LAPORAN HARIAN
( BULAN KE - 1)
PERIODE : 6 JULI 2021 S/D 25 JULI 2021

PAKET : REKONSTRUKSI JALAN WELERI-KENDAL-SEMARANG


KONTRAK NO. : HK0201/PPK3.1-JATENG/PKT/VII/2021/03, TGL.5 JULI 2021

JL.WALISONGO SEMARANG DAN JL. WELERI - BATAS KOTA


LOKASI : KENDAL(KAB.KENDAL)

PPK 3.1 PROVINSI JAWA TENGAH

SATUAN KERJA
PELAKSANAAN JALAN NASIONAL WILAYAH III
PROVINSI JAWA TENGAH

KONSULTAN PENGAWAS PENYEDIA JASA

PT. ARIA JASA REKSATAMA KSO PT. AYUDI PERSADA –


PT. VIRAMA KARYA PT. MULTI BANGUN
PT. BUANA ARCHICON. INDONESIA, KSO
PT. ARIA JASA REKSATAMA KSO
PT. VIRAMA KARYA
PT. BUANA ARCHICON.
KEMENTRIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL BINA MARGA
BALAI BESAR PELAKSANAAN JALAN NASIONAL
JAWA TENGAH - D.I. YOGYAKARTA

LAPORAN HARIAN
( BULAN KE - 2)
PERIODE : 26 JULI 2021 S/D 25 AGUTUS 2021

PAKET : REKONSTRUKSI JALAN WELERI-KENDAL-SEMARANG


KONTRAK NO. : HK0201/PPK3.1-JATENG/PKT/VII/2021/03, TGL.5 JULI 2021

JL.WALISONGO SEMARANG DAN JL. WELERI - BATAS KOTA


LOKASI : KENDAL(KAB.KENDAL)

PPK 3.1 PROVINSI JAWA TENGAH

SATUAN KERJA
PELAKSANAAN JALAN NASIONAL WILAYAH III
PROVINSI JAWA TENGAH

KONSULTAN PENGAWAS PENYEDIA JASA

PT. ARIA JASA REKSATAMA KSO PT. AYUDI PERSADA –


PT. VIRAMA KARYA PT. MULTI BANGUN
PT. BUANA ARCHICON. INDONESIA, KSO
PT. ARIA JASA REKSATAMA KSO
PT. VIRAMA KARYA
PT. BUANA ARCHICON.
KEMENTRIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL BINA MARGA
BALAI BESAR PELAKSANAAN JALAN NASIONAL
JAWA TENGAH - D.I. YOGYAKARTA

LAPORAN HARIAN
( BULAN KE - 3)
PERIODE : 26 AGUSTUS 2021 S/D 25 SEPTEMBER 2021

PAKET : REKONSTRUKSI JALAN WELERI-KENDAL-SEMARANG


KONTRAK NO. : HK0201/PPK3.1-JATENG/PKT/VII/2021/03, TGL.5 JULI 2021

JL.WALISONGO SEMARANG DAN JL. WELERI - BATAS KOTA


LOKASI : KENDAL(KAB.KENDAL)

PPK 3.1 PROVINSI JAWA TENGAH

SATUAN KERJA
PELAKSANAAN JALAN NASIONAL WILAYAH III
PROVINSI JAWA TENGAH

KONSULTAN PENGAWAS PENYEDIA JASA

PT. ARIA JASA REKSATAMA KSO PT. AYUDI PERSADA –


PT. VIRAMA KARYA PT. MULTI BANGUN
PT. BUANA ARCHICON. INDONESIA, KSO
PT. ARIA JASA REKSATAMA KSO
PT. VIRAMA KARYA
PT. BUANA ARCHICON.
LAPORAN HARIAN
REKONSTRUKSI JALAN

PAKET : REKONSTRUKSI JALAN WELERI-KENDAL-SEMARANG


NO./TANGGAL KONTRAK : HK0201/PPK3.1-JATENG/PKT/VII/2021/03, 5 JULI 2021
NO./TANGGAL SPMK : HK0201/PPK3.1-JATENG/PKT/VII/2021/04, 6 JULI 2021
PENYEDIA JASA : PT. AYUDI PERSDA-PT.MULTI BANGUN INDONESIA, KSO
KONSULTAN SUPERVISI : PT.ARIA JASA REKSATAMA,KSO, PT. VIRAMA KARYA, PT. BUANA ARCHICON
LINGKUP PEKERJAAN : REKONSTRUKSI JALAN
HARI/TANGGAL : SELASA 21-Sep-2021
TENAGA KERJA JENIS MATERIAL PERALATAN
NO. KUALIFIKASI SAT. JUMLAH NO. JENIS BAHAN SAT. VOLUME NO. JENIS/MERK JUMLAH
1 ASPHALT FINISHER
1 Surveyor org 2 1 Beton FS-45 m3 36.41 2 BULDOZER D 31
2 Pembantu Surveyor org 4 3 COMPRESSOR 4000-6500 L\M
3 Pelaksana PJ org 3 4 BULLDOZER 100-150 HP
4 Petugas K-3 org 7 5 ASPHAL DISTRIBUTOR
5 Konsultan org 5 6 CONCRETE MIXER 0.3-0.6 M3
6 Bina Marga org 2 7 CRANE 10-15 TON
7 Pekerja org 6 8 DUMP TRUCK 3 - 4 M3
8 Operator org 15 9 DUMP TRUCK 6-8 M3
9 Teknisi Lab org 4 10 EXCAVATOR 80-140 HP
10 Mandor dan Tenaga org 38 11 FLAT BED TRUCK 3-4 TON
12 GENERATOR SET 2 unit
13 WHEEL LOADER 1.0-1.6 M3
14 ASPHAL SPRAYER
15 TANDEM ROLLER 6-8 T
16 TIRE ROLLER 8-10 T
17 VIBRATORY ROLLER 5-8 T.
18 CONCRETE VIBRATOR 4 Unit
19 JACK HAMMER
20 CONCRETE PAVER MANUAL 2 Unit
21 WELDING SET
22 ALAT UKUR WP/TS 2 Set
23 COLD MILLING MACHINE

PEKERJAAN YANG DILAKSANAKAN


ITEM CATATAN
URAIAN PEKERJAAN SAT. VOLUME LOKASI
PEKERJAAN PERMASALAHAN

Skh.1.5.3(3) Perkerasan Beton Semen dengan umur Pembukan Lebih m3 36.41 41+115 -41+128 (L1)
dari 3 hari dan kurang dari 7 hari. 38+050-38+069 (L1)

CUACA
Pekerjaan KONDISI CERAH GERIMIS HUJAN
Mulai Pukul : 08.00 08.00 s/d 24.00 √
Selesai Pukul : 24.00

Menyetujui : Diperiksa Oleh : Dibuat Oleh :


PPK. 3.1 Provinsi Jawa Tengah Konsultan Supervisi Penyedia Jasa

……………………………… ………………………………… …………………………………


Penilik Jalan Inspektor Pelaksana
LAPORAN HARIAN
REKONSTRUKSI JALAN

PAKET : REKONSTRUKSI JALAN WELERI-KENDAL-SEMARANG


NO./TANGGAL KONTRAK : HK0201/PPK3.1-JATENG/PKT/VII/2021/03, 5 JULI 2021
NO./TANGGAL SPMK : HK0201/PPK3.1-JATENG/PKT/VII/2021/04, 6 JULI 2021
PENYEDIA JASA : PT. AYUDI PERSDA-PT.MULTI BANGUN INDONESIA, KSO
KONSULTAN SUPERVISI : PT.ARIA JASA REKSATAMA,KSO, PT. VIRAMA KARYA, PT. BUANA ARCHICON
LINGKUP PEKERJAAN : REKONSTRUKSI JALAN
HARI/TANGGAL : RABU 22-Sep-2021
TENAGA KERJA JENIS MATERIAL PERALATAN
NO. KUALIFIKASI SAT. JUMLAH NO. JENIS BAHAN SAT. VOLUME NO. JENIS/MERK JUMLAH
1 ASPHALT FINISHER
1 Surveyor org 2 1 Beton FS-45 m3 164.92 2 BULDOZER D 31
2 Pembantu Surveyor org 4 3 COMPRESSOR 4000-6500 L\M
3 Pelaksana PJ org 3 4 BULLDOZER 100-150 HP
4 Petugas K-3 org 7 5 ASPHAL DISTRIBUTOR
5 Konsultan org 5 6 CONCRETE MIXER 0.3-0.6 M3
6 Bina Marga org 2 7 CRANE 10-15 TON
7 Pekerja org 6 8 DUMP TRUCK 3 - 4 M3
8 Operator org 15 9 DUMP TRUCK 6-8 M3
9 Teknisi Lab org 4 10 EXCAVATOR 80-140 HP
10 Mandor dan Tenaga org 38 11 FLAT BED TRUCK 3-4 TON
12 GENERATOR SET 2 unit
13 WHEEL LOADER 1.0-1.6 M3
14 ASPHAL SPRAYER
15 TANDEM ROLLER 6-8 T
16 TIRE ROLLER 8-10 T
17 VIBRATORY ROLLER 5-8 T.
18 CONCRETE VIBRATOR 2 Unit
19 JACK HAMMER
20 CONCRETE PAVER MANUAL 2 Unit
21 WELDING SET
22 ALAT UKUR WP/TS 2 Set
23 COLD MILLING MACHINE

PEKERJAAN YANG DILAKSANAKAN


ITEM CATATAN
URAIAN PEKERJAAN SAT. VOLUME LOKASI
PEKERJAAN PERMASALAHAN

Skh.1.5.3(3) Perkerasan Beton Semen dengan umur Pembukan Lebih m3 164.92 38+069-38+209 (L2)
dari 3 hari dan kurang dari 7 hari.

CUACA
Pekerjaan KONDISI CERAH GERIMIS HUJAN
Mulai Pukul : 08.00 08.00 s/d 24.00 √
Selesai Pukul : 24.00

Menyetujui : Diperiksa Oleh : Dibuat Oleh :


PPK. 3.1 Provinsi Jawa Tengah Konsultan Supervisi Penyedia Jasa

……………………………… ………………………………… …………………………………


Penilik Jalan Inspektor Pelaksana
LAPORAN HARIAN
REKONSTRUKSI JALAN

PAKET : REKONSTRUKSI JALAN WELERI-KENDAL-SEMARANG


NO./TANGGAL KONTRAK : HK0201/PPK3.1-JATENG/PKT/VII/2021/03, 5 JULI 2021
NO./TANGGAL SPMK : HK0201/PPK3.1-JATENG/PKT/VII/2021/04, 6 JULI 2021
PENYEDIA JASA : PT. AYUDI PERSDA-PT.MULTI BANGUN INDONESIA, KSO
KONSULTAN SUPERVISI : PT.ARIA JASA REKSATAMA,KSO, PT. VIRAMA KARYA, PT. BUANA ARCHICON
LINGKUP PEKERJAAN : REKONSTRUKSI JALAN
HARI/TANGGAL : KAMIS 23-Sep-2021
TENAGA KERJA JENIS MATERIAL PERALATAN
NO. KUALIFIKASI SAT. JUMLAH NO. JENIS BAHAN SAT. VOLUME NO. JENIS/MERK JUMLAH
1 ASPHALT FINISHER
1 Surveyor org 2 1 Beton FS-45 m3 95.42 2 BULDOZER D 31
2 Pembantu Surveyor org 4 3 COMPRESSOR 4000-6500 L\M
3 Pelaksana PJ org 3 4 BULLDOZER 100-150 HP
4 Petugas K-3 org 7 5 ASPHAL DISTRIBUTOR
5 Konsultan org 5 6 CONCRETE MIXER 0.3-0.6 M3
6 Bina Marga org 2 7 CRANE 10-15 TON
7 Pekerja org 6 8 DUMP TRUCK 3 - 4 M3
8 Operator org 15 9 DUMP TRUCK 6-8 M3
9 Teknisi Lab org 4 10 EXCAVATOR 80-140 HP
10 Mandor dan Tenaga org 38 11 FLAT BED TRUCK 3-4 TON
12 GENERATOR SET 2 unit
13 WHEEL LOADER 1.0-1.6 M3
14 ASPHAL SPRAYER
15 TANDEM ROLLER 6-8 T
16 TIRE ROLLER 8-10 T
17 VIBRATORY ROLLER 5-8 T.
18 CONCRETE VIBRATOR 2 Unit
19 JACK HAMMER
20 CONCRETE PAVER MANUAL 2 Unit
21 WELDING SET
22 ALAT UKUR WP/TS 2 Set
23 COLD MILLING MACHINE

PEKERJAAN YANG DILAKSANAKAN


ITEM CATATAN
URAIAN PEKERJAAN SAT. VOLUME LOKASI
PEKERJAAN PERMASALAHAN

Skh.1.5.3(3) Perkerasan Beton Semen dengan umur Pembukan Lebih m3 95.42 38+209-38+290 (L2)
dari 3 hari dan kurang dari 7 hari.

CUACA
Pekerjaan KONDISI CERAH GERIMIS HUJAN
Mulai Pukul : 08.00 08.00 s/d 24.00 √
Selesai Pukul : 24.00

Menyetujui : Diperiksa Oleh : Dibuat Oleh :


PPK. 3.1 Provinsi Jawa Tengah Konsultan Supervisi Penyedia Jasa

……………………………… ………………………………… …………………………………


Penilik Jalan Inspektor Pelaksana
LAPORAN HARIAN
REKONSTRUKSI JALAN

PAKET : REKONSTRUKSI JALAN WELERI-KENDAL-SEMARANG


NO./TANGGAL KONTRAK : HK0201/PPK3.1-JATENG/PKT/VII/2021/03, 5 JULI 2021
NO./TANGGAL SPMK : HK0201/PPK3.1-JATENG/PKT/VII/2021/04, 6 JULI 2021
PENYEDIA JASA : PT. AYUDI PERSDA-PT.MULTI BANGUN INDONESIA, KSO
KONSULTAN SUPERVISI : PT.ARIA JASA REKSATAMA,KSO, PT. VIRAMA KARYA, PT. BUANA ARCHICON
LINGKUP PEKERJAAN : REKONSTRUKSI JALAN
HARI/TANGGAL : JUMAT 24-Sep-2021
TENAGA KERJA JENIS MATERIAL PERALATAN
NO. KUALIFIKASI SAT. JUMLAH NO. JENIS BAHAN SAT. VOLUME NO. JENIS/MERK JUMLAH
1 ASPHALT FINISHER
1 Surveyor org 2 1 Beton FS-45 m3 130.76 2 BULDOZER D 31
2 Pembantu Surveyor org 4 3 COMPRESSOR 4000-6500 L\M
3 Pelaksana PJ org 3 4 BULLDOZER 100-150 HP
4 Petugas K-3 org 7 5 ASPHAL DISTRIBUTOR
5 Konsultan org 5 6 CONCRETE MIXER 0.3-0.6 M3
6 Bina Marga org 2 7 CRANE 10-15 TON
7 Pekerja org 6 8 DUMP TRUCK 3 - 4 M3
8 Operator org 15 9 DUMP TRUCK 6-8 M3
9 Teknisi Lab org 4 10 EXCAVATOR 80-140 HP
10 Mandor dan Tenaga org 38 11 FLAT BED TRUCK 3-4 TON
12 GENERATOR SET 2 unit
13 WHEEL LOADER 1.0-1.6 M3
14 ASPHAL SPRAYER
15 TANDEM ROLLER 6-8 T
16 TIRE ROLLER 8-10 T
17 VIBRATORY ROLLER 5-8 T.
18 CONCRETE VIBRATOR 4 Unit
19 JACK HAMMER
20 CONCRETE PAVER MANUAL 2 Unit
21 WELDING SET
22 ALAT UKUR WP/TS 2 Set
23 COLD MILLING MACHINE

PEKERJAAN YANG DILAKSANAKAN


ITEM CATATAN
URAIAN PEKERJAAN SAT. VOLUME LOKASI
PEKERJAAN PERMASALAHAN

Skh.1.5.3(3) Perkerasan Beton Semen dengan umur Pembukan Lebih m3 130.76 38+290-38+401 (L2)
dari 3 hari dan kurang dari 7 hari.

CUACA
Pekerjaan KONDISI CERAH GERIMIS HUJAN
Mulai Pukul : 08.00 08.00 s/d 24.00 √
Selesai Pukul : 24.00

Menyetujui : Diperiksa Oleh : Dibuat Oleh :


PPK. 3.1 Provinsi Jawa Tengah Konsultan Supervisi Penyedia Jasa

……………………………… ………………………………… …………………………………


Penilik Jalan Inspektor Pelaksana
LAPORAN HARIAN
REKONSTRUKSI JALAN

PAKET : REKONSTRUKSI JALAN WELERI-KENDAL-SEMARANG


NO./TANGGAL KONTRAK : HK0201/PPK3.1-JATENG/PKT/VII/2021/03, 5 JULI 2021
NO./TANGGAL SPMK : HK0201/PPK3.1-JATENG/PKT/VII/2021/04, 6 JULI 2021
PENYEDIA JASA : PT. AYUDI PERSDA-PT.MULTI BANGUN INDONESIA, KSO
KONSULTAN SUPERVISI : PT.ARIA JASA REKSATAMA,KSO, PT. VIRAMA KARYA, PT. BUANA ARCHICON
LINGKUP PEKERJAAN : REKONSTRUKSI JALAN
HARI/TANGGAL : SABTU 25-Sep-2021
TENAGA KERJA JENIS MATERIAL PERALATAN
NO. KUALIFIKASI SAT. JUMLAH NO. JENIS BAHAN SAT. VOLUME NO. JENIS/MERK JUMLAH
1 ASPHALT FINISHER
1 Surveyor org 2 1 Beton FS-45 m3 89.53 2 BULDOZER D 31
2 Pembantu Surveyor org 4 3 COMPRESSOR 4000-6500 L\M
3 Pelaksana PJ org 3 4 BULLDOZER 100-150 HP
4 Petugas K-3 org 7 5 ASPHAL DISTRIBUTOR
5 Konsultan org 5 6 CONCRETE MIXER 0.3-0.6 M3
6 Bina Marga org 2 7 CRANE 10-15 TON
7 Pekerja org 6 8 DUMP TRUCK 3 - 4 M3
8 Operator org 15 9 DUMP TRUCK 6-8 M3
9 Teknisi Lab org 4 10 EXCAVATOR 80-140 HP
10 Mandor dan Tenaga org 38 11 FLAT BED TRUCK 3-4 TON
12 GENERATOR SET 2 unit
13 WHEEL LOADER 1.0-1.6 M3
14 ASPHAL SPRAYER
15 TANDEM ROLLER 6-8 T
16 TIRE ROLLER 8-10 T
17 VIBRATORY ROLLER 5-8 T.
18 CONCRETE VIBRATOR 2 Unit
19 JACK HAMMER
20 CONCRETE PAVER MANUAL 2 Unit
21 WELDING SET
22 ALAT UKUR WP/TS 2 Set
23 COLD MILLING MACHINE

PEKERJAAN YANG DILAKSANAKAN


ITEM CATATAN
URAIAN PEKERJAAN SAT. VOLUME LOKASI
PEKERJAAN PERMASALAHAN

Skh.1.5.3(3) Perkerasan Beton Semen dengan umur Pembukan Lebih m3 89.53 38+401-38+447(L2)
dari 3 hari dan kurang dari 7 hari.

CUACA
Pekerjaan KONDISI CERAH GERIMIS HUJAN
Mulai Pukul : 08.00 08.00 s/d 24.00 √
Selesai Pukul : 24.00

Menyetujui : Diperiksa Oleh : Dibuat Oleh :


PPK. 3.1 Provinsi Jawa Tengah Konsultan Supervisi Penyedia Jasa

……………………………… ………………………………… …………………………………


Penilik Jalan Inspektor Pelaksana
LAPORAN HARIAN
REKONSTRUKSI JALAN

PAKET : REKONSTRUKSI JALAN WELERI-KENDAL-SEMARANG


NO./TANGGAL KONTRAK : HK0201/PPK3.1-JATENG/PKT/VII/2021/03, 5 JULI 2021
NO./TANGGAL SPMK : HK0201/PPK3.1-JATENG/PKT/VII/2021/04, 6 JULI 2021
PENYEDIA JASA : PT. AYUDI PERSDA-PT.MULTI BANGUN INDONESIA, KSO
KONSULTAN SUPERVISI : PT.ARIA JASA REKSATAMA,KSO, PT. VIRAMA KARYA, PT. BUANA ARCHICON
LINGKUP PEKERJAAN : REKONSTRUKSI JALAN
HARI/TANGGAL : MINGGU 26-Sep-2021
TENAGA KERJA JENIS MATERIAL PERALATAN
NO. KUALIFIKASI SAT. JUMLAH NO. JENIS BAHAN SAT. VOLUME NO. JENIS/MERK JUMLAH
1 ASPHALT FINISHER
1 Surveyor org 2 1 Beton FS-45 m3 41.23 2 BULDOZER D 31
2 Pembantu Surveyor org 4 3 COMPRESSOR 4000-6500 L\M
3 Pelaksana PJ org 3 4 BULLDOZER 100-150 HP
4 Petugas K-3 org 7 5 ASPHAL DISTRIBUTOR
5 Konsultan org 5 6 CONCRETE MIXER 0.3-0.6 M3
6 Bina Marga org 2 7 CRANE 10-15 TON
7 Pekerja org 3 8 DUMP TRUCK 3 - 4 M3
8 Operator org 15 9 DUMP TRUCK 6-8 M3
9 Teknisi Lab org 4 10 EXCAVATOR 80-140 HP
10 Mandor dan Tenaga org 38 11 FLAT BED TRUCK 3-4 TON
12 GENERATOR SET 2 unit
13 WHEEL LOADER 1.0-1.6 M3
14 ASPHAL SPRAYER
15 TANDEM ROLLER 6-8 T
16 TIRE ROLLER 8-10 T
17 VIBRATORY ROLLER 5-8 T.
18 CONCRETE VIBRATOR 2 Unit
19 JACK HAMMER
20 CONCRETE PAVER MANUAL 2 Unit
21 WELDING SET
22 ALAT UKUR WP/TS 2 Set
23 COLD MILLING MACHINE

PEKERJAAN YANG DILAKSANAKAN


ITEM CATATAN
URAIAN PEKERJAAN SAT. VOLUME LOKASI
PEKERJAAN PERMASALAHAN

Skh.1.5.3(3) Perkerasan Beton Semen dengan umur Pembukan Lebih m3 41.23 38+477-38+512 (L2)
dari 3 hari dan kurang dari 7 hari.

CUACA
Pekerjaan KONDISI CERAH GERIMIS HUJAN
Mulai Pukul : 08.00 08.00 s/d 24.00 √
Selesai Pukul : 24.00

Menyetujui : Diperiksa Oleh : Dibuat Oleh :


PPK. 3.1 Provinsi Jawa Tengah Konsultan Supervisi Penyedia Jasa

……………………………… ………………………………… …………………………………


Penilik Jalan Inspektor Pelaksana
LAPORAN HARIAN
REKONSTRUKSI JALAN

PAKET : REKONSTRUKSI JALAN WELERI-KENDAL-SEMARANG


NO./TANGGAL KONTRAK : HK0201/PPK3.1-JATENG/PKT/VII/2021/03, 5 JULI 2021
NO./TANGGAL SPMK : HK0201/PPK3.1-JATENG/PKT/VII/2021/04, 6 JULI 2021
PENYEDIA JASA : PT. AYUDI PERSDA-PT.MULTI BANGUN INDONESIA, KSO
KONSULTAN SUPERVISI : PT.ARIA JASA REKSATAMA,KSO, PT. VIRAMA KARYA, PT. BUANA ARCHICON
LINGKUP PEKERJAAN : REKONSTRUKSI JALAN
HARI/TANGGAL : SENIN 27-Sep-2021
TENAGA KERJA JENIS MATERIAL PERALATAN
NO. KUALIFIKASI SAT. JUMLAH NO. JENIS BAHAN SAT. VOLUME NO. JENIS/MERK JUMLAH
1 ASPHALT FINISHER
1 Surveyor org 2 1 Beton FS-45 m3 188.75 2 BULDOZER D 31
2 Pembantu Surveyor org 4 3 COMPRESSOR 4000-6500 L\M
3 Pelaksana PJ org 3 4 BULLDOZER 100-150 HP
4 Petugas K-3 org 7 5 ASPHAL DISTRIBUTOR
5 Konsultan org 5 6 CONCRETE MIXER 0.3-0.6 M3
6 Bina Marga org 2 7 CRANE 10-15 TON
7 Pekerja org 3 8 DUMP TRUCK 3 - 4 M3
8 Operator org 15 9 DUMP TRUCK 6-8 M3
9 Teknisi Lab org 4 10 EXCAVATOR 80-140 HP
10 Mandor dan Tenaga org 38 11 FLAT BED TRUCK 3-4 TON
12 GENERATOR SET 2 unit
13 WHEEL LOADER 1.0-1.6 M3
14 ASPHAL SPRAYER
15 TANDEM ROLLER 6-8 T
16 TIRE ROLLER 8-10 T
17 VIBRATORY ROLLER 5-8 T.
18 CONCRETE VIBRATOR 4 Unit
19 JACK HAMMER
20 CONCRETE PAVER MANUAL 2 Unit
21 WELDING SET
22 ALAT UKUR WP/TS 2 Set
23 COLD MILLING MACHINE

PEKERJAAN YANG DILAKSANAKAN


ITEM CATATAN
URAIAN PEKERJAAN SAT. VOLUME LOKASI
PEKERJAAN PERMASALAHAN

Skh.1.5.3(3) Perkerasan Beton Semen dengan umur Pembukan Lebih m3 188.75 38+512-38+628 (L2)
dari 3 hari dan kurang dari 7 hari. 38+050-38+005 (L2)

CUACA
Pekerjaan KONDISI CERAH GERIMIS HUJAN
Mulai Pukul : 08.00 08.00 s/d 24.00 √
Selesai Pukul : 24.00

Menyetujui : Diperiksa Oleh : Dibuat Oleh :


PPK. 3.1 Provinsi Jawa Tengah Konsultan Supervisi Penyedia Jasa

……………………………… ………………………………… …………………………………


Penilik Jalan Inspektor Pelaksana
LAPORAN HARIAN
REKONSTRUKSI JALAN

PAKET : REKONSTRUKSI JALAN WELERI-KENDAL-SEMARANG


NO./TANGGAL KONTRAK : HK0201/PPK3.1-JATENG/PKT/VII/2021/03, 5 JULI 2021
NO./TANGGAL SPMK : HK0201/PPK3.1-JATENG/PKT/VII/2021/04, 6 JULI 2021
PENYEDIA JASA : PT. AYUDI PERSDA-PT.MULTI BANGUN INDONESIA, KSO
KONSULTAN SUPERVISI : PT.ARIA JASA REKSATAMA,KSO, PT. VIRAMA KARYA, PT. BUANA ARCHICON
LINGKUP PEKERJAAN : REKONSTRUKSI JALAN
HARI/TANGGAL : SELASA 28-Sep-2021
TENAGA KERJA JENIS MATERIAL PERALATAN
NO. KUALIFIKASI SAT. JUMLAH NO. JENIS BAHAN SAT. VOLUME NO. JENIS/MERK JUMLAH
1 ASPHALT FINISHER
1 Surveyor org 2 1 Beton FS-45 m3 137.83 2 BULDOZER D 31
2 Pembantu Surveyor org 4 3 COMPRESSOR 4000-6500 L\M
3 Pelaksana PJ org 3 4 BULLDOZER 100-150 HP
4 Petugas K-3 org 7 5 ASPHAL DISTRIBUTOR
5 Konsultan org 5 6 CONCRETE MIXER 0.3-0.6 M3
6 Bina Marga org 2 7 CRANE 10-15 TON
7 Pekerja org 3 8 DUMP TRUCK 3 - 4 M3
8 Operator org 15 9 DUMP TRUCK 6-8 M3
9 Teknisi Lab org 4 10 EXCAVATOR 80-140 HP
10 Mandor dan Tenaga org 38 11 FLAT BED TRUCK 3-4 TON
12 GENERATOR SET 2 unit
13 WHEEL LOADER 1.0-1.6 M3
14 ASPHAL SPRAYER
15 TANDEM ROLLER 6-8 T
16 TIRE ROLLER 8-10 T
17 VIBRATORY ROLLER 5-8 T.
18 CONCRETE VIBRATOR 2 Unit
19 JACK HAMMER
20 CONCRETE PAVER MANUAL 2 Unit
21 WELDING SET
22 ALAT UKUR WP/TS 2 Set
23 COLD MILLING MACHINE

PEKERJAAN YANG DILAKSANAKAN


ITEM CATATAN
URAIAN PEKERJAAN SAT. VOLUME LOKASI
PEKERJAAN PERMASALAHAN

Skh.1.5.3(3) Perkerasan Beton Semen dengan umur Pembukan Lebih m3 137.83 38+005-37+888 (L2)
dari 3 hari dan kurang dari 7 hari.

CUACA
Pekerjaan KONDISI CERAH GERIMIS HUJAN
Mulai Pukul : 08.00 08.00 s/d 24.00 √
Selesai Pukul : 24.00

Menyetujui : Diperiksa Oleh : Dibuat Oleh :


PPK. 3.1 Provinsi Jawa Tengah Konsultan Supervisi Penyedia Jasa

……………………………… ………………………………… …………………………………


Penilik Jalan Inspektor Pelaksana
LAPORAN HARIAN
REKONSTRUKSI JALAN

PAKET : REKONSTRUKSI JALAN WELERI-KENDAL-SEMARANG


NO./TANGGAL KONTRAK : HK0201/PPK3.1-JATENG/PKT/VII/2021/03, 5 JULI 2021
NO./TANGGAL SPMK : HK0201/PPK3.1-JATENG/PKT/VII/2021/04, 6 JULI 2021
PENYEDIA JASA : PT. AYUDI PERSDA-PT.MULTI BANGUN INDONESIA, KSO
KONSULTAN SUPERVISI : PT.ARIA JASA REKSATAMA,KSO, PT. VIRAMA KARYA, PT. BUANA ARCHICON
LINGKUP PEKERJAAN : REKONSTRUKSI JALAN
HARI/TANGGAL : RABU 29-Sep-2021
TENAGA KERJA JENIS MATERIAL PERALATAN
NO. KUALIFIKASI SAT. JUMLAH NO. JENIS BAHAN SAT. VOLUME NO. JENIS/MERK JUMLAH
1 ASPHALT FINISHER
1 Surveyor org 2 1 Asphalt Concrete Ton 150.16 2 BULDOZER D 31
2 Pembantu Surveyor org 4 3 COMPRESSOR 4000-6500 L\M
3 Pelaksana PJ org 3 4 BULLDOZER 100-150 HP
4 Petugas K-3 org 7 5 ASPHAL DISTRIBUTOR
5 Konsultan org 5 6 CONCRETE MIXER 0.3-0.6 M3
6 Bina Marga org 2 7 CRANE 10-15 TON
7 Pekerja org 3 8 DUMP TRUCK 3 - 4 M3
8 Operator org 15 9 DUMP TRUCK 6-8 M3
9 Teknisi Lab org 4 10 EXCAVATOR 80-140 HP
10 Mandor dan Tenaga org 38 11 FLAT BED TRUCK 3-4 TON
12 GENERATOR SET 2 unit
13 WHEEL LOADER 1.0-1.6 M3
14 ASPHAL SPRAYER
15 TANDEM ROLLER 6-8 T
16 TIRE ROLLER 8-10 T
17 VIBRATORY ROLLER 5-8 T.
18 CONCRETE VIBRATOR 4 Unit
19 JACK HAMMER
20 CONCRETE PAVER MANUAL 2 Unit
21 WELDING SET
22 ALAT UKUR WP/TS 2 Set
23 COLD MILLING MACHINE

PEKERJAAN YANG DILAKSANAKAN


ITEM CATATAN
URAIAN PEKERJAAN SAT. VOLUME LOKASI
PEKERJAAN PERMASALAHAN

Skh.1.5.3(3) Perkerasan Beton Semen dengan umur Pembukan Lebih m3 128.40 37+888-37+779 (L2)
dari 3 hari dan kurang dari 7 hari. 21.75 37+003-36+983 (R1)

CUACA
Pekerjaan KONDISI CERAH GERIMIS HUJAN
Mulai Pukul : 08.00 08.00 s/d 24.00 √
Selesai Pukul : 24.00

Menyetujui : Diperiksa Oleh : Dibuat Oleh :


PPK. 3.1 Provinsi Jawa Tengah Konsultan Supervisi Penyedia Jasa
……………………………… ………………………………… …………………………………
Penilik Jalan Inspektor Pelaksana
LAPORAN HARIAN
REKONSTRUKSI JALAN

PAKET : REKONSTRUKSI JALAN WELERI-KENDAL-SEMARANG


NO./TANGGAL KONTRAK : HK0201/PPK3.1-JATENG/PKT/VII/2021/03, 5 JULI 2021
NO./TANGGAL SPMK : HK0201/PPK3.1-JATENG/PKT/VII/2021/04, 6 JULI 2021
PENYEDIA JASA : PT. AYUDI PERSDA-PT.MULTI BANGUN INDONESIA, KSO
KONSULTAN SUPERVISI : PT.ARIA JASA REKSATAMA,KSO, PT. VIRAMA KARYA, PT. BUANA ARCHICON
LINGKUP PEKERJAAN : REKONSTRUKSI JALAN
HARI/TANGGAL : KAMIS 30-Sep-2021
TENAGA KERJA JENIS MATERIAL PERALATAN
NO. KUALIFIKASI SAT. JUMLAH NO. JENIS BAHAN SAT. VOLUME NO. JENIS/MERK JUMLAH
1 ASPHALT FINISHER
1 Surveyor org 2 1 Asphalt Concrete Ton 159.05 2 BULDOZER D 31
2 Pembantu Surveyor org 4 3 COMPRESSOR 4000-6500 L\M
3 Pelaksana PJ org 3 4 BULLDOZER 100-150 HP
4 Petugas K-3 org 7 5 ASPHAL DISTRIBUTOR
5 Konsultan org 5 6 CONCRETE MIXER 0.3-0.6 M3
6 Bina Marga org 2 7 CRANE 10-15 TON
7 Pekerja org 3 8 DUMP TRUCK 3 - 4 M3
8 Operator org 15 9 DUMP TRUCK 6-8 M3
9 Teknisi Lab org 4 10 EXCAVATOR 80-140 HP
10 Mandor dan Tenaga org 38 11 FLAT BED TRUCK 3-4 TON
12 GENERATOR SET 2 unit
13 WHEEL LOADER 1.0-1.6 M3
14 ASPHAL SPRAYER
15 TANDEM ROLLER 6-8 T
16 TIRE ROLLER 8-10 T
17 VIBRATORY ROLLER 5-8 T.
18 CONCRETE VIBRATOR 4 Unit
19 JACK HAMMER
20 CONCRETE PAVER MANUAL 2 Unit
21 WELDING SET
22 ALAT UKUR WP/TS 2 Set
23 COLD MILLING MACHINE

PEKERJAAN YANG DILAKSANAKAN


ITEM CATATAN
URAIAN PEKERJAAN SAT. VOLUME LOKASI
PEKERJAAN PERMASALAHAN

Skh.1.5.3(3) Perkerasan Beton Semen dengan umur Pembukan Lebih m3 63.36 36+983-36+927(R1)
dari 3 hari dan kurang dari 7 hari.
95.68 37+779-37+697(L2)

CUACA
Pekerjaan KONDISI CERAH GERIMIS HUJAN
Mulai Pukul : 08.00 08.00 s/d 24.00 √
Selesai Pukul : 24.00

Menyetujui : Diperiksa Oleh : Dibuat Oleh :


PPK. 3.1 Provinsi Jawa Tengah Konsultan Supervisi Penyedia Jasa

……………………………… ………………………………… …………………………………


Penilik Jalan Inspektor Pelaksana
LAPORAN HARIAN
REKONSTRUKSI JALAN

PAKET : REKONSTRUKSI JALAN WELERI-KENDAL-SEMARANG


NO./TANGGAL KONTRAK : HK0201/PPK3.1-JATENG/PKT/VII/2021/03, 5 JULI 2021
NO./TANGGAL SPMK : HK0201/PPK3.1-JATENG/PKT/VII/2021/04, 6 JULI 2021
PENYEDIA JASA : PT. AYUDI PERSDA-PT.MULTI BANGUN INDONESIA, KSO
KONSULTAN SUPERVISI : PT.ARIA JASA REKSATAMA,KSO, PT. VIRAMA KARYA, PT. BUANA ARCHICON
LINGKUP PEKERJAAN : REKONSTRUKSI JALAN
HARI/TANGGAL : JUMAT 1-Oct-2021
TENAGA KERJA JENIS MATERIAL PERALATAN
NO. KUALIFIKASI SAT. JUMLAH NO. JENIS BAHAN SAT. VOLUME NO. JENIS/MERK JUMLAH
1 ASPHALT FINISHER
1 Surveyor org 2 1 Asphalt Concrete Ton 230.32 2 BULDOZER D 31
2 Pembantu Surveyor org 4 3 COMPRESSOR 4000-6500 L\M
3 Pelaksana PJ org 3 4 BULLDOZER 100-150 HP
4 Petugas K-3 org 7 5 ASPHAL DISTRIBUTOR
5 Konsultan org 5 6 CONCRETE MIXER 0.3-0.6 M3
6 Bina Marga org 2 7 CRANE 10-15 TON
7 Pekerja org 3 8 DUMP TRUCK 3 - 4 M3
8 Operator org 15 9 DUMP TRUCK 6-8 M3
9 Teknisi Lab org 4 10 EXCAVATOR 80-140 HP
10 Mandor dan Tenaga org 38 11 FLAT BED TRUCK 3-4 TON
12 GENERATOR SET 2 unit
13 WHEEL LOADER 1.0-1.6 M3
14 ASPHAL SPRAYER
15 TANDEM ROLLER 6-8 T
16 TIRE ROLLER 8-10 T
17 VIBRATORY ROLLER 5-8 T.
18 CONCRETE VIBRATOR 4 Unit
19 JACK HAMMER
20 CONCRETE PAVER MANUAL 2 Unit
21 WELDING SET
22 ALAT UKUR WP/TS 2 Set
23 COLD MILLING MACHINE

PEKERJAAN YANG DILAKSANAKAN


ITEM CATATAN
URAIAN PEKERJAAN SAT. VOLUME LOKASI
PEKERJAAN PERMASALAHAN

Skh.1.5.3(3) Perkerasan Beton Semen dengan umur Pembukan Lebih m3 71.29 36+927-36+864 (R1)
dari 3 hari dan kurang dari 7 hari. 159.03 40+385-40+250 (L2)

CUACA
Pekerjaan KONDISI CERAH GERIMIS HUJAN
Mulai Pukul : 08.00 08.00 s/d 24.00 √
Selesai Pukul : 24.00

Menyetujui : Diperiksa Oleh : Dibuat Oleh :


PPK. 3.1 Provinsi Jawa Tengah Konsultan Supervisi Penyedia Jasa

……………………………… ………………………………… …………………………………


Penilik Jalan Inspektor Pelaksana
LAPORAN HARIAN
REKONSTRUKSI JALAN

PAKET : REKONSTRUKSI JALAN WELERI-KENDAL-SEMARANG


NO./TANGGAL KONTRAK : HK0201/PPK3.1-JATENG/PKT/VII/2021/03, 5 JULI 2021
NO./TANGGAL SPMK : HK0201/PPK3.1-JATENG/PKT/VII/2021/04, 6 JULI 2021
PENYEDIA JASA : PT. AYUDI PERSDA-PT.MULTI BANGUN INDONESIA, KSO
KONSULTAN SUPERVISI : PT.ARIA JASA REKSATAMA,KSO, PT. VIRAMA KARYA, PT. BUANA ARCHICON
LINGKUP PEKERJAAN : REKONSTRUKSI JALAN
HARI/TANGGAL : SABTU 2-Oct-2021
TENAGA KERJA JENIS MATERIAL PERALATAN
NO. KUALIFIKASI SAT. JUMLAH NO. JENIS BAHAN SAT. VOLUME NO. JENIS/MERK JUMLAH
1 ASPHALT FINISHER
1 Surveyor org 2 1 Asphalt Concrete Ton 246.07 2 BULDOZER D 31
2 Pembantu Surveyor org 4 3 COMPRESSOR 4000-6500 L\M
3 Pelaksana PJ org 3 4 BULLDOZER 100-150 HP
4 Petugas K-3 org 7 5 ASPHAL DISTRIBUTOR
5 Konsultan org 5 6 CONCRETE MIXER 0.3-0.6 M3
6 Bina Marga org 2 7 CRANE 10-15 TON
7 Pekerja org 3 8 DUMP TRUCK 3 - 4 M3
8 Operator org 15 9 DUMP TRUCK 6-8 M3
9 Teknisi Lab org 4 10 EXCAVATOR 80-140 HP
10 Mandor dan Tenaga org 38 11 FLAT BED TRUCK 3-4 TON
12 GENERATOR SET 2 unit
13 WHEEL LOADER 1.0-1.6 M3
14 ASPHAL SPRAYER
15 TANDEM ROLLER 6-8 T
16 TIRE ROLLER 8-10 T
17 VIBRATORY ROLLER 5-8 T.
18 CONCRETE VIBRATOR 4 Unit
19 JACK HAMMER
20 CONCRETE PAVER MANUAL 2 Unit
21 WELDING SET
22 ALAT UKUR WP/TS 2 Set
23 COLD MILLING MACHINE

PEKERJAAN YANG DILAKSANAKAN


ITEM CATATAN
URAIAN PEKERJAAN SAT. VOLUME LOKASI
PEKERJAAN PERMASALAHAN

Skh.1.5.3(3) Perkerasan Beton Semen dengan umur Pembukan Lebih m3 164.60 40+250-40+109.50 (L2)
dari 3 hari dan kurang dari 7 hari.
81.47 36+864-36+792 (R1)

CUACA
Pekerjaan KONDISI CERAH GERIMIS HUJAN
Mulai Pukul : 08.00 08.00 s/d 24.00 √
Selesai Pukul : 24.00

Menyetujui : Diperiksa Oleh : Dibuat Oleh :


PPK. 3.1 Provinsi Jawa Tengah Konsultan Supervisi Penyedia Jasa

……………………………… ………………………………… …………………………………


Penilik Jalan Inspektor Pelaksana
LAPORAN HARIAN
REKONSTRUKSI JALAN

PAKET : REKONSTRUKSI JALAN WELERI-KENDAL-SEMARANG


NO./TANGGAL KONTRAK : HK0201/PPK3.1-JATENG/PKT/VII/2021/03, 5 JULI 2021
NO./TANGGAL SPMK : HK0201/PPK3.1-JATENG/PKT/VII/2021/04, 6 JULI 2021
PENYEDIA JASA : PT. AYUDI PERSDA-PT.MULTI BANGUN INDONESIA, KSO
KONSULTAN SUPERVISI : PT.ARIA JASA REKSATAMA,KSO, PT. VIRAMA KARYA, PT. BUANA ARCHICON
LINGKUP PEKERJAAN : REKONSTRUKSI JALAN
HARI/TANGGAL : MINGGU 3-Oct-2021
TENAGA KERJA JENIS MATERIAL PERALATAN
NO. KUALIFIKASI SAT. JUMLAH NO. JENIS BAHAN SAT. VOLUME NO. JENIS/MERK JUMLAH
1 ASPHALT FINISHER
1 Surveyor org 2 1 Asphalt Concrete Ton 289.85 2 BULDOZER D 31
2 Pembantu Surveyor org 4 3 COMPRESSOR 4000-6500 L\M
3 Pelaksana PJ org 3 4 BULLDOZER 100-150 HP
4 Petugas K-3 org 7 5 ASPHAL DISTRIBUTOR
5 Konsultan org 5 6 CONCRETE MIXER 0.3-0.6 M3
6 Bina Marga org 2 7 CRANE 10-15 TON
7 Pekerja org 3 8 DUMP TRUCK 3 - 4 M3
8 Operator org 15 9 DUMP TRUCK 6-8 M3
9 Teknisi Lab org 4 10 EXCAVATOR 80-140 HP
10 Mandor dan Tenaga org 38 11 FLAT BED TRUCK 3-4 TON
12 GENERATOR SET 2 unit
13 WHEEL LOADER 1.0-1.6 M3
14 ASPHAL SPRAYER
15 TANDEM ROLLER 6-8 T
16 TIRE ROLLER 8-10 T
17 VIBRATORY ROLLER 5-8 T.
18 CONCRETE VIBRATOR 4 Unit
19 JACK HAMMER
20 CONCRETE PAVER MANUAL 2 Unit
21 WELDING SET
22 ALAT UKUR WP/TS 2 Set
23 COLD MILLING MACHINE

PEKERJAAN YANG DILAKSANAKAN


ITEM CATATAN
URAIAN PEKERJAAN SAT. VOLUME LOKASI
PEKERJAAN PERMASALAHAN

Skh.1.5.3(3) Perkerasan Beton Semen dengan umur Pembukan Lebih m3 113.15 36+792-36+692 (R1)
dari 3 hari dan kurang dari 7 hari. 176.70 40+385-40+535 (L2)

CUACA
Pekerjaan KONDISI CERAH GERIMIS HUJAN
Mulai Pukul : 08.00 08.00 s/d 24.00 √
Selesai Pukul : 24.00

Menyetujui : Diperiksa Oleh : Dibuat Oleh :


PPK. 3.1 Provinsi Jawa Tengah Konsultan Supervisi Penyedia Jasa

……………………………… ………………………………… …………………………………


Penilik Jalan Inspektor Pelaksana
LAPORAN HARIAN
REKONSTRUKSI JALAN

PAKET : REKONSTRUKSI JALAN WELERI-KENDAL-SEMARANG


NO./TANGGAL KONTRAK : HK0201/PPK3.1-JATENG/PKT/VII/2021/03, 5 JULI 2021
NO./TANGGAL SPMK : HK0201/PPK3.1-JATENG/PKT/VII/2021/04, 6 JULI 2021
PENYEDIA JASA : PT. AYUDI PERSDA-PT.MULTI BANGUN INDONESIA, KSO
KONSULTAN SUPERVISI : PT.ARIA JASA REKSATAMA,KSO, PT. VIRAMA KARYA, PT. BUANA ARCHICON
LINGKUP PEKERJAAN : REKONSTRUKSI JALAN
HARI/TANGGAL : SENIN 4-Oct-2021
TENAGA KERJA JENIS MATERIAL PERALATAN
NO. KUALIFIKASI SAT. JUMLAHNO. JENIS BAHAN SAT. VOLUME NO. JENIS/MERK JUMLAH
1 ASPHALT FINISHER
1 Surveyor org 2 1 Asphalt Concrete Ton 179.65 2 BULDOZER D 31
2 Pembantu Surveyor org 4 3 COMPRESSOR 4000-6500 L\M
3 Pelaksana PJ org 3 4 BULLDOZER 100-150 HP
4 Petugas K-3 org 7 5 ASPHAL DISTRIBUTOR
5 Konsultan org 5 6 CONCRETE MIXER 0.3-0.6 M3
6 Bina Marga org 2 7 CRANE 10-15 TON
7 Pekerja org 3 8 DUMP TRUCK 3 - 4 M3
8 Operator org 15 9 DUMP TRUCK 6-8 M3
9 Teknisi Lab org 4 10 EXCAVATOR 80-140 HP
10 Mandor dan Tenaga org 38 11 FLAT BED TRUCK 3-4 TON
12 GENERATOR SET 2 unit
13 WHEEL LOADER 1.0-1.6 M3
14 ASPHAL SPRAYER
15 TANDEM ROLLER 6-8 T
16 TIRE ROLLER 8-10 T
17 VIBRATORY ROLLER 5-8 T.
18 CONCRETE VIBRATOR 4 Unit
19 JACK HAMMER
20 CONCRETE PAVER MANUAL 2 Unit
21 WELDING SET
22 ALAT UKUR WP/TS 2 Set
23 COLD MILLING MACHINE

PEKERJAAN YANG DILAKSANAKAN


ITEM CATATAN
URAIAN PEKERJAAN SAT. VOLUME LOKASI
PEKERJAAN PERMASALAHAN

Skh.1.5.3(3) Perkerasan Beton Semen dengan umur Pembukan Lebih m3 136.65 40+535-40+651 (L2)
dari 3 hari dan kurang dari 7 hari.
43.00 36+692-36+654 (R1)

CUACA
Pekerjaan KONDISI CERAH GERIMIS HUJAN
Mulai Pukul : 08.00 08.00 s/d 24.00 √
Selesai Pukul : 24.00

Menyetujui : Diperiksa Oleh : Dibuat Oleh :


PPK. 3.1 Provinsi Jawa Tengah Konsultan Supervisi Penyedia Jasa

……………………………… ………………………………… …………………………………


Penilik Jalan Inspektor Pelaksana
LAPORAN HARIAN
REKONSTRUKSI JALAN

PAKET : REKONSTRUKSI JALAN WELERI-KENDAL-SEMARANG


NO./TANGGAL KONTRAK : HK0201/PPK3.1-JATENG/PKT/VII/2021/03, 5 JULI 2021
NO./TANGGAL SPMK : HK0201/PPK3.1-JATENG/PKT/VII/2021/04, 6 JULI 2021
PENYEDIA JASA : PT. AYUDI PERSDA-PT.MULTI BANGUN INDONESIA, KSO
KONSULTAN SUPERVISI : PT.ARIA JASA REKSATAMA,KSO, PT. VIRAMA KARYA, PT. BUANA ARCHICON
LINGKUP PEKERJAAN : REKONSTRUKSI JALAN
HARI/TANGGAL : SELASA 5-Oct-2021
TENAGA KERJA JENIS MATERIAL PERALATAN
NO. KUALIFIKASI SAT. JUMLAH NO. JENIS BAHAN SAT. VOLUME NO. JENIS/MERK JUMLAH
1 ASPHALT FINISHER
1 Surveyor org 2 1 Asphalt Concrete Ton 145.34 2 BULDOZER D 31
2 Pembantu Surveyor org 4 3 COMPRESSOR 4000-6500 L\M
3 Pelaksana PJ org 3 4 BULLDOZER 100-150 HP
4 Petugas K-3 org 7 5 ASPHAL DISTRIBUTOR
5 Konsultan org 5 6 CONCRETE MIXER 0.3-0.6 M3
6 Bina Marga org 2 7 CRANE 10-15 TON
7 Pekerja org 3 8 DUMP TRUCK 3 - 4 M3
8 Operator org 15 9 DUMP TRUCK 6-8 M3
9 Teknisi Lab org 4 10 EXCAVATOR 80-140 HP
10 Mandor dan Tenaga org 38 11 FLAT BED TRUCK 3-4 TON
12 GENERATOR SET 2 unit
13 WHEEL LOADER 1.0-1.6 M3
14 ASPHAL SPRAYER
15 TANDEM ROLLER 6-8 T
16 TIRE ROLLER 8-10 T
17 VIBRATORY ROLLER 5-8 T.
18 CONCRETE VIBRATOR 4 Unit
19 JACK HAMMER
20 CONCRETE PAVER MANUAL 2 Unit
21 WELDING SET
22 ALAT UKUR WP/TS 2 Set
23 COLD MILLING MACHINE

PEKERJAAN YANG DILAKSANAKAN


ITEM CATATAN
URAIAN PEKERJAAN SAT. VOLUME LOKASI
PEKERJAAN PERMASALAHAN

Skh.1.5.3(3) Perkerasan Beton Semen dengan umur Pembukan Lebih m3 145.34 36+654-36+577 (R1)
dari 3 hari dan kurang dari 7 hari. 36+533-36+480 (R1)
165.19 40+651-40+726 (L2)
40+765-40+831 (L2)

CUACA
Pekerjaan KONDISI CERAH GERIMIS HUJAN
Mulai Pukul : 08.00 08.00 s/d 24.00 √
Selesai Pukul : 24.00

Menyetujui : Diperiksa Oleh : Dibuat Oleh :


PPK. 3.1 Provinsi Jawa Tengah Konsultan Supervisi Penyedia Jasa

……………………………… ………………………………… …………………………………


Penilik Jalan Inspektor Pelaksana
LAPORAN HARIAN
REKONSTRUKSI JALAN

PAKET : REKONSTRUKSI JALAN WELERI-KENDAL-SEMARANG


NO./TANGGAL KONTRAK : HK0201/PPK3.1-JATENG/PKT/VII/2021/03, 5 JULI 2021
NO./TANGGAL SPMK : HK0201/PPK3.1-JATENG/PKT/VII/2021/04, 6 JULI 2021
PENYEDIA JASA : PT. AYUDI PERSDA-PT.MULTI BANGUN INDONESIA, KSO
KONSULTAN SUPERVISI : PT.ARIA JASA REKSATAMA,KSO, PT. VIRAMA KARYA, PT. BUANA ARCHICON
LINGKUP PEKERJAAN : REKONSTRUKSI JALAN
HARI/TANGGAL : RABU 6-Oct-2021
TENAGA KERJA JENIS MATERIAL PERALATAN
NO. KUALIFIKASI SAT. JUMLAH NO. JENIS BAHAN SAT. VOLUME NO. JENIS/MERK JUMLAH
1 ASPHALT FINISHER
1 Surveyor org 2 1 Asphalt Concrete Ton 277.34 2 BULDOZER D 31
2 Pembantu Surveyor org 4 3 COMPRESSOR 4000-6500 L\M
3 Pelaksana PJ org 3 4 BULLDOZER 100-150 HP
4 Petugas K-3 org 7 5 ASPHAL DISTRIBUTOR
5 Konsultan org 5 6 CONCRETE MIXER 0.3-0.6 M3
6 Bina Marga org 2 7 CRANE 10-15 TON
7 Pekerja org 3 8 DUMP TRUCK 3 - 4 M3
8 Operator org 15 9 DUMP TRUCK 6-8 M3
9 Teknisi Lab org 4 10 EXCAVATOR 80-140 HP
10 Mandor dan Tenaga org 38 11 FLAT BED TRUCK 3-4 TON
12 GENERATOR SET 2 unit
13 WHEEL LOADER 1.0-1.6 M3
14 ASPHAL SPRAYER
15 TANDEM ROLLER 6-8 T
16 TIRE ROLLER 8-10 T
17 VIBRATORY ROLLER 5-8 T.
18 CONCRETE VIBRATOR 4 Unit
19 JACK HAMMER
20 CONCRETE PAVER MANUAL 2 Unit
21 WELDING SET
22 ALAT UKUR WP/TS 2 Set
23 COLD MILLING MACHINE

PEKERJAAN YANG DILAKSANAKAN


ITEM CATATAN
URAIAN PEKERJAAN SAT. VOLUME LOKASI
PEKERJAAN PERMASALAHAN

Skh.1.5.3(3) Perkerasan Beton Semen dengan umur Pembukan Lebih m3 203.79 40+831-41+004 (L2)
dari 3 hari dan kurang dari 7 hari.
73.55 36+480-36+415 (R1)

CUACA
Pekerjaan KONDISI CERAH GERIMIS HUJAN
Mulai Pukul : 08.00 08.00 s/d 24.00 √
Selesai Pukul : 24.00

Menyetujui : Diperiksa Oleh : Dibuat Oleh :


PPK. 3.1 Provinsi Jawa Tengah Konsultan Supervisi Penyedia Jasa

……………………………… ………………………………… …………………………………


Penilik Jalan Inspektor Pelaksana
LAPORAN HARIAN
REKONSTRUKSI JALAN

PAKET : REKONSTRUKSI JALAN WELERI-KENDAL-SEMARANG


NO./TANGGAL KONTRAK : HK0201/PPK3.1-JATENG/PKT/VII/2021/03, 5 JULI 2021
NO./TANGGAL SPMK : HK0201/PPK3.1-JATENG/PKT/VII/2021/04, 6 JULI 2021
PENYEDIA JASA : PT. AYUDI PERSDA-PT.MULTI BANGUN INDONESIA, KSO
KONSULTAN SUPERVISI : PT.ARIA JASA REKSATAMA,KSO, PT. VIRAMA KARYA, PT. BUANA ARCHICON
LINGKUP PEKERJAAN : REKONSTRUKSI JALAN
HARI/TANGGAL : KAMIS 7-Oct-2021
TENAGA KERJA JENIS MATERIAL PERALATAN
NO. KUALIFIKASI SAT. JUMLAH NO. JENIS BAHAN SAT. VOLUME NO. JENIS/MERK JUMLAH
1 ASPHALT FINISHER
1 Surveyor org 2 1 Asphalt Concrete Ton 288.86 2 BULDOZER D 31
2 Pembantu Surveyor org 4 3 COMPRESSOR 4000-6500 L\M
3 Pelaksana PJ org 3 4 BULLDOZER 100-150 HP
4 Petugas K-3 org 7 5 ASPHAL DISTRIBUTOR
5 Konsultan org 5 6 CONCRETE MIXER 0.3-0.6 M3
6 Bina Marga org 2 7 CRANE 10-15 TON
7 Pekerja org 3 8 DUMP TRUCK 3 - 4 M3
8 Operator org 15 9 DUMP TRUCK 6-8 M3
9 Teknisi Lab org 4 10 EXCAVATOR 80-140 HP
10 Mandor dan Tenaga org 38 11 FLAT BED TRUCK 3-4 TON
12 GENERATOR SET 2 unit
13 WHEEL LOADER 1.0-1.6 M3
14 ASPHAL SPRAYER
15 TANDEM ROLLER 6-8 T
16 TIRE ROLLER 8-10 T
17 VIBRATORY ROLLER 5-8 T.
18 CONCRETE VIBRATOR 4 Unit
19 JACK HAMMER
20 CONCRETE PAVER MANUAL 2 Unit
21 WELDING SET
22 ALAT UKUR WP/TS 2 Set
23 COLD MILLING MACHINE

PEKERJAAN YANG DILAKSANAKAN


ITEM CATATAN
URAIAN PEKERJAAN SAT. VOLUME LOKASI
PEKERJAAN PERMASALAHAN

Skh.1.5.3(3) Perkerasan Beton Semen dengan umur Pembukan Lebih m3 143.70 36+415-36+288 (R1)
dari 3 hari dan kurang dari 7 hari. 145.16 41+004-41+128 (L2)

CUACA
Pekerjaan KONDISI CERAH GERIMIS HUJAN
Mulai Pukul : 08.00 08.00 s/d 24.00 √
Selesai Pukul : 24.00

Menyetujui : Diperiksa Oleh : Dibuat Oleh :


PPK. 3.1 Provinsi Jawa Tengah Konsultan Supervisi Penyedia Jasa

……………………………… ………………………………… …………………………………


Penilik Jalan Inspektor Pelaksana
LAPORAN HARIAN
REKONSTRUKSI JALAN

PAKET : REKONSTRUKSI JALAN WELERI-KENDAL-SEMARANG


NO./TANGGAL KONTRAK : HK0201/PPK3.1-JATENG/PKT/VII/2021/03, 5 JULI 2021
NO./TANGGAL SPMK : HK0201/PPK3.1-JATENG/PKT/VII/2021/04, 6 JULI 2021
PENYEDIA JASA : PT. AYUDI PERSDA-PT.MULTI BANGUN INDONESIA, KSO
KONSULTAN SUPERVISI : PT.ARIA JASA REKSATAMA,KSO, PT. VIRAMA KARYA, PT. BUANA ARCHICON
LINGKUP PEKERJAAN : REKONSTRUKSI JALAN
HARI/TANGGAL : JUMAT 8-Oct-2021
TENAGA KERJA JENIS MATERIAL PERALATAN
NO. KUALIFIKASI SAT. JUMLAH NO. JENIS BAHAN SAT. VOLUME NO. JENIS/MERK JUMLAH
1 ASPHALT FINISHER
1 Surveyor org 2 1 Asphalt Concrete Ton 217.74 2 BULDOZER D 31
2 Pembantu Surveyor org 4 3 COMPRESSOR 4000-6500 L\M
3 Pelaksana PJ org 3 4 BULLDOZER 100-150 HP
4 Petugas K-3 org 7 5 ASPHAL DISTRIBUTOR
5 Konsultan org 5 6 CONCRETE MIXER 0.3-0.6 M3
6 Bina Marga org 2 7 CRANE 10-15 TON
7 Pekerja org 3 8 DUMP TRUCK 3 - 4 M3
8 Operator org 15 9 DUMP TRUCK 6-8 M3
9 Teknisi Lab org 4 10 EXCAVATOR 80-140 HP
10 Mandor dan Tenaga org 38 11 FLAT BED TRUCK 3-4 TON
12 GENERATOR SET 2 unit
13 WHEEL LOADER 1.0-1.6 M3
14 ASPHAL SPRAYER
15 TANDEM ROLLER 6-8 T
16 TIRE ROLLER 8-10 T
17 VIBRATORY ROLLER 5-8 T.
18 CONCRETE VIBRATOR 4 Unit
19 JACK HAMMER
20 CONCRETE PAVER MANUAL 2 Unit
21 WELDING SET
22 ALAT UKUR WP/TS 2 Set
23 COLD MILLING MACHINE

PEKERJAAN YANG DILAKSANAKAN


ITEM CATATAN
URAIAN PEKERJAAN SAT. VOLUME LOKASI
PEKERJAAN PERMASALAHAN

Skh.1.5.3(3) Perkerasan Beton Semen dengan umur Pembukan Lebih m3 165.69 39+451-39+597 (L1)
dari 3 hari dan kurang dari 7 hari. 52.05 36+288-36+242 (R1)

CUACA
Pekerjaan KONDISI CERAH GERIMIS HUJAN
Mulai Pukul : 08.00 08.00 s/d 24.00 √
Selesai Pukul : 24.00

Menyetujui : Diperiksa Oleh : Dibuat Oleh :


PPK. 3.1 Provinsi Jawa Tengah Konsultan Supervisi Penyedia Jasa

……………………………… ………………………………… …………………………………


Penilik Jalan Inspektor Pelaksana
LAPORAN HARIAN
REKONSTRUKSI JALAN

PAKET : REKONSTRUKSI JALAN WELERI-KENDAL-SEMARANG


NO./TANGGAL KONTRAK : HK0201/PPK3.1-JATENG/PKT/VII/2021/03, 5 JULI 2021
NO./TANGGAL SPMK : HK0201/PPK3.1-JATENG/PKT/VII/2021/04, 6 JULI 2021
PENYEDIA JASA : PT. AYUDI PERSDA-PT.MULTI BANGUN INDONESIA, KSO
KONSULTAN SUPERVISI : PT.ARIA JASA REKSATAMA,KSO, PT. VIRAMA KARYA, PT. BUANA ARCHICON
LINGKUP PEKERJAAN : REKONSTRUKSI JALAN
HARI/TANGGAL : SABTU 9-Oct-2021
TENAGA KERJA JENIS MATERIAL PERALATAN
NO. KUALIFIKASI SAT. JUMLAH NO. JENIS BAHAN SAT. VOLUME NO. JENIS/MERK JUMLAH
1 ASPHALT FINISHER
1 Surveyor org 2 1 Asphalt Concrete Ton 358.29 2 BULDOZER D 31
2 Pembantu Surveyor org 4 3 COMPRESSOR 4000-6500 L\M
3 Pelaksana PJ org 3 4 BULLDOZER 100-150 HP
4 Petugas K-3 org 7 5 ASPHAL DISTRIBUTOR
5 Konsultan org 5 6 CONCRETE MIXER 0.3-0.6 M3
6 Bina Marga org 2 7 CRANE 10-15 TON
7 Pekerja org 3 8 DUMP TRUCK 3 - 4 M3
8 Operator org 15 9 DUMP TRUCK 6-8 M3
9 Teknisi Lab org 4 10 EXCAVATOR 80-140 HP
10 Mandor dan Tenaga org 38 11 FLAT BED TRUCK 3-4 TON
12 GENERATOR SET 2 unit
13 WHEEL LOADER 1.0-1.6 M3
14 ASPHAL SPRAYER
15 TANDEM ROLLER 6-8 T
16 TIRE ROLLER 8-10 T
17 VIBRATORY ROLLER 5-8 T.
18 CONCRETE VIBRATOR 4 Unit
19 JACK HAMMER
20 CONCRETE PAVER MANUAL 2 Unit
21 WELDING SET
22 ALAT UKUR WP/TS 2 Set
23 COLD MILLING MACHINE

PEKERJAAN YANG DILAKSANAKAN


ITEM CATATAN
URAIAN PEKERJAAN SAT. VOLUME LOKASI
PEKERJAAN PERMASALAHAN

Skh.1.5.3(3) Perkerasan Beton Semen dengan umur Pembukan Lebih m3 155.02 36+242-36+105 (R1)
dari 3 hari dan kurang dari 7 hari. 203.28 39+631-39+809 (L1)

CUACA
Pekerjaan KONDISI CERAH GERIMIS HUJAN
Mulai Pukul : 08.00 08.00 s/d 24.00 √
Selesai Pukul : 24.00

Menyetujui : Diperiksa Oleh : Dibuat Oleh :


PPK. 3.1 Provinsi Jawa Tengah Konsultan Supervisi Penyedia Jasa

……………………………… ………………………………… …………………………………


Penilik Jalan Inspektor Pelaksana
LAPORAN HARIAN
REKONSTRUKSI JALAN

PAKET : REKONSTRUKSI JALAN WELERI-KENDAL-SEMARANG


NO./TANGGAL KONTRAK : HK0201/PPK3.1-JATENG/PKT/VII/2021/03, 5 JULI 2021
NO./TANGGAL SPMK : HK0201/PPK3.1-JATENG/PKT/VII/2021/04, 6 JULI 2021
PENYEDIA JASA : PT. AYUDI PERSDA-PT.MULTI BANGUN INDONESIA, KSO
KONSULTAN SUPERVISI : PT.ARIA JASA REKSATAMA,KSO, PT. VIRAMA KARYA, PT. BUANA ARCHICON
LINGKUP PEKERJAAN : REKONSTRUKSI JALAN
HARI/TANGGAL : MINGGU 10-Oct-2021
TENAGA KERJA JENIS MATERIAL PERALATAN
NO. KUALIFIKASI SAT. JUMLAH NO. JENIS BAHAN SAT. VOLUME NO. JENIS/MERK JUMLAH
1 ASPHALT FINISHER
1 Surveyor org 2 1 Asphalt Concrete Ton 424.11 2 BULDOZER D 31
2 Pembantu Surveyor org 4 3 COMPRESSOR 4000-6500 L\M
3 Pelaksana PJ org 3 4 BULLDOZER 100-150 HP
4 Petugas K-3 org 7 5 ASPHAL DISTRIBUTOR
5 Konsultan org 5 6 CONCRETE MIXER 0.3-0.6 M3
6 Bina Marga org 2 7 CRANE 10-15 TON
7 Pekerja org 3 8 DUMP TRUCK 3 - 4 M3
8 Operator org 15 9 DUMP TRUCK 6-8 M3
9 Teknisi Lab org 4 10 EXCAVATOR 80-140 HP
10 Mandor dan Tenaga org 38 11 FLAT BED TRUCK 3-4 TON
12 GENERATOR SET 2 unit
13 WHEEL LOADER 1.0-1.6 M3
14 ASPHAL SPRAYER
15 TANDEM ROLLER 6-8 T
16 TIRE ROLLER 8-10 T
17 VIBRATORY ROLLER 5-8 T.
18 CONCRETE VIBRATOR 4 Unit
19 JACK HAMMER
20 CONCRETE PAVER MANUAL 2 Unit
21 WELDING SET
22 ALAT UKUR WP/TS 2 Set
23 COLD MILLING MACHINE

PEKERJAAN YANG DILAKSANAKAN


ITEM CATATAN
URAIAN PEKERJAAN SAT. VOLUME LOKASI
PEKERJAAN PERMASALAHAN

Skh.1.5.3(3) Perkerasan Beton Semen dengan umur Pembukan Lebih m3 236.28 39+809-40+015 (L1)
dari 3 hari dan kurang dari 7 hari. 187.83 36+105-35+939 (R1)

7.1 (7a) Beton strukur, Fc’ 20 MPa M3

CUACA
Pekerjaan KONDISI CERAH GERIMIS HUJAN
Mulai Pukul : 08.00 08.00 s/d 24.00 √
Selesai Pukul : 24.00

Menyetujui : Diperiksa Oleh : Dibuat Oleh :


PPK. 3.1 Provinsi Jawa Tengah Konsultan Supervisi Penyedia Jasa
……………………………… ………………………………… …………………………………
Penilik Jalan Inspektor Pelaksana
LAPORAN HARIAN
REKONSTRUKSI JALAN

PAKET : REKONSTRUKSI JALAN WELERI-KENDAL-SEMARANG


NO./TANGGAL KONTRAK : HK0201/PPK3.1-JATENG/PKT/VII/2021/03, 5 JULI 2021
NO./TANGGAL SPMK : HK0201/PPK3.1-JATENG/PKT/VII/2021/04, 6 JULI 2021
PENYEDIA JASA : PT. AYUDI PERSDA-PT.MULTI BANGUN INDONESIA, KSO
KONSULTAN SUPERVISI : PT.ARIA JASA REKSATAMA,KSO, PT. VIRAMA KARYA, PT. BUANA ARCHICON
LINGKUP PEKERJAAN : REKONSTRUKSI JALAN
HARI/TANGGAL : SENIN 11-Oct-2021
TENAGA KERJA JENIS MATERIAL PERALATAN
NO. KUALIFIKASI SAT. JUMLAH NO. JENIS BAHAN SAT. VOLUME NO. JENIS/MERK JUMLAH
1 ASPHALT FINISHER
1 Surveyor org 2 1 Asphalt Concrete Ton 418.28 2 BULDOZER D 31
2 Pembantu Surveyor org 4 3 COMPRESSOR 4000-6500 L\M
3 Pelaksana PJ org 3 4 BULLDOZER 100-150 HP
4 Petugas K-3 org 7 5 ASPHAL DISTRIBUTOR
5 Konsultan org 5 6 CONCRETE MIXER 0.3-0.6 M3
6 Bina Marga org 2 7 CRANE 10-15 TON
7 Pekerja org 3 8 DUMP TRUCK 3 - 4 M3
8 Operator org 15 9 DUMP TRUCK 6-8 M3
9 Teknisi Lab org 4 10 EXCAVATOR 80-140 HP
10 Mandor dan Tenaga org 38 11 FLAT BED TRUCK 3-4 TON
12 GENERATOR SET 2 unit
13 WHEEL LOADER 1.0-1.6 M3
14 ASPHAL SPRAYER
15 TANDEM ROLLER 6-8 T
16 TIRE ROLLER 8-10 T
17 VIBRATORY ROLLER 5-8 T.
18 CONCRETE VIBRATOR 4 Unit
19 JACK HAMMER
20 CONCRETE PAVER MANUAL 2 Unit
21 WELDING SET
22 ALAT UKUR WP/TS 2 Set
23 COLD MILLING MACHINE

PEKERJAAN YANG DILAKSANAKAN


ITEM CATATAN
URAIAN PEKERJAAN SAT. VOLUME LOKASI
PEKERJAAN PERMASALAHAN

Skh.1.5.3(3) Perkerasan Beton Semen dengan umur Pembukan Lebih m3 194.62 35+939-35+767(R1)
dari 3 hari dan kurang dari 7 hari. 223.67 38+770-38+965 (L1)

Pekerjaan KONDISI CERAH GERIMIS HUJAN


Mulai Pukul : 08.00 08.00 s/d 24.00 √
Selesai Pukul : 24.00

Menyetujui : Diperiksa Oleh : Dibuat Oleh :


PPK. 3.1 Provinsi Jawa Tengah Konsultan Supervisi Penyedia Jasa

……………………………… ………………………………… …………………………………


Penilik Jalan Inspektor Pelaksana
LAPORAN HARIAN
REKONSTRUKSI JALAN

PAKET : REKONSTRUKSI JALAN WELERI-KENDAL-SEMARANG


NO./TANGGAL KONTRAK : HK0201/PPK3.1-JATENG/PKT/VII/2021/03, 5 JULI 2021
NO./TANGGAL SPMK : HK0201/PPK3.1-JATENG/PKT/VII/2021/04, 6 JULI 2021
PENYEDIA JASA : PT. AYUDI PERSDA-PT.MULTI BANGUN INDONESIA, KSO
KONSULTAN SUPERVISI : PT.ARIA JASA REKSATAMA,KSO, PT. VIRAMA KARYA, PT. BUANA ARCHICON
LINGKUP PEKERJAAN : REKONSTRUKSI JALAN
HARI/TANGGAL : SELASA 12-Oct-2021
TENAGA KERJA JENIS MATERIAL PERALATAN
NO. KUALIFIKASI SAT. JUMLAH NO. JENIS BAHAN SAT. VOLUME NO. JENIS/MERK JUMLAH
1 ASPHALT FINISHER
1 Surveyor org 2 1 Asphalt Concrete Ton 296.13 2 BULDOZER D 31
2 Pembantu Surveyor org 4 3 COMPRESSOR 4000-6500 L\M
3 Pelaksana PJ org 3 2 U-DITCH Tipe DS 4a BUAH 25.00 4 BULLDOZER 100-150 HP
4 Petugas K-3 org 7 (dengan tutup) 5 ASPHAL DISTRIBUTOR
5 Konsultan org 5 6 CONCRETE MIXER 0.3-0.6 M3
6 Bina Marga org 2 7 CRANE 10-15 TON
7 Pekerja org 3 8 DUMP TRUCK 3 - 4 M3
8 Operator org 15 9 DUMP TRUCK 6-8 M3
9 Teknisi Lab org 4 10 EXCAVATOR 80-140 HP 1 unit
10 Mandor dan Tenaga org 38 11 FLAT BED TRUCK 3-4 TON
12 GENERATOR SET 2 unit
13 WHEEL LOADER 1.0-1.6 M3
14 ASPHAL SPRAYER
15 TANDEM ROLLER 6-8 T
16 TIRE ROLLER 8-10 T
17 VIBRATORY ROLLER 5-8 T.
18 CONCRETE VIBRATOR 4 Unit
19 JACK HAMMER
20 CONCRETE PAVER MANUAL 2 Unit
21 WELDING SET
22 ALAT UKUR WP/TS 2 Set
23 COLD MILLING MACHINE

PEKERJAAN YANG DILAKSANAKAN


ITEM CATATAN
URAIAN PEKERJAAN SAT. VOLUME LOKASI
PEKERJAAN PERMASALAHAN

Skh.1.5.3(3) Perkerasan Beton Semen dengan umur Pembukan Lebih m3 143.38 38+965-39+090 (L1)
dari 3 hari dan kurang dari 7 hari.
152.75 35+767-35+632 (R1)

2. 3.(29) Saluran berbentuk U Tipe DS 4a (dengan tutup) m1 30.00 41+194-41+224 (L)

Pekerjaan KONDISI CERAH GERIMIS HUJAN


Mulai Pukul : 08.00 08.00 s/d 24.00 √
Selesai Pukul : 24.00

Menyetujui : Diperiksa Oleh : Dibuat Oleh :


PPK. 3.1 Provinsi Jawa Tengah Konsultan Supervisi Penyedia Jasa

……………………………… ………………………………… …………………………………


Penilik Jalan Inspektor Pelaksana
LAPORAN HARIAN
REKONSTRUKSI JALAN

PAKET : REKONSTRUKSI JALAN WELERI-KENDAL-SEMARANG


NO./TANGGAL KONTRAK : HK0201/PPK3.1-JATENG/PKT/VII/2021/03, 5 JULI 2021
NO./TANGGAL SPMK : HK0201/PPK3.1-JATENG/PKT/VII/2021/04, 6 JULI 2021
PENYEDIA JASA : PT. AYUDI PERSDA-PT.MULTI BANGUN INDONESIA, KSO
KONSULTAN SUPERVISI : PT.ARIA JASA REKSATAMA,KSO, PT. VIRAMA KARYA, PT. BUANA ARCHICON
LINGKUP PEKERJAAN : REKONSTRUKSI JALAN
HARI/TANGGAL : RABU 13-Oct-2021
TENAGA KERJA JENIS MATERIAL PERALATAN
NO. KUALIFIKASI SAT. JUMLAH NO. JENIS BAHAN SAT. VOLUME NO. JENIS/MERK JUMLAH
1 ASPHALT FINISHER
1 Surveyor org 2 1 Asphalt Concrete Ton 443.59 2 BULDOZER D 31
2 Pembantu Surveyor org 4 3 COMPRESSOR 4000-6500 L\M
3 Pelaksana PJ org 3 2 U-DITCH Tipe DS 4a BUAH 13.00 4 BULLDOZER 100-150 HP
4 Petugas K-3 org 7 (dengan tutup) 5 ASPHAL DISTRIBUTOR
5 Konsultan org 5 6 CONCRETE MIXER 0.3-0.6 M3
6 Bina Marga org 2 7 CRANE 10-15 TON
7 Pekerja org 3 8 DUMP TRUCK 3 - 4 M3
8 Operator org 15 9 DUMP TRUCK 6-8 M3
9 Teknisi Lab org 4 10 EXCAVATOR 80-140 HP 1 unit
10 Mandor dan Tenaga org 38 11 FLAT BED TRUCK 3-4 TON
12 GENERATOR SET 2 unit
13 WHEEL LOADER 1.0-1.6 M3
14 ASPHAL SPRAYER
15 TANDEM ROLLER 6-8 T
16 TIRE ROLLER 8-10 T
17 VIBRATORY ROLLER 5-8 T.
18 CONCRETE VIBRATOR 4 Unit
19 JACK HAMMER
20 CONCRETE PAVER MANUAL 2 Unit
21 WELDING SET
22 ALAT UKUR WP/TS 2 Set
23 COLD MILLING MACHINE

PEKERJAAN YANG DILAKSANAKAN


ITEM CATATAN
URAIAN PEKERJAAN SAT. VOLUME LOKASI
PEKERJAAN PERMASALAHAN

Skh.1.5.3(3) Perkerasan Beton Semen dengan umur Pembukan Lebih m3 208.45 35+632-35+447 (R1)
dari 3 hari dan kurang dari 7 hari. 235.14 39+090-39+295 (L1)

2. 3.(29) Saluran berbentuk U Tipe DS 4a (dengan tutup) m1 15.60 41+224-41+239.60 (L)

CUACA
Pekerjaan KONDISI CERAH GERIMIS HUJAN
Mulai Pukul : 08.00 08.00 s/d 24.00 √
Selesai Pukul : 24.00

Menyetujui : Diperiksa Oleh : Dibuat Oleh :


PPK. 3.1 Provinsi Jawa Tengah Konsultan Supervisi Penyedia Jasa

……………………………… ………………………………… …………………………………


Penilik Jalan Inspektor Pelaksana
LAPORAN HARIAN
REKONSTRUKSI JALAN

PAKET : REKONSTRUKSI JALAN WELERI-KENDAL-SEMARANG


NO./TANGGAL KONTRAK : HK0201/PPK3.1-JATENG/PKT/VII/2021/03, 5 JULI 2021
NO./TANGGAL SPMK : HK0201/PPK3.1-JATENG/PKT/VII/2021/04, 6 JULI 2021
PENYEDIA JASA : PT. AYUDI PERSDA-PT.MULTI BANGUN INDONESIA, KSO
KONSULTAN SUPERVISI : PT.ARIA JASA REKSATAMA,KSO, PT. VIRAMA KARYA, PT. BUANA ARCHICON
LINGKUP PEKERJAAN : REKONSTRUKSI JALAN
HARI/TANGGAL : KAMIS 14-Oct-2021
TENAGA KERJA JENIS MATERIAL PERALATAN
NO. KUALIFIKASI SAT. JUMLAH NO. JENIS BAHAN SAT. VOLUME NO. JENIS/MERK JUMLAH
1 ASPHALT FINISHER
1 Surveyor org 2 1 Asphalt Concrete Ton 340.10 2 BULDOZER D 31
2 Pembantu Surveyor org 4 3 COMPRESSOR 4000-6500 L\M
3 Pelaksana PJ org 3 2 U-DITCH Tipe DS 4a BUAH 24.00 4 BULLDOZER 100-150 HP
4 Petugas K-3 org 7 (dengan tutup) 5 ASPHAL DISTRIBUTOR
5 Konsultan org 5 6 CONCRETE MIXER 0.3-0.6 M3
6 Bina Marga org 2 7 CRANE 10-15 TON
7 Pekerja org 3 8 DUMP TRUCK 3 - 4 M3
8 Operator org 15 9 DUMP TRUCK 6-8 M3
9 Teknisi Lab org 4 10 EXCAVATOR 80-140 HP 1 unit
10 Mandor dan Tenaga org 38 11 FLAT BED TRUCK 3-4 TON
12 GENERATOR SET 2 unit
13 WHEEL LOADER 1.0-1.6 M3
14 ASPHAL SPRAYER
15 TANDEM ROLLER 6-8 T
16 TIRE ROLLER 8-10 T
17 VIBRATORY ROLLER 5-8 T.
18 CONCRETE VIBRATOR 4 Unit
19 JACK HAMMER
20 CONCRETE PAVER MANUAL 2 Unit
21 WELDING SET
22 ALAT UKUR WP/TS 2 Set
23 COLD MILLING MACHINE

PEKERJAAN YANG DILAKSANAKAN


ITEM CATATAN
URAIAN PEKERJAAN SAT. VOLUME LOKASI
PEKERJAAN PERMASALAHAN

Skh.1.5.3(3) Perkerasan Beton Semen dengan umur Pembukan Lebih m3 158.80 39+295-39+328 (L1)
dari 3 hari dan kurang dari 7 hari. 38+663-38+770 (L1)
181.30 33+797-33+958 (L1)

2. 3.(29) Saluran berbentuk U Tipe DS 4a (dengan tutup) m1 3.60 41+239.60-41+234.20 (L)


25.20 41+275.60-41+300.80 (L)

CUACA
Pekerjaan KONDISI CERAH GERIMIS HUJAN
Mulai Pukul : 08.00 08.00 s/d 24.00 √
Selesai Pukul : 24.00

Menyetujui : Diperiksa Oleh : Dibuat Oleh :


PPK. 3.1 Provinsi Jawa Tengah Konsultan Supervisi Penyedia Jasa

……………………………… ………………………………… …………………………………


Penilik Jalan Inspektor Pelaksana
LAPORAN HARIAN
REKONSTRUKSI JALAN

PAKET : REKONSTRUKSI JALAN WELERI-KENDAL-SEMARANG


NO./TANGGAL KONTRAK : HK0201/PPK3.1-JATENG/PKT/VII/2021/03, 5 JULI 2021
NO./TANGGAL SPMK : HK0201/PPK3.1-JATENG/PKT/VII/2021/04, 6 JULI 2021
PENYEDIA JASA : PT. AYUDI PERSDA-PT.MULTI BANGUN INDONESIA, KSO
KONSULTAN SUPERVISI : PT.ARIA JASA REKSATAMA,KSO, PT. VIRAMA KARYA, PT. BUANA ARCHICON
LINGKUP PEKERJAAN : REKONSTRUKSI JALAN
HARI/TANGGAL : JUMAT 15-Oct-2021
TENAGA KERJA JENIS MATERIAL PERALATAN
NO. KUALIFIKASI SAT. JUMLAH NO. JENIS BAHAN SAT. VOLUME NO. JENIS/MERK JUMLAH
1 ASPHALT FINISHER
1 Surveyor org 2 1 Asphalt Concrete Ton 294.35 2 BULDOZER D 31
2 Pembantu Surveyor org 4 3 COMPRESSOR 4000-6500 L\M
3 Pelaksana PJ org 3 2 U-DITCH Tipe DS 4a BUAH 21.00 4 BULLDOZER 100-150 HP
4 Petugas K-3 org 7 (dengan tutup) 5 ASPHAL DISTRIBUTOR
5 Konsultan org 5 6 CONCRETE MIXER 0.3-0.6 M3
6 Bina Marga org 2 7 CRANE 10-15 TON
7 Pekerja org 3 8 DUMP TRUCK 3 - 4 M3
8 Operator org 15 9 DUMP TRUCK 6-8 M3
9 Teknisi Lab org 4 10 EXCAVATOR 80-140 HP 1 unit
10 Mandor dan Tenaga org 38 11 FLAT BED TRUCK 3-4 TON
12 GENERATOR SET 2 unit
13 WHEEL LOADER 1.0-1.6 M3
14 ASPHAL SPRAYER
15 TANDEM ROLLER 6-8 T
16 TIRE ROLLER 8-10 T
17 VIBRATORY ROLLER 5-8 T.
18 CONCRETE VIBRATOR 4 Unit
19 JACK HAMMER
20 CONCRETE PAVER MANUAL 2 Unit
21 WELDING SET
22 ALAT UKUR WP/TS 2 Set
23 COLD MILLING MACHINE

PEKERJAAN YANG DILAKSANAKAN


ITEM CATATAN
URAIAN PEKERJAAN SAT. VOLUME LOKASI
PEKERJAAN PERMASALAHAN

Skh.1.5.3(3) Perkerasan Beton Semen dengan umur Pembukan Lebih m3 152.75 33+958-34+093 (L1)
dari 3 hari dan kurang dari 7 hari. 141.60 39+328-39+357 (L1)
42+497-42+593 (L1)

2. 3.(29) Saluran berbentuk U Tipe DS 4a (dengan tutup) m1 25.20 41+398-41+423.2 (L)

CUACA
Pekerjaan KONDISI CERAH GERIMIS HUJAN
Mulai Pukul : 08.00 08.00 s/d 24.00 √
Selesai Pukul : 24.00

Menyetujui : Diperiksa Oleh : Dibuat Oleh :


PPK. 3.1 Provinsi Jawa Tengah Konsultan Supervisi Penyedia Jasa

……………………………… ………………………………… …………………………………


Penilik Jalan Inspektor Pelaksana
LAPORAN HARIAN
REKONSTRUKSI JALAN

PAKET : REKONSTRUKSI JALAN WELERI-KENDAL-SEMARANG


NO./TANGGAL KONTRAK : HK0201/PPK3.1-JATENG/PKT/VII/2021/03, 5 JULI 2021
NO./TANGGAL SPMK : HK0201/PPK3.1-JATENG/PKT/VII/2021/04, 6 JULI 2021
PENYEDIA JASA : PT. AYUDI PERSDA-PT.MULTI BANGUN INDONESIA, KSO
KONSULTAN SUPERVISI : PT.ARIA JASA REKSATAMA,KSO, PT. VIRAMA KARYA, PT. BUANA ARCHICON
LINGKUP PEKERJAAN : REKONSTRUKSI JALAN
HARI/TANGGAL : SABTU 16-Oct-2021
TENAGA KERJA JENIS MATERIAL PERALATAN
NO. KUALIFIKASI SAT. JUMLAH NO. JENIS BAHAN SAT. VOLUME NO. JENIS/MERK JUMLAH
1 ASPHALT FINISHER
1 Surveyor org 2 1 Asphalt Concrete Ton 381.84 2 BULDOZER D 31
2 Pembantu Surveyor org 4 3 COMPRESSOR 4000-6500 L\M
3 Pelaksana PJ org 3 2 U-DITCH Tipe DS 4a BUAH 23.00 4 BULLDOZER 100-150 HP
4 Petugas K-3 org 7 (dengan tutup) 5 ASPHAL DISTRIBUTOR
5 Konsultan org 5 6 CONCRETE MIXER 0.3-0.6 M3
6 Bina Marga org 2 7 CRANE 10-15 TON
7 Pekerja org 3 8 DUMP TRUCK 3 - 4 M3
8 Operator org 15 9 DUMP TRUCK 6-8 M3
9 Teknisi Lab org 4 10 EXCAVATOR 80-140 HP 1 unit
10 Mandor dan Tenaga org 38 11 FLAT BED TRUCK 3-4 TON
12 GENERATOR SET 2 unit
13 WHEEL LOADER 1.0-1.6 M3
14 ASPHAL SPRAYER
15 TANDEM ROLLER 6-8 T
16 TIRE ROLLER 8-10 T
17 VIBRATORY ROLLER 5-8 T.
18 CONCRETE VIBRATOR 4 Unit
19 JACK HAMMER
20 CONCRETE PAVER MANUAL 2 Unit
21 WELDING SET
22 ALAT UKUR WP/TS 2 Set
23 COLD MILLING MACHINE

PEKERJAAN YANG DILAKSANAKAN


ITEM CATATAN
URAIAN PEKERJAAN SAT. VOLUME LOKASI
PEKERJAAN PERMASALAHAN

Skh.1.5.3(3) Perkerasan Beton Semen dengan umur Pembukan Lebih m3 187.22 40+015-40+043 (L1)
dari 3 hari dan kurang dari 7 hari. 42+593-42+729 (L1)
194.62 34+093-34+265 (L1)

2. 3.(29) Saluran berbentuk U Tipe DS 4a (dengan tutup) m1 27.60 41+423.20-41+450.80 (L)

CUACA
Pekerjaan KONDISI CERAH GERIMIS HUJAN
Mulai Pukul : 08.00 08.00 s/d 24.00 √
Selesai Pukul : 24.00

Menyetujui : Diperiksa Oleh : Dibuat Oleh :


PPK. 3.1 Provinsi Jawa Tengah Konsultan Supervisi Penyedia Jasa

……………………………… ………………………………… …………………………………


Penilik Jalan Inspektor Pelaksana
LAPORAN HARIAN
REKONSTRUKSI JALAN

PAKET : REKONSTRUKSI JALAN WELERI-KENDAL-SEMARANG


NO./TANGGAL KONTRAK : HK0201/PPK3.1-JATENG/PKT/VII/2021/03, 5 JULI 2021
NO./TANGGAL SPMK : HK0201/PPK3.1-JATENG/PKT/VII/2021/04, 6 JULI 2021
PENYEDIA JASA : PT. AYUDI PERSDA-PT.MULTI BANGUN INDONESIA, KSO
KONSULTAN SUPERVISI : PT.ARIA JASA REKSATAMA,KSO, PT. VIRAMA KARYA, PT. BUANA ARCHICON
LINGKUP PEKERJAAN : REKONSTRUKSI JALAN
HARI/TANGGAL : MINGGU 17-Oct-2021
TENAGA KERJA JENIS MATERIAL PERALATAN
NO. KUALIFIKASI SAT. JUMLAH NO. JENIS BAHAN SAT. VOLUME NO. JENIS/MERK JUMLAH
1 ASPHALT FINISHER
1 Surveyor org 2 1 Asphalt Concrete Ton 356.61 2 BULDOZER D 31
2 Pembantu Surveyor org 4 3 COMPRESSOR 4000-6500 L\M
3 Pelaksana PJ org 3 2 U-DITCH Tipe DS 4a BUAH 14.00 4 BULLDOZER 100-150 HP
4 Petugas K-3 org 7 (dengan tutup) 5 ASPHAL DISTRIBUTOR
5 Konsultan org 5 6 CONCRETE MIXER 0.3-0.6 M3
6 Bina Marga org 2 7 CRANE 10-15 TON
7 Pekerja org 3 8 DUMP TRUCK 3 - 4 M3
8 Operator org 15 9 DUMP TRUCK 6-8 M3
9 Teknisi Lab org 4 10 EXCAVATOR 80-140 HP 1 unit
10 Mandor dan Tenaga org 38 11 FLAT BED TRUCK 3-4 TON
12 GENERATOR SET 2 unit
13 WHEEL LOADER 1.0-1.6 M3
14 ASPHAL SPRAYER
15 TANDEM ROLLER 6-8 T
16 TIRE ROLLER 8-10 T
17 VIBRATORY ROLLER 5-8 T.
18 CONCRETE VIBRATOR 4 Unit
19 JACK HAMMER
20 CONCRETE PAVER MANUAL 2 Unit
21 WELDING SET
22 ALAT UKUR WP/TS 2 Set
23 COLD MILLING MACHINE

PEKERJAAN YANG DILAKSANAKAN


ITEM CATATAN
URAIAN PEKERJAAN SAT. VOLUME LOKASI
PEKERJAAN PERMASALAHAN

Skh.1.5.3(3) Perkerasan Beton Semen dengan umur Pembukan Lebih m3 175.38 34+265-34+420 (L1)
dari 3 hari dan kurang dari 7 hari. 181.23 42+729-42+887 (L1)

2. 3.(29) Saluran berbentuk U Tipe DS 4a (dengan tutup) m1 16.80 41+450.80-41+467.60 (L)

CUACA
Pekerjaan KONDISI CERAH GERIMIS HUJAN
Mulai Pukul : 08.00 08.00 s/d 24.00 √
Selesai Pukul : 24.00

Menyetujui : Diperiksa Oleh : Dibuat Oleh :


PPK. 3.1 Provinsi Jawa Tengah Konsultan Supervisi Penyedia Jasa

……………………………… ………………………………… …………………………………


Penilik Jalan Inspektor Pelaksana
LAPORAN HARIAN
REKONSTRUKSI JALAN

PAKET : REKONSTRUKSI JALAN WELERI-KENDAL-SEMARANG


NO./TANGGAL KONTRAK : HK0201/PPK3.1-JATENG/PKT/VII/2021/03, 5 JULI 2021
NO./TANGGAL SPMK : HK0201/PPK3.1-JATENG/PKT/VII/2021/04, 6 JULI 2021
PENYEDIA JASA : PT. AYUDI PERSDA-PT.MULTI BANGUN INDONESIA, KSO
KONSULTAN SUPERVISI : PT.ARIA JASA REKSATAMA,KSO, PT. VIRAMA KARYA, PT. BUANA ARCHICON
LINGKUP PEKERJAAN : REKONSTRUKSI JALAN
HARI/TANGGAL : SENIN 18-Oct-2021
TENAGA KERJA JENIS MATERIAL PERALATAN
NO. KUALIFIKASI SAT. JUMLAH NO. JENIS BAHAN SAT. VOLUME NO. JENIS/MERK JUMLAH
1 ASPHALT FINISHER
1 Surveyor org 2 1 Asphalt Concrete Ton 50.92 2 BULDOZER D 31
2 Pembantu Surveyor org 4 3 COMPRESSOR 4000-6500 L\M
3 Pelaksana PJ org 3 2 U-DITCH Tipe DS 4a BUAH 17.00 4 BULLDOZER 100-150 HP
4 Petugas K-3 org 7 (dengan tutup) 5 ASPHAL DISTRIBUTOR
5 Konsultan org 5 6 CONCRETE MIXER 0.3-0.6 M3
6 Bina Marga org 2 7 CRANE 10-15 TON
7 Pekerja org 3 8 DUMP TRUCK 3 - 4 M3
8 Operator org 15 9 DUMP TRUCK 6-8 M3
9 Teknisi Lab org 4 10 EXCAVATOR 80-140 HP 1 unit
10 Mandor dan Tenaga org 38 11 FLAT BED TRUCK 3-4 TON
12 GENERATOR SET 2 unit
13 WHEEL LOADER 1.0-1.6 M3
14 ASPHAL SPRAYER
15 TANDEM ROLLER 6-8 T
16 TIRE ROLLER 8-10 T
17 VIBRATORY ROLLER 5-8 T.
18 CONCRETE VIBRATOR 2 Unit
19 JACK HAMMER
20 CONCRETE PAVER MANUAL 2 Unit
21 WELDING SET
22 ALAT UKUR WP/TS 2 Set
23 COLD MILLING MACHINE

PEKERJAAN YANG DILAKSANAKAN


ITEM CATATAN
URAIAN PEKERJAAN SAT. VOLUME LOKASI
PEKERJAAN PERMASALAHAN

Skh.1.5.3(3) Perkerasan Beton Semen dengan umur Pembukan Lebih m3 50.92 34+420-34+465 (L1)
dari 3 hari dan kurang dari 7 hari.

2. 3.(29) Saluran berbentuk U Tipe DS 4a (dengan tutup) m1 20.40 41+467.60-41+488 (L)

CUACA
Pekerjaan KONDISI CERAH GERIMIS HUJAN
Mulai Pukul : 08.00 08.00 s/d 24.00 √
Selesai Pukul : 24.00

Menyetujui : Diperiksa Oleh : Dibuat Oleh :


PPK. 3.1 Provinsi Jawa Tengah Konsultan Supervisi Penyedia Jasa

……………………………… ………………………………… …………………………………


Penilik Jalan Inspektor Pelaksana
LAPORAN HARIAN
REKONSTRUKSI JALAN

PAKET : REKONSTRUKSI JALAN WELERI-KENDAL-SEMARANG


NO./TANGGAL KONTRAK : HK0201/PPK3.1-JATENG/PKT/VII/2021/03, 5 JULI 2021
NO./TANGGAL SPMK : HK0201/PPK3.1-JATENG/PKT/VII/2021/04, 6 JULI 2021
PENYEDIA JASA : PT. AYUDI PERSDA-PT.MULTI BANGUN INDONESIA, KSO
KONSULTAN SUPERVISI : PT.ARIA JASA REKSATAMA,KSO, PT. VIRAMA KARYA, PT. BUANA ARCHICON
LINGKUP PEKERJAAN : REKONSTRUKSI JALAN
HARI/TANGGAL : SELASA 19-Oct-2021
TENAGA KERJA JENIS MATERIAL PERALATAN
NO. KUALIFIKASI SAT. JUMLAH NO. JENIS BAHAN SAT. VOLUME NO. JENIS/MERK JUMLAH
1 ASPHALT FINISHER
1 Surveyor org 2 1 Asphalt Concrete Ton 345.69 2 BULDOZER D 31
2 Pembantu Surveyor org 4 3 COMPRESSOR 4000-6500 L\M
3 Pelaksana PJ org 3 2 U-DITCH Tipe DS 4a BUAH 10.00 4 BULLDOZER 100-150 HP
4 Petugas K-3 org 7 (dengan tutup) 5 ASPHAL DISTRIBUTOR
5 Konsultan org 5 6 CONCRETE MIXER 0.3-0.6 M3
6 Bina Marga org 2 7 CRANE 10-15 TON
7 Pekerja org 3 8 DUMP TRUCK 3 - 4 M3
8 Operator org 15 9 DUMP TRUCK 6-8 M3
9 Teknisi Lab org 4 10 EXCAVATOR 80-140 HP 1 unit
10 Mandor dan Tenaga org 38 11 FLAT BED TRUCK 3-4 TON
12 GENERATOR SET 2 unit
13 WHEEL LOADER 1.0-1.6 M3
14 ASPHAL SPRAYER
15 TANDEM ROLLER 6-8 T
16 TIRE ROLLER 8-10 T
17 VIBRATORY ROLLER 5-8 T.
18 CONCRETE VIBRATOR 4 Unit
19 JACK HAMMER
20 CONCRETE PAVER MANUAL 2 Unit
21 WELDING SET
22 ALAT UKUR WP/TS 2 Set
23 COLD MILLING MACHINE

PEKERJAAN YANG DILAKSANAKAN


ITEM CATATAN
URAIAN PEKERJAAN SAT. VOLUME LOKASI
PEKERJAAN PERMASALAHAN

Skh.1.5.3(3) Perkerasan Beton Semen dengan umur Pembukan Lebih m3 153.88 34+650-34+786 (L1)
dari 3 hari dan kurang dari 7 hari. 191.81 42+887-42+960 (L1)
43+003-42+908 (R1)

2. 3.(29) Saluran berbentuk U Tipe DS 4a (dengan tutup) m1 12.00 41+245.20-41+257.20 (L)

CUACA
Pekerjaan KONDISI CERAH GERIMIS HUJAN
Mulai Pukul : 08.00 08.00 s/d 24.00 √
Selesai Pukul : 24.00

Menyetujui : Diperiksa Oleh : Dibuat Oleh :


PPK. 3.1 Provinsi Jawa Tengah Konsultan Supervisi Penyedia Jasa

……………………………… ………………………………… …………………………………


Penilik Jalan Inspektor Pelaksana
LAPORAAN HARIAN
REKONSTRUKSI JALAN

PAKET : REKONSTRUKSI JALAN WELERI-KENDAL-SEMARANG


NO./TANGGAL KONTRAK : HK0201/PPK3.1-JATENG/PKT/VII/2021/03, 5 JULI 2021
NO./TANGGAL SPMK : HK0201/PPK3.1-JATENG/PKT/VII/2021/04, 6 JULI 2021
PENYEDIA JASA : PT. AYUDI PERSDA-PT.MULTI BANGUN INDONESIA, KSO
KONSULTAN SUPERVISI : PT.ARIA JASA REKSATAMA,KSO, PT. VIRAMA KARYA, PT. BUANA ARCHICON
LINGKUP PEKERJAAN : REKONSTRUKSI JALAN
HARI/TANGGAL : KAMIS 23-Sep-2021
TENAGA KERJA JENIS MATERIAL PERALATAN
NO. KUALIFIKASI SAT. JUMLAHNO. JENIS BAHAN SAT. VOLUME NO. JENIS/MERK JUMLAH
1 ASPHALT FINISHER 2 unit
1 Surveyor org 2 1 Beton FS-45 m3 213.00 2 BULDOZER D 31
2 Pembantu Surveyor org 4 2 Asphalt Concrete Ton 416.21 3 COMPRESSOR 4000-6500 L\M 2 unit
3 Pelaksana PJ org 3 Binder Course 4 BULLDOZER 100-150 HP
4 Petugas K-3 org 7 3 Emulsi/As.Cair Ltr - 5 ASPHAL DISTRIBUTOR 2 unit
5 Konsultan org 5 6 CONCRETE MIXER 0.3-0.6 M3
6 Bina Marga org 2 7 CRANE 10-15 TON
7 Pekerja org 3 8 DUMP TRUCK 3 - 4 M3
8 Operator org 15 9 DUMP TRUCK 6-8 M3 10 unit
9 Teknisi Lab org 4 10 EXCAVATOR 80-140 HP
10 Mandor dan Tenaga org 38 11 FLAT BED TRUCK 3-4 TON
12 GENERATOR SET 2 unit
13 WHEEL LOADER 1.0-1.6 M3
14 ASPHAL SPRAYER 2 unit
15 TANDEM ROLLER 6-8 T 2 unit
16 TIRE ROLLER 8-10 T 2 unit
17 VIBRATORY ROLLER 5-8 T.
18 CONCRETE VIBRATOR 4 Unit
19 JACK HAMMER
20 CONCRETE PAVER MANUAL 2 Unit
21 WELDING SET
22 ALAT UKUR WP/TS 2 Set
23 COLD MILLING MACHINE

PEKERJAAN YANG DILAKSANAKAN


ITEM CATATAN
URAIAN PEKERJAAN SAT. VOLUME LOKASI
PEKERJAAN PERMASALAHAN

Skh.1.5.3(3) Perkerasan Beton Semen dengan umur Pembukan Lebih m3 105.00


dari 3 hari dan kurang dari 7 hari.
108.00

6.1(2a) Lapis Perekat - Aspal Cair/Emulsi ltr

6.3(6a) Laston Lapis Antara (AC-BC) Ton 266.89

149.32

CUACA
Pekerjaan KONDISI CERAH GERIMIS HUJAN
Mulai Pukul : 08.00 08.00 s/d 24.00 √
Selesai Pukul : 24.00

Menyetujui : Diperiksa Oleh : Dibuat Oleh :


PPK. 3.1 Provinsi Jawa Tengah Konsultan Supervisi Penyedia Jasa
……………………………… ………………………………… …………………………………
Penilik Jalan Inspektor Pelaksana
LAPORAAN HARIAN
REKONSTRUKSI JALAN

PAKET : REKONSTRUKSI JALAN WELERI-KENDAL-SEMARANG


NO./TANGGAL KONTRAK : HK0201/PPK3.1-JATENG/PKT/VII/2021/03, 5 JULI 2021
NO./TANGGAL SPMK : HK0201/PPK3.1-JATENG/PKT/VII/2021/04, 6 JULI 2021
PENYEDIA JASA : PT. AYUDI PERSDA-PT.MULTI BANGUN INDONESIA, KSO
KONSULTAN SUPERVISI : PT.ARIA JASA REKSATAMA,KSO, PT. VIRAMA KARYA, PT. BUANA ARCHICON
LINGKUP PEKERJAAN : REKONSTRUKSI JALAN
HARI/TANGGAL : JUMAT 24-Sep-2021
TENAGA KERJA JENIS MATERIAL PERALATAN
NO. KUALIFIKASI SAT. JUMLAHNO. JENIS BAHAN SAT. VOLUME NO. JENIS/MERK JUMLAH
1 ASPHALT FINISHER 2 unit
1 Surveyor org 2 1 Beton FS-45 m3 213.00 2 BULDOZER D 31
2 Pembantu Surveyor org 4 2 Asphalt Concrete Ton 416.21 3 COMPRESSOR 4000-6500 L\M 2 unit
3 Pelaksana PJ org 3 Binder Course 4 BULLDOZER 100-150 HP
4 Petugas K-3 org 7 3 Emulsi/As.Cair Ltr - 5 ASPHAL DISTRIBUTOR 2 unit
5 Konsultan org 5 6 CONCRETE MIXER 0.3-0.6 M3
6 Bina Marga org 2 7 CRANE 10-15 TON
7 Pekerja org 3 8 DUMP TRUCK 3 - 4 M3
8 Operator org 15 9 DUMP TRUCK 6-8 M3 10 unit
9 Teknisi Lab org 4 10 EXCAVATOR 80-140 HP
10 Mandor dan Tenaga org 38 11 FLAT BED TRUCK 3-4 TON
12 GENERATOR SET 2 unit
13 WHEEL LOADER 1.0-1.6 M3
14 ASPHAL SPRAYER 2 unit
15 TANDEM ROLLER 6-8 T 2 unit
16 TIRE ROLLER 8-10 T 2 unit
17 VIBRATORY ROLLER 5-8 T.
18 CONCRETE VIBRATOR 4 Unit
19 JACK HAMMER
20 CONCRETE PAVER MANUAL 2 Unit
21 WELDING SET
22 ALAT UKUR WP/TS 2 Set
23 COLD MILLING MACHINE

PEKERJAAN YANG DILAKSANAKAN


ITEM CATATAN
URAIAN PEKERJAAN SAT. VOLUME LOKASI
PEKERJAAN PERMASALAHAN

Skh.1.5.3(3) Perkerasan Beton Semen dengan umur Pembukan Lebih m3 105.00


dari 3 hari dan kurang dari 7 hari.
108.00

6.1(2a) Lapis Perekat - Aspal Cair/Emulsi ltr

6.3(6a) Laston Lapis Antara (AC-BC) Ton 266.89

149.32

CUACA
Pekerjaan KONDISI CERAH GERIMIS HUJAN
Mulai Pukul : 08.00 08.00 s/d 24.00 √
Selesai Pukul : 24.00

Menyetujui : Diperiksa Oleh : Dibuat Oleh :


PPK. 3.1 Provinsi Jawa Tengah Konsultan Supervisi Penyedia Jasa
……………………………… ………………………………… …………………………………
Penilik Jalan Inspektor Pelaksana
LAPORAAN HARIAN
REKONSTRUKSI JALAN

PAKET : REKONSTRUKSI JALAN WELERI-KENDAL-SEMARANG


NO./TANGGAL KONTRAK : HK0201/PPK3.1-JATENG/PKT/VII/2021/03, 5 JULI 2021
NO./TANGGAL SPMK : HK0201/PPK3.1-JATENG/PKT/VII/2021/04, 6 JULI 2021
PENYEDIA JASA : PT. AYUDI PERSDA-PT.MULTI BANGUN INDONESIA, KSO
KONSULTAN SUPERVISI : PT.ARIA JASA REKSATAMA,KSO, PT. VIRAMA KARYA, PT. BUANA ARCHICON
LINGKUP PEKERJAAN : REKONSTRUKSI JALAN
HARI/TANGGAL : SABTU 25-Sep-2021
TENAGA KERJA JENIS MATERIAL PERALATAN
NO. KUALIFIKASI SAT. JUMLAHNO. JENIS BAHAN SAT. VOLUME NO. JENIS/MERK JUMLAH
1 ASPHALT FINISHER 2 unit
1 Surveyor org 2 1 Beton FS-45 m3 213.00 2 BULDOZER D 31
2 Pembantu Surveyor org 4 2 Asphalt Concrete Ton 416.21 3 COMPRESSOR 4000-6500 L\M 2 unit
3 Pelaksana PJ org 3 Binder Course 4 BULLDOZER 100-150 HP
4 Petugas K-3 org 7 3 Emulsi/As.Cair Ltr - 5 ASPHAL DISTRIBUTOR 2 unit
5 Konsultan org 5 6 CONCRETE MIXER 0.3-0.6 M3
6 Bina Marga org 2 7 CRANE 10-15 TON
7 Pekerja org 3 8 DUMP TRUCK 3 - 4 M3
8 Operator org 15 9 DUMP TRUCK 6-8 M3 10 unit
9 Teknisi Lab org 4 10 EXCAVATOR 80-140 HP
10 Mandor dan Tenaga org 38 11 FLAT BED TRUCK 3-4 TON
12 GENERATOR SET 2 unit
13 WHEEL LOADER 1.0-1.6 M3
14 ASPHAL SPRAYER 2 unit
15 TANDEM ROLLER 6-8 T 2 unit
16 TIRE ROLLER 8-10 T 2 unit
17 VIBRATORY ROLLER 5-8 T.
18 CONCRETE VIBRATOR 4 Unit
19 JACK HAMMER
20 CONCRETE PAVER MANUAL 2 Unit
21 WELDING SET
22 ALAT UKUR WP/TS 2 Set
23 COLD MILLING MACHINE

PEKERJAAN YANG DILAKSANAKAN


ITEM CATATAN
URAIAN PEKERJAAN SAT. VOLUME LOKASI
PEKERJAAN PERMASALAHAN

Skh.1.5.3(3) Perkerasan Beton Semen dengan umur Pembukan Lebih m3 105.00


dari 3 hari dan kurang dari 7 hari.
108.00

6.1(2a) Lapis Perekat - Aspal Cair/Emulsi ltr

6.3(6a) Laston Lapis Antara (AC-BC) Ton 266.89

149.32

CUACA
Pekerjaan KONDISI CERAH GERIMIS HUJAN
Mulai Pukul : 08.00 08.00 s/d 24.00 √
Selesai Pukul : 24.00

Menyetujui : Diperiksa Oleh : Dibuat Oleh :


PPK. 3.1 Provinsi Jawa Tengah Konsultan Supervisi Penyedia Jasa
……………………………… ………………………………… …………………………………
Penilik Jalan Inspektor Pelaksana
LAPORAN HARIAN
REKONSTRUKSI JALAN

PAKET : REKONSTRUKSI JALAN WELERI-KENDAL-SEMARANG


NO./TANGGAL KONTRAK : HK0201/PPK3.1-JATENG/PKT/VII/2021/03, 5 JULI 2021
NO./TANGGAL SPMK : HK0201/PPK3.1-JATENG/PKT/VII/2021/04, 6 JULI 2021
PENYEDIA JASA : PT. AYUDI PERSDA-PT.MULTI BANGUN INDONESIA, KSO
KONSULTAN SUPERVISI : PT.ARIA JASA REKSATAMA,KSO, PT. VIRAMA KARYA, PT. BUANA ARCHICON
LINGKUP PEKERJAAN : REKONSTRUKSI JALAN
HARI/TANGGAL : RABU 20-Oct-2021
TENAGA KERJA JENIS MATERIAL PERALATAN
NO. KUALIFIKASI SAT. JUMLAH NO. JENIS BAHAN SAT. VOLUME NO. JENIS/MERK JUMLAH
1 ASPHALT FINISHER
1 Surveyor org 2 1 Asphalt Concrete Ton 405.90 2 BULDOZER D 31
2 Pembantu Surveyor org 4 3 COMPRESSOR 4000-6500 L\M
3 Pelaksana PJ org 3 2 U-DITCH Tipe DS 4a BUAH 12.00 4 BULLDOZER 100-150 HP
4 Petugas K-3 org 7 (dengan tutup) 5 ASPHAL DISTRIBUTOR
5 Konsultan org 5 6 CONCRETE MIXER 0.3-0.6 M3
6 Bina Marga org 2 7 CRANE 10-15 TON
7 Pekerja org 3 8 DUMP TRUCK 3 - 4 M3
8 Operator org 15 9 DUMP TRUCK 6-8 M3
9 Teknisi Lab org 4 10 EXCAVATOR 80-140 HP 1 unit
10 Mandor dan Tenaga org 38 11 FLAT BED TRUCK 3-4 TON
12 GENERATOR SET 2 unit
13 WHEEL LOADER 1.0-1.6 M3
14 ASPHAL SPRAYER
15 TANDEM ROLLER 6-8 T
16 TIRE ROLLER 8-10 T
17 VIBRATORY ROLLER 5-8 T.
18 CONCRETE VIBRATOR 4 Unit
19 JACK HAMMER
20 CONCRETE PAVER MANUAL 2 Unit
21 WELDING SET
22 ALAT UKUR WP/TS 2 Set
23 COLD MILLING MACHINE

PEKERJAAN YANG DILAKSANAKAN


ITEM CATATAN
URAIAN PEKERJAAN SAT. VOLUME LOKASI
PEKERJAAN PERMASALAHAN

Skh.1.5.3(3) Perkerasan Beton Semen dengan umur Pembukan Lebih m3 228.25 42+908-42+709 (R1)
dari 3 hari dan kurang dari 7 hari. 177.65 34+786-34+943 (L1)

2. 3.(29) Saluran berbentuk U Tipe DS 4a (dengan tutup) m1 14.40 41+300.80-41+315.20 (L)

CUACA
Pekerjaan KONDISI CERAH GERIMIS HUJAN
Mulai Pukul : 08.00 08.00 s/d 24.00 √
Selesai Pukul : 24.00

Menyetujui : Diperiksa Oleh : Dibuat Oleh :


PPK. 3.1 Provinsi Jawa Tengah Konsultan Supervisi Penyedia Jasa

……………………………… ………………………………… …………………………………


Penilik Jalan Inspektor Pelaksana
LAPORAN HARIAN
REKONSTRUKSI JALAN

PAKET : REKONSTRUKSI JALAN WELERI-KENDAL-SEMARANG


NO./TANGGAL KONTRAK : HK0201/PPK3.1-JATENG/PKT/VII/2021/03, 5 JULI 2021
NO./TANGGAL SPMK : HK0201/PPK3.1-JATENG/PKT/VII/2021/04, 6 JULI 2021
PENYEDIA JASA : PT. AYUDI PERSDA-PT.MULTI BANGUN INDONESIA, KSO
KONSULTAN SUPERVISI : PT.ARIA JASA REKSATAMA,KSO, PT. VIRAMA KARYA, PT. BUANA ARCHICON
LINGKUP PEKERJAAN : REKONSTRUKSI JALAN
HARI/TANGGAL : KAMIS 21-Oct-2021
TENAGA KERJA JENIS MATERIAL PERALATAN
NO. KUALIFIKASI SAT. JUMLAH NO. JENIS BAHAN SAT. VOLUME NO. JENIS/MERK JUMLAH
1 ASPHALT FINISHER
1 Surveyor org 2 1 Asphalt Concrete Ton 264.46 2 BULDOZER D 31
2 Pembantu Surveyor org 4 3 COMPRESSOR 4000-6500 L\M
3 Pelaksana PJ org 3 2 U-DITCH Tipe DS 4a BUAH 16.00 4 BULLDOZER 100-150 HP
4 Petugas K-3 org 7 (dengan tutup) 5 ASPHAL DISTRIBUTOR
5 Konsultan org 5 6 CONCRETE MIXER 0.3-0.6 M3
6 Bina Marga org 2 7 CRANE 10-15 TON
7 Pekerja org 3 8 DUMP TRUCK 3 - 4 M3
8 Operator org 15 9 DUMP TRUCK 6-8 M3
9 Teknisi Lab org 4 10 EXCAVATOR 80-140 HP 1 unit
10 Mandor dan Tenaga org 38 11 FLAT BED TRUCK 3-4 TON
12 GENERATOR SET 2 unit
13 WHEEL LOADER 1.0-1.6 M3
14 ASPHAL SPRAYER
15 TANDEM ROLLER 6-8 T
16 TIRE ROLLER 8-10 T
17 VIBRATORY ROLLER 5-8 T.
18 CONCRETE VIBRATOR 4 Unit
19 JACK HAMMER
20 CONCRETE PAVER MANUAL 2 Unit
21 WELDING SET
22 ALAT UKUR WP/TS 2 Set
23 COLD MILLING MACHINE

PEKERJAAN YANG DILAKSANAKAN


ITEM CATATAN
URAIAN PEKERJAAN SAT. VOLUME LOKASI
PEKERJAAN PERMASALAHAN

Skh.1.5.3(3) Perkerasan Beton Semen dengan umur Pembukan Lebih m3 106.67 42+709-42+616 (R1)
dari 3 hari dan kurang dari 7 hari. 157.79 34+943-35+013 (L1)
35+057-35+128 (L1)

2. 3.(29) Saluran berbentuk U Tipe DS 4a (dengan tutup) m1 14.40 41+488-41+502.40(L)


4.80 41+194-1+198.80(L)

CUACA
Pekerjaan KONDISI CERAH GERIMIS HUJAN
Mulai Pukul : 08.00 08.00 s/d 24.00 √
Selesai Pukul : 24.00

Menyetujui : Diperiksa Oleh : Dibuat Oleh :


PPK. 3.1 Provinsi Jawa Tengah Konsultan Supervisi Penyedia Jasa

……………………………… ………………………………… …………………………………


Penilik Jalan Inspektor Pelaksana
LAPORAN HARIAN
REKONSTRUKSI JALAN

PAKET : REKONSTRUKSI JALAN WELERI-KENDAL-SEMARANG


NO./TANGGAL KONTRAK : HK0201/PPK3.1-JATENG/PKT/VII/2021/03, 5 JULI 2021
NO./TANGGAL SPMK : HK0201/PPK3.1-JATENG/PKT/VII/2021/04, 6 JULI 2021
PENYEDIA JASA : PT. AYUDI PERSDA-PT.MULTI BANGUN INDONESIA, KSO
KONSULTAN SUPERVISI : PT.ARIA JASA REKSATAMA,KSO, PT. VIRAMA KARYA, PT. BUANA ARCHICON
LINGKUP PEKERJAAN : REKONSTRUKSI JALAN
HARI/TANGGAL : JUMAT 22-Oct-2021
TENAGA KERJA JENIS MATERIAL PERALATAN
NO. KUALIFIKASI SAT. JUMLAH NO. JENIS BAHAN SAT. VOLUME NO. JENIS/MERK JUMLAH
1 ASPHALT FINISHER
1 Surveyor org 2 1 Asphalt Concrete Ton 149.36 2 BULDOZER D 31
2 Pembantu Surveyor org 4 3 COMPRESSOR 4000-6500 L\M
3 Pelaksana PJ org 3 2 U-DITCH Tipe DS 4a BUAH 14.00 4 BULLDOZER 100-150 HP
4 Petugas K-3 org 7 (dengan tutup) 5 ASPHAL DISTRIBUTOR
5 Konsultan org 5 6 CONCRETE MIXER 0.3-0.6 M3
6 Bina Marga org 2 7 CRANE 10-15 TON
7 Pekerja org 3 8 DUMP TRUCK 3 - 4 M3
8 Operator org 15 9 DUMP TRUCK 6-8 M3
9 Teknisi Lab org 4 10 EXCAVATOR 80-140 HP 1 unit
10 Mandor dan Tenaga org 38 11 FLAT BED TRUCK 3-4 TON
12 GENERATOR SET 2 unit
13 WHEEL LOADER 1.0-1.6 M3
14 ASPHAL SPRAYER
15 TANDEM ROLLER 6-8 T
16 TIRE ROLLER 8-10 T
17 VIBRATORY ROLLER 5-8 T.
18 CONCRETE VIBRATOR 4 Unit
19 JACK HAMMER
20 CONCRETE PAVER MANUAL 2 Unit
21 WELDING SET
22 ALAT UKUR WP/TS 2 Set
23 COLD MILLING MACHINE

PEKERJAAN YANG DILAKSANAKAN


ITEM CATATAN
URAIAN PEKERJAAN SAT. VOLUME LOKASI
PEKERJAAN PERMASALAHAN

Skh.1.5.3(3) Perkerasan Beton Semen dengan umur Pembukan Lebih m3 149.36 35+128-35+260 (L1)
dari 3 hari dan kurang dari 7 hari. 135.72 42+616-42+497 (R1)

2. 3.(29) Saluran berbentuk U Tipe DS 4a (dengan tutup) m1 16.80 41+502.40-41+519.20 (L)

CUACA
Pekerjaan KONDISI CERAH GERIMIS HUJAN
Mulai Pukul : 08.00 08.00 s/d 24.00 √
Selesai Pukul : 24.00

Menyetujui : Diperiksa Oleh : Dibuat Oleh :


PPK. 3.1 Provinsi Jawa Tengah Konsultan Supervisi Penyedia Jasa

……………………………… ………………………………… …………………………………


Penilik Jalan Inspektor Pelaksana
LAPORAN HARIAN
REKONSTRUKSI JALAN

PAKET : REKONSTRUKSI JALAN WELERI-KENDAL-SEMARANG


NO./TANGGAL KONTRAK : HK0201/PPK3.1-JATENG/PKT/VII/2021/03, 5 JULI 2021
NO./TANGGAL SPMK : HK0201/PPK3.1-JATENG/PKT/VII/2021/04, 6 JULI 2021
PENYEDIA JASA : PT. AYUDI PERSDA-PT.MULTI BANGUN INDONESIA, KSO
KONSULTAN SUPERVISI : PT.ARIA JASA REKSATAMA,KSO, PT. VIRAMA KARYA, PT. BUANA ARCHICON
LINGKUP PEKERJAAN : REKONSTRUKSI JALAN
HARI/TANGGAL : SABTU 23-Oct-2021
TENAGA KERJA JENIS MATERIAL PERALATAN
NO. KUALIFIKASI SAT. JUMLAH NO. JENIS BAHAN SAT. VOLUME NO. JENIS/MERK JUMLAH
1 ASPHALT FINISHER
1 Surveyor org 2 1 Asphalt Concrete Ton 371.84 2 BULDOZER D 31
2 Pembantu Surveyor org 4 3 COMPRESSOR 4000-6500 L\M
3 Pelaksana PJ org 3 2 Beton Fc '20 Mpa m3 31.05 4 BULLDOZER 100-150 HP
4 Petugas K-3 org 7 5 ASPHAL DISTRIBUTOR
5 Konsultan org 5 6 CONCRETE MIXER 0.3-0.6 M3
6 Bina Marga org 2 7 CRANE 10-15 TON
7 Pekerja org 3 8 DUMP TRUCK 3 - 4 M3
8 Operator org 15 9 DUMP TRUCK 6-8 M3
9 Teknisi Lab org 4 10 EXCAVATOR 80-140 HP
10 Mandor dan Tenaga org 38 11 FLAT BED TRUCK 3-4 TON
12 GENERATOR SET 2 unit
13 WHEEL LOADER 1.0-1.6 M3
14 ASPHAL SPRAYER
15 TANDEM ROLLER 6-8 T
16 TIRE ROLLER 8-10 T
17 VIBRATORY ROLLER 5-8 T.
18 CONCRETE VIBRATOR 4 Unit
19 JACK HAMMER
20 CONCRETE PAVER MANUAL 2 Unit
21 WELDING SET
22 ALAT UKUR WP/TS 2 Set
23 COLD MILLING MACHINE

PEKERJAAN YANG DILAKSANAKAN


ITEM CATATAN
URAIAN PEKERJAAN SAT. VOLUME LOKASI
PEKERJAAN PERMASALAHAN

Skh.1.5.3(3) Perkerasan Beton Semen dengan umur Pembukan Lebih m3 164.7705 35+290-35+368 (L1)
dari 3 hari dan kurang dari 7 hari. 35+412-35+475 (L1)
207.0723 38+865-38+691.5 (L2)

7.1 (7a) Beton strukur, Fc’ 20 MPa m3 31.05 37+697-3+759 (L)

CUACA
Pekerjaan KONDISI CERAH GERIMIS HUJAN
Mulai Pukul : 08.00 08.00 s/d 24.00 √
Selesai Pukul : 24.00

Menyetujui : Diperiksa Oleh : Dibuat Oleh :


PPK. 3.1 Provinsi Jawa Tengah Konsultan Supervisi Penyedia Jasa

……………………………… ………………………………… …………………………………


Penilik Jalan Inspektor Pelaksana
LAPORAN HARIAN
REKONSTRUKSI JALAN

PAKET : REKONSTRUKSI JALAN WELERI-KENDAL-SEMARANG


NO./TANGGAL KONTRAK : HK0201/PPK3.1-JATENG/PKT/VII/2021/03, 5 JULI 2021
NO./TANGGAL SPMK : HK0201/PPK3.1-JATENG/PKT/VII/2021/04, 6 JULI 2021
PENYEDIA JASA : PT. AYUDI PERSDA-PT.MULTI BANGUN INDONESIA, KSO
KONSULTAN SUPERVISI : PT.ARIA JASA REKSATAMA,KSO, PT. VIRAMA KARYA, PT. BUANA ARCHICON
LINGKUP PEKERJAAN : REKONSTRUKSI JALAN
HARI/TANGGAL : MINGGU 24-Oct-2021
TENAGA KERJA JENIS MATERIAL PERALATAN
NO. KUALIFIKASI SAT. JUMLAH NO. JENIS BAHAN SAT. VOLUME NO. JENIS/MERK JUMLAH
1 ASPHALT FINISHER
1 Surveyor org 2 1 Asphalt Concrete Ton 401.58 2 BULDOZER D 31
2 Pembantu Surveyor org 4 3 COMPRESSOR 4000-6500 L\M
3 Pelaksana PJ org 3 4 BULLDOZER 100-150 HP
4 Petugas K-3 org 7 5 ASPHAL DISTRIBUTOR
5 Konsultan org 5 6 CONCRETE MIXER 0.3-0.6 M3
6 Bina Marga org 2 7 CRANE 10-15 TON
7 Pekerja org 3 8 DUMP TRUCK 3 - 4 M3
8 Operator org 15 9 DUMP TRUCK 6-8 M3
9 Teknisi Lab org 4 10 EXCAVATOR 80-140 HP
10 Mandor dan Tenaga org 38 11 FLAT BED TRUCK 3-4 TON
12 GENERATOR SET 2 unit
13 WHEEL LOADER 1.0-1.6 M3
14 ASPHAL SPRAYER
15 TANDEM ROLLER 6-8 T
16 TIRE ROLLER 8-10 T
17 VIBRATORY ROLLER 5-8 T.
18 CONCRETE VIBRATOR 4 Unit
19 JACK HAMMER
20 CONCRETE PAVER MANUAL 2 Unit
21 WELDING SET
22 ALAT UKUR WP/TS 2 Set
23 COLD MILLING MACHINE

PEKERJAAN YANG DILAKSANAKAN


ITEM CATATAN
URAIAN PEKERJAAN SAT. VOLUME LOKASI
PEKERJAAN PERMASALAHAN

Skh.1.5.3(3) Perkerasan Beton Semen dengan umur Pembukan Lebih m3 213.28 35+475-35+647 (L1)
dari 3 hari dan kurang dari 7 hari. 188.3035 38+691.5-38+663 (L2)
38+865-38+995 (L2)

CUACA
Pekerjaan KONDISI CERAH GERIMIS HUJAN
Mulai Pukul : 08.00 08.00 s/d 24.00 √
Selesai Pukul : 24.00

Menyetujui : Diperiksa Oleh : Dibuat Oleh :


PPK. 3.1 Provinsi Jawa Tengah Konsultan Supervisi Penyedia Jasa

……………………………… ………………………………… …………………………………


Penilik Jalan Inspektor Pelaksana
LAPORAN HARIAN
REKONSTRUKSI JALAN

PAKET : REKONSTRUKSI JALAN WELERI-KENDAL-SEMARANG


NO./TANGGAL KONTRAK : HK0201/PPK3.1-JATENG/PKT/VII/2021/03, 5 JULI 2021
NO./TANGGAL SPMK : HK0201/PPK3.1-JATENG/PKT/VII/2021/04, 6 JULI 2021
PENYEDIA JASA : PT. AYUDI PERSDA-PT.MULTI BANGUN INDONESIA, KSO
KONSULTAN SUPERVISI : PT.ARIA JASA REKSATAMA,KSO, PT. VIRAMA KARYA, PT. BUANA ARCHICON
LINGKUP PEKERJAAN : REKONSTRUKSI JALAN
HARI/TANGGAL : SENIN 25-Oct-2021
TENAGA KERJA JENIS MATERIAL PERALATAN
NO. KUALIFIKASI SAT. JUMLAH NO. JENIS BAHAN SAT. VOLUME NO. JENIS/MERK JUMLAH
1 ASPHALT FINISHER
1 Surveyor org 2 1 Asphalt Concrete Ton 236.93 2 BULDOZER D 31
2 Pembantu Surveyor org 4 3 COMPRESSOR 4000-6500 L\M
3 Pelaksana PJ org 3 2 Beton Fc '20 Mpa m3 11.75 4 BULLDOZER 100-150 HP
4 Petugas K-3 org 7 5 ASPHAL DISTRIBUTOR
5 Konsultan org 5 6 CONCRETE MIXER 0.3-0.6 M3
6 Bina Marga org 2 7 CRANE 10-15 TON
7 Pekerja org 3 8 DUMP TRUCK 3 - 4 M3
8 Operator org 15 9 DUMP TRUCK 6-8 M3
9 Teknisi Lab org 4 10 EXCAVATOR 80-140 HP
10 Mandor dan Tenaga org 38 11 FLAT BED TRUCK 3-4 TON
12 GENERATOR SET 2 unit
13 WHEEL LOADER 1.0-1.6 M3
14 ASPHAL SPRAYER
15 TANDEM ROLLER 6-8 T
16 TIRE ROLLER 8-10 T
17 VIBRATORY ROLLER 5-8 T.
18 CONCRETE VIBRATOR 4 Unit
19 JACK HAMMER
20 CONCRETE PAVER MANUAL 2 Unit
21 WELDING SET
22 ALAT UKUR WP/TS 2 Set
23 COLD MILLING MACHINE

PEKERJAAN YANG DILAKSANAKAN


ITEM CATATAN
URAIAN PEKERJAAN SAT. VOLUME LOKASI
PEKERJAAN PERMASALAHAN

Skh.1.5.3(3) Perkerasan Beton Semen dengan umur Pembukan Lebih m3 48.36 35+647-35+686(L1)
dari 3 hari dan kurang dari 7 hari. 188.573 38+995-39+153 (L2)

7.1 (7a) Beton strukur, Fc’ 20 MPa m3 11.75 37+759-37+800 (L1)

CUACA
Pekerjaan KONDISI CERAH GERIMIS HUJAN
Mulai Pukul : 08.00 08.00 s/d 24.00 √
Selesai Pukul : 24.00

Menyetujui : Diperiksa Oleh : Dibuat Oleh :


PPK. 3.1 Provinsi Jawa Tengah Konsultan Supervisi Penyedia Jasa

……………………………… ………………………………… …………………………………


Penilik Jalan Inspektor Pelaksana
REKAP ### REKAP 264.46
- ### 405.90
- ### 345.69
- ### 50.92
- ### 356.61
- ### 381.84
- ### 294.35
- ### 340.10
- ### 443.59
296.13 ###
- ### 418.28
- ### 424.11
- ### 358.29
- ### 217.74
- ### 288.86
- ### 277.34
- ### 145.34
- ### 179.65
- ### 289.85
- ### 246.07
- ### 230.32
159.05 ### -
150.16 ### -
- ### 137.83
- ### 188.75
- ### 41.23
- ### 89.53
- ### 130.76
- ### 95.42
- ### 164.92
- ### 36.41
LH 605.33 6,844.13

DEDY 8492.84 4891.8143


7,887.51 (1,952.32)