KONTRAK PROGRESS
No. SISA PEKERJAAN
URAIAN PEKERJAAN SATUAN BOBOT Minggu Lalu Minggu Ini s/d Minggu Ini
VOLUME
ITEM (%) Volume Bobot (%) Volume Bobot (%) Volume Bobot (%) Volume Bobot (%)
II. PEK. PELEBARAN PAVED SHOULDER & FILLET TAXIWAY DELTA 5.454 - - - 5.454
1 Pek. Galian Tanah m³ 785.52 0.183 - - - - - - 785.52 0.183
2 Pek. Pemadatan m² 1,636.49 0.058 - - - - - - 1,636.49 0.058
3 Pek. Sirtu tebal = 20 cm m³ 327.30 0.499 - - - - - - 327.30 0.499
4 Pek. LPA tebal = 15 cm m³ 245.47 0.471 - - - - - - 245.47 0.471
5 Pek. Prime coat 2,5 kg/m2 m² 1,636.49 0.340 - - - - - - 1,636.49 0.340
6 Pek. Aspal AC-BC tebal = 7 cm Ton 269.20 1.947 - - - - - - 269.20 1.947
7 Pek. Coating 0.75 kg/m2 m² 1,636.49 0.124 - - - - - - 1,636.49 0.124
8 Pek. Aspal AC-WC tebal = 6 cm Ton 230.75 1.831 - - - - - - 230.75 1.831
V. PEK. PELEBARAN PAVED SHOULDER & FILLET TAXIWAY GOLF 5.454 - - - 5.454
1 Pek. Galian Tanah m³ 785.52 0.183 - - - - - - 785.52 0.183
2 Pek. Pemadatan m² 1,636.49 0.058 - - - - - - 1,636.49 0.058
3 Pek. Sirtu tebal = 20 cm m³ 327.30 0.499 - - - - - - 327.30 0.499
KONTRAK PROGRESS
No. SISA PEKERJAAN
URAIAN PEKERJAAN SATUAN BOBOT Minggu Lalu Minggu Ini s/d Minggu Ini
VOLUME
ITEM (%) Volume Bobot (%) Volume Bobot (%) Volume Bobot (%) Volume Bobot (%)
MUH. ISHAK
Nip : 19770806 200901 1 010 ABD. RAHMAN, ST Ir. ISBUDIANTO SOENARTO
Site Engineer General Superintendent
PROGRESS MINGGUAN
Pekerjaan : PELEBARAN PAVED SHOULDER TAXIWAY MINGGU KE
DI BANDAR UDARA SULTAN HASANUDDIN MAKASSAR
2
Penyedia Pekerjaan Konstruksi : PT. GENYTOV FAJAR Penyedia Jasa Konsultasi : PT. WIRA MARGA
Nomor Kontrak : AP. I. 25/SPP/HK. 06. 01/2015/GM. UPG Nomor Kontrak : AP. I. 23/SPP/HK. 06. 01/2015/GM. UPG PERIODE TANGGAL
Tanggal Kontrak : 10 SEPTEMBER 2015 Tanggal Kontrak : 10 SEPTEMBER 2015 14 SEPT S/D 20 SEPT
KONTRAK PROGRESS
No. SISA PEKERJAAN
URAIAN PEKERJAAN SATUAN BOBOT Minggu Lalu Minggu Ini s/d Minggu Ini
VOLUME
ITEM (%) Volume Bobot (%) Volume Bobot (%) Volume Bobot (%) Volume Bobot (%)
II. PEK. PELEBARAN PAVED SHOULDER & FILLET TAXIWAY DELTA 5.454 - - - 5.454
1 Pek. Galian Tanah m³ 785.52 0.183 - - - - - - 785.52 0.183
2 Pek. Pemadatan m² 1,636.49 0.058 - - - - - - 1,636.49 0.058
3 Pek. Sirtu tebal = 20 cm m³ 327.30 0.499 - - - - - - 327.30 0.499
4 Pek. LPA tebal = 15 cm m³ 245.47 0.471 - - - - - - 245.47 0.471
5 Pek. Prime coat 2,5 kg/m2 m² 1,636.49 0.340 - - - - - - 1,636.49 0.340
6 Pek. Aspal AC-BC tebal = 7 cm Ton 269.20 1.947 - - - - - - 269.20 1.947
7 Pek. Coating 0.75 kg/m2 m² 1,636.49 0.124 - - - - - - 1,636.49 0.124
8 Pek. Aspal AC-WC tebal = 6 cm Ton 230.75 1.831 - - - - - - 230.75 1.831
V. PEK. PELEBARAN PAVED SHOULDER & FILLET TAXIWAY GOLF 5.454 - - - 5.454
1 Pek. Galian Tanah m³ 785.52 0.183 - - - - - - 785.52 0.183
2 Pek. Pemadatan m² 1,636.49 0.058 - - - - - - 1,636.49 0.058
3 Pek. Sirtu tebal = 20 cm m³ 327.30 0.499 - - - - - - 327.30 0.499
KONTRAK PROGRESS
No. SISA PEKERJAAN
URAIAN PEKERJAAN SATUAN BOBOT Minggu Lalu Minggu Ini s/d Minggu Ini
VOLUME
ITEM (%) Volume Bobot (%) Volume Bobot (%) Volume Bobot (%) Volume Bobot (%)
MUH. ISHAK
Nip : 19770806 200901 1 010 ABD. RAHMAN, ST Ir. ISBUDIANTO SOENARTO
Site Engineer General Superintendent
PROGRESS MINGGUAN
Pekerjaan : PELEBARAN PAVED SHOULDER TAXIWAY MINGGU KE
DI BANDAR UDARA SULTAN HASANUDDIN MAKASSAR
3
Penyedia Pekerjaan Konstruksi : PT. GENYTOV FAJAR Penyedia Jasa Konsultasi : PT. WIRA MARGA
Nomor Kontrak : AP. I. 25/SPP/HK. 06. 01/2015/GM. UPG Nomor Kontrak : AP. I. 23/SPP/HK. 06. 01/2015/GM. UPG PERIODE TANGGAL
Tanggal Kontrak : 10 SEPTEMBER 2015 Tanggal Kontrak : 10 SEPTEMBER 2015 21 SEP S/D 27 SEPT
KONTRAK PROGRESS
No. SISA PEKERJAAN
URAIAN PEKERJAAN SATUAN BOBOT Minggu Lalu Minggu Ini s/d Minggu Ini
VOLUME
ITEM (%) Volume Bobot (%) Volume Bobot (%) Volume Bobot (%) Volume Bobot (%)
II. PEK. PELEBARAN PAVED SHOULDER & FILLET TAXIWAY DELTA 5.454 - - - 5.454
1 Pek. Galian Tanah m³ 785.52 0.183 - - - - - - 785.52 0.183
2 Pek. Pemadatan m² 1,636.49 0.058 - - - - - - 1,636.49 0.058
3 Pek. Sirtu tebal = 20 cm m³ 327.30 0.499 - - - - - - 327.30 0.499
4 Pek. LPA tebal = 15 cm m³ 245.47 0.471 - - - - - - 245.47 0.471
5 Pek. Prime coat 2,5 kg/m2 m² 1,636.49 0.340 - - - - - - 1,636.49 0.340
6 Pek. Aspal AC-BC tebal = 7 cm Ton 269.20 1.947 - - - - - - 269.20 1.947
7 Pek. Coating 0.75 kg/m2 m² 1,636.49 0.124 - - - - - - 1,636.49 0.124
8 Pek. Aspal AC-WC tebal = 6 cm Ton 230.75 1.831 - - - - - - 230.75 1.831
V. PEK. PELEBARAN PAVED SHOULDER & FILLET TAXIWAY GOLF 5.454 - - - 5.454
1 Pek. Galian Tanah m³ 785.52 0.183 - - - - - - 785.52 0.183
2 Pek. Pemadatan m² 1,636.49 0.058 - - - - - - 1,636.49 0.058
3 Pek. Sirtu tebal = 20 cm m³ 327.30 0.499 - - - - - - 327.30 0.499
KONTRAK PROGRESS
No. SISA PEKERJAAN
URAIAN PEKERJAAN SATUAN BOBOT Minggu Lalu Minggu Ini s/d Minggu Ini
VOLUME
ITEM (%) Volume Bobot (%) Volume Bobot (%) Volume Bobot (%) Volume Bobot (%)
IX PEK. PELEBARAN PAVED SHOULDER TAXIWAY WESTPARALEL 34.809 - 0.179 0.179 34.630
1 Pek. Galian Tanah m³ 5,013.08 1.169 - - 89.976 0.021 89.976 0.021 4,923.10 1.148
2 Pek. Pemadatan m² 10,443.92 0.367 - - 202.560 0.007 202.560 0.007 10,241.36 0.360
3 Pek. Sirtu tebal = 20 cm m³ 2,088.78 3.186 - - 33.259 0.051 33.259 0.051 2,055.52 3.135
4 Pek. LPA tebal = 15 cm m³ 1,566.59 3.009 - - 30.384 0.058 30.384 0.058 1,536.21 2.951
5 Pek. Prime coat 2,5 kg/m2 m² 10,443.92 2.173 - - 202.560 0.042 202.560 0.042 10,241.36 2.131
6 Pek. Aspal AC-BC tebal = 7 cm Ton 1,718.02 12.428 - - - - - - 1,718.02 12.428
7 Pek. Coating 0.75 kg/m2 m² 10,443.92 0.792 - - - - - - 10,443.92 0.792
8 Pek. Aspal AC-WC tebal = 6 cm Ton 1,472.59 11.686 - - - - - - 1,472.59 11.686
MUH. ISHAK
Nip : 19770806 200901 1 010 ABD. RAHMAN, ST Ir. ISBUDIANTO SOENARTO
Site Engineer General Superintendent
PROGRESS MINGGUAN
Pekerjaan : PELEBARAN PAVED SHOULDER TAXIWAY MINGGU KE
DI BANDAR UDARA SULTAN HASANUDDIN MAKASSAR
4
Penyedia Pekerjaan Konstruksi : PT. GENYTOV FAJAR Penyedia Jasa Konsultasi : PT. WIRA MARGA
Nomor Kontrak : AP. I. 25/SPP/HK. 06. 01/2015/GM. UPG Nomor Kontrak : AP. I. 23/SPP/HK. 06. 01/2015/GM. UPG PERIODE TANGGAL
Tanggal Kontrak : 10 SEPTEMBER 2015 Tanggal Kontrak : 10 SEPTEMBER 2015 28 SEP S/D 4 OKT
KONTRAK PROGRESS
No. SISA PEKERJAAN
URAIAN PEKERJAAN SATUAN BOBOT Minggu Lalu Minggu Ini s/d Minggu Ini
VOLUME
ITEM (%) Volume Bobot (%) Volume Bobot (%) Volume Bobot (%) Volume Bobot (%)
II. PEK. PELEBARAN PAVED SHOULDER & FILLET TAXIWAY DELTA 5.454 - - - 5.454
1 Pek. Galian Tanah m³ 785.52 0.183 - - - - - - 785.52 0.183
2 Pek. Pemadatan m² 1,636.49 0.058 - - - - - - 1,636.49 0.058
3 Pek. Sirtu tebal = 20 cm m³ 327.30 0.499 - - - - - - 327.30 0.499
4 Pek. LPA tebal = 15 cm m³ 245.47 0.471 - - - - - - 245.47 0.471
5 Pek. Prime coat 2,5 kg/m2 m² 1,636.49 0.340 - - - - - - 1,636.49 0.340
6 Pek. Aspal AC-BC tebal = 7 cm Ton 269.20 1.947 - - - - - - 269.20 1.947
7 Pek. Coating 0.75 kg/m2 m² 1,636.49 0.124 - - - - - - 1,636.49 0.124
8 Pek. Aspal AC-WC tebal = 6 cm Ton 230.75 1.831 - - - - - - 230.75 1.831
V. PEK. PELEBARAN PAVED SHOULDER & FILLET TAXIWAY GOLF 5.454 - - - 5.454
1 Pek. Galian Tanah m³ 785.52 0.183 - - - - - - 785.52 0.183
2 Pek. Pemadatan m² 1,636.49 0.058 - - - - - - 1,636.49 0.058
3 Pek. Sirtu tebal = 20 cm m³ 327.30 0.499 - - - - - - 327.30 0.499
KONTRAK PROGRESS
No. SISA PEKERJAAN
URAIAN PEKERJAAN SATUAN BOBOT Minggu Lalu Minggu Ini s/d Minggu Ini
VOLUME
ITEM (%) Volume Bobot (%) Volume Bobot (%) Volume Bobot (%) Volume Bobot (%)
IX PEK. PELEBARAN PAVED SHOULDER TAXIWAY WESTPARALEL 34.809 0.179 0.286 0.465 34.344
1 Pek. Galian Tanah m³ 5,013.08 1.169 89.976 0.021 143.823 0.034 233.799 0.055 4,779.28 1.114
2 Pek. Pemadatan m² 10,443.92 0.367 202.560 0.007 316.860 0.011 519.420 0.018 9,924.50 0.349
3 Pek. Sirtu tebal = 20 cm m³ 2,088.78 3.186 33.259 0.051 55.102 0.084 88.361 0.135 2,000.42 3.051
4 Pek. LPA tebal = 15 cm m³ 1,566.59 3.009 30.384 0.058 47.529 0.091 77.913 0.150 1,488.68 2.859
5 Pek. Prime coat 2,5 kg/m2 m² 10,443.92 2.173 202.560 0.042 316.860 0.066 519.420 0.108 9,924.50 2.065
6 Pek. Aspal AC-BC tebal = 7 cm Ton 1,718.02 12.428 - - - - - - 1,718.02 12.428
7 Pek. Coating 0.75 kg/m2 m² 10,443.92 0.792 - - - - - - 10,443.92 0.792
8 Pek. Aspal AC-WC tebal = 6 cm Ton 1,472.59 11.686 - - - - - - 1,472.59 11.686
MUH. ISHAK
Nip : 19770806 200901 1 010 ABD. RAHMAN, ST Ir. ISBUDIANTO SOENARTO
Site Engineer General Superintendent
PROGRESS MINGGUAN
Pekerjaan : PELEBARAN PAVED SHOULDER TAXIWAY MINGGU KE
DI BANDAR UDARA SULTAN HASANUDDIN MAKASSAR
5
Penyedia Pekerjaan Konstruksi : PT. GENYTOV FAJAR Penyedia Jasa Konsultasi : PT. WIRA MARGA
Nomor Kontrak : AP. I. 25/SPP/HK. 06. 01/2015/GM. UPG Nomor Kontrak : AP. I. 23/SPP/HK. 06. 01/2015/GM. UPG PERIODE TANGGAL
Tanggal Kontrak : 10 SEPTEMBER 2015 Tanggal Kontrak : 10 SEPTEMBER 2015 5 OKT S/D 11 OKT
KONTRAK PROGRESS
No. SISA PEKERJAAN
URAIAN PEKERJAAN SATUAN BOBOT Minggu Lalu Minggu Ini s/d Minggu Ini
VOLUME
ITEM (%) Volume Bobot (%) Volume Bobot (%) Volume Bobot (%) Volume Bobot (%)
II. PEK. PELEBARAN PAVED SHOULDER & FILLET TAXIWAY DELTA 5.454 - - - 5.454
1 Pek. Galian Tanah m³ 785.52 0.183 - - - - - - 785.52 0.183
2 Pek. Pemadatan m² 1,636.49 0.058 - - - - - - 1,636.49 0.058
3 Pek. Sirtu tebal = 20 cm m³ 327.30 0.499 - - - - - - 327.30 0.499
4 Pek. LPA tebal = 15 cm m³ 245.47 0.471 - - - - - - 245.47 0.471
5 Pek. Prime coat 2,5 kg/m2 m² 1,636.49 0.340 - - - - - - 1,636.49 0.340
6 Pek. Aspal AC-BC tebal = 7 cm Ton 269.20 1.947 - - - - - - 269.20 1.947
7 Pek. Coating 0.75 kg/m2 m² 1,636.49 0.124 - - - - - - 1,636.49 0.124
8 Pek. Aspal AC-WC tebal = 6 cm Ton 230.75 1.831 - - - - - - 230.75 1.831
V. PEK. PELEBARAN PAVED SHOULDER & FILLET TAXIWAY GOLF 5.454 - - - 5.454
1 Pek. Galian Tanah m³ 785.52 0.183 - - - - - - 785.52 0.183
2 Pek. Pemadatan m² 1,636.49 0.058 - - - - - - 1,636.49 0.058
3 Pek. Sirtu tebal = 20 cm m³ 327.30 0.499 - - - - - - 327.30 0.499
KONTRAK PROGRESS
No. SISA PEKERJAAN
URAIAN PEKERJAAN SATUAN BOBOT Minggu Lalu Minggu Ini s/d Minggu Ini
VOLUME
ITEM (%) Volume Bobot (%) Volume Bobot (%) Volume Bobot (%) Volume Bobot (%)
VIII PEK. PELEBARAN PAVED SHOULDER TAXIWAY SHOUTHPARALEL 2.294 - 0.563 0.563 1.731
1 Pek. Galian Tanah m³ 330.43 0.077 - - 285.043 0.066 285.043 0.066 45.39 0.011
2 Pek. Pemadatan m² 688.40 0.024 - - 593.840 0.021 593.840 0.021 94.56 0.003
3 Pek. Sirtu tebal = 20 cm m³ 137.68 0.210 - - 118.768 0.181 118.768 0.181 18.91 0.029
4 Pek. LPA tebal = 15 cm m³ 103.26 0.198 - - 89.076 0.171 89.076 0.171 14.18 0.027
5 Pek. Prime coat 2,5 kg/m2 m² 688.40 0.143 - - 593.840 0.124 593.840 0.124 94.56 0.020
6 Pek. Aspal AC-BC tebal = 7 cm Ton 113.24 0.819 - - - - - - 113.24 0.819
7 Pek. Coating 0.75 kg/m2 m² 688.40 0.052 - - - - - - 688.40 0.052
8 Pek. Aspal AC-WC tebal = 6 cm Ton 97.06 0.770 - - - - - - 97.06 0.770
IX PEK. PELEBARAN PAVED SHOULDER TAXIWAY WESTPARALEL 34.809 0.465 - 0.465 34.344
1 Pek. Galian Tanah m³ 5,013.08 1.169 233.799 0.055 - - 233.799 0.055 4,779.28 1.114
2 Pek. Pemadatan m² 10,443.92 0.367 519.420 0.018 - - 519.420 0.018 9,924.50 0.349
3 Pek. Sirtu tebal = 20 cm m³ 2,088.78 3.186 88.361 0.135 - - 88.361 0.135 2,000.42 3.051
4 Pek. LPA tebal = 15 cm m³ 1,566.59 3.009 77.913 0.150 - - 77.913 0.150 1,488.68 2.859
5 Pek. Prime coat 2,5 kg/m2 m² 10,443.92 2.173 519.420 0.108 - - 519.420 0.108 9,924.50 2.065
6 Pek. Aspal AC-BC tebal = 7 cm Ton 1,718.02 12.428 - - - - - - 1,718.02 12.428
7 Pek. Coating 0.75 kg/m2 m² 10,443.92 0.792 - - - - - - 10,443.92 0.792
8 Pek. Aspal AC-WC tebal = 6 cm Ton 1,472.59 11.686 - - - - - - 1,472.59 11.686
MUH. ISHAK
Nip : 19770806 200901 1 010 ABD. RAHMAN, ST Ir. ISBUDIANTO SOENARTO
Site Engineer General Superintendent
PROGRESS MINGGUAN
Pekerjaan : PELEBARAN PAVED SHOULDER TAXIWAY MINGGU KE
DI BANDAR UDARA SULTAN HASANUDDIN MAKASSAR
6
Penyedia Pekerjaan Konstruksi : PT. GENYTOV FAJAR Penyedia Jasa Konsultasi : PT. WIRA MARGA
Nomor Kontrak : AP. I. 25/SPP/HK. 06. 01/2015/GM. UPG Nomor Kontrak : AP. I. 23/SPP/HK. 06. 01/2015/GM. UPG PERIODE TANGGAL
Tanggal Kontrak : 10 SEPTEMBER 2015 Tanggal Kontrak : 10 SEPTEMBER 2015 12 OKT S/D 18 OKT
KONTRAK PROGRESS
No. SISA PEKERJAAN
URAIAN PEKERJAAN SATUAN BOBOT Minggu Lalu Minggu Ini s/d Minggu Ini
VOLUME
ITEM (%) Volume Bobot (%) Volume Bobot (%) Volume Bobot (%) Volume Bobot (%)
II. PEK. PELEBARAN PAVED SHOULDER & FILLET TAXIWAY DELTA 5.454 - - - 5.454
1 Pek. Galian Tanah m³ 785.52 0.183 - - - - - - 785.52 0.183
2 Pek. Pemadatan m² 1,636.49 0.058 - - - - - - 1,636.49 0.058
3 Pek. Sirtu tebal = 20 cm m³ 327.30 0.499 - - - - - - 327.30 0.499
4 Pek. LPA tebal = 15 cm m³ 245.47 0.471 - - - - - - 245.47 0.471
5 Pek. Prime coat 2,5 kg/m2 m² 1,636.49 0.340 - - - - - - 1,636.49 0.340
6 Pek. Aspal AC-BC tebal = 7 cm Ton 269.20 1.947 - - - - - - 269.20 1.947
7 Pek. Coating 0.75 kg/m2 m² 1,636.49 0.124 - - - - - - 1,636.49 0.124
8 Pek. Aspal AC-WC tebal = 6 cm Ton 230.75 1.831 - - - - - - 230.75 1.831
V. PEK. PELEBARAN PAVED SHOULDER & FILLET TAXIWAY GOLF 5.454 - - - 5.454
1 Pek. Galian Tanah m³ 785.52 0.183 - - - - - - 785.52 0.183
2 Pek. Pemadatan m² 1,636.49 0.058 - - - - - - 1,636.49 0.058
3 Pek. Sirtu tebal = 20 cm m³ 327.30 0.499 - - - - - - 327.30 0.499
KONTRAK PROGRESS
No. SISA PEKERJAAN
URAIAN PEKERJAAN SATUAN BOBOT Minggu Lalu Minggu Ini s/d Minggu Ini
VOLUME
ITEM (%) Volume Bobot (%) Volume Bobot (%) Volume Bobot (%) Volume Bobot (%)
VIII PEK. PELEBARAN PAVED SHOULDER TAXIWAY SHOUTHPARALEL 2.294 0.563 0.058 0.621 1.673
1 Pek. Galian Tanah m³ 330.43 0.077 285.043 0.066 29.338 0.007 314.381 0.073 16.05 0.004
2 Pek. Pemadatan m² 688.40 0.024 593.840 0.021 61.120 0.002 654.960 0.023 33.44 0.001
3 Pek. Sirtu tebal = 20 cm m³ 137.68 0.210 118.768 0.181 12.224 0.019 130.992 0.200 6.69 0.010
4 Pek. LPA tebal = 15 cm m³ 103.26 0.198 89.076 0.171 9.168 0.018 98.244 0.189 5.02 0.010
5 Pek. Prime coat 2,5 kg/m2 m² 688.40 0.143 593.840 0.124 61.120 0.013 654.960 0.136 33.44 0.007
6 Pek. Aspal AC-BC tebal = 7 cm Ton 113.24 0.819 - - - - - - 113.24 0.819
7 Pek. Coating 0.75 kg/m2 m² 688.40 0.052 - - - - - - 688.40 0.052
8 Pek. Aspal AC-WC tebal = 6 cm Ton 97.06 0.770 - - - - - - 97.06 0.770
IX PEK. PELEBARAN PAVED SHOULDER TAXIWAY WESTPARALEL 34.809 0.465 1.262 1.727 33.082
1 Pek. Galian Tanah m³ 5,013.08 1.169 233.799 0.055 638.880 0.149 872.679 0.203 4,140.40 0.965
2 Pek. Pemadatan m² 10,443.92 0.367 519.420 0.018 1,331.000 0.047 1,850.420 0.065 8,593.50 0.302
3 Pek. Sirtu tebal = 20 cm m³ 2,088.78 3.186 88.361 0.135 266.200 0.406 354.561 0.541 1,734.22 2.645
4 Pek. LPA tebal = 15 cm m³ 1,566.59 3.009 77.913 0.150 199.650 0.383 277.563 0.533 1,289.03 2.476
5 Pek. Prime coat 2,5 kg/m2 m² 10,443.92 2.173 519.420 0.108 1,331.000 0.277 1,850.420 0.385 8,593.50 1.788
6 Pek. Aspal AC-BC tebal = 7 cm Ton 1,718.02 12.428 - - - - - - 1,718.02 12.428
7 Pek. Coating 0.75 kg/m2 m² 10,443.92 0.792 - - - - - - 10,443.92 0.792
8 Pek. Aspal AC-WC tebal = 6 cm Ton 1,472.59 11.686 - - - - - - 1,472.59 11.686
-
MUH. ISHAK
Nip : 19770806 200901 1 010 ABD. RAHMAN, ST Ir. ISBUDIANTO SOENARTO
Site Engineer General Superintendent
PROGRESS MINGGUAN
Pekerjaan : PELEBARAN PAVED SHOULDER TAXIWAY MINGGU KE
DI BANDAR UDARA SULTAN HASANUDDIN MAKASSAR
7
Penyedia Pekerjaan Konstruksi : PT. GENYTOV FAJAR Penyedia Jasa Konsultasi : PT. WIRA MARGA
Nomor Kontrak : AP. I. 25/SPP/HK. 06. 01/2015/GM. UPG Nomor Kontrak : AP. I. 23/SPP/HK. 06. 01/2015/GM. UPG PERIODE TANGGAL
Tanggal Kontrak : 10 SEPTEMBER 2015 Tanggal Kontrak : 10 SEPTEMBER 2015 19 OKT S/D 25 OKT
KONTRAK PROGRESS
No. SISA PEKERJAAN
URAIAN PEKERJAAN SATUAN BOBOT Minggu Lalu Minggu Ini s/d Minggu Ini
VOLUME
ITEM (%) Volume Bobot (%) Volume Bobot (%) Volume Bobot (%) Volume Bobot (%)
II. PEK. PELEBARAN PAVED SHOULDER & FILLET TAXIWAY DELTA 5.454 - 0.582 0.582 4.872
1 Pek. Galian Tanah m³ 785.52 0.183 - - 290.259 0.068 290.259 0.068 495.26 0.115
2 Pek. Pemadatan m² 1,636.49 0.058 - - 689.680 0.024 689.680 0.024 946.81 0.033
3 Pek. Sirtu tebal = 20 cm m³ 327.30 0.499 - - 97.149 0.148 97.149 0.148 230.15 0.351
4 Pek. LPA tebal = 15 cm m³ 245.47 0.471 - - 103.452 0.199 103.452 0.199 142.02 0.273
5 Pek. Prime coat 2,5 kg/m2 m² 1,636.49 0.340 - - 689.680 0.143 689.680 0.143 946.81 0.197
6 Pek. Aspal AC-BC tebal = 7 cm Ton 269.20 1.947 - - - - - - 269.20 1.947
7 Pek. Coating 0.75 kg/m2 m² 1,636.49 0.124 - - - - - - 1,636.49 0.124
8 Pek. Aspal AC-WC tebal = 6 cm Ton 230.75 1.831 - - - - - - 230.75 1.831
V. PEK. PELEBARAN PAVED SHOULDER & FILLET TAXIWAY GOLF 5.454 - - - 5.454
1 Pek. Galian Tanah m³ 785.52 0.183 - - - - - - 785.52 0.183
2 Pek. Pemadatan m² 1,636.49 0.058 - - - - - - 1,636.49 0.058
3 Pek. Sirtu tebal = 20 cm m³ 327.30 0.499 - - - - - - 327.30 0.499
KONTRAK PROGRESS
No. SISA PEKERJAAN
URAIAN PEKERJAAN SATUAN BOBOT Minggu Lalu Minggu Ini s/d Minggu Ini
VOLUME
ITEM (%) Volume Bobot (%) Volume Bobot (%) Volume Bobot (%) Volume Bobot (%)
VIII PEK. PELEBARAN PAVED SHOULDER TAXIWAY SHOUTHPARALEL 2.294 0.621 - 0.621 1.673
1 Pek. Galian Tanah m³ 330.43 0.077 314.381 0.073 - - 314.381 0.073 16.05 0.004
2 Pek. Pemadatan m² 688.40 0.024 654.960 0.023 - - 654.960 0.023 33.44 0.001
3 Pek. Sirtu tebal = 20 cm m³ 137.68 0.210 130.992 0.200 - - 130.992 0.200 6.69 0.010
4 Pek. LPA tebal = 15 cm m³ 103.26 0.198 98.244 0.189 - - 98.244 0.189 5.02 0.010
5 Pek. Prime coat 2,5 kg/m2 m² 688.40 0.143 654.960 0.136 - - 654.960 0.136 33.44 0.007
6 Pek. Aspal AC-BC tebal = 7 cm Ton 113.24 0.819 - - - - - - 113.24 0.819
7 Pek. Coating 0.75 kg/m2 m² 688.40 0.052 - - - - - - 688.40 0.052
8 Pek. Aspal AC-WC tebal = 6 cm Ton 97.06 0.770 - - - - - - 97.06 0.770
IX PEK. PELEBARAN PAVED SHOULDER TAXIWAY WESTPARALEL 34.809 1.727 0.431 2.158 32.651
1 Pek. Galian Tanah m³ 5,013.08 1.169 872.679 0.203 218.026 0.051 1,090.705 0.254 3,922.38 0.915
2 Pek. Pemadatan m² 10,443.92 0.367 1,850.420 0.065 454.220 0.016 2,304.640 0.081 8,139.28 0.286
3 Pek. Sirtu tebal = 20 cm m³ 2,088.78 3.186 354.561 0.541 90.844 0.139 445.405 0.679 1,643.37 2.507
4 Pek. LPA tebal = 15 cm m³ 1,566.59 3.009 277.563 0.533 68.133 0.131 345.696 0.664 1,220.89 2.345
5 Pek. Prime coat 2,5 kg/m2 m² 10,443.92 2.173 1,850.420 0.385 454.220 0.094 2,304.640 0.479 8,139.28 1.693
6 Pek. Aspal AC-BC tebal = 7 cm Ton 1,718.02 12.428 - - - - - - 1,718.02 12.428
7 Pek. Coating 0.75 kg/m2 m² 10,443.92 0.792 - - - - - - 10,443.92 0.792
8 Pek. Aspal AC-WC tebal = 6 cm Ton 1,472.59 11.686 - - - - - - 1,472.59 11.686
MUH. ISHAK
Nip : 19770806 200901 1 010 ABD. RAHMAN, ST Ir. ISBUDIANTO SOENARTO
Site Engineer General Superintendent
PROGRESS MINGGUAN
Pekerjaan : PELEBARAN PAVED SHOULDER TAXIWAY MINGGU KE
DI BANDAR UDARA SULTAN HASANUDDIN MAKASSAR
8
Penyedia Pekerjaan Konstruksi : PT. GENYTOV FAJAR Penyedia Jasa Konsultasi : PT. WIRA MARGA
Nomor Kontrak : AP. I. 25/SPP/HK. 06. 01/2015/GM. UPG Nomor Kontrak : AP. I. 23/SPP/HK. 06. 01/2015/GM. UPG PERIODE TANGGAL
Tanggal Kontrak : 10 SEPTEMBER 2015 Tanggal Kontrak : 10 SEPTEMBER 2015 26 OKT S/D 1 NOP
KONTRAK PROGRESS
No. SISA PEKERJAAN
URAIAN PEKERJAAN SATUAN BOBOT Minggu Lalu Minggu Ini s/d Minggu Ini
VOLUME
ITEM (%) Volume Bobot (%) Volume Bobot (%) Volume Bobot (%) Volume Bobot (%)
II. PEK. PELEBARAN PAVED SHOULDER & FILLET TAXIWAY DELTA 5.454 0.582 0.131 0.713 4.741
1 Pek. Galian Tanah m³ 785.52 0.183 290.259 0.068 65.817 0.015 356.077 0.083 429.44 0.100
2 Pek. Pemadatan m² 1,636.49 0.058 689.680 0.024 150.155 0.005 839.835 0.030 796.66 0.028
3 Pek. Sirtu tebal = 20 cm m³ 327.30 0.499 97.149 0.148 24.289 0.037 121.438 0.185 205.86 0.314
4 Pek. LPA tebal = 15 cm m³ 245.47 0.471 103.452 0.199 22.008 0.042 125.460 0.241 120.01 0.231
5 Pek. Prime coat 2,5 kg/m2 m² 1,636.49 0.340 689.680 0.143 150.155 0.031 839.835 0.175 796.66 0.166
6 Pek. Aspal AC-BC tebal = 7 cm Ton 269.20 1.947 - - - - - - 269.20 1.947
7 Pek. Coating 0.75 kg/m2 m² 1,636.49 0.124 - - - - - - 1,636.49 0.124
8 Pek. Aspal AC-WC tebal = 6 cm Ton 230.75 1.831 - - - - - - 230.75 1.831
V. PEK. PELEBARAN PAVED SHOULDER & FILLET TAXIWAY GOLF 5.454 - - - 5.454
1 Pek. Galian Tanah m³ 785.52 0.183 - - - - - - 785.52 0.183
2 Pek. Pemadatan m² 1,636.49 0.058 - - - - - - 1,636.49 0.058
3 Pek. Sirtu tebal = 20 cm m³ 327.30 0.499 - - - - - - 327.30 0.499
KONTRAK PROGRESS
No. SISA PEKERJAAN
URAIAN PEKERJAAN SATUAN BOBOT Minggu Lalu Minggu Ini s/d Minggu Ini
VOLUME
ITEM (%) Volume Bobot (%) Volume Bobot (%) Volume Bobot (%) Volume Bobot (%)
VIII PEK. PELEBARAN PAVED SHOULDER TAXIWAY SHOUTHPARALEL 2.294 0.621 - 0.621 1.673
1 Pek. Galian Tanah m³ 330.43 0.077 314.381 0.073 - - 314.381 0.073 16.05 0.004
2 Pek. Pemadatan m² 688.40 0.024 654.960 0.023 - - 654.960 0.023 33.44 0.001
3 Pek. Sirtu tebal = 20 cm m³ 137.68 0.210 130.992 0.200 - - 130.992 0.200 6.69 0.010
4 Pek. LPA tebal = 15 cm m³ 103.26 0.198 98.244 0.189 - - 98.244 0.189 5.02 0.010
5 Pek. Prime coat 2,5 kg/m2 m² 688.40 0.143 654.960 0.136 - - 654.960 0.136 33.44 0.007
6 Pek. Aspal AC-BC tebal = 7 cm Ton 113.24 0.819 - - - - - - 113.24 0.819
7 Pek. Coating 0.75 kg/m2 m² 688.40 0.052 - - - - - - 688.40 0.052
8 Pek. Aspal AC-WC tebal = 6 cm Ton 97.06 0.770 - - - - - - 97.06 0.770
IX PEK. PELEBARAN PAVED SHOULDER TAXIWAY WESTPARALEL 34.809 2.158 1.662 3.820 30.989
1 Pek. Galian Tanah m³ 5,013.08 1.169 1,090.705 0.254 833.592 0.194 1,924.296 0.449 3,088.78 0.720
2 Pek. Pemadatan m² 10,443.92 0.367 2,304.640 0.081 1,883.135 0.066 4,187.775 0.147 6,256.15 0.220
3 Pek. Sirtu tebal = 20 cm m³ 2,088.78 3.186 445.405 0.679 306.198 0.467 751.604 1.146 1,337.18 2.040
4 Pek. LPA tebal = 15 cm m³ 1,566.59 3.009 345.696 0.664 282.586 0.543 628.282 1.207 938.31 1.802
5 Pek. Prime coat 2,5 kg/m2 m² 10,443.92 2.173 2,304.640 0.479 1,883.135 0.392 4,187.775 0.871 6,256.15 1.301
6 Pek. Aspal AC-BC tebal = 7 cm Ton 1,718.02 12.428 - - - - - - 1,718.02 12.428
7 Pek. Coating 0.75 kg/m2 m² 10,443.92 0.792 - - - - - - 10,443.92 0.792
8 Pek. Aspal AC-WC tebal = 6 cm Ton 1,472.59 11.686 - - - - - - 1,472.59 11.686
MUH. ISHAK
Nip : 19770806 200901 1 010 ABD. RAHMAN, ST Ir. ISBUDIANTO SOENARTO
Site Engineer General Superintendent
PROGRESS MINGGUAN
Pekerjaan : PELEBARAN PAVED SHOULDER TAXIWAY MINGGU KE
DI BANDAR UDARA SULTAN HASANUDDIN MAKASSAR
9
Penyedia Pekerjaan Konstruksi : PT. GENYTOV FAJAR Penyedia Jasa Konsultasi : PT. WIRA MARGA
Nomor Kontrak : AP. I. 25/SPP/HK. 06. 01/2015/GM. UPG Nomor Kontrak : AP. I. 23/SPP/HK. 06. 01/2015/GM. UPG PERIODE TANGGAL
Tanggal Kontrak : 10 SEPTEMBER 2015 Tanggal Kontrak : 10 SEPTEMBER 2015 2 NOP S/D 8 NOP
KONTRAK PROGRESS
No. SISA PEKERJAAN
URAIAN PEKERJAAN SATUAN BOBOT Minggu Lalu Minggu Ini s/d Minggu Ini
VOLUME
ITEM (%) Volume Bobot (%) Volume Bobot (%) Volume Bobot (%) Volume Bobot (%)
II. PEK. PELEBARAN PAVED SHOULDER & FILLET TAXIWAY DELTA 5.454 0.713 0.154 0.868 4.587
1 Pek. Galian Tanah m³ 785.52 0.183 356.077 0.083 77.138 0.018 433.214 0.101 352.31 0.082
2 Pek. Pemadatan m² 1,636.49 0.058 839.835 0.030 178.560 0.006 1,018.395 0.036 618.10 0.022
3 Pek. Sirtu tebal = 20 cm m³ 327.30 0.499 121.438 0.185 27.141 0.041 148.579 0.227 178.72 0.273
4 Pek. LPA tebal = 15 cm m³ 245.47 0.471 125.460 0.241 26.784 0.051 152.244 0.292 93.23 0.179
5 Pek. Prime coat 2,5 kg/m2 m² 1,636.49 0.340 839.835 0.175 178.560 0.037 1,018.395 0.212 618.10 0.129
6 Pek. Aspal AC-BC tebal = 7 cm Ton 269.20 1.947 - - - - - - 269.20 1.947
7 Pek. Coating 0.75 kg/m2 m² 1,636.49 0.124 - - - - - - 1,636.49 0.124
8 Pek. Aspal AC-WC tebal = 6 cm Ton 230.75 1.831 - - - - - - 230.75 1.831
V. PEK. PELEBARAN PAVED SHOULDER & FILLET TAXIWAY GOLF 5.454 - - - 5.454
1 Pek. Galian Tanah m³ 785.52 0.183 - - - - - - 785.52 0.183
2 Pek. Pemadatan m² 1,636.49 0.058 - - - - - - 1,636.49 0.058
3 Pek. Sirtu tebal = 20 cm m³ 327.30 0.499 - - - - - - 327.30 0.499
KONTRAK PROGRESS
No. SISA PEKERJAAN
URAIAN PEKERJAAN SATUAN BOBOT Minggu Lalu Minggu Ini s/d Minggu Ini
VOLUME
ITEM (%) Volume Bobot (%) Volume Bobot (%) Volume Bobot (%) Volume Bobot (%)
VIII PEK. PELEBARAN PAVED SHOULDER TAXIWAY SHOUTHPARALEL 2.294 0.621 - 0.621 1.673
1 Pek. Galian Tanah m³ 330.43 0.077 314.381 0.073 - - 314.381 0.073 16.05 0.004
2 Pek. Pemadatan m² 688.40 0.024 654.960 0.023 - - 654.960 0.023 33.44 0.001
3 Pek. Sirtu tebal = 20 cm m³ 137.68 0.210 130.992 0.200 - - 130.992 0.200 6.69 0.010
4 Pek. LPA tebal = 15 cm m³ 103.26 0.198 98.244 0.189 - - 98.244 0.189 5.02 0.010
5 Pek. Prime coat 2,5 kg/m2 m² 688.40 0.143 654.960 0.136 - - 654.960 0.136 33.44 0.007
6 Pek. Aspal AC-BC tebal = 7 cm Ton 113.24 0.819 - - - - - - 113.24 0.819
7 Pek. Coating 0.75 kg/m2 m² 688.40 0.052 - - - - - - 688.40 0.052
8 Pek. Aspal AC-WC tebal = 6 cm Ton 97.06 0.770 - - - - - - 97.06 0.770
IX PEK. PELEBARAN PAVED SHOULDER TAXIWAY WESTPARALEL 34.809 3.820 0.356 4.176 30.633
1 Pek. Galian Tanah m³ 5,013.08 1.169 1,924.296 0.449 178.866 0.042 2,103.162 0.490 2,909.92 0.679
2 Pek. Pemadatan m² 10,443.92 0.367 4,187.775 0.147 397.480 0.014 4,585.255 0.161 5,858.67 0.206
3 Pek. Sirtu tebal = 20 cm m³ 2,088.78 3.186 751.604 1.146 67.572 0.103 819.175 1.250 1,269.60 1.937
4 Pek. LPA tebal = 15 cm m³ 1,566.59 3.009 628.282 1.207 59.622 0.115 687.904 1.321 878.69 1.688
5 Pek. Prime coat 2,5 kg/m2 m² 10,443.92 2.173 4,187.775 0.871 397.480 0.083 4,585.255 0.954 5,858.67 1.219
6 Pek. Aspal AC-BC tebal = 7 cm Ton 1,718.02 12.428 - - - - - - 1,718.02 12.428
7 Pek. Coating 0.75 kg/m2 m² 10,443.92 0.792 - - - - - - 10,443.92 0.792
8 Pek. Aspal AC-WC tebal = 6 cm Ton 1,472.59 11.686 - - - - - - 1,472.59 11.686
MUH. ISHAK
Nip : 19770806 200901 1 010 ABD. RAHMAN, ST Ir. ISBUDIANTO SOENARTO
Site Engineer General Superintendent
PROGRESS MINGGUAN
Pekerjaan : PELEBARAN PAVED SHOULDER TAXIWAY MINGGU KE
DI BANDAR UDARA SULTAN HASANUDDIN MAKASSAR
10
Penyedia Pekerjaan Konstruksi : PT. GENYTOV FAJAR Penyedia Jasa Konsultasi : PT. WIRA MARGA
Nomor Kontrak : AP. I. 25/SPP/HK. 06. 01/2015/GM. UPG Nomor Kontrak : AP. I. 23/SPP/HK. 06. 01/2015/GM. UPG PERIODE TANGGAL
Tanggal Kontrak : 10 SEPTEMBER 2015 Tanggal Kontrak : 10 SEPTEMBER 2015 9 NOP S/D 15 NOP
KONTRAK PROGRESS
No. SISA PEKERJAAN
URAIAN PEKERJAAN SATUAN BOBOT Minggu Lalu Minggu Ini s/d Minggu Ini
VOLUME
ITEM (%) Volume Bobot (%) Volume Bobot (%) Volume Bobot (%) Volume Bobot (%)
II. PEK. PELEBARAN PAVED SHOULDER & FILLET TAXIWAY DELTA 5.454 0.868 - 0.868 4.587
1 Pek. Galian Tanah m³ 785.52 0.183 433.214 0.101 - - 433.214 0.101 352.31 0.082
2 Pek. Pemadatan m² 1,636.49 0.058 1,018.395 0.036 - - 1,018.395 0.036 618.10 0.022
3 Pek. Sirtu tebal = 20 cm m³ 327.30 0.499 148.579 0.227 - - 148.579 0.227 178.72 0.273
4 Pek. LPA tebal = 15 cm m³ 245.47 0.471 152.244 0.292 - - 152.244 0.292 93.23 0.179
5 Pek. Prime coat 2,5 kg/m2 m² 1,636.49 0.340 1,018.395 0.212 - - 1,018.395 0.212 618.10 0.129
6 Pek. Aspal AC-BC tebal = 7 cm Ton 269.20 1.947 - - - - - - 269.20 1.947
7 Pek. Coating 0.75 kg/m2 m² 1,636.49 0.124 - - - - - - 1,636.49 0.124
8 Pek. Aspal AC-WC tebal = 6 cm Ton 230.75 1.831 - - - - - - 230.75 1.831
V. PEK. PELEBARAN PAVED SHOULDER & FILLET TAXIWAY GOLF 5.454 - 0.409 0.409 5.045
1 Pek. Galian Tanah m³ 785.52 0.183 - - 200.831 0.047 200.831 0.047 584.69 0.136
2 Pek. Pemadatan m² 1,636.49 0.058 - - 521.640 0.018 521.640 0.018 1,114.85 0.039
3 Pek. Sirtu tebal = 20 cm m³ 327.30 0.499 - - 54.772 0.084 54.772 0.084 272.53 0.416
KONTRAK PROGRESS
No. SISA PEKERJAAN
URAIAN PEKERJAAN SATUAN BOBOT Minggu Lalu Minggu Ini s/d Minggu Ini
VOLUME
ITEM (%) Volume Bobot (%) Volume Bobot (%) Volume Bobot (%) Volume Bobot (%)
4 Pek. LPA tebal = 15 cm m³ 245.47 0.471 - - 78.246 0.150 78.246 0.150 167.22 0.321
5 Pek. Prime coat 2,5 kg/m2 m² 1,636.49 0.340 - - 530.040 0.110 530.040 0.110 1,106.45 0.230
6 Pek. Aspal AC-BC tebal = 7 cm Ton 269.20 1.947 - - - - - - 269.20 1.947
7 Pek. Coating 0.75 kg/m2 m² 1,636.49 0.124 - - - - - - 1,636.49 0.124
8 Pek. Aspal AC-WC tebal = 6 cm Ton 230.75 1.831 - - - - - - 230.75 1.831
VI. PEK. PELEBARAN PAVED SHOULDER TAXIWAY HOTEL 36.553 - 0.311 0.311 36.242
1 Pek. Galian Tanah m³ 287.13 0.067 - - 145.901 0.034 145.901 0.034 141.23 0.033
2 Pek. Pemadatan m² 598.18 0.021 - - 401.139 0.014 401.139 0.014 197.04 0.007
3 Pek. Sirtu tebal = 20 cm m³ 119.64 0.182 - - 33.582 0.051 33.582 0.051 86.06 0.131
4 Pek. LPA tebal = 15 cm m³ 89.73 0.172 - - 60.171 0.116 60.171 0.116 29.56 0.057
5 Pek. Prime coat 2,5 kg/m2 m² 598.18 0.124 - - 460.740 0.096 460.740 0.096 137.44 0.029
6 Pek. Aspal AC-BC tebal = 7 cm Ton 98.40 0.712 - - - - - - 98.40 0.712
7 Pek. Coating 0.75 kg/m2 m² 598.18 0.045 - - - - - - 598.18 0.045
8 Pek. Aspal AC-WC tebal = 6 cm Ton 84.34 0.669 - - - - - - 84.34 0.669
VIII PEK. PELEBARAN PAVED SHOULDER TAXIWAY SHOUTHPARALEL 2.294 0.621 - 0.621 1.673
1 Pek. Galian Tanah m³ 330.43 0.077 314.381 0.073 - - 314.381 0.073 16.05 0.004
2 Pek. Pemadatan m² 688.40 0.024 654.960 0.023 - - 654.960 0.023 33.44 0.001
3 Pek. Sirtu tebal = 20 cm m³ 137.68 0.210 130.992 0.200 - - 130.992 0.200 6.69 0.010
4 Pek. LPA tebal = 15 cm m³ 103.26 0.198 98.244 0.189 - - 98.244 0.189 5.02 0.010
5 Pek. Prime coat 2,5 kg/m2 m² 688.40 0.143 654.960 0.136 - - 654.960 0.136 33.44 0.007
6 Pek. Aspal AC-BC tebal = 7 cm Ton 113.24 0.819 - - - - - - 113.24 0.819
7 Pek. Coating 0.75 kg/m2 m² 688.40 0.052 - - - - - - 688.40 0.052
8 Pek. Aspal AC-WC tebal = 6 cm Ton 97.06 0.770 - - - - - - 97.06 0.770
IX PEK. PELEBARAN PAVED SHOULDER TAXIWAY WESTPARALEL 34.809 4.176 0.705 4.881 29.928
1 Pek. Galian Tanah m³ 5,013.08 1.169 2,103.162 0.490 345.516 0.081 2,448.679 0.571 2,564.40 0.598
2 Pek. Pemadatan m² 10,443.92 0.367 4,585.255 0.161 1,122.840 0.039 5,708.095 0.201 4,735.83 0.167
3 Pek. Sirtu tebal = 20 cm m³ 2,088.78 3.186 819.175 1.250 90.523 0.138 909.698 1.388 1,179.08 1.798
4 Pek. LPA tebal = 15 cm m³ 1,566.59 3.009 687.904 1.321 109.024 0.209 796.928 1.531 769.66 1.478
5 Pek. Prime coat 2,5 kg/m2 m² 10,443.92 2.173 4,585.255 0.954 1,140.440 0.237 5,725.695 1.191 4,718.23 0.982
6 Pek. Aspal AC-BC tebal = 7 cm Ton 1,718.02 12.428 - - - - - - 1,718.02 12.428
7 Pek. Coating 0.75 kg/m2 m² 10,443.92 0.792 - - - - - - 10,443.92 0.792
8 Pek. Aspal AC-WC tebal = 6 cm Ton 1,472.59 11.686 - - - - - - 1,472.59 11.686
MUH. ISHAK
Nip : 19770806 200901 1 010 ABD. RAHMAN, ST Ir. ISBUDIANTO SOENARTO
Site Engineer General Superintendent
PROGRESS MINGGUAN
Pekerjaan : PELEBARAN PAVED SHOULDER TAXIWAY MINGGU KE
DI BANDAR UDARA SULTAN HASANUDDIN MAKASSAR
11
Penyedia Pekerjaan Konstruksi : PT. GENYTOV FAJAR Penyedia Jasa Konsultasi : PT. WIRA MARGA
Nomor Kontrak : AP. I. 25/SPP/HK. 06. 01/2015/GM. UPG Nomor Kontrak : AP. I. 23/SPP/HK. 06. 01/2015/GM. UPG PERIODE TANGGAL
Tanggal Kontrak : 10 SEPTEMBER 2015 Tanggal Kontrak : 10 SEPTEMBER 2015 16 NOP S/D 22 NOP
KONTRAK PROGRESS
No. SISA PEKERJAAN
URAIAN PEKERJAAN SATUAN BOBOT Minggu Lalu Minggu Ini s/d Minggu Ini
VOLUME
ITEM (%) Volume Bobot (%) Volume Bobot (%) Volume Bobot (%) Volume Bobot (%)
II. PEK. PELEBARAN PAVED SHOULDER & FILLET TAXIWAY DELTA 5.454 0.868 0.347 1.214 4.240
1 Pek. Galian Tanah m³ 785.52 0.183 433.214 0.101 170.282 0.040 603.497 0.141 182.02 0.042
2 Pek. Pemadatan m² 1,636.49 0.058 1,018.395 0.036 453.680 0.016 1,472.075 0.052 164.42 0.006
3 Pek. Sirtu tebal = 20 cm m³ 327.30 0.499 148.579 0.227 43.252 0.066 191.831 0.293 135.47 0.207
4 Pek. LPA tebal = 15 cm m³ 245.47 0.471 152.244 0.292 68.052 0.131 220.296 0.423 25.17 0.048
5 Pek. Prime coat 2,5 kg/m2 m² 1,636.49 0.340 1,018.395 0.212 453.680 0.094 1,472.075 0.306 164.42 0.034
6 Pek. Aspal AC-BC tebal = 7 cm Ton 269.20 1.947 - - - - - - 269.20 1.947
7 Pek. Coating 0.75 kg/m2 m² 1,636.49 0.124 - - - - - - 1,636.49 0.124
8 Pek. Aspal AC-WC tebal = 6 cm Ton 230.75 1.831 - - - - - - 230.75 1.831
III. PEK. PELEBARAN PAVED SHOULDER TAXIWAY ECHO 4.195 - 0.400 0.400 3.795
1 Pek. Galian Tanah m³ 604.08 0.141 - - 195.621 0.046 195.621 0.046 408.46 0.095
2 Pek. Pemadatan m² 1,258.50 0.044 - - 532.715 0.019 532.715 0.019 725.79 0.026
3 Pek. Sirtu tebal = 20 cm m³ 251.70 0.384 - - 46.461 0.071 46.461 0.071 205.24 0.313
4 Pek. LPA tebal = 15 cm m³ 188.78 0.363 - - 79.907 0.153 79.907 0.153 108.87 0.209
5 Pek. Prime coat 2,5 kg/m2 m² 1,258.50 0.262 - - 532.715 0.111 532.715 0.111 725.79 0.151
6 Pek. Aspal AC-BC tebal = 7 cm Ton 207.02 1.498 - - - - - - 207.02 1.498
7 Pek. Coating 0.75 kg/m2 m² 1,258.50 0.095 - - - - - - 1,258.50 0.095
8 Pek. Aspal AC-WC tebal = 6 cm Ton 177.45 1.408 - - - - - - 177.45 1.408
IV. PEK. PELEBARAN PAVED SHOULDER TAXIWAY FOXTROT 4.235 - 0.278 0.278 3.957
1 Pek. Galian Tanah m³ 609.89 0.142 - - 136.608 0.032 136.608 0.032 473.28 0.110
2 Pek. Pemadatan m² 1,270.60 0.045 - - 363.320 0.013 363.320 0.013 907.28 0.032
3 Pek. Sirtu tebal = 20 cm m³ 254.12 0.388 - - 34.879 0.053 34.879 0.053 219.24 0.334
4 Pek. LPA tebal = 15 cm m³ 190.59 0.366 - - 54.498 0.105 54.498 0.105 136.09 0.261
5 Pek. Prime coat 2,5 kg/m2 m² 1,270.60 0.264 - - 363.320 0.076 363.320 0.076 907.28 0.189
6 Pek. Aspal AC-BC tebal = 7 cm Ton 209.01 1.512 - - - - - - 209.01 1.512
7 Pek. Coating 0.75 kg/m2 m² 1,270.60 0.096 - - - - - - 1,270.60 0.096
8 Pek. Aspal AC-WC tebal = 6 cm Ton 179.15 1.422 - - - - - - 179.15 1.422
KONTRAK PROGRESS
No. SISA PEKERJAAN
URAIAN PEKERJAAN SATUAN BOBOT Minggu Lalu Minggu Ini s/d Minggu Ini
VOLUME
ITEM (%) Volume Bobot (%) Volume Bobot (%) Volume Bobot (%) Volume Bobot (%)
V. PEK. PELEBARAN PAVED SHOULDER & FILLET TAXIWAY GOLF 5.454 0.409 0.327 0.736 4.718
1 Pek. Galian Tanah m³ 785.52 0.183 200.831 0.047 159.578 0.037 360.410 0.084 425.11 0.099
2 Pek. Pemadatan m² 1,636.49 0.058 521.640 0.018 385.455 0.014 907.095 0.032 729.40 0.026
3 Pek. Sirtu tebal = 20 cm m³ 327.30 0.499 54.772 0.084 51.651 0.079 106.423 0.162 220.88 0.337
4 Pek. LPA tebal = 15 cm m³ 245.47 0.471 78.246 0.150 57.818 0.111 136.064 0.261 109.41 0.210
5 Pek. Prime coat 2,5 kg/m2 m² 1,636.49 0.340 530.040 0.110 415.800 0.086 945.840 0.197 690.65 0.144
6 Pek. Aspal AC-BC tebal = 7 cm Ton 269.20 1.947 - - - - - - 269.20 1.947
7 Pek. Coating 0.75 kg/m2 m² 1,636.49 0.124 - - - - - - 1,636.49 0.124
8 Pek. Aspal AC-WC tebal = 6 cm Ton 230.75 1.831 - - - - - - 230.75 1.831
VI. PEK. PELEBARAN PAVED SHOULDER TAXIWAY HOTEL 36.553 0.311 - 0.311 36.242
1 Pek. Galian Tanah m³ 287.13 0.067 145.901 0.034 - - 145.901 0.034 141.23 0.033
2 Pek. Pemadatan m² 598.18 0.021 401.139 0.014 - - 401.139 0.014 197.04 0.007
3 Pek. Sirtu tebal = 20 cm m³ 119.64 0.182 33.582 0.051 - - 33.582 0.051 86.06 0.131
4 Pek. LPA tebal = 15 cm m³ 89.73 0.172 60.171 0.116 - - 60.171 0.116 29.56 0.057
5 Pek. Prime coat 2,5 kg/m2 m² 598.18 0.124 460.740 0.096 - - 460.740 0.096 137.44 0.029
6 Pek. Aspal AC-BC tebal = 7 cm Ton 98.40 0.712 - - - - - - 98.40 0.712
7 Pek. Coating 0.75 kg/m2 m² 598.18 0.045 - - - - - - 598.18 0.045
8 Pek. Aspal AC-WC tebal = 6 cm Ton 84.34 0.669 - - - - - - 84.34 0.669
VIII PEK. PELEBARAN PAVED SHOULDER TAXIWAY SHOUTHPARALEL 2.294 0.621 - 0.621 1.673
1 Pek. Galian Tanah m³ 330.43 0.077 314.381 0.073 - - 314.381 0.073 16.05 0.004
2 Pek. Pemadatan m² 688.40 0.024 654.960 0.023 - - 654.960 0.023 33.44 0.001
3 Pek. Sirtu tebal = 20 cm m³ 137.68 0.210 130.992 0.200 - - 130.992 0.200 6.69 0.010
4 Pek. LPA tebal = 15 cm m³ 103.26 0.198 98.244 0.189 - - 98.244 0.189 5.02 0.010
5 Pek. Prime coat 2,5 kg/m2 m² 688.40 0.143 654.960 0.136 - - 654.960 0.136 33.44 0.007
6 Pek. Aspal AC-BC tebal = 7 cm Ton 113.24 0.819 - - - - - - 113.24 0.819
7 Pek. Coating 0.75 kg/m2 m² 688.40 0.052 - - - - - - 688.40 0.052
8 Pek. Aspal AC-WC tebal = 6 cm Ton 97.06 0.770 - - - - - - 97.06 0.770
IX PEK. PELEBARAN PAVED SHOULDER TAXIWAY WESTPARALEL 34.809 4.881 - 4.881 29.928
1 Pek. Galian Tanah m³ 5,013.08 1.169 2,448.679 0.571 - - 2,448.679 0.571 2,564.40 0.598
2 Pek. Pemadatan m² 10,443.92 0.367 5,708.095 0.201 - - 5,708.095 0.201 4,735.83 0.167
3 Pek. Sirtu tebal = 20 cm m³ 2,088.78 3.186 909.698 1.388 - - 909.698 1.388 1,179.08 1.798
4 Pek. LPA tebal = 15 cm m³ 1,566.59 3.009 796.928 1.531 - - 796.928 1.531 769.66 1.478
5 Pek. Prime coat 2,5 kg/m2 m² 10,443.92 2.173 5,725.695 1.191 - - 5,725.695 1.191 4,718.23 0.982
6 Pek. Aspal AC-BC tebal = 7 cm Ton 1,718.02 12.428 - - - - - - 1,718.02 12.428
7 Pek. Coating 0.75 kg/m2 m² 10,443.92 0.792 - - - - - - 10,443.92 0.792
8 Pek. Aspal AC-WC tebal = 6 cm Ton 1,472.59 11.686 - - - - - - 1,472.59 11.686
MUH. ISHAK
Nip : 19770806 200901 1 010 ABD. RAHMAN, ST Ir. ISBUDIANTO SOENARTO
Site Engineer General Superintendent
PROGRESS MINGGUAN
Pekerjaan : PELEBARAN PAVED SHOULDER TAXIWAY MINGGU KE
DI BANDAR UDARA SULTAN HASANUDDIN MAKASSAR
12
Penyedia Pekerjaan Konstruksi : PT. GENYTOV FAJAR Penyedia Jasa Konsultasi : PT. WIRA MARGA
Nomor Kontrak : AP. I. 25/SPP/HK. 06. 01/2015/GM. UPG Nomor Kontrak : AP. I. 23/SPP/HK. 06. 01/2015/GM. UPG PERIODE TANGGAL
Tanggal Kontrak : 10 SEPTEMBER 2015 Tanggal Kontrak : 10 SEPTEMBER 2015 23 NOP S/D 29 NOP
KONTRAK PROGRESS
No. SISA PEKERJAAN
URAIAN PEKERJAAN SATUAN BOBOT Minggu Lalu Minggu Ini s/d Minggu Ini
VOLUME
ITEM (%) Volume Bobot (%) Volume Bobot (%) Volume Bobot (%) Volume Bobot (%)
II. PEK. PELEBARAN PAVED SHOULDER & FILLET TAXIWAY DELTA 5.454 1.214 - 1.214 4.240
1 Pek. Galian Tanah m³ 785.52 0.183 603.497 0.141 - - 603.497 0.141 182.02 0.042
2 Pek. Pemadatan m² 1,636.49 0.058 1,472.075 0.052 - - 1,472.075 0.052 164.42 0.006
3 Pek. Sirtu tebal = 20 cm m³ 327.30 0.499 191.831 0.293 - - 191.831 0.293 135.47 0.207
4 Pek. LPA tebal = 15 cm m³ 245.47 0.471 220.296 0.423 - - 220.296 0.423 25.17 0.048
5 Pek. Prime coat 2,5 kg/m2 m² 1,636.49 0.340 1,472.075 0.306 - - 1,472.075 0.306 164.42 0.034
6 Pek. Aspal AC-BC tebal = 7 cm Ton 269.20 1.947 - - - - - - 269.20 1.947
7 Pek. Coating 0.75 kg/m2 m² 1,636.49 0.124 - - - - - - 1,636.49 0.124
8 Pek. Aspal AC-WC tebal = 6 cm Ton 230.75 1.831 - - - - - - 230.75 1.831
III. PEK. PELEBARAN PAVED SHOULDER TAXIWAY ECHO 4.195 0.400 - 0.400 3.795
1 Pek. Galian Tanah m³ 604.08 0.141 195.621 0.046 - - 195.621 0.046 408.46 0.095
2 Pek. Pemadatan m² 1,258.50 0.044 532.715 0.019 - - 532.715 0.019 725.79 0.026
3 Pek. Sirtu tebal = 20 cm m³ 251.70 0.384 46.461 0.071 - - 46.461 0.071 205.24 0.313
4 Pek. LPA tebal = 15 cm m³ 188.78 0.363 79.907 0.153 - - 79.907 0.153 108.87 0.209
5 Pek. Prime coat 2,5 kg/m2 m² 1,258.50 0.262 532.715 0.111 - - 532.715 0.111 725.79 0.151
6 Pek. Aspal AC-BC tebal = 7 cm Ton 207.02 1.498 - - - - - - 207.02 1.498
7 Pek. Coating 0.75 kg/m2 m² 1,258.50 0.095 - - - - - - 1,258.50 0.095
8 Pek. Aspal AC-WC tebal = 6 cm Ton 177.45 1.408 - - - - - - 177.45 1.408
IV. PEK. PELEBARAN PAVED SHOULDER TAXIWAY FOXTROT 4.235 0.278 - 0.278 3.957
1 Pek. Galian Tanah m³ 609.89 0.142 136.608 0.032 - - 136.608 0.032 473.28 0.110
2 Pek. Pemadatan m² 1,270.60 0.045 363.320 0.013 - - 363.320 0.013 907.28 0.032
3 Pek. Sirtu tebal = 20 cm m³ 254.12 0.388 34.879 0.053 - - 34.879 0.053 219.24 0.334
4 Pek. LPA tebal = 15 cm m³ 190.59 0.366 54.498 0.105 - - 54.498 0.105 136.09 0.261
5 Pek. Prime coat 2,5 kg/m2 m² 1,270.60 0.264 363.320 0.076 - - 363.320 0.076 907.28 0.189
6 Pek. Aspal AC-BC tebal = 7 cm Ton 209.01 1.512 - - - - - - 209.01 1.512
7 Pek. Coating 0.75 kg/m2 m² 1,270.60 0.096 - - - - - - 1,270.60 0.096
8 Pek. Aspal AC-WC tebal = 6 cm Ton 179.15 1.422 - - - - - - 179.15 1.422
KONTRAK PROGRESS
No. SISA PEKERJAAN
URAIAN PEKERJAAN SATUAN BOBOT Minggu Lalu Minggu Ini s/d Minggu Ini
VOLUME
ITEM (%) Volume Bobot (%) Volume Bobot (%) Volume Bobot (%) Volume Bobot (%)
V. PEK. PELEBARAN PAVED SHOULDER & FILLET TAXIWAY GOLF 5.454 0.736 - 0.736 4.718
1 Pek. Galian Tanah m³ 785.52 0.183 360.410 0.084 - - 360.410 0.084 425.11 0.099
2 Pek. Pemadatan m² 1,636.49 0.058 907.095 0.032 - - 907.095 0.032 729.40 0.026
3 Pek. Sirtu tebal = 20 cm m³ 327.30 0.499 106.423 0.162 - - 106.423 0.162 220.88 0.337
4 Pek. LPA tebal = 15 cm m³ 245.47 0.471 136.064 0.261 - - 136.064 0.261 109.41 0.210
5 Pek. Prime coat 2,5 kg/m2 m² 1,636.49 0.340 945.840 0.197 - - 945.840 0.197 690.65 0.144
6 Pek. Aspal AC-BC tebal = 7 cm Ton 269.20 1.947 - - - - - - 269.20 1.947
7 Pek. Coating 0.75 kg/m2 m² 1,636.49 0.124 - - - - - - 1,636.49 0.124
8 Pek. Aspal AC-WC tebal = 6 cm Ton 230.75 1.831 - - - - - - 230.75 1.831
VI. PEK. PELEBARAN PAVED SHOULDER TAXIWAY HOTEL 36.553 0.311 0.602 0.913 35.640
1 Pek. Galian Tanah m³ 287.13 0.067 145.901 0.034 51.660 0.012 197.560 0.046 89.57 0.021
2 Pek. Pemadatan m² 598.18 0.021 401.139 0.014 146.760 0.005 547.899 0.019 50.28 0.002
3 Pek. Sirtu tebal = 20 cm m³ 119.64 0.182 33.582 0.051 10.567 0.016 44.149 0.067 75.49 0.115
4 Pek. LPA tebal = 15 cm m³ 89.73 0.172 60.171 0.116 22.014 0.042 82.185 0.158 7.55 0.014
5 Pek. Prime coat 2,5 kg/m2 m² 598.18 0.124 460.740 0.096 146.760 0.029 598.180 0.124 - -
6 Pek. Aspal AC-BC tebal = 7 cm Ton 98.40 0.712 - - 68.800 0.498 68.800 0.498 29.60 0.214
7 Pek. Coating 0.75 kg/m2 m² 598.18 0.045 - - - - - - 598.18 0.045
8 Pek. Aspal AC-WC tebal = 6 cm Ton 84.34 0.669 - - - - - - 84.34 0.669
VIII PEK. PELEBARAN PAVED SHOULDER TAXIWAY SHOUTHPARALEL 2.294 0.621 - 0.621 1.673
1 Pek. Galian Tanah m³ 330.43 0.077 314.381 0.073 - - 314.381 0.073 16.05 0.004
2 Pek. Pemadatan m² 688.40 0.024 654.960 0.023 - - 654.960 0.023 33.44 0.001
3 Pek. Sirtu tebal = 20 cm m³ 137.68 0.210 130.992 0.200 - - 130.992 0.200 6.69 0.010
4 Pek. LPA tebal = 15 cm m³ 103.26 0.198 98.244 0.189 - - 98.244 0.189 5.02 0.010
5 Pek. Prime coat 2,5 kg/m2 m² 688.40 0.143 654.960 0.136 - - 654.960 0.136 33.44 0.007
6 Pek. Aspal AC-BC tebal = 7 cm Ton 113.24 0.819 - - - - - - 113.24 0.819
7 Pek. Coating 0.75 kg/m2 m² 688.40 0.052 - - - - - - 688.40 0.052
8 Pek. Aspal AC-WC tebal = 6 cm Ton 97.06 0.770 - - - - - - 97.06 0.770
IX PEK. PELEBARAN PAVED SHOULDER TAXIWAY WESTPARALEL 34.809 4.881 0.264 5.145 29.664
1 Pek. Galian Tanah m³ 5,013.08 1.169 2,448.679 0.571 128.848 0.030 2,577.527 0.601 2,435.55 0.568
2 Pek. Pemadatan m² 10,443.92 0.367 5,708.095 0.201 360.920 0.013 6,069.015 0.213 4,374.91 0.154
3 Pek. Sirtu tebal = 20 cm m³ 2,088.78 3.186 909.698 1.388 27.791 0.042 937.489 1.430 1,151.29 1.756
4 Pek. LPA tebal = 15 cm m³ 1,566.59 3.009 796.928 1.531 54.138 0.104 851.066 1.635 715.52 1.374
5 Pek. Prime coat 2,5 kg/m2 m² 10,443.92 2.173 5,725.695 1.191 360.920 0.075 6,086.615 1.266 4,357.31 0.906
6 Pek. Aspal AC-BC tebal = 7 cm Ton 1,718.02 12.428 - - - - - - 1,718.02 12.428
7 Pek. Coating 0.75 kg/m2 m² 10,443.92 0.792 - - - - - - 10,443.92 0.792
8 Pek. Aspal AC-WC tebal = 6 cm Ton 1,472.59 11.686 - - - - - - 1,472.59 11.686
MUH. ISHAK
Nip : 19770806 200901 1 010 ABD. RAHMAN, ST Ir. ISBUDIANTO SOENARTO
Site Engineer General Superintendent
PROGRESS MINGGUAN
Pekerjaan : PELEBARAN PAVED SHOULDER TAXIWAY MINGGU KE
DI BANDAR UDARA SULTAN HASANUDDIN MAKASSAR
13
Penyedia Pekerjaan Konstruksi : PT. GENYTOV FAJAR Penyedia Jasa Konsultasi : PT. WIRA MARGA
Nomor Kontrak : AP. I. 25/SPP/HK. 06. 01/2015/GM. UPG Nomor Kontrak : AP. I. 23/SPP/HK. 06. 01/2015/GM. UPG PERIODE TANGGAL
Tanggal Kontrak : 10 SEPTEMBER 2015 Tanggal Kontrak : 10 SEPTEMBER 2015 30 NOP S/D 06 DES
KONTRAK PROGRESS
No. SISA PEKERJAAN
URAIAN PEKERJAAN SATUAN BOBOT Minggu Lalu Minggu Ini s/d Minggu Ini
VOLUME
ITEM (%) Volume Bobot (%) Volume Bobot (%) Volume Bobot (%) Volume Bobot (%)
II. PEK. PELEBARAN PAVED SHOULDER & FILLET TAXIWAY DELTA 5.454 1.214 - 1.214 4.240
1 Pek. Galian Tanah m³ 785.52 0.183 603.497 0.141 - - 603.497 0.141 182.02 0.042
2 Pek. Pemadatan m² 1,636.49 0.058 1,472.075 0.052 - - 1,472.075 0.052 164.42 0.006
3 Pek. Sirtu tebal = 20 cm m³ 327.30 0.499 191.831 0.293 - - 191.831 0.293 135.47 0.207
4 Pek. LPA tebal = 15 cm m³ 245.47 0.471 220.296 0.423 - - 220.296 0.423 25.17 0.048
5 Pek. Prime coat 2,5 kg/m2 m² 1,636.49 0.340 1,472.075 0.306 - - 1,472.075 0.306 164.42 0.034
6 Pek. Aspal AC-BC tebal = 7 cm Ton 269.20 1.947 - - - - - - 269.20 1.947
7 Pek. Coating 0.75 kg/m2 m² 1,636.49 0.124 - - - - - - 1,636.49 0.124
8 Pek. Aspal AC-WC tebal = 6 cm Ton 230.75 1.831 - - - - - - 230.75 1.831
III. PEK. PELEBARAN PAVED SHOULDER TAXIWAY ECHO 4.195 0.400 - 0.400 3.795
1 Pek. Galian Tanah m³ 604.08 0.141 195.621 0.046 - - 195.621 0.046 408.46 0.095
2 Pek. Pemadatan m² 1,258.50 0.044 532.715 0.019 - - 532.715 0.019 725.79 0.026
3 Pek. Sirtu tebal = 20 cm m³ 251.70 0.384 46.461 0.071 - - 46.461 0.071 205.24 0.313
4 Pek. LPA tebal = 15 cm m³ 188.78 0.363 79.907 0.153 - - 79.907 0.153 108.87 0.209
5 Pek. Prime coat 2,5 kg/m2 m² 1,258.50 0.262 532.715 0.111 - - 532.715 0.111 725.79 0.151
6 Pek. Aspal AC-BC tebal = 7 cm Ton 207.02 1.498 - - - - - - 207.02 1.498
7 Pek. Coating 0.75 kg/m2 m² 1,258.50 0.095 - - - - - - 1,258.50 0.095
8 Pek. Aspal AC-WC tebal = 6 cm Ton 177.45 1.408 - - - - - - 177.45 1.408
IV. PEK. PELEBARAN PAVED SHOULDER TAXIWAY FOXTROT 4.235 0.278 - 0.278 3.957
1 Pek. Galian Tanah m³ 609.89 0.142 136.608 0.032 - - 136.608 0.032 473.28 0.110
2 Pek. Pemadatan m² 1,270.60 0.045 363.320 0.013 - - 363.320 0.013 907.28 0.032
3 Pek. Sirtu tebal = 20 cm m³ 254.12 0.388 34.879 0.053 - - 34.879 0.053 219.24 0.334
4 Pek. LPA tebal = 15 cm m³ 190.59 0.366 54.498 0.105 - - 54.498 0.105 136.09 0.261
5 Pek. Prime coat 2,5 kg/m2 m² 1,270.60 0.264 363.320 0.076 - - 363.320 0.076 907.28 0.189
6 Pek. Aspal AC-BC tebal = 7 cm Ton 209.01 1.512 - - - - - - 209.01 1.512
7 Pek. Coating 0.75 kg/m2 m² 1,270.60 0.096 - - - - - - 1,270.60 0.096
8 Pek. Aspal AC-WC tebal = 6 cm Ton 179.15 1.422 - - - - - - 179.15 1.422
KONTRAK PROGRESS
No. SISA PEKERJAAN
URAIAN PEKERJAAN SATUAN BOBOT Minggu Lalu Minggu Ini s/d Minggu Ini
VOLUME
ITEM (%) Volume Bobot (%) Volume Bobot (%) Volume Bobot (%) Volume Bobot (%)
V. PEK. PELEBARAN PAVED SHOULDER & FILLET TAXIWAY GOLF 5.454 0.736 - 0.736 4.718
1 Pek. Galian Tanah m³ 785.52 0.183 360.410 0.084 - - 360.410 0.084 425.11 0.099
2 Pek. Pemadatan m² 1,636.49 0.058 907.095 0.032 - - 907.095 0.032 729.40 0.026
3 Pek. Sirtu tebal = 20 cm m³ 327.30 0.499 106.423 0.162 - - 106.423 0.162 220.88 0.337
4 Pek. LPA tebal = 15 cm m³ 245.47 0.471 136.064 0.261 - - 136.064 0.261 109.41 0.210
5 Pek. Prime coat 2,5 kg/m2 m² 1,636.49 0.340 945.840 0.197 - - 945.840 0.197 690.65 0.144
6 Pek. Aspal AC-BC tebal = 7 cm Ton 269.20 1.947 - - - - - - 269.20 1.947
7 Pek. Coating 0.75 kg/m2 m² 1,636.49 0.124 - - - - - - 1,636.49 0.124
8 Pek. Aspal AC-WC tebal = 6 cm Ton 230.75 1.831 - - - - - - 230.75 1.831
VI. PEK. PELEBARAN PAVED SHOULDER TAXIWAY HOTEL 36.553 0.913 - 0.913 35.640
1 Pek. Galian Tanah m³ 287.13 0.067 197.560 0.046 - - 197.560 0.046 89.57 0.021
2 Pek. Pemadatan m² 598.18 0.021 547.899 0.019 - - 547.899 0.019 50.28 0.002
3 Pek. Sirtu tebal = 20 cm m³ 119.64 0.182 44.149 0.067 - - 44.149 0.067 75.49 0.115
4 Pek. LPA tebal = 15 cm m³ 89.73 0.172 82.185 0.158 - - 82.185 0.158 7.55 0.014
5 Pek. Prime coat 2,5 kg/m2 m² 598.18 0.124 598.180 0.124 - - 598.180 0.124 - -
6 Pek. Aspal AC-BC tebal = 7 cm Ton 98.40 0.712 68.800 0.498 - - 68.800 0.498 29.60 0.214
7 Pek. Coating 0.75 kg/m2 m² 598.18 0.045 - - - - - - 598.18 0.045
8 Pek. Aspal AC-WC tebal = 6 cm Ton 84.34 0.669 - - - - - - 84.34 0.669
VIII PEK. PELEBARAN PAVED SHOULDER TAXIWAY SHOUTHPARALEL 2.294 0.621 0.591 1.212 1.082
1 Pek. Galian Tanah m³ 330.43 0.077 314.381 0.073 - - 314.381 0.073 16.05 0.004
2 Pek. Pemadatan m² 688.40 0.024 654.960 0.023 - - 654.960 0.023 33.44 0.001
3 Pek. Sirtu tebal = 20 cm m³ 137.68 0.210 130.992 0.200 - - 130.992 0.200 6.69 0.010
4 Pek. LPA tebal = 15 cm m³ 103.26 0.198 98.244 0.189 - - 98.244 0.189 5.02 0.010
5 Pek. Prime coat 2,5 kg/m2 m² 688.40 0.143 654.960 0.136 - - 654.960 0.136 33.44 0.007
6 Pek. Aspal AC-BC tebal = 7 cm Ton 113.24 0.819 - - 81.719 0.591 81.719 0.591 31.52 0.228
7 Pek. Coating 0.75 kg/m2 m² 688.40 0.052 - - - - - - 688.40 0.052
8 Pek. Aspal AC-WC tebal = 6 cm Ton 97.06 0.770 - - - - - - 97.06 0.770
IX PEK. PELEBARAN PAVED SHOULDER TAXIWAY WESTPARALEL 34.809 5.145 1.731 6.877 27.933
1 Pek. Galian Tanah m³ 5,013.08 1.169 2,577.527 0.601 - - 2,577.527 0.601 2,435.55 0.568
2 Pek. Pemadatan m² 10,443.92 0.367 6,069.015 0.213 - - 6,069.015 0.213 4,374.91 0.154
3 Pek. Sirtu tebal = 20 cm m³ 2,088.78 3.186 937.489 1.430 - - 937.489 1.430 1,151.29 1.756
4 Pek. LPA tebal = 15 cm m³ 1,566.59 3.009 851.066 1.635 - - 851.066 1.635 715.52 1.374
5 Pek. Prime coat 2,5 kg/m2 m² 10,443.92 2.173 6,086.615 1.266 - - 6,086.615 1.266 4,357.31 0.906
6 Pek. Aspal AC-BC tebal = 7 cm Ton 1,718.02 12.428 - - 239.333 1.731 239.333 1.731 1,478.69 10.697
7 Pek. Coating 0.75 kg/m2 m² 10,443.92 0.792 - - - - - - 10,443.92 0.792
8 Pek. Aspal AC-WC tebal = 6 cm Ton 1,472.59 11.686 - - - - - - 1,472.59 11.686
MUH. ISHAK
Nip : 19770806 200901 1 010 ABD. RAHMAN, ST Ir. ISBUDIANTO SOENARTO
Site Engineer General Superintendent
PROGRESS MINGGUAN
Pekerjaan : PELEBARAN PAVED SHOULDER TAXIWAY MINGGU KE
DI BANDAR UDARA SULTAN HASANUDDIN MAKASSAR
14
Penyedia Pekerjaan Konstruksi : PT. GENYTOV FAJAR Penyedia Jasa Konsultasi : PT. WIRA MARGA
Nomor Kontrak : AP. I. 25/SPP/HK. 06. 01/2015/GM. UPG Nomor Kontrak : AP. I. 23/SPP/HK. 06. 01/2015/GM. UPG PERIODE TANGGAL
Tanggal Kontrak : 10 SEPTEMBER 2015 Tanggal Kontrak : 10 SEPTEMBER 2015 07 DES S/D 13 DES
KONTRAK PROGRESS
No. SISA PEKERJAAN
URAIAN PEKERJAAN SATUAN BOBOT Minggu Lalu Minggu Ini s/d Minggu Ini
VOLUME
ITEM (%) Volume Bobot (%) Volume Bobot (%) Volume Bobot (%) Volume Bobot (%)
II. PEK. PELEBARAN PAVED SHOULDER & FILLET TAXIWAY DELTA 5.454 1.214 0.116 1.330 4.124
1 Pek. Galian Tanah m³ 785.52 0.183 603.497 0.141 - - 603.497 0.141 182.02 0.042
2 Pek. Pemadatan m² 1,636.49 0.058 1,472.075 0.052 - - 1,472.075 0.052 164.42 0.006
3 Pek. Sirtu tebal = 20 cm m³ 327.30 0.499 191.831 0.293 - - 191.831 0.293 135.47 0.207
4 Pek. LPA tebal = 15 cm m³ 245.47 0.471 220.296 0.423 - - 220.296 0.423 25.17 0.048
5 Pek. Prime coat 2,5 kg/m2 m² 1,636.49 0.340 1,472.075 0.306 - - 1,472.075 0.306 164.42 0.034
6 Pek. Aspal AC-BC tebal = 7 cm Ton 269.20 1.947 - - 16.000 0.116 16.000 0.116 253.20 1.832
7 Pek. Coating 0.75 kg/m2 m² 1,636.49 0.124 - - - - - - 1,636.49 0.124
8 Pek. Aspal AC-WC tebal = 6 cm Ton 230.75 1.831 - - - - - - 230.75 1.831
III. PEK. PELEBARAN PAVED SHOULDER TAXIWAY ECHO 4.195 0.400 - 0.400 3.795
1 Pek. Galian Tanah m³ 604.08 0.141 195.621 0.046 - - 195.621 0.046 408.46 0.095
2 Pek. Pemadatan m² 1,258.50 0.044 532.715 0.019 - - 532.715 0.019 725.79 0.026
3 Pek. Sirtu tebal = 20 cm m³ 251.70 0.384 46.461 0.071 - - 46.461 0.071 205.24 0.313
4 Pek. LPA tebal = 15 cm m³ 188.78 0.363 79.907 0.153 - - 79.907 0.153 108.87 0.209
5 Pek. Prime coat 2,5 kg/m2 m² 1,258.50 0.262 532.715 0.111 - - 532.715 0.111 725.79 0.151
6 Pek. Aspal AC-BC tebal = 7 cm Ton 207.02 1.498 - - - - - - 207.02 1.498
7 Pek. Coating 0.75 kg/m2 m² 1,258.50 0.095 - - - - - - 1,258.50 0.095
8 Pek. Aspal AC-WC tebal = 6 cm Ton 177.45 1.408 - - - - - - 177.45 1.408
IV. PEK. PELEBARAN PAVED SHOULDER TAXIWAY FOXTROT 4.235 0.278 - 0.278 3.957
1 Pek. Galian Tanah m³ 609.89 0.142 136.608 0.032 - - 136.608 0.032 473.28 0.110
2 Pek. Pemadatan m² 1,270.60 0.045 363.320 0.013 - - 363.320 0.013 907.28 0.032
3 Pek. Sirtu tebal = 20 cm m³ 254.12 0.388 34.879 0.053 - - 34.879 0.053 219.24 0.334
4 Pek. LPA tebal = 15 cm m³ 190.59 0.366 54.498 0.105 - - 54.498 0.105 136.09 0.261
5 Pek. Prime coat 2,5 kg/m2 m² 1,270.60 0.264 363.320 0.076 - - 363.320 0.076 907.28 0.189
6 Pek. Aspal AC-BC tebal = 7 cm Ton 209.01 1.512 - - - - - - 209.01 1.512
7 Pek. Coating 0.75 kg/m2 m² 1,270.60 0.096 - - - - - - 1,270.60 0.096
8 Pek. Aspal AC-WC tebal = 6 cm Ton 179.15 1.422 - - - - - - 179.15 1.422
KONTRAK PROGRESS
No. SISA PEKERJAAN
URAIAN PEKERJAAN SATUAN BOBOT Minggu Lalu Minggu Ini s/d Minggu Ini
VOLUME
ITEM (%) Volume Bobot (%) Volume Bobot (%) Volume Bobot (%) Volume Bobot (%)
V. PEK. PELEBARAN PAVED SHOULDER & FILLET TAXIWAY GOLF 5.454 0.736 - 0.736 4.718
1 Pek. Galian Tanah m³ 785.52 0.183 360.410 0.084 - - 360.410 0.084 425.11 0.099
2 Pek. Pemadatan m² 1,636.49 0.058 907.095 0.032 - - 907.095 0.032 729.40 0.026
3 Pek. Sirtu tebal = 20 cm m³ 327.30 0.499 106.423 0.162 - - 106.423 0.162 220.88 0.337
4 Pek. LPA tebal = 15 cm m³ 245.47 0.471 136.064 0.261 - - 136.064 0.261 109.41 0.210
5 Pek. Prime coat 2,5 kg/m2 m² 1,636.49 0.340 945.840 0.197 - - 945.840 0.197 690.65 0.144
6 Pek. Aspal AC-BC tebal = 7 cm Ton 269.20 1.947 - - - - - - 269.20 1.947
7 Pek. Coating 0.75 kg/m2 m² 1,636.49 0.124 - - - - - - 1,636.49 0.124
8 Pek. Aspal AC-WC tebal = 6 cm Ton 230.75 1.831 - - - - - - 230.75 1.831
VI. PEK. PELEBARAN PAVED SHOULDER TAXIWAY HOTEL 36.553 0.913 - 0.913 35.640
1 Pek. Galian Tanah m³ 287.13 0.067 197.560 0.046 - - 197.560 0.046 89.57 0.021
2 Pek. Pemadatan m² 598.18 0.021 547.899 0.019 - - 547.899 0.019 50.28 0.002
3 Pek. Sirtu tebal = 20 cm m³ 119.64 0.182 44.149 0.067 - - 44.149 0.067 75.49 0.115
4 Pek. LPA tebal = 15 cm m³ 89.73 0.172 82.185 0.158 - - 82.185 0.158 7.55 0.014
5 Pek. Prime coat 2,5 kg/m2 m² 598.18 0.124 598.180 0.124 - - 598.180 0.124 - -
6 Pek. Aspal AC-BC tebal = 7 cm Ton 98.40 0.712 68.800 0.498 - - 68.800 0.498 29.60 0.214
7 Pek. Coating 0.75 kg/m2 m² 598.18 0.045 - - - - - - 598.18 0.045
8 Pek. Aspal AC-WC tebal = 6 cm Ton 84.34 0.669 - - - - - - 84.34 0.669
VIII PEK. PELEBARAN PAVED SHOULDER TAXIWAY SHOUTHPARALEL 2.294 1.212 - 1.212 1.082
1 Pek. Galian Tanah m³ 330.43 0.077 314.381 0.073 - - 314.381 0.073 16.05 0.004
2 Pek. Pemadatan m² 688.40 0.024 654.960 0.023 - - 654.960 0.023 33.44 0.001
3 Pek. Sirtu tebal = 20 cm m³ 137.68 0.210 130.992 0.200 - - 130.992 0.200 6.69 0.010
4 Pek. LPA tebal = 15 cm m³ 103.26 0.198 98.244 0.189 - - 98.244 0.189 5.02 0.010
5 Pek. Prime coat 2,5 kg/m2 m² 688.40 0.143 654.960 0.136 - - 654.960 0.136 33.44 0.007
6 Pek. Aspal AC-BC tebal = 7 cm Ton 113.24 0.819 81.719 0.591 - - 81.719 0.591 31.52 0.228
7 Pek. Coating 0.75 kg/m2 m² 688.40 0.052 - - - - - - 688.40 0.052
8 Pek. Aspal AC-WC tebal = 6 cm Ton 97.06 0.770 - - - - - - 97.06 0.770
IX PEK. PELEBARAN PAVED SHOULDER TAXIWAY WESTPARALEL 34.809 6.877 1.181 8.058 26.752
1 Pek. Galian Tanah m³ 5,013.08 1.169 2,577.527 0.601 - - 2,577.527 0.601 2,435.55 0.568
2 Pek. Pemadatan m² 10,443.92 0.367 6,069.015 0.213 - - 6,069.015 0.213 4,374.91 0.154
3 Pek. Sirtu tebal = 20 cm m³ 2,088.78 3.186 937.489 1.430 - - 937.489 1.430 1,151.29 1.756
4 Pek. LPA tebal = 15 cm m³ 1,566.59 3.009 851.066 1.635 - - 851.066 1.635 715.52 1.374
5 Pek. Prime coat 2,5 kg/m2 m² 10,443.92 2.173 6,086.615 1.266 - - 6,086.615 1.266 4,357.31 0.906
6 Pek. Aspal AC-BC tebal = 7 cm Ton 1,718.02 12.428 239.333 1.731 163.260 1.181 402.593 2.912 1,315.43 9.516
7 Pek. Coating 0.75 kg/m2 m² 10,443.92 0.792 - - - - - - 10,443.92 0.792
8 Pek. Aspal AC-WC tebal = 6 cm Ton 1,472.59 11.686 - - - - - - 1,472.59 11.686
MUH. ISHAK
Nip : 19770806 200901 1 010 ABD. RAHMAN, ST Ir. ISBUDIANTO SOENARTO
Site Engineer General Superintendent
PROGRESS MINGGUAN
Pekerjaan : PELEBARAN PAVED SHOULDER TAXIWAY MINGGU KE
DI BANDAR UDARA SULTAN HASANUDDIN MAKASSAR
15
Penyedia Pekerjaan Konstruksi : PT. GENYTOV FAJAR Penyedia Jasa Konsultasi : PT. WIRA MARGA
Nomor Kontrak : AP. I. 25/SPP/HK. 06. 01/2015/GM. UPG Nomor Kontrak : AP. I. 23/SPP/HK. 06. 01/2015/GM. UPG PERIODE TANGGAL
Tanggal Kontrak : 10 SEPTEMBER 2015 Tanggal Kontrak : 10 SEPTEMBER 2015 14 DES S/D 20 DES
KONTRAK PROGRESS
No. SISA PEKERJAAN
URAIAN PEKERJAAN SATUAN BOBOT Minggu Lalu Minggu Ini s/d Minggu Ini
VOLUME
ITEM (%) Volume Bobot (%) Volume Bobot (%) Volume Bobot (%) Volume Bobot (%)
II. PEK. PELEBARAN PAVED SHOULDER & FILLET TAXIWAY DELTA 5.454 1.330 0.231 1.562 3.893
1 Pek. Galian Tanah m³ 785.52 0.183 603.497 0.141 - - 603.497 0.141 182.02 0.042
2 Pek. Pemadatan m² 1,636.49 0.058 1,472.075 0.052 - - 1,472.075 0.052 164.42 0.006
3 Pek. Sirtu tebal = 20 cm m³ 327.30 0.499 191.831 0.293 - - 191.831 0.293 135.47 0.207
4 Pek. LPA tebal = 15 cm m³ 245.47 0.471 220.296 0.423 - - 220.296 0.423 25.17 0.048
5 Pek. Prime coat 2,5 kg/m2 m² 1,636.49 0.340 1,472.075 0.306 - - 1,472.075 0.306 164.42 0.034
6 Pek. Aspal AC-BC tebal = 7 cm Ton 269.20 1.947 16.000 0.116 32.000 0.231 48.000 0.347 221.20 1.600
7 Pek. Coating 0.75 kg/m2 m² 1,636.49 0.124 - - - - - - 1,636.49 0.124
8 Pek. Aspal AC-WC tebal = 6 cm Ton 230.75 1.831 - - - - - - 230.75 1.831
III. PEK. PELEBARAN PAVED SHOULDER TAXIWAY ECHO 4.195 0.400 - 0.400 3.795
1 Pek. Galian Tanah m³ 604.08 0.141 195.621 0.046 - - 195.621 0.046 408.46 0.095
2 Pek. Pemadatan m² 1,258.50 0.044 532.715 0.019 - - 532.715 0.019 725.79 0.026
3 Pek. Sirtu tebal = 20 cm m³ 251.70 0.384 46.461 0.071 - - 46.461 0.071 205.24 0.313
4 Pek. LPA tebal = 15 cm m³ 188.78 0.363 79.907 0.153 - - 79.907 0.153 108.87 0.209
5 Pek. Prime coat 2,5 kg/m2 m² 1,258.50 0.262 532.715 0.111 - - 532.715 0.111 725.79 0.151
6 Pek. Aspal AC-BC tebal = 7 cm Ton 207.02 1.498 - - - - - - 207.02 1.498
7 Pek. Coating 0.75 kg/m2 m² 1,258.50 0.095 - - - - - - 1,258.50 0.095
8 Pek. Aspal AC-WC tebal = 6 cm Ton 177.45 1.408 - - - - - - 177.45 1.408
IV. PEK. PELEBARAN PAVED SHOULDER TAXIWAY FOXTROT 4.235 0.278 - 0.278 3.957
1 Pek. Galian Tanah m³ 609.89 0.142 136.608 0.032 - - 136.608 0.032 473.28 0.110
2 Pek. Pemadatan m² 1,270.60 0.045 363.320 0.013 - - 363.320 0.013 907.28 0.032
3 Pek. Sirtu tebal = 20 cm m³ 254.12 0.388 34.879 0.053 - - 34.879 0.053 219.24 0.334
4 Pek. LPA tebal = 15 cm m³ 190.59 0.366 54.498 0.105 - - 54.498 0.105 136.09 0.261
5 Pek. Prime coat 2,5 kg/m2 m² 1,270.60 0.264 363.320 0.076 - - 363.320 0.076 907.28 0.189
6 Pek. Aspal AC-BC tebal = 7 cm Ton 209.01 1.512 - - - - - - 209.01 1.512
7 Pek. Coating 0.75 kg/m2 m² 1,270.60 0.096 - - - - - - 1,270.60 0.096
8 Pek. Aspal AC-WC tebal = 6 cm Ton 179.15 1.422 - - - - - - 179.15 1.422
KONTRAK PROGRESS
No. SISA PEKERJAAN
URAIAN PEKERJAAN SATUAN BOBOT Minggu Lalu Minggu Ini s/d Minggu Ini
VOLUME
ITEM (%) Volume Bobot (%) Volume Bobot (%) Volume Bobot (%) Volume Bobot (%)
V. PEK. PELEBARAN PAVED SHOULDER & FILLET TAXIWAY GOLF 5.454 0.736 - 0.736 4.718
1 Pek. Galian Tanah m³ 785.52 0.183 360.410 0.084 - - 360.410 0.084 425.11 0.099
2 Pek. Pemadatan m² 1,636.49 0.058 907.095 0.032 - - 907.095 0.032 729.40 0.026
3 Pek. Sirtu tebal = 20 cm m³ 327.30 0.499 106.423 0.162 - - 106.423 0.162 220.88 0.337
4 Pek. LPA tebal = 15 cm m³ 245.47 0.471 136.064 0.261 - - 136.064 0.261 109.41 0.210
5 Pek. Prime coat 2,5 kg/m2 m² 1,636.49 0.340 945.840 0.197 - - 945.840 0.197 690.65 0.144
6 Pek. Aspal AC-BC tebal = 7 cm Ton 269.20 1.947 - - - - - - 269.20 1.947
7 Pek. Coating 0.75 kg/m2 m² 1,636.49 0.124 - - - - - - 1,636.49 0.124
8 Pek. Aspal AC-WC tebal = 6 cm Ton 230.75 1.831 - - - - - - 230.75 1.831
VI. PEK. PELEBARAN PAVED SHOULDER TAXIWAY HOTEL 36.553 0.913 - 0.913 35.640
1 Pek. Galian Tanah m³ 287.13 0.067 197.560 0.046 - - 197.560 0.046 89.57 0.021
2 Pek. Pemadatan m² 598.18 0.021 547.899 0.019 - - 547.899 0.019 50.28 0.002
3 Pek. Sirtu tebal = 20 cm m³ 119.64 0.182 44.149 0.067 - - 44.149 0.067 75.49 0.115
4 Pek. LPA tebal = 15 cm m³ 89.73 0.172 82.185 0.158 - - 82.185 0.158 7.55 0.014
5 Pek. Prime coat 2,5 kg/m2 m² 598.18 0.124 598.180 0.124 - - 598.180 0.124 - -
6 Pek. Aspal AC-BC tebal = 7 cm Ton 98.40 0.712 68.800 0.498 - - 68.800 0.498 29.60 0.214
7 Pek. Coating 0.75 kg/m2 m² 598.18 0.045 - - - - - - 598.18 0.045
8 Pek. Aspal AC-WC tebal = 6 cm Ton 84.34 0.669 - - - - - - 84.34 0.669
VIII PEK. PELEBARAN PAVED SHOULDER TAXIWAY SHOUTHPARALEL 2.294 1.212 - 1.212 1.082
1 Pek. Galian Tanah m³ 330.43 0.077 314.381 0.073 - - 314.381 0.073 16.05 0.004
2 Pek. Pemadatan m² 688.40 0.024 654.960 0.023 - - 654.960 0.023 33.44 0.001
3 Pek. Sirtu tebal = 20 cm m³ 137.68 0.210 130.992 0.200 - - 130.992 0.200 6.69 0.010
4 Pek. LPA tebal = 15 cm m³ 103.26 0.198 98.244 0.189 - - 98.244 0.189 5.02 0.010
5 Pek. Prime coat 2,5 kg/m2 m² 688.40 0.143 654.960 0.136 - - 654.960 0.136 33.44 0.007
6 Pek. Aspal AC-BC tebal = 7 cm Ton 113.24 0.819 81.719 0.591 - - 81.719 0.591 31.52 0.228
7 Pek. Coating 0.75 kg/m2 m² 688.40 0.052 - - - - - - 688.40 0.052
8 Pek. Aspal AC-WC tebal = 6 cm Ton 97.06 0.770 - - - - - - 97.06 0.770
IX PEK. PELEBARAN PAVED SHOULDER TAXIWAY WESTPARALEL 34.809 8.058 - 8.058 26.752
1 Pek. Galian Tanah m³ 5,013.08 1.169 2,577.527 0.601 - - 2,577.527 0.601 2,435.55 0.568
2 Pek. Pemadatan m² 10,443.92 0.367 6,069.015 0.213 - - 6,069.015 0.213 4,374.91 0.154
3 Pek. Sirtu tebal = 20 cm m³ 2,088.78 3.186 937.489 1.430 - - 937.489 1.430 1,151.29 1.756
4 Pek. LPA tebal = 15 cm m³ 1,566.59 3.009 851.066 1.635 - - 851.066 1.635 715.52 1.374
5 Pek. Prime coat 2,5 kg/m2 m² 10,443.92 2.173 6,086.615 1.266 - - 6,086.615 1.266 4,357.31 0.906
6 Pek. Aspal AC-BC tebal = 7 cm Ton 1,718.02 12.428 402.593 2.912 - - 402.593 2.912 1,315.43 9.516
7 Pek. Coating 0.75 kg/m2 m² 10,443.92 0.792 - - - - - - 10,443.92 0.792
8 Pek. Aspal AC-WC tebal = 6 cm Ton 1,472.59 11.686 - - - - - - 1,472.59 11.686
MUH. ISHAK
Nip : 19770806 200901 1 010 ABD. RAHMAN, ST Ir. ISBUDIANTO SOENARTO
Site Engineer General Superintendent
TIME SCHEDULE
Err:509
Err:509
RUAS ###
PENYEDIA PEKERJAAN KONSTRUKSI ### PENYEDIA JASA KONSULTAN #REF!
NOMOR KONTRAK ### NOMOR KONTRAK :
TANGGAL KONTRAK ### TANGGAL KONTRAK :
1 UMUM
1.2 #REF! Err:509 Err:509 Err:509 Err:509 Err:509 RENC. Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
REAL. 0.20 0.20
2 DRAINASE
#REF! #REF! Err:509 Err:509 Err:509 Err:509 Err:509 RENC. 0.50 0.80 1.00 1.20 1.30 1.40 1.00 0.31
REAL.
3 PEKERJAAN TANAH
#REF! #REF! Ton 230.75 1,428,004.00 329,511,923.00 Err:509 RENC. Err:509 Err:509 Err:509 Err:509
REAL.
#REF! #REF! - - - - Err:509 RENC. Err:509 Err:509
REAL.
#REF! #REF! Err:509 Err:509 Err:509 Err:509 Err:509 RENC. Err:509 Err:509 Err:509 Err:509
REAL.
#REF! #REF! Err:509 Err:509 Err:509 Err:509 Err:509 RENC. Err:509 Err:509 Err:509 Err:509
REAL.
6 PERKERASAN ASPAL
#REF! #REF! Err:509 Err:509 Err:509 Err:509 Err:509 RENC. Err:509 Err:509
REAL.
#REF! #REF! Err:509 Err:509 Err:509 Err:509 Err:509 RENC. 0.10 0.18 0.20 0.20 0.21 0.21 0.20 0.09
REAL.
#REF! #REF! Err:509 Err:509 Err:509 Err:509 Err:509 RENC. 1.00 3.50 4.00 4.00 5.00 5.00 4.00 1.66
REAL.
#REF! #REF! Err:509 Err:509 Err:509 Err:509 Err:509 RENC. 0.50 0.70 0.24
REAL.
7 STRUKTUR
#REF! #REF! Err:509 Err:509 Err:509 Err:509 Err:509 RENC. Err:509 Err:509
REAL.
#REF! #REF! Err:509 Err:509 Err:509 Err:509 - RENC.
REAL.
#REF! #REF! Err:509 Err:509 Err:509 Err:509 Err:509 RENC. Err:509 Err:509
REAL.
#REF! #REF! Err:509 Err:509 Err:509 Err:509 Err:509 RENC. Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
REAL.
#REF! #REF! Err:509 Err:509 Err:509 Err:509 Err:509 RENC. 2.00 2.00 2.00 2.00 3.00 4.50 4.50 4.60 3.75 3.00 2.00 1.89
REAL.
RENCANA KEMAJUAN MINGGUAN Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
KUMULATIF KEMAJUAN MINGGUAN - - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
DEVIASI Err:509
KET
BREAKDOWN OF THE LUMP SUM PRICE FOR LABORATORY EQUIPMENT
PERIOD : #REF!
CONTRACTOR : PT.WASKITA KARYA - PT.BRANTAS ABIPRAYA. JO
ITEM NUMBER : 1.2
DESCRIPTION OF WORK : Mobilization and Demobilization
UNIT OF WORK : Lump Sum
Quantity Work Progress Volume (%) Work Progress Weight (%)
Weight
No. Description Unit Qty Up to Up to Up to Up to Up to Up to
This Week This Week This Week
% Last Week This Week Last Week This Week Last Week This Week
I. EARTH EQUIPMENT
3 SO-400 SAND CONE TEST SET set 1 4.902 1.00 - 1.00 100.00% 0.00% 100.00% 4.902 - 4.902
ASTM D-1556 / AASHTO T-191
Consist of :
SO-401 Sand Cone Bottle pc 1
Plastic, 4 ltr. cap. approx.
SO-402 Sand Cone Funnel pc 1
Seamless metal, turning stopper,
6 1/2" dia bottom, 1/2 neck dia.
SO-403 Base Plate pc 1
Cast alumunium, 12" x 12".
SO-404 Graduated Sand zak 1
Uncemented sand, passing # 10,
retained # 60, 25 kg capacity.
GE-380 Sample Can pcs 6
Round can, tinned metal.
GE-801 Scoop pc 1
Cast alumunium.
GE-861 Spoon pc 1
Stainless steel.
GE-871 Trowel pc 1
Pointed type.
GE-880 Chisel pc 1
Hardened type.
GE-900 Rubber Mallet pc 1
Wooden handle, 0,5 kg weigth
4 SO-350 COMPACTION TEST SET set 1 14.458 1.00 - 1.00 100.00% 0.00% 100.00% 14.458 - 14.458
ASTM D-698/D-1557
AASHTO T-99/T-280
Terdiri dari :
SO-351 Standard Proctor Mold, Machine steel, plated, pc 1 1.800 1.00 - 1.00 100.00% 0.00% 100.00% 1.800 - 1.800
4" i.d., 4.584" height, 2" height of collar.
SO-352 Modified Proctor Mold, Machine steel, plated, pc 1 2.116 1.00 - 1.00 100.00% 0.00% 100.00% 2.116 - 2.116
6" i.d., 4.584" height, 2" height of collar.
SO-353 Standard Proctor Hammer, Machine steel, plated, pc 1 1.068 1.00 - 1.00 100.00% 0.00% 100.00% 1.068 - 1.068
12" drop height, 5,5 lbs weight.
SO-354 Modified Proctor Hammer, Machine steel, plated, pc 1 1.346 1.00 - 1.00 100.00% 0.00% 100.00% 1.346 - 1.346
18" drop height, 10 lbs weight.
SO-355 Extruder, Steel frame, hydraulic jack. set 1 4.025 1.00 - 1.00 100.00% 0.00% 100.00% 4.025 - 4.025
GE-303 Square Pan, Galvanised steel 65 x 65 x 7.5 cm. pc 1 1.147 1.00 - 1.00 100.00% 0.00% 100.00% 1.147 - 1.147
GE-390 Thin Box, Alumunium, 60 gr capacity. pcs 12 0.417 12.00 - 12.00 100.00% 0.00% 100.00% 0.417 - 0.417
GE-405 A Graduated Cylinder, Plastic, 1000 ml cap. pc 1 1.721 1.00 - 1.00 100.00% 0.00% 100.00% 1.721 - 1.721
GE-801 Scoop, Cast Alumunium. pc 1 0.341 1.00 - 1.00 100.00% 0.00% 100.00% 0.341 - 0.341
GE-871 Trowel, Pointed type. pc 1 0.142 1.00 - 1.00 100.00% 0.00% 100.00% 0.142 - 0.142
GE-890 Straight Edge, 30 cm length. pc 1 0.123 1.00 - 1.00 100.00% 0.00% 100.00% 0.123 - 0.123
GE-900 Rubber Mallet, Wooden handle. pc 1 0.115 1.00 - 1.00 100.00% 0.00% 100.00% 0.115 - 0.115
GE-920 Steel Wire Brush, Wooden handle. pc 1 0.095 1.00 - 1.00 100.00% 0.00% 100.00% 0.095 - 0.095
5 SO-430 SPEEDY MOISTURE TESTER set 1 21.212 1.00 - 1.00 100.00% 0.00% 100.00% 21.212 - 21.212
AASHTO T-217
Consist of :
SO-432 Speedy Gauge pc 1
M/C range 0-20 %, sens. : 0.2 %,
sample weight 20 gr.
SO-434 Speedy Balance pc 1
Brass beam, Cast alumunium frame,
10 gr counter balance.
SO-435 Calcium Carbide can 1
Calcium Carbide.
SO-436 Measuring Spoon pc 1
Cast Alumunium.
SO-437 Crushing Ball pcs 2
Steel ball.
SO-438 Cleaning Brush pc 1
Wooden/plastic Holder.
SO-439 Carrying Case pc 1
Wooden case with handle.
7 SAMPLE SPLITTER
9 AG-610 SAND EQUIVALENT SHAKER HAND set 1 7.188 1.00 - 1.00 100.00% 0.00% 100.00% 7.188 - 7.188
OPERATED ASTM D-2419 / AASHTO T-176
To give greater uniformity action, hand operated
mounting bracket with cylinder holder, two spring
steel strapes, built in counter, wooden case,
Supplied without graduated cylinder.
Dimension (l x w x h) : 60 x 30 x 90 cm
10 AG-180 THICKNESS GAUGE BS-812 pc 1 1.185 1.00 - 1.00 100.00% 0.00% 100.00% 1.185 - 1.185
For determing the flakiness index of coarse
aggregate. Galvanized metal sheet, hole
size 100 x 33.9, 90 x 26.3, 80 x 19.7, 60 x 14.4,
50 x 10.2, 40 x 7.2, 30 x 4.9
GE-157 Heavy Duty Solution Balance set 1 51.055 1.00 - 1.00 100.00% 0.00% 100.00% 51.055 - 51.055
20 kg capacity, 1 gr sensitivity
suplied complete with weights.
I. PERALATAN TANAH
Page 53 of 68
Mobilized on Site Situation of Equipment Use
No. Description Unit Qty Existing Equipment Available on Site Remarks
Date Work / Pause
Page 54 of 68
LIST OF MOBILIZATION EQUIPMENT
Period :
Project : Eastern Indonesia National Road Improvement Project (EINRIP)
No.Package : ESS - 02
Package Name : BANTAENG - BULUKUMBA
Province / Region : South Sulawesi
Consultant : Egis BCEOM International in Joint Venture
Contraktor : PT.WASKITA KARYA - PT.BRANTAS ABIPRAYA. JO
Contract No. : 01-54/ESS-02/NR/A/L002/0509
Date : May 19th , 2009
SPMK date : October 15th , 2009
KONTRAK PROGRESS
No. SISA PEKERJAAN
URAIAN PEKERJAAN SATUAN BOBOT Minggu Lalu Minggu Ini s/d Minggu Ini
VOLUME
ITEM (%) Volume Bobot (%) Volume Bobot (%) Volume Bobot (%) Volume Bobot (%)
II. PEK. PELEBARAN PAVED SHOULDER & FILLET TAXIWAY DELTA 5.454 1.562 - 1.562 3.893
1 Pek. Galian Tanah m³ 785.52 0.183 603.497 0.141 - - 603.497 0.141 182.02 0.042
2 Pek. Pemadatan m² 1,636.49 0.058 1,472.075 0.052 - - 1,472.075 0.052 164.42 0.006
3 Pek. Sirtu tebal = 20 cm m³ 327.30 0.499 191.831 0.293 - - 191.831 0.293 135.47 0.207
4 Pek. LPA tebal = 15 cm m³ 245.47 0.471 220.296 0.423 - - 220.296 0.423 25.17 0.048
5 Pek. Prime coat 2,5 kg/m2 m² 1,636.49 0.340 1,472.075 0.306 - - 1,472.075 0.306 164.42 0.034
6 Pek. Aspal AC-BC tebal = 7 cm Ton 269.20 1.947 48.000 0.347 - - 48.000 0.347 221.20 1.600
7 Pek. Coating 0.75 kg/m2 m² 1,636.49 0.124 - - - - - - 1,636.49 0.124
8 Pek. Aspal AC-WC tebal = 6 cm Ton 230.75 1.831 - - - - - - 230.75 1.831
III. PEK. PELEBARAN PAVED SHOULDER TAXIWAY ECHO 4.195 0.400 - 0.400 3.795
1 Pek. Galian Tanah m³ 604.08 0.141 195.621 0.046 - - 195.621 0.046 408.46 0.095
2 Pek. Pemadatan m² 1,258.50 0.044 532.715 0.019 - - 532.715 0.019 725.79 0.026
3 Pek. Sirtu tebal = 20 cm m³ 251.70 0.384 46.461 0.071 - - 46.461 0.071 205.24 0.313
4 Pek. LPA tebal = 15 cm m³ 188.78 0.363 79.907 0.153 - - 79.907 0.153 108.87 0.209
5 Pek. Prime coat 2,5 kg/m2 m² 1,258.50 0.262 532.715 0.111 - - 532.715 0.111 725.79 0.151
6 Pek. Aspal AC-BC tebal = 7 cm Ton 207.02 1.498 - - - - - - 207.02 1.498
7 Pek. Coating 0.75 kg/m2 m² 1,258.50 0.095 - - - - - - 1,258.50 0.095
8 Pek. Aspal AC-WC tebal = 6 cm Ton 177.45 1.408 - - - - - - 177.45 1.408
136.09
IV. PEK. PELEBARAN PAVED SHOULDER TAXIWAY FOXTROT 4.235 0.278 - 0.278 3.957
1 Pek. Galian Tanah m³ 609.89 0.142 136.608 0.032 - - 136.608 0.032 473.28 0.110
2 Pek. Pemadatan m² 1,270.60 0.045 363.320 0.013 - - 363.320 0.013 907.28 0.032
3 Pek. Sirtu tebal = 20 cm m³ 254.12 0.388 34.879 0.053 - - 34.879 0.053 219.24 0.334
4 Pek. LPA tebal = 15 cm m³ 190.59 0.366 54.498 0.105 - - 54.498 0.105 136.09 0.261
5 Pek. Prime coat 2,5 kg/m2 m² 1,270.60 0.264 363.320 0.076 - - 363.320 0.076 907.28 0.189
6 Pek. Aspal AC-BC tebal = 7 cm Ton 209.01 1.512 - - - - - - 209.01 1.512
7 Pek. Coating 0.75 kg/m2 m² 1,270.60 0.096 - - - - - - 1,270.60 0.096
8 Pek. Aspal AC-WC tebal = 6 cm Ton 179.15 1.422 - - - - - - 179.15 1.422
KONTRAK PROGRESS
No. SISA PEKERJAAN
URAIAN PEKERJAAN SATUAN BOBOT Minggu Lalu Minggu Ini s/d Minggu Ini
VOLUME
ITEM (%) Volume Bobot (%) Volume Bobot (%) Volume Bobot (%) Volume Bobot (%)
V. PEK. PELEBARAN PAVED SHOULDER & FILLET TAXIWAY GOLF 5.454 0.736 - 0.736 4.718
1 Pek. Galian Tanah m³ 785.52 0.183 360.410 0.084 - - 360.410 0.084 425.11 0.099
2 Pek. Pemadatan m² 1,636.49 0.058 907.095 0.032 - - 907.095 0.032 729.40 0.026
3 Pek. Sirtu tebal = 20 cm m³ 327.30 0.499 106.423 0.162 - - 106.423 0.162 220.88 0.337
4 Pek. LPA tebal = 15 cm m³ 245.47 0.471 136.064 0.261 - - 136.064 0.261 109.41 0.210
5 Pek. Prime coat 2,5 kg/m2 m² 1,636.49 0.340 945.840 0.197 - - 945.840 0.197 690.65 0.144
6 Pek. Aspal AC-BC tebal = 7 cm Ton 269.20 1.947 - - - - - - 269.20 1.947
7 Pek. Coating 0.75 kg/m2 m² 1,636.49 0.124 - - - - - - 1,636.49 0.124
8 Pek. Aspal AC-WC tebal = 6 cm Ton 230.75 1.831 - - - - - - 230.75 1.831
VI. PEK. PELEBARAN PAVED SHOULDER TAXIWAY HOTEL 36.553 0.913 - 0.913 35.640
1 Pek. Galian Tanah m³ 287.13 0.067 197.560 0.046 - - 197.560 0.046 89.57 0.021
2 Pek. Pemadatan m² 598.18 0.021 547.899 0.019 - - 547.899 0.019 50.28 0.002
3 Pek. Sirtu tebal = 20 cm m³ 119.64 0.182 44.149 0.067 - - 44.149 0.067 75.49 0.115
4 Pek. LPA tebal = 15 cm m³ 89.73 0.172 82.185 0.158 - - 82.185 0.158 7.55 0.014
5 Pek. Prime coat 2,5 kg/m2 m² 598.18 0.124 598.180 0.124 - - 598.180 0.124 - -
6 Pek. Aspal AC-BC tebal = 7 cm Ton 98.40 0.712 68.800 0.498 - - 68.800 0.498 29.60 0.214
7 Pek. Coating 0.75 kg/m2 m² 598.18 0.045 - - - - - - 598.18 0.045
8 Pek. Aspal AC-WC tebal = 6 cm Ton 84.34 0.669 - - - - - - 84.34 0.669
-
9 Pek. Bongkaran Perkerasan m³ 351.57 0.527 - - - - - - 351.57 0.527
10 Pek. Buangan bongkaran m³ 351.57 0.102 - - - - - - 351.57 0.102
11 Pek. Beton Ready Mix K-400, wiremesh, besi dowel, m³ 605.25 18.564 - - - - - - 605.25 18.564
Tie bar dan chemikal sika cim -
12 Pek. Shearconnector (Hilti Rebar + chemical bh 3,828.00 4.233 - - - - - - 3,828.00 4.233
Ø M20 P = 250 mm jarak tiap 400 mm) -
13 Pek. Joint Sealant m' 439.40 0.355 - - - - - - 439.40 0.355
14 Pek. Bongkaran Perkerasan Interlok m³ 4.85 0.007 - - - - - - 4.85 0.007
15 Pek. Buangan bongkaran interlock m³ 4.85 0.001 - - - - - - 4.85 0.001
16 Pek. Coating 0.75 kg/m2 interlock m² 97.00 0.007 - - - - - - 97.00 0.007
17 Pek. Aspal AC-WC Interlock Ton 11.40 0.090 - - - - - - 11.40 0.090
18 Pek. Coating 0.75 kg/m2 m² 8,660.49 0.657 - - - - - - 8,660.49 0.657
19 Pek. Aspal AC-WC Ton 1,255.05 9.959 - - - - - - 1,255.05 9.959
20 Pek. Pengecatan marka TW Hotel m² 133.33 0.055 - - - - - - 133.33 0.055
-
17 Pek. Bongkaran Perkerasan Interlok m³ 4.60 0.007 - - - - - - 4.60 0.007
18 Pek. Buangan bongkaran interlock m³ 4.60 0.001 - - - - - - 4.60 0.001
19 Pek. Coating 0.75 kg/m2 tappering m² 695.00 0.053 - - - - - - 695.00 0.053
20 Pek. Aspal AC-WC Tappering Ton 61.25 0.486 - - - - - - 61.25 0.486
21 Pek. Coating 0.75 kg/m2 m² 1,432.00 0.109 - - - - - - 1,432.00 0.109
22 Pek. Aspal AC-WC tebal rata-rata = 7.5 cm Ton 252.39 2.003 - - - - - - 252.39 2.003
23 Pek. Pengecatan Marka TW India m² 9.00 0.004 - - - - - - 9.00 0.004
VIII PEK. PELEBARAN PAVED SHOULDER TAXIWAY SHOUTHPARALEL 2.294 1.212 - 1.212 1.082
1 Pek. Galian Tanah m³ 330.43 0.077 314.381 0.073 - - 314.381 0.073 16.05 0.004
2 Pek. Pemadatan m² 688.40 0.024 654.960 0.023 - - 654.960 0.023 33.44 0.001
3 Pek. Sirtu tebal = 20 cm m³ 137.68 0.210 130.992 0.200 - - 130.992 0.200 6.69 0.010
4 Pek. LPA tebal = 15 cm m³ 103.26 0.198 98.244 0.189 - - 98.244 0.189 5.02 0.010
5 Pek. Prime coat 2,5 kg/m2 m² 688.40 0.143 654.960 0.136 - - 654.960 0.136 33.44 0.007
6 Pek. Aspal AC-BC tebal = 7 cm Ton 113.24 0.819 81.719 0.591 - - 81.719 0.591 31.52 0.228
7 Pek. Coating 0.75 kg/m2 m² 688.40 0.052 - - - - - - 688.40 0.052
8 Pek. Aspal AC-WC tebal = 6 cm Ton 97.06 0.770 - - - - - - 97.06 0.770
IX PEK. PELEBARAN PAVED SHOULDER TAXIWAY WESTPARALEL 34.809 8.058 - 8.058 26.752
1 Pek. Galian Tanah m³ 5,013.08 1.169 2,577.527 0.601 - - 2,577.527 0.601 2,435.55 0.568
2 Pek. Pemadatan m² 10,443.92 0.367 6,069.015 0.213 - - 6,069.015 0.213 4,374.91 0.154
3 Pek. Sirtu tebal = 20 cm m³ 2,088.78 3.186 937.489 1.430 - - 937.489 1.430 1,151.29 1.756
4 Pek. LPA tebal = 15 cm m³ 1,566.59 3.009 851.066 1.635 - - 851.066 1.635 715.52 1.374
5 Pek. Prime coat 2,5 kg/m2 m² 10,443.92 2.173 6,086.615 1.266 - - 6,086.615 1.266 4,357.31 0.906
6 Pek. Aspal AC-BC tebal = 7 cm Ton 1,718.02 12.428 402.593 2.912 - - 402.593 2.912 1,315.43 9.516
7 Pek. Coating 0.75 kg/m2 m² 10,443.92 0.792 - - - - - - 10,443.92 0.792
8 Pek. Aspal AC-WC tebal = 6 cm Ton 1,472.59 11.686 - - - - - - 1,472.59 11.686
MUH. ISHAK
Nip : 19770806 200901 1 010 ABD. RAHMAN, ST Ir. ISBUDIANTO SOENARTO
Site Engineer General Superintendent
PROGRESS MINGGUAN
Pekerjaan : PELEBARAN PAVED SHOULDER TAXIWAY MINGGU KE
DI BANDAR UDARA SULTAN HASANUDDIN MAKASSAR
17
Penyedia Pekerjaan Konstruksi : PT. GENYTOV FAJAR Penyedia Jasa Konsultasi : PT. WIRA MARGA
Nomor Kontrak : AP. I. 25/SPP/HK. 06. 01/2015/GM. UPG Nomor Kontrak : AP. I. 23/SPP/HK. 06. 01/2015/GM. UPG PERIODE TANGGAL
Tanggal Kontrak : 10 SEPTEMBER 2015 Tanggal Kontrak : 10 SEPTEMBER 2015 28 DES S/D 31 DES
KONTRAK PROGRESS
No. SISA PEKERJAAN
URAIAN PEKERJAAN SATUAN BOBOT Minggu Lalu Minggu Ini s/d Minggu Ini
VOLUME
ITEM (%) Volume Bobot (%) Volume Bobot (%) Volume Bobot (%) Volume Bobot (%)
II. PEK. PELEBARAN PAVED SHOULDER & FILLET TAXIWAY DELTA 5.454 1.562 - 1.562 3.893
1 Pek. Galian Tanah m³ 785.52 0.183 603.497 0.141 - - 603.497 0.141 182.02 0.042
2 Pek. Pemadatan m² 1,636.49 0.058 1,472.075 0.052 - - 1,472.075 0.052 164.42 0.006
3 Pek. Sirtu tebal = 20 cm m³ 327.30 0.499 191.831 0.293 - - 191.831 0.293 135.47 0.207
4 Pek. LPA tebal = 15 cm m³ 245.47 0.471 220.296 0.423 - - 220.296 0.423 25.17 0.048
5 Pek. Prime coat 2,5 kg/m2 m² 1,636.49 0.340 1,472.075 0.306 - - 1,472.075 0.306 164.42 0.034
6 Pek. Aspal AC-BC tebal = 7 cm Ton 269.20 1.947 48.000 0.347 - - 48.000 0.347 221.20 1.600
7 Pek. Coating 0.75 kg/m2 m² 1,636.49 0.124 - - - - - - 1,636.49 0.124
8 Pek. Aspal AC-WC tebal = 6 cm Ton 230.75 1.831 - - - - - - 230.75 1.831
III. PEK. PELEBARAN PAVED SHOULDER TAXIWAY ECHO 4.195 0.400 - 0.400 3.795
1 Pek. Galian Tanah m³ 604.08 0.141 195.621 0.046 - - 195.621 0.046 408.46 0.095
2 Pek. Pemadatan m² 1,258.50 0.044 532.715 0.019 - - 532.715 0.019 725.79 0.026
3 Pek. Sirtu tebal = 20 cm m³ 251.70 0.384 46.461 0.071 - - 46.461 0.071 205.24 0.313
4 Pek. LPA tebal = 15 cm m³ 188.78 0.363 79.907 0.153 - - 79.907 0.153 108.87 0.209
5 Pek. Prime coat 2,5 kg/m2 m² 1,258.50 0.262 532.715 0.111 - - 532.715 0.111 725.79 0.151
6 Pek. Aspal AC-BC tebal = 7 cm Ton 207.02 1.498 - - - - - - 207.02 1.498
7 Pek. Coating 0.75 kg/m2 m² 1,258.50 0.095 - - - - - - 1,258.50 0.095
8 Pek. Aspal AC-WC tebal = 6 cm Ton 177.45 1.408 - - - - - - 177.45 1.408
IV. PEK. PELEBARAN PAVED SHOULDER TAXIWAY FOXTROT 4.235 0.278 - 0.278 3.957
1 Pek. Galian Tanah m³ 609.89 0.142 136.608 0.032 - - 136.608 0.032 473.28 0.110
2 Pek. Pemadatan m² 1,270.60 0.045 363.320 0.013 - - 363.320 0.013 907.28 0.032
3 Pek. Sirtu tebal = 20 cm m³ 254.12 0.388 34.879 0.053 - - 34.879 0.053 219.24 0.334
4 Pek. LPA tebal = 15 cm m³ 190.59 0.366 54.498 0.105 - - 54.498 0.105 136.09 0.261
5 Pek. Prime coat 2,5 kg/m2 m² 1,270.60 0.264 363.320 0.076 - - 363.320 0.076 907.28 0.189
6 Pek. Aspal AC-BC tebal = 7 cm Ton 209.01 1.512 - - - - - - 209.01 1.512
7 Pek. Coating 0.75 kg/m2 m² 1,270.60 0.096 - - - - - - 1,270.60 0.096
8 Pek. Aspal AC-WC tebal = 6 cm Ton 179.15 1.422 - - - - - - 179.15 1.422
KONTRAK PROGRESS
No. SISA PEKERJAAN
URAIAN PEKERJAAN SATUAN BOBOT Minggu Lalu Minggu Ini s/d Minggu Ini
VOLUME
ITEM (%) Volume Bobot (%) Volume Bobot (%) Volume Bobot (%) Volume Bobot (%)
V. PEK. PELEBARAN PAVED SHOULDER & FILLET TAXIWAY GOLF 5.454 0.736 - 0.736 4.718
1 Pek. Galian Tanah m³ 785.52 0.183 360.410 0.084 - - 360.410 0.084 425.11 0.099
2 Pek. Pemadatan m² 1,636.49 0.058 907.095 0.032 - - 907.095 0.032 729.40 0.026
3 Pek. Sirtu tebal = 20 cm m³ 327.30 0.499 106.423 0.162 - - 106.423 0.162 220.88 0.337
4 Pek. LPA tebal = 15 cm m³ 245.47 0.471 136.064 0.261 - - 136.064 0.261 109.41 0.210
5 Pek. Prime coat 2,5 kg/m2 m² 1,636.49 0.340 945.840 0.197 - - 945.840 0.197 690.65 0.144
6 Pek. Aspal AC-BC tebal = 7 cm Ton 269.20 1.947 - - - - - - 269.20 1.947
7 Pek. Coating 0.75 kg/m2 m² 1,636.49 0.124 - - - - - - 1,636.49 0.124
8 Pek. Aspal AC-WC tebal = 6 cm Ton 230.75 1.831 - - - - - - 230.75 1.831
VI. PEK. PELEBARAN PAVED SHOULDER TAXIWAY HOTEL 36.553 0.913 - 0.913 35.640
1 Pek. Galian Tanah m³ 287.13 0.067 197.560 0.046 - - 197.560 0.046 89.57 0.021
2 Pek. Pemadatan m² 598.18 0.021 547.899 0.019 - - 547.899 0.019 50.28 0.002
3 Pek. Sirtu tebal = 20 cm m³ 119.64 0.182 44.149 0.067 - - 44.149 0.067 75.49 0.115
4 Pek. LPA tebal = 15 cm m³ 89.73 0.172 82.185 0.158 - - 82.185 0.158 7.55 0.014
5 Pek. Prime coat 2,5 kg/m2 m² 598.18 0.124 598.180 0.124 - - 598.180 0.124 - -
6 Pek. Aspal AC-BC tebal = 7 cm Ton 98.40 0.712 68.800 0.498 - - 68.800 0.498 29.60 0.214
7 Pek. Coating 0.75 kg/m2 m² 598.18 0.045 - - - - - - 598.18 0.045
8 Pek. Aspal AC-WC tebal = 6 cm Ton 84.34 0.669 - - - - - - 84.34 0.669
VIII PEK. PELEBARAN PAVED SHOULDER TAXIWAY SHOUTHPARALEL 2.294 1.212 - 1.212 1.082
1 Pek. Galian Tanah m³ 330.43 0.077 314.381 0.073 - - 314.381 0.073 16.05 0.004
2 Pek. Pemadatan m² 688.40 0.024 654.960 0.023 - - 654.960 0.023 33.44 0.001
3 Pek. Sirtu tebal = 20 cm m³ 137.68 0.210 130.992 0.200 - - 130.992 0.200 6.69 0.010
4 Pek. LPA tebal = 15 cm m³ 103.26 0.198 98.244 0.189 - - 98.244 0.189 5.02 0.010
5 Pek. Prime coat 2,5 kg/m2 m² 688.40 0.143 654.960 0.136 - - 654.960 0.136 33.44 0.007
6 Pek. Aspal AC-BC tebal = 7 cm Ton 113.24 0.819 81.719 0.591 - - 81.719 0.591 31.52 0.228
7 Pek. Coating 0.75 kg/m2 m² 688.40 0.052 - - - - - - 688.40 0.052
8 Pek. Aspal AC-WC tebal = 6 cm Ton 97.06 0.770 - - - - - - 97.06 0.770
IX PEK. PELEBARAN PAVED SHOULDER TAXIWAY WESTPARALEL 34.809 8.058 0.082 8.140 26.670
1 Pek. Galian Tanah m³ 5,013.08 1.169 2,577.527 0.601 - - 2,577.527 0.601 2,435.55 0.568
2 Pek. Pemadatan m² 10,443.92 0.367 6,069.015 0.213 - - 6,069.015 0.213 4,374.91 0.154
3 Pek. Sirtu tebal = 20 cm m³ 2,088.78 3.186 937.489 1.430 - - 937.489 1.430 1,151.29 1.756
4 Pek. LPA tebal = 15 cm m³ 1,566.59 3.009 851.066 1.635 - - 851.066 1.635 715.52 1.374
5 Pek. Prime coat 2,5 kg/m2 m² 10,443.92 2.173 6,086.615 1.266 393.904 0.082 6,480.519 1.348 3,963.40 0.825
6 Pek. Aspal AC-BC tebal = 7 cm Ton 1,718.02 12.428 402.593 2.912 - - 402.593 2.912 1,315.43 9.516
7 Pek. Coating 0.75 kg/m2 m² 10,443.92 0.792 - - - - - - 10,443.92 0.792
8 Pek. Aspal AC-WC tebal = 6 cm Ton 1,472.59 11.686 - - - - - - 1,472.59 11.686
MUH. ISHAK
Nip : 19770806 200901 1 010 ABD. RAHMAN, ST Ir. ISBUDIANTO SOENARTO
Site Engineer General Superintendent
PROGRESS MINGGUAN
SPP/SPK.NO : AP.123/SPP/HK.06.01/2015/GM.UPG
BERITA ACARA PERUBAHAAN : BA.10/TK.09/2016-GM.UPG
NAMA PEKERJAAN : PEK. PELEBARAN PAVED SHOULDER TAXIWAY WEST PRALEL,
FOXTROT,HOTEL,DAN PELEBARAN FILLET TAXIWAY DELTA
DI BANDAR UDARA SULTAN HASANUDDIN MAKASSAR
PELAKSANA : PT. GENYTOV FAJAR
PENGAWAS : PT. WIRA MARGA
PRESTASI FISIK : 61.80 %
PERIODE : 15 JULI - 21 JULI 2017
I. PEKERJAAN PERSIAPAN
1 Pek. Mobilisasi dan Demobilisasi 1.00 ls 1.00 Rp 12,700,000.00 Rp 12,700,000.00 0.07 0.64 0.05 -
2 Pek. Pengukuran Selama Proses Pekerjaan 23,741.59 m² 43,690.92 Rp 550.00 Rp 24,030,006.00 0.13 17,433.92 0.05 10,887.98 0.03
3 Los Kerja 78.00 m² 85.36 Rp 499,000.00 Rp 42,595,441.16 0.24 85.36 0.24 - -
9 Pek.Bongkaran Perkerasan Interlock m3 18.71 Rp 269,780.00 Rp 5,047,583.80 0.03 4.95 0.01 13.76 0.02
10 Pek.Buangan Bongkaran Interlock m3 22.45 Rp 52,160.00 Rp 1,171,096.32 0.01 5.94 0.00 16.51 0.00
11 Pek. Coating 0.75 kg/m2 Interlock m2 374.20 Rp 13,646.00 Rp 5,106,333.20 0.03 99.00 0.01 275.20 0.02
12 Pek. Aspal AC-WC Interlock Ton 43.41 Rp 1,428,004.00 Rp 61,985,655.23 0.34 11.48 0.09 31.93 0.25
13 Pek. Coating 0.75 kg/m2 Tepring m2 1,329.51 Rp 13,646.00 Rp 18,142,493.46 0.10 - -
14 Pek. Aspal AC-WC Tepring Ton 115.67 Rp 1,428,004.00 Rp 165,173,467.03 0.92 - -
15 Pek. Coating 0.75 kg/m2 m2 4,875.39 Rp 13,646.00 Rp 66,529,571.94 0.37 - -
16 Pek. Aspal AC-WC tebal rata - rata = 7.5 cm Ton 848.32 Rp 1,428,004.00 Rp 1,211,401,297.35 6.73 - -
17 Pek. Pengecetan marka TW Foxtrot m2 144.90 Rp 74,350.00 Rp 10,773,315.00 0.06 - -
18 Pek. Pengecetan marka sementara m2 144.90 Rp 19,226.00 Rp 2,785,847.40 0.02 - -
9 Pek. Bongkaran Perkerasan 351.57 m³ 29.67 Rp 269,780.00 Rp 8,005,148.22 0.04 27.79 0.04 - -
10 Pek. Buangan bongkaran 351.57 m³ 35.61 Rp 52,160.00 Rp 1,857,284.59 0.01 33.70 0.01 - -
11 Pek. Beton Ready Mix K-400, wiremesh, besi - 605.25 m³ Rp 5,519,630.00 Rp - - -
dowel Tie bar dan chemikal sika cim Rp Rp - - -
12 Pek. Shearconnector (Hilti Rebar + chemical 3,828.00 bh Rp 199,000.00 Rp - - -
Ø M20 P = 250 mm jarak tiap 400 mm) Rp Rp - - -
13 Pek. Joint Sealant 439.40 m' Rp 145,385.00 Rp - - -
14 Pek. Bongkaran Perkerasan Interlok 4.85 m³ Rp 269,780.00 Rp - - -
15 Pek. Buangan bongkaran interlock 4.85 m³ Rp 52,160.00 Rp - - -
16 Pek. Coating 0.75 kg/m2 interlock 97.00 m² Rp 13,646.00 Rp - - -
17 Pek. Aspal AC-WC Interlock 11.40 Ton Rp 1,428,004.00 Rp - - -
18 Pek. Coating 0.75 kg/m2 8,660.49 m² Rp 13,646.00 Rp - - -
19 Pek. Aspal AC-WC 1,255.05 Ton Rp 1,428,004.00 Rp - - -
20 Pek. Pengecatan marka TW Hotel 133.33 m² 259.53 Rp 74,350.00 Rp 19,296,055.50 0.11 - -
Page 64
VOLUME VOLUME HARGA JUMLAH BOBOT PROGRESS
No.
URAIAN PEKERJAAN KONTRAK CCO SATUAN CCO HARGA CCO (%) Minggu Lalu Minggu Ini
ITEM ( RP ) ( RP ) Volume Bobot (%) Volume Bobot (%)
Rp Rp - -
21 Pek. Coating 0.75 kg/m2 Weaksport m2 258.03 Rp 13,646.00 Rp 3,521,009.15 0.02 257.43 0.02 - -
22 Pek. Aspal AC-BC Weaksport Tebal = 11.5 cm Ton 68.25 Rp 1,301,773.00 Rp 88,842,899.27 0.49 63.92 0.46 - -
23 Pek. Pembongkaran Perkerasan Interlok m3 7.71 Rp 269,780.00 Rp 2,080,003.80 0.01 - - -
24 Pek. Buangan bongkaran interlock m3 9.25 Rp 52,160.00 Rp 482,480.00 0.003 - - -
25 Pek. Coating 0.75 kg/m2 interlock m2 154.21 Rp 13,646.00 Rp 2,102,848.60 0.01 - - -
26 Pek. Aspal Cariphalte Fuelsasafe AC - WC Interlok Ton 18.11 Rp 1,882,456.00 Rp 34,091,278.16 0.19 - - -
27 Pek. Coating 0.75 kg/m2 Tepring m2 4,587.30 Rp 13,646.00 Rp 62,598,295.80 0.35 - - -
28 Pek. Aspal Cariphalte Fuelsasafe AC - WC Tepring Ton 404.26 Rp 1,882,456.00 Rp 761,001,662.56 4.23 - - -
29 Pek. Coating 0.75 kg/m2 m2 7,910.32 Rp 13,646.00 Rp 107,944,226.72 0.60 - - -
30 Pek. Aspal Cariphalte Fuelsasafe AC - WC T.7.5 cm Ton 1,394.19 Rp 1,882,456.00 Rp 2,624,501,330.64 14.58 - - -
31 Pek. Pengecetan marka sementara m2 259.53 Rp 19,226.00 Rp 4,989,723.78 0.03 - - -
32 Pek. Pembongkaran & Peninggian Lampu Elevated Lot 12.00 Rp 1,400,000.00 Rp 16,800,000.00 0.09 - - -
TW. Hotel
VII. PEK. PELEBARAN PAVED SHOULDER TAXIWAY INDIA
1 Pek. Galian Tanah L = 2M 410.97 m³ 410.52 Rp 41,960.00 Rp 17,225,620.61 0.10 256.58 0.06 153.94 0.04
2 Pek. Pemadatan 856.18 m² 855.26 Rp 6,330.00 Rp 5,413,795.80 0.03 534.54 0.02 320.72 0.01
3 Pek. Sirtu tebal = 20 cm 171.24 m³ 171.05 Rp 274,490.00 Rp 46,952,063.48 0.26 106.91 0.16 64.14 0.10
4 Pek. LPA Tebal = 15 cm 128.43 m³ 128.29 Rp 345,650.00 Rp 44,343,092.85 0.25 80.18 0.15 48.11 0.09
5 Pek. Prime Coat 2.5 kg/m2 856.18 m² 855.26 Rp 37,436.00 Rp 32,017,513.36 0.18 534.54 0.11 320.72 0.07
6 Pek. Aspal AC-BC tebal = 7 cm 140.84 Ton 137.70 Rp 1,301,773.00 Rp 179,250,054.53 1.00 90.94 0.66 46.76 0.34
7 Pek. Coating 0.75 kg/m2 856.18 m² 855.26 Rp 13,646.00 Rp 11,670,877.96 0.06 - 855.26 0.06
8 Pek. Aspal AC-WC tebal = 6 cm 120.72 Ton 119.05 Rp 1,428,004.00 Rp 170,007,006.38 0.94 - 119.05 0.94
- -
9 Pek. Galian Tanah L = 3M 162.72 m³ 160.76 Rp 41,960.00 Rp 6,745,556.74 0.04 154.43 0.04 6.33 0.00
10 Pek. Pemadatan 339.00 m² 334.92 Rp 6,330.00 Rp 2,120,043.60 0.01 321.72 0.01 13.20 0.00
11 Pek. Sirtu tebal = 20 cm 67.80 m³ 66.98 Rp 274,490.00 Rp 18,386,438.16 0.10 64.34 0.10 2.64 0.00
12 Pek. LPA tebal = 15 cm 50.85 m³ 50.24 Rp 345,650.00 Rp 17,364,764.70 0.10 48.26 0.09 1.98 0.00
13 Pek. Prime Coat 2.5 Kg/M2 339.00 m² 334.92 Rp 37,436.00 Rp 12,538,065.12 0.07 321.72 0.07 13.20 0.00
14 Pek. Aspal AC-BC tebal = 7 cm 55.77 Ton 53.92 Rp 1,301,773.00 Rp 70,194,359.92 0.39 50.18 0.36 3.74 0.03
15 Pek. Coating 0.75 kg/m2 339.00 m² 334.92 Rp 13,646.00 Rp 4,570,318.32 0.03 285.72 0.02 49.20 0.00
16 Pek. Aspal AC-WC tebal = 6 cm 47.80 Ton 46.62 Rp 1,428,004.00 Rp 66,574,780.28 0.37 39.77 0.32 6.85 0.05
- - -
17 Pek. Bongkaran Perkerasan Interlok 4.60 m³ 14.70 Rp 269,780.00 Rp 3,966,170.67 0.02 - -
18 Pek. Buangan bongkaran interlock 4.60 m³ 17.64 Rp 52,160.00 Rp 920,196.29 0.01 - -
19 Pek. Coating 0.75 kg/m2 Interlok 294.03 Rp 13,646.00 Rp 4,012,333.38 0.02 - -
Pek. Aspal AC-WC Interlok 34.11 Rp 1,428,004.00 Rp 48,705,617.87 0.27 - -
1 Pek. Coating 0.75 kg/m2 tappering 695.00 m² 1,060.62 Rp 13,646.00 Rp 14,473,220.52 0.08 - -
2 Pek. Aspal AC-WC Tappering 61.25 Ton 92.27 Rp 1,428,004.00 Rp 131,767,555.42 0.73 - -
3 Pek. Coating 0.75 kg/m2 1,432.00 m² 5,358.52 Rp 13,646.00 Rp 73,122,363.92 0.41 - -
4 Pek. Aspal AC-WC tebal rata-rata = 7.5 cm 252.39 Ton 932.38 Rp 1,428,004.00 Rp 1,331,445,910.97 7.40 - -
5 Pek. Pengecatan Marka TW India 9.00 m² 173.28 Rp 74,350.00 Rp 12,883,368.00 0.07 - -
6 Pek. Pengecatan Marka Sementara m2 173.28 Rp 19,226.00 Rp 3,331,481.28 0.02 - -
-
VIII PEK. PELEBARAN PAVED SHOULDER TAXIWAY SHOUTHPARAL -
1 Pek. Galian Tanah 330.43 m³ 314.86 Rp 41,960.00 Rp 13,211,559.17 0.07 314.38 0.07 0.48 0.00
2 Pek. Pemadatan 688.40 m² 655.96 Rp 6,330.00 Rp 4,152,226.80 0.02 654.96 0.02 1.00 0.00
3 Pek. Sirtu tebal = 20 cm 137.68 m³ 131.19 Rp 274,490.00 Rp 36,010,892.08 0.20 130.99 0.20 0.20 0.00
4 Pek. LPA tebal = 15 cm 103.26 m³ 98.39 Rp 345,650.00 Rp 34,009,886.10 0.19 98.24 0.19 0.15 0.00
5 Pek. Prime coat 2,5 kg/m2 688.40 m² 655.96 Rp 37,436.00 Rp 24,556,518.56 0.14 654.96 0.14 1.00 0.00
6 Pek. Aspal AC-BC tebal = 7 cm 113.24 Ton 105.61 Rp 1,301,773.00 Rp 137,479,673.75 0.76 95.55 0.69 10.06 0.07
7 Pek. Coating 0.75 kg/m2 688.40 m² 655.96 Rp 13,646.00 Rp 8,951,230.16 0.05 654.96 0.05 1.00 0.00
8 Pek. Aspal AC-WC tebal = 6 cm 97.06 Ton 91.31 Rp 1,428,004.00 Rp 130,390,519.73 0.72 91.17 0.72 0.14 0.00
-
IX PEK. PELEBARAN PAVED SHOULDER TAXIWAY WESTPARALEL -
1 Pek. Galian Tanah 5,013.08 m³ 5,084.74 Rp 41,960.00 Rp 213,355,522.56 1.19 5,066.00 1.18 18.74 0.00
2 Pek. Pemadatan 10,443.92 m² 10,593.20 Rp 6,330.00 Rp 67,054,956.00 0.37 10,554.17 0.37 39.03 0.00
3 Pek. Sirtu tebal = 20 cm 2,088.78 m³ 2,118.64 Rp 274,490.00 Rp 581,545,493.60 3.23 2,110.83 3.22 7.81 0.01
4 Pek. LPA tebal = 15 cm 1,566.59 m³ 1,588.98 Rp 345,650.00 Rp 549,230,937.00 3.05 1,583.12 3.04 5.86 0.01
5 Pek. Prime coat 2,5 kg/m2 10,443.92 m² 10,593.20 Rp 37,436.00 Rp 396,567,035.20 2.20 10,571.77 2.20 21.43 0.00
6 Pek. Aspal AC-BC tebal = 7 cm 1,718.02 Ton 1,705.51 Rp 1,301,773.00 Rp 2,220,180,620.72 12.34 1,608.47 11.64 97.04 0.70
7 Pek. Coating 0.75 kg/m2 10,443.92 m² 10,593.20 Rp 13,646.00 Rp 144,554,807.20 0.80 10,122.30 0.77 470.90 0.04
8 Pek. Aspal AC-WC tebal = 6 cm 1,472.59 Ton 1,474.57 Rp 1,428,004.00 Rp 2,105,696,770.61 11.70 1,366.75 10.85 107.82 0.86
REKAPITULASI TOTAL
RENCANA ( Rp ) REALISASI 9 Rp )
Rp 11,121,625,577.93
PRESTASI FISIK : = 61.80 %
Rp 17,995,476,668.16
Page 65
RESS MINGGUAN
( MINGGU 47 )
PROGRESS PEROSENTASE
Page 66
PROGRESS PEROSENTASE
- Rp -
257.43 Rp 3,512,889.78 0.02 99.77
63.92 Rp 83,206,726.61 0.46 93.65
- Rp - - -
- Rp - - -
- Rp - - -
- Rp - - -
- Rp - - -
- Rp - - -
- Rp - - -
- Rp - - -
- Rp - - -
- Rp - - -
Rp 11,121,625,577.93 61.80
Dibuat :
Kontraktor Pelaksana
PT. GENYTOV FAJAR
Page 67
lokasi panjang 0.324 tanggal 0.60 1.50
wp11 25.69 8.312 2 3
85 27.501 3 2
110.69 35.813
wp12 151 48.855 3 6
151 48.855
wp1 155 50.149 4 3 1
20 6.471 5
175 56.620
wp2 28.3 9.156 3 2
53.5 17.309 4 1
20 6.471 4 1
14.5 4.691 5
227 73.444 5 4 1
343.3 111.071
sp1 106 34.295 2 5 1
54 17.471 3 6 1
160 51.766
sp2 50.3 16.274 2 3 1
62.4 20.189 3 4
17.6 5.694 4 2 1
130.3 42.157
2 48.00 346.282
3 115.80
4 78.40
5 79.20
321.40