NO URAIAN PEKERJAA KODE ANALISA SAT. VOLUME PROSENTASE


1 Pondasi Batu Kali 2.1.1.b.(a) m3 392,13 7,31%
2 - Besi Beton 2.2.6.1.b.(c) Kg 27.606,41 6,99%
3 Beton K250 tebal 10cm B.1.1. m3 281,96 5,73%
4 Pas, Keramik lantai 40x40cm (Glossy) A.4.4.3.36. m2 1.034,58 5,11%
5 - Besi Beton 2.2.6.1.b.(c) Kg 19.620,25 4,96%
6 - Begisting Plat Lantai A.4.1.1.22. m2 657,14 4,71%
7 - Begisting Balok A.4.1.1.21. m2 848,30 4,63%
8 Kuda-kuda WF 150,75,5,7 A.4.2.1.1. Kg 6.691,61 4,34%
9 - Begisting A.4.1.1.20. m2 798,97 4,24%
10 Jendela Type J1 J1 Unit 50,00 4,15%
11 Panel Pagar precast 5x40x242cm A.1.1.1.16.(a) m2 366,00 3,33%
12 - Beton K250 B.1.1. m3 158,73 3,22%
13 Acian dinding 3.2.2(c). m2 3.656,24 3,03%
14 Usuk + Reng Galvalume A.4.2.1.22.(a) m2 614,76 2,40%
15 Penutup Atap Genteng Karangpilang A.4.5.2.2.(a) m2 614,76 2,31%
16 Bor Strauss diameter 30cm A.3.1.1.12. m1 1.224,00 2,24%
17 Pas, Dinding bata merah 1Pc 5Ps A.4.4.1.10. m2 932,47 2,01%
18 Plesteran dinding Trasraam 1Pc 3Ps A.4.4.2.19. m2 2.394,31 1,89%
19 Benangan sudut A.4.4.2.28. m1 3.617,20 1,54%
20 Pas, Keramik dinding 30x60cm (Glossy) A.4.4.3.37. m2 243,40 1,50%
21 Pasang Paving segi empat tebal 6cm K350 A.4.4.3.63. m2 327,00 1,31%
22 Pintu Type P1 P1 Unit 11,00 1,23%
23 Galian tanah pondasi 1.7.1.a(c) m3 577,98 1,02%
24 Rangka Plafond hollow galvalume A.4.2.1.21. m2 378,00 1,01%
JUMLAH 80,22%
Batu, 04 Mei 2023

Ditetapkan, Disusun,
PENGGUNA ANGGARAN PEJABAT PELAKSANA TEKNIS
KEGIATAN

Ir. BANGUN YULIANTO, ST, MT SYEH ZAENAL ARIFIN, ST


Pembina Tingkat I NIP 197809162007011008
NIP 197207021999011001

Anda mungkin juga menyukai