Anda di halaman 1dari 1

JASA PERBAIKAN PENTANAHAN SUTT/SUTET WILAYAH UPT CIREBON

002.SPJ-06.PJ.23/DAN.01.03/F35030000/2023
Tanggal 29 Mei 2023
-------------------------------------------------------------------------------------------------AUTOFILL------------------------------------------------------------------------
NO RENCANA PEKERJAAN LOKASI JUMLAH DETAIL HARGA SATUAN JUMLAH HARGA
A JASA PEKERJAAN PENTANAHAN SUTT/SUTET TOWER ULTG TOWER TIPE PENTANAHAN TEGANGAN TOTAL

T.1,2,3,4,5,6,7,8,9,10,11,12,13,14,17,18,19,20,
1 SUTT 70 KV SUNYARAGI-BABAKAN-1-2 56,57,58,59,60,61,62,63,64,65,66,67,68,69,70, CIREBON 41 MRG 70 kV Rp 5.768.750 Rp 236.518.750
71,72,73,74,75,76,77,78,

B MOBILISASI PERALATAN SUTT/SUTET TRIP TOWER TOTAL

T.1,2,3,4,5,6,7,8,9,10,11,12,13,14,17,18,19,2
1 Sewa Kendaraan Pickup + BBM (Zona 1 <50km) SUTT 70 KV SUNYARAGI-BABAKAN-1-2 10 0,56,57,58,59,60,61,62,63,64,65,66,67,68,69 Rp 488.088 Rp 4.880.880
,70,71,72,73,74,75,76,77,78,

C MOBILISASI PERSONIL SUTT/SUTET TRIP TOWER TOTAL


T.1,2,3,4,5,6,7,8,9,10,11,12,13,14,17,18,19,2
1 Sewa Kendaraan Avanza + BBM (Zona 1 <50km) SUTT 70 KV SUNYARAGI-BABAKAN-1-2 10 0,56,57,58,59,60,61,62,63,64,65,66,67,68,69 Rp 499.970 Rp 4.999.700
,70,71,72,73,74,75,76,77,78,

JUMLAH (A+B+C) : Rp 246.399.330


PPN 11 % : Rp 27.103.926
TOTAL : Rp 273.503.256
TERBILANG : Dua Ratus Tujuh Puluh Tiga Juta Lima Ratus Tiga Ribu Dua Ratus Lima Puluh Enam Rupiah

PLN UPT CIREBON PT. PERINTIS SARANA ELEKTRIK

MANAGER DIREKTUR UTAMA

YAYA SUPRIMAN KOKO SURYONO