Anda di halaman 1dari 213

PERHITUNGAN

No Jenis Pekerjaan Satuan Volume Ket.

LANTAI 01
I PEKERJAAN PERSIAPAN
1 Pengurusan IMB ls 1.00
2 Pembersihan lokasi m2 317.72
3 Pasangan bouplang m1 74.75
4 Direksi Kit (10 m2) ls 10.00
5 Pas Pavingblok halaman utara m2 45.94

II PEKERJAAN TANAH DAN PASIR


1 Galian tnh Pondasi Sumuran m3 397.41
2 Galian tnh Pondasi Batu Kali m3 204.51

3 Galian tnh Pondasi Footplat 32.8


4 Urug tanah kembali m3 275.33275
5 Urug tanah peninggian level bang. m3 37.62
6 Urug pasir bwh lantai m3 6.45

III PEKERJAAN PASANGAN


1 Pas Pondasi bt kali 1:5 m3 64.68

2 Pas Aanstamping m3 29.4


3 Pas Pasir Urug batu kali m3 7.35
Pas Pasir Urug Footplat m3 1.6
4 Pas Rollag Bata 1:5 m1 74.75
5 Pas Dinding 1/2 bata 1:5 m2 238.05
Ruang 1
Vol Kusen p1
Vol Kusen j1
Vol Kusen j2
Vol K1
Vol k2
Vol Kp
Vol B1
Vol B2
Vol Balok Latei
Ruang 2-Km/Wc
Vol Kusen p1
Vol Kusen p2
Vol Kusen j1
Vol BV
Vol K1
Vol k2
Vol Kp
Vol B1
Vol B2
Vol Balok Latei
Ruang 5-Km/Wc
Vol Kusen p1
Vol Kusen p2
Vol Kusen j1
Vol BV
Vol K1
Vol k2
Vol Kp
Vol B1
Vol B2
Vol Balok Latei
Ruang 6
Vol Kusen p1
Vol Kusen j1
Vol Kusen j2
Vol K1
Vol k2
Vol Kp
Vol B1
Vol B2
Vol Balok Latei
R AreaTangga
Vol K1
Vol Kp
Vol B2
Pintu shaft
Vol 1/2 GB
6 Pek Plesteran dan Acian dinding m2 476.10
7 Pek Sponengan m1 128.00
8 Pek Pas Batu Andersit Klm besar depan m2 0.72
9 Pek Pas plesteran penutup pipa air hujan m2
10 Pek Pas Glassblok lt 1 s/d lt 3 bh 4.00
11 Pek Selokan Keliling bangunan m1 97.50

IV PEKERJAAN BETON
1 Pek Pondasi Sumuran (Cyclope) m3 220.78
2 Pek Foot Plate 1:2:3 (180x180) m3 27.22

Pek Foot Plate 1:2:3 (100x100) 6.76

Pek Cor Lantai Kerja Footplat m3 1.60


3 Pek Sloof Beton 20/40 1:2:3 m3 13.20
4 Pek Kolom Beton K1 30/30 1:2:3 m3 5.76
5 Pek Kolom Beton K2 20/30 1:2:3 m3 3.84
6 Pek Kolom Beton K3 30/60 1:2:3 m3 1.44
7 Pek Kolom Beton Bulat Ф 60 1:2:3 m3 9.04
8 Pek Kolom Beton 15/15 1:2:3 m3 2.34
9 Pek Balok Beton B1 30/60 fc' 22,5 Mpa m3 11.45
10 Pek Balok Beton B2 20/45 fc' 22,5 Mpa m3 14.29
11 Pek Balok Beton Lisplang fc' 22,5 Mpa m3 9.16

12 Pek Balok Beton Lisplang fc' 22,5 Mpa Tampak m3 3.54


depan Utara
13 Pek Balok Latei 10/15 atas kusen m3 0.90
14 Pek Beton sun shading belakang selatan Pek m3 2.87
Beton sun shading penutup timur-barat

15 Pek Plat beton lantai t=12 cm fc' 22,5 Mpa m3 25.92


16 Pek Plat beton teras depan t=12 cm fc' 22,5 Mpa m3 5.25

17 Pek Rabat Beton 1:3:5 m3 4.88


18 Pek foot plate Tangga fc' 22,5 Mpa m3 5.46

19 Pek plat Tangga fc' 22,5 Mpa m3 1.99

V PEKERJAAN KERAMIK
1 Pas Lantai keramik 40x40 kw I m2 265.25
Ruang 1

Ruang 2
Ruang 3
Area Km/WC
Area Tangga
Area Km/WC
Ruang 4
Ruang 5
Ruang 6

Teras
Selasar Keramik

2 Pas Lantai keramik KM Anti Slip 40x40 kw I m2 6.00


3 Pas Dinding Keramik KM 20x20 kw I m2 12.40
Vol. P2
4 Pas Lis keramik KM m1 6.20
5 Pas Keramik dinding Tangga m2 20.00 Bordes
Antrade
6 Pas Keramik lantai Tangga dg stepnosing m2 7.50
Optrade

Antrade

VI PEKERJAAN KUSEN PINTU JENDELA


1 Pas Pintu P1 bh 6.00
Pas Kusen Bangkirei 6/15 m1 44.76
Pas Daun Pintu (ukuran 0,9x2) bh 6.00
Pas daun jendela atas pintu(uk 0,6x0,7) unit 6.00
Pas Slot pintu bh 6.00
Pas engsel 4" utk daun pintu psg 12.00
Pas engsel 3" utk daun jendela psg 6.00
Pas Tangan gareng psg 12.00
Pas Kunci Gerendel Jago bh 6.00

2 Pas Pintu Aluminium P2 bh 2.00


Pas Kusen aluminium 3" coklat m1 13.88
Pas Daun Pintu aluminium coklat bh 2.00
Pas Daun Jendela aluminium. atas pintu bh 2.00

3 Pas Jendela J1 bh 12.00


Pas Kusen aluminium 3" coklat m1 80.18
Pas Daun Jdl besar aluminium coklat bh 36.00
Pas Daun Jdl kecil aluminium coklat bh 36.00
Pas kaca mati 5" m2 12.48

4 Pas Jendela J2 bh 2.00


Pas Kusen certainwall m1 42.34
Pas kaca mati 5" m2 15.34

5 Pas Pintu Shaft bh 2.00


Pas Kusen aluminium 3" coklat m1 10.00
Pas Daun Pintu aluminium bh 4.00

6 Pas Boven BV bh 2.00


Pas Kusen aluminium 3" coklat m1 5.36
Pas kaca mati 5" m2 0.60

7 Pas Pegangan railing tangga Stainless 1 1/2" m1 12.94

8 Pas Jendela J4 lantai 2,3,4 bh 3


Pas Kusen certainwall m1 20.05
Pas kaca mati 5" m2 1.04

9 Pas Jendela J3 lantai 2,3,4 bh 6.00


Pas Kusen certainwall m1 27.60
Pas daun jendela bh 6.00
Pas kaca mati 5" m2 3.81

10 Pasang alucubon depan dari lt 2,3,4 bh


Pas alucubon m2 216.33
Vol J2

Vol J4
VII PEKERJAAN PLAFOND
1 Pas Plafond Dinogip m2 213.83
Pas Plafond kalsiboard m2 41.17

VIII
1 PEKERJAAN INTALASI AIR KOTOR
2 Pas Pipa PVC ø4" Maspion KM m1 7.78
3 Pas Pipa PVC ø3" Maspion KM m1 12.90
4 Pas Pipa PVC ø2" AIR HUJAN utara dr lt 2 m1 10.00
5 Pas Fllor Drain Stainless bh 2.00
6 Pas tmp sabun bh 2.00
7 Septic tank dan peresapan ls 1.00
8 Peresapan Air Hujan bh 2.00
9 Pas Kloset jongkok bh 2.00
Pas jet shower pd tiap km bh 2.00

IX
1 PEKERJAAN INTALASI AIR BERSIH
2 Pas Groundtank pakai pinguin 1000 ltr bh 1.00
3 Pas Pompa air bersih dr sumur ke ground m1 1.00
4 Pas Pompa air bersih dr ground ke lt 4 m1 12,8
5 Pipa Air bersih 1" dr sumur ke groundtank m1 1.00
6 Pipa Air bersih 1" dr groundtank ke atas m1 6.60
7 Pipa PVC 1/2" m1 11.50
8 Pas Kran KM 1/2" bh 2.00
Pas Kran wudlu 1/2" bh 2.00

X
PEKERJAAN PENGECATAN
1 Pek Cat Dinding Luar Dulux m2 557.70
2 Pek Cat Dinding Dalam Catylac m2 557.70
3 Pek Cat Plafon Catylac (kalsiboard) m2 41.17
4 Pek Melamin Kusen Pintu m1 89.52
5 Pek Melamin Daun Pintu m2 21.60
6 Pek Melamin Daun Jendela m1 31.20
I LANTAI 02
1 PEKERJAAN PASANGAN
Pas Dinding 1/2 bata 1:5 m2 276.35
Ruang 7
Vol Kusen p1
Vol Kusen j1
Vol Kusen j2
Vol K1
Vol k2
Vol Kp
Vol B1
Vol B2
Vol Balok Latei
Ruang 8-Km/Wc
Vol Kusen p1
Vol Kusen p2
Vol Kusen j1
Vol BV
Vol K1
Vol k2
Vol Kp
Vol B1
Vol B2
Vol Balok Latei
Ruang 11-Km/Wc
Vol Kusen p1
Vol Kusen p2
Vol Kusen j1
Vol BV
Vol K1
Vol k2
Vol Kp
Vol B1
Vol B2
Vol Balok Latei
Ruang 12
Vol Kusen p1
Vol Kusen j1
Vol Kusen j2
Vol K1
Vol k2
Vol Kp
Vol B1
Vol B2
Vol Balok Latei
Ruang Teras
1/2 Dinding
Vol Kusen j3
Vol Kusen j4
Vol Kp
Vol K3
Vol B2
R AreaTangga
Vol K1
Vol Kp
Vol B2
Pintu shaft
Vol 1/2 GB

2 Pek Plesteran dan Acian dinding m2 552.70


3 Pek Sponengan m1 128.00
4 Pas penebalan klm penutup pipa a hjn m2

II
1 PEKERJAAN BETON
2 Pek Kolom Beton K1 30/30 1:2:3 m3 5.76
3 Pek Kolom Beton K2 20/30 1:2:3 m3 3.84
4 Pek Kolom Beton K3 30/60 1:2:3 m3 1.44
5 Pek Kolom Beton Bulat Ф 60 1:2:3 m3 9.04
6 Pek Kolom Beton 15/15 1:2:3 m3 2.70
7 Pek Balok Beton B1 30/60 fc' 22,5 Mpa m3 11.45
8 Pek Balok Beton B2 20/45 fc' 22,5 Mpa m3 14.29
9 Pek Balok Beton Lisplang fc' 22,5 Mpa m3 9.16

10 Pek Balok Beton Lisplang fc' 22,5 Mpa m3 3.54


Tampak depan Utara
11 Pek Balok Lateu 10/15 atas kusen m3 0.90
12 Pek Beton sun shading belakang selatan m3 2.87
Pek Beton sun shading penutup timur-barat
13 Pek Plat beton lantai t=12 cm fc' 22,5 Mpa m3 25.92
14 Pek Plat Tangga fc' 22,5 Mpa m3 1.99

III
1 PEKERJAAN KERAMIK
Pas Lantai keramik 40x40 kw I m2 228.83
Ruang 7

Ruang 8
Ruang 9
Area Km/WC
Area Tangga
Area Km/WC
Ruang 10
Ruang 11
Ruang 12

Teras
2 Pas Lantai keramik KM Anti Slip 40x40 kw I m2 6.00
3 Pas Dinding Keramik KM 20x20 kw I m2 12.40
Vol. P2
4 Pas Lis keramik KM m1 6.20
5 Pas Keramik dinding Tangga m2 20.00 Bordes
Antrade
6 Pas Keramik lantai Tangga dg stepnosing m2 7.50
Optrade

Antrade

IV
1 PEKERJAAN KUSEN PINTU DAN JENDELA

Pas Pintu P1 bh 6.00


Pas Kusen Bangkirei 6/15 m1 44.76
Pas Daun Pintu (ukuran 0,9x2) bh 6.00
Pas daun jendela atas pintu(uk 0,6x0,7) unit 6.00
Pas Slot pintu bh 6.00
Pas engsel 4" utk daun pintu psg 12.00
Pas engsel 3" utk daun jendela psg 6.00
Pas Tangan gareng psg 12.00
Pas Kunci Gerendel Jago bh 6.00
2
Pas Pintu Aluminium P2 bh 2.00
Pas Kusen aluminium 3" coklat m1 13.88
Pas Daun Pintu aluminium coklat bh 2.00
Pas Daun Jendela aluminium. atas pintu bh 2.00
3
Pas Jendela J1 bh 12.00
Pas Kusen aluminium 3" coklat m1 80.18
Pas Daun Jdl besar aluminium coklat bh 36.00
Pas Daun Jdl kecil aluminium coklat bh 36.00
Pas kaca mati 5" m2 12.48

4 Pas Jendela J2 bh 2.00


Pas Kusen certainwall m1 42.34
Pas kaca mati 5" m2 15.34

5 Pas Pintu Shaft bh 2.00


Pas Kusen aluminium 3" coklat m1 10.00
Pas Daun Pintu aluminium bh 4.00

6 Pas Boven BV bh 2.00


Pas Kusen aluminium 3" coklat m1 5.36
Pas kaca mati 5" m2 0.60

7 Pas Pegangan railing tangga Stainless 1 1/2" m1 12.94

8 Pas Pegangan railing depan Stainless 1 1/2" bh

9 Pas Hollow tampak depan bh 20.00

V
1 PEKERJAAN PLAFOND
Pas Plafond Dinogip m2 213.83
Pas Plafond kalsiboard m2 41.17

VI
1 PEKERJAAN INSTALASI AIR
2 Pas Pipa PVC ø3" Maspion m1 8,64
3 Pas Pipa PVC ø2" Maspion air hujan m1 8.00
4 Pas Pipa PVC ø4" Maspion m1 6.87
5 Pipa PVC 1" dari bawah m1 10.60
6 Pipa PVC 1/2" m1 11.50
7 Pas Kloset Jongkok bh 2.00
8 Pas Fllor Drain Stainless bh 2.00
9 Pas Tempat sabun bh 1.00
10 Pas Kran KM 1/2" bh 2.00
11 Pas Kran Wudlu 1/2" bh 2.00
Pas Jet shower pd tiap Km bh 2.00

VII
1 PEKERJAAN PENGECATAN
2 Pek Cat Dinding Luar Dulux m2 643.90
3 Pek Cat Dinding Dalam Catylac m2 643.90
4 Pek Cat Plafon Catylac (kalsiboard) m2 41.17
5 Pek Melamin Kusen Pintu m1 44.76
6 Pek Melamin Daun Pintu m2 10.80
Pek Melamin Daun Jendela m1 15.60

I LANTAI 03
1 PEKERJAAN PASANGAN
Pas Dinding 1/2 bata 1:5 m2 296.35
Ruang 13
Vol Kusen p1
Vol Kusen j1
Vol Kusen j2
Vol K1
Vol k2
Vol Kp
Vol B1
Vol B2
Vol Balok Latei
Ruang Rapat-Wc
Vol Kusen p1
Vol Kusen j1
Vol K1
Vol k2
Vol Kp
Vol Kusen p2
Vol BV
Vol B1
Vol B2
Vol Balok Latei
Ruang 16-Km/Wc
Vol Kusen p1
Vol Kusen p2
Vol Kusen j1
Vol BV
Vol K1
Vol k2
Vol Kp
Vol B1
Vol B2
Vol Balok Latei
Ruang 17
Vol Kusen p1
Vol Kusen j1
Vol Kusen j2
Vol K1
Vol k2
Vol Kp
Vol B1
Vol B2
Vol Balok Latei
Ruang Teras
1/2 Dinding
Vol Kusen j3
Vol Kusen j4
Vol Kp
Vol K3
Vol B2
R AreaTangga
Vol K1
Vol Kp
Vol B2
Pintu shaft
Vol 1/2 GB

2 Pek Plesteran dan Acian dinding m2 592.70


3 Pek Sponengan m1 64.00
4 Pas penebalan klm penutup pipa a hjn m2
II
1 PEKERJAAN BETON
2 Pek Kolom Beton K1 30/30 1:2:3 m3 6.91
3 Pek Kolom Beton K2 20/30 1:2:3 m3 4.03
4 Pek Kolom Beton K3 30/60 1:2:3 m3 1.73
5 Pek Kolom Beton Bulat Ф 60 1:2:3 m3 10.85
6 Pek Kolom Beton 15/15 1:2:3 m3 3.24
7 Pek Balok Beton B1 30/60 fc' 22,5 Mpa m3 11.45
8 Pek Balok Beton B2 20/45 fc' 22,5 Mpa m3 14.29
9 Pek Balok Beton Lisplang fc' 22,5 Mpa m3 3.54
Tampak depan Utara
10 Pek Balok Lateu 10/15 atas kusen m3 1.09
Pek Beton sun shading belakang selatan m3 2.87
Pek Beton sun shading penutup timur-barat
11 Pek Plat beton lantai t=12 cm fc' 22,5 Mpa m3 4.21

12 Pek Plat beton lantai t=12 cm fc' 22,5 Mpa m3 2.16


menara depan
13 Pek Plat Tangga fc' 22,5 Mpa m3 1.99

III
1 PEKERJAAN KERAMIK
Pas Lantai keramik 40x40 kw I m2 228.83
Ruang 13

Ruang 14
Area Km/WC
Area Tangga
Area Km/WC
Ruang 15
Ruang 16
Ruang 17

Teras
2 Pas Lantai keramik KM Anti Slip 40x40 kw I m2 6.00
3 Pas Dinding Keramik KM 20x20 kw I m2 12.40
Vol. P2
4 Pas Lis keramik KM m1 6.20
5 Pas Keramik dinding Tangga m2 20.00 Bordes
Antrade
6 Pas Keramik lantai Tangga dg stepnosing m2 7.50
Optrade

Antrade

IV PEKERJAAN KUSEN PINTU DAN JENDELA


1 Pas Pintu P1 bh 6.00
Pas Kusen Bangkirei 6/15 m1 44.76
Pas Daun Pintu (ukuran 0,9x2) bh 6.00
Pas daun jendela atas pintu(uk 0,6x0,7) unit 6.00
Pas Slot pintu bh 6.00
Pas engsel 4" utk daun pintu psg 12.00
Pas engsel 3" utk daun jendela psg 6.00
Pas Tangan gareng psg 12.00
Pas Kunci Gerendel Jago bh 6.00

2 Pas Pintu Aluminium P2 bh 2.00


Pas Kusen aluminium 3" coklat m1 13.88
Pas Daun Pintu aluminium coklat bh 2.00
Pas Daun Jendela aluminium. atas pintu bh 2.00

3 Pas Jendela J1 bh 12.00


Pas Kusen aluminium 3" coklat m1 80.18
Pas Daun Jdl besar aluminium coklat bh 36.00
Pas Daun Jdl kecil aluminium coklat bh 36.00
Pas kaca mati 5" m2 12.48

4 Pas Jendela J2 bh 2.00


Pas Kusen certainwall m1 42.34
Pas kaca mati 5" m2 15.34

5 Pas Pintu Shaft bh 2.00


Pas Kusen aluminium 3" coklat m1 10.00
Pas Daun Pintu aluminium bh 4.00

6 Pas Boven BV bh 2.00


Pas Kusen aluminium 3" coklat m1 5.36
Pas kaca mati 5" m2 0.60
7 Pas Pegangan railing tangga Stainless 1 1/2" m1 12.94

8 Pas Pegangan railing depan Stainless 1 1/2" bh

9 Pas Hollow tampak depan bh 20.00

10 Pas Kaca menara beserta rangka baja bh 2.00

V
1 PEKERJAAN PLAFOND
Pas Plafond Dinogip m2 162.51
Pas Plafond kalsiboard 41.17

VI
1 PEKERJAAN INSTALASI AIR
2 Pas Pipa PVC ø3" Maspion m1 8.64
3 Pas Pipa PVC ø4" Maspion m1 6.87
4 Pipa PVC 1" dari bawah m1 19.26
5 Pipa PVC 1/2" m1 11.50
6 Pas Kloset Jongkok bh 2.00
7 Pas Fllor Drain Stainless bh 2.00
8 Pas Tempat sabun bh 1.00
9 Pas Kran KM 1/2" bh 2.00
10 Pas Kran Wudlu 1/2" bh 2.00
Pas Jet shower pd tiap Km bh 2.00

VII
PEKERJAAN PENGECATAN
1 Pek Cat Dinding Luar Dulux m2 696.38
2 Pek Cat Dinding Dalam Catylac m2 696.38
3 Pek Cat Plafon Catylac (kalsiboard) m2 41.17
4 Pek Pengecatan lisplang m1 71.76
5 Pek Melamin Kusen Pintu m1 44.76
6 Pek Melamin Daun Pintu m2 10.80
7 Pek Melamin Daun Jendela m1 2.52

VIII
PEKERJAAN ATAP DEPAN
1 Pas Rangka Atap Baja Ringan m2 239.94
2 Pas Genteng Glasur natural Kanmuri m2 222.70
Bentuk Trapesium

Bentuk Segitiga
3 Pas Bubungan genteng Kanmuri m1 35.06

4 Pas Lisplang dobel woodplang m1 71.76

I LANTAI 04
1 PEKERJAAN PASANGAN
Pas Dinding 1/2 bata 1:5 m2 76.15
Ruang 18
Vol BV
Vol K1
Vol k2
Vol Kp
Vol B1
Vol B2
Vol k3
2 Pek Plesteran dan Acian dinding m2 152.30
3 Pek Sponengan m1 34.74

II
1 PEKERJAAN BETON
2 Pek Kolom Beton K1 30/30 1:2:3 m3 1.39
3 Pek Kolom Beton K2 20/30 1:2:3 m3 0.93
4 Pek Kolom Beton K3 30/60 1:2:3 m3 1.39
5 Pek Kolom Beton 15/15 1:2:3 m3 0.17
6 Pek Balok Beton B2 20/45 fc' 22,5 Mpa m3 1.14
Pek Balok Lateu 10/15 atas kusen m3 0.14

III PEKERJAAN KERAMIK


1 Pas Lantai keramik 40x40 kw I m2 35.10
Luas Seluruh
Luas 2
2 Pas Lantai keramik KM 40x40 kw I m2 -
tempat tower
IV PEKERJAAN KUSEN PINTU DAN JENDELA
1 Pas Jendela J5 (jendela belakang) bh 3.00
2 Pas Kusen aluminium 3" coklat m1 13.80
3 Pas Daun Jdl besar aluminium coklat bh 3.00
4 Pas kaca mati 5" m2 1.90
5 Pas Pegangan railing Stainless 1 1/2" m1 7.58

V PEKERJAAN PLAFOND
1 Pas Plafond Dinogip dan m2 36.00
2 Pas Plafond Kalsiboard m2 -

VI PEKERJAAN INSTALASI AIR


1 Pas Tower Pinguin 1000 liter bh 1.00
2 Pipa PVC 1" m1 -
3 Pipa PVC 1/2" m1 -
4 Pas Fllor Drain Stainless bh -

VII PEKERJAAN PENGECATAN


1 Pek Cat Dinding Luar Dulux m2 190.70
2 Pek Cat Dinding Dalam Catylac m2 468.42
3 Pek Pengecatan plafon kalsiboard m2 -
4 Pek Pengecatan lisplang m1 35.60

VIII PEKERJAAN ATAP DEPAN


1 Pas Rangka Atap Baja Ringan m2 90.40
2 Pas Genteng Glasur natural Kanmuri m2 127.17
Bentuk Trapesium

Bentuk Segitiga
3 Pas Bubungan genteng Kanmuri m1 27.86
4 Pas Lisplang dobel woodplang m1 35.60
PERHITUNGAN

Panjang (m) Lebar (m) Tinggi (m) Jumlah Total Jumlah Total

1 1 1.00
24.3 13.075 317.7225 317.72
24.3 13.075 74.75 74.75
2.5 4 10 10.00
12.85 3.575 45.93875 45.94

3.14 1.5625 4.5 18 397.40625 397.41


147 1.00 1.05 204.51375 204.51
1.65
1.00 1.00 2.05 16 32.8 32.80
275.33 275.33
35.3 48.3 0.45 37.62 37.62
31 33.45 0.1 6.445 6.45

147 0.8 0.8 64.68 64.68


0.3
147 1.00 0.2 29.4 29.40
147 1.00 0.05 7.35 7.35
1.00 1.00 0.1 16 1.6 1.60
24.3 13.075 74.75 74.75
238.05
18.045 4.00 72.18 41.70
1.07 2.66 1 2.8462 2.85
1.781 1.56 1 2.77836 2.78
0.924 9.66 1 8.92584 8.93
0.3 4 3 3.6 3.60
0.3 4 1 1.2 1.20
0.15 4 5 3 3.00
8.8 0.6 5.28 5.28
5.425 0.4 2.17 2.17
4.55 0.15 0.6825 0.68
34.5 4 138 73.90
1.07 2.66 2 5.6924 5.69
0.8 2.67 1 2.136 2.14
1.781 1.56 5 13.8918 13.89
0.72 0.62 1 0.4464 0.45
0.3 4 6 7.2 7.20
0.3 4 6 7.2 7.20
0.15 4 6 3.6 3.60
18 0.6 10.8 10.80
27 0.4 10.8 10.80
15.57 0.15 2.3355 2.34
34.5 4 138 73.90
1.07 2.66 2 5.6924 5.69
0.8 2.67 1 2.136 2.14
1.781 1.56 5 13.8918 13.89
0.72 0.62 1 0.4464 0.45
0.3 4 6 7.2 7.20
0.3 4 6 7.2 7.20
0.15 4 6 3.6 3.60
18 0.6 10.8 10.80
27 0.4 10.8 10.80
15.57 0.15 2.3355 2.34
18.045 4.00 72.18 41.70
1.07 2.66 1 2.8462 2.85
1.781 1.56 1 2.77836 2.78
0.924 9.66 1 8.92584 8.93
0.3 4 3 3.6 3.60
0.3 4 1 1.2 1.20
0.15 4 5 3 3.00
8.8 0.6 5.28 5.28
5.425 0.4 2.17 2.17
4.55 0.15 0.6825 0.68
5.85 4 23.4 6.86
0.3 4 2 2.4 2.40
0.15 4 4 2.4 2.40
5.85 0.4 2.34 2.34
1 1.5 2 3 3.00
1.6 2 2 6.4 6.40
2 238.05 476.10
4.00 32 128.00 128.00
0.6 0.6 1 2 0.72 0.72

4 4 4.00
26.15 22.6 97.5 97.50

3.14 1.5625 2.5 18 220.78125 220.78


1.8 1.8 0.8 18 27.216 27.22
0.3
1.00 1.00 0.65 16 6.76 6.76
0.3
1.00 1.00 0.1 16 1.6 1.60
164.978 0.2 0.4 13.19824 13.20
0.3 0.3 4.00 16 5.76 5.76
0.2 0.3 4.00 16 3.84 3.84
0.3 0.6 4.00 2 1.44 1.44
3.14 0.36 4.00 2 9.0432 9.04
0.15 0.15 4.00 26 2.34 2.34
63.6 0.3 0.6 11.448 11.45
158.81 0.2 0.45 14.2929 14.29
2 9.16
1.075 9.575 0.4 4.11725 4.12
1.075 1.075 0.4 0.46225 0.46
3.54
4 1 0.4 2 3.54
40.09 0.15 0.15 0.902025 0.90
2.87

1 28.66 0.1 2.866


0.12 215.98 25.92 25.92
5.25
0.12 43.73 5.25
26.15 22.6 0.05 4.875 4.88
1.5 0.8 0.3 1.38 5.46
1.5 0.2 1.2 4.08
3.52 1.5 0.12 2 1.2672 1.99
2 3 0.12 0.72
265.25
25.05
2.5 3.405 8.5125 8.51
3.5 4.725 16.5375 16.54
4.575 6.00 27.45 27.45
4.425 6.00 26.55 26.55
1.5 4.00 6.00 6.00
3.00 5.00 15.00 15.00
1.5 4.00 6.00 6.00
4.425 6.00 26.55 26.55
4.575 6.00 27.45 27.45
25.05
2.5 3.405 8.5125 8.51
3.5 4.725 16.5375 16.54
17.49 2.5 43.725 43.73
36.42
0.7 1.625 1.1375 1.14
1.075 6.65 7.14875 7.15
2.5 1 2.5 2.50
1 14.85 14.85 14.85
2.5 1 2.5 2.50
1.075 6.65 7.14875 7.15
0.7 1.625 1.1375 1.14
1.5 2 2 6 6.00
1.5 2 2.00 14.00 12.40
0.8 2.00 1.6 1.60
1.5 2 6.20 6.20
7.00 2.00 14.00 20.00
0.25 2.00 12 6.00 6.00
7.50
1.50 0.185 1 0.28 0.28
1.50 0.165 11 2.72 2.72
0.25 1.50 12 4.50 4.50

6 6 6.00
1.07 2.66 44.76 44.76
6 6 6.00
6 6 6.00
6 6 6.00
2 12 12.00
6 6 6.00
2 12 12.00
6 6 6.00

2 2 2.00
0.8 2.67 13.88 13.88
2 2 2.00
2 2 2.00

12 12 12.00
1.781 1.56 80.18 80.18
3 36 36.00
3 36 36.00
0.327 0.72 3 8.47584 12.48
0.327 0.34 3 4.00248
2 2 2.00
0.924 9.66 42.336 42.34
0.804 9.54 15.34032 15.34

2 2 2.00
1 1.5 10 10.00
2 4 4.00
-
2 2 2.00
0.72 0.62 5.36 5.36
0.6 0.5 0.6 0.60

12.93945 12.93945 12.93945 12.94

3 3 3.00
1.781 1.56 20.05 20.05
0.327 1.06 1.03986 1.04

6 6 6.00
0.8 1.50 27.60 27.60
6 6 6.00
0.52 1.22 3.8064 3.81

216.33
2.8 12.36 2 69.216 69.22
4.025 12.36 2 99.498 81.65
0.924 9.66 2 17.85168
9 8.2 73.8 65.46
1.781 1.56 3 8.33508

213.83 213.83
2.15 9.575 2 41.1725 41.17

7.78 7.78 7.78


12.9 12.9 12.90
10 10 10.00
1 2 2.00
1 2 2.00
1 1 1.00
2 2 2.00
1 2 2.00
1 2 2.00

1 1 1.00
1.00 1.00 1.00
12,8 12,8 12,8
1 1 1.00
6.6 6.6 6.60
11.5 11.5 11.50
1 2 2.00
1 2 2.00

2 278.85 557.70
2 278.85 557.70
41.17 41.17
2 89.52 89.52
0.9 2.00 6.00 21.60 21.60
0.6 0.7 6.00 31.20 31.20
276.35
18.045 4.00 72.18 41.70
1.07 2.66 1 2.8462 2.85
1.781 1.56 1 2.77836 2.78
0.924 9.66 1 8.92584 8.93
0.3 4 3 3.6 3.60
0.3 4 1 1.2 1.20
0.15 4 5 3 3.00
8.8 0.6 5.28 5.28
5.425 0.4 2.17 2.17
4.55 0.15 0.6825 0.68
34.5 4 138 73.90
1.07 2.66 2 5.6924 5.69
0.8 2.67 1 2.136 2.14
1.781 1.56 5 13.8918 13.89
0.72 0.62 1 0.4464 0.45
0.3 4 6 7.2 7.20
0.3 4 6 7.2 7.20
0.15 4 6 3.6 3.60
18 0.6 10.8 10.80
27 0.4 10.8 10.80
15.57 0.15 2.3355 2.34
34.5 4 138 73.90
1.07 2.66 2 5.6924 5.69
0.8 2.67 1 2.136 2.14
1.781 1.56 5 13.8918 13.89
0.72 0.62 1 0.4464 0.45
0.3 4 6 7.2 7.20
0.3 4 6 7.2 7.20
0.15 4 6 3.6 3.60
18 0.6 10.8 10.80
27 0.4 10.8 10.80
15.57 0.15 2.3355 2.34
18.045 4.00 72.18 41.70
1.07 2.66 1 2.8462 2.85
1.781 1.56 1 2.77836 2.78
0.924 9.66 1 8.92584 8.93
0.3 4 3 3.6 3.60
0.3 4 1 1.2 1.20
0.15 4 5 3 3.00
8.8 0.6 5.28 5.28
5.425 0.4 2.17 2.17
4.55 0.15 0.6825 0.68
11.2 4 44.8 38.30
4.425 1.2 2 10.62 10.62
0.8 1.50 2 2.4 2.40
1.781 1.56 1 2.77836 2.78
0.15 4 6 3.6 3.60
0.6 4 2 4.8 4.80
8.85 0.4 1 3.54 3.54
5.85 4 23.4 6.86
0.3 4 2 2.4 2.40
0.15 4 4 2.4 2.40
5.85 0.4 2.34 2.34
1 1.5 2 3 3.00
1.6 2 2 6.4 6.40

2 276.35 552.70
4 32 128 128.00

0.3 0.3 4.00 16 5.76 5.76


0.2 0.3 4.00 16 3.84 3.84
0.3 0.6 4.00 2 1.44 1.44
3.14 0.36 4.00 2 9.0432 9.04
0.15 0.15 4.00 30 2.7 2.70
63.6 0.3 0.6 11.448 11.45
158.81 0.2 0.45 14.2929 14.29
2 9.16
1.075 9.575 0.4 4.11725 4.12
1.075 1.075 0.4 0.46225 0.46
4 1 0.4 2 3.54 3.54

40.09 0.15 0.15 0.902025 0.90


1 28.66 0.1 2.866 2.87

0.12 215.98 25.92 25.92


3.52 1.5 0.12 2 1.2672 1.99
2 3 0.12 0.72

228.83
25.05
2.5 3.405 8.5125 8.51
3.5 4.725 16.5375 16.54
4.575 6.00 27.45 27.45
4.425 6.00 26.55 26.55
1.5 4.00 6.00 6.00
3.00 5.00 15.00 15.00
1.5 4.00 6.00 6.00
4.425 6.00 26.55 26.55
4.575 6.00 27.45 27.45
25.05
2.5 3.405 8.5125 8.51
3.5 4.725 16.5375 16.54
17.49 2.5 43.725 43.73
1.5 2 2 6 6.00
1.5 2 2.00 14.00 12.40
0.8 2.00 1.6 1.60
1.5 2 6.20 6.20
7.00 2.00 14.00 20.00
0.25 2.00 12 6.00 6.00
7.50
1.50 0.185 1 0.28 0.28
1.50 0.165 11 2.72 2.72
0.25 1.50 12 4.50 4.50

6 6 6.00
1.07 2.66 44.76 44.76
6 6 6.00
6 6 6.00
6 6 6.00
2 12 12.00
6 6 6.00
2 12 12.00
6 6 6.00

2 2 2.00
0.8 2.67 13.88 13.88
2 2 2.00
2 2 2.00

12 12 12.00
1.781 1.56 80.18 80.18
3 36 36.00
3 36 36.00
0.327 0.72 3 8.47584 12.48
0.327 0.34 3 4.00248
2 2 2.00
0.924 9.66 42.336 42.34
0.804 9.54 15.34032 15.34

2 2 2.00
1 1.5 10 10.00
2 4 4.00
-
2 2 2.00
0.72 0.62 5.36 5.36
0.6 0.5 0.6 0.60

12.93945 12.93945 12.93945 12.94

2 10 20.00

213.83 213.83
2.15 9.575 2 41.1725 41.17

8,64 8,64 8,64


8 8 8.00
6.87 6.87 6.87
10.6 10.6 10.60
11.5 11.5 11.50
1 2 2.00
1 2 2.00
1 1 1.00
2 2 2.00
1 2 2.00
1 2 2.00

2 321.95 643.90
2 321.95 643.90
41.17 41.17
44.76 44.76
0.9 2.00 6.00 10.80 10.80
0.6 0.7 6.00 15.60 15.60

296.35
18.045 4.80 86.616 54.57
1.07 2.66 1 2.8462 2.85
1.781 1.56 1 2.77836 2.78
0.924 9.66 1 8.92584 8.93
0.3 4.80 3 4.32 4.32
0.3 4.80 1 1.44 1.44
0.15 4.80 5 3.6 3.60
8.8 0.6 5.28 5.28
5.425 0.4 2.17 2.17
4.55 0.15 0.6825 0.68
22.2 4.80 106.56 54.38
1.07 2.66 2 5.6924 5.69
1.781 1.56 5 13.8918 13.89
0.3 4.80 6 8.64 8.64
0.3 4.80 4 5.76 5.76
0.15 4.80 3 2.16 2.16
0.8 2.67 1 2.136 2.14
0.72 0.62 1 0.4464 0.45
1.8 0.6 1.08 1.08
27 0.4 10.8 10.80
10.47 0.15 1.5705 1.57
34.5 4.8 165.6 97.90
1.07 2.66 2 5.6924 5.69
0.8 2.67 1 2.136 2.14
1.781 1.56 5 13.8918 13.89
0.72 0.62 1 0.4464 0.45
0.3 4.80 6 8.64 8.64
0.3 4.80 6 8.64 8.64
0.15 4.80 6 4.32 4.32
18 0.6 10.8 10.80
27 0.4 10.8 10.80
15.57 0.15 2.3355 2.34
18.045 4.80 86.616 54.57
1.07 2.66 1 2.8462 2.85
1.781 1.56 1 2.77836 2.78
0.924 9.66 1 8.92584 8.93
0.3 4.80 3 4.32 4.32
0.3 4.80 1 1.44 1.44
0.15 4.80 5 3.6 3.60
8.8 0.6 5.28 5.28
5.425 0.4 2.17 2.17
4.55 0.15 0.6825 0.68
11.2 4.8 53.76 24.34
4.425 1.2 2 10.62 10.62
0.8 1.50 2 2.4 2.40
1.781 1.56 1 2.77836 2.78
0.15 4.80 6 4.32 4.32
0.6 4.80 2 5.76 5.76
8.85 0.4 1 3.54 3.54
5.85 4.8 28.08 10.58
0.3 4.80 2 2.88 2.88
0.15 4.80 4 2.88 2.88
5.85 0.4 2.34 2.34
1 1.5 2 3 3.00
1.6 2 2 6.4 6.40

2 296.35 592.70
4 16 64 64.00

0.3 0.3 4.80 16 6.912 6.91


0.2 0.3 4.80 14 4.032 4.03
0.3 0.6 4.80 2 1.728 1.73
3.14 0.36 4.80 2 10.85184 10.85
0.15 0.15 4.80 30 3.24 3.24
63.6 0.3 0.6 11.448 11.45
158.81 0.2 0.45 14.2929 14.29
4 1 0.4 2 3.54 3.54

48.34 0.15 0.15 1.08765 1.09


1 28.66 0.1 2.866 2.87

6 8.5 0.12 4.21 4.21


2.65 6
6 3 0.12 2.16 2.16

3.52 1.5 0.12 2 1.2672 1.99


2 3 0.12 0.72

228.83
25.05
2.5 3.405 8.5125 8.51
3.5 4.725 16.5375 16.54
9 6.00 54 54.00
1.5 4.00 6.00 6.00
3.00 5.00 15.00 15.00
1.5 4.00 6.00 6.00
4.425 6.00 26.55 26.55
4.575 6.00 27.45 27.45
25.05
2.5 3.405 8.5125 8.51
3.5 4.725 16.5375 16.54
17.49 2.5 43.725 43.73
1.5 2 2 6 6.00
1.5 2 2.00 14.00 12.40
0.8 2.00 1.6 1.60
1.5 2 6.20 6.20
7.00 2.00 14.00 20.00
0.25 2.00 12 6.00 6.00
7.50
1.50 0.185 1 0.28 0.28
1.50 0.165 11 2.72 2.72
0.25 1.50 12 4.50 4.50

6 6 6.00
1.07 2.66 44.76 44.76
6 6 6.00
6 6 6.00
6 6 6.00
2 12 12.00
6 6 6.00
2 12 12.00
6 6 6.00

2 2 2.00
0.8 2.67 13.88 13.88
2 2 2.00
2 2 2.00

12 12 12.00
1.781 1.56 80.18 80.18
3 36 36.00
3 36 36.00
0.327 0.72 3 8.47584 12.48
0.327 0.34 3 4.00248
2 2 2.00
0.924 9.66 42.336 42.34
0.804 9.54 15.34032 15.34

2 2 2.00
1 1.5 10 10.00
2 4 4.00
-
2 2 2.00
0.72 0.62 5.36 5.36
0.6 0.5 0.6 0.60
12.93945 12.93945 12.93945 12.94

2 10 20.00

2 2 2.00

162.51 162.51
2.15 9.575 2 41.1725 41.17

8.64 8.64 8.64 8.64


6.87 6.87 6.87 6.87
19.26 19.26 19.26 19.26
11.5 11.5 11.5 11.50
1 2 2.00
1 2 2.00
1 1 1.00
2 2 2.00
1 2 2.00
1 2 2.00

2 696.38 696.38
2 696.38 696.38
41.17 41.17
26.23 9.65 71.76 71.76
44.76 44.76
0.9 2 6 10.8 10.80
0.6 0.7 6 2.52 2.52

26.23 9.65 239.94195402299 239.941954023 239.94


6 8.5
222.70
26.23 4.47 2 136.4271 136.43
15.7
9.65 4.47 2 86.271 86.27
41.06 35.06 35.06 35.06

26.23 9.65 71.76 71.76

76.15
29 3.86 111.94 76.15
0.72 0.62 3 1.3392 1.34
0.3 4 4 4.8 4.80
0.3 4 4 4.8 4.80
0.12 4 2 0.96 0.96
15.35 0.6 9.21 9.21
12.7 0.4 5.08 5.08
0.6 16 1 9.6 9.60
2 152.30 152.30
3.86 9 34.74 34.74

0.3 0.3 3.86 4 1.3896 1.39


0.2 0.3 3.86 4 0.9264 0.93
0.3 0.6 3.86 2 1.3896 1.39
0.15 0.15 3.86 2 0.1737 0.17
12.7 0.2 0.45 1.143 1.14
6 0.15 0.15 0.135 0.14

35.10
8.5 6 51 51.00
6 2.65 15.9 15.90
0 -
3 3 3.00
0.8 1.50 13.80 13.80
3 3 3.00
0.52 1.22 1.9032 1.90
7.575 7.575 7.58

8.5 6 51 36.00
-

1 1 1.00
- - -
- - -
- - -

2.00 190.70 190.70


2.00 468.42 468.42

8.15 9.65 35.6 35.6 35.60

8.15 9.65 90.399425287356 90.39942528736 90.40


127.17
9.65 4.47 2 54.3105 54.31
2.5
8.15 4.47 2 72.861 72.86
27.86 27.86 27.86 27.86
8.15 9.65 35.6 35.6 35.60
3 3.5 10.5
2.5
12

31.65625

4.575
6

27.45
21.15

18
200 16.5 11 181.5 18.5

11
18.18182

300 12 25
107.5
107.5

#REF!
48.7

402.5

9
820

2.15
9.575
4.47
4.5
6.34
RENCANA ANGGARAN BIAYA
REKAPITULASI HARGA

NAMA PEKERJAAN : PEKERJAAN PEMBANGUNAN GEDUNG UKM, IMM, RADIO


UNIVERSITAS MUHAMMADIYAH PURWOKERTO
JENIS PEKERJAAN : PEMBANGUNAN GEDUNG BARU
SUMBER DANA : -
TAHUN ANGGARAN : 2022
LOKASI : UNIVERSITAS MUHAMMADIYAH PURWOKERTO
KABUPATEN PURWOKERTO

NO REKAB PEKERJAAN JUMLAH HARGA

I JUMLAH TOTAL PEKERJAAN LANTAI 01 Rp. -


II JUMLAH TOTAL PEKERJAAN LANTAI 02 Rp. -
III JUMLAH TOTAL PEKERJAAN LANTAI 03 Rp. -
IV JUMLAH TOTAL PEKERJAAN LANTAI 04 Rp. -

A JUMLAH Rp. -
B PPN 11% Rp. -
C JUMLAH TOTAL Rp. -
D DIBULATKAN Rp. -

Terbilang : ###

dibuat oleh :
peserta
Nawasena Sunrise

…………………….
tim
..................
PEKERJAAN PEMBANGUNAN GEDUNG UKM, IMM, RADIO UNIVERSITAS
MUHAMMADIYAH PURWOKERTO
HARGA SAT JML HARGA JML TOTAL
NO URAIAN PEKERJAAN VOLUME SAT
(Rp) (Rp) (Rp)
LANTAI 01
I PEKERJAAN PERSIAPAN
1 Pengurusan IMB 1 ls 1,200,000 Rp 1,200,000.00 1,200,000.00
2 Pembersihan lokasi 317.7225 m2 85,000 Rp 27,006,412.50 27,006,412.50
3 Pasangan bouplang 74.75 m1 177,142 Rp 13,241,364.50 13,241,364.50
4 Direksi Kit (10 m2) 10 ls 1,622,857 Rp 16,228,570.00 16,228,570.00
5 Pas Pavingblok halaman utara 45.93875 m2 164,632 Rp 7,562,988.29 7,562,988.29
Rp 65,239,335.29 Rp 65,239,335.29

II PEKERJAAN TANAH DAN PASIR


1 Galian tnh Pondasi Sumuran 397.40625 m3 94,339 Rp 37,490,908.22 37,490,908.22
2 Galian tnh Pondasi 634.72 m3 65,148 Rp 41,350,738.56 41,350,738.56
3 Urug tanah kembali 275.33275 m3 46,695 Rp 12,856,662.76 12,856,662.76
4 Urug tanah peninggian level bang. 37.62 m3 263,659 Rp 9,918,851.58 9,918,851.58
5 Urug pasir bwh lantai 6.445 m3 188,348 Rp 1,213,902.86 1,213,902.86
Rp 102,831,063.98 Rp 102,831,063.98

III PEKERJAAN PASANGAN


1 Pas Pondasi bt kali 1:5 64.68 m3 415,000 Rp 26,842,200.00 26,842,200.00
2 Pas Rollag Bata 1:5 74.75 m1 200,700 Rp 15,002,325.00 15,002,325.00
3 Pas Dinding 1/2 bata 1:5 238.05 m2 205,500 Rp 48,919,275.00 48,919,275.00
4 Pek Plesteran dan Acian dinding 476.1 m2 112,500 Rp 53,561,250.00 53,561,250.00
5 Pek Sponengan 128 m1 112,500 Rp 14,400,000.00 14,400,000.00
6 Pek Pas Batu Andersit Klm besar depan 0.72 m2 284,000 Rp 204,480.00 204,480.00
7 Pek Pas plesteran penutup pipa air hujan m2 Rp -
8 Pek Pas Glassblok lt 1 s/d lt 3 4 bh 23,350 Rp 93,400.00 93,400.00
9 Pek Selokan Keliling bangunan 97.5 m1 46,274 Rp 4,511,715.00 4,511,715.00
Rp 159,022,930.00 Rp 159,022,930.00

IV PEKERJAAN BETON
1 Pek Pondasi Sumuran (Cyclope) 220.78125 m3 813,841 Rp 179,680,833.28 179,680,833.28
2 Pek Foot Plate 1:2:3 m3 3,113,600 Rp -
3 Pek Sloof Beton 20/40 1:2:3 13.19824 m3 219,457 Rp 2,896,446.16 2,896,446.16
4 Pek Kolom Beton K1 30/30 1:2:3 5.76 m3 494,915 Rp 2,850,710.40 2,850,710.40
5 Pek Kolom Beton K2 20/30 1:2:3 3.84 m3 494,915 Rp 1,900,473.60 1,900,473.60
6 Pek Kolom Beton K3 30/60 1:2:3 1.44 m3 494,915 Rp 712,677.60 712,677.60
7 Pek Kolom Beton Bulat Ф 60 1:2:3 9.0432 m3 494,915 Rp 4,475,615.33 4,475,615.33
8 Pek Kolom Beton 15/15 1:2:3 2.34 m3 90,138 Rp 210,922.92 210,922.92
9 Pek Balok Beton B1 30/60 fc' 22,5 Mpa 11.448 m3 5,918,754 Rp 67,757,895.79 67,757,895.79
10 Pek Balok Beton B2 20/45 fc' 22,5 Mpa 14.2929 m3 5,918,754 Rp 84,596,159.05 84,596,159.05
11 Pek Balok Beton Lisplang fc' 22,5 Mpa 9.159 m3 4,872,300 Rp 44,625,395.70 44,625,395.70
12 Pek Balok Beton Lisplang fc' 22,5 Mpa Tampak 3.54 m3 4,872,300 Rp 17,247,942.00
depan Utara
17,247,942.00
13 Pek Balok Latei 10/15 atas kusen 0.902025 m3 429,187 Rp 387,137.40 387,137.40
14 Pek Beton sun shading belakang selatan Pek Beton 2.866 m4 3,143,935 Rp 9,010,517.71
sun shading penutup timur-barat 9,010,517.71
15 Pek Plat beton lantai t=12 cm fc' 22,5 Mpa 25.917 m5 4,472,475 Rp 115,913,134.58 115,913,134.58
16 Pek Plat beton teras depan t=12 cm fc' 22,5 Mpa 5.247 m6 4,472,475 Rp 23,467,076.33
23,467,076.33
17 Pek Rabat Beton 1:3:5 4.875 m7 797,015.16 Rp 3,885,448.91 3,885,448.91
18 Pek foot plate Tangga fc' 22,5 Mpa 5.46 m8 3,113,600 Rp 17,000,256.00 17,000,256.00
19 Pek foot plate Tangga fc' 22,5 Mpa m9 4,472,475 Rp -
Rp 576,618,642.74 Rp 576,618,642.74

V PEKERJAAN KERAMIK
1 Pas Lantai keramik 40x40 kw I 265.2475 m2 232,977.20 Rp 61,796,619.86 61,796,619.86
2 Pas Lantai keramik KM Anti Slip 40x40 kw I 6 m2 232,977.20 Rp 1,397,863.20 1,397,863.20
3 Pas Dinding Keramik KM 20x20 kw I 12.4 m2 239,410.00 Rp 2,968,684.00 2,968,684.00
4 Pas Lis keramik KM 6.2 m1 86,290 Rp 534,998.00 534,998.00
5 Pas Keramik dinding Tangga 20 m2 413,277.30 Rp 8,265,546.00 8,265,546.00
6 Pas Keramik lantai Tangga dg stepnosing 7.5 m2 413,277.30 Rp 3,099,579.75 3,099,579.75
Rp 16,266,670.95 Rp 16,266,670.95

VI PEKERJAAN KUSEN PINTU JENDELA


1 Pas Pintu P1 6 bh Rp -
Pas Kusen Bangkirei 6/15 44.76 m1 Rp -
Pas Daun Pintu (ukuran 0,9x2) 6 bh Rp -
Pas daun jendela atas pintu(uk 0,6x0,7) 6 unit Rp -
Pas Slot pintu 6 bh Rp -
Pas engsel 4" utk daun pintu 12 psg Rp -
Pas engsel 3" utk daun jendela 6 psg Rp -
Pas Tangan gareng 12 psg Rp -
Pas Kunci Gerendel Jago 6 bh Rp -

2 Pas Pintu Aluminium P2 2 bh Rp -


Pas Kusen aluminium 3" coklat 13.88 m1 Rp -
Pas Daun Pintu aluminium coklat 2 bh Rp -
Pas Daun Jendela aluminium. atas pintu 2 bh Rp -

3 Pas Jendela J1 12 bh Rp -
Pas Kusen aluminium 3" coklat 80.184 m1 Rp -
Pas Daun Jdl besar aluminium coklat 36 bh Rp -
Pas Daun Jdl kecil aluminium coklat 36 bh Rp -
Pas kaca mati 5" 12.47832 m2 Rp -

4 Pas Jendela J2 2 bh Rp -
Pas Kusen certainwall 42.336 m1 Rp -
Pas kaca mati 5" 15.34032 m2 Rp -

5 Pas Pintu Shaft 2 bh Rp -


Pas Kusen aluminium 3" coklat 5.36 m1 Rp -
Pas Daun Pintu aluminium 4 bh Rp -

6 Pas Boven BV 2 bh Rp -
Pas Kusen aluminium 3" coklat 5.36 m1 Rp -
Pas kaca mati 5" 0.6 m2 Rp -

7 Pas Pegangan railing tangga Stainless 1 1/2" 12.93945 m1 Rp -

8 Pas Jendela J4 lantai 2,3,4 3 bh Rp -


Pas Kusen certainwall 20.05 m1 Rp -
Pas kaca mati 5" 1.04 m2 Rp -

9 Pas Jendela J3 lantai 2,3,4 6.00 bh Rp -


Pas Kusen certainwall 27.60 m1 Rp -
Pas daun jendela 6.00 bh Rp -
Pas kaca mati 5" 3.81 m2 Rp -

10 Pasang alucubon depan dari lt 2,3,4 bh Rp -


Pas alucubon 216.33 m2 Rp -
Rp - Rp -

VII PEKERJAAN PLAFOND -


1 Pas Plafond Dinogip 213.83 m2 Rp -
Pas Plafond kalsiboard 41.17 -
Rp - Rp -

VIII PEKERJAAN INTALASI AIR KOTOR -


1 Pas Pipa PVC ø4" Maspion KM 7.78 m1 Rp -
2 Pas Pipa PVC ø3" Maspion KM 12.90 m1 Rp -
3 Pas Pipa PVC ø2" AIR HUJAN utara dr lt 2 10.00 m1 Rp -
4 Pas Fllor Drain Stainless 2.00 bh Rp -
5 Pas tmp sabun 2.00 bh Rp -
6 Septic tank dan peresapan 1.00 ls Rp -
7 Peresapan Air Hujan 2.00 bh Rp -
8 Pas Kloset jongkok 2.00 bh Rp -
9 Pas jet shower pd tiap km 2.00 bh Rp -
Rp - Rp -

IX PEKERJAAN INTALASI AIR BERSIH


1 Pas Groundtank pakai pinguin 1000 ltr 1.00 bh Rp -
2 Pas Pompa air bersih dr sumur ke ground 1.00 m1 Rp -
3 Pas Pompa air bersih dr ground ke lt 4 12,8 m1 Rp -
4 Pipa Air bersih 1" dr sumur ke groundtank 1.00 m1 Rp -
5 Pipa Air bersih 1" dr groundtank ke atas 6.60 m1 Rp -
6 Pipa PVC 1/2" 11.50 m1 Rp -
7 Pas Kran KM 1/2" 2.00 bh Rp -
8 Pas Kran wudlu 1/2" 2.00 bh Rp -
Rp - Rp -

X PEKERJAAN PENGECATAN
1 Pek Cat Dinding Luar Dulux m2 Rp -
2 Pek Cat Dinding Dalam Catylac m2 Rp -
3 Pek Cat Plafon Catylac (kalsiboard) m2 Rp -
4 Pek Melamin Kusen Pintu m1 Rp -
5 Pek Melamin Daun Pintu m2 Rp -
6 Pek Melamin Daun Jendela m1 Rp -
Rp - Rp -
JUMLAH TOTAL PEKERJAAN LANTAI 01 Rp -

LANTAI 02
I PEKERJAAN PASANGAN
1 Pas Dinding 1/2 bata 1:5 276.35 m2 205,500 Rp 56,790,262.02 56,790,262.02
2 Pek Plesteran dan Acian dinding 552.70 m2 112,500 Rp 62,179,119.00 62,179,119.00
3 Pek Sponengan 128.00 m1 112,500 Rp 14,400,000.00 14,400,000.00
4 Pas penebalan klm penutup pipa a hjn m2 Rp -
Rp 133,369,381.02 Rp 133,369,381.02

II PEKERJAAN BETON
1 Pek Kolom Beton K1 30/30 1:2:3 5.76 m3 494,915 Rp 2,850,710.40 2,850,710.40
2 Pek Kolom Beton K2 20/30 1:2:3 3.84 m3 494,915 Rp 1,900,473.60 1,900,473.60
3 Pek Kolom Beton K3 30/60 1:2:3 1.44 m3 494,915 Rp 712,677.60 712,677.60
4 Pek Kolom Beton Bulat Ф 60 1:2:3 9.0432 m3 494,915 Rp 4,475,615.33 4,475,615.33
5 Pek Kolom Beton 15/15 1:2:3 2.7 m3 90,138 Rp 243,372.60 243,372.60
6 Pek Balok Beton B1 30/60 fc' 22,5 Mpa 11.448 m3 5,918,754 Rp 67,757,895.79 67,757,895.79
7 Pek Balok Beton B2 20/45 fc' 22,5 Mpa 14.2929 m3 5,918,754 Rp 84,596,159.05 84,596,159.05
8 Pek Balok Beton Lisplang fc' 22,5 Mpa 9.159 m3 4,872,300 Rp 44,625,395.70 44,625,395.70
9 Pek Balok Beton Lisplang fc' 22,5 Mpa 3.54 m3 4,872,300 Rp 17,247,942.00 17,247,942.00
Tampak depan Utara - -
10 Pek Balok Lateu 10/15 atas kusen 0.902025 m3 429,187 Rp 387,137.40 387,137.40
11 Pek Beton sun shading belakang selatan 2.866 m3 3,143,935 Rp 9,010,517.71 9,010,517.71
Pek Beton sun shading penutup timur-barat - -
12 Pek Plat beton lantai t=12 cm fc' 22,5 Mpa 25.917 m3 4,472,475 Rp 115,913,134.58 115,913,134.58
13 Pek Plat Tangga fc' 22,5 Mpa 1.9872 m3 3,113,600 Rp 6,187,345.92 6,187,345.92
Rp 355,908,377.68 Rp 355,908,377.68

III PEKERJAAN KERAMIK


1 Pas Lantai keramik 40x40 kw I 228.825 m2 232,977.20 Rp 53,311,007.79 53,311,007.79
2 Pas Lantai keramik KM Anti Slip 40x40 kw I 6 m2 232,977.20 Rp 1,397,863.20 1,397,863.20
3 Pas Dinding Keramik KM 20x20 kw I 12.4 m2 239,410.00 Rp 2,968,684.00 2,968,684.00
4 Pas Lis keramik KM 6.2 m1 86,290 Rp 534,998.00 534,998.00
5 Pas Keramik dinding Tangga 20 m2 413,277.30 Rp 8,265,546.00 8,265,546.00
6 Pas Keramik lantai Tangga dg stepnosing 7.5 m2 413,277.30 Rp 3,099,579.75 3,099,579.75
Rp 69,577,678.74 Rp 69,577,678.74

IV PEKERJAAN KUSEN PINTU DAN JENDELA


1 Pas Pintu P1 6 bh Rp -
Pas Kusen Bangkirei 6/15 44.76 m1 Rp -
Pas Daun Pintu (ukuran 0,9x2) 6 bh Rp -
Pas daun jendela atas pintu(uk 0,6x0,7) 6 unit Rp -
Pas Slot pintu 6 bh Rp -
Pas engsel 4" utk daun pintu 12 psg Rp -
Pas engsel 3" utk daun jendela 6 psg Rp -
Pas Tangan gareng 12 psg Rp -
Pas Kunci Gerendel Jago 6 bh Rp -

2 Pas Pintu Aluminium P2 2 bh Rp -


Pas Kusen aluminium 3" coklat 80.184 m1 Rp -
Pas Daun Pintu aluminium coklat 36 bh Rp -
Pas Daun Jendela aluminium. atas pintu 2 bh Rp -

3 Pas Jendela J1 12 bh Rp -
Pas Kusen aluminium 3" coklat 80.184 m1 Rp -
Pas Daun Jdl besar aluminium coklat 36 bh Rp -
Pas Daun Jdl kecil aluminium coklat 36 bh Rp -
Pas kaca mati 5" 12.47832 m2 Rp -

4 Pas Jendela J2 2 bh Rp -
Pas Kusen certainwall 42.336 m1 Rp -
Pas kaca mati 5" 15.34032 m2 Rp -

5 Pas Pintu Shaft 2 bh Rp -


Pas Kusen aluminium 3" coklat 10 m1 Rp -
Pas Daun Pintu aluminium 4 bh Rp -

6 Pas Boven BV 2 bh Rp -
Pas Kusen aluminium 3" coklat 5.36 m1 Rp -
Pas kaca mati 5" 0.6 m2 Rp -

7 Pas Pegangan railing tangga Stainless 1 1/2" 12.93945 m1 Rp -

8 Pas Pegangan railing depan Stainless 1 1/2" bh Rp -

9 Pas Hollow tampak depan 20 bh Rp -


Rp - Rp -

V PEKERJAAN PLAFOND -
1 Pas Plafond Dinogip 213.83 m2 Rp -
Pas Plafond kalsiboard 41.17 -
Rp - Rp -

VI PEKERJAAN INSTALASI AIR


1 Pas Pipa PVC ø3" Maspion 8,64 m1 Rp -
2 Pas Pipa PVC ø2" Maspion air hujan 8.00 m1 Rp -
3 Pas Pipa PVC ø4" Maspion 6.87 m1 Rp -
4 Pipa PVC 1" dari bawah 10.60 m1 Rp -
5 Pipa PVC 1/2" 11.50 m1 Rp -
6 Pas Kloset Jongkok 2.00 bh Rp -
7 Pas Fllor Drain Stainless 2.00 bh Rp -
8 Pas Tempat sabun 1.00 bh Rp -
9 Pas Kran KM 1/2" 2.00 bh Rp -
10 Pas Kran Wudlu 1/2" 2.00 bh Rp -
11 Pas Jet shower pd tiap Km 2.00 bh Rp -
Rp - Rp -

VII PEKERJAAN PENGECATAN


1 Pek Cat Dinding Luar Dulux m2 Rp -
2 Pek Cat Dinding Dalam Catylac m2 Rp -
3 Pek Cat Plafon Catylac (kalsiboard) 41.1725 m2 Rp -
4 Pek Melamin Kusen Pintu 44.76 m1 Rp -
5 Pek Melamin Daun Pintu 10.80 m2 Rp -
6 Pek Melamin Daun Jendela 15.60 m1 Rp -
Rp - Rp -
JUMLAH TOTAL PEKERJAAN LANTAI 02 Rp -
LANTAI 03 Rp -
I PEKERJAAN PASANGAN Rp -
1 Pas Dinding 1/2 bata 1:5 296.34864 m2 Rp -
2 Pek Plesteran dan Acian dinding 592.70 m2 Rp -
3 Pek Sponengan 64.00 m1 Rp -
4 Pas penebalan klm penutup pipa a hjn m2 Rp -
Rp - Rp -

II PEKERJAAN BETON
1 Pek Kolom Beton K1 30/30 1:2:3 6.912 m3 Rp -
2 Pek Kolom Beton K2 20/30 1:2:3 4.032 m3 Rp -
3 Pek Kolom Beton K3 30/60 1:2:3 1.728 m3 Rp -
4 Pek Kolom Beton Bulat Ф 60 1:2:3 10.85184 m3 Rp -
5 Pek Kolom Beton 15/15 1:2:3 3.24 m3 Rp -
6 Pek Balok Beton B1 30/60 fc' 22,5 Mpa 11.448 m3 Rp -
7 Pek Balok Beton B2 20/45 fc' 22,5 Mpa 14.2929 m3 Rp -
8 Pek Balok Beton Lisplang fc' 22,5 Mpa 3.54 m3 Rp -
Tampak depan Utara
9 Pek Balok Lateu 10/15 atas kusen 1.08765 m3 Rp -
10 Pek Beton sun shading belakang selatan 2.866 m3 Rp -
Pek Beton sun shading penutup timur-barat
11 Pek Plat beton lantai t=12 cm fc' 22,5 Mpa 4.212 m3 Rp -
12 Pek Plat beton lantai t=12 cm fc' 22,5 Mpa m3 Rp -
menara depan
13 Pek Plat Tangga fc' 22,5 Mpa 1.9872 m3 Rp -
Rp - Rp -

III PEKERJAAN KERAMIK


1 Pas Lantai keramik 40x40 kw I 228.825 m2 Rp -
2 Pas Lantai keramik KM Anti Slip 40x40 kw I 6 m2 Rp -
3 Pas Dinding Keramik KM 20x20 kw I 12.4 m2 Rp -
4 Pas Lis keramik KM 6.2 m1 Rp -
5 Pas Keramik dinding Tangga 20 m2 Rp -
6 Pas Keramik lantai Tangga dg stepnosing 7.5 m2 Rp -
Rp - Rp -

IV PEKERJAAN KUSEN PINTU DAN JENDELA


1 Pas Pintu P1 6 bh Rp -
Pas Kusen Bangkirei 6/15 44.76 m1 Rp -
Pas Daun Pintu (ukuran 0,9x2) 6 bh Rp -
Pas daun jendela atas pintu(uk 0,6x0,7) 6 unit Rp -
Pas Slot pintu 12 bh Rp -
Pas engsel 4" utk daun pintu 6 psg Rp -
Pas engsel 3" utk daun jendela 12 psg Rp -
Pas Tangan gareng 6 psg Rp -
Pas Kunci Gerendel Jago bh Rp -

2 Pas Pintu Aluminium P2 2 bh Rp -


Pas Kusen aluminium 3" coklat 13.88 m1 Rp -
Pas Daun Pintu aluminium coklat 2 bh Rp -
Pas Daun Jendela aluminium. atas pintu 2 bh Rp -

3 Pas Jendela J1 12 bh Rp -
Pas Kusen aluminium 3" coklat 80.184 m1 Rp -
Pas Daun Jdl besar aluminium coklat 36 bh Rp -
Pas Daun Jdl kecil aluminium coklat 36 bh Rp -
Pas kaca mati 5" 12.47832 m2 Rp -

4 Pas Jendela J2 2 bh Rp -
Pas Kusen certainwall 42.336 m1 Rp -
Pas kaca mati 5" 15.34032 m2 Rp -

5 Pas Pintu Shaft 2 bh Rp -


Pas Kusen aluminium 3" coklat 10 m1 Rp -
Pas Daun Pintu aluminium 4 bh Rp -
6 Pas Boven BV 2 bh Rp -
Pas Kusen aluminium 3" coklat 5.36 m1 Rp -
Pas kaca mati 5" 0.6 m2 Rp -

7 Pas Pegangan railing tangga Stainless 1 1/2" 12.93945 m1 Rp -

9 Pas Pegangan railing depan Stainless 1 1/2" bh Rp -

10 Pas Hollow tampak depan 20 bh Rp -

11 Pas Kaca menara beserta rangka baja 2 bh Rp -


Rp - Rp -

V PEKERJAAN PLAFOND -
1 Pas Plafond Dinogip 162.51 m2 Rp -
Pas Plafond kalsiboard 41.17 -
Rp - Rp -

VI PEKERJAAN INSTALASI AIR


1 Pas Pipa PVC ø3" Maspion 8.64 m1 Rp -
2 Pas Pipa PVC ø4" Maspion 6.87 m1 Rp -
3 Pipa PVC 1" dari bawah 19.26 m1 Rp -
4 Pipa PVC 1/2" 11.50 m1 Rp -
5 Pas Kloset Jongkok 2.00 bh Rp -
6 Pas Fllor Drain Stainless 2.00 bh Rp -
7 Pas Tempat sabun 1.00 bh Rp -
8 Pas Kran KM 1/2" 2.00 bh Rp -
9 Pas Kran Wudlu 1/2" 2.00 bh Rp -
10 Pas Jet shower pd tiap Km 2.00 bh Rp -
Rp - Rp -

VII PEKERJAAN PENGECATAN


1 Pek Cat Dinding Luar Dulux m2 Rp -
2 Pek Cat Dinding Dalam Catylac m2 Rp -
3 Pek Cat Plafon Catylac (kalsiboard) 41.17 m2 Rp -
4 Pek Pengecatan lisplang 71.76 m1 Rp -
5 Pek Melamin Kusen Pintu 44.76 m1 Rp -
6 Pek Melamin Daun Pintu 10.80 m2 Rp -
7 Pek Melamin Daun Jendela 2.52 m1 Rp -
Rp - Rp -

VIII PEKERJAAN ATAP DEPAN


1 Pas Rangka Atap Baja Ringan 239.94 m2 Rp -
2 Pas Genteng Glasur natural Kanmuri 222.70 m2 Rp -
3 Pas Bubungan genteng Kanmuri 35.06 m1 Rp -
4 Pas Lisplang dobel woodplang 71.76 m1 Rp -
Rp - Rp -
JUMLAH TOTAL PEKERJAAN LANTAI 03 Rp -

LANTAI 04
I PEKERJAAN PASANGAN
1 Pas Dinding 1/2 bata 1:5 m2 Rp -
2 Pek Plesteran dan Acian dinding m2 Rp -
3 Pek Sponengan m1 Rp -
Rp - Rp -

II PEKERJAAN BETON
1 Pek Kolom Beton K1 30/30 1:2:3 m3 Rp -
2 Pek Kolom Beton K2 20/30 1:2:3 m3 Rp -
3 Pek Kolom Beton K3 30/60 1:2:3 m3 Rp -
4 Pek Kolom Beton 15/15 1:2:3 m3 Rp -
5 Pek Balok Beton B2 20/45 fc' 22,5 Mpa m3 Rp -
6 Pek Balok Lateu 10/15 atas kusen m3 Rp -
Rp - Rp -
III PEKERJAAN KERAMIK
1 Pas Lantai keramik 40x40 kw I m2 Rp -
2 Pas Lantai keramik KM 40x40 kw I m2 Rp -
tempat tower
Rp - Rp -

IV PEKERJAAN KUSEN PINTU DAN JENDELA


1 Pas Jendela J5 (jendela belakang) bh Rp -
Pas Kusen aluminium 3" coklat m1 Rp -
Pas Daun Jdl besar aluminium coklat bh Rp -
Pas kaca mati 5" m2 Rp -
2 Pas Pegangan railing Stainless 1 1/2" m1 Rp -
Rp - Rp -

V PEKERJAAN PLAFOND Rp -
1 Pas Plafond Dinogip dan Rp -
Pas Plafond Kalsiboard m2 Rp -
Rp - Rp -

VI PEKERJAAN INSTALASI AIR Rp -


1 Pas Tower Pinguin 1000 liter bh Rp -
2 Pipa PVC 1" m1 Rp -
3 Pipa PVC 1/2" m1 Rp -
4 Pas Fllor Drain Stainless bh Rp -
Rp - Rp -

VII PEKERJAAN PENGECATAN


1 Pek Cat Dinding Luar Dulux m2 Rp -
2 Pek Cat Dinding Dalam Catylac m2 Rp -
3 Pek Pengecatan plafon kalsiboard m2 Rp -
4 Pek Pengecatan lisplang m1 Rp -
Rp - Rp -

VIII PEKERJAAN ATAP DEPAN


1 Pas Rangka Atap Baja Ringan m2 Rp -
2 Pas Genteng Glasur natural Kanmuri m2 Rp -
3 Pas Bubungan genteng Kanmuri m1 Rp -
4 Pas Lisplang dobel woodplang m1 Rp -
Rp - Rp -
JUMLAH TOTAL PEKERJAAN LANTAI 04 Rp -

JUMLAH Rp -
Dibulatkan Rp -
TIME SCHEDULE

Minggu Ke -

No Uraian Pekerjaan Jumlah Harga Bobot MEI JUNI JULY AGUSTUS

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

LANTAI 01
1 PEKERJAAN PERSIAPAN Rp 3,000,000 0.000%

2 PEKERJAAN TANAH DAN PASIR Rp 340,000 0.000000085

3 PEKERJAAN PASANGAN

4 PEKERJAAN BETON

5 PEKERJAAN KERAMIK

6 PEKERJAAN KUSEN PINTU JENDELA

7 PEKERJAAN KUSEN PINTU JENDELA

8 PEKERJAAN PLAFOND

9 PEKERJAAN INSTALASI AIR

10 PEKERJAAN INTALASI AIR BERSIH

11 PEKERJAAN PENGECATAN

LANTAI 02
1 PEKERJAAN PASANGAN

2 PEKERJAAN BETON

3 PEKERJAAN KERAMIK

4 PEKERJAAN KUSEN PINTU JENDELA

5 PEKERJAAN PLAFOND

6 PEKERJAAN INSTALASI AIR

7 PEKERJAAN PENGECATAN

LANTAI 03
1 PEKERJAAN PASANGAN

2 PEKERJAAN BETON

3 PEKERJAAN KERAMIK

4 PEKERJAAN KUSEN PINTU JENDELA

5 PEKERJAAN PLAFOND

6 PEKERJAAN INSTALASI AIR

7 PEKERJAAN PENGECATAN
8 PEKERJAAN ATAP DEPAN

LANTAI 04
1 PEKERJAAN PASANGAN

2 PEKERJAAN BETON

3 PEKERJAAN KERAMIK

4 PEKERJAAN KUSEN PINTU DAN JENDELA

5 PEKERJAAN PLAFOND

6 PEKERJAAN INSTALASI AIR

7 PEKERJAAN PENGECATAN

8 PEKERJAAN ATAP DEPAN

Jumlah Bobot Rencana Rp 4,000,000,000,000

Komulatif Bobot Rencana 0% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
SEPTEMBER OKTOBER Persen

17 18 19 20 21 22 23 24
100%

50%
0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
ANALISA HARGA SATUAN PEKERJAAN

Biaya K3 (Keselamatan dan Kesehatan Kerja)


Kebutuhan
Rambu rambu Ls 1
Peraltan P3K Ls 1
Alat Pelindung Diri (Helm, Sepatu, Sarung Tangan, masker, sabuk Ls 1
JUMLAH
Dibulatkan

Penggalian 1 m3 Tanah Biasa Dalam 1 m


A TENAGA
Pekerja L.01 OH 0.750
Mandor L.04 OH 0.025
JUMLAH TENAGA KERJA
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)

Mengebor 1 m Bor Strouse


A TENAGA
Pekerja L.01 OH 0.250
Mandor L.04 OH 0.125
JUMLAH TENAGA KERJA
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Bor Strouse Hari 0.042
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)

Pengurugan Kembali 1 m3 Galian Tanah


A TENAGA
Pekerja L.01 OH 0.500
Mandor L.04 OH 0.050
JUMLAH TENAGA KERJA
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)

Pengurugan 1 m3 Dengan Pasir Urug


A TENAGA
Pekerja L.01 OH 0.300
Mandor L.04 OH 0.010
JUMLAH TENAGA KERJA
B BAHAN
Pasir Urug M3 1.200
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)

Pengurugan 1 m3 Dengan Tanah


A TENAGA
Pekerja L.01 OH 0.300
Mandor L.04 OH 0.010
JUMLAH TENAGA KERJA
B BAHAN
Tanah M3 1.200
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)

HARGA SATUAN PEKERJAAN BETON


K100 Membuat 1 m3 lantai kerja beton mutu f’c = 7,4 MPa slump (3-6)cm, w/c = 0,87
A TENAGA
Pekerja L.01 OH 1.200
Tukang Batu L.02 OH 0.200
Kepala Tukang Batu L.03 OH 0.020
Mandor L.04 OH 0.060
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland Kg 230.000
Pasir Beton Kg 893.000
Kerikil ( Max 30 mm ) Kg 1,027.000
Air Liter 200.000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)

K175 Membuat 1 m3 beton mutu f’c = 14,5 MPa, slump (120 ± 20) mm
A TENAGA
Pekerja L.01 OH 1.650
Tukang Batu L.02 OH 0.275
Kepala Tukang Batu L.03 OH 0.028
Mandor L.04 OH 0.083
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland Kg 326.000
Pasir Beton Kg 760.000
Kerikil ( Max 30 mm ) Kg 1,029.000
Air Ltr 215.000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)
Bobot isi pasir = 1.400 kg/m3, Bobot isi kerikil = 1.350 kg/m3, Buckling factor pasir = 20 %

K225 Membuat 1 m3 beton mutu f’c = 19,3 MPa


A TENAGA
Pekerja L.01 OH 1.650
Tukang Batu L.02 OH 0.275
Kepala Tukang Batu L.03 OH 0.028
Mandor L.04 OH 0.083
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland Kg 371.000
Pasir Beton Kg 698.000
Kerikil ( Max 30 mm ) Kg 1,047.000
Air Ltr 215.000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)
Pembesian 10 Kg dengan besi Polos atau Ulir
A TENAGA
Pekerja L.01 OH 0.070
Tukang Besi L.02 OH 0.070
Kepala Tukang Besi L.03 OH 0.007
Mandor L.04 OH 0.004
JUMLAH TENAGA KERJA
B BAHAN
Besi Beton ( Polos/ Ulir ) Kg 10.500
Kawat Beton/ Bendrat Kg 0.150
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E) 10 Kg
G Harga Satuan Pekerjaan 1 Kg

Pemasangan 1 m2 Bekisting untuk Pondasi 5x


A TENAGA
Pekerja L.01 OH 0.520
Tukang Kayu L.02 OH 0.260
Kepala Tukang Kayu L.03 OH 0.026
Mandor L.04 OH 0.026
JUMLAH TENAGA KERJA
B BAHAN
Kayu Kelas III M3 0.008
Paku 5 - 10 cm Kg 0.300
Minyak Bekisting Ltr 0.100
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)

Pemasangan 1 m2 Bekisting untuk Sloof 5x


A TENAGA
Pekerja L.01 OH 0.520
Tukang Kayu L.02 OH 0.260
Kepala Tukang Kayu L.03 OH 0.026
Mandor L.04 OH 0.026
JUMLAH TENAGA KERJA
B BAHAN
Kayu Kelas III M3 0.009
Paku 5 - 10 cm Kg 0.300
Minyak Bekisting Ltr 0.100
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)

Pemasangan 1 m2 Bekisting untuk Kolom 5x


A TENAGA
Pekerja L.01 OH 0.660
Tukang Kayu L.02 OH 0.330
Kepala Tukang Kayu L.03 OH 0.033
Mandor L.04 OH 0.033
JUMLAH TENAGA KERJA
B BAHAN
Kayu Kelas III M3 0.008
Paku 5 - 10 cm Kg 0.400
Balok Kayu Kelas II M3 0.003
Minyak Bekisting Ltr 0.200
Plywood tbl. 9 mm Lbr 0.070
Dolken bambu bongkotan / tiang Btg 0.400
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)

Pemasangan 1 m2 Bekisting untuk Balok 5x


A TENAGA
Pekerja L.01 OH 0.660
Tukang Kayu L.02 OH 0.330
Kepala Tukang Kayu L.03 OH 0.033
Mandor L.04 OH 0.033
JUMLAH TENAGA KERJA
B BAHAN
Kayu Kelas III M3 0.008
Paku 5 - 10 cm Kg 0.400
Balok Kayu kelas II M3 0.004
Minyak Bekisting Ltr 0.200
Plywood tbl. 9 mm Lbr 0.070
Dolken bambu bongkotan / tiang Btg 0.400
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)
Pemasangan 1 m2 Bekisting untuk Lantai 2x
A TENAGA
Pekerja L.01 OH 0.660
Tukang Kayu L.02 OH 0.330
Kepala Tukang Kayu L.03 OH 0.033
Mandor L.04 OH 0.033
JUMLAH TENAGA KERJA
B BAHAN
Kayu Kelas III M3 0.020
Paku 5 - 10 cm Kg 0.400
Balok Kayu kelas II M3 0.008
Minyak Bekisting Ltr 0.200
Plywood tbl. 9 mm Lbr 0.175
Dolken bambu bongkotan / tiang Btg 3.000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)

Pemasangan 1 Kg Besi Profil Siku


A TENAGA
Pekerja L.01 OH 0.060
Tukang Besi L.02 OH 0.060
Kepala Tukang Besi L.03 OH 0.006
Mandor L.04 OH 0.003
JUMLAH TENAGA KERJA
B BAHAN
Besi Profil Siku Kg 1.150
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)

Pemasangan 1 m2 reng galvalume


A TENAGA
Pekerja L.01 OH 0.100
Tukang Besi L.02 OH 0.100
Kepala Tukang Besi L.03 OH 0.010
Mandor L.04 OH 0.005
JUMLAH TENAGA KERJA
B BAHAN
Reng Galvalume m1 4.000
Paku Skrup Bh 10.000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)

Pemasangan 1 m2 Dinding Bata merah ( 5x11x22 ) cm tbl. 1/2 bata campuran 1SP : 3PP
A TENAGA
Pekerja L.01 OH 0.300
Tukang Batu L.02 OH 0.100
Kepala Tukang Batu L.03 OH 0.010
Mandor L.04 OH 0.015
JUMLAH TENAGA KERJA
B BAHAN
Bata Merah Bh 70.000
Semen Portland Kg 14.370
Pasir Pasang M3 0.040
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)

Pemasangan 1 m2 Dinding Bata merah ( 5x11x22 ) cm tbl. 1/2 bata campuran 1SP : 5PP
A TENAGA
Pekerja L.01 OH 0.300
Tukang Batu L.02 OH 0.100
Kepala Tukang Batu L.03 OH 0.010
Mandor L.04 OH 0.015
JUMLAH TENAGA KERJA
B BAHAN
Bata Merah Bh 70.000
Semen Portland Kg 9.680
Pasir Pasang M3 0.045
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)
Pemasangan 1 m2 Dinding Bata merah ( 5x11x22 ) cm tbl. 1 bata campuran 1SP : 5PP
A TENAGA
Pekerja L.01 OH 0.600
Tukang Batu L.02 OH 0.200
Kepala Tukang Batu L.03 OH 0.020
Mandor L.04 OH 0.030
JUMLAH TENAGA KERJA
B BAHAN
Bata Merah Bh 140.000
Semen Portland Kg 22.200
Pasir Pasang M3 0.102
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)

Pemasangan 1 m2 Dinding Bata merah ( 5x11x22 ) cm tbl. 1 bata campuran 1SP : 3PP
A TENAGA
Pekerja L.01 OH 0.600
Tukang Batu L.02 OH 0.200
Kepala Tukang Batu L.03 OH 0.020
Mandor L.04 OH 0.030
JUMLAH TENAGA KERJA
B BAHAN
Bata Merah Bh 140.000
Semen Portland Kg 32.950
Pasir Pasang M3 0.091
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)

Pemasangan 1 m2 Dinding Bata merah ( 5x11x22 ) cm tbl. 1 bata Kosong (Patlah)


A TENAGA
Pekerja L.01 OH 0.600
Tukang Batu L.02 OH 0.200
Kepala Tukang Batu L.03 OH 0.020
Mandor L.04 OH 0.030
JUMLAH TENAGA KERJA
B BAHAN
Bata Merah Bh 140.000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)

Pemasangan 1 cm2 Dinding Terawang ( 12x11x24 ) campuran 1SP : 5PP


A TENAGA
Pekerja L.01 OH 0.300
Tukang Batu L.02 OH 0.100
Kepala Tukang Batu L.03 OH 0.010
Mandor L.04 OH 0.015
JUMLAH TENAGA KERJA
B BAHAN
Rooster ( 12x11x24 ) cm M2 3.157
Semen Portland Kg 11.000
Pasir Pasang M3 0.035
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)

HARGA SATUAN PEKERJAAN PLESTERAN


Pemasangan 1 m2 Plesteran 1SP : 3PP tebal 15 mm
A TENAGA
Pekerja L.01 OH 0.300
Tukang Batu L.02 OH 0.150
Kepala Tukang Batu L.03 OH 0.015
Mandor L.04 OH 0.015
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland Kg 7.776
Pasir Pasang M3 0.023
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)

Pemasangan 1 m2 Plesteran 1SP : 5PP tebal 15 mm


A TENAGA
Pekerja L.01 OH 0.300
Tukang Batu L.02 OH 0.150
Kepala Tukang Batu L.03 OH 0.015
Mandor L.04 OH 0.015
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland Kg 5.184
Pasir Pasang M3 0.026
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)

Pemasangan 1 m2 Acian
A TENAGA
Pekerja L.01 OH 0.200
Tukang Batu L.02 OH 0.100
Kepala Tukang Batu L.03 OH 0.010
Mandor L.04 OH 0.010
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland Kg 3.250
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)

Pemasangan 1 m' Benangan / Tali Air


A TENAGA
Tukang Batu L.02 OH 0.080
Mandor L.04 OH 0.010
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland Kg 3.100
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)

HARGA SATUAN PEKERJAAN PENUTUP LANTAI


Pemasangan 1 m2 Lantai Keramik 40x40 cm
A TENAGA
Pekerja L.01 OH 0.250
Tukang Batu L.02 OH 0.125
Kepala Tukang Batu L.03 OH 0.013
Mandor L.04 OH 0.013
JUMLAH TENAGA KERJA
B BAHAN
Keramik 40x40 cm bh 6.630
Semen Portland Kg 9.800
Pasir Pasang M3 0.045
Semen Warna Kg 0.600
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)

Pemasangan 1 m2 Lantai Keramik 30x30 cm


A TENAGA
Pekerja L.01 OH 0.250
Tukang Batu L.02 OH 0.125
Kepala Tukang Batu L.03 OH 0.013
Mandor L.04 OH 0.013
JUMLAH TENAGA KERJA
B BAHAN
Keramik 30x30 cm bh 11.870
Semen Portland Kg 10.000
Pasir Pasang M3 0.045
Semen Warna Kg 0.600
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)
Pemasangan 1 m2 Keramik Dinding 25x40 cm
A TENAGA
Pekerja L.01 OH 0.900
Tukang Batu L.02 OH 0.450
Kepala Tukang Batu L.03 OH 0.045
Mandor L.04 OH 0.045
JUMLAH TENAGA KERJA
B BAHAN
Keramik 25x40 cm Bh 10.600
Semen Portland Kg 9.300
Pasir Pasang M3 0.018
Semen Warna Kg 1.940
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)

Pemasangan 1 m1 Keramik Kuku Macan


A TENAGA
Pekerja L.01 OH 0.025
Tukang Batu L.02 OH 0.012
Kepala Tukang Batu L.03 OH 0.0012
Mandor L.04 OH 0.0012
JUMLAH TENAGA KERJA
B BAHAN
Keramik kuku Macan Bh 10.000
Semen Portland Kg 5.690
Pasir Pasang M3 0.0045
Semen Warna Kg 0.010
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)

Pemasangan 1 m2 Lantai Keramik 25x25 cm


A TENAGA
Pekerja L.01 OH 0.270
Tukang Batu L.02 OH 0.135
Kepala Tukang Batu L.03 OH 0.014
Mandor L.04 OH 0.014
JUMLAH TENAGA KERJA
B BAHAN
Keramik 25x25 cm bh 16.960
Semen Portland Kg 10.400
Pasir Pasang M3 0.045
Semen Warna Kg 1.000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)

HARGA SATUAN PEKERJAAN PLAFOND


Pemasangan 1 m2 rangka besi hollow 1x35.35.2mm, modul 60 x 60 cm, untuk plafon
A TENAGA
Pekerja L.01 OH 0.350
Tukang Besi L.02 OH 0.350
Kepala Tukang Besi L.03 OH 0.035
Mandor L.04 OH 0.018
JUMLAH TENAGA KERJA
B BAHAN
Rangka Hollow 40.40.2 mm M' 4.000
Aksesoris ( Perkuatan, Las, dll. ) Ls 1.000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)

Pemasangan 1 m2 Calsiboard 3.5 mm


A TENAGA
Pekerja L.01 OH 0.100
Tukang Kayu L.02 OH 0.050
Kepala Tukang Kayu L.03 OH 0.005
Mandor L.04 OH 0.005
JUMLAH TENAGA KERJA
B BAHAN
Kalsiboard tb 3.5 mm Lbr 0.347
Paku Skrup kg 0.110
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)
Pemasangan 1 m' List Plafond U 1 x 4
A TENAGA
Pekerja L.01 OH 0.021
Tukang Kayu L.02 OH 0.021
Kepala Tukang Kayu L.03 OH 0.002
Mandor L.04 OH 0.001
JUMLAH TENAGA KERJA
B BAHAN
List Plafond U 1 x 4 M' 1.000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)

HARGA SATUAN PEKERJAAN PENUTUP ATAP


Pemasangan 1 m2 Penutup Atap Genteng Beton
A TENAGA
Pekerja L.01 OH 0.150
Tukang Besi L.02 OH 0.060
Kepala Tukang Besi L.03 OH 0.060
Mandor L.04 OH 0.008
JUMLAH TENAGA KERJA
B BAHAN
Genteng Bh 11.000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)

Pemasangan 1 m1 Bubungan Genteng Beton


A TENAGA
Pekerja L.01 OH 0.400
Tukang Besi L.02 OH 0.200
Kepala Tukang Besi L.03 OH 0.020
Mandor L.04 OH 0.002
JUMLAH TENAGA KERJA
B BAHAN
Genteng Bubungan Bh 4.000
Semen Pc Kg 8.000
Pasir Pasang M3 0.032
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)

Pemasangan 1 m' KalsiPlank


A TENAGA
Pekerja L.01 OH 0.100
Tukang Kayu L.02 OH 0.200
Kepala Tukang Kayu L.03 OH 0.020
Mandor L.04 OH 0.050
JUMLAH TENAGA KERJA
B BAHAN
Kalsiplank M' 1.050
Paku skrup Bh 16.000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)

Pemasangan Kompres 1 m' KalsiPlank


A TENAGA
Pekerja L.01 OH 0.0367
Tukang Kayu L.02 OH 0.0733
Kepala Tukang Kayu L.03 OH 0.0073
Mandor L.04 OH 0.0017
JUMLAH TENAGA KERJA
B BAHAN
Kalsiplank M' 1.1000
Paku skrup Bh 0.0167
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)

HARGA SATUAN PEKERJAAN CAT


Pengecatan 1 m2 tembok baru ( 1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup ), Interior
A TENAGA
Pekerja L.01 OH 0.020
Tukang Cat L.02 OH 0.063
Kepala Tukang Cat L.03 OH 0.0063
Mandor L.04 OH 0.003
JUMLAH TENAGA KERJA
B BAHAN
Plamir Kg 0.100
Cat Dasar Kg 0.100
Cat Penutup Kg 0.260
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)

Pengecatan 1 m2 tembok baru ( 1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup ), Exterior
A TENAGA
Pekerja L.01 OH 0.020
Tukang Cat L.02 OH 0.063
Kepala Tukang Cat L.03 OH 0.0063
Mandor L.04 OH 0.003
JUMLAH TENAGA KERJA
B BAHAN
Plamir Kg 0.100
Cat Dasar Kg 0.100
Cat Penutup Kg 0.260
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)

1 Titik Memasang Instalasi Listrik


A TENAGA
Pekerja L.01 OH 0.075
Tukang Listrik L.02 OH 0.0375
JUMLAH TENAGA KERJA
B BAHAN
Kabel NYM 2,5 mm m1 7.500
Pipa Tanam PVC m1 2.000
Inbow Bh 1.000
T. Dos Bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)

HARGA SATUAN PEKERJAAN PINTU


A.4.2.1.11. Pemasangan 1 m kusen pintu alluminium
A TENAGA
Pekerja L.01 OH 0.043
Tukang Besi L.02 OH 0.043
Kepala Tukang Besi L.03 OH 0.004
Mandor L.04 OH 0.002
JUMLAH TENAGA KERJA
B BAHAN
Profil Alumunium M' 1.100
Skrup Fixer Buah 2.000
Sealant Tube 0.060
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)

Pemasangan 1 m' Slimar Aluminium 3/8"


A TENAGA
Pekerja L.01 OH 0.043
Tukang Besi L.02 OH 0.043
Kepala Tukang Besi L.03 OH 0.004
Mandor L.04 OH 0.002
JUMLAH TENAGA KERJA
B BAHAN
Slimar Aluminium 3/8" M' 1.100
Perlengkapan % 0.200
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)
Pemasangan 1 m' Slimar Jendela Aluminium
A TENAGA
Pekerja L.01 OH 0.043
Tukang Besi L.02 OH 0.043
Kepala Tukang Besi L.03 OH 0.004
Mandor L.04 OH 0.002
JUMLAH TENAGA KERJA
B BAHAN
Slimar Aluminium 25/50 M' 1.100
Perlengkapan % 0.200
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)

Pemasangan 1 m2 kaca bening tbl. 5 mm


A TENAGA
Pekerja L.01 OH 0.015
Tukang Kayu L.02 OH 0.150
Kepala Tukang Kayu L.03 OH 0.002
Mandor L.04 OH 0.001
JUMLAH TENAGA KERJA
B BAHAN
Kaca Bening tbl. 5mm M' 1.100
Perlengkapan % 0.200
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)

1 Unit Pasang Kusen dan Daun Pintu Type P1


A BAHAN
Kusen aluminium 10" M1 7.0000
Daun Pintu WPC Unit 1.0000
Kaca Bening 5 mm M2 0.0900
Jalusi Aluminium 2/7,5 m1 3.6000
Engsel pintu Set 1.5000
Kunci pintu Bh 1.0000
Door Stop Bh 1.0000
Grendel pintu Bh 1.0000
JUMLAH HARGA BAHAN
B PERALATAN
JUMLAH HARGA ALAT
C Jumlah ( A+B+C)
D OverHead & Profit 0% 0%xD
E Harga Satuan Pekerjaan ( D+E)

1 Unit Pasang Kusen dan Daun Pintu Type P2 (KM/WC)


A BAHAN
Kusen aluminium 10" M1 5.0000
Daun Pintu WPC Unit 1.0000
Engsel pintu Set 1.5000
Kunci pintu Bh 1.0000
Grendel pintu Bh 1.0000
JUMLAH HARGA BAHAN
B PERALATAN
JUMLAH HARGA ALAT
C Jumlah ( A+B+C)
D OverHead & Profit 0% 0%xD
E Harga Satuan Pekerjaan ( D+E)

1 Unit Pasang Kusen dan Daun Jendela Type BV 3


A BAHAN
Kusen aluminium 10" M1 2.2000
Kaca 5 mm polos M1 0.1920
JUMLAH HARGA BAHAN
B PERALATAN
JUMLAH HARGA ALAT
C Jumlah ( A+B+C)
D OverHead & Profit 0% 0%xD
E Harga Satuan Pekerjaan ( D+E)

1 Unit Pasang Kusen dan Daun Jendela Type J1


A BAHAN
Kusen aluminium 10" M1 9.1980
Daun Jendela aluminium 25 x 50 - 1.2 mm M1 3.2800
Aluminium Strip Lebar 10 Cm M1 6.1600
Tutup Open Kusen M1 3.3610
Kaca 5 mm polos M2 1.3201
Tatapan Casment M1 3.2800
Tatapan Tutup Casment M1 3.2800
Engsel Casment Set 1.0000
Rambucis Bh 1.0000
Karet Sirip M1 3.2800
JUMLAH HARGA BAHAN
B PERALATAN
JUMLAH HARGA ALAT
C Jumlah ( A+B+C)
D OverHead & Profit 0% 0%xD
E Harga Satuan Pekerjaan ( D+E)

1 Unit Pasang Kusen dan Daun Jendela Type J2


A BAHAN
Kusen aluminium 10" M1 15.3750
Daun Jendela aluminium 25 x 50 - 1.2 mm M1 5.7800
Aluminium Strip Lebar 10 Cm M1 10.4800
Tutup Open Kusen M1 6.6950
Kaca 5 mm polos M2 2.2090
Tatapan Casment M1 5.7800
Tatapan Tutup Casment M1 5.7800
Engsel Casment Set 2.0000
Rambucis Bh 2.0000
Karet Sirip M1 5.7800
JUMLAH HARGA BAHAN
B PERALATAN
JUMLAH HARGA ALAT
C Jumlah ( A+B+C)
D OverHead & Profit 0% 0%xD
E Harga Satuan Pekerjaan ( D+E)

1 Unit Pasang Kusen dan Daun Jendela Type BV 1


A BAHAN
Kusen aluminium 10" M1 7.1200
Aluminium Strip Lebar 10 Cm M1 10.0800
JUMLAH HARGA BAHAN
B PERALATAN
JUMLAH HARGA ALAT
C Jumlah ( A+B+C)
D OverHead & Profit 0% 0%xD
E Harga Satuan Pekerjaan ( D+E)

1 Unit Pasang Kusen dan Daun Jendela Type BV 2


A BAHAN
Kusen aluminium 10" M1 2.6300
Aluminium Strip Lebar 10 Cm M1 3.5400
JUMLAH HARGA BAHAN
B PERALATAN
JUMLAH HARGA ALAT
C Jumlah ( A+B+C)
D OverHead & Profit 0% 0%xD
E Harga Satuan Pekerjaan ( D+E)

1 Unit Pasang Kusen Jendela Kaca


A BAHAN
Kusen aluminium 10" M1 69.3570
Tutup Open Kusen M1 45.1100
Kaca 5 mm polos M2 33.4807
Karet Sirip M1 126.5540
JUMLAH HARGA BAHAN
B PERALATAN
JUMLAH HARGA ALAT
C Jumlah ( A+B+C)
D OverHead & Profit 0% 0%xD
E Harga Satuan Pekerjaan ( D+E)

1 Unit Pasang besi Hollow Pagar Type 1


Besi hollow 40x40x2 mm M1 12.8400
Besi hollow 40x20x2 mm M1 32.8000
Fabrikasi, Cat dan Pemasangan % 0.3500
Jumlah

1 Unit Pasang besi Hollow Pagar Type 2


Besi hollow 40x40x2 mm M1 4.9000
Besi hollow 40x20x2 mm M1 13.1200
Fabrikasi, Cat dan Pemasangan % 0.3500
Jumlah

1 Unit Pasang besi Hollow Pagar Type 3


Besi hollow 40x40x2 mm M1 4.0200
Besi hollow 40x20x2 mm M1 5.7400
Fabrikasi, Cat dan Pemasangan % 0.3500
Jumlah

1 Unit Tangga Besi Galvanis


Besi Dia 1" M1 12.0000
Besi Dia 3/4" M1 7.0000
Fabrikasi, Cat dan Pemasangan % 0.3500
Jumlah

1 Unit Pasang besi Hollow Railing hand Type 1


Besi hollow 40x40x2 mm M1 7.5000
Besi hollow 40x20x2 mm M1 10.8000
Fabrikasi, Cat dan Pemasangan % 0.3500
Jumlah

1 Unit Pasang besi Hollow Railing hand Type 1


Besi hollow 40x40x2 mm M1 7.3400
Besi hollow 40x20x2 mm M1 9.6000
Fabrikasi, Cat dan Pemasangan % 0.3500
Jumlah

HARGA SATUAN PEKERJAAN SANITASI


Pemasangan 1 bh Closet Jongkok
A TENAGA
Pekerja L.01 OH 1.000
Tukang Batu L.02 OH 1.500
Kepala Tukang Batu L.03 OH 0.150
Mandor L.04 OH 0.160
JUMLAH TENAGA KERJA
B BAHAN
Closet Jongkok Bh 1.000
Semen Portland Kg 6.000
Pasir Pasang M3 0.010
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)

Pemasangan 1 bh Kran Air dia. 1/2"


A TENAGA
Pekerja L.01 OH 0.010
Tukang Batu L.02 OH 0.400
Kepala Tukang Batu L.03 OH 0.040
Mandor L.04 OH 0.005
JUMLAH TENAGA KERJA
B BAHAN
Kran Air dia. 1/2" Bh 1.000
Sealtape Roll 0.025
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)

Pemasangan 1 bh Floor Drain / Avour


A TENAGA
Pekerja L.01 OH 0.010
Tukang Batu L.02 OH 0.100
Kepala Tukang Batu L.03 OH 0.010
Mandor L.04 OH 0.005
JUMLAH TENAGA KERJA
B BAHAN
Floor Drain / Avour Bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)

Pemasangan 1 m' pipa PVC 1/2"


A TENAGA
Pekerja L.01 OH 0.054
Tukang Besi L.02 OH 0.090
Kepala Tukang Besi L.03 OH 0.009
Mandor L.04 OH 0.027
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC 1/2" M' 1.100
Perlengkapan % 0.200
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)
Pemasangan 1 m' pipa PVC 2"
A TENAGA
Pekerja L.01 OH 0.054
Tukang Besi L.02 OH 0.090
Kepala Tukang Besi L.03 OH 0.009
Mandor L.04 OH 0.027
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC 2" M' 1.100
Perlengkapan % 0.200
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)

Pemasangan 1 m' pipa PVC 4"


A TENAGA
Pekerja L.01 OH 0.054
Tukang Besi L.02 OH 0.090
Kepala Tukang Besi L.03 OH 0.009
Mandor L.04 OH 0.027
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC 4" M' 1.100
Perlengkapan % 0.200
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)
HARGA SATUAN PEKERJAAN AKSESORIS
Pemasangan 1 Unit Hollow Nama Pasar
A TENAGA
Pekerja L.01 OH 0.420
Tukang Besi L.02 OH 0.650
Kepala Tukang Besi L.03 OH 0.035
Mandor L.04 OH 0.030
JUMLAH TENAGA KERJA
B BAHAN
Besi Hollow 4 x 4 M' 16.200
Besi Hollow 2 x 4 M' 82.800
Cat Besi M2 5.088
Cat Meni Besi M2 5.088
Perlengkapan % 0.350
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)
Pemasangan 1 Unit Pagar Hollow 1
A TENAGA
Pekerja L.01 OH 0.420
Tukang Besi L.02 OH 0.650
Kepala Tukang Besi L.03 OH 0.035
Mandor L.04 OH 0.030
JUMLAH TENAGA KERJA
B BAHAN
Besi Hollow 4 x 4 M' 6.800
Besi Hollow 2 x 4 M' 8.400
Cat Besi M2 0.672
Cat Meni Besi M2 0.672
Perlengkapan % 0.350
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)

Pemasangan 1 Unit Pagar Hollow 2


A TENAGA
Pekerja L.01 OH 0.420
Tukang Besi L.02 OH 0.650
Kepala Tukang Besi L.03 OH 0.035
Mandor L.04 OH 0.030
JUMLAH TENAGA KERJA
B BAHAN
Besi Hollow 4 x 4 M' 6.000
Besi Hollow 2 x 4 M' 7.140
Cat Besi M2 0.571
Cat Meni Besi M2 0.571
Perlengkapan % 0.350
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)

Pemasangan 1 Unit Pintu Pagar Hollow


A TENAGA
Pekerja L.01 OH 0.420
Tukang Besi L.02 OH 0.650
Kepala Tukang Besi L.03 OH 0.035
Mandor L.04 OH 0.030
JUMLAH TENAGA KERJA
B BAHAN
Besi Hollow 4 x 4 M' 7.000
Besi Hollow 2 x 4 M' 25.080
Cat Besi M2 2.006
Cat Meni Besi M2 2.006
Perlengkapan % 0.350
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)

Pemasangan 1 Unit Pintu TPS Lapis Zinkalume


A TENAGA
Pekerja L.01 OH 0.420
Tukang Besi L.02 OH 0.650
Kepala Tukang Besi L.03 OH 0.035
Mandor L.04 OH 0.030
JUMLAH TENAGA KERJA
B BAHAN
Besi Hollow 4 x 4 M' 26.000
Besi Hollow 2 x 4 M' 51.000
Zinkalume M2 10.500
Cat Besi M2 4.122
Cat Meni Besi M2 4.122
Perlengkapan % 0.350
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)

Pemasangan 1 Unit Pintu Masuk Depan PM1


A TENAGA
Pekerja L.01 OH 0.420
Tukang Besi L.02 OH 0.650
Kepala Tukang Besi L.03 OH 0.035
Mandor L.04 OH 0.030
JUMLAH TENAGA KERJA
B BAHAN
Besi Hollow 5 x 5 M' 26.100
Besi Hollow 2 x 4 M' 28.000
Cat Besi M2 2.305
Cat Meni Besi M2 2.305
Perlengkapan % 0.350
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)

Pemasangan 1 Unit Pintu Masuk Depan PM2 Timur


A TENAGA
Pekerja L.01 OH 0.420
Tukang Besi L.02 OH 0.650
Kepala Tukang Besi L.03 OH 0.035
Mandor L.04 OH 0.030
JUMLAH TENAGA KERJA
B BAHAN
Besi Hollow 5 x 5 M' 28.200
Besi Hollow 2 x 4 M' 33.600
Cat Besi M2 2.759
Cat Meni Besi M2 2.759
Perlengkapan % 0.350
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)

Pemasangan 1 Unit Pintu Masuk Depan PM3 Barat


A TENAGA
Pekerja L.01 OH 0.420
Tukang Besi L.02 OH 0.650
Kepala Tukang Besi L.03 OH 0.035
Mandor L.04 OH 0.030
JUMLAH TENAGA KERJA
B BAHAN
Besi Hollow 5 x 5 M' 37.150
Besi Hollow 2 x 4 M' 64.400
Roda Pagar Bh 3.000
Cat Besi M2 5.245
Cat Meni Besi M2 5.245
Perlengkapan % 0.350
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)

Pemasangan 1 m2 Aluminium Composite Panel ( ACP )


A TENAGA
Pekerja L.01 OH 0.420
Tukang Besi L.02 OH 0.650
Kepala Tukang Besi L.03 OH 0.035
Mandor L.04 OH 0.030
JUMLAH TENAGA KERJA
B BAHAN
Aluminium Composite Panel M2 1.000
Hollow 4x4 M' 4.000
Srew Bh 20.000
sealent Tube 0.060
peralatan % 0.200
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)

Pemasangan 1 m' pipa PVC 1/2"


A TENAGA
Pekerja L.01 OH 0.054
Tukang Besi L.02 OH 0.090
Kepala Tukang Besi L.03 OH 0.009
Mandor L.04 OH 0.027
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC 1/2" M' 1.100
Perlengkapan % 0.200
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)

Pemasangan 1 m' pipa PVC 2"


A TENAGA
Pekerja L.01 OH 0.054
Tukang Besi L.02 OH 0.090
Kepala Tukang Besi L.03 OH 0.009
Mandor L.04 OH 0.027
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC 2" M' 1.100
Perlengkapan % 0.200
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)

Pemasangan 1 m' pipa PVC 3"


A TENAGA
Pekerja L.01 OH 0.054
Tukang Besi L.02 OH 0.090
Kepala Tukang Besi L.03 OH 0.009
Mandor L.04 OH 0.027
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC 3" M' 1.100
Perlengkapan % 0.200
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)

Pemasangan 1 m' pipa PVC 4"


A TENAGA
Pekerja L.01 OH 0.054
Tukang Besi L.02 OH 0.090
Kepala Tukang Besi L.03 OH 0.009
Mandor L.04 OH 0.027
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC 4" M' 1.100
Perlengkapan % 0.200
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)

HARGA SATUAN PEKERJAAN MEKANIKAL DAN ELEKTRIKAL


Instalasi Penerangan
A TENAGA
Ongkos Pasang Ls 1.000
JUMLAH TENAGA KERJA
B BAHAN
Kabel NYA 3x2,5mm M' 7.500
Pipa Paralon 5/8 Ljr 2.000
Klem Bh 4.000
dos Bh 2.000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)

Instalasi Stop Kontak


A TENAGA
Ongkos Pasang Ls 1.000
JUMLAH TENAGA KERJA
B BAHAN
Kabel NYA 3x2,5mm M' 7.500
Pipa Paralon 5/8 Ljr 2.000
Klem Bh 6.000
dos Bh 2.000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)

Pemasangan 1 bh saklar tunggal


A TENAGA
Pekerja L.01 OH 0.240
Tukang Listrik L.02 OH 0.120
Kepala Tukang Listrik L.03 OH 0.300
Mandor L.04 OH 0.025
JUMLAH TENAGA KERJA
B BAHAN
saklar tunggal ex braco Bh 1.000
Inbouw doos Bj 1.000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)

Pemasangan 1 bh saklar Ganda


A TENAGA
Pekerja L.01 OH 0.240
Tukang Listrik L.02 OH 0.120
Kepala Tukang Listrik L.03 OH 0.300
Mandor L.04 OH 0.025
JUMLAH TENAGA KERJA
B BAHAN
saklar Gandal ex braco Bh 1.000
Inbouw doos Bj 1.000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)
Pemasangan 1 bh Stop Kontak
A TENAGA
Pekerja L.01 OH 0.240
Tukang Listrik L.02 OH 0.120
Kepala Tukang Listrik L.03 OH 0.300
Mandor L.04 OH 0.025
JUMLAH TENAGA KERJA
B BAHAN
Stop Kontak ex braco Bh 1.000
Inbouw doos Bj 1.000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)

Pemasangan 1 Unit Pagar dan Tangga Tandon


A TENAGA
Pekerja L.01 OH 0.420
Tukang Besi L.02 OH 0.650
Kepala Tukang Besi L.03 OH 0.035
Mandor L.04 OH 0.030
JUMLAH TENAGA KERJA
B BAHAN
Besi Hollow 5 x 5 M' 31.840
Besi Hollow 2 x 4 M' 57.400
Cat Besi M2 4.643
Cat Meni Besi M2 4.643
Perlengkapan % 0.350
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)

Pemasangan 1 m2 Dinding Bata Ringan tbl. 10 cm


A TENAGA
Pekerja L.01 OH 0.300
Tukang Batu L.02 OH 0.100
Kepala Tukang Batu L.03 OH 0.010
Mandor L.04 OH 0.015
JUMLAH TENAGA KERJA
B BAHAN
Bata Ringan Bh 8.333
Semen Instan Pasangan Kg 4.000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)

Pemasangan 1 m2 Plesteran , tebal 10 mm


A TENAGA
Pekerja L.01 OH 0.300
Tukang Batu L.02 OH 0.150
Kepala Tukang Batu L.03 OH 0.015
Mandor L.04 OH 0.015
JUMLAH TENAGA KERJA
B BAHAN
Semen Instan Plesteran Kg 7.776
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)

Pemasangan 1 m2 Acian
A TENAGA
Pekerja L.01 OH 0.200
Tukang Batu L.02 OH 0.100
Kepala Tukang Batu L.03 OH 0.010
Mandor L.04 OH 0.010
JUMLAH TENAGA KERJA
B BAHAN
Semen Instan acian Kg 3.250
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)

Pengecatan 1 m2 Permukaan baja


A TENAGA
Pekerja L.01 OH 0.020
Tukang Cat L.02 OH 0.200
Kepala Tukang Cat L.03 OH 0.020
Mandor L.04 OH 0.003
JUMLAH TENAGA KERJA
B BAHAN
Cat Besi Kg 0.100
Kuas Bh 0.010
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)

A.4.4.3.63. Pemasangan 1 m2 Paving Block (Blok Beton) Natural tebal 6cm

A TENAGA
Pekerja L.01 OH 0.120
Tukang Batu L.02 OH 0.120
Kepala Tukang L.03 OH 0.012
Mandor L.04 OH 0.006
JUMLAH TENAGA KERJA
B BAHAN
Papan Kayu kw I m3 0.003
Paku / Sekrup 5 cm Kg 0.050
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)

24.0 Penggalian Tanah Keras m3 SNI


1.02 2835:2008
.08 (6.4)

A TENAGA
Pekerja L.01 OH 0.025
Mandor L.04 OH 0.750
JUMLAH TENAGA KERJA
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)

Pengurugan Kembali 1 m3 Galian Tanah

A TENAGA
Pekerja L.01 OH 0.500
Mandor L.04 OH 0.050
JUMLAH TENAGA KERJA
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)

Pengurugan 1 m3 Dengan Tanah


A TENAGA
Pekerja L.01 OH 0.300
Mandor L.04 OH 0.010
JUMLAH TENAGA KERJA
B BAHAN
Tanah M3 1.200
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)

Pengurugan 1 m3 Dengan Pasir Urug


A TENAGA
Pekerja L.01 OH 0.300
Mandor L.04 OH 0.010
JUMLAH TENAGA KERJA
B BAHAN
Pasir Urug M3 1.200
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)

24.0 Pekerjaan Pemasangan Batu Kali m3 SNI


2.01. Belah 15/20 cm (1 Pc : 3 Ps) 2836:2008
11 (6.1)

A TENAGA
Pekerja L.01 OH 0.0750
tukang 0.0750
kepala tukang 0.7500
Mandor L.04 OH 1.5000
JUMLAH TENAGA KERJA
B BAHAN
Semen PC 50 Kg Zak 4.0400
Pasir Pasang M3 0.4850
Batu Kali Belah 15/20 cm M3 1.2000

JUMLAH HARGA BAHAN


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)

Pemasangan 1 m2 Dinding Bata merah ( 5x11x22 ) cm tbl. 1/2 bata campuran 1SP : 5PP
A TENAGA
Pekerja L.01 OH 0.300
Tukang Batu L.02 OH 0.100
Kepala Tukang Batu L.03 OH 0.010
Mandor L.04 OH 0.015
JUMLAH TENAGA KERJA
B BAHAN
Bata Merah Bh 70.000
Semen Portland Kg 9.680
Pasir Pasang M3 0.045
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)

HARGA SATUAN PEKERJAAN PLESTERAN


Pemasangan 1 m2 Plesteran 1SP : 3PP tebal 15 mm
A TENAGA
Pekerja L.01 OH 0.300
Tukang Batu L.02 OH 0.150
Kepala Tukang Batu L.03 OH 0.015
Mandor L.04 OH 0.015
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland Kg 7.776
Pasir Pasang M3 0.023
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)

Pemasangan 1 m2 Acian
A TENAGA
Pekerja L.01 OH 0.200
Tukang Batu L.02 OH 0.100
Kepala Tukang Batu L.03 OH 0.010
Mandor L.04 OH 0.010
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland Kg 3.250
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)

Pek Pondasi Sumuran (Cyclope)


A TENAGA
Pekerja L.01 OH 0.0150

Tukang Batu L.02 OH 0.0150

Kepala Tukang Batu L.03 OH 0.1500

JUMLAH TENAGA KERJA


B BAHAN
Semen Portland Kg 3.250
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)
KERJAAN

Helm 12 70,000.00
200000 Rp 200,000.00 Sepatu 12 100,000.00
150000 Rp 150,000.00 Sabuk 4.8 100,000.00
2844000 Rp 2,844,000.00 Sarung Tangan 12 25,000.00
Rp 3,194,000.00 Masker 12 2,000.00
Rp 3,194,000.00

4.8

Rp 85,000.00 Rp 63,750.00
Rp 200,000.00 Rp 5,000.00
Rp 68,750.00

Rp 68,750.00
Rp -
Rp 68,750.00

Rp 85,000.00 Rp 21,250.00
Rp 200,000.00 Rp 25,000.00
Rp 46,250.00

Rp 150,000.00 Rp 6,300.00
Rp 6,300.00
Rp 52,550.00
Rp -
Rp 52,550.00

Rp 85,000.00 Rp 42,500.00
Rp 200,000.00 Rp 10,000.00
Rp 52,500.00
Rp 52,500.00
Rp -
Rp 52,500.00

Rp 85,000.00 Rp 25,500.00
Rp 200,000.00 Rp 2,000.00
Rp 27,500.00

Rp 162,500.00 Rp 195,000.00
Rp 195,000.00

Rp 222,500.00
Rp -
Rp 222,500.00

Rp 85,000.00 Rp 25,500.00
Rp 200,000.00 Rp 2,000.00
Rp 27,500.00

Rp 60,000.00 Rp 72,000.00
Rp 72,000.00

Rp 99,500.00
Rp -
Rp 99,500.00

Rp 80,000.00 Rp 96,000.00
Rp 90,000.00 Rp 18,000.00
Rp 95,000.00 Rp 1,900.00
Rp 100,000.00 Rp 6,000.00
Rp 121,900.00

Rp 1,250.00 Rp 287,500.00
Rp 238.13 Rp 212,650.09
Rp 261.48 Rp 268,539.96
Rp 100.00 Rp 20,000.00
Rp 788,690.05
Rp 910,590.05
Rp -
Rp 910,590.05

Rp 80,000.00 Rp 132,000.00
Rp 90,000.00 Rp 24,750.00
Rp 95,000.00 Rp 2,660.00
Rp 100,000.00 Rp 8,300.00
Rp 167,710.00

Rp 1,250.00 Rp 407,500.00
Rp 238.13 Rp 180,978.80
Rp 261.48 Rp 269,062.92
Rp 100.00 Rp 21,500.00
Rp 879,041.72

Rp 1,046,751.72
Rp -
Rp 1,046,751.72

Rp 80,000.00 Rp 132,000.00
Rp 90,000.00 Rp 24,750.00
Rp 95,000.00 Rp 2,660.00
Rp 100,000.00 Rp 8,300.00
Rp 167,710.00

Rp 1,250.00 Rp 463,750.00
Rp 238.13 Rp 166,214.74
Rp 261.48 Rp 273,769.56
Rp 100.00 Rp 21,500.00
Rp 925,234.30

Rp 1,092,944.30
Rp -
Rp 1,092,944.30
Rp 80,000.00 Rp 5,600.00
Rp 90,000.00 Rp 6,300.00
Rp 95,000.00 Rp 665.00
Rp 100,000.00 Rp 400.00
Rp 12,965.00

Rp 12,000.00 Rp 126,000.00
Rp 18,000.00 Rp 2,700.00
Rp 128,700.00

Rp 141,665.00
Rp -
Rp 141,665.00
Rp 14,166.50

Rp 80,000.00 Rp 41,600.00
Rp 90,000.00 Rp 23,400.00
Rp 95,000.00 Rp 2,470.00
Rp 100,000.00 Rp 2,600.00
Rp 70,070.00

Rp 4,000,000.00 Rp 32,000.00
Rp 20,000.00 Rp 6,000.00
Rp 3,500.00 Rp 350.00
Rp 38,350.00

Rp 108,420.00
Rp -
Rp 108,420.00

Rp 80,000.00 Rp 41,600.00
Rp 90,000.00 Rp 23,400.00
Rp 95,000.00 Rp 2,470.00
Rp 100,000.00 Rp 2,600.00
Rp 70,070.00
Rp 4,000,000.00 Rp 36,000.00
Rp 20,000.00 Rp 6,000.00
Rp 3,500.00 Rp 350.00
Rp 42,350.00

Rp 112,420.00
Rp -
Rp 112,420.00

Rp 80,000.00 Rp 52,800.00
Rp 90,000.00 Rp 29,700.00
Rp 95,000.00 Rp 3,135.00
Rp 100,000.00 Rp 3,300.00
Rp 88,935.00

Rp 4,000,000.00 Rp 32,000.00
Rp 20,000.00 Rp 8,000.00
Rp 5,500,000.00 Rp 16,500.00
Rp 3,500.00 Rp 700.00
Rp 105,000.00 Rp 7,350.00
Rp 15,000.00 Rp 6,000.00
Rp 70,550.00

Rp 159,485.00
Rp -
Rp 159,485.00

Rp 80,000.00 Rp 52,800.00
Rp 90,000.00 Rp 29,700.00
Rp 95,000.00 Rp 3,135.00
Rp 100,000.00 Rp 3,300.00
Rp 88,935.00

Rp 4,000,000.00 Rp 32,000.00
Rp 20,000.00 Rp 8,000.00
Rp 5,500,000.00 Rp 19,800.00
Rp 3,500.00 Rp 700.00
Rp 105,000.00 Rp 7,350.00
Rp 15,000.00 Rp 6,000.00
Rp 73,850.00

Rp 162,785.00
Rp -
Rp 162,785.00

Rp 80,000.00 Rp 52,800.00
Rp 90,000.00 Rp 29,700.00
Rp 95,000.00 Rp 3,135.00
Rp 100,000.00 Rp 3,300.00
Rp 88,935.00

Rp 4,000,000.00 Rp 80,000.00
Rp 20,000.00 Rp 8,000.00
Rp 5,500,000.00 Rp 41,250.00
Rp 3,500.00 Rp 700.00
Rp 105,000.00 Rp 18,375.00
Rp 15,000.00 Rp 45,000.00
Rp 193,325.00

Rp 282,260.00
Rp -
Rp 282,260.00

Rp 80,000.00 Rp 4,800.00
Rp 90,000.00 Rp 5,400.00
Rp 95,000.00 Rp 570.00
Rp 100,000.00 Rp 300.00
Rp 11,070.00

Rp 15,000.00 Rp 17,250.00

Rp 28,320.00
Rp -
Rp 28,320.00

Rp 80,000.00 Rp 8,000.00
Rp 90,000.00 Rp 9,000.00
Rp 95,000.00 Rp 950.00
Rp 100,000.00 Rp 500.00
Rp 18,450.00

Rp 10,000.00 Rp 40,000.00
Rp 250.00 Rp 2,500.00
Rp 42,500.00

Rp 60,950.00
Rp -
Rp 60,950.00

Rp 80,000.00 Rp 24,000.00
Rp 90,000.00 Rp 9,000.00
Rp 95,000.00 Rp 950.00
Rp 100,000.00 Rp 1,500.00
Rp 35,450.00

Rp 750.00 Rp 52,500.00
Rp 1,250.00 Rp 17,962.50
Rp 305,000.00 Rp 12,200.00
Rp 82,662.50

Rp 118,112.50
Rp -
Rp 118,112.50

Rp 80,000.00 Rp 24,000.00
Rp 90,000.00 Rp 9,000.00
Rp 95,000.00 Rp 950.00
Rp 100,000.00 Rp 1,500.00
Rp 35,450.00

Rp 750.00 Rp 52,500.00
Rp 1,250.00 Rp 12,100.00
Rp 305,000.00 Rp 13,725.00
Rp 78,325.00

Rp 113,775.00
Rp -
Rp 113,775.00
Rp 80,000.00 Rp 48,000.00
Rp 90,000.00 Rp 18,000.00
Rp 95,000.00 Rp 1,900.00
Rp 100,000.00 Rp 3,000.00
Rp 70,900.00

Rp 750.00 Rp 105,000.00
Rp 1,250.00 Rp 27,750.00
Rp 305,000.00 Rp 31,110.00
Rp 163,860.00

Rp 234,760.00
Rp -
Rp 234,760.00

Rp 80,000.00 Rp 48,000.00
Rp 90,000.00 Rp 18,000.00
Rp 95,000.00 Rp 1,900.00
Rp 100,000.00 Rp 3,000.00
Rp 70,900.00

Rp 750.00 Rp 105,000.00
Rp 1,250.00 Rp 41,187.50
Rp 305,000.00 Rp 27,755.00
Rp 173,942.50

Rp 244,842.50
Rp -
Rp 244,842.50

Rp 80,000.00 Rp 48,000.00
Rp 90,000.00 Rp 18,000.00
Rp 95,000.00 Rp 1,900.00
Rp 100,000.00 Rp 3,000.00
Rp 70,900.00
Rp 750.00 Rp 105,000.00
Rp 105,000.00

Rp 175,900.00
Rp -
Rp 175,900.00

Rp 80,000.00 Rp 24,000.00
Rp 90,000.00 Rp 9,000.00
Rp 95,000.00 Rp 950.00
Rp 100,000.00 Rp 1,500.00
Rp 35,450.00

Rp 15,000.00 Rp 47,355.00
Rp 1,250.00 Rp 13,750.00
Rp 305,000.00 Rp 10,675.00
Rp 71,780.00

Rp 107,230.00
Rp -
Rp 107,230.00

Rp 80,000.00 Rp 24,000.00
Rp 90,000.00 Rp 13,500.00
Rp 95,000.00 Rp 1,425.00
Rp 100,000.00 Rp 1,500.00
Rp 40,425.00

Rp 1,250.00 Rp 9,720.00
Rp 305,000.00 Rp 7,015.00
Rp 16,735.00

Rp 57,160.00
Rp -
Rp 57,160.00

Rp 80,000.00 Rp 24,000.00
Rp 90,000.00 Rp 13,500.00
Rp 95,000.00 Rp 1,425.00
Rp 100,000.00 Rp 1,500.00
Rp 40,425.00

Rp 1,250.00 Rp 6,480.00
Rp 305,000.00 Rp 7,930.00
Rp 14,410.00

Rp 54,835.00
Rp -
Rp 54,835.00

Rp 80,000.00 Rp 16,000.00
Rp 90,000.00 Rp 9,000.00
Rp 95,000.00 Rp 950.00
Rp 100,000.00 Rp 1,000.00
Rp 26,950.00

Rp 1,250.00 Rp 4,062.50
Rp 4,062.50

Rp 31,012.50
Rp -
Rp 31,012.50

Rp 90,000.00 Rp 7,200.00
Rp 100,000.00 Rp 1,000.00
Rp 8,200.00
Rp 1,250.00 Rp 3,875.00
Rp 3,875.00

Rp 12,075.00
Rp -
Rp 12,075.00

Rp 80,000.00 Rp 20,000.00
Rp 90,000.00 Rp 11,250.00
Rp 95,000.00 Rp 1,235.00 0.0625
Rp 100,000.00 Rp 1,300.00 16
Rp 33,785.00

Rp 9,049.77 Rp 60,000.00
Rp 1,250.00 Rp 12,250.00
Rp 305,000.00 Rp 13,725.00
Rp 1,250.00 Rp 750.00
Rp 86,725.00

Rp 120,510.00
Rp -
Rp 120,510.00

Rp 80,000.00 Rp 20,000.00
Rp 90,000.00 Rp 11,250.00
Rp 95,000.00 Rp 1,235.00 1
Rp 100,000.00 Rp 1,300.00 0.09
Rp 33,785.00 11.1111111

Rp 4,633.53 Rp 55,000.00
Rp 1,250.00 Rp 12,500.00
Rp 305,000.00 Rp 13,725.00
Rp 1,250.00 Rp 750.00
Rp 81,975.00

Rp 115,760.00
Rp -
Rp 115,760.00
Rp 80,000.00 Rp 72,000.00
Rp 90,000.00 Rp 40,500.00
Rp 95,000.00 Rp 4,275.00
Rp 100,000.00 Rp 4,500.00
Rp 121,275.00

Rp 5,188.68 Rp 55,000.00
Rp 1,250.00 Rp 11,625.00
Rp 305,000.00 Rp 5,490.00
Rp 1,250.00 Rp 2,425.00
Rp 74,540.00

Rp 195,815.00
Rp -
Rp 195,815.00

Rp 80,000.00 Rp 2,000.00
Rp 90,000.00 Rp 1,080.00
Rp 95,000.00 Rp 114.00
Rp 100,000.00 Rp 120.00
Rp 3,314.00

Rp 900.00 Rp 9,000.00
Rp 1,250.00 Rp 7,112.50
Rp 305,000.00 Rp 1,372.50
Rp 1,250.00 Rp 12.50
Rp 17,497.50

Rp 20,811.50
Rp -
Rp 20,811.50

Rp 80,000.00 Rp 21,600.00
Rp 90,000.00 Rp 12,150.00
Rp 95,000.00 Rp 1,330.00
Rp 100,000.00 Rp 1,400.00
Rp 36,480.00

Rp 3,537.74 Rp 60,000.00
Rp 1,250.00 Rp 13,000.00
Rp 305,000.00 Rp 13,725.00
Rp 1,250.00 Rp 1,250.00
Rp 87,975.00

Rp 124,455.00
Rp -
Rp 124,455.00

Rp 80,000.00 Rp 28,000.00
Rp 90,000.00 Rp 31,500.00
Rp 95,000.00 Rp 3,325.00
Rp 100,000.00 Rp 1,800.00
Rp 64,625.00

Rp 7,150.00 Rp 28,600.00
Rp 28,600.00 Rp 28,600.00
Rp 57,200.00

Rp 121,825.00
Rp -
Rp 121,825.00

Rp 80,000.00 Rp 8,000.00
Rp 90,000.00 Rp 4,500.00
Rp 95,000.00 Rp 475.00
Rp 100,000.00 Rp 500.00
Rp 13,475.00

Rp 57,000.00 Rp 19,779.00
Rp 250.00 Rp 27.50
Rp 19,806.50

Rp 33,281.50
Rp -
Rp 33,281.50
Rp 80,000.00 Rp 1,680.00
Rp 90,000.00 Rp 1,890.00
Rp 95,000.00 Rp 190.00
Rp 100,000.00 Rp 100.00
Rp 3,860.00

Rp 13,750.00 Rp 13,750.00
Rp 13,750.00

Rp 17,610.00
Rp -
Rp 17,610.00

Rp 80,000.00 Rp 12,000.00
Rp 90,000.00 Rp 5,400.00
Rp 95,000.00 Rp 5,700.00
Rp 100,000.00 Rp 800.00
Rp 23,900.00

Rp 4,100.00 Rp 45,100.00
Rp 45,100.00

Rp 69,000.00
Rp -
Rp 69,000.00

Rp 80,000.00 Rp 32,000.00
Rp 90,000.00 Rp 18,000.00
Rp 95,000.00 Rp 1,900.00
Rp 100,000.00 Rp 200.00
Rp 52,100.00
Rp 7,500.00 Rp 30,000.00
Rp 1,250.00 Rp 10,000.00
Rp 305,000.00 Rp 9,760.00
Rp 49,760.00

Rp 101,860.00
Rp -
Rp 101,860.00

Rp 80,000.00 Rp 8,000.00
Rp 90,000.00 Rp 18,000.00
Rp 95,000.00 Rp 1,900.00
Rp 100,000.00 Rp 5,000.00
Rp 32,900.00

Rp 20,000.00 Rp 21,000.00
Rp 250.00 Rp 4,000.00
Rp 25,000.00

Rp 57,900.00
Rp -
Rp 57,900.00

Rp 80,000.00 Rp 2,936.00
Rp 90,000.00 Rp 6,597.00
Rp 95,000.00 Rp 693.50
Rp 100,000.00 Rp 170.00
Rp 10,396.50

Rp 20,000.00 Rp 22,000.00
Rp 250.00 Rp 4.18
Rp 22,004.18

Rp 32,400.68
Rp -
Rp 32,400.68

p ), Interior

Rp 80,000.00 Rp 1,600.00
Rp 90,000.00 Rp 5,670.00
Rp 95,000.00 Rp 598.50
Rp 100,000.00 Rp 300.00
Rp 8,168.50

Rp 65,000.00 Rp 6,500.00
Rp 25,000.00 Rp 2,500.00
Rp 25,000.00 Rp 6,500.00
Rp 15,500.00

Rp 23,668.50
Rp -
Rp 23,668.50

p ), Exterior

Rp 80,000.00 Rp 1,600.00
Rp 90,000.00 Rp 5,670.00
Rp 95,000.00 Rp 598.50
Rp 100,000.00 Rp 300.00
Rp 8,168.50

Rp 65,000.00 Rp 6,500.00
Rp 120,000.00 Rp 12,000.00
Rp 120,000.00 Rp 31,200.00
Rp 49,700.00

Rp 57,868.50
Rp -
Rp 57,868.50

Rp 80,000.00 Rp 6,000.00
Rp 90,000.00 Rp 3,375.00
Rp 9,375.00

Rp 10,000.00 Rp 75,000.00
Rp 9,000.00 Rp 18,000.00
Rp 2,000.00 Rp 2,000.00
Rp 2,000.00 Rp 2,000.00
Rp 97,000.00

Rp 106,375.00
Rp -
Rp 106,375.00

Rp 80,000.00 Rp 3,440.00
Rp 90,000.00 Rp 3,870.00
Rp 95,000.00 Rp 380.00
Rp 100,000.00 Rp 200.00
Rp 7,890.00

Rp 80,000.00 Rp 88,000.00
Rp 250.00 Rp 500.00
Rp 40,000.00 Rp 2,400.00
Rp 90,900.00

Rp 98,790.00
Rp -
Rp 98,790.00

Rp 80,000.00 Rp 3,440.00
Rp 90,000.00 Rp 3,870.00
Rp 95,000.00 Rp 380.00
Rp 100,000.00 Rp 200.00
Rp 7,890.00

Rp 70,000.00 Rp 77,000.00
Rp 70,000.00 Rp 14,000.00
Rp 91,000.00

Rp 98,890.00
Rp -
Rp 98,890.00
Rp 80,000.00 Rp 3,440.00
Rp 90,000.00 Rp 3,870.00
Rp 95,000.00 Rp 380.00
Rp 100,000.00 Rp 200.00
Rp 7,890.00

Rp 75,000.00 Rp 82,500.00
Rp 75,000.00 Rp 15,000.00
Rp 97,500.00

Rp 105,390.00
Rp -
Rp 105,390.00

Rp 80,000.00 Rp 1,200.00
Rp 90,000.00 Rp 13,500.00
Rp 95,000.00 Rp 190.00
Rp 100,000.00 Rp 100.00
Rp 14,990.00

Rp 85,000.00 Rp 93,500.00
Rp 85,000.00 Rp 17,000.00
Rp 110,500.00

Rp 125,490.00
Rp -
Rp 125,490.00

Rp 98,790.00 Rp 691,530.00
Rp 1,400,000.00 Rp 1,400,000.00
Rp 125,490.00 Rp 11,294.10
Rp 25,000.00 Rp 90,000.00
Rp 35,000.00 Rp 52,500.00
Rp 150,000.00 Rp 150,000.00
Rp 25,000.00 Rp 25,000.00
Rp 12,000.00 Rp 12,000.00
Rp 2,432,324.10

Rp 2,432,324.10
Rp -
Rp 2,432,324.10

Rp 98,790.00 Rp 493,950.00
Rp 1,200,000.00 Rp 1,200,000.00
Rp 35,000.00 Rp 52,500.00
Rp 150,000.00 Rp 150,000.00
Rp 12,000.00 Rp 12,000.00
Rp 1,908,450.00

Rp 1,908,450.00
Rp -
Rp 1,908,450.00

Rp 98,790.00 Rp 217,338.00
Rp 125,490.00 Rp 24,094.08
Rp 241,432.08

Rp 241,432.08
Rp -
Rp 241,432.08

Rp 98,790.00 Rp 908,670.42
Rp 105,390.00 Rp 345,679.20
Rp 25,000.00 Rp 154,000.00
Rp 19,000.00 Rp 63,859.00
Rp 125,490.00 Rp 165,653.07
Rp 35,000.00 Rp 114,800.00
Rp 10,833.33 Rp 35,533.32
Rp 60,000.00 Rp 60,000.00
Rp 15,000.00 Rp 15,000.00
Rp 1,500.00 Rp 4,920.00
Rp 1,868,115.02

Rp 1,868,115.02
Rp -
Rp 1,868,115.02

Rp 98,790.00 Rp 1,518,896.25
Rp 105,390.00 Rp 609,154.20
Rp 25,000.00 Rp 262,000.00
Rp 19,000.00 Rp 127,205.00
Rp 125,490.00 Rp 277,207.41
Rp 35,000.00 Rp 202,300.00
Rp 10,833.33 Rp 62,616.65
Rp 60,000.00 Rp 120,000.00
Rp 15,000.00 Rp 30,000.00
Rp 1,500.00 Rp 8,670.00
Rp 3,218,049.51

Rp 3,218,049.51
Rp -
Rp 3,218,049.51

Rp 98,790.00 Rp 703,384.80
Rp 25,000.00 Rp 252,000.00
Rp 955,384.80
Rp 955,384.80
Rp -
Rp 955,384.80

Rp 98,790.00 Rp 259,817.70
Rp 25,000.00 Rp 88,500.00
Rp 348,317.70

Rp 348,317.70
Rp -
Rp 348,317.70

Rp 98,790.00 Rp 6,851,778.03
Rp 19,000.00 Rp 857,090.00
Rp 125,490.00 Rp 4,201,493.42
Rp 23,000.00 Rp 2,910,742.00
Rp 14,821,103.45

Rp 14,821,103.45
Rp -
Rp 14,821,103.45

27,500.00 353,100.00
22,500.00 738,000.00
1,091,100.00 381,885.00
1,472,985.00

27,500.00 134,750.00
22,500.00 295,200.00
429,950.00 150,482.50
580,432.50

27,500.00 110,550.00
22,500.00 129,150.00
239,700.00 83,895.00
323,595.00

24,000.00 288,000.00
20,000.00 140,000.00
428,000.00 149,800.00
577,800.00

24,000.00 180,000.00
20,000.00 216,000.00
396,000.00 138,600.00
534,600.00

24,000.00 176,160.00
20,000.00 192,000.00
368,160.00 128,856.00
497,016.00

Rp 80,000.00 Rp 80,000.00
Rp 90,000.00 Rp 135,000.00
Rp 95,000.00 Rp 14,250.00
Rp 100,000.00 Rp 16,000.00
Rp 245,250.00

Rp 250,000.00 Rp 250,000.00
Rp 1,250.00 Rp 7,500.00
Rp 305,000.00 Rp 3,050.00
Rp 260,550.00

Rp 505,800.00
Rp -
Rp 505,800.00

Rp 80,000.00 Rp 800.00
Rp 90,000.00 Rp 36,000.00
Rp 95,000.00 Rp 3,800.00
Rp 100,000.00 Rp 500.00
Rp 41,100.00

Rp 40,000.00 Rp 40,000.00
Rp 5,000.00 Rp 125.00
Rp 40,125.00

Rp 81,225.00
Rp -
Rp 81,225.00

Rp 80,000.00 Rp 800.00
Rp 90,000.00 Rp 9,000.00
Rp 95,000.00 Rp 950.00
Rp 100,000.00 Rp 500.00
Rp 11,250.00

Rp 30,000.00 Rp 30,000.00
Rp 30,000.00

Rp 41,250.00
Rp -
Rp 41,250.00

Rp 80,000.00 Rp 4,320.00
Rp 90,000.00 Rp 8,100.00
Rp 95,000.00 Rp 855.00
Rp 100,000.00 Rp 2,700.00
Rp 15,975.00

Rp 20,000.00 Rp 22,000.00
Rp 22,000.00 Rp 4,400.00
Rp 26,400.00

Rp 42,375.00
Rp -
Rp 42,375.00
Rp 80,000.00 Rp 4,320.00
Rp 90,000.00 Rp 8,100.00
Rp 95,000.00 Rp 855.00
Rp 100,000.00 Rp 2,700.00
Rp 15,975.00

Rp 20,000.00 Rp 22,000.00
Rp 22,000.00 Rp 4,400.00
Rp 26,400.00

Rp 42,375.00
Rp -
Rp 42,375.00

Rp 80,000.00 Rp 4,320.00
Rp 90,000.00 Rp 8,100.00
Rp 95,000.00 Rp 855.00
Rp 100,000.00 Rp 2,700.00
Rp 15,975.00

Rp 30,000.00 Rp 33,000.00
Rp 33,000.00 Rp 6,600.00
Rp 39,600.00

Rp 55,575.00
Rp -
Rp 55,575.00
Rp 80,000.00 Rp 33,600.00
Rp 90,000.00 Rp 58,500.00
Rp 95,000.00 Rp 3,325.00
Rp 100,000.00 Rp 3,000.00
Rp 98,425.00

Rp 6,250.00 Rp 101,250.00
Rp 5,500.00 Rp 455,400.00
Rp 60,000.00 Rp 305,280.00
Rp 45,000.00 Rp 228,960.00
Rp 1,090,890.00 Rp 381,811.50
Rp 1,472,701.50

Rp 1,571,126.50
Rp -
Rp 1,571,126.50
Rp 80,000.00 Rp 33,600.00
Rp 90,000.00 Rp 58,500.00
Rp 95,000.00 Rp 3,325.00
Rp 100,000.00 Rp 3,000.00
Rp 98,425.00

Rp 6,250.00 Rp 42,500.00
Rp 5,500.00 Rp 46,200.00
Rp 60,000.00 Rp 40,320.00
Rp 45,000.00 Rp 30,240.00
Rp 159,260.00 Rp 55,741.00
Rp 215,001.00

Rp 313,426.00
Rp -
Rp 313,426.00

Rp 80,000.00 Rp 33,600.00
Rp 90,000.00 Rp 58,500.00
Rp 95,000.00 Rp 3,325.00
Rp 100,000.00 Rp 3,000.00
Rp 98,425.00

Rp 6,250.00 Rp 37,500.00
Rp 5,500.00 Rp 39,270.00
Rp 60,000.00 Rp 34,260.00
Rp 45,000.00 Rp 25,695.00
Rp 136,725.00 Rp 47,853.75
Rp 184,578.75

Rp 283,003.75
Rp -
Rp 283,003.75

Rp 80,000.00 Rp 33,600.00
Rp 90,000.00 Rp 58,500.00
Rp 95,000.00 Rp 3,325.00
Rp 100,000.00 Rp 3,000.00
Rp 98,425.00

Rp 6,250.00 Rp 43,750.00
Rp 5,500.00 Rp 137,940.00
Rp 60,000.00 Rp 120,360.00
Rp 45,000.00 Rp 90,270.00
Rp 392,320.00 Rp 137,312.00
Rp 529,632.00

Rp 628,057.00
Rp -
Rp 628,057.00

Rp 80,000.00 Rp 33,600.00
Rp 90,000.00 Rp 58,500.00
Rp 95,000.00 Rp 3,325.00
Rp 100,000.00 Rp 3,000.00
Rp 98,425.00

Rp 6,250.00 Rp 162,500.00
Rp 5,500.00 Rp 280,500.00
Rp 60,000.00 Rp 630,000.00
Rp 60,000.00 Rp 247,320.00
Rp 45,000.00 Rp 185,490.00
Rp 1,505,810.00 Rp 527,033.50
Rp 2,032,843.50

Rp 2,131,268.50
Rp -
Rp 2,131,268.50

Rp 80,000.00 Rp 33,600.00
Rp 90,000.00 Rp 58,500.00
Rp 95,000.00 Rp 3,325.00
Rp 100,000.00 Rp 3,000.00
Rp 98,425.00

Rp 7,500.00 Rp 195,750.00
Rp 5,500.00 Rp 154,000.00
Rp 60,000.00 Rp 138,300.00
Rp 45,000.00 Rp 103,725.00
Rp 591,775.00 Rp 207,121.25
Rp 798,896.25

Rp 897,321.25
Rp -
Rp 897,321.25

Rp 80,000.00 Rp 33,600.00
Rp 90,000.00 Rp 58,500.00
Rp 95,000.00 Rp 3,325.00
Rp 100,000.00 Rp 3,000.00
Rp 98,425.00

Rp 7,500.00 Rp 211,500.00
Rp 5,500.00 Rp 184,800.00
Rp 60,000.00 Rp 165,540.00
Rp 45,000.00 Rp 124,155.00
Rp 685,995.00 Rp 240,098.25
Rp 926,093.25

Rp 1,024,518.25
Rp -
Rp 1,024,518.25

Rp 80,000.00 Rp 33,600.00
Rp 90,000.00 Rp 58,500.00
Rp 95,000.00 Rp 3,325.00
Rp 100,000.00 Rp 3,000.00
Rp 98,425.00

Rp 7,500.00 Rp 278,625.00
Rp 5,500.00 Rp 354,200.00
Rp 150,000.00 Rp 450,000.00
Rp 60,000.00 Rp 314,700.00
Rp 45,000.00 Rp 236,025.00
Rp 1,633,550.00 Rp 571,742.50
Rp 2,205,292.50

Rp 2,303,717.50
Rp -
Rp 2,303,717.50

Rp 80,000.00 Rp 33,600.00
Rp 90,000.00 Rp 58,500.00
Rp 95,000.00 Rp 3,325.00
Rp 100,000.00 Rp 3,000.00
Rp 98,425.00

Rp 600,000.00 Rp 600,000.00
Rp 6,250.00 Rp 25,000.00
Rp 1,000.00 Rp 20,000.00
Rp 30,000.00 Rp 1,800.00
Rp 646,800.00 Rp 129,360.00
Rp 776,160.00

Rp 874,585.00
Rp -
Rp 874,585.00

Rp 80,000.00 Rp 4,320.00
Rp 90,000.00 Rp 8,100.00
Rp 95,000.00 Rp 855.00
Rp 100,000.00 Rp 2,700.00
Rp 15,975.00

Rp 5,833.33 Rp 6,416.67
Rp 6,416.67 Rp 1,283.33
Rp 7,700.00

Rp 23,675.00
Rp -
Rp 23,675.00

Rp 80,000.00 Rp 4,320.00
Rp 90,000.00 Rp 8,100.00
Rp 95,000.00 Rp 855.00
Rp 100,000.00 Rp 2,700.00
Rp 15,975.00
Rp 10,833.33 Rp 11,916.67
Rp 11,916.67 Rp 2,383.33
Rp 14,300.00

Rp 30,275.00
Rp -
Rp 30,275.00

Rp 80,000.00 Rp 4,320.00
Rp 90,000.00 Rp 8,100.00
Rp 95,000.00 Rp 855.00
Rp 100,000.00 Rp 2,700.00
Rp 15,975.00

Rp 20,000.00 Rp 22,000.00
Rp 22,000.00 Rp 4,400.00
Rp 26,400.00

Rp 42,375.00
Rp -
Rp 42,375.00

Rp 80,000.00 Rp 4,320.00
Rp 90,000.00 Rp 8,100.00
Rp 95,000.00 Rp 855.00
Rp 100,000.00 Rp 2,700.00
Rp 15,975.00

Rp 30,000.00 Rp 33,000.00
Rp 33,000.00 Rp 6,600.00
Rp 39,600.00

Rp 55,575.00
Rp -
Rp 55,575.00

Rp 50,000.00 Rp 50,000.00
Rp 50,000.00

Rp 7,500.00 Rp 56,250.00
Rp 9,000.00 Rp 18,000.00
Rp 500.00 Rp 2,000.00
Rp 3,000.00 Rp 6,000.00
Rp 82,250.00

Rp 132,250.00
Rp -
Rp 132,250.00

Rp 35,000.00 Rp 35,000.00
Rp 35,000.00

Rp 7,500.00 Rp 56,250.00
Rp 9,000.00 Rp 18,000.00
Rp 500.00 Rp 3,000.00
Rp 3,000.00 Rp 6,000.00
Rp 83,250.00
Rp 118,250.00
Rp -
Rp 118,250.00

#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF!

Rp 20,000.00 Rp 20,000.00
Rp 3,000.00 Rp 3,000.00
Rp 23,000.00

#REF!
#REF!
#REF!

#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF!

Rp 25,000.00 Rp 25,000.00
Rp 3,000.00 Rp 3,000.00
Rp 28,000.00

#REF!
#REF!
#REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF!

Rp 23,000.00 Rp 23,000.00
Rp 3,000.00 Rp 3,000.00
Rp 26,000.00

#REF!
#REF!
#REF!

#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF!

Rp 7,500.00 Rp 238,800.00
Rp 5,500.00 Rp 315,700.00
Rp 60,000.00 Rp 278,580.00
Rp 45,000.00 Rp 208,935.00
Rp 1,042,015.00 Rp 364,705.25
Rp 1,406,720.25

#REF!
#REF!
#REF!

#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF!
Rp 7,228.92 Rp 60,238.55
Rp 2,875.00 Rp 11,500.00
Rp 71,738.55

#REF!
#REF!
#REF!

#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF!

Rp 1,550.00 Rp 12,052.80
Rp 12,052.80

#REF!
#REF!
#REF!

#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF!

Rp 3,625.00 Rp 11,781.25
Rp 11,781.25

#REF!
#REF!
#REF!

Rp 80,000.00 Rp 1,600.00
Rp 90,000.00 Rp 18,000.00
Rp 95,000.00 Rp 1,900.00
Rp 100,000.00 Rp 300.00
Rp 21,800.00

Rp 60,000.00 Rp 6,000.00
Err:509 Err:509
Err:509

Err:509
Err:509
Err:509

Rp 85,000.00 Rp 10,200.00
Rp 95,000.00 Rp 11,400.00
Rp 120,000.00 Rp 1,440.00
Rp 200,000.00 Rp 1,200.00
Rp 24,240.00

Rp 16,250,000.00 Rp 48,750.00
Rp 23,150.00 Rp 1,157.50
Rp 49,907.50

Rp 74,147.50
Rp -
Rp 74,147.50
Rp 85,000.00 Rp 2,125.00
Rp 200,000.00 Rp 150,000.00
Rp 152,125.00

Rp 152,125.00
Rp -
Rp 152,125.00

Rp 85,000.00 Rp 42,500.00
Rp 200,000.00 Rp 10,000.00
Rp 52,500.00

Rp 52,500.00
Rp -
Rp 52,500.00

Rp 85,000.00 Rp 25,500.00
Rp 200,000.00 Rp 2,000.00
Rp 27,500.00

Rp 125,000.00 Rp 150,000.00
Rp 150,000.00

Rp 177,500.00
Rp -
Rp 177,500.00

Rp 85,000.00 Rp 25,500.00
Rp 200,000.00 Rp 2,000.00
Rp 27,500.00
Rp 175,000.00 Rp 210,000.00
Rp 210,000.00

Rp 237,500.00
Rp -
Rp 237,500.00

Rp 85,000.00 Rp 6,375.00
Rp 95,000.00 Rp 7,125.00
Rp 120,000.00 Rp 90,000.00
Rp 200,000.00 Rp 300,000.00
Rp 403,500.00

Rp 57,000.00 Rp 230,280.00
Rp 300,000.00 Rp 145,500.00
Rp 200,000.00 Rp 240,000.00
Rp 615,780.00

Rp 1,019,280.00
Rp -
Rp 1,019,280.00

Rp 85,000.00 Rp 25,500.00
Rp 95,000.00 Rp 9,500.00
Rp 120,000.00 Rp 1,200.00
Rp 200,000.00 Rp 3,000.00
Rp 39,200.00

Rp 700.00 Rp 49,000.00
Rp 1,140.00 Rp 11,035.20
Rp 300,000.00 Rp 13,500.00
Rp 73,535.20

Rp 112,735.20
Rp -
Rp 112,735.20

Rp 85,000.00 Rp 25,500.00
Rp 95,000.00 Rp 14,250.00
Rp 120,000.00 Rp 1,800.00
Rp 200,000.00 Rp 3,000.00
Rp 44,550.00

Rp 1,140.00 Rp 8,864.64
Rp 300,000.00 Rp 6,900.00
Rp 15,764.64

Rp 60,314.64
Rp -
Rp 60,314.64

Rp 85,000.00 Rp 17,000.00
Rp 95,000.00 Rp 9,500.00
Rp 120,000.00 Rp 1,200.00
Rp 200,000.00 Rp 2,000.00
Rp 29,700.00

Rp 1,140.00 Rp 3,705.00
Rp 3,705.00

Rp 33,405.00
Rp -
Rp 33,405.00

Rp 85,000.00 Rp 1,275.00
Rp 95,000.00 Rp 1,425.00
Rp 120,000.00 Rp 18,000.00
Rp 20,700.00

Rp - Rp -
Rp -

Rp 20,700.00
Rp -
Rp 20,700.00
840,000.00
1,200,000.00
480,000.00
300,000.00
24,000.00

2,844,000.00

54,202,324.00
ANALISA HARGA SATUAN PEKERJAAN

Biaya K3 (Keselamatan dan Kesehatan Kerja)


Kebutuhan
Rambu rambu Ls 1
Peraltan P3K Ls 1
Alat Pelindung Diri (Helm, Sepatu, Sarung Tangan, masker, sabuk Ls 1
JUMLAH
Dibulatkan

Penggalian 1 m3 Tanah Biasa Dalam 1 m


A TENAGA
Pekerja L.01 OH 0.750
Mandor L.04 OH 0.025
JUMLAH TENAGA KERJA
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)

Mengebor 1 m Bor Strouse


A TENAGA
Pekerja L.01 OH 0.250
Mandor L.04 OH 0.125
JUMLAH TENAGA KERJA
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Bor Strouse Hari 0.042
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)

Pengurugan Kembali 1 m3 Galian Tanah


A TENAGA
Pekerja L.01 OH 0.500
Mandor L.04 OH 0.050
JUMLAH TENAGA KERJA
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)

Pengurugan 1 m3 Dengan Pasir Urug


A TENAGA
Pekerja L.01 OH 0.300
Mandor L.04 OH 0.010
JUMLAH TENAGA KERJA
B BAHAN
Pasir Urug M3 1.200
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)

Pengurugan 1 m3 Dengan Tanah


A TENAGA
Pekerja L.01 OH 0.300
Mandor L.04 OH 0.010
JUMLAH TENAGA KERJA
B BAHAN
Tanah M3 1.200
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)

HARGA SATUAN PEKERJAAN BETON


K100 Membuat 1 m3 lantai kerja beton mutu f’c = 7,4 MPa slump (3-6)cm, w/c = 0,87
A TENAGA
Pekerja L.01 OH 1.200
Tukang Batu L.02 OH 0.200
Kepala Tukang Batu L.03 OH 0.020
Mandor L.04 OH 0.060
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland Kg 230.000
Pasir Beton Kg 893.000
Kerikil ( Max 30 mm ) Kg 1,027.000
Air Liter 200.000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)

K175 Membuat 1 m3 beton mutu f’c = 14,5 MPa, slump (120 ± 20) mm
A TENAGA
Pekerja L.01 OH 1.650
Tukang Batu L.02 OH 0.275
Kepala Tukang Batu L.03 OH 0.028
Mandor L.04 OH 0.083
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland Kg 326.000
Pasir Beton Kg 760.000
Kerikil ( Max 30 mm ) Kg 1,029.000
Air Ltr 215.000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)
Bobot isi pasir = 1.400 kg/m3, Bobot isi kerikil = 1.350 kg/m3, Buckling factor pasir = 20 %

K225 Membuat 1 m3 beton mutu f’c = 19,3 MPa


A TENAGA
Pekerja L.01 OH 1.650
Tukang Batu L.02 OH 0.275
Kepala Tukang Batu L.03 OH 0.028
Mandor L.04 OH 0.083
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland Kg 371.000
Pasir Beton Kg 698.000
Kerikil ( Max 30 mm ) Kg 1,047.000
Air Ltr 215.000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)

Pembesian 10 Kg dengan besi Polos atau Ulir


A TENAGA
Pekerja L.01 OH 0.070
Tukang Besi L.02 OH 0.070
Kepala Tukang Besi L.03 OH 0.007
Mandor L.04 OH 0.004
JUMLAH TENAGA KERJA
B BAHAN
Besi Beton ( Polos/ Ulir ) Kg 10.500
Kawat Beton/ Bendrat Kg 0.150
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E) 10 Kg
G Harga Satuan Pekerjaan 1 Kg

Pemasangan 1 m2 Bekisting untuk Pondasi 5x


A TENAGA
Pekerja L.01 OH 0.520
Tukang Kayu L.02 OH 0.260
Kepala Tukang Kayu L.03 OH 0.026
Mandor L.04 OH 0.026
JUMLAH TENAGA KERJA
B BAHAN
Kayu Kelas III M3 0.008
Paku 5 - 10 cm Kg 0.300
Minyak Bekisting Ltr 0.100
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)

Pemasangan 1 m2 Bekisting untuk Sloof 5x


A TENAGA
Pekerja L.01 OH 0.520
Tukang Kayu L.02 OH 0.260
Kepala Tukang Kayu L.03 OH 0.026
Mandor L.04 OH 0.026
JUMLAH TENAGA KERJA
B BAHAN
Kayu Kelas III M3 0.009
Paku 5 - 10 cm Kg 0.300
Minyak Bekisting Ltr 0.100
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)

Pemasangan 1 m2 Bekisting untuk Kolom 5x


A TENAGA
Pekerja L.01 OH 0.660
Tukang Kayu L.02 OH 0.330
Kepala Tukang Kayu L.03 OH 0.033
Mandor L.04 OH 0.033
JUMLAH TENAGA KERJA
B BAHAN
Kayu Kelas III M3 0.008
Paku 5 - 10 cm Kg 0.400
Balok Kayu Kelas II M3 0.003
Minyak Bekisting Ltr 0.200
Plywood tbl. 9 mm Lbr 0.070
Dolken bambu bongkotan / tiang Btg 0.400
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)

Pemasangan 1 m2 Bekisting untuk Balok 5x


A TENAGA
Pekerja L.01 OH 0.660
Tukang Kayu L.02 OH 0.330
Kepala Tukang Kayu L.03 OH 0.033
Mandor L.04 OH 0.033
JUMLAH TENAGA KERJA
B BAHAN
Kayu Kelas III M3 0.008
Paku 5 - 10 cm Kg 0.400
Balok Kayu kelas II M3 0.004
Minyak Bekisting Ltr 0.200
Plywood tbl. 9 mm Lbr 0.070
Dolken bambu bongkotan / tiang Btg 0.400
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)
Pemasangan 1 m2 Bekisting untuk Lantai 2x
A TENAGA
Pekerja L.01 OH 0.660
Tukang Kayu L.02 OH 0.330
Kepala Tukang Kayu L.03 OH 0.033
Mandor L.04 OH 0.033
JUMLAH TENAGA KERJA
B BAHAN
Kayu Kelas III M3 0.020
Paku 5 - 10 cm Kg 0.400
Balok Kayu kelas II M3 0.008
Minyak Bekisting Ltr 0.200
Plywood tbl. 9 mm Lbr 0.175
Dolken bambu bongkotan / tiang Btg 3.000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)

Pemasangan 1 Kg Besi Profil Siku


A TENAGA
Pekerja L.01 OH 0.060
Tukang Besi L.02 OH 0.060
Kepala Tukang Besi L.03 OH 0.006
Mandor L.04 OH 0.003
JUMLAH TENAGA KERJA
B BAHAN
Besi Profil Siku Kg 1.150
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)

Pemasangan 1 m2 reng galvalume


A TENAGA
Pekerja L.01 OH 0.100
Tukang Besi L.02 OH 0.100
Kepala Tukang Besi L.03 OH 0.010
Mandor L.04 OH 0.005
JUMLAH TENAGA KERJA
B BAHAN
Reng Galvalume m1 4.000
Paku Skrup Bh 10.000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)

Pemasangan 1 m2 Dinding Bata merah ( 5x11x22 ) cm tbl. 1/2 bata campuran 1SP : 3PP
A TENAGA
Pekerja L.01 OH 0.300
Tukang Batu L.02 OH 0.100
Kepala Tukang Batu L.03 OH 0.010
Mandor L.04 OH 0.015
JUMLAH TENAGA KERJA
B BAHAN
Bata Merah Bh 70.000
Semen Portland Kg 14.370
Pasir Pasang M3 0.040
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)

Pemasangan 1 m2 Dinding Bata merah ( 5x11x22 ) cm tbl. 1/2 bata campuran 1SP : 5PP
A TENAGA
Pekerja L.01 OH 0.300
Tukang Batu L.02 OH 0.100
Kepala Tukang Batu L.03 OH 0.010
Mandor L.04 OH 0.015
JUMLAH TENAGA KERJA
B BAHAN
Bata Merah Bh 70.000
Semen Portland Kg 9.680
Pasir Pasang M3 0.045
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)

Pemasangan 1 m2 Dinding Bata merah ( 5x11x22 ) cm tbl. 1 bata campuran 1SP : 5PP
A TENAGA
Pekerja L.01 OH 0.600
Tukang Batu L.02 OH 0.200
Kepala Tukang Batu L.03 OH 0.020
Mandor L.04 OH 0.030
JUMLAH TENAGA KERJA
B BAHAN
Bata Merah Bh 140.000
Semen Portland Kg 22.200
Pasir Pasang M3 0.102
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)

Pemasangan 1 m2 Dinding Bata merah ( 5x11x22 ) cm tbl. 1 bata campuran 1SP : 3PP
A TENAGA
Pekerja L.01 OH 0.600
Tukang Batu L.02 OH 0.200
Kepala Tukang Batu L.03 OH 0.020
Mandor L.04 OH 0.030
JUMLAH TENAGA KERJA
B BAHAN
Bata Merah Bh 140.000
Semen Portland Kg 32.950
Pasir Pasang M3 0.091
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)

Pemasangan 1 m2 Dinding Bata merah ( 5x11x22 ) cm tbl. 1 bata Kosong (Patlah)


A TENAGA
Pekerja L.01 OH 0.600
Tukang Batu L.02 OH 0.200
Kepala Tukang Batu L.03 OH 0.020
Mandor L.04 OH 0.030
JUMLAH TENAGA KERJA
B BAHAN
Bata Merah Bh 140.000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)

Pemasangan 1 cm2 Dinding Terawang ( 12x11x24 ) campuran 1SP : 5PP


A TENAGA
Pekerja L.01 OH 0.300
Tukang Batu L.02 OH 0.100
Kepala Tukang Batu L.03 OH 0.010
Mandor L.04 OH 0.015
JUMLAH TENAGA KERJA
B BAHAN
Rooster ( 12x11x24 ) cm M2 3.157
Semen Portland Kg 11.000
Pasir Pasang M3 0.035
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)

HARGA SATUAN PEKERJAAN PLESTERAN


Pemasangan 1 m2 Plesteran 1SP : 3PP tebal 15 mm
A TENAGA
Pekerja L.01 OH 0.300
Tukang Batu L.02 OH 0.150
Kepala Tukang Batu L.03 OH 0.015
Mandor L.04 OH 0.015
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland Kg 7.776
Pasir Pasang M3 0.023
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)

Pemasangan 1 m2 Plesteran 1SP : 5PP tebal 15 mm


A TENAGA
Pekerja L.01 OH 0.300
Tukang Batu L.02 OH 0.150
Kepala Tukang Batu L.03 OH 0.015
Mandor L.04 OH 0.015
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland Kg 5.184
Pasir Pasang M3 0.026
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)

Pemasangan 1 m2 Acian
A TENAGA
Pekerja L.01 OH 0.200
Tukang Batu L.02 OH 0.100
Kepala Tukang Batu L.03 OH 0.010
Mandor L.04 OH 0.010
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland Kg 3.250
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)

Pemasangan 1 m' Benangan / Tali Air


A TENAGA
Tukang Batu L.02 OH 0.080
Mandor L.04 OH 0.010
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland Kg 3.100
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)

HARGA SATUAN PEKERJAAN PENUTUP LANTAI


Pemasangan 1 m2 Lantai Keramik 40x40 cm
A TENAGA
Pekerja L.01 OH 0.250
Tukang Batu L.02 OH 0.125
Kepala Tukang Batu L.03 OH 0.013
Mandor L.04 OH 0.013
JUMLAH TENAGA KERJA
B BAHAN
Keramik 40x40 cm bh 6.630
Semen Portland Kg 9.800
Pasir Pasang M3 0.045
Semen Warna Kg 0.600
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)

Pemasangan 1 m2 Lantai Keramik 30x30 cm


A TENAGA
Pekerja L.01 OH 0.250
Tukang Batu L.02 OH 0.125
Kepala Tukang Batu L.03 OH 0.013
Mandor L.04 OH 0.013
JUMLAH TENAGA KERJA
B BAHAN
Keramik 30x30 cm bh 11.870
Semen Portland Kg 10.000
Pasir Pasang M3 0.045
Semen Warna Kg 0.600
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)

Pemasangan 1 m2 Keramik Dinding 25x40 cm


A TENAGA
Pekerja L.01 OH 0.900
Tukang Batu L.02 OH 0.450
Kepala Tukang Batu L.03 OH 0.045
Mandor L.04 OH 0.045
JUMLAH TENAGA KERJA
B BAHAN
Keramik 25x40 cm Bh 10.600
Semen Portland Kg 9.300
Pasir Pasang M3 0.018
Semen Warna Kg 1.940
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)

Pemasangan 1 m1 Keramik Kuku Macan


A TENAGA
Pekerja L.01 OH 0.025
Tukang Batu L.02 OH 0.012
Kepala Tukang Batu L.03 OH 0.0012
Mandor L.04 OH 0.0012
JUMLAH TENAGA KERJA
B BAHAN
Keramik kuku Macan Bh 10.000
Semen Portland Kg 5.690
Pasir Pasang M3 0.0045
Semen Warna Kg 0.010
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)

Pemasangan 1 m2 Lantai Keramik 25x25 cm


A TENAGA
Pekerja L.01 OH 0.270
Tukang Batu L.02 OH 0.135
Kepala Tukang Batu L.03 OH 0.014
Mandor L.04 OH 0.014
JUMLAH TENAGA KERJA
B BAHAN
Keramik 25x25 cm bh 16.960
Semen Portland Kg 10.400
Pasir Pasang M3 0.045
Semen Warna Kg 1.000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)

HARGA SATUAN PEKERJAAN PLAFOND


Pemasangan 1 m2 rangka besi hollow 1x35.35.2mm, modul 60 x 60 cm, untuk plafon
A TENAGA
Pekerja L.01 OH 0.350
Tukang Besi L.02 OH 0.350
Kepala Tukang Besi L.03 OH 0.035
Mandor L.04 OH 0.018
JUMLAH TENAGA KERJA
B BAHAN
Rangka Hollow 40.40.2 mm M' 4.000
Aksesoris ( Perkuatan, Las, dll. ) Ls 1.000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)

Pemasangan 1 m2 Calsiboard 3.5 mm


A TENAGA
Pekerja L.01 OH 0.100
Tukang Kayu L.02 OH 0.050
Kepala Tukang Kayu L.03 OH 0.005
Mandor L.04 OH 0.005
JUMLAH TENAGA KERJA
B BAHAN
Kalsiboard tb 3.5 mm Lbr 0.347
Paku Skrup kg 0.110
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)

Pemasangan 1 m' List Plafond U 1 x 4


A TENAGA
Pekerja L.01 OH 0.021
Tukang Kayu L.02 OH 0.021
Kepala Tukang Kayu L.03 OH 0.002
Mandor L.04 OH 0.001
JUMLAH TENAGA KERJA
B BAHAN
List Plafond U 1 x 4 M' 1.000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)

HARGA SATUAN PEKERJAAN PENUTUP ATAP


Pemasangan 1 m2 Penutup Atap Genteng Beton
A TENAGA
Pekerja L.01 OH 0.150
Tukang Besi L.02 OH 0.060
Kepala Tukang Besi L.03 OH 0.060
Mandor L.04 OH 0.008
JUMLAH TENAGA KERJA
B BAHAN
Genteng Bh 11.000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)

Pemasangan 1 m1 Bubungan Genteng Beton


A TENAGA
Pekerja L.01 OH 0.400
Tukang Besi L.02 OH 0.200
Kepala Tukang Besi L.03 OH 0.020
Mandor L.04 OH 0.002
JUMLAH TENAGA KERJA
B BAHAN
Genteng Bubungan Bh 4.000
Semen Pc Kg 8.000
Pasir Pasang M3 0.032
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)

Pemasangan 1 m' KalsiPlank


A TENAGA
Pekerja L.01 OH 0.100
Tukang Kayu L.02 OH 0.200
Kepala Tukang Kayu L.03 OH 0.020
Mandor L.04 OH 0.050
JUMLAH TENAGA KERJA
B BAHAN
Kalsiplank M' 1.050
Paku skrup Bh 16.000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)

Pemasangan Kompres 1 m' KalsiPlank


A TENAGA
Pekerja L.01 OH 0.0367
Tukang Kayu L.02 OH 0.0733
Kepala Tukang Kayu L.03 OH 0.0073
Mandor L.04 OH 0.0017
JUMLAH TENAGA KERJA
B BAHAN
Kalsiplank M' 1.1000
Paku skrup Bh 0.0167
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)

HARGA SATUAN PEKERJAAN CAT


Pengecatan 1 m2 tembok baru ( 1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup ), Interior
A TENAGA
Pekerja L.01 OH 0.020
Tukang Cat L.02 OH 0.063
Kepala Tukang Cat L.03 OH 0.0063
Mandor L.04 OH 0.003
JUMLAH TENAGA KERJA
B BAHAN
Plamir Kg 0.100
Cat Dasar Kg 0.100
Cat Penutup Kg 0.260
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)

Pengecatan 1 m2 tembok baru ( 1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup ), Exterior
A TENAGA
Pekerja L.01 OH 0.020
Tukang Cat L.02 OH 0.063
Kepala Tukang Cat L.03 OH 0.0063
Mandor L.04 OH 0.003
JUMLAH TENAGA KERJA
B BAHAN
Plamir Kg 0.100
Cat Dasar Kg 0.100
Cat Penutup Kg 0.260
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)
1 Titik Memasang Instalasi Listrik
A TENAGA
Pekerja L.01 OH 0.075
Tukang Listrik L.02 OH 0.0375
JUMLAH TENAGA KERJA
B BAHAN
Kabel NYM 2,5 mm m1 7.500
Pipa Tanam PVC m1 2.000
Inbow Bh 1.000
T. Dos Bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)

HARGA SATUAN PEKERJAAN PINTU


A.4.2.1.11. Pemasangan 1 m kusen pintu alluminium
A TENAGA
Pekerja L.01 OH 0.043
Tukang Besi L.02 OH 0.043
Kepala Tukang Besi L.03 OH 0.004
Mandor L.04 OH 0.002
JUMLAH TENAGA KERJA
B BAHAN
Profil Alumunium M' 1.100
Skrup Fixer Buah 2.000
Sealant Tube 0.060
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)

Pemasangan 1 m' Slimar Aluminium 3/8"


A TENAGA
Pekerja L.01 OH 0.043
Tukang Besi L.02 OH 0.043
Kepala Tukang Besi L.03 OH 0.004
Mandor L.04 OH 0.002
JUMLAH TENAGA KERJA
B BAHAN
Slimar Aluminium 3/8" M' 1.100
Perlengkapan % 0.200
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)

Pemasangan 1 m' Slimar Jendela Aluminium


A TENAGA
Pekerja L.01 OH 0.043
Tukang Besi L.02 OH 0.043
Kepala Tukang Besi L.03 OH 0.004
Mandor L.04 OH 0.002
JUMLAH TENAGA KERJA
B BAHAN
Slimar Aluminium 25/50 M' 1.100
Perlengkapan % 0.200
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)

Pemasangan 1 m2 kaca bening tbl. 5 mm


A TENAGA
Pekerja L.01 OH 0.015
Tukang Kayu L.02 OH 0.150
Kepala Tukang Kayu L.03 OH 0.002
Mandor L.04 OH 0.001
JUMLAH TENAGA KERJA
B BAHAN
Kaca Bening tbl. 5mm M' 1.100
Perlengkapan % 0.200
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)

1 Unit Pasang Kusen dan Daun Pintu Type P1


A BAHAN
Kusen aluminium 10" M1 7.0000
Daun Pintu WPC Unit 1.0000
Kaca Bening 5 mm M2 0.0900
Jalusi Aluminium 2/7,5 m1 3.6000
Engsel pintu Set 1.5000
Kunci pintu Bh 1.0000
Door Stop Bh 1.0000
Grendel pintu Bh 1.0000
JUMLAH HARGA BAHAN
B PERALATAN
JUMLAH HARGA ALAT
C Jumlah ( A+B+C)
D OverHead & Profit 0% 0%xD
E Harga Satuan Pekerjaan ( D+E)

1 Unit Pasang Kusen dan Daun Pintu Type P2 (KM/WC)


A BAHAN
Kusen aluminium 10" M1 5.0000
Daun Pintu WPC Unit 1.0000
Engsel pintu Set 1.5000
Kunci pintu Bh 1.0000
Grendel pintu Bh 1.0000
JUMLAH HARGA BAHAN
B PERALATAN
JUMLAH HARGA ALAT
C Jumlah ( A+B+C)
D OverHead & Profit 0% 0%xD
E Harga Satuan Pekerjaan ( D+E)

1 Unit Pasang Kusen dan Daun Jendela Type BV 3


A BAHAN
Kusen aluminium 10" M1 2.2000
Kaca 5 mm polos M1 0.1920
JUMLAH HARGA BAHAN
B PERALATAN
JUMLAH HARGA ALAT
C Jumlah ( A+B+C)
D OverHead & Profit 0% 0%xD
E Harga Satuan Pekerjaan ( D+E)

1 Unit Pasang Kusen dan Daun Jendela Type J1


A BAHAN
Kusen aluminium 10" M1 9.1980
Daun Jendela aluminium 25 x 50 - 1.2 mm M1 3.2800
Aluminium Strip Lebar 10 Cm M1 6.1600
Tutup Open Kusen M1 3.3610
Kaca 5 mm polos M2 1.3201
Tatapan Casment M1 3.2800
Tatapan Tutup Casment M1 3.2800
Engsel Casment Set 1.0000
Rambucis Bh 1.0000
Karet Sirip M1 3.2800
JUMLAH HARGA BAHAN
B PERALATAN
JUMLAH HARGA ALAT
C Jumlah ( A+B+C)
D OverHead & Profit 0% 0%xD
E Harga Satuan Pekerjaan ( D+E)

1 Unit Pasang Kusen dan Daun Jendela Type J2


A BAHAN
Kusen aluminium 10" M1 15.3750
Daun Jendela aluminium 25 x 50 - 1.2 mm M1 5.7800
Aluminium Strip Lebar 10 Cm M1 10.4800
Tutup Open Kusen M1 6.6950
Kaca 5 mm polos M2 2.2090
Tatapan Casment M1 5.7800
Tatapan Tutup Casment M1 5.7800
Engsel Casment Set 2.0000
Rambucis Bh 2.0000
Karet Sirip M1 5.7800
JUMLAH HARGA BAHAN
B PERALATAN
JUMLAH HARGA ALAT
C Jumlah ( A+B+C)
D OverHead & Profit 0% 0%xD
E Harga Satuan Pekerjaan ( D+E)

1 Unit Pasang Kusen dan Daun Jendela Type BV 1


A BAHAN
Kusen aluminium 10" M1 7.1200
Aluminium Strip Lebar 10 Cm M1 10.0800
JUMLAH HARGA BAHAN
B PERALATAN
JUMLAH HARGA ALAT
C Jumlah ( A+B+C)
D OverHead & Profit 0% 0%xD
E Harga Satuan Pekerjaan ( D+E)

1 Unit Pasang Kusen dan Daun Jendela Type BV 2


A BAHAN
Kusen aluminium 10" M1 2.6300
Aluminium Strip Lebar 10 Cm M1 3.5400
JUMLAH HARGA BAHAN
B PERALATAN
JUMLAH HARGA ALAT
C Jumlah ( A+B+C)
D OverHead & Profit 0% 0%xD
E Harga Satuan Pekerjaan ( D+E)

1 Unit Pasang Kusen Jendela Kaca


A BAHAN
Kusen aluminium 10" M1 69.3570
Tutup Open Kusen M1 45.1100
Kaca 5 mm polos M2 33.4807
Karet Sirip M1 126.5540
JUMLAH HARGA BAHAN
B PERALATAN
JUMLAH HARGA ALAT
C Jumlah ( A+B+C)
D OverHead & Profit 0% 0%xD
E Harga Satuan Pekerjaan ( D+E)
1 Unit Pasang besi Hollow Pagar Type 1
Besi hollow 40x40x2 mm M1 12.8400
Besi hollow 40x20x2 mm M1 32.8000
Fabrikasi, Cat dan Pemasangan % 0.3500
Jumlah

1 Unit Pasang besi Hollow Pagar Type 2


Besi hollow 40x40x2 mm M1 4.9000
Besi hollow 40x20x2 mm M1 13.1200
Fabrikasi, Cat dan Pemasangan % 0.3500
Jumlah

1 Unit Pasang besi Hollow Pagar Type 3


Besi hollow 40x40x2 mm M1 4.0200
Besi hollow 40x20x2 mm M1 5.7400
Fabrikasi, Cat dan Pemasangan % 0.3500
Jumlah

1 Unit Tangga Besi Galvanis


Besi Dia 1" M1 12.0000
Besi Dia 3/4" M1 7.0000
Fabrikasi, Cat dan Pemasangan % 0.3500
Jumlah

1 Unit Pasang besi Hollow Railing hand Type 1


Besi hollow 40x40x2 mm M1 7.5000
Besi hollow 40x20x2 mm M1 10.8000
Fabrikasi, Cat dan Pemasangan % 0.3500
Jumlah

1 Unit Pasang besi Hollow Railing hand Type 1


Besi hollow 40x40x2 mm M1 7.3400
Besi hollow 40x20x2 mm M1 9.6000
Fabrikasi, Cat dan Pemasangan % 0.3500
Jumlah

HARGA SATUAN PEKERJAAN SANITASI


Pemasangan 1 bh Closet Jongkok
A TENAGA
Pekerja L.01 OH 1.000
Tukang Batu L.02 OH 1.500
Kepala Tukang Batu L.03 OH 0.150
Mandor L.04 OH 0.160
JUMLAH TENAGA KERJA
B BAHAN
Closet Jongkok Bh 1.000
Semen Portland Kg 6.000
Pasir Pasang M3 0.010
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)

Pemasangan 1 bh Kran Air dia. 1/2"


A TENAGA
Pekerja L.01 OH 0.010
Tukang Batu L.02 OH 0.400
Kepala Tukang Batu L.03 OH 0.040
Mandor L.04 OH 0.005
JUMLAH TENAGA KERJA
B BAHAN
Kran Air dia. 1/2" Bh 1.000
Sealtape Roll 0.025
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)

Pemasangan 1 bh Floor Drain / Avour


A TENAGA
Pekerja L.01 OH 0.010
Tukang Batu L.02 OH 0.100
Kepala Tukang Batu L.03 OH 0.010
Mandor L.04 OH 0.005
JUMLAH TENAGA KERJA
B BAHAN
Floor Drain / Avour Bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)

Pemasangan 1 m' pipa PVC 1/2"


A TENAGA
Pekerja L.01 OH 0.054
Tukang Besi L.02 OH 0.090
Kepala Tukang Besi L.03 OH 0.009
Mandor L.04 OH 0.027
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC 1/2" M' 1.100
Perlengkapan % 0.200
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)

Pemasangan 1 m' pipa PVC 2"


A TENAGA
Pekerja L.01 OH 0.054
Tukang Besi L.02 OH 0.090
Kepala Tukang Besi L.03 OH 0.009
Mandor L.04 OH 0.027
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC 2" M' 1.100
Perlengkapan % 0.200
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)
Pemasangan 1 m' pipa PVC 4"
A TENAGA
Pekerja L.01 OH 0.054
Tukang Besi L.02 OH 0.090
Kepala Tukang Besi L.03 OH 0.009
Mandor L.04 OH 0.027
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC 4" M' 1.100
Perlengkapan % 0.200
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)
HARGA SATUAN PEKERJAAN AKSESORIS
Pemasangan 1 Unit Hollow Nama Pasar
A TENAGA
Pekerja L.01 OH 0.420
Tukang Besi L.02 OH 0.650
Kepala Tukang Besi L.03 OH 0.035
Mandor L.04 OH 0.030
JUMLAH TENAGA KERJA
B BAHAN
Besi Hollow 4 x 4 M' 16.200
Besi Hollow 2 x 4 M' 82.800
Cat Besi M2 5.088
Cat Meni Besi M2 5.088
Perlengkapan % 0.350
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)

Pemasangan 1 Unit Pagar Hollow 1


A TENAGA
Pekerja L.01 OH 0.420
Tukang Besi L.02 OH 0.650
Kepala Tukang Besi L.03 OH 0.035
Mandor L.04 OH 0.030
JUMLAH TENAGA KERJA
B BAHAN
Besi Hollow 4 x 4 M' 6.800
Besi Hollow 2 x 4 M' 8.400
Cat Besi M2 0.672
Cat Meni Besi M2 0.672
Perlengkapan % 0.350
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)

Pemasangan 1 Unit Pagar Hollow 2


A TENAGA
Pekerja L.01 OH 0.420
Tukang Besi L.02 OH 0.650
Kepala Tukang Besi L.03 OH 0.035
Mandor L.04 OH 0.030
JUMLAH TENAGA KERJA
B BAHAN
Besi Hollow 4 x 4 M' 6.000
Besi Hollow 2 x 4 M' 7.140
Cat Besi M2 0.571
Cat Meni Besi M2 0.571
Perlengkapan % 0.350
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)

Pemasangan 1 Unit Pintu Pagar Hollow


A TENAGA
Pekerja L.01 OH 0.420
Tukang Besi L.02 OH 0.650
Kepala Tukang Besi L.03 OH 0.035
Mandor L.04 OH 0.030
JUMLAH TENAGA KERJA
B BAHAN
Besi Hollow 4 x 4 M' 7.000
Besi Hollow 2 x 4 M' 25.080
Cat Besi M2 2.006
Cat Meni Besi M2 2.006
Perlengkapan % 0.350
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)

Pemasangan 1 Unit Pintu TPS Lapis Zinkalume


A TENAGA
Pekerja L.01 OH 0.420
Tukang Besi L.02 OH 0.650
Kepala Tukang Besi L.03 OH 0.035
Mandor L.04 OH 0.030
JUMLAH TENAGA KERJA
B BAHAN
Besi Hollow 4 x 4 M' 26.000
Besi Hollow 2 x 4 M' 51.000
Zinkalume M2 10.500
Cat Besi M2 4.122
Cat Meni Besi M2 4.122
Perlengkapan % 0.350
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)

Pemasangan 1 Unit Pintu Masuk Depan PM1


A TENAGA
Pekerja L.01 OH 0.420
Tukang Besi L.02 OH 0.650
Kepala Tukang Besi L.03 OH 0.035
Mandor L.04 OH 0.030
JUMLAH TENAGA KERJA
B BAHAN
Besi Hollow 5 x 5 M' 26.100
Besi Hollow 2 x 4 M' 28.000
Cat Besi M2 2.305
Cat Meni Besi M2 2.305
Perlengkapan % 0.350
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)
Pemasangan 1 Unit Pintu Masuk Depan PM2 Timur
A TENAGA
Pekerja L.01 OH 0.420
Tukang Besi L.02 OH 0.650
Kepala Tukang Besi L.03 OH 0.035
Mandor L.04 OH 0.030
JUMLAH TENAGA KERJA
B BAHAN
Besi Hollow 5 x 5 M' 28.200
Besi Hollow 2 x 4 M' 33.600
Cat Besi M2 2.759
Cat Meni Besi M2 2.759
Perlengkapan % 0.350
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)

Pemasangan 1 Unit Pintu Masuk Depan PM3 Barat


A TENAGA
Pekerja L.01 OH 0.420
Tukang Besi L.02 OH 0.650
Kepala Tukang Besi L.03 OH 0.035
Mandor L.04 OH 0.030
JUMLAH TENAGA KERJA
B BAHAN
Besi Hollow 5 x 5 M' 37.150
Besi Hollow 2 x 4 M' 64.400
Roda Pagar Bh 3.000
Cat Besi M2 5.245
Cat Meni Besi M2 5.245
Perlengkapan % 0.350
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)

Pemasangan 1 m2 Aluminium Composite Panel ( ACP )


A TENAGA
Pekerja L.01 OH 0.420
Tukang Besi L.02 OH 0.650
Kepala Tukang Besi L.03 OH 0.035
Mandor L.04 OH 0.030
JUMLAH TENAGA KERJA
B BAHAN
Aluminium Composite Panel M2 1.000
Hollow 4x4 M' 4.000
Srew Bh 20.000
sealent Tube 0.060
peralatan % 0.200
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)

Pemasangan 1 m' pipa PVC 1/2"


A TENAGA
Pekerja L.01 OH 0.054
Tukang Besi L.02 OH 0.090
Kepala Tukang Besi L.03 OH 0.009
Mandor L.04 OH 0.027
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC 1/2" M' 1.100
Perlengkapan % 0.200
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)

Pemasangan 1 m' pipa PVC 2"


A TENAGA
Pekerja L.01 OH 0.054
Tukang Besi L.02 OH 0.090
Kepala Tukang Besi L.03 OH 0.009
Mandor L.04 OH 0.027
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC 2" M' 1.100
Perlengkapan % 0.200
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)

Pemasangan 1 m' pipa PVC 3"


A TENAGA
Pekerja L.01 OH 0.054
Tukang Besi L.02 OH 0.090
Kepala Tukang Besi L.03 OH 0.009
Mandor L.04 OH 0.027
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC 3" M' 1.100
Perlengkapan % 0.200
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)

Pemasangan 1 m' pipa PVC 4"


A TENAGA
Pekerja L.01 OH 0.054
Tukang Besi L.02 OH 0.090
Kepala Tukang Besi L.03 OH 0.009
Mandor L.04 OH 0.027
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC 4" M' 1.100
Perlengkapan % 0.200
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)

HARGA SATUAN PEKERJAAN MEKANIKAL DAN ELEKTRIKAL


Instalasi Penerangan
A TENAGA
Ongkos Pasang Ls 1.000
JUMLAH TENAGA KERJA
B BAHAN
Kabel NYA 3x2,5mm M' 7.500
Pipa Paralon 5/8 Ljr 2.000
Klem Bh 4.000
dos Bh 2.000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)

Instalasi Stop Kontak


A TENAGA
Ongkos Pasang Ls 1.000
JUMLAH TENAGA KERJA
B BAHAN
Kabel NYA 3x2,5mm M' 7.500
Pipa Paralon 5/8 Ljr 2.000
Klem Bh 6.000
dos Bh 2.000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)

Pemasangan 1 bh saklar tunggal


A TENAGA
Pekerja L.01 OH 0.240
Tukang Listrik L.02 OH 0.120
Kepala Tukang Listrik L.03 OH 0.300
Mandor L.04 OH 0.025
JUMLAH TENAGA KERJA
B BAHAN
saklar tunggal ex braco Bh 1.000
Inbouw doos Bj 1.000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)

Pemasangan 1 bh saklar Ganda


A TENAGA
Pekerja L.01 OH 0.240
Tukang Listrik L.02 OH 0.120
Kepala Tukang Listrik L.03 OH 0.300
Mandor L.04 OH 0.025
JUMLAH TENAGA KERJA
B BAHAN
saklar Gandal ex braco Bh 1.000
Inbouw doos Bj 1.000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)
Pemasangan 1 bh Stop Kontak
A TENAGA
Pekerja L.01 OH 0.240
Tukang Listrik L.02 OH 0.120
Kepala Tukang Listrik L.03 OH 0.300
Mandor L.04 OH 0.025
JUMLAH TENAGA KERJA
B BAHAN
Stop Kontak ex braco Bh 1.000
Inbouw doos Bj 1.000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)

Pemasangan 1 Unit Pagar dan Tangga Tandon


A TENAGA
Pekerja L.01 OH 0.420
Tukang Besi L.02 OH 0.650
Kepala Tukang Besi L.03 OH 0.035
Mandor L.04 OH 0.030
JUMLAH TENAGA KERJA
B BAHAN
Besi Hollow 5 x 5 M' 31.840
Besi Hollow 2 x 4 M' 57.400
Cat Besi M2 4.643
Cat Meni Besi M2 4.643
Perlengkapan % 0.350
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)
Pemasangan 1 m2 Dinding Bata Ringan tbl. 10 cm
A TENAGA
Pekerja L.01 OH 0.300
Tukang Batu L.02 OH 0.100
Kepala Tukang Batu L.03 OH 0.010
Mandor L.04 OH 0.015
JUMLAH TENAGA KERJA
B BAHAN
Bata Ringan Bh 8.333
Semen Instan Pasangan Kg 4.000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)

Pemasangan 1 m2 Plesteran , tebal 10 mm


A TENAGA
Pekerja L.01 OH 0.300
Tukang Batu L.02 OH 0.150
Kepala Tukang Batu L.03 OH 0.015
Mandor L.04 OH 0.015
JUMLAH TENAGA KERJA
B BAHAN
Semen Instan Plesteran Kg 7.776
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)

Pemasangan 1 m2 Acian
A TENAGA
Pekerja L.01 OH 0.200
Tukang Batu L.02 OH 0.100
Kepala Tukang Batu L.03 OH 0.010
Mandor L.04 OH 0.010
JUMLAH TENAGA KERJA
B BAHAN
Semen Instan acian Kg 3.250
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)

Pengecatan 1 m2 Permukaan baja


A TENAGA
Pekerja L.01 OH 0.020
Tukang Cat L.02 OH 0.200
Kepala Tukang Cat L.03 OH 0.020
Mandor L.04 OH 0.003
JUMLAH TENAGA KERJA
B BAHAN
Cat Besi Kg 0.100
Kuas Bh 0.010
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah ( A+B+C)
E OverHead & Profit 0% 0%xD
F Harga Satuan Pekerjaan ( D+E)
PEKERJAAN

Helm 12 ### ###


200000 Rp 200,000.00 Sepatu 12 ### ###
150000 Rp 150,000.00 Sabuk 4.8 ### ###
2844000 Rp 2,844,000.00 Sarung Tangan 12 ### ###
Rp 3,194,000.00 Masker 12 ### ###
Rp 3,194,000.00
###
4.8

###

Rp 85,000.00 Rp 63,750.00
Rp 200,000.00 Rp 5,000.00
Rp 68,750.00

Rp 68,750.00
Rp -
Rp 68,750.00

Rp 85,000.00 Rp 21,250.00
Rp 200,000.00 Rp 25,000.00
Rp 46,250.00

Rp 150,000.00 Rp 6,300.00
Rp 6,300.00
Rp 52,550.00
Rp -
Rp 52,550.00

Rp 85,000.00 Rp 42,500.00
Rp 200,000.00 Rp 10,000.00
Rp 52,500.00
Rp 52,500.00
Rp -
Rp 52,500.00

Rp 85,000.00 Rp 25,500.00
Rp 200,000.00 Rp 2,000.00
Rp 27,500.00

Rp 162,500.00 Rp 195,000.00
Rp 195,000.00

Rp 222,500.00
Rp -
Rp 222,500.00

Rp 85,000.00 Rp 25,500.00
Rp 200,000.00 Rp 2,000.00
Rp 27,500.00

Rp 60,000.00 Rp 72,000.00
Rp 72,000.00

Rp 99,500.00
Rp -
Rp 99,500.00

Rp 80,000.00 Rp 96,000.00
Rp 90,000.00 Rp 18,000.00
Rp 95,000.00 Rp 1,900.00
Rp 100,000.00 Rp 6,000.00
Rp 121,900.00

Rp 1,250.00 Rp 287,500.00
Rp 238.13 Rp 212,650.09
Rp 261.48 Rp 268,539.96
Rp 100.00 Rp 20,000.00
Rp 788,690.05

Rp 910,590.05
Rp -
Rp 910,590.05

Rp 80,000.00 Rp 132,000.00
Rp 90,000.00 Rp 24,750.00
Rp 95,000.00 Rp 2,660.00
Rp 100,000.00 Rp 8,300.00
Rp 167,710.00

Rp 1,250.00 Rp 407,500.00
Rp 238.13 Rp 180,978.80
Rp 261.48 Rp 269,062.92
Rp 100.00 Rp 21,500.00
Rp 879,041.72

Rp 1,046,751.72
Rp -
Rp 1,046,751.72

Rp 80,000.00 Rp 132,000.00
Rp 90,000.00 Rp 24,750.00
Rp 95,000.00 Rp 2,660.00
Rp 100,000.00 Rp 8,300.00
Rp 167,710.00
Rp 1,250.00 Rp 463,750.00
Rp 238.13 Rp 166,214.74
Rp 261.48 Rp 273,769.56
Rp 100.00 Rp 21,500.00
Rp 925,234.30

Rp 1,092,944.30
Rp -
Rp 1,092,944.30

Rp 80,000.00 Rp 5,600.00
Rp 90,000.00 Rp 6,300.00
Rp 95,000.00 Rp 665.00
Rp 100,000.00 Rp 400.00
Rp 12,965.00

Rp 12,000.00 Rp 126,000.00
Rp 18,000.00 Rp 2,700.00
Rp 128,700.00

Rp 141,665.00
Rp -
Rp 141,665.00
Rp 14,166.50

Rp 80,000.00 Rp 41,600.00
Rp 90,000.00 Rp 23,400.00
Rp 95,000.00 Rp 2,470.00
Rp 100,000.00 Rp 2,600.00
Rp 70,070.00

Rp 4,000,000.00 Rp 32,000.00
Rp 20,000.00 Rp 6,000.00
Rp 3,500.00 Rp 350.00
Rp 38,350.00

Rp 108,420.00
Rp -
Rp 108,420.00

Rp 80,000.00 Rp 41,600.00
Rp 90,000.00 Rp 23,400.00
Rp 95,000.00 Rp 2,470.00
Rp 100,000.00 Rp 2,600.00
Rp 70,070.00

Rp 4,000,000.00 Rp 36,000.00
Rp 20,000.00 Rp 6,000.00
Rp 3,500.00 Rp 350.00
Rp 42,350.00

Rp 112,420.00
Rp -
Rp 112,420.00

Rp 80,000.00 Rp 52,800.00
Rp 90,000.00 Rp 29,700.00
Rp 95,000.00 Rp 3,135.00
Rp 100,000.00 Rp 3,300.00
Rp 88,935.00

Rp 4,000,000.00 Rp 32,000.00
Rp 20,000.00 Rp 8,000.00
Rp 5,500,000.00 Rp 16,500.00
Rp 3,500.00 Rp 700.00
Rp 105,000.00 Rp 7,350.00
Rp 15,000.00 Rp 6,000.00
Rp 70,550.00

Rp 159,485.00
Rp -
Rp 159,485.00
Rp 80,000.00 Rp 52,800.00
Rp 90,000.00 Rp 29,700.00
Rp 95,000.00 Rp 3,135.00
Rp 100,000.00 Rp 3,300.00
Rp 88,935.00

Rp 4,000,000.00 Rp 32,000.00
Rp 20,000.00 Rp 8,000.00
Rp 5,500,000.00 Rp 19,800.00
Rp 3,500.00 Rp 700.00
Rp 105,000.00 Rp 7,350.00
Rp 15,000.00 Rp 6,000.00
Rp 73,850.00

Rp 162,785.00
Rp -
Rp 162,785.00

Rp 80,000.00 Rp 52,800.00
Rp 90,000.00 Rp 29,700.00
Rp 95,000.00 Rp 3,135.00
Rp 100,000.00 Rp 3,300.00
Rp 88,935.00

Rp 4,000,000.00 Rp 80,000.00
Rp 20,000.00 Rp 8,000.00
Rp 5,500,000.00 Rp 41,250.00
Rp 3,500.00 Rp 700.00
Rp 105,000.00 Rp 18,375.00
Rp 15,000.00 Rp 45,000.00
Rp 193,325.00

Rp 282,260.00
Rp -
Rp 282,260.00

Rp 80,000.00 Rp 4,800.00
Rp 90,000.00 Rp 5,400.00
Rp 95,000.00 Rp 570.00
Rp 100,000.00 Rp 300.00
Rp 11,070.00

Rp 15,000.00 Rp 17,250.00

Rp 28,320.00
Rp -
Rp 28,320.00

Rp 80,000.00 Rp 8,000.00
Rp 90,000.00 Rp 9,000.00
Rp 95,000.00 Rp 950.00
Rp 100,000.00 Rp 500.00
Rp 18,450.00

Rp 10,000.00 Rp 40,000.00
Rp 250.00 Rp 2,500.00
Rp 42,500.00

Rp 60,950.00
Rp -
Rp 60,950.00

Rp 80,000.00 Rp 24,000.00
Rp 90,000.00 Rp 9,000.00
Rp 95,000.00 Rp 950.00
Rp 100,000.00 Rp 1,500.00
Rp 35,450.00

Rp 750.00 Rp 52,500.00
Rp 1,250.00 Rp 17,962.50
Rp 305,000.00 Rp 12,200.00
Rp 82,662.50
Rp 118,112.50
Rp -
Rp 118,112.50

Rp 80,000.00 Rp 24,000.00
Rp 90,000.00 Rp 9,000.00
Rp 95,000.00 Rp 950.00
Rp 100,000.00 Rp 1,500.00
Rp 35,450.00

Rp 750.00 Rp 52,500.00
Rp 1,250.00 Rp 12,100.00
Rp 305,000.00 Rp 13,725.00
Rp 78,325.00

Rp 113,775.00
Rp -
Rp 113,775.00

Rp 80,000.00 Rp 48,000.00
Rp 90,000.00 Rp 18,000.00
Rp 95,000.00 Rp 1,900.00
Rp 100,000.00 Rp 3,000.00
Rp 70,900.00

Rp 750.00 Rp 105,000.00
Rp 1,250.00 Rp 27,750.00
Rp 305,000.00 Rp 31,110.00
Rp 163,860.00

Rp 234,760.00
Rp -
Rp 234,760.00
Rp 80,000.00 Rp 48,000.00
Rp 90,000.00 Rp 18,000.00
Rp 95,000.00 Rp 1,900.00
Rp 100,000.00 Rp 3,000.00
Rp 70,900.00

Rp 750.00 Rp 105,000.00
Rp 1,250.00 Rp 41,187.50
Rp 305,000.00 Rp 27,755.00
Rp 173,942.50

Rp 244,842.50
Rp -
Rp 244,842.50

Rp 80,000.00 Rp 48,000.00
Rp 90,000.00 Rp 18,000.00
Rp 95,000.00 Rp 1,900.00
Rp 100,000.00 Rp 3,000.00
Rp 70,900.00

Rp 750.00 Rp 105,000.00
Rp 105,000.00

Rp 175,900.00
Rp -
Rp 175,900.00

Rp 80,000.00 Rp 24,000.00
Rp 90,000.00 Rp 9,000.00
Rp 95,000.00 Rp 950.00
Rp 100,000.00 Rp 1,500.00
Rp 35,450.00

Rp 15,000.00 Rp 47,355.00
Rp 1,250.00 Rp 13,750.00
Rp 305,000.00 Rp 10,675.00
Rp 71,780.00
Rp 107,230.00
Rp -
Rp 107,230.00

Rp 80,000.00 Rp 24,000.00
Rp 90,000.00 Rp 13,500.00
Rp 95,000.00 Rp 1,425.00
Rp 100,000.00 Rp 1,500.00
Rp 40,425.00

Rp 1,250.00 Rp 9,720.00
Rp 305,000.00 Rp 7,015.00
Rp 16,735.00

Rp 57,160.00
Rp -
Rp 57,160.00

Rp 80,000.00 Rp 24,000.00
Rp 90,000.00 Rp 13,500.00
Rp 95,000.00 Rp 1,425.00
Rp 100,000.00 Rp 1,500.00
Rp 40,425.00

Rp 1,250.00 Rp 6,480.00
Rp 305,000.00 Rp 7,930.00
Rp 14,410.00

Rp 54,835.00
Rp -
Rp 54,835.00

Rp 80,000.00 Rp 16,000.00
Rp 90,000.00 Rp 9,000.00
Rp 95,000.00 Rp 950.00
Rp 100,000.00 Rp 1,000.00
Rp 26,950.00

Rp 1,250.00 Rp 4,062.50
Rp 4,062.50

Rp 31,012.50
Rp -
Rp 31,012.50

Rp 90,000.00 Rp 7,200.00
Rp 100,000.00 Rp 1,000.00
Rp 8,200.00

Rp 1,250.00 Rp 3,875.00
Rp 3,875.00

Rp 12,075.00
Rp -
Rp 12,075.00

Rp 80,000.00 Rp 20,000.00
Rp 90,000.00 Rp 11,250.00
Rp 95,000.00 Rp 1,235.00 0.0625
Rp 100,000.00 Rp 1,300.00 16
Rp 33,785.00

Rp 9,049.77 Rp 60,000.00
Rp 1,250.00 Rp 12,250.00
Rp 305,000.00 Rp 13,725.00
Rp 1,250.00 Rp 750.00
Rp 86,725.00

Rp 120,510.00
Rp -
Rp 120,510.00

Rp 80,000.00 Rp 20,000.00
Rp 90,000.00 Rp 11,250.00
Rp 95,000.00 Rp 1,235.00 1
Rp 100,000.00 Rp 1,300.00 0.09
Rp 33,785.00 11.11111

Rp 4,633.53 Rp 55,000.00
Rp 1,250.00 Rp 12,500.00
Rp 305,000.00 Rp 13,725.00
Rp 1,250.00 Rp 750.00
Rp 81,975.00

Rp 115,760.00
Rp -
Rp 115,760.00

Rp 80,000.00 Rp 72,000.00
Rp 90,000.00 Rp 40,500.00
Rp 95,000.00 Rp 4,275.00
Rp 100,000.00 Rp 4,500.00
Rp 121,275.00
Rp 5,188.68 Rp 55,000.00
Rp 1,250.00 Rp 11,625.00
Rp 305,000.00 Rp 5,490.00
Rp 1,250.00 Rp 2,425.00
Rp 74,540.00

Rp 195,815.00
Rp -
Rp 195,815.00

Rp 80,000.00 Rp 2,000.00
Rp 90,000.00 Rp 1,080.00
Rp 95,000.00 Rp 114.00
Rp 100,000.00 Rp 120.00
Rp 3,314.00

Rp 900.00 Rp 9,000.00
Rp 1,250.00 Rp 7,112.50
Rp 305,000.00 Rp 1,372.50
Rp 1,250.00 Rp 12.50
Rp 17,497.50

Rp 20,811.50
Rp -
Rp 20,811.50

Rp 80,000.00 Rp 21,600.00
Rp 90,000.00 Rp 12,150.00
Rp 95,000.00 Rp 1,330.00
Rp 100,000.00 Rp 1,400.00
Rp 36,480.00

Rp 3,537.74 Rp 60,000.00
Rp 1,250.00 Rp 13,000.00
Rp 305,000.00 Rp 13,725.00
Rp 1,250.00 Rp 1,250.00
Rp 87,975.00
Rp 124,455.00
Rp -
Rp 124,455.00

Rp 80,000.00 Rp 28,000.00
Rp 90,000.00 Rp 31,500.00
Rp 95,000.00 Rp 3,325.00
Rp 100,000.00 Rp 1,800.00
Rp 64,625.00

Rp 7,150.00 Rp 28,600.00
Rp 28,600.00 Rp 28,600.00
Rp 57,200.00

Rp 121,825.00
Rp -
Rp 121,825.00

Rp 80,000.00 Rp 8,000.00
Rp 90,000.00 Rp 4,500.00
Rp 95,000.00 Rp 475.00
Rp 100,000.00 Rp 500.00
Rp 13,475.00

Rp 57,000.00 Rp 19,779.00
Rp 250.00 Rp 27.50
Rp 19,806.50

Rp 33,281.50
Rp -
Rp 33,281.50

Rp 80,000.00 Rp 1,680.00
Rp 90,000.00 Rp 1,890.00
Rp 95,000.00 Rp 190.00
Rp 100,000.00 Rp 100.00
Rp 3,860.00

Rp 13,750.00 Rp 13,750.00
Rp 13,750.00

Rp 17,610.00
Rp -
Rp 17,610.00

Rp 80,000.00 Rp 12,000.00
Rp 90,000.00 Rp 5,400.00
Rp 95,000.00 Rp 5,700.00
Rp 100,000.00 Rp 800.00
Rp 23,900.00

Rp 4,100.00 Rp 45,100.00
Rp 45,100.00

Rp 69,000.00
Rp -
Rp 69,000.00

Rp 80,000.00 Rp 32,000.00
Rp 90,000.00 Rp 18,000.00
Rp 95,000.00 Rp 1,900.00
Rp 100,000.00 Rp 200.00
Rp 52,100.00

Rp 7,500.00 Rp 30,000.00
Rp 1,250.00 Rp 10,000.00
Rp 305,000.00 Rp 9,760.00
Rp 49,760.00

Rp 101,860.00
Rp -
Rp 101,860.00

Rp 80,000.00 Rp 8,000.00
Rp 90,000.00 Rp 18,000.00
Rp 95,000.00 Rp 1,900.00
Rp 100,000.00 Rp 5,000.00
Rp 32,900.00

Rp 20,000.00 Rp 21,000.00
Rp 250.00 Rp 4,000.00
Rp 25,000.00

Rp 57,900.00
Rp -
Rp 57,900.00

Rp 80,000.00 Rp 2,936.00
Rp 90,000.00 Rp 6,597.00
Rp 95,000.00 Rp 693.50
Rp 100,000.00 Rp 170.00
Rp 10,396.50

Rp 20,000.00 Rp 22,000.00
Rp 250.00 Rp 4.18
Rp 22,004.18
Rp 32,400.68
Rp -
Rp 32,400.68

p ), Interior

Rp 80,000.00 Rp 1,600.00
Rp 90,000.00 Rp 5,670.00
Rp 95,000.00 Rp 598.50
Rp 100,000.00 Rp 300.00
Rp 8,168.50

Rp 65,000.00 Rp 6,500.00
Rp 25,000.00 Rp 2,500.00
Rp 25,000.00 Rp 6,500.00
Rp 15,500.00

Rp 23,668.50
Rp -
Rp 23,668.50

p ), Exterior

Rp 80,000.00 Rp 1,600.00
Rp 90,000.00 Rp 5,670.00
Rp 95,000.00 Rp 598.50
Rp 100,000.00 Rp 300.00
Rp 8,168.50

Rp 65,000.00 Rp 6,500.00
Rp 120,000.00 Rp 12,000.00
Rp 120,000.00 Rp 31,200.00
Rp 49,700.00

Rp 57,868.50
Rp -
Rp 57,868.50
Rp 80,000.00 Rp 6,000.00
Rp 90,000.00 Rp 3,375.00
Rp 9,375.00

Rp 10,000.00 Rp 75,000.00
Rp 9,000.00 Rp 18,000.00
Rp 2,000.00 Rp 2,000.00
Rp 2,000.00 Rp 2,000.00
Rp 97,000.00

Rp 106,375.00
Rp -
Rp 106,375.00

Rp 80,000.00 Rp 3,440.00
Rp 90,000.00 Rp 3,870.00
Rp 95,000.00 Rp 380.00
Rp 100,000.00 Rp 200.00
Rp 7,890.00

Rp 80,000.00 Rp 88,000.00
Rp 250.00 Rp 500.00
Rp 40,000.00 Rp 2,400.00
Rp 90,900.00

Rp 98,790.00
Rp -
Rp 98,790.00

Rp 80,000.00 Rp 3,440.00
Rp 90,000.00 Rp 3,870.00
Rp 95,000.00 Rp 380.00
Rp 100,000.00 Rp 200.00
Rp 7,890.00

Rp 70,000.00 Rp 77,000.00
Rp 70,000.00 Rp 14,000.00
Rp 91,000.00

Rp 98,890.00
Rp -
Rp 98,890.00

Rp 80,000.00 Rp 3,440.00
Rp 90,000.00 Rp 3,870.00
Rp 95,000.00 Rp 380.00
Rp 100,000.00 Rp 200.00
Rp 7,890.00

Rp 75,000.00 Rp 82,500.00
Rp 75,000.00 Rp 15,000.00
Rp 97,500.00

Rp 105,390.00
Rp -
Rp 105,390.00

Rp 80,000.00 Rp 1,200.00
Rp 90,000.00 Rp 13,500.00
Rp 95,000.00 Rp 190.00
Rp 100,000.00 Rp 100.00
Rp 14,990.00

Rp 85,000.00 Rp 93,500.00
Rp 85,000.00 Rp 17,000.00
Rp 110,500.00

Rp 125,490.00
Rp -
Rp 125,490.00

Rp 98,790.00 Rp 691,530.00
Rp 1,400,000.00 Rp 1,400,000.00
Rp 125,490.00 Rp 11,294.10
Rp 25,000.00 Rp 90,000.00
Rp 35,000.00 Rp 52,500.00
Rp 150,000.00 Rp 150,000.00
Rp 25,000.00 Rp 25,000.00
Rp 12,000.00 Rp 12,000.00
Rp 2,432,324.10

Rp 2,432,324.10
Rp -
Rp 2,432,324.10

Rp 98,790.00 Rp 493,950.00
Rp 1,200,000.00 Rp 1,200,000.00
Rp 35,000.00 Rp 52,500.00
Rp 150,000.00 Rp 150,000.00
Rp 12,000.00 Rp 12,000.00
Rp 1,908,450.00

Rp 1,908,450.00
Rp -
Rp 1,908,450.00

Rp 98,790.00 Rp 217,338.00
Rp 125,490.00 Rp 24,094.08
Rp 241,432.08
Rp 241,432.08
Rp -
Rp 241,432.08

Rp 98,790.00 Rp 908,670.42
Rp 105,390.00 Rp 345,679.20
Rp 25,000.00 Rp 154,000.00
Rp 19,000.00 Rp 63,859.00
Rp 125,490.00 Rp 165,653.07
Rp 35,000.00 Rp 114,800.00
Rp 10,833.33 Rp 35,533.32
Rp 60,000.00 Rp 60,000.00
Rp 15,000.00 Rp 15,000.00
Rp 1,500.00 Rp 4,920.00
Rp 1,868,115.02

Rp 1,868,115.02
Rp -
Rp 1,868,115.02

Rp 98,790.00 Rp 1,518,896.25
Rp 105,390.00 Rp 609,154.20
Rp 25,000.00 Rp 262,000.00
Rp 19,000.00 Rp 127,205.00
Rp 125,490.00 Rp 277,207.41
Rp 35,000.00 Rp 202,300.00
Rp 10,833.33 Rp 62,616.65
Rp 60,000.00 Rp 120,000.00
Rp 15,000.00 Rp 30,000.00
Rp 1,500.00 Rp 8,670.00
Rp 3,218,049.51

Rp 3,218,049.51
Rp -
Rp 3,218,049.51

Rp 98,790.00 Rp 703,384.80
Rp 25,000.00 Rp 252,000.00
Rp 955,384.80

Rp 955,384.80
Rp -
Rp 955,384.80

Rp 98,790.00 Rp 259,817.70
Rp 25,000.00 Rp 88,500.00
Rp 348,317.70

Rp 348,317.70
Rp -
Rp 348,317.70

Rp 98,790.00 Rp 6,851,778.03
Rp 19,000.00 Rp 857,090.00
Rp 125,490.00 Rp 4,201,493.42
Rp 23,000.00 Rp 2,910,742.00
Rp 14,821,103.45

Rp 14,821,103.45
Rp -
Rp 14,821,103.45
27,500.00 353,100.00
22,500.00 738,000.00
1,091,100.00 381,885.00
1,472,985.00

27,500.00 134,750.00
22,500.00 295,200.00
429,950.00 150,482.50
580,432.50

27,500.00 110,550.00
22,500.00 129,150.00
239,700.00 83,895.00
323,595.00

24,000.00 288,000.00
20,000.00 140,000.00
428,000.00 149,800.00
577,800.00

24,000.00 180,000.00
20,000.00 216,000.00
396,000.00 138,600.00
534,600.00

24,000.00 176,160.00
20,000.00 192,000.00
368,160.00 128,856.00
497,016.00

Rp 80,000.00 Rp 80,000.00
Rp 90,000.00 Rp 135,000.00
Rp 95,000.00 Rp 14,250.00
Rp 100,000.00 Rp 16,000.00
Rp 245,250.00

Rp 250,000.00 Rp 250,000.00
Rp 1,250.00 Rp 7,500.00
Rp 305,000.00 Rp 3,050.00
Rp 260,550.00

Rp 505,800.00
Rp -
Rp 505,800.00

Rp 80,000.00 Rp 800.00
Rp 90,000.00 Rp 36,000.00
Rp 95,000.00 Rp 3,800.00
Rp 100,000.00 Rp 500.00
Rp 41,100.00

Rp 40,000.00 Rp 40,000.00
Rp 5,000.00 Rp 125.00
Rp 40,125.00

Rp 81,225.00
Rp -
Rp 81,225.00

Rp 80,000.00 Rp 800.00
Rp 90,000.00 Rp 9,000.00
Rp 95,000.00 Rp 950.00
Rp 100,000.00 Rp 500.00
Rp 11,250.00

Rp 30,000.00 Rp 30,000.00
Rp 30,000.00

Rp 41,250.00
Rp -
Rp 41,250.00

Rp 80,000.00 Rp 4,320.00
Rp 90,000.00 Rp 8,100.00
Rp 95,000.00 Rp 855.00
Rp 100,000.00 Rp 2,700.00
Rp 15,975.00

Rp 20,000.00 Rp 22,000.00
Rp 22,000.00 Rp 4,400.00
Rp 26,400.00

Rp 42,375.00
Rp -
Rp 42,375.00

Rp 80,000.00 Rp 4,320.00
Rp 90,000.00 Rp 8,100.00
Rp 95,000.00 Rp 855.00
Rp 100,000.00 Rp 2,700.00
Rp 15,975.00

Rp 20,000.00 Rp 22,000.00
Rp 22,000.00 Rp 4,400.00
Rp 26,400.00

Rp 42,375.00
Rp -
Rp 42,375.00
Rp 80,000.00 Rp 4,320.00
Rp 90,000.00 Rp 8,100.00
Rp 95,000.00 Rp 855.00
Rp 100,000.00 Rp 2,700.00
Rp 15,975.00

Rp 30,000.00 Rp 33,000.00
Rp 33,000.00 Rp 6,600.00
Rp 39,600.00

Rp 55,575.00
Rp -
Rp 55,575.00
Rp 80,000.00 Rp 33,600.00
Rp 90,000.00 Rp 58,500.00
Rp 95,000.00 Rp 3,325.00
Rp 100,000.00 Rp 3,000.00
Rp 98,425.00

Rp 6,250.00 Rp 101,250.00
Rp 5,500.00 Rp 455,400.00
Rp 60,000.00 Rp 305,280.00
Rp 45,000.00 Rp 228,960.00
Rp 1,090,890.00 Rp 381,811.50
Rp 1,472,701.50

Rp 1,571,126.50
Rp -
Rp 1,571,126.50

Rp 80,000.00 Rp 33,600.00
Rp 90,000.00 Rp 58,500.00
Rp 95,000.00 Rp 3,325.00
Rp 100,000.00 Rp 3,000.00
Rp 98,425.00

Rp 6,250.00 Rp 42,500.00
Rp 5,500.00 Rp 46,200.00
Rp 60,000.00 Rp 40,320.00
Rp 45,000.00 Rp 30,240.00
Rp 159,260.00 Rp 55,741.00
Rp 215,001.00
Rp 313,426.00
Rp -
Rp 313,426.00

Rp 80,000.00 Rp 33,600.00
Rp 90,000.00 Rp 58,500.00
Rp 95,000.00 Rp 3,325.00
Rp 100,000.00 Rp 3,000.00
Rp 98,425.00

Rp 6,250.00 Rp 37,500.00
Rp 5,500.00 Rp 39,270.00
Rp 60,000.00 Rp 34,260.00
Rp 45,000.00 Rp 25,695.00
Rp 136,725.00 Rp 47,853.75
Rp 184,578.75

Rp 283,003.75
Rp -
Rp 283,003.75

Rp 80,000.00 Rp 33,600.00
Rp 90,000.00 Rp 58,500.00
Rp 95,000.00 Rp 3,325.00
Rp 100,000.00 Rp 3,000.00
Rp 98,425.00

Rp 6,250.00 Rp 43,750.00
Rp 5,500.00 Rp 137,940.00
Rp 60,000.00 Rp 120,360.00
Rp 45,000.00 Rp 90,270.00
Rp 392,320.00 Rp 137,312.00
Rp 529,632.00

Rp 628,057.00
Rp -
Rp 628,057.00

Rp 80,000.00 Rp 33,600.00
Rp 90,000.00 Rp 58,500.00
Rp 95,000.00 Rp 3,325.00
Rp 100,000.00 Rp 3,000.00
Rp 98,425.00

Rp 6,250.00 Rp 162,500.00
Rp 5,500.00 Rp 280,500.00
Rp 60,000.00 Rp 630,000.00
Rp 60,000.00 Rp 247,320.00
Rp 45,000.00 Rp 185,490.00
Rp 1,505,810.00 Rp 527,033.50
Rp 2,032,843.50

Rp 2,131,268.50
Rp -
Rp 2,131,268.50

Rp 80,000.00 Rp 33,600.00
Rp 90,000.00 Rp 58,500.00
Rp 95,000.00 Rp 3,325.00
Rp 100,000.00 Rp 3,000.00
Rp 98,425.00

Rp 7,500.00 Rp 195,750.00
Rp 5,500.00 Rp 154,000.00
Rp 60,000.00 Rp 138,300.00
Rp 45,000.00 Rp 103,725.00
Rp 591,775.00 Rp 207,121.25
Rp 798,896.25

Rp 897,321.25
Rp -
Rp 897,321.25
Rp 80,000.00 Rp 33,600.00
Rp 90,000.00 Rp 58,500.00
Rp 95,000.00 Rp 3,325.00
Rp 100,000.00 Rp 3,000.00
Rp 98,425.00

Rp 7,500.00 Rp 211,500.00
Rp 5,500.00 Rp 184,800.00
Rp 60,000.00 Rp 165,540.00
Rp 45,000.00 Rp 124,155.00
Rp 685,995.00 Rp 240,098.25
Rp 926,093.25

Rp 1,024,518.25
Rp -
Rp 1,024,518.25

Rp 80,000.00 Rp 33,600.00
Rp 90,000.00 Rp 58,500.00
Rp 95,000.00 Rp 3,325.00
Rp 100,000.00 Rp 3,000.00
Rp 98,425.00

Rp 7,500.00 Rp 278,625.00
Rp 5,500.00 Rp 354,200.00
Rp 150,000.00 Rp 450,000.00
Rp 60,000.00 Rp 314,700.00
Rp 45,000.00 Rp 236,025.00
Rp 1,633,550.00 Rp 571,742.50
Rp 2,205,292.50

Rp 2,303,717.50
Rp -
Rp 2,303,717.50

Rp 80,000.00 Rp 33,600.00
Rp 90,000.00 Rp 58,500.00
Rp 95,000.00 Rp 3,325.00
Rp 100,000.00 Rp 3,000.00
Rp 98,425.00

Rp 600,000.00 Rp 600,000.00
Rp 6,250.00 Rp 25,000.00
Rp 1,000.00 Rp 20,000.00
Rp 30,000.00 Rp 1,800.00
Rp 646,800.00 Rp 129,360.00
Rp 776,160.00

Rp 874,585.00
Rp -
Rp 874,585.00

Rp 80,000.00 Rp 4,320.00
Rp 90,000.00 Rp 8,100.00
Rp 95,000.00 Rp 855.00
Rp 100,000.00 Rp 2,700.00
Rp 15,975.00

Rp 5,833.33 Rp 6,416.67
Rp 6,416.67 Rp 1,283.33
Rp 7,700.00

Rp 23,675.00
Rp -
Rp 23,675.00

Rp 80,000.00 Rp 4,320.00
Rp 90,000.00 Rp 8,100.00
Rp 95,000.00 Rp 855.00
Rp 100,000.00 Rp 2,700.00
Rp 15,975.00

Rp 10,833.33 Rp 11,916.67
Rp 11,916.67 Rp 2,383.33
Rp 14,300.00

Rp 30,275.00
Rp -
Rp 30,275.00

Rp 80,000.00 Rp 4,320.00
Rp 90,000.00 Rp 8,100.00
Rp 95,000.00 Rp 855.00
Rp 100,000.00 Rp 2,700.00
Rp 15,975.00

Rp 20,000.00 Rp 22,000.00
Rp 22,000.00 Rp 4,400.00
Rp 26,400.00

Rp 42,375.00
Rp -
Rp 42,375.00

Rp 80,000.00 Rp 4,320.00
Rp 90,000.00 Rp 8,100.00
Rp 95,000.00 Rp 855.00
Rp 100,000.00 Rp 2,700.00
Rp 15,975.00

Rp 30,000.00 Rp 33,000.00
Rp 33,000.00 Rp 6,600.00
Rp 39,600.00

Rp 55,575.00
Rp -
Rp 55,575.00

Rp 50,000.00 Rp 50,000.00
Rp 50,000.00

Rp 7,500.00 Rp 56,250.00
Rp 9,000.00 Rp 18,000.00
Rp 500.00 Rp 2,000.00
Rp 3,000.00 Rp 6,000.00
Rp 82,250.00

Rp 132,250.00
Rp -
Rp 132,250.00

Rp 35,000.00 Rp 35,000.00
Rp 35,000.00

Rp 7,500.00 Rp 56,250.00
Rp 9,000.00 Rp 18,000.00
Rp 500.00 Rp 3,000.00
Rp 3,000.00 Rp 6,000.00
Rp 83,250.00

Rp 118,250.00
Rp -
Rp 118,250.00

#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF!

Rp 20,000.00 Rp 20,000.00
Rp 3,000.00 Rp 3,000.00
Rp 23,000.00

#REF!
#REF!
#REF!

#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF!

Rp 25,000.00 Rp 25,000.00
Rp 3,000.00 Rp 3,000.00
Rp 28,000.00

#REF!
#REF!
#REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF!

Rp 23,000.00 Rp 23,000.00
Rp 3,000.00 Rp 3,000.00
Rp 26,000.00

#REF!
#REF!
#REF!

#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF!

Rp 7,500.00 Rp 238,800.00
Rp 5,500.00 Rp 315,700.00
Rp 60,000.00 Rp 278,580.00
Rp 45,000.00 Rp 208,935.00
Rp 1,042,015.00 Rp 364,705.25
Rp 1,406,720.25

#REF!
#REF!
#REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF!

Rp 7,228.92 Rp 60,238.55
Rp 2,875.00 Rp 11,500.00
Rp 71,738.55

#REF!
#REF!
#REF!

#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF!

Rp 1,550.00 Rp 12,052.80
Rp 12,052.80

#REF!
#REF!
#REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF!

Rp 3,625.00 Rp 11,781.25
Rp 11,781.25

#REF!
#REF!
#REF!

Rp 80,000.00 Rp 1,600.00
Rp 90,000.00 Rp 18,000.00
Rp 95,000.00 Rp 1,900.00
Rp 100,000.00 Rp 300.00
Rp 21,800.00

Rp 60,000.00 Rp 6,000.00
Err:509 Err:509
Err:509

Err:509
Err:509
Err:509
DAFTAR SEWA ALAT BERDASARKAN PASARAN UMUM
KABUPATEN BANYUMAS TAHUN 2022
Harga Keterangan,
No. Sat.
Satuan Harga alat perjam

1 Serut mesin Hari / 8 jam 45,000.00 5,625.00


2 Bor listrik Hari / 8 jam 45,000.00 5,625.00
3 Amplas mesin Hari / 8 jam 45,000.00 5,625.00
4 Pahat mesin Hari / 8 jam 45,000.00 5,625.00
5 Vibrator Hari / 8 jam 375,000.00 46,875.00
6 Beton molen kap 0.2 m Hari / 8 jam 450,000.00 56,250.00
7 Gerinda tangan Hari / 8 jam 45,000.00 5,625.00
8 Trafo las Hari / 8 jam 75,000.00 9,375.00
9 Sewa wales Hari / 8 jam 475,000.00 59,375.00
10 Sewa stamper / baby w Hari / 8 jam 475,000.00 56,250.00
11 Sewa Concreate Pump Hari / 8 jam 4,250,000.00 531,250.00
12 Sewa Dump Truck kap Hari / 8 jam 650,000.00 81,250.00
13 Sewa Mobil Crane kap Hari / 8 jam 4,250,000.00 531,250.00
14 Sewa Escavator kap 0. Hari / 8 jam 3,650,000.00 456,250.00
15 Sewa Dumwater/Lift ba Bulan 17,500,000.00 72,916.67
16 Sewa Genset kap 100 Bulan 22,500,000.00 93,750.00
DAFTAR HARGA BAHAN SIPIL & ARSITEKTUR
KATEGORI I KETERANGAN
NO JENIS BAHAN SAT (SATU)
1 2 3 4 5
I BAHAN DASAR / GALIAN
1 Batu Kali
a Batu Kali pecah m3 200,000.00
b Pecah 2/3 mesin m3 240,000.00
c Pecah 2/3 manual m3 240,000.00
d Pecah 1/2 mesin m3 255,000.00
e Air buat kerja ltr 75.00

2 Batu Bata
a Ex lokal bh 700.00
b Ex lokal m3 406,875.00
c Batako bh 4,800.00
d Hebel/celcon ukuan bh 10,500.00
e Bata Rooster bh 4,400.00

3 Pasir
a Urug m3 175,000.00
b Sirtu m3 200,000.00
c Pasang m3 300,000.00
d Pasir beton m3 300,000.00

4 Tanah
a Tanah Merah / Timbun ( Jarak Angkut Max. 3 km ) m3 125,000.00

5 Portalnd Cemen
a Cemen Type 1 biasa kg 1,140.00 45600
b Cemen Putih kg 14,200.00

6 Floor Hardener kg 7,500.00


7 a Pondasi Mini Pancang uk. 25 x 25 cm K 500 terpasang m' 168,000.00
b sistem hidroulick ( Bahan )
c Jasa Pancang per/m' m' 68,500.00
d Biaya penyambungan /las ttk/joint 45,000.00 281,500.00

8 Beton Ready mix


a K 175 m3 878,300.00
b K 225 m3 912,450.00
c K 250 m3 968,700.00
d K 300 m3 1,048,000.00

II BAHAN PENUTUP ATAP


1 Atap Zinczlume Steel
a Atap Metal Roof Natural m2 102,000.00 0.4 mm thk
b Atap Metal Roof Colour Coated m2 138,200.00 0.4 mm thk
c Glass Wool m2 27,500.00
d Alumunium Voil m2 17,800.00
e Roof Mesh m2 27,500.00
f Nok Zinczlume Steel m' 127,500.00 0.4 mm thk
g Zinczlume Sheet m' 127,500.00 0.4 mm thk
2 Seng Gelombang BJLS0,30 panjang 180 cm lbr 91,500.00
3 Seng Plat m' 55,125.00
4 Water Proofing Sheet Membrace m2 920,000.00
5 Semen Watterproofing kg 27,500.00
6 Floor Hardenner kg 9,250.00
7 Glass Sheet ex. LEXAN m2 189,393.94
8 Atap Arcrilic tebal 5 mm m2 2,145,000.00 bening

III BAHAN KAYU


1 Kamper Oven
a Papan = 4 x 20 x 4 m m3 16,250,000.00
b Papan = 4 x 30 x 4 m m3 16,250,000.00
c Balok = 6 x 12 x 4 m m3 14,275,000.00
d Dowel 6 mm pcs 450.00

2 Meranti
a Balok = 6 x 12 x 4 m m3 8,750,000.00
b Balok =8 x12 x 4 m m3 8,750,000.00
c Kaso = 5 x 7 x 4 m m3 8,750,000.00
d Kaso = 4 x 6 x 4 m m3 8,750,000.00

3 Bahan Bekisting
a Kayu cetakan ( kayu tahun lokal ) m3 3,475,000.00
b Papan ukuran 20 x 2 x 200 cm m3 3,475,000.00
c Bambu btg 22,500.00
d Minyak bekisting ltr 59,500.00
e Dolken dia 8 - 10 cm @ 4 m btg 67,250.00
f Multiplek tebal 6 mm lbr 98,700.00
g Multiplek tebal 9 mm lbr 145,350.00
h Multiplek tebal 12 mm lbr 168,200.00
4 Multiplek tebal 18 mm lbr 247,500.00
5 Kayu list daun pintu uk. 1 x 2 cm m' 12,500.00
6 Pipa Support set/bln 27,500.00
7 Sewa mainframe scafolding set/bln 47,000.00
8 Jack base set/bln 10,500.00
9 U Head set/bln 15,500.00

IV BAHAN PENUTUP DINDING & LANTAI


1 Keramik Lantai
a 60 x 60, cm Grannite Tile Cina/ setara m2 150,000.00 53,956.83
b 40 x 40, cm Granite Tile Granito / setara m2 312,500.00 50,000.00
c 40 x 40, cm Keramik Tile KW1 m2 55,000.00 8,800.00
d 33.3 x 33.3, cm Keramik Tile Roman / setara m2 137,500.00 12,500.00
e 20 x 20, cm Keramik Tile Roman setara m2 80,000.00 3,200.00
f 30 x 30, cm Vynil Tile Amstrongs / setara m2 350,000.00

2 Keramik Dinding
a 60 x 60 cm Grannite Tile Cina/ setara m2 150,000.00 54,151.62
b 20 x 50 cm, Roman / setara m2 80,000.00 8,000.00
c 20 x 25 cm, Roman / setara m2 147,300.00 7,365.00
d Grouting /semen warna khusus kg 27,500.00
e 10 x 20 cm Grannite Tile Nire Granito Astro / setara box 150,000.00 25 tile

3 Alumunium Cladding Wall


a Alumunium Composit Panel m2 325,000.00
b Rangka Alumunium 40.40.1.2 m1 45,700.00
c Bracket Angel Steel Zincromate bh 27,500.00
d Sealan dan Backup Rod tube 75,000.00
e Grc lembaran tebal 8 mm uk. 120x240 cm lbr 148,000.00

4 Curtain Wall
a Kaca Panasap Green 8 mm m2 365,000.00
b Rangka Alumunium Mulion, Transom Alka m1 38,450.00
c Bracket Angel Steel Zincromate, Embaded, Groutir bh 22,500.00

5 Automatic Slidding Door ( Pintu Utama )


a Mecanic Nabco DS-21S unit 75,000,000.00
b Pintu Kaca Tempered 12 mm m2 4,250,000.00
c Cover Stainless Steel 1.2 mm unit 6,500,000.00
d Struktur Baja & Guide Rail set 3,750,000.00
6 Automatic Door ( Pintu Rg. OK )
a Dorma unit 178,000,000.00
7 Wall Paper
a Wall Paper m2 58,200.00
b Lem kg 55,000.00

V BAHAN BESI
1 Besi Beton
a Besi beton polos kg 12,800.00
b Besi beton ulir kg 13,200.00

2 Besi Plat
a Plat strip kg 14,600.00

3 Besi Profil
a Besi profil kg 16,000.00

4 Tulangan Wiremesh
a Type M 5 m2 62,700.00
b Type M 6 m2 69,200.00
c Type M 8 m2 78,450.00

5 Baja Kosntuksi WF, Siku, H Beam, UNP, CNP


a Standart SNI, KS, Cigading, Gunung Garuda kg 14,600.00

6 Kawat
a Kawat ikat beton / bendrat kg 27,600.00
b Saringan pasir m2 22,500.00
c Kawat las kg 60,000.00

7 Besi Hollow Stalbush


a □ 20 x 40 m1 25,000.00
b □ 40 x 40 m1 45,000.00
c □ 60 x 60 m1 65,000.00
d Ring Hollow bh 12,500.00
e Dynabolt dia. 10 x 50 mm bh 5,200.00

VI BAHAN PIPA
1 Pipa
a Pipa Galvanis dia 1/2 " Medium B m' 25,800.00
b Pipa Galvanis dia 3/4 " m' 34,780.00
c Pipa Galvanis dia 1" m' 45,620.00
d Pipa Galvanis dia 1 1/2 " m' 63,625.00
e Pipa Galvanis dia 2 " m' 80,430.00
f Pipa Galvanis dia 3 " m' 151,590.00
g Pipa Galvanis dia 4 " m' 203,930.00
h Pipa PVC Type AW Setara - Wavin dia 1/2 " m' 4,590.00
i Pipa PVC Type AW Setara - Wavin dia 3/4 " m' 6,875.00
j Pipa PVC Type AW Setara - Wavin dia 1 " m' 9,125.00
k Pipa PVC Type AW Setara - Wavin dia 1 1/4 " m' 12,750.00
l Pipa PVC Type AW Setara - Wavin dia 1 1/2 " m' 16,680.00
m Pipa PVC Type AW Setara - Wavin dia 2 " m' 21,250.00
n Pipa PVC Type AW Setara - Wavin dia 3 " m' 45,375.00
o Pipa PVC Type AW Setara - Wavin dia 4 " m' 74,375.00
p Pipa PVC Type AW Setara - Wavin dia 6 " m' 90,000.00

2 Alat Bantu / Sambung


a Elbo dia 1/2 " Ex Rucika bh 7,500.00
b Elbo dia 3/4 " Ex Rucika bh 8,600.00
c Elbo dia 1 " Ex Rucika bh 12,500.00
d T dia 1/2 " Ex Rucika bh 14,000.00
e T dia 3/4 " Ex Rucika bh 16,300.00
f T dia 1 " Ex Rucika bh 17,500.00
g Shok dia 1/2 " Ex Rucika bh 8,500.00
h Shok dia 3/4 " Ex Rucika bh 12,500.00
i Shok dia 1 " Ex Rucika bh 18,200.00
j Sok Drat Dalam dia 1/2 " Ex Rucika bh 12,500.00
k Sok Drat Dalam dia 3/4 " Ex Rucika bh 14,200.00
l Sok Drat Dalam dia 1 " Ex Rucika bh 16,200.00
m Elbo dia 3 " Ex Rucika bh 32,250.00
n Elbo dia 4 " Ex Rucika bh 59,125.00
o Elbo 45 dia 3 " Ex Rucika bh 75,250.00
p Sok dia 3 " Ex Rucika bh 21,500.00
q Sok dia 4 " Ex rucika bh 26,875.00
r Lem PVC kg 75,250.00
s Sealttape bh 4,500.00

VII BAHAN LANGIT - LANGIT


1 Asbes semen tebal 4 mm 270 x 1050 mm lbr 68,000.00
2 Eternit plat ( 100 X 100 ) m2 6,400.00
3 Gypsum tebal 9 mm lbr 92,700.00
4 Gypsum tebal 12 mm lbr 127,300.00
5 Cornys gypsum lebar 7 cm m' 11,750.00
6 Triplek ukuran 120 / 244 tebal 4 mm lbr 72,000.00
7 Multiplek ukuran 120 / 240 tebal 9 mm lbr 168,000.00
8 GRC tebal 4 mm lbr 86,000.00
9 List kayu m' 6,800.00
10 Hollow Plafond 40 x 40 mm m' 6,800.00
11 Hollow Plafond 20 x 40 mm m' 5,125.00

VIII BAHAN FINSIHING


1 Kayu
a Meni kg 43,200.00
b Dempul / plamur kg 53,360.00
c Ambril / amplas lbr 12,325.00
d Cat finishing Setara Emco / Glotek ltr 84,500.00
e Melamine ltr 78,300.00
f Seanding Sealer ltr 78,300.00
g Wood Stain ltr 78,300.00
h Impra ltr/kg 72,500.00

2 Tembok
a Plamur kg 27,500.00
b Cat tembok Kwalitas ICI, Dulux / setara kg 59,700.00
c Cat tembok Weathesielt Kwalitas ICI, Dulux / setara kg 83,400.00
d Wall Sealer kg 72,000.00
3 Besi
a Meni kg 38,900.00
b Cat mengkilap kg 84,500.00
c Thinner Biasa ltr 22,500.00
d Thinner Special ltr 35,000.00
e Lem aica aibon ltr 65,000.00
f Kuas bh 12,500.00
g Rol cat bh 27,500.00

IX BAHAN ALUMUNIUM, KACA, DAN PENGGANTUNG


1 Kaca Bening
a Kaca bening 3 mm m2 78,250.00
b Kaca bening 6 mm m2 114,350.00
c Kaca Bening 8 mm m2 386,000.00
d Kaca Panasap Green 8 mm m2 365,000.00
e Kaca Tempered 12 mm m2 917,000.00

Assesories Alumunium
a Kusen Alumunium Colour, 1 5/8" x 4" ( powder coating 85 m1 147,000.00
mikron
b Sidehinge Alumunium Colour, 1 5/8" x 4" (powder coating 85 m1 117,450.00
c mikron)
Engsel Pintu SOLID, EK 02, 4 x 3 x 2.5 2 BB set 62,400.00
d Kunci Pintu LOGO, Swing Lockcase 5C611-40/US26 set 300,000.00
e Handle Pintu LOGO, HRE 61.44 set 343,750.00
f Cylinder LOGO Double Cylinder 08010-07/US26 set 247,500.00
g Engsel Jendela SOLID, EK 01, 3 x 2.5 x 2 set 72,500.00
h Kunci Jendela SOLID RMB 616 set 89,200.00
i Door Closer SOLID, DC 20 SLD set 1,425,000.00
j Flush Bolt SOLID, 025 set 96,350.00
k Hak Angin SOLID, CAS 621 12" set 107,200.00
l Floor Hinge Dorma set 2,225,000.00
m Casement set 427,500.00

3 Assesories Kayu
a Engsel SOLID, EK 02, 3 x 4 x 2.5 2 BB set 87,000.00
b Kunci Pintu LOGO, Swing Lockcase 5C611-40/US26 set 348,000.00
c Handle Pintu LOGO, HRE 61.44 set 398,750.00
d Door Closer SOLID, DC 20 SLD set 1,075,000.00
e Flush Bolt SOLID, 025 set 68,250.00

X BAHAN SANITASI AIR


1 Closed Duduk CW 704 J / SW 784 JP bh 2,500,000.00
2 Closed Jongkok Squating Closed uk. P.550.L440.T.280. CE 6 bh 615,000.00
3 Kran air dia 1/2 " type T 23 B13 V 7 N bh 247,500.00
4 Floordrain TX 1 BN bh 50,000.00
5 Urinoir U 57 M unit 6,737,500.00
6 Sealtape bh 6,500.00
7 Wastafel OMNI LW 861 CJ set 2,750,000.00
8 Bak mandi precast lapis keramik set 525,000.00
9 Cermin set 187,500.00
10 Shower Panas Dingin TX 401 SBV 5 N set 2,145,000.00
11 Shower Dingin TX 402 S set 348,000.00
12 Jet Washer TX 403 SCR set 483,500.00
13 Towel Bar TX 724 AE set 1,009,500.00
14 Paper Holder TX 703 AE set 516,000.00
15 Bak Cuci Piring Stainless Steel set 845,600.00
16 Roof Draine Iron case unit 650,000.00

XI ALAT - ALAT PENGIKAT KAYU


1 Paku beberapa ukuran kg 23,150.00
2 Paku payung kg 23,150.00
3 Paku sekrup bh 150.00
4 Mur baut untk kuda 2 bh 16,500.00
5 Angkur baut bh 16,500.00
6 Lem kayu kg 65,000.00
7 Mur baut HTB ¢ 16 mm bh 8,900.00
8 Mur baut HTB ¢ 12 mm bh 7,200.00
9 Mur baut HTB ¢ 10 mm bh 6,215.00
10 Mur baut HTB ¢ 08 mm bh 4,725.00
11 Mur baut HTB ¢ 16 mm bh 4,500.00
12 Mur baut HTB ¢ 12 mm bh 3,000.00
13 Mur baut HTB ¢ 10 mm bh 2,500.00
14 Mur baut HTB ¢ 8 mm bh 2,000.00
15 Angkur dia 16 mm HTB bh 32,700.00
16 Angkur dia 12 mm HTB bh 27,500.00
17 Angkur dia 10 mm HTB bh 22,150.00
18 Angkur dia 8 mm HTB bh 16,700.00
DAFTAR UPAH BERDASARKAN HARGA PASARAN UMUM
KABUPATEN BANYUMAS TAHUN 2022
Harga
No. Uraian Sat. Keterangan
Satuan

1 Pekerja/ buruh terlatih OH 8 jam 85,000.00


2 Tukang batu OH 8 jam 95,000.00
3 Tukang kayu OH 8 jam 95,000.00
4 Tukang besi OH 8 jam 95,000.00
5 Tukang cat OH 8 jam 95,000.00
6 Tukang Listrik OH 8 jam 95,000.00
7 Tukang las OH 8 jam 95,000.00
8 Kepala Tukang batu OH 8 jam 120,000.00
9 Kepala Tukang kayu OH 8 jam 120,000.00
10 Kepala Tukang besi OH 8 jam 120,000.00
11 Mandor Sipil OH 8 jam 200,000.00
12 Mandor Baja OH 8 jam 200,000.00
13 Tukang Pipa / Plumbing OH 8 jam 175,000.00

DAFTAR SEWA ALAT BERDASARKAN PASARAN UMUM


KABUPATEN BANYUMAS TAHUN 2022
Keterangan,
Harga
No. Sat. Harga alat perjam
Satuan

1 Serut mesin Hari / 8 45,000.00 5,625.00


jam
2 Bor listrik Hari / 8 45,000.00 5,625.00
jam
3 Amplas mesin Hari / 8 45,000.00 5,625.00
jam
4 Pahat mesin Hari / 8 45,000.00 5,625.00
jam
5 Vibrator Hari / 8 375,000.00 46,875.00
jam
6 Beton molen kap 0.2 m Hari / 8 450,000.00 56,250.00
jam
7 Gerinda tangan Hari / 8 45,000.00 5,625.00
jam
8 Trafo las Hari / 8 75,000.00 9,375.00
jam
9 Sewa wales Hari / 8 475,000.00 59,375.00
jam
10 Sewa stamper / baby w Hari / 8 475,000.00 56,250.00
jam
11 Sewa Concreate Pump Hari / 8 4,250,000.00 531,250.00
jam
12 Sewa Dump Truck kap Hari / 8 650,000.00 81,250.00
jam
13 Sewa Mobil Crane kap Hari / 8 4,250,000.00 531,250.00
jam
14 Sewa Escavator kap 0. Hari / 8 3,650,000.00 456,250.00
jam
15 Sewa Dumwater/Lift ba Bulan 17,500,000.00 72,916.67
16 Sewa Genset kap 100 Bulan 22,500,000.00 93,750.00

Anda mungkin juga menyukai