AREA : PALANGKARAYA
PALANGKARAYA
Harga
No Uraian Pekerjaan Sat Volume Jumlah Harga
Satuan
1 BANGUNAN TYPICAL 1
1.B PEKERJAAN STRUKTUR
1.B.1 PEKERJAAN TANAH 44,058,763
Pekerjaan galian tanah m3 14.1 54,075 762,863
Pekerjaan Urugan tanah untuk mencapai elevasi yg
m3 54.3 126,175 6,847,517
ditentukan tanah baru tinggi 50 cm
Pekerjaan pemadatan tanah per 20 cm m2 108.5 68,495 7,434,447
Pekerjaan Lean Concrete tebal 5 cm m2 108.5 27,038 2,934,650
PALANGKARAYA
Harga
No Uraian Pekerjaan Sat Volume Jumlah Harga
Satuan
Kolom
KJ1 H 200X200X8X12 kg 4909.7 28,500 139,926,493
KJ2 H 250X250X9X14 kg 1295.2 28,500 36,914,454
BJ5 LC 100x50x20x3.2 kg 2365.0 28,500 67,402,500
Ikata angin dia 19 kg 289.3 28,500 8,245,718
Balok Lantai 2
BJ1 WF 400x200x8x13 kg 660.3 28,500 18,818,550
BJ2 WF 350x175x7x11 kg 148.7 28,500 4,237,380
BJ3 WF 200x100x5.5x8 kg 1028.7 28,500 29,317,665
BJ4 WF 150x75x5x7 kg 252.2 28,500 7,187,130
BJ8 WF 250x125x6x9 kg 1230.1 28,500 35,058,420
Atap
BJ2 WF 350x175x7x11 kg 569.9 28,500 16,243,290
BJ3 WF 200x100x5.5x8 kg 916.8 28,500 26,127,660
BJ8 WF 250x125x6x9 kg 1230.1 28,500 35,058,420
G1 WF 150x75x5x7 kg 1401.0 28,500 39,928,500
G2 UNP 100x50x5x7.5 kg 861.1 28,500 24,541,920
Ikata angin dia 19 kg 138.0 28,500 3,932,573
Tangga Baja
BJ6 UNP 200x90x8x13.5
BJ7 L 50x50x5 kg 109.5 28,500 3,122,159
Plat 8 mm anak tangga kg 129.1 28,500 3,678,917
kg 510.7 28,500 14,554,654
Grid Lampu
PALANGKARAYA
Harga
No Uraian Pekerjaan Sat Volume Jumlah Harga
Satuan
2 Pek Pengecatan Plafond sesuai gambar dan spesifikasi m2 176.8 37,853 6,690,808
-
1.C.4 PEKERJAAN KUSEN PINTU DAN JENDELA - 35,833,700
Pintu Swing Besi (P.1), dengan 2 Daun Pintu & Kusen Besi
1 Uk 215x210mm, Lengkap dengan Harware, sesuai dengan bh 1.0 9,877,700 9,877,700
gambar dan spesifikasi
Pintu Swing Besi (P.2), dengan 1 Daun Pintu & Kusen Besi
2 Uk 100x210mm, Lengkap dengan Harware, sesuai dengan bh 2.0 5,623,800 11,247,600
gambar dan spesifikasi
AREA : PALANGKARAYA
PALANGKARAYA
Harga
No Uraian Pekerjaan Sat Volume Jumlah Harga
Satuan
1.C.5 PEKERJAAN ATAP DAN LAIN-LAIN - 42,367,464
1 Pek Pemasangan Atap UPVC, sesuai gambar dan spesifikasi m2 109.3 209,090 22,860,855
AREA : PALANGKARAYA
PALANGKARAYA
Harga
No Uraian Pekerjaan Sat Volume Jumlah Harga
Satuan
2.C PEKERJAAN ARSITEKTUR & INTERIOR - 394,934,735
2.C.1 PEKERJAAN DINDING DAN PELAPIS -
Pek Pengecatan Tembok Interior (D1), Acrylic sesuai
1 m2 89.0 140,595 12,511,268
gambar dan spesifikasi.
Pek. Pemasangan Dinding Multiplek 18mm + Metal
2 Perforated t.1.2mm fin cat duco + dengan rangka (C), m2 49.4 2,126,950 105,156,408
sesuai gambar dan spesifikasi
-
2.C.3 PEKERJAAN PLAFOND - 26,332,650
Pek Pemasangan Plafond Akustik + rangka, sesuai gambar
1 m2 63.4 284,795 18,047,459
dan spesifikasi
2 Pek Pengecatan Plafond sesuai gambar dan spesifikasi m2 183.9 45,063 8,285,191
2.C.4 PEKERJAAN KUSEN PINTU DAN JENDELA - 24,982,650
Pintu 1 Daun Pintu & Jendela (R. Editing) ,Kusen
Alumunium + Pintu Enginering wood+ Kaca T.8mm,
1 bh 7.0 3,568,950 24,982,650
Lengkap dengan Harware, sesuai dengan gambar dan
spesifikasi
-
2.C.5 PEKERJAAN FIX FURNITURE - 19,178,600
AREA : PALANGKARAYA
PALANGKARAYA
Harga
No Uraian Pekerjaan Sat Volume Jumlah Harga
Satuan
REKAPITULASI HARGA Rp
Terbilang : Dua milyard sembilan ratus tujuh puluh juta sembilan ratus ribu rupiah
561,207,579
2,090,133,956
BILL OF QUQNTITY (BOQ)
Lantai 1 (Satu)
1 IU-STD.1 & OU-STD.1 1 Unit 53,182,800 53,182,800
Kapasitas 14 PK
Tipe Indoor Split Duct
Lokasi Ruang Studio 1
Lantai 1 (Satu)
1 EAF-RRV-01 s/d 02 2 Unit 486,200 972,400
Kapasitas 530 Cfm
Tipe Wall Fan
Static Pressure
Lokasi R. Genset
Lantai 1 (Satu)
1 Dari IU-STD.1 ke OU-STD.1
(L) 12,7 mm ; (G) 28,6 mm 7 mtr 273,768 1,916,376
IU-STD.1
IU-MCL.01
IU-SC.1
IU-EDT.01 s/d 07
IU-SC2.01
IU-STD2.01
IU-PNL.01 s/d 02
D DUCTING
Pengadaan dan pemasangan ducting untuk AC lengkap dengan
support dan aksesoris yang diperlukan mengikuti spesifikasi, gambar
dan intruksi dari pembuat
Lantai 1 (Satu)
IU-STD.1
1 SAD 800 x 300 mm PIR 9 m2 598,400 5,385,600
2 SAD 700 x 250 mm PIR 4 m2 546,040 2,184,160
3 SAD 500 x 200 mm PIR 8 m2 568,480 4,547,840
4 SAD 400 x 150 mm PIR 1 m2 553,520 553,520
5 FAD 300 X 300 mm BJLS 50 1 m2 456,280 456,280
6 RAD 800 x 300 mm PIR 4 m2 598,400 2,393,600
7 Plenum Box 1 bh 748,000 748,000
IU-MCL.01
8 SAD 500 x 150 mm PIR 3 m2 561,000 1,683,000
9 SAD 250 x 150 mm PIR 2 m2 441,320 882,640
10 FAD 150 X 100 mm BJLS 50 1 m2 516,120 516,120
11 RAD 400 x 150 mm PIR 2 m2 553,520 1,107,040
12 Plenum Box 1 bh 748,000 748,000
IU-SC.1
13 SAD 500 x 200 mm PIR 4 m2 568,480 2,273,920
14 SAD 200 x 150 mm PIR 2 m2 441,320 882,640
15 FAD 200 X 150 mm BJLS 1 m2 523,600 523,600
16 RAD 500 x 150 mm PIR 2 m2 561,000 1,122,000
17 Plenum Box 1 bh 748,000 748,000
BILL OF QUQNTITY (BOQ)
IU-SC2.01
18 SAD 500 x 200 mm PIR 5 m2 568,480 2,842,400
19 SAD 250 x 150 mm PIR 3 m2 441,320 1,323,960
20 FAD 200 X 150 mm BJLS 1 m2 523,600 523,600
21 RAD 700 x 250 mm PIR 2 m2 583,440 1,166,880
22 Plenum Box 1 bh 748,000 748,000
IU.STD.2
23 SAD 700 x 250 mm PIR 6 m2 583,440 3,500,640
24 SAD 500 x 200 mm PIR 16 m2 568,480 9,095,680
25 FAD 350 X 300 mm BJLS 1 m2 512,380 512,380
26 RAD 800 x 300 mm PIR 6 m2 598,400 3,590,400
27 Plenum Box 1 bh 748,000 748,000
Sub Total D DUCTING 50,807,900
E EQUIPMENT GRILLE
Lantai 1 (Satu)
Pengadaan dan pemasangan grille c/w box
1 IU-STD.1
SAD 300 x 300 mm 6 bh 774,180 4,645,080
Bar Grille Return 900 x 150 mm 4 bh 890,120 3,560,480
FAL 300 x 300 mm 1 bh 774,180 774,180
VD 300 x 300 mm 1 bh 774,180 774,180
2 IU-MCL.01
SAD 200 x 200 mm 2 bh 774,180 1,548,360
Bar Grille Return 500 x 100 mm 2 bh 774,180 1,548,360
FAL 150 x 100 mm 1 bh 774,180 774,180
VD 150 x 100 mm 1 bh 774,180 774,180
3 IU-SC.1
SAD 300 x 300 mm 2 bh 774,180 1,548,360
Bar Grille Return 900 x 100 mm 2 bh 856,460 1,712,920
FAL 200 x 150 mm 1 bh 774,180 774,180
VD 200 x 150 mm 1 bh 774,180 774,180
4 IU-SC2.01
SAD 300 x 300 mm 2 bh 774,180 1,548,360
Bar Grille Return 900 x 100 mm 2 bh 856,460 1,712,920
FAL 200 x 150 mm 1 bh 774,180 774,180
VD 200 x 150 mm 1 bh 774,180 774,180
5 IU-STS2.01
SAD 450 x 350 mm 4 bh 774,180 3,096,720
Bar Grille Return 900 x 150 mm 6 bh 856,460 5,138,760
FAL 350 x 300 mm 1 bh 774,180 774,180
VD 350 x 300 mm 1 bh 774,180 774,180
Sub Total E EQUIPMENT GRILLE 33,802,120
F PENGKABELAN AC
Pengadaan dan pemasangan Kabel AC dari Indoor ke Outdoor
Lantai 1 (Satu)
1 Kabel NYM 3 x 2,5 mm2 121 mtr 39,644 4,796,924
2 PEKERJAAN ELEKTRIKAL
Lantai 2 -
1 Tray 200 x 100 mm 54 m 247,500 13,365,000
-
Sub Total D Pekerjaan Kabel Ladder & Tray 13,365,000
-
E Pekerjaan Armature Lampu dan Instalasinya -
Pengadaan, pemasangan dan pengujian Armatur Lampu, Saklar,
Stop Kontak dan aksesoris listrik berikut, termasuk semua
sambungan kabel dan sistim saluran, grounding, pemasangan
pada lokasi dengan cara yang ditentukan, termasuk terminal,
dan semua asesoris pelengkap lainnya yang diperlukan,
dikerjakan sesuai gambar, spesifikasi dan petunjuk pabrik -
pembuat.
Lantai 1 -
1 Downlight LED 18 Watt Dimmable 38 bh 135,000 5,130,000
2 Spot Light LED 36 Watt 12 bh 154,800 1,857,600
3 Down Light LED 70 Watt 7 Watt 6 bh 63,000 378,000
4 Linear LED 12 Watt 7 bh 67,500 472,500
------------------------------------ -
5 NYA 3 x 2,5 mm2 + PCV Conduit HI 20 mm ; u/ Inst. Lampu 38 titik 108,000 4,104,000
-
RUANG GENSET -
1 TL Balk 1 x 19 Watt 4 bh 132,000 528,000
------------------------------------ -
2 NYA 3 x 2,5 mm2 + PCV Conduit HI 20 mm ; u/ Inst. Lampu 4 titik 108,000 432,000
-
Sub Total E Pekerjaan Armature Lampu dan Instalasinya 12,902,100
-
F Pekerjaan Saklar & Stop Kontak -
Pengadaan, pemasangan dan pengujian Saklar, Stop Kontak
dan aksesoris listrik berikut, termasuk semua sambungan kabel
dan sistim saluran, grounding, pemasangan pada lokasi dengan
cara yang ditentukan, termasuk terminal, dan semua asesoris
pelengkap lainnya yang diperlukan, dikerjakan sesuai gambar, -
spesifikasi dan petunjuk pabrik pembuat.
Lantai 1 -
1 Saklar Tunggal 6 bh 14,850 89,100
2 Saklar Ganda 8 bh 18,150 145,200
3 Dimmer Lampu 6 bh 56,925 341,550
-
RUANG GENSET -
1 Saklar Ganda 1 bh 18,150 18,150
-
Sub Total F Pekerjaan Saklar & Stop Kontak 594,000
TOTAL 2 PEKERJAAN ELEKTRIKAL 365,762,355
BILL OF QUQNTITY (BOQ)
PEKERJAAN CCTV
A PERALATAN UTAMA
1 HUB 1 unit 270,000 270,000
2 NVR 1 x 12 CH c/w Controller Eternet (HD 3 TB) 1 unit 3,456,000 3,456,000
3 Monitor LED 32" c/w Bracket 1 unit 3,024,000 3,024,000
4 Pengkabelan Ruang Kontrol CCTV 1 lot 6,480,000 6,480,000
B KABEL FEEDER
Kabel Power NYM 2 x 1,5 mm2 + UTP CAT 6 +
PVC Conduit dia. 20 mm ; dari NVR ke :
1 Switch HUB 8 Port Lantai 1 9 m' 135,000 1,215,000
C EQUIPMENT CCTV
Equipment CCTV termasuk semua accessories sesuai dengan spesifikasi.
Lantai 1
1 Switch HUB 8 Port PoE Power Supply c/w Rack 1 bh 1,200,960 1,200,960
2 Modular Camera 6 bh 270,000 1,620,000
--------------------------------------------- -
3 UTP CAT 6 4 Pairs + PVC Conduit 20 mm 6 ttk 40,500 243,000
u/ Inst. Camera
Sub Total C EQUIPMENT CCTV 3,063,960
TOTAL PEKERJAAN CCTV 17,508,960
S Curve
TAHUN
No DESCRIPTION AMOUNTBOBOT BLN JUNI
Uraian Jumlah TGL 01~10
B BANGUNAN TYPICAL 1
1 PEKERJAAN STRUKTUR
PEKERJAAN TANAH ### 1.48% 0.37%
STRUKTUR BETON ### 2.85%
PEKERJAAN STRUKTUR BAJA ### 19.23%
C BANGUNAN EKSISTING
1 PEKERJAAN STRUKTUR
PEKERJAAN TANAH ### 2.15% 0.54%
STRUKTUR BETON ### 1.74%
PEKERJAAN STRUKTUR BAJA ### 5.84%
0.63%
0.23% 0.23% 0.23% 0.23%
0.12% 0.12% 0.12% 0.12%
0.30% 0.30% 0.30% 0.30%
0.71% 0.71%
1.28% 1.28% 1.28% 1.28% 1.28% 1.28% 1.28%
1.66% 1.66%
0.49% 0.49% 0.49% 0.49%
0.22% 0.22% 0.22% 0.22%
0.21% 0.21% 0.21% 0.21%
0.16% 0.16% 0.16%
1.28%
0.16%
1.23% 1.23%
0.29% 0.29%
3.94% 3.00% 2.07% 2.07%
92.87% 95.87% 97.93% 100.00%
KETERANGAN
100%