A PEKERJAAN STRUKTUR
2.2. PEKERJAAN PONDASI DAN PILECAP 2.016.704.378,71 12,521 12,521 - 12,521 2.016.704.437,21 - 2.016.704.437,21
PEKERJAAN
2.3 STRUKTUR ATAS
B PEKERJAAN ARSITEKTUR
320.035.597,96 1,987 - - - -
IV PEKERJAAN TURAP BETON & JALAN RAMP 830.604.922,99 5,157 1,392 - 1,392 224.130.060,00 - 224.130.060,00
I PEKERJAAN PLAMBING
46.155.000,00 0,287 - - - - - -
(I) JUMLAH HARGA PEKERJAAN (A+B+C+D) 16.107.000.534,49 A. BOBOT RENCANA S/D MINGGU INI (A) 61,734 %
( II ) PAJAK PERTAMBAHAN NILAN ( PPN ) = 10 % x ( I ) 1.610.700.053,45 B. BOBOT REALISASI S/D MINGGU INI (B) 61,106 %
( III ) JUMLAH TOTAL HARGA PEKERJAAN (III = I + II) 17.717.700.587,94 C. DEVIASI REALISASI TERHADAP RENCANA (C=B-A) - 0,628 %
( IV ) PEMBULATAN 17.717.700.000,00
PEJABAT PEMBUAT KOMITMEN (PPK) PENGADMINISTRASIAN TEKNIS KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
Dinas PUPR dan PERA Prov. Kaltim Dinas PUPR dan PERA Prov. Kaltim PT. GEOMAP INTERNATIONAL CONSULTANT PT. EN HANDAYANI GROUP
RAHMAT RAMADHAN, ST, MM. IMMANUEL HIRO TITO, ST YARRI ADHIDARMA, ST SURATNO, ST SUFRIZAL IBRAHIM, ST BUDI SETYO UTOMO, ST
NIP. 19790806 200901 1 003 NIP. 19830618 201503 1 003 NIP. 19780419 200901 1 002 Ahli Struktur Ahli Arsitektur Manager Teknik
PEMERINTAH PROVINSI KALIMANTAN TIMUR
DINAS PEKERJAAN UMUM PENATAAN RUANG DAN PERUMAHAN RAKYAT
Jalan Tengkawang No. 1 Samarinda Kalimantan Timur Kode Pos 75125
Telp. ( 0541 ) 275666, Fax ( 0521 ) 275997
Website: http://DpiprKaltimprov.go.id,email : sekumum@gmail.com
KEGIATAN : PENETAPAN DAN PENYELENGGARAAN BANGUNAN GEDUNG UNTUK KEPENTINGAN STRATEGIS DAERAH
PEKERJAAN : PEMBANGUNAN GEDUNG RS MATA
LOKASI : JL. M. YAMIN - SAMARINDA
SUMBER DANA : APBD PROVINSI KALTIM
TAHUN PELAKSANAAN : 2021
A PEKERJAAN STRUKTUR
I. PEKERJAAN PERSIAPAN
1 Pagar sementara dari seng gelombang tinggi 2 meter m¹ 96,000 370.612,00 Rp 35.578.752,00 0,221 96,000 - 96,000 0,221 - 0,221 100,00 - 100,00 35.578.752,00 - 35.578.752,00
2 Pengukuran dan pemasangan bowplank m¹ 153,000 82.351,50 Rp 12.599.779,50 0,078 153,000 - 153,000 0,078 - 0,078 100,00 - 100,00 12.599.779,50 - 12.599.779,50
3 Mobilisasi dan Demobilisasi Alat ls 1,000 35.000.000,00 Rp 35.000.000,00 0,217 1,000 - 1,000 0,217 - 0,217 100,00 - 100,00 35.000.000,00 - 35.000.000,00
Penyiapan RKK ls 1,000 5.000.000,00 Rp 5.000.000,00 0,031 1,000 - 1,000 0,031 - 0,031 100,00 - 100,00 5.000.000,00 - 5.000.000,000
Sosialisasi ls 1,000 750.000,00 Rp 750.000,00 0,005 1,000 - 1,000 0,005 - 0,005 100,00 - 100,00 750.000,00 - 750.000,000
Topi Pelindung ( Safety Helmet ) bh 15,000 150.000,00 Rp 2.250.000,00 0,014 15,000 - 15,000 0,014 - 0,014 100,00 - 100,00 2.250.000,00 - 2.250.000,000
Rompi Keselamatan ( Safety Vest ) bh 15,000 75.000,00 Rp 1.125.000,00 0,007 15,000 - 15,000 0,007 - 0,007 100,00 - 100,00 1.125.000,00 - 1.125.000,000
Pelindung Pernafasan dan Mulut ( Masker ) bh 15,000 150.000,00 Rp 2.250.000,00 0,014 15,000 - 15,000 0,014 - 0,014 100,00 - 100,00 2.250.000,00 - 2.250.000,000
Kacamata pelindung ( Safety Glasses ) bh 15,000 150.000,00 Rp 2.250.000,00 0,014 15,000 - 15,000 0,014 - 0,014 100,00 - 100,00 2.250.000,00 - 2.250.000,000
Sarung Tangan ( Safety Gloves ) bh 15,000 100.000,00 Rp 1.500.000,00 0,009 15,000 - 15,000 0,009 - 0,009 100,00 - 100,00 1.500.000,00 - 1.500.000,000
Sepatu Keselamatan ( Safety Shoes ) bh 15,000 250.000,00 Rp 3.750.000,00 0,023 15,000 - 15,000 0,023 - 0,023 100,00 - 100,00 3.750.000,00 - 3.750.000,000
Papan Informasi K3 bh 1,000 300.000,00 Rp 300.000,00 0,002 1,000 - 1,000 0,002 - 0,002 100,00 - 100,00 300.000,00 - 300.000,000
P3K unit 1,000 500.000,00 Rp 500.000,00 0,003 1,000 - 1,000 0,003 - 0,003 100,00 - 100,00 500.000,00 - 500.000,000
Spanduk ( Banner ) bh 1,000 500.000,00 Rp 500.000,00 0,003 1,000 - 1,000 0,003 - 0,003 100,00 - 100,00 500.000,00 - 500.000,000
BPJS Ketenaga Kerjaan ls 1,000 13.336.679,69 Rp 13.336.679,69 0,083 1,000 - 1,000 0,083 - 0,083 100,00 - 100,00 13.336.679,69 - 13.336.679,690
1 Pekerjaan Cut m3 1.626,785 105.325,00 Rp 171.341.130,13 1,064 1.626,785 - 1.626,785 1,064 - 1,064 100,00 - 100,00 171.341.130,13 - 171.341.130,125
2 Galian Tanah Pondasi Pile Cap m³ 501,467 105.325,00 Rp 52.816.959,11 0,328 501,466 - 501,466 0,328 - 0,328 100,00 - 100,00 52.816.874,75 - 52.816.874,747
3 Urugan Kembali Ex. Galian m³ 209,275 75.900,00 Rp 15.883.934,55 0,099 209,275 - 209,275 0,099 - 0,099 100,00 - 100,00 15.883.934,55 - 15.883.934,550
4 Pasir Urug Bawah Pondasi t.10 cm m³ 22,560 240.130,00 Rp 5.417.332,80 0,034 22,560 - 22,560 0,034 - 0,034 100,00 - 100,00 5.417.332,80 - 5.417.332,800
5 Lantai Kerja Bawah Pondasi t.5 cm m³ 11,280 1.525.568,00 Rp 17.208.407,04 0,107 11,280 - 11,280 0,107 - 0,107 100,00 - 100,00 17.208.407,04 - 17.208.407,040
Pengadaan Spun Pile termasuk jasa pancang m¹ 532,000 1.088.010,00 Rp 578.821.320,00 3,594 532,000 - 532,000 3,594 - 3,594 100,00 - 100,00 578.821.320,00 - 578.821.320,000
Mobilisasi & Demobilisasi Hydrolic Static Pile Driver Kap: 240 t unit 1,000 175.000.000,00 Rp 175.000.000,00 1,086 1,000 - 1,000 1,086 - 1,086 100,00 - 100,00 175.000.000,00 - 175.000.000,000
Mobilisasi Tiang Spun Pile ke lokasi Ls 1,000 95.000.000,00 Rp 95.000.000,00 0,590 1,000 - 1,000 0,590 - 0,590 100,00 - 100,00 95.000.000,00 - 95.000.000,000
Bobok Kepala Tiang Spun pile BH 89,000 150.000,00 Rp 13.350.000,00 0,083 89,000 - 89,000 0,083 - 0,083 100,00 - 100,00 13.350.058,50 - 13.350.058,500
PDA Test Ls 1,000 40.000.000,00 Rp 40.000.000,00 0,248 1,000 - 1,000 0,248 - 0,248 100,00 - 100,00 40.000.000,00 - 40.000.000,000
Besi BJTD 39 kg 999,065 19.758,93 Rp 19.740.458,83 0,123 999,065 - 999,065 0,123 - 0,123 100,00 - 100,00 19.740.458,83 - 19.740.458,834
Beton K-300 : fc' = 24.9 Mpa m³ 9,000 1.728.466,52 Rp 15.556.198,68 0,097 9,000 - 9,000 0,097 - 0,097 100,00 - 100,00 15.556.198,68 - 15.556.198,680
Page 3 M14
REALISASI KEMAJUAN PEKERJAAN
KONTRAK PRESTASI PEKERJAAN KEMAJUAN TERHADAP KEUANGAN
NO. URAIAN PEKERJAAN KEMAJUAN VOLUME PEKERJAAN BOBOT PEKERJAAN (%)
S / D MINGGU S / D MINGGU S / D MINGGU S / D MINGGU S / D MINGGU S / D MINGGU
SATUAN VOL HARGA SATUAN JUMLAH HARGA BOBOT MINGGU INI MINGGU INI MINGGU INI S / D MINGGU LALU MINGGU INI S / D MINGGU INI
LALU INI LALU INI LALU INI
Begisting Multiplek m³ 24,000 262.557,02 Rp 6.301.368,48 0,039 24,000 - 24,000 0,039 - 0,039 100,00 - 100,00 6.301.368,48 - 6.301.368,480
Besi BJTD 39 kg 3.533,857 19.758,93 Rp 69.825.217,22 0,434 3.533,857 - 3.533,857 0,434 - 0,434 100,00 - 100,00 69.825.217,22 - 69.825.217,219
Beton K-300 : fc' = 24.9 Mpa m³ 36,000 1.728.466,52 Rp 62.224.794,72 0,386 36,000 - 36,000 0,386 - 0,386 100,00 - 100,00 62.224.794,72 - 62.224.794,720
Begisting Multiplek m³ 72,000 262.557,02 Rp 18.904.105,44 0,117 72,000 - 72,000 0,117 - 0,117 100,00 - 100,00 18.904.105,44 - 18.904.105,440
Besi BJTD 39 kg 7.524,688 19.758,93 Rp 148.679.749,23 0,923 7.524,688 - 7.524,688 0,923 - 0,923 100,00 - 100,00 148.679.749,23 - 148.679.749,232
Beton K-300 : fc' = 24.9 Mpa m³ 81,600 1.728.466,52 Rp 141.042.868,03 0,876 81,600 - 81,600 0,876 - 0,876 100,00 - 100,00 141.042.868,03 - 141.042.868,032
Begisting Multiplek m³ 125,040 262.557,02 Rp 32.830.129,78 0,204 125,040 - 125,040 0,204 - 0,204 100,00 - 100,00 32.830.129,78 - 32.830.129,781
Besi BJTD 39 kg 8.439,550 19.758,93 Rp 166.756.436,49 1,035 8.439,550 - 8.439,550 1,035 - 1,035 100,00 - 100,00 166.756.436,49 - 166.756.436,494
Beton K-300 : fc' = 24.9 Mpa m³ 99,000 1.728.466,52 Rp 171.118.185,48 1,062 99,000 - 99,000 1,062 - 1,062 100,00 - 100,00 171.118.185,48 - 171.118.185,480
Begisting Multiplek m³ 132,000 262.557,02 Rp 34.657.526,64 0,215 132,000 - 132,000 0,215 - 0,215 100,00 - 100,00 34.657.526,64 - 34.657.526,640
Beton K-300 : fc' = 24.9 Mpa m³ 20,900 1.728.466,52 Rp 36.124.950,27 0,224 20,900 - 20,900 0,224 - 0,224 100,00 - 100,00 36.124.950,27 - 36.124.950,268
Begisting Multiplek m² 25,000 262.557,02 Rp 6.563.925,50 0,041 25,000 - 25,000 0,041 - 0,041 100,00 - 100,00 6.563.925,50 - 6.563.925,500
Galian Tanah m³ 125,125 105.325,00 Rp 13.178.790,63 0,082 125,125 - 125,125 0,082 - 0,082 100,00 - 100,00 13.178.790,63 - 13.178.790,625
Besi BJTD 39 kg 2.602,126 19.758,93 Rp 51.415.208,48 0,319 2.602,126 - 2.602,126 0,319 - 0,319 100,00 - 100,00 51.415.208,48 - 51.415.208,477
Beton K-300 : fc' = 24.9 Mpa m³ 13,568 1.728.466,52 Rp 23.451.833,74 0,146 13,568 - 13,568 0,146 - 0,146 100,00 - 100,00 23.451.833,74 - 23.451.833,743
Begisting Multiplek m3 135,680 262.557,02 Rp 35.623.736,47 0,221 135,680 - 135,680 0,221 - 0,221 100,00 - 100,00 35.623.736,47 - 35.623.736,474
Besi BJTD 39 kg 2.547,595 19.758,93 Rp 50.337.741,24 0,313 2.547,595 - 2.547,595 0,313 - 0,313 100,00 - 100,00 50.337.741,24 - 50.337.741,241
Begisting Multiplek m² 7,600 262.557,02 Rp 1.995.433,35 0,012 7,600 - 7,600 0,012 - 0,012 100,00 - 100,00 1.995.433,35 - 1.995.433,352
Beton K-300 : fc' = 24.9 Mpa m³ 9,116 150.000,00 Rp 1.367.400,00 0,008 9,116 - 9,116 0,008 - 0,008 100,00 - 100,00 1.367.400,00 - 1.367.400,000
Waterproofing membrane sheet m² 45,580 150.000,00 Rp 6.837.000,00 0,042 45,580 - 45,580 0,042 - 0,042 100,00 - 100,00 6.837.000,00 - 6.837.000,000
JUMLAH 2.2.PEKERJAAN PONDASI DAN PILECAP - Rp 2.016.704.378,71 12,521 12,521 - 12,521 2.016.704.437,211 - 2.016.704.437,211
2.3.1. LEVEL - 1
Besi BJTD 39 kg 3.208,592 19.758,93 Rp 63.398.322,25 0,394 3.208,592 - 3.208,592 0,394 - 0,394 100,00 - 100,00 63.398.322,25 - 63.398.322,250
Beton K-300 : fc' = 24.9 Mpa m³ 9,885 1.728.466,52 Rp 17.085.891,55 0,106 9,885 - 9,885 0,106 - 0,106 100,00 - 100,00 17.085.891,55 - 17.085.891,550
Begisting Multiplek m² 79,080 262.557,02 Rp 20.763.009,14 0,129 79,080 - 79,080 0,129 - 0,129 100,00 - 100,00 20.763.009,14 - 20.763.009,142
Besi BJTD 39 kg 24.405,479 19.758,93 Rp 482.226.057,67 2,994 24.405,479 - 24.405,479 2,994 - 2,994 100,00 - 100,00 482.226.057,67 - 482.226.057,665
Beton K-300 : fc' = 24.9 Mpa m³ 81,060 1.728.466,52 Rp 140.109.496,11 0,870 81,060 - 81,060 0,870 - 0,870 100,00 - 100,00 140.109.496,11 - 140.109.496,111
Begisting Multiplek m² 405,300 262.557,02 Rp 106.414.360,21 0,661 405,300 - 405,300 0,661 - 0,661 100,00 - 100,00 106.414.360,21 - 106.414.360,206
Besi BJTD 39 kg 10.927,704 19.758,93 Rp 215.919.698,01 1,341 10.927,704 - 10.927,704 1,341 - 1,341 100,00 - 100,00 215.919.698,01 - 215.919.698,005
Begisting Multiplek m² 34,140 262.557,02 Rp 8.963.696,66 0,056 34,140 - 34,140 0,056 - 0,056 100,00 - 100,00 8.963.696,66 - 8.963.696,663
Beton K-300 : fc' = 24.9 Mpa m³ 169,510 1.728.466,52 Rp 292.992.359,81 1,819 169,510 - 169,510 1,819 - 1,819 100,00 - 100,00 292.992.359,81 - 292.992.359,805
Besi BJTD 39 kg 15.701,244 19.758,93 Rp 310.239.717,12 1,926 15.701,244 - 15.701,244 1,926 - 1,926 100,00 - 100,00 310.239.717,12 - 310.239.717,118
Begisting Kolom Multipleks m² 312,480 262.557,02 Rp 82.043.817,61 0,509 312,480 - 312,480 0,509 - 0,509 100,00 - 100,00 82.043.817,61 - 82.043.817,610
Beton K-300 : fc' = 24.9 Mpa m³ 46,872 1.728.466,52 Rp 81.016.682,73 0,503 46,872 - 46,872 0,503 - 0,503 100,00 - 100,00 81.016.682,73 - 81.016.682,725
5 PEKERJAAN TANGGA
Page 4 M14
REALISASI KEMAJUAN PEKERJAAN
KONTRAK PRESTASI PEKERJAAN KEMAJUAN TERHADAP KEUANGAN
NO. URAIAN PEKERJAAN KEMAJUAN VOLUME PEKERJAAN BOBOT PEKERJAAN (%)
S / D MINGGU S / D MINGGU S / D MINGGU S / D MINGGU S / D MINGGU S / D MINGGU
SATUAN VOL HARGA SATUAN JUMLAH HARGA BOBOT MINGGU INI MINGGU INI MINGGU INI S / D MINGGU LALU MINGGU INI S / D MINGGU INI
LALU INI LALU INI LALU INI
2.3.2. LEVEL - 2
Besi BJTD 39 kg 3.571,577 19.758,93 Rp 70.570.522,64 0,438 3.571,577 - 3.571,577 0,438 - 0,438 100,00 - 100,00 70.570.522,64 - 70.570.522,643
Begisting balok Multipleks m² 114,765 267.507,02 Rp 30.700.443,15 0,191 114,765 - 114,765 0,191 - 0,191 100,00 - 100,00 30.700.443,15 - 30.700.443,150
Beton K-300 : fc' = 24.9 Mpa m³ 10,930 1.728.466,52 Rp 18.892.139,06 0,117 10,930 - 10,930 0,117 - 0,117 100,00 - 100,00 18.892.139,06 - 18.892.139,064
Besi BJTD 39 kg 24.915,497 19.758,93 Rp 492.303.467,96 3,056 24.915,497 - 24.915,497 3,056 - 3,056 100,00 - 100,00 492.303.467,96 - 492.303.467,957
Begisting balok Multipleks m² 546,800 267.507,02 Rp 146.272.838,54 0,908 546,800 - 546,800 0,908 - 0,908 100,00 - 100,00 146.272.838,54 - 146.272.838,536
Beton K-300 : fc' = 24.9 Mpa m³ 82,020 1.728.466,52 Rp 141.768.823,97 0,880 82,020 - 82,020 0,880 - 0,880 100,00 - 100,00 141.768.823,97 - 141.768.823,970
Besi BJTD 39 kg 25.677,304 19.758,93 Rp 507.355.947,88 3,150 25.677,304 - 25.677,304 3,150 - 3,150 100,00 - 100,00 507.355.947,88 - 507.355.947,877
Begisting Plat Lantai Multipleks m² 861,065 284.557,02 Rp 245.022.090,43 1,521 861,065 - 861,065 1,521 - 1,521 100,00 - 100,00 245.022.090,43 - 245.022.090,426
Beton K-300 : fc' = 24.9 Mpa m³ 123,926 1.728.466,52 Rp 214.202.374,07 1,330 123,926 - 123,926 1,330 - 1,330 100,00 - 100,00 214.202.374,07 - 214.202.374,074
Besi BJTD 39 kg 10.225,264 19.758,93 Rp 202.040.236,05 1,254 10.225,264 - 10.225,264 1,254 - 1,254 100,00 - 100,00 202.040.236,05 - 202.040.236,050
Begisting kolom Multipleks m² 312,480 262.557,02 Rp 82.043.817,61 0,509 312,480 - 312,480 0,509 - 0,509 100,00 - 100,00 82.043.817,61 - 82.043.817,610
Beton K-300 : fc' = 24.9 Mpa m³ 46,872 1.728.466,52 Rp 81.016.682,73 0,503 46,872 - 46,872 0,503 - 0,503 100,00 - 100,00 81.016.682,73 - 81.016.682,725
5 PEKERJAAN TANGGA
2.3.3. LEVEL - 3
- Besi BJTD 39 kg 3.088,793 19.758,93 Rp 61.031.236,90 0,379 3.088,793 - 3.088,793 0,379 - 0,379 100,00 - 100,00 61.031.236,90 - 61.031.236,900
- Begisting balok Multipleks m² 99,593 284.557,02 Rp 28.339.745,01 0,176 99,593 - 99,593 0,176 - 0,176 100,00 - 100,00 28.339.745,01 - 28.339.745,014
- Beton K-300 : fc' = 24.9 Mpa m³ 9,485 1.728.466,52 Rp 16.394.504,94 0,102 9,485 - 9,485 0,102 - 0,102 100,00 - 100,00 16.394.504,94 - 16.394.504,942
- Besi BJTD 39 kg 24.666,450 19.758,93 Rp 487.382.556,74 3,026 24.666,450 - 24.666,450 3,026 - 3,026 100,00 - 100,00 487.382.556,74 - 487.382.556,735
- Begisting balok Multipleks m² 540,400 267.507,02 Rp 144.560.793,61 0,898 540,400 - 540,400 0,898 - 0,898 100,00 - 100,00 144.560.793,61 - 144.560.793,608
- Beton K-300 : fc' = 24.9 Mpa m³ 81,060 1.728.466,52 Rp 140.109.496,11 0,870 81,060 - 81,060 0,870 - 0,870 100,00 - 100,00 140.109.496,11 - 140.109.496,111
- Besi BJTD 39 kg 10.225,264 19.758,93 Rp 202.040.236,05 1,254 10.225,264 - 10.225,264 1,254 - 1,254 100,00 - 100,00 202.040.236,05 - 202.040.236,050
- Begisting Balok Multipleks m² 312,480 262.557,02 Rp 82.043.817,61 0,509 312,480 - 312,480 0,509 - 0,509 100,00 - 100,00 82.043.817,61 - 82.043.817,610
Page 5 M14
REALISASI KEMAJUAN PEKERJAAN
KONTRAK PRESTASI PEKERJAAN KEMAJUAN TERHADAP KEUANGAN
NO. URAIAN PEKERJAAN KEMAJUAN VOLUME PEKERJAAN BOBOT PEKERJAAN (%)
S / D MINGGU S / D MINGGU S / D MINGGU S / D MINGGU S / D MINGGU S / D MINGGU
SATUAN VOL HARGA SATUAN JUMLAH HARGA BOBOT MINGGU INI MINGGU INI MINGGU INI S / D MINGGU LALU MINGGU INI S / D MINGGU INI
LALU INI LALU INI LALU INI
- Beton K-300 : fc' = 24.9 Mpa m³ 46,872 1.728.466,52 Rp 81.016.682,73 0,503 46,872 - 46,872 0,503 - 0,503 100,00 - 100,00 81.016.682,73 - 81.016.682,725
- Besi BJTD 39 kg 23.396,382 19.758,93 Rp 462.287.383,45 2,870 23.396,382 - 23.396,382 2,870 - 2,870 100,00 - 100,00 462.287.383,45 - 462.287.383,451
- Begisting Plat Lantai Multipleks m² 829,355 267.507,02 Rp 221.858.284,57 1,377 829,355 - 829,355 1,377 - 1,377 100,00 - 100,00 221.858.284,57 - 221.858.284,572
- Beton K-300 : fc' = 24.9 Mpa m³ 119,933 1.728.466,52 Rp 207.299.310,91 1,287 119,933 - 119,933 1,287 - 1,287 100,00 - 100,00 207.299.310,91 - 207.299.310,910
5 PEKERJAAN TANGGA
2.3.4. LEVEL - 4
- Besi BJTD 39 kg 3.088,793 19.758,93 Rp 61.031.236,90 0,379 - 3.088,793 3.088,793 - 0,379 0,379 - 100,00 100,00 - 61.031.236,900 61.031.236,900
- Begisting balok Multipleks m² 99,593 284.557,02 Rp 28.339.745,01 0,176 - 99,593 99,593 - 0,176 0,176 - 100,00 100,00 - 28.339.745,014 28.339.745,014
- Besi BJTD 39 kg 24.406,657 19.758,93 Rp 482.249.324,10 2,994 - 19.525,325 19.525,325 - 2,395 2,395 - 80,00 80,00 - 385.799.459,278 385.799.459,278
- Begisting balok Multipleks m² 540,400 284.557,02 Rp 153.774.613,61 0,955 - 486,360 486,360 - 0,859 0,859 - 90,00 90,00 - 138.397.152,247 138.397.152,247
- Besi BJTD 39 kg 23.396,382 19.758,93 Rp 462.287.383,45 2,870 - 9.358,553 9.358,553 - 1,148 1,148 - 40,00 40,00 - 184.914.953,380 184.914.953,380
- Begisting Plat Lantai Multipleks m² 829,355 284.557,02 Rp 235.998.787,32 1,465 - 829,355 829,355 - 1,465 1,465 - 100,00 100,00 - 235.998.787,322 235.998.787,322
5 PEKERJAAN TANGGA
Page 6 M14
REALISASI KEMAJUAN PEKERJAAN
KONTRAK PRESTASI PEKERJAAN KEMAJUAN TERHADAP KEUANGAN
NO. URAIAN PEKERJAAN KEMAJUAN VOLUME PEKERJAAN BOBOT PEKERJAAN (%)
S / D MINGGU S / D MINGGU S / D MINGGU S / D MINGGU S / D MINGGU S / D MINGGU
SATUAN VOL HARGA SATUAN JUMLAH HARGA BOBOT MINGGU INI MINGGU INI MINGGU INI S / D MINGGU LALU MINGGU INI S / D MINGGU INI
LALU INI LALU INI LALU INI
2.3.5. LEVEL - 5
5 PEKERJAAN TANGGA
Page 7 M14
REALISASI KEMAJUAN PEKERJAAN
KONTRAK PRESTASI PEKERJAAN KEMAJUAN TERHADAP KEUANGAN
NO. URAIAN PEKERJAAN KEMAJUAN VOLUME PEKERJAAN BOBOT PEKERJAAN (%)
S / D MINGGU S / D MINGGU S / D MINGGU S / D MINGGU S / D MINGGU S / D MINGGU
SATUAN VOL HARGA SATUAN JUMLAH HARGA BOBOT MINGGU INI MINGGU INI MINGGU INI S / D MINGGU LALU MINGGU INI S / D MINGGU INI
LALU INI LALU INI LALU INI
B PEKERJAAN ARSITEKTUR
a. LEVEL-1
1 Pemasangan Dinding Bata Merah 1/2 Batu ,Campuran 1 SP : 5 PP m² 435,049 133.902,62 Rp 58.254.225,53 0,362 - - - - - - - - - - - -
Lantai-1
PINTU
1 Pemasangan Pintu type P1 Uk. 2x800x2150 mm unit 4,000 8.000.000,00 Rp 32.000.000,00 0,199 - - - - - - - - - - - -
2 Pemasangan Pintu type P2 Uk. 2x750x2150 mm unit 1,000 7.800.000,00 Rp 7.800.000,00 0,048 - - - - - - - - - - - -
3 Pemasangan Pintu type P3 Uk. 900x2150 mm unit 1,000 4.000.000,00 Rp 4.000.000,00 0,025 - - - - - - - - - - - -
4 Pemasangan Pintu dan Jendela Type PJ1 unit 1,000 55.000.000,00 Rp 55.000.000,00 0,341 - - - - - - - - - - - -
JENDELA ALLUMUNIUM
Page 8 M14
REALISASI KEMAJUAN PEKERJAAN
KONTRAK PRESTASI PEKERJAAN KEMAJUAN TERHADAP KEUANGAN
NO. URAIAN PEKERJAAN KEMAJUAN VOLUME PEKERJAAN BOBOT PEKERJAAN (%)
S / D MINGGU S / D MINGGU S / D MINGGU S / D MINGGU S / D MINGGU S / D MINGGU
SATUAN VOL HARGA SATUAN JUMLAH HARGA BOBOT MINGGU INI MINGGU INI MINGGU INI S / D MINGGU LALU MINGGU INI S / D MINGGU INI
LALU INI LALU INI LALU INI
4 JALAN RAMP
- Pancang Spun pile Diameter 50cm t=9cm m' 206,000 1.088.010,00 Rp 224.130.060,00 1,392 206,000 - 206,000 1,392 - 1,392 100,00 - 100,00 224.130.060,00 - 224.130.060,000
JUMLAH IV.PEKERJAAN TURAP BETON & JALAN RAMP Rp 830.604.922,99 5,157 1,392 - 1,392 224.130.060,000 - 224.130.060,000
I PEKERJAAN PLAMBING
a. Peralatan Utama
dalam gambar.
- SUMPIT PUMP
b. Instalasi Pemipaan
ø 50 mm
- Pipa PVC Klas AW (10 kg/cm²) ø 150 mm m' 3,000 375.000,00 Rp 1.125.000,00 0,007 - - - - - - - - - - - -
TOTAL BIAYA PEKERJAAN Rp 16.107.000.534,49 100,000 54,684 6,423 61,106 8.636.577.799,10 - 8.636.577.799,10
Page 9 M14
PEKERJAAN : PEMBANGUNAN GEDUNG RS MATA
JADWAL PELAKSANAAN PEKERJAAN (TIME SCHEDULE) ADD-01
LOKASI : SAMARINDA, PROVINSI KALIMANTAN TIMUR
TAHUN ANGGARAN : 2021
WAKTU PELAKSANAAN : 142 (SERATUS EMPAT PULUH DUA) HARI KALENDER
A PEKERJAAN STRUKTUR
I. PEKERJAAN PERSIAPAN
1 Pagar sementara dari seng gelombang tinggi 2 meter 35.578.752,00 0,221 35.578.752,00 0,221 0,1104 0,1104
Pelindung Pernafasan dan Mulut ( Masker ) 2.250.000,00 0,014 2.250.000,00 0,014 0,0140
2 Galian Tanah Pondasi Pile Cap 158.082.292,50 0,981 52.816.959,11 0,328 0,3279
3 Urugan Kembali Ex. Galian 113.235.210,00 0,703 15.883.934,55 0,099 0,0493 0,0493
4 Pasir Urug Bawah Pondasi t.10 cm 432.234,00 0,003 5.417.332,80 0,034 0,0336
5 Lantai Kerja Bawah Pondasi t.5 cm 1.373.011,20 0,009 17.208.407,04 0,107 0,0356 0,0356 0,0356
Pengadaan Spun Pile termasuk jasa pancang 1.253.387.520,00 7,782 578.821.320,00 3,594 0,8984 0,8984 0,8984 0,8984
Mobilisasi & Demobilisasi Hydrolic Static Pile Driver Kap: 240 t 175.000.000,00 1,086 175.000.000,00 1,086 0,5432 0,5432
Mobilisasi Tiang Spun Pile ke lokasi 95.000.000,00 0,590 95.000.000,00 0,590 0,1966 0,1966 0,1966
Bobok Kepala Tiang Spun pile 21.600.000,00 0,134 13.350.000,00 0,083 0,0335 0,0494
Beton K-300 : fc' = 24.9 Mpa 15.556.198,68 0,097 15.556.198,68 0,097 0,048 0,0483
Beton K-300 : fc' = 24.9 Mpa 70.002.894,06 0,435 62.224.794,72 0,386 0,3863
Beton K-300 : fc' = 24.9 Mpa 31.112.397,36 0,193 141.042.868,03 0,876 0,8757
Beton K-300 : fc' = 24.9 Mpa 171.118.185,48 1,062 171.118.185,48 1,062 0,5312 0,531
Page 10 of 16
JADWAL PELAKSANAAN PEKERJAAN (TIME SCHEDULE)
KONTRAK AWAL KONTRAK ADD-01
BULAN 1 BULAN 2 BULAN 3 BULAN 4 BULAN 5
NO. URAIAN M-1 M-2 M-3 M-4 M-5 M-6 M-7 M-8 M-9 M-10 M-11 M-12 M-13 M-14 M-15 M-16 M-17 M-18 M-19 M-20 KET:
BOBOT BOBOT 12/08/2021 19/08/2021 26/08/2021 02/09/2021 09/09/2021 16/09/2021 23/09/2021 30/09/2021 07/10/2021 14/10/2021 21/10/2021 28/10/2021 04/11/2021 11/11/2021 18/11/2021 25/11/2021 02/12/2021 09/12/2021 16/12/2021 23/12/2021
JUMLAH JUMLAH
(%) (%) S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D
18/08/2021 25/08/2021 01/09/2021 08/09/2021 15/09/2021 22/09/2021 29/09/2021 06/10/2021 13/10/2021 20/10/2021 27/10/2021 03/11/2021 10/11/2021 17/11/2021 24/11/2021 01/12/2021 08/12/2021 15/12/2021 22/12/2021 31/12/2021
Beton K-300 : fc' = 24.9 Mpa 8.263.798,43 0,051 23.451.833,74 0,146 0,1456
Beton K-300 : fc' = 24.9 Mpa 19.098.000,00 0,119 1.367.400,00 0,008 0,0085
Beton K-300 : fc' = 24.9 Mpa 8.191.202,84 0,051 17.085.891,55 0,106 0,1061
Beton K-300 : fc' = 24.9 Mpa 97.502.796,39 0,605 140.109.496,11 0,870 0,8699
Beton K-300 : fc' = 24.9 Mpa 196.422.935,33 1,219 292.992.359,81 1,819 1,8190
Beton K-300 : fc' = 24.9 Mpa 28.934.529,54 0,180 81.016.682,73 0,503 0,5030
6 PEKERJAAN TANGGA
Beton K-300 : fc' = 24.9 Mpa 2.722.334,77 0,017 8.218.652,96 0,051 0,0510
Beton K-300 : fc' = 24.9 Mpa 1.037.079,91 0,006 1.752.665,05 0,011 0,0109
Beton K-300 : fc' = 24.9 Mpa 276.554,64 0,002 674.101,94 0,004 0,0042
2.3.2. LEVEL - 2
Besi BJTD 39 46.262.126,69 0,287 70.570.522,64 0,438 0,1095 0,1095 0,1095 0,1095
Begisting balok Multipleks 25.349.767,74 0,157 30.700.443,15 0,191 0,0635 0,0635 0,0635
Beton K-300 : fc' = 24.9 Mpa 10.920.451,47 0,068 18.892.139,06 0,117 0,0586 0,0586
Besi BJTD 39 375.764.742,92 2,333 492.303.467,96 3,056 0,7641 0,7641 0,7641 0,7641
Begisting balok Multipleks 209.126.287,96 1,298 146.272.838,54 0,908 0,3027 0,3027 0,3027
Page 11 of 16
JADWAL PELAKSANAAN PEKERJAAN (TIME SCHEDULE)
KONTRAK AWAL KONTRAK ADD-01
BULAN 1 BULAN 2 BULAN 3 BULAN 4 BULAN 5
NO. URAIAN M-1 M-2 M-3 M-4 M-5 M-6 M-7 M-8 M-9 M-10 M-11 M-12 M-13 M-14 M-15 M-16 M-17 M-18 M-19 M-20 KET:
BOBOT BOBOT 12/08/2021 19/08/2021 26/08/2021 02/09/2021 09/09/2021 16/09/2021 23/09/2021 30/09/2021 07/10/2021 14/10/2021 21/10/2021 28/10/2021 04/11/2021 11/11/2021 18/11/2021 25/11/2021 02/12/2021 09/12/2021 16/12/2021 23/12/2021
JUMLAH JUMLAH
(%) (%) S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D
18/08/2021 25/08/2021 01/09/2021 08/09/2021 15/09/2021 22/09/2021 29/09/2021 06/10/2021 13/10/2021 20/10/2021 27/10/2021 03/11/2021 10/11/2021 17/11/2021 24/11/2021 01/12/2021 08/12/2021 15/12/2021 22/12/2021 31/12/2021
Beton K-300 : fc' = 24.9 Mpa 162.149.172,71 1,007 141.768.823,97 0,880 0,4401 0,4401
Besi BJTD 39 212.324.900,40 1,318 507.355.947,88 3,150 0,7875 0,7875 0,7875 0,7875
Begisting Plat Lantai Multipleks 224.957.405,83 1,397 245.022.090,43 1,521 0,5071 0,5071 0,5071
Beton K-300 : fc' = 24.9 Mpa 163.973.327,13 1,018 214.202.374,07 1,330 0,6649 0,6649
Beton K-300 : fc' = 24.9 Mpa 55.310.928,64 0,343 81.016.682,73 0,503 0,503
5 PEKERJAAN TANGGA
Beton K-300 : fc' = 24.9 Mpa 2.722.334,77 0,017 8.218.652,96 0,051 0,0510
Beton K-300 : fc' = 24.9 Mpa 1.037.079,91 0,006 1.752.665,05 0,011 0,0109
Beton K-300 : fc' = 24.9 Mpa 276.554,64 0,002 674.101,94 0,004 0,0042
2.3.3. LEVEL - 3
- Besi BJTD 39 46.262.126,69 0,287 61.031.236,90 0,379 0,0758 0,0758 0,0758 0,0758 0,0758
- Begisting balok Multipleks 26.965.476,89 0,167 28.339.745,01 0,176 0,0440 0,0440 0,0440 0,0440
- Beton K-300 : fc' = 24.9 Mpa 10.920.451,47 0,068 16.394.504,94 0,102 0,0509 0,0509
- Besi BJTD 39 375.764.742,92 2,333 487.382.556,74 3,026 0,6052 0,6052 0,6052 0,6052 0,6052
- Begisting balok Multipleks 209.126.287,96 1,298 144.560.793,61 0,898 0,3141 0,3141 0,2693
- Beton K-300 : fc' = 24.9 Mpa 162.149.172,71 1,007 140.109.496,11 0,870 0,4349 0,4349
- Beton K-300 : fc' = 24.9 Mpa 14.933.950,73 0,093 81.016.682,73 0,503 0,503
- Besi BJTD 39 222.502.114,89 1,381 462.287.383,45 2,870 0,5740 0,5740 0,5740 0,5740 0,5740
- Begisting Plat Lantai Multipleks 221.615.120,69 1,376 221.858.284,57 1,377 0,3444 0,3444 0,3444 0,3444
- Beton K-300 : fc' = 24.9 Mpa 171.832.940,96 1,067 207.299.310,91 1,287 0,6435 0,6435
6 PEKERJAAN TANGGA
Page 12 of 16
JADWAL PELAKSANAAN PEKERJAAN (TIME SCHEDULE)
KONTRAK AWAL KONTRAK ADD-01
BULAN 1 BULAN 2 BULAN 3 BULAN 4 BULAN 5
NO. URAIAN M-1 M-2 M-3 M-4 M-5 M-6 M-7 M-8 M-9 M-10 M-11 M-12 M-13 M-14 M-15 M-16 M-17 M-18 M-19 M-20 KET:
BOBOT BOBOT 12/08/2021 19/08/2021 26/08/2021 02/09/2021 09/09/2021 16/09/2021 23/09/2021 30/09/2021 07/10/2021 14/10/2021 21/10/2021 28/10/2021 04/11/2021 11/11/2021 18/11/2021 25/11/2021 02/12/2021 09/12/2021 16/12/2021 23/12/2021
JUMLAH JUMLAH
(%) (%) S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D
18/08/2021 25/08/2021 01/09/2021 08/09/2021 15/09/2021 22/09/2021 29/09/2021 06/10/2021 13/10/2021 20/10/2021 27/10/2021 03/11/2021 10/11/2021 17/11/2021 24/11/2021 01/12/2021 08/12/2021 15/12/2021 22/12/2021 31/12/2021
2.3.4. LEVEL - 4
5 PEKERJAAN TANGGA
2.3.5. LEVEL - 5
5 PEKERJAAN TANGGA
Page 13 of 16
JADWAL PELAKSANAAN PEKERJAAN (TIME SCHEDULE)
KONTRAK AWAL KONTRAK ADD-01
BULAN 1 BULAN 2 BULAN 3 BULAN 4 BULAN 5
NO. URAIAN M-1 M-2 M-3 M-4 M-5 M-6 M-7 M-8 M-9 M-10 M-11 M-12 M-13 M-14 M-15 M-16 M-17 M-18 M-19 M-20 KET:
BOBOT BOBOT 12/08/2021 19/08/2021 26/08/2021 02/09/2021 09/09/2021 16/09/2021 23/09/2021 30/09/2021 07/10/2021 14/10/2021 21/10/2021 28/10/2021 04/11/2021 11/11/2021 18/11/2021 25/11/2021 02/12/2021 09/12/2021 16/12/2021 23/12/2021
JUMLAH JUMLAH
(%) (%) S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D
18/08/2021 25/08/2021 01/09/2021 08/09/2021 15/09/2021 22/09/2021 29/09/2021 06/10/2021 13/10/2021 20/10/2021 27/10/2021 03/11/2021 10/11/2021 17/11/2021 24/11/2021 01/12/2021 08/12/2021 15/12/2021 22/12/2021 31/12/2021
- Beton K-300 : fc' = 24.9 Mpa 20.719.128,18 0,129 13.654.885,51 0,085 0,085
- Beton K-300 : fc' = 24.9 Mpa 11.051.814,93 0,069 39.616.452,64 0,246 0,246
- Begisting Plat Lantai Multipleks 138.721.547,25 0,861 53.781.276,78 0,334 0,167 0,167
- Beton K-300 : fc' = 24.9 Mpa 101.115.291,42 0,628 37.334.876,83 0,232 0,232
B PEKERJAAN ARSITEKTUR
a. LEVEL-1
1 Pemasangan Dinding Bata Merah 1/2 Batu ,Campuran 1 SP : 5 PP 198.156.956,46 1,230 58.254.225,53 0,362 0,217 0,145
2 Pemasangan Pelesteran , 1 SP : 5 PP, tebal 15 mm 253.703.491,63 1,575 74.583.808,13 0,463 0,232 0,232
4 Opening pintu & jendela 58.059.928,64 0,360 9.059.996,97 0,056 0,014 0,014 0,014 0,014
5 Kolom praktis 12/12 cm 45.106.875,00 0,280 5.961.600,00 0,037 0,009 0,009 0,009 0,009
Lantai-1
Page 14 of 16
JADWAL PELAKSANAAN PEKERJAAN (TIME SCHEDULE)
KONTRAK AWAL KONTRAK ADD-01
BULAN 1 BULAN 2 BULAN 3 BULAN 4 BULAN 5
NO. URAIAN M-1 M-2 M-3 M-4 M-5 M-6 M-7 M-8 M-9 M-10 M-11 M-12 M-13 M-14 M-15 M-16 M-17 M-18 M-19 M-20 KET:
BOBOT BOBOT 12/08/2021 19/08/2021 26/08/2021 02/09/2021 09/09/2021 16/09/2021 23/09/2021 30/09/2021 07/10/2021 14/10/2021 21/10/2021 28/10/2021 04/11/2021 11/11/2021 18/11/2021 25/11/2021 02/12/2021 09/12/2021 16/12/2021 23/12/2021
JUMLAH JUMLAH
(%) (%) S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D
18/08/2021 25/08/2021 01/09/2021 08/09/2021 15/09/2021 22/09/2021 29/09/2021 06/10/2021 13/10/2021 20/10/2021 27/10/2021 03/11/2021 10/11/2021 17/11/2021 24/11/2021 01/12/2021 08/12/2021 15/12/2021 22/12/2021 31/12/2021
PINTU
1 Pemasangan Pintu type P1 Uk. 2x800x2150 mm 64.000.000,00 0,397 32.000.000,00 0,199 0,199
2 Pemasangan Pintu type P2 Uk. 2x750x2150 mm 62.400.000,00 0,387 7.800.000,00 0,048 0,048
3 Pemasangan Pintu type P3 Uk. 900x2150 mm 36.000.000,00 0,224 4.000.000,00 0,025 0,025
6 Pemasangan Pintu dan Jendela Type PJ1 55.000.000,00 0,341 55.000.000,00 0,341 0,341
JENDELA ALLUMUNIUM
4 JALAN RAMP
a. Peralatan Utama
dalam gambar.
- SUMPIT PUMP
a. Instalasi Pemipaan
Page 15 of 16
JADWAL PELAKSANAAN PEKERJAAN (TIME SCHEDULE)
KONTRAK AWAL KONTRAK ADD-01
BULAN 1 BULAN 2 BULAN 3 BULAN 4 BULAN 5
NO. URAIAN M-1 M-2 M-3 M-4 M-5 M-6 M-7 M-8 M-9 M-10 M-11 M-12 M-13 M-14 M-15 M-16 M-17 M-18 M-19 M-20 KET:
BOBOT BOBOT 12/08/2021 19/08/2021 26/08/2021 02/09/2021 09/09/2021 16/09/2021 23/09/2021 30/09/2021 07/10/2021 14/10/2021 21/10/2021 28/10/2021 04/11/2021 11/11/2021 18/11/2021 25/11/2021 02/12/2021 09/12/2021 16/12/2021 23/12/2021
JUMLAH JUMLAH
(%) (%) S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D
18/08/2021 25/08/2021 01/09/2021 08/09/2021 15/09/2021 22/09/2021 29/09/2021 06/10/2021 13/10/2021 20/10/2021 27/10/2021 03/11/2021 10/11/2021 17/11/2021 24/11/2021 01/12/2021 08/12/2021 15/12/2021 22/12/2021 31/12/2021
- Pipa PVC Klas AW (10 kg/cm²) ø 150 mm 22.500.000,00 0,140 1.125.000,00 0,007 0,007
BOBOT RENCANA MINGGU INI 8,162 6,012 4,646 5,051 3,789 4,492 6,534 8,138 8,306 6,848 5,897 7,163 7,883 7,168 3,308
RENCANA ADD-01
BOBOT RENCANA KOMULATIF MINGGU INI - 14,287 14,766 20,778 25,424 30,475 34,265 38,756 45,291 53,428 61,734 68,582 74,479 81,641 89,524 96,692 100,000
BOBOT REALISASI MINGGU INI 6,396 5,862 7,133 4,643 5,592 2,936 4,739 10,779 6,423
REALISASI ADD-01
BOBOT REALISASI KOMULATIF MINGGU INI - 6,604 13,000 18,862 25,995 30,638 36,230 39,166 43,905 54,684 61,106
DEVIASI -0,072 -0,011 -0,779 -3,476 -7,683 -1,766 -1,916 0,571 0,163 1,966 0,409 -1,386 1,255 -0,628
RAHMAT RAMADHAN, ST, MM. Ir. PEPEN SOLIHIN YUSUF EDDY HARTONO, ST
NIP. 19790806 200901 1 003 Team Leader Project Manager
Page 16 of 16