Anda di halaman 1dari 1

RENCANA ANGGARAN BIAYA

GUDANG ALAT BERAT

HARGA SATUAN TOTAL


NO. URAIAN PEKERJAAN VOLUME SAT.
(Rp.) HARGA (Rp.)

A PEKERJAAN PERSIAPAN
1 Pelaporan Administrasi 1.00 unit 1,000,000.00 1,000,000.00
2 Uietzet/Bouwplank 1.00 set 600,000.00 600,000.00
3 Mob/Demobilisasi 1.00 set 2,500,000.00 2,500,000.00
SUB JUMLAH A 4,100,000.00
B PEKERJAAN KONSTRUKSI BAJA
I RANGKA BAJA WF
1 Kolom WF 200 x 100 x 5,7 x 8 mm 768.00 kg 32,610.30 25,044,712.73
Tinggi 6 m
2 Balok WF 150 x 75 x 5 x 7 mm 392.00 kg 32,610.30 12,783,238.79
Panjang 14 m
3 Span WF 200 x 100 x 5,7 x 8 mm 1,036.80 kg 32,610.30 33,810,362.18
Panjang 8.1 m
4 Pengelasan, Pembautan, Finishing 87.87 kg 32,610.30 2,865,532.55
SUB JUMLAH B-I 74,503,846.24
II GORDING
1 CNP Gording 100 x 50 x 20 x 2,3 mm 735.00 kg 40,401.43 29,695,050.00
Panjang 14 m
Jarak rata-rata 100 cm
2 Pengelasan, Pembautan, Finishing 29.40 kg 40,401.43 1,187,802.00
SUB JUMLAH B-II 30,882,852.00
III ATAP
1 Atap Metal Spandek 226.80 m2 116,937.14 26,521,344.00
2 Nok Metal 14.00 m 81,235.00 1,137,290.00
3 Talang Air Besi Canal C 100 28.00 m 110,000.00 3,080,000.00
4 Pengelasan, Pembautan, Finishing 1.00 ls 1,500,000.00 1,500,000.00
5 Pipa PVC 3" + Sambungan 28.00 m 65,000.00 1,820,000.00
SUB JUMLAH B-III 34,058,634.00
SUB JUMLAH B 139,445,332.24
C PEKERJAAN NON KONSTRUKSI BAJA
I PEKERJAAN TANAH
1 Galian tanah 1.51 m3 72,450.00 109,544.40
SUB JUMLAH C-I 109,544.40
II PEKERJAAN PONDASI
1 Pek. Pondasi Beton 2.16 m3 3,266,489.20 7,055,616.67
SUB JUMLAH C-II 7,055,616.67
III PEKERJAAN STRUKTUR BETON
1 Pelat Lantai Rabat Beton t = 7 cm 10.08 m3 922,005.75 9,293,817.92
SUB JUMLAH C-III 9,293,817.92
SUB JUMLAH C 16,458,978.99

REKAPITULASI :
A PEKERJAAN PERSIAPAN 4,100,000.00
B PEKERJAAN KONSTRUKSI BAJA 139,445,332.24
C PEKERJAAN NON KONSTRUKSI BAJA 16,458,978.99
Jumlah 160,004,311.24

Dibulatkan 160,000,000.00

Terbilang : Seratus Enam Puluh Juta Rupiah