tk = 7.00 Jam
3 Upah Operator / Sopir L-6 = 26,858.00 Rp./Jam
4 Upah Pembantu Operator / Pmb.Sop L-7 = 21,000.00 Rp./Jam
5 Bahan Bakar Bensin MA.1 = 17,877.00 Liter
6 Bahan Bakar Solar MA.2 = 18,054.00 Liter
7 Minyak Pelumas MA.4 = 44,201.00 Liter
8 PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan 0 E - 30
2. Tenaga Pw = 0.0 HP
3. Kapasitas Cp = 0.0 0.00
4. Alat Baru : a. Umur Ekonomis A = 0.0 Tahun
b. Jam Kerja Dalam 1 Tahun W = 0.0 Jam
c. Harga Alat B = 0 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' = 0.0 Tahun
b. Jam Kerja Dalam 1 Tahun W' = 0.0 Jam
c. Harga Alat (*) B' = A>15th ?? Rupiah
1. Bahan Bakar Minyak = (0.125 s/d 0.175 Ltr/HP/Jam) x Pw x Rp. Solar H = 0.00 Rupiah
= 12.50% x Ltr/HP/Jam x Pw x HDA-02
2. Pelumas, gemuk, hidrolik oil = (0.01-0.02 Ltr/HP/Jam) x Pw x Rp. Pelumas I = 0.00 Rupiah
Peralatan sederhana = 1.00% x Ltr/HP/Jam x Pw x HDA-03
F. LAIN - LAIN
1 Tingkat Suku Bunga i = 10.00 % / Tahun
2 Jam kerja efektif per hari Tk = 7.00 Jam
3 Upah Operator / Sopir L-6 = 26,858.00 Rp./Jam
4 Upah Pembantu Operator / Pmb.Sop L-7 = 21,000.00 Rp./Jam
5 Bahan Bakar Bensin MA.1 = 17,877.00 Liter
6 Bahan Bakar Solar MA.2 = 18,054.00 Liter
7 Minyak Pelumas MA.4 = 44,201.00 Liter
8 PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan : 0 E - 31
2. Tenaga Pw = 0.0 HP
3. Kapasitas Cp = 0.0
4. Alat Baru : a. Umur Ekonomis A = 0.0 Tahun
b. Jam Kerja Dalam 1 Tahun W = 0.0 Jam
c. Harga Alat B = 0 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' = 0.0 Tahun
b. Jam Kerja Dalam 1 Tahun W' = 0.0 Jam
c. Harga Alat (*) B' = A>15th ?? Rupiah
1. Bahan Bakar Minyak = (0.125 s/d 0.175 Ltr/HP/Jam) x Pw x Rp. Bensin H = 0.00 Rupiah
= 12.50% x Ltr/HP/Jam x Pw x HDA-01
2. Pelumas, gemuk, hidrolik oil = (0.01-0.02 Ltr/HP/Jam) x Pw x Rp. Pelumas I = 0.00 Rupiah
= 1.00% x Ltr/HP/Jam x Pw x HDA-03
F. LAIN - LAIN
1 Tingkat Suku Bunga i = 10.00 % / Tahun
2 Jam kerja efektif per hari Tk = 7.00 Jam
3 Upah Operator / Sopir L-6 = 26,858.00 Rp./Jam
4 Upah Pembantu Operator / Pmb.Sop L-7 = 21,000.00 Rp./Jam
5 Bahan Bakar Bensin MA.1 = 17,877.00 Liter
6 Bahan Bakar Solar MA.2 = 18,054.00 Liter
7 Minyak Pelumas MA.4 = 44,201.00 Liter
8 PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
ANALISA BIAYA SEWA PERALATAN PER JAM KERJA
LOKASI PEKERJAAN : KAMPUNG NGGOLAR - DISTRIK MERAUKE
KEGIATAN : PENYUSUNAN NORMA, STANDAR, PEDOMAN DAN MANUAL (NSPM)
PEKERJAAN : PERHITUNGAN HARGA SATUAN BAHAN, UPAH, PEKERJAAN DAN KEGIATAN
LOKASI : KAMPUNG NGGOLAR - DISTRIK MERAUKE
KABUPATEN / PROPINSI : MERAUKE - PAPUA
TAHUN ANGGARAN : 2022
SUMBER DANA : ---
1 DUMP TRUCK E-1 115 3.50 Ton 415,000,000.00 6 1600 415,000,000.00 41,500,000.00 0.22961 53,598.97 518.75 54,117.72 0.125 0.010 310,357.40 0.125 32,421.88 26,858.00 21,000.00 390,637.28 444,754.00 0
2 EXCAVATOR 100-140 HP E-2 130 0.90 M3 1,743,900,000.00 5 1600 1,743,900,000.00 174,390,000.00 0.26380 258,770.49 2,179.88 260,950.37 0.125 0.010 350,838.80 0.125 136,242.19 26,858.00 21,000.00 534,938.99 795,889.00 0
3 BULLDOZER 100-150 HP E-3 130 - - 1,736,250,000.00 5 1600 1,736,250,000.00 173,625,000.00 0.26380 257,635.34 2,170.31 259,805.65 0.125 0.010 350,838.80 0.125 135,644.53 26,858.00 21,000.00 534,341.33 794,146.00 0
4 MOTOR GRADER >100 HP E-4 135 - - 2,337,500,000.00 5 1600 2,337,500,000.00 233,750,000.00 0.26380 346,852.47 2,921.88 349,774.34 0.125 0.010 364,332.60 0.125 182,617.19 26,858.00 21,000.00 594,807.79 944,582.00 0
5 VIBRATOR ROLLER 5-8 T. E-5 100 8.00 Ton 1,325,000,000.00 5 1600 1,325,000,000.00 132,500,000.00 0.26380 196,611.56 1,656.25 198,267.81 0.125 0.010 269,876.00 0.125 103,515.63 26,858.00 21,000.00 421,249.63 619,517.00 0
6 PNEUMATIC T. ROLLER 8-15 T. E-6 129 8.00 Ton 1,324,300,000.00 5 1600 1,324,300,000.00 132,430,000.00 0.26380 196,507.69 1,655.38 198,163.06 0.125 0.010 348,140.04 0.125 103,460.94 26,858.00 21,000.00 499,458.98 697,622.00 0
7 TANDEM ROLER 6-8 T E-7 83 8.00 Ton 1,316,900,000.00 5 1600 1,316,900,000.00 131,690,000.00 0.26380 195,409.63 1,646.13 197,055.76 0.125 0.010 223,997.08 0.125 102,882.81 26,858.00 21,000.00 374,737.89 571,793.00 0
8 CONCRETE MIXER 0.3-0.6 M3 E-8 10 500.00 Liter 18,000,000.00 5 1600 18,000,000.00 1,800,000.00 0.26380 2,670.95 22.50 2,693.45 0.125 0.010 26,987.60 0.125 1,406.25 26,858.00 21,000.00 76,251.85 78,945.00 0
9 WATER PUMP 70-100 mm E-9 8 30.00M3/hari 7,500,000.00 5 1600 7,500,000.00 750,000.00 0.26380 1,112.90 9.38 1,122.27 0.125 0.010 21,413.08 0.125 585.94 26,858.00 21,000.00 69,857.02 70,979.00 0
10 WATER TANKER 3000-4500 L. E - 10 115 5000.00 Liter 395,000,000.00 5 1600 395,000,000.00 39,500,000.00 0.26380 58,612.50 493.75 59,106.25 0.125 0.010 310,357.40 0.125 30,859.38 26,858.00 21,000.00 389,074.78 448,181.00 0
11 CHAIN SAW (MESIN POTONG KAYUE - 11 10 - - 5,500,000.00 5 1600 5,500,000.00 550,000.00 0.26380 816.12 6.88 823.00 0.125 0.010 26,766.35 0.125 429.69 26,858.00 21,000.00 75,054.04 75,877.00 0
12 COMPRESSOR 4000-6500 L\M E - 12 80 - - 50,000,000.00 5 2000 50,000,000.00 5,000,000.00 0.26380 5,935.44 50.00 5,985.44 0.125 0.010 214,130.80 0.125 3,125.00 26,858.00 21,000.00 265,113.80 271,099.00 0
13 ASPHALT SPRAYER E - 13 15 800.00 Liter 45,000,000.00 5 1200 45,000,000.00 4,500,000.00 0.26380 8,903.16 75.00 8,978.16 0.125 0.010 40,481.40 0.125 4,687.50 26,858.00 21,000.00 93,026.90 102,005.00 0
14 FARM TRACTOR (ROTARI) M 5000 E - 14 50 2.00 Ton 295,000,000.00 5 1600 295,000,000.00 29,500,000.00 0.26380 43,773.89 368.75 44,142.64 0.125 0.010 134,938.00 0.125 23,046.88 26,858.00 21,000.00 205,842.88 249,985.00 0
15 STAMPER E - 15 5 0.20 Ton 20,000,000.00 5 1200 20,000,000.00 2,000,000.00 0.26380 3,956.96 33.33 3,990.30 0.125 0.010 13,383.18 0.125 2,083.33 26,858.00 21,000.00 63,324.51 67,314.00 0
16 WHELL LOADER E - 16 95 1.50 M3 1,820,000,000.00 5 1600 1,820,000,000.00 182,000,000.00 0.26380 270,062.67 2,275.00 272,337.67 0.125 0.010 256,382.20 0.125 142,187.50 26,858.00 21,000.00 446,427.70 718,765.00 0
17 ASPHALT FINIZHER E - 17 144 - - 1,977,960,000.00 5 1600 1,977,960,000.00 197,796,000.00 0.26380 293,501.74 2,472.45 295,974.19 0.125 0.010 388,621.44 0.125 154,528.13 26,858.00 21,000.00 591,007.57 886,981.00 0
18 GENERATOR ZET E - 18 50 - - 35,000,000.00 5 1200 35,000,000.00 3,500,000.00 0.26380 6,924.68 58.33 6,983.02 0.125 0.010 134,938.00 0.125 3,645.83 26,858.00 21,000.00 186,441.83 193,424.00 0
19 ASPHAL MIXING PLANT (AMP) E - 19 150 30.00Ton/Jam 3,179,000,000.00 10 1600 3,179,000,000.00 317,900,000.00 0.16275 291,019.28 3,973.75 294,993.03 0.150 0.015 5,055,275.25 0.150 298,031.25 26,858.00 21,000.00 5,401,164.50 5,696,157.00 0
20 EXCAVATOR MINI + BLADE E - 20 50 - - 554,400,000.00 5 1600 554,400,000.00 55,440,000.00 0.26380 82,265.24 693.00 82,958.24 0.125 0.010 134,938.00 0.125 43,312.50 26,858.00 21,000.00 226,108.50 309,066.00 0
21 FULVI MIXER E - 21 345 - - 800,000,000.00 5 1600 800,000,000.00 80,000,000.00 0.26380 118,708.87 1,000.00 119,708.87 0.125 0.010 931,072.20 0.125 62,500.00 26,858.00 21,000.00 1,041,430.20 1,161,139.00 0
22 MILLING MACHINE E - 22 428 - - 6,500,000,000.00 5 1600 6,500,000,000.00 650,000,000.00 0.26380 964,509.54 8,125.00 972,634.54 0.125 0.010 1,155,069.28 0.125 507,812.50 26,858.00 21,000.00 1,710,739.78 2,683,374.00 0
23 CEMENT SPREADER E - 23 155 - - 2,500,000,000.00 5 1600 2,500,000,000.00 250,000,000.00 0.26380 370,965.21 3,125.00 374,090.21 0.125 0.010 418,307.80 0.125 195,312.50 26,858.00 21,000.00 661,478.30 1,035,568.00 0
24 ADDITIVE SPREADER E - 24 95 - - 1,260,000,000.00 5 1600 1,260,000,000.00 126,000,000.00 0.26380 186,966.46 1,575.00 188,541.46 0.125 0.010 256,382.20 0.125 98,437.50 26,858.00 21,000.00 402,677.70 591,219.00 0
25 BABY ROLLER E - 25 10 2.00Ton/Jam 145,000,000.00 5 1200 145,000,000.00 14,500,000.00 0.26380 28,687.98 241.67 28,929.64 0.125 0.010 26,987.60 0.125 15,104.17 26,858.00 21,000.00 89,949.77 118,879.00 0
26 0 E - 26 0 0.00 0 - 0 0 A>15th ?? - 0.00000 #VALUE! #VALUE! #VALUE! 0.125 0.010 - 0.125 - 26,858.00 21,000.00 #VALUE! #VALUE! 0
27 0 E - 27 0 0.00 0 - 0 0 A>15th ?? - 0.00000 #VALUE! #VALUE! #VALUE! 0.125 0.010 - 0.125 - 26,858.00 21,000.00 #VALUE! #VALUE! 0
28 0 E - 28 0 0.00 0 - 0 0 A>15th ?? - 0.00000 #VALUE! #VALUE! #VALUE! 0.125 0.010 - 0.125 - 26,858.00 21,000.00 #VALUE! #VALUE! 0
29 0 E - 29 0 0.00 0 - 0 0 A>15th ?? - 0.00000 #VALUE! #VALUE! #VALUE! 0.125 0.010 - 0.125 - 26,858.00 21,000.00 #VALUE! #VALUE! 0
30 0 E - 30 0 0.00 0 - 0 0 A>15th ?? - 0.00000 #VALUE! #VALUE! #VALUE! 0.125 0.010 - 0.125 - 26,858.00 21,000.00 #VALUE! #VALUE! 0
31 0 E - 31 0 0.00 0 - 0 0 A>15th ?? - 0.00000 #VALUE! #VALUE! #VALUE! 0.125 0.010 - 0.125 - 26,858.00 21,000.00 #VALUE! #VALUE! 0
KETERANGAN : 1 Tingkat Suku Bunga i = 10.00 % per-tahun
2 Asuransi, Pajak, dll i = 0.0020
3 Jam kerja efektif per hari Tk = 7.00 Jam/Hari
4 Jarak Merauke ke lokasi Proyek L = 30.00 Kilo Meter
5 Upah Operator / Sopir / Mekanik L-6 = 26,858.00 Rupiah per-orang/jam
6 Upah Pembantu Operator/Sopir/Mekanik L-7 = 21,000.00 Rupiah per-orang/jam
7 Harga Bahan Bakar Bensin MA.1 = 17,877.00 Rupiah per-liter
8 Harga Bahan Bakar Solar MA.2 = 18,054.00 Rupiah per-liter
9 Minyak Pelumas MA.4 = 44,201.00 Rupiah per-liter
10 Khusus AMP, biaya bahan bakar ditambah (untuk pemanasan material) sebesar : 12 Liter x (Kapasitas AMP Riil = 0.7 x Kapasitas AMP/Jam) x Harga BBM Solar
DAFTAR HARGA SATUAN ALAT
LOKASI KEGIATAN : KAMPUNG NGGOLAR - DISTRIK MERAUKE
Catatan :
- Harga satuan belum termasuk pajak PPN dan PPH
- Harga - harga hanya sebagai pedoman / pendukung, dalam perhitungan konstruksi ( tidak mengikat ).
- Undang -undang no. 13 tahun 2003 tentang Ketenagakerjaan (Bab X Pasal 77)
Jika dalam 1 hari bekerja selama 8 jam (5 hari kerja/ senin s/d jumat) maka dalam 1 bulan bekerja selama 21 hari
Jika dalam 1 hari bekerja selama 7 jam (6 hari kerja/ senin s/d sabtu) maka dalam 1 bulan bekerja selama 25 hari
DAFTAR HARGA SATUAN BAHAN
LOKASI KEGIATAN : KAMPUNG NGGOLAR - DISTRIK MERAUKE
F. BAHAN KERAMIK
1 Ubin Abu-Abu 20 x 20 Cm MF.1 Buah 3,200.00 0% 240.00 3,440.00
2 Ubin Abu-Abu 30 x 30 Cm MF.2 Buah 7,727.00 0% 500.00 8,227.00
3 Ubin Abu-Abu 40 x 40 Cm MF.3 Buah 14,361.00 0% 1,040.00 15,401.00
4 Ubin Warna 20 x 20 Cm MF.4 Buah 3,060.00 0% 240.00 3,300.00
5 Ubin Warna 30 x 30 Cm MF.5 Buah 7,045.00 0% 500.00 7,545.00
6 Ubin Warna 40 x 40 Cm MF.6 Buah 14,020.00 0% 1,040.00 15,060.00
7 Ubin Teraso Ukuran 30 x 30 cm MF.7 Buah 6,590.00 0% 500.00 7,090.00
8 Ubin Teraso Ukuran 40 x 40 cm MF.8 Buah 14,166.00 0% 1,040.00 15,206.00
9 Ubin Granito Ukuran 30 x 30 cm MF.9 Buah 6,318.00 0% 500.00 6,818.00
10 Ubin Granito Ukuran 40 x 40 cm MF.10 Buah 12,166.00 0% 1,040.00 13,206.00
11 Ubin Teralux Kerang Ukuran 30 x 30 cm MF.11 Buah 7,272.00 0% 500.00 7,772.00
12 Ubin Teralux Kerang Ukuran 40 x 40 cm MF.12 Buah 14,250.00 0% 1,040.00 15,290.00
Kode Harga Dasar Tingkat Ongkos Harga Dasar +
No. Nama Bahan/Barang Barang Satuan (Distributor) Inflasi Angkut Inflasi + Ket.
( Rp. ) ( %. ) (Rp) Ongkos angkut
1 2 3 4 5 6 7 8 9
13 Ubin Teralux Marmer Ukuran 30 x 30 cm MF.13 Buah 11,363.00 0% 500.00 11,863.00
14 Ubin Teralux Marmer Ukuran 40 x 40 cm MF.14 Buah 22,083.00 0% 1,040.00 23,123.00
15 Ubin Teralux Marmer Ukuran 60 x 60 cm MF.15 Buah 71,666.00 0% 3,910.00 75,576.00
16 Keramik Artistik 10x20; 15x15 cm MF.16 Buah 1,250.00 0% 160.00 1,410.00
17 Keramik Artistik 10x10 atau 5x20 cm MF.17 Buah 650.00 0% 130.00 780.00
18 Keramik Lantai 20 x 20 cm MF.18 Buah 3,040.00 0% 240.00 3,280.00
19 Keramik Lantai 20 x 30 cm MF.19 Buah 4,687.00 0% 350.00 5,037.00
20 Keramik Lantai 30 x 30 cm MF.20 Buah 5,693.00 0% 500.00 6,193.00
21 Keramik Lantai 30 x 30 berglasir MF.21 Buah 6,909.00 0% 500.00 7,409.00
22 Keramik Lantai 30 x 30 berglasir (Mozaik) MF.22 Buah 6,818.00 0% 500.00 7,318.00
23 Keramik Lantai 40 x 40 cm MF.23 Buah 13,000.00 0% 1,040.00 14,040.00
24 Keramik Lantai 50 x 50 cm MF.24 Buah 26,000.00 0% 2,100.00 28,100.00
25 Keramik Lantai 60 x 60 cm MF.25 Buah 81,333.00 0% 3,910.00 85,243.00
26 Keramik Dinding 10 x 20 cm MF.26 Buah 1,400.00 0% 160.00 1,560.00
27 Keramik Dinding 20x20 atau 20x25 cm MF.27 Buah 3,092.00 0% 240.00 3,332.00
28 Ubin Dinding Porselin 11 x 11 MF.28 Buah 670.00 0% 130.00 800.00
29 Ubin Dinding Porselin 10 x 20 cm MF.29 Buah 1,036.00 0% 160.00 1,196.00
30 Ubin Dinding Porselin 20 x 20 MF.30 Buah 2,900.00 0% 240.00 3,140.00
31 Plint Ubin Abu-Abu 15 x 20 cm MF.31 Buah 12,500.00 0% 300.00 12,800.00
32 Plint Ubin Abu-Abu 10 x 30 cm MF.32 Buah 10,000.00 0% 290.00 10,290.00
33 Plint Ubin Abu-Abu 10 x 40 cm MF.33 Buah 12,250.00 0% 310.00 12,560.00
34 Plint Ubin Warna 10 x 20 cm MF.34 Buah 4,500.00 0% 160.00 4,660.00
35 Plint Ubin Warna 10 x 30 cm MF.35 Buah 10,000.00 0% 290.00 10,290.00
36 Plint Ubin Warna 10 x 40 cm MF.36 Buah 11,500.00 0% 310.00 11,810.00
37 Plint Ubin Teraso 10 x 30 cm MF.37 Buah 10,000.00 0% 290.00 10,290.00
38 Plint Ubin Teraso 10 x 40 cm MF.38 Buah 12,500.00 0% 310.00 12,810.00
39 Plint Ubin Granito 10 x 40 cm MF.39 Buah 12,500.00 0% 310.00 12,810.00
40 Plint Ubin Granito 10 x 30 cm MF.40 Buah 8,000.00 0% 290.00 8,290.00
41 Plint Ubin Teralux Kerang 10 x 40 cm MF.41 Buah 8,000.00 0% 310.00 8,310.00
42 Plint Ubin Teralux Kerang 10 x 30 cm MF.42 Buah 8,000.00 0% 290.00 8,290.00
43 Plint Ubin Teralux Marmer 10 x 60 cm MF.43 Buah 33,500.00 0% 330.00 33,830.00
44 Plint Ubin Teralux Marmer 10 x 40 cm MF.44 Buah 10,000.00 0% 310.00 10,310.00
45 Plint Ubin Teralux Marmer 10 x 30 cm MF.45 Buah 7,500.00 0% 290.00 7,790.00
46 Plint Keramik Artistik 10 x 20 cm MF.46 Buah 5,000.00 0% 160.00 5,160.00
47 Plint Keramik Artistik 10 x 10 cm MF.47 Buah 4,500.00 0% 130.00 4,630.00
48 Plint Keramik Artistik 5 x 20 cm MF.48 Buah 5,500.00 0% 130.00 5,630.00
49 Plint Keramik Artistik 10 x 30 cm MF.49 Buah 10,000.00 0% 290.00 10,290.00
50 Marmer Ukuran 100 x 100 cm MF.50 Buah 350,000.00 0% 22,830.00 372,830.00
51 Wall paper (Lebar 50 cm) MF.51 M2 310,000.00 0% 751.00 310,751.00
52 Batu Paras MF.52 Buah 22,727.00 0% 500.00 23,227.00
53 Batu Tempel Hitam MF.53 Buah 28,181.00 0% 500.00 28,681.00
G. BAHAN KACA
1 Kaca Polos 3 mm MG.1 M2 175,000.00 0% 4,290.00 179,290.00
2 Kaca Polos 5 mm MG.2 M2 208,759.00 0% 6,540.00 215,299.00
3 Kaca Buram 3 mm MG.3 M2 140,056.00 0% 4,290.00 144,346.00
4 Kaca Buram 4 mm MG.4 M2 140,056.00 0% 5,420.00 145,476.00
5 Kaca Buram 5 mm MG.5 M2 206,685.00 0% 6,540.00 213,225.00
6 Kaca Naco / Louver - 7 Clips (polos) MG.6 Buah 189,375.00 0% 7,910.00 197,285.00
7 Kaca Naco / Louver - 8 Clips (polos) MG.7 Buah 252,000.00 0% 8,970.00 260,970.00
8 Kaca Naco / Louver - 9 Clips (polos) MG.8 Buah 283,666.00 0% 10,030.00 293,696.00
9 Kaca Naco / Louver - 10 Clips (polos) MG.9 Buah 323,000.00 0% 11,130.00 334,130.00
10 Kaca Rayban 25 % - tebal 5 mm MG.10 M2 215,000.00 0% 6,540.00 221,540.00
11 Kaca Acrylic (Kaca Plastik) - 5 mm MG.11 Lembar 1,412,000.00 0% 5,850.00 1,417,850.00
H. BAHAN/ALAT PENGGANTUNG
1 Kunci Tanam (Setara Cap Kuda Terbang) MH.1 Set 102,000.00 0% 640.00 102,640.00
2 Kunci Tanam - 2 Slaagh MH.2 Set 209,375.00 0% 640.00 210,015.00
3 Kunci Tanam - 1 Slaagh MH.3 Set 175,000.00 0% 640.00 175,640.00
4 Kunci Tanam (Setara Cap Anchor / Yale) MH.4 Set 179,900.00 0% 640.00 180,540.00
5 Kunci Gembok MH.5 Set 42,250.00 0% 320.00 42,570.00
6 Engsel 4" (Untuk Pintu) MH.6 Pasang 29,666.00 0% 320.00 29,986.00
7 Engsel 3" (Untuk Jendela) MH.7 Pasang 21,416.00 0% 320.00 21,736.00
8 Engsel Kupu-Kupu T MH.8 Pasang 23,000.00 0% 320.00 23,320.00
9 Engsel Nylon Kuningan 4" MH.9 Pasang 22,500.00 0% 320.00 22,820.00
10 Engsel Biasa 3" (Untuk Jendela) MH.10 Pasang 12,100.00 0% 320.00 12,420.00
11 Hak Angin / Kait Angin MH.11 Buah 14,750.00 0% 320.00 15,070.00
12 Espagnolet MH.12 Set 10,000.00 0% 320.00 10,320.00
13 Grendel Tanam (Pintu) MH.13 Buah 124,000.00 0% 320.00 124,320.00
14 Grendel Besar / Kecil MH.14 Buah 50,250.00 0% 320.00 50,570.00
15 Tarikan Pintu MH.15 Buah 133,333.00 0% 320.00 133,653.00
16 Tarikan Jendela MH.16 Buah 14,666.00 0% 320.00 14,986.00
I. BAHAN CAT
1 Amplas Kertas (Amplas Kayu) MI.1 Lembar 5,500.00 0% 30.00 5,530.00
2 Amplas Besi MI.2 Lembar 5,875.00 0% 30.00 5,905.00
3 Dempul Kayu MI.3 Kg 43,100.00 0% 590.00 43,690.00
4 Cat Meny Kayu MI.4 Kg 45,416.00 0% 590.00 46,006.00
5 Cat Meny Besi MI.5 Kg 46,250.00 0% 590.00 46,840.00
Kode Harga Dasar Tingkat Ongkos Harga Dasar +
No. Nama Bahan/Barang Barang Satuan (Distributor) Inflasi Angkut Inflasi + Ket.
( Rp. ) ( %. ) (Rp) Ongkos angkut
1 2 3 4 5 6 7 8 9
6 Cat Kayu MI.6 Kg 73,333.00 0% 590.00 73,923.00
7 Cat Besi MI.7 Kg 78,500.00 0% 590.00 79,090.00
8 Cat Kilat LN MI.8 Kg 69,166.00 0% 590.00 69,756.00
9 Minyak Cat / Thinner MI.9 Kg 40,944.00 0% 590.00 41,534.00
10 Cat Tembok (Setara Dulux Weathershield) MI.10 Kg 151,350.00 0% 590.00 151,940.00
11 Plamur Tembok MI.11 Zak 131,600.00 0% 14,260.00 145,860.00
12 Cat Tembok Biasa (1 Klg @ 5 Kg) MI.12 Kaleng 64,916.00 0% 3,170.00 68,086.00
13 Cat Besi Crom MI.13 Kg 60,916.00 0% 590.00 61,506.00
14 Cat Besi (Setara Nippon Paint) MI.14 Kg 82,916.00 0% 590.00 83,506.00
15 Politur Kaleng (Setara Apache) MI.15 Kg 72,400.00 0% 590.00 72,990.00
16 Floor Hardener MI.16 KG 95,000.00 0% 590.00 95,590.00
M. BETON PRACETAK
1 Dwiker Sumur/Gorong2 Ø 1 m, H 60 cm MM.1 Buah 450,000.00 0% 150,040.00 600,040.00
2 Dwiker Sumur/Gorong2 Ø 0,8 m, H 60 cm MM.2 Buah 385,000.00 0% 119,630.00 504,630.00
3 Dwiker/Gorong2 Ø 0,6 m, H 80 cm MM.3 Buah 350,000.00 0% 122,030.00 472,030.00
4 Dwiker/Gorong2 Ø 0,45 m, H 80 cm MM.4 Buah 340,000.00 0% 73,020.00 413,020.00
NB - Pemilihan Harga Satuan disesuaikan dengan Format Standar Analisa Harga Satuan Pekerjaan Masing-masing Bidang Pekerjaan Konstruksi
- Harga Sewaktu-waktu dapat berubah, penentuan nilai barang/material dalam penyusunan HPS disesuaikan dengan hasil survei dilapangan kembali.
Mengetahui / menyetujui :
Plt. Kepala Dinas Pekerjaan Umum dan Penataan Ruang
Kabupaten Merauke
KEGIATAN :
TAHUN ANGGARAN :
2022
PERIODE
JANUARI - JUNI 2022
PEMERINTAH KABUPATEN MERAUKE
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
Jalan Trikora Merauke 99613 Telp/Fax: (0971) 321154
KEGIATAN :
LOKASI :
TAHUN ANGGARAN :
2022
PERIODE
KEGIATAN :
LOKASI :
TAHUN ANGGARAN :
2022
PERIODE
KEGIATAN :
TAHUN ANGGARAN :
2022
PERIODE