Anda di halaman 1dari 1

PENGUJIAN RELAY

ID Pel I > OCR 429 Io > GFR 7.3 49 RMS SETTING OVER LOAD
Nama Curve SIT Curve SIT Es1 Alarm 87 %
Alamat Delay (ms) 100 Delay 100 Es2 Tripping 109 %
Daya T1 Running 13 mnt
Tarip I >> OCR M 1715 Io >> GFR M 29.1 T2 Stopped 5 mnt
Curve DEFINITE Curve DEFINITE
CT Terpasang 250 5 Delay 0 Delay 0
Ib 238 A Merk Relay
Trafo Pel 1260 KVA Type
In Trafo 36 A SN
PEMERIKSAAN WAKTU KERJA RELAY OVERLOAD HASIL PENGUJIAN

Kriteria Waktu Arus di Relay Arus Injek Arus Uji waktu trip
TDL 2003 (A) (Ampere) (Ampere) (detik)
1.05 Ib > 3600 1.05 x Ib 250.06 5.00
1.2 Ib < 1200 1.2 x Ib 285.79 5.72
1.5 Ib < 600 1.5 x Ib 357.24 7.14
4 Ib di koordinasikan 4 x Ib 952.63 19.05
PEMERIKSAAN WAKTU KERJA RELAY OCR/GFR

OVER CURRENT

MENURUT RUMUS MENURUT ALAT UJI

Arus di Relay Arus Injek Waktu Trip Arus (Ampere) Waktu Trip (Detik)
Pengujian
(Ampere) (Ampere) (detik)
R-S R-T S-T R-S R-T S-T
1.5 Iset 643.02 12.9 0.579
2 Iset 857.37 17.1 0.338
3 Iset 1286.05 25.7 0.212
4 Iset 1714.73 34.3 0.168
1.5 Moment 2572.10 51.4 0
GROUND FAULT
MENURUT RUMUS MENURUT ALAT UJI

Arus di Relay Arus Injek Waktu Trip Arus (Ampere) Waktu Trip (Detik)
Pengujian
(Ampere) (Ampere) (detik)
R-N S-N T-N R-N S-N T-N
1.5 Iset 10.91 0.2 0.579
2 Iset 14.55 0.3 0.338
3 Iset 21.82 0.4 0.212
4 Iset 29.10 0.6 0.168
1.5 Moment 43.65 0.9 0.000
Depok,
Penguji

(.......................................................)

Anda mungkin juga menyukai