Anda di halaman 1dari 28

BACK UP DATA

REKAPITULASI
NO. DEVISI / PEKERJAAN
2.1. MOBILISASI
BULAN DESEMBER 2007

PROYEK / BAGPRO : KEGIATAN BIDANG BINA MARGA DINAS PU KABUPATEN OGAN ILIR
NO. PAKET KONTRAK : 109/PU-BM.P-PPK.PK/JAMAK/OI/V/2007
NAMA PAKET : PAKET V TAHUN JAMAK
PROP. / KAB / KODYA : SUM - SEL / OGAN ILIR
PENYEDIA JASA : PT. CHANDRATEX INDO ARTHA
KONSULTAN : PT. POLA TEKNIK KONSULTAN
VOLUME
NO.
NAMA RUAS / PAKET S/d Bulan S/d Keterangan
Urut Bulan Ini
Lalu Bulan Ini
1 2 3 4 5 6

1 PENINGKATAN JALAN DG ATB RUAS TJ. SEJARO - TJ. SENEH 0.333 0.500 0.833

2 PENINGKATAN JALAN DG ATB RUAS SAKATIGA - MA. PENIMBUNG 0.333 0.500 0.833

3 PENINGKATAN JALAN DG ATB RUAS LBG. KARANGAN - TJ. SENEH 0.333 0.500 0.833

4 PENINGKATAN JALAN DG ATB RUAS BURAI - SAKATIGA 0.333 0.500 0.833

5 PENINGKATAN JALAN DG ATB RUAS SMP. KORAMIL - TJ. SENEH 0.333 0.500 0.833

6 PENINGKTN JLN DG PERKRSN BT PECAH RUAS SP. KEDONDONG - SEJANGKO 0.333 0.500 0.833

7 PEMBANGUNAN JALAN RUAS SENTUL - BURAI 0.333 0.500 0.833

8 PENINGKATAN JALAN DG ATB RUAS BUBUSAN - KANTOR CAMAT 0.333 0.500 0.833

TOTAL RATA - RATA DARI 8 PAKET 0.333 0.500 0.833

DISETUJUI DIPERIKSA DIBUAT OLEH :


BINA MARGA KONSULTAN PENYEDIA JASA
1 IR. RUSLAN KIROM 1. …………………..
NIP. 440 017 219

2 ANANG MUCHTAR 2. …………………..


NIP. 440 027 507 NOBEL HERIYANTO, ST. IR. SYAHRI
Inspector Koord. Pelaksana
3 MAILAN 3. …………………..
NIP. 440 018 589

4 SYUMIRYADI, ST. 4. …………………..


NIP. 440 026 280

BACK UP DATA
REKAPITULASI
NO. DEVISI / PEKERJAAN
3.2 ( 2 ) TIMBUNAN PILIHAN
BULAN DESEMBER 2007
PROYEK / BAGPRO : KEGIATAN BIDANG BINA MARGA DINAS PU KABUPATEN OGAN ILIR
NO. PAKET KONTRAK : 109/PU-BM.P-PPK.PK/JAMAK/OI/V/2007
NAMA PAKET : PAKET V TAHUN JAMAK
PROP. / KAB / KODYA : SUM - SEL / OGAN ILIR
PENYEDIA JASA : PT. CHANDRATEX INDO ARTHA
KONSULTAN : PT. POLA TEKNIK KONSULTAN
VOLUME
NO.
NAMA RUAS / PAKET S/d Bulan S/d Keterangan
Urut Bulan Ini
Lalu Bulan Ini
1 2 3 4 5 6

1 PENINGKATAN JALAN DG ATB RUAS TJ. SEJARO - TJ. SENEH - -

2 PENINGKATAN JALAN DG ATB RUAS SAKATIGA - MA. PENIMBUNG - -

3 PENINGKATAN JALAN DG ATB RUAS LBG. KARANGAN - TJ. SENEH - -

4 PENINGKATAN JALAN DG ATB RUAS BURAI - SAKATIGA - -

5 PENINGKATAN JALAN DG ATB RUAS SMP. KORAMIL - TJ. SENEH - -

6 PENINGKTN JLN DG PERKRSN BT PECAH RUAS SP. KEDONDONG - SEJANGKO - -

7 PEMBANGUNAN JALAN RUAS SENTUL - BURAI - -

8 PENINGKATAN JALAN DG ATB RUAS BUBUSAN - KANTOR CAMAT - -

T O T A L - -

DISETUJUI DIPERIKSA DIBUAT OLEH :


BINA MARGA KONSULTAN PENYEDIA JASA
1 IR. RUSLAN KIROM 1. …………………..
NIP. 440 017 219

2 ANANG MUCHTAR 2. …………………..


NIP. 440 027 507 NOBEL HERIYANTO, ST. IR. SYAHRI
Inspector Koord. Pelaksana
3 MAILAN 3. …………………..
NIP. 440 018 589

4 SYUMIRYADI, ST. 4. …………………..


NIP. 440 026 280

BACK UP DATA
REKAPITULASI
NO. DEVISI / PEKERJAAN
3.3a PENYIAPAN BADAN JALAN PADA GALIAN BIASA
BULAN DESEMBER 2007

PROYEK / BAGPRO : KEGIATAN BIDANG BINA MARGA DINAS PU KABUPATEN OGAN ILIR
NO. PAKET KONTRAK : 109/PU-BM.P-PPK.PK/JAMAK/OI/V/2007
NAMA PAKET : PAKET V TAHUN JAMAK
PROP. / KAB / KODYA : SUM - SEL / OGAN ILIR
PENYEDIA JASA : PT. CHANDRATEX INDO ARTHA
KONSULTAN : PT. POLA TEKNIK KONSULTAN
VOLUME
NO.
NAMA RUAS / PAKET S/d Bulan S/d Keterangan
Urut Bulan Ini
NO.
NAMA RUAS / PAKET
Urut Bulan Ini
Lalu Bulan Ini
1 2 3 4 5 6

1 PENINGKATAN JALAN DG ATB RUAS TJ. SEJARO - TJ. SENEH - -

2 PENINGKATAN JALAN DG ATB RUAS SAKATIGA - MA. PENIMBUNG - -

3 PENINGKATAN JALAN DG ATB RUAS LBG. KARANGAN - TJ. SENEH - -

4 PENINGKATAN JALAN DG ATB RUAS BURAI - SAKATIGA - -

5 PENINGKATAN JALAN DG ATB RUAS SMP. KORAMIL - TJ. SENEH - -

6 PENINGKTN JLN DG PERKRSN BT PECAH RUAS SP. KEDONDONG - SEJANGKO - -

7 PEMBANGUNAN JALAN RUAS SENTUL - BURAI - -

8 PENINGKATAN JALAN DG ATB RUAS BUBUSAN - KANTOR CAMAT - -

T O T A L - -

DISETUJUI DIPERIKSA DIBUAT OLEH :


BINA MARGA KONSULTAN PENYEDIA JASA
1 IR. RUSLAN KIROM 1. …………………..
NIP. 440 017 219

2 ANANG MUCHTAR 2. …………………..


NIP. 440 027 507 NOBEL HERIYANTO, ST. IR. SYAHRI
Inspector Koord. Pelaksana
3 MAILAN 3. …………………..
NIP. 440 018 589

4 SYUMIRYADI, ST. 4. …………………..


NIP. 440 026 280
BACK UP DATA
NO. DEVISI / PEKERJAAN
2.1. MOBILISASI
BULAN DESEMBER 2007

PROYEK / BAGPRO : KEGIATAN BIDANG BINA MARGA DINAS PU KABUPATEN OGAN ILIR
NO. PAKET KONTRAK : 109/PU-BM.P-PPK.PK/JAMAK/OI/V/2007
NAMA PAKET : PENINGKATAN JALAN DG ATB RUAS SAKATIGA - MA. PENIMBUNG
PROP. / KAB / KODYA : SUM - SEL / OGAN ILIR
PENYEDIA JASA : PT. CHANDRATEX INDO ARTHA
KONSULTAN : PT. POLA TEKNIK KONSULTAN

NO. VOLUME
PEKERJAAN
Urut ( LS )

1 2 3

1 MOBILISASI 0.500

TOTAL 0.500

DISETUJUI DIPERIKSA
BINA MARGA KONSULTAN
1 IR. RUSLAN KIROM 1. …………………..
NIP. 440 017 219

2 ANANG MUCHTAR 2. …………………..


NIP. 440 027 507 NOBEL HERIYANTO, ST.
Inspector
3 MAILAN 3. …………………..
NIP. 440 018 589

4 SYUMIRYADI, ST. 4. …………………..


NIP. 440 026 280
EN OGAN ILIR

ENIMBUNG

KETERANGAN

DIBUAT OLEH :
PENYEDIA JASA

IR. SYAHRI
Koord. Pelaksana
1 BACK UP DATA
NO. DEVISI / PEKERJAAN
23-19/04/08 3.2 ( 2 ) TIMBUNAN PILIHAN
BULAN APRIL 2008

PROYEK / BAGPRO : KEGIATAN BIDANG BINA MARGA DINAS PU KABUPATEN OGAN ILIR
NO. PAKET KONTRAK : 109/PU-BM.P-PPK.PK/JAMAK/OI/V/2007
NAMA PAKET : PENINGKATAN JALAN DENGAN ATB RUAS LBG. KARANGAN - TJG. SENEH
PROP. / KAB / KODYA : SUM - SEL / OGAN ILIR
PENYEDIA JASA : PT. CHANDRATEX INDO ARTHA
KONSULTAN : PT. POLA TEKNIK KONSULTAN
A
CL
L
1:1

B
EXISTING

LEBAR LUAS TEBAL


PANJANG
NO. URUT STASION A B RATA-RATA (M) LEFT CL RIGHT
(M)
M³ M1 M1 M1 M1 M1
1 2 3 4 5 6 7 8 9 10

1 02+050 8.00 12.00 10.00 0.10 0.10 0.10


50.00 500.00
2 02+100 8.00 12.00 10.00 0.10 0.10 0.10
50.00 500.00
3 02+150 8.00 12.00 10.00 0.10 0.10 0.10
50.00 500.00
4 02+200 8.00 12.00 10.00 0.10 0.10 0.10
50.00 500.00
5 02+250

10

11

12

13

14

15

16

17

18

19

TOTAL 200.00

Mengetahui / Menyetujui
DPU Bina Marga Kab. Ogan Ilir Diperiksa Oleh, Dibuat Oleh
Konsultan Pengawas Kontraktor / Pela

1 SUHARYONO 1. …………………..
NIP.

IR. ENDANG PU IR. SYAHRI


Site Enginerring Kordinator Pelak
2 ZAKARIA 2. …………………..
IR. ENDANG PU IR. SYAHRI
NIP. Site Enginerring Kordinator Pelak

3 MUCHLISUN 3. …………………..
NIP.

BACK UP DATA
NO. DEVISI / PEKERJAAN
3.2 ( 2 ) TIMBUNAN PILIHAN
BULAN APRIL 2008

PROYEK / BAGPRO : KEGIATAN BIDANG BINA MARGA DINAS PU KABUPATEN OGAN ILIR
NO. PAKET KONTRAK : 109/PU-BM.P-PPK.PK/JAMAK/OI/V/2007
NAMA PAKET : PENINGKATAN JALAN DENGAN ATB RUAS LBG. TJG SEJARO - TJG. SENEH
PROP. / KAB / KODYA : SUM - SEL / OGAN ILIR
PENYEDIA JASA : PT. CHANDRATEX INDO ARTHA
KONSULTAN : PT. POLA TEKNIK KONSULTAN
A
CL
L
1:1

B
EXISTING

LEBAR LUAS TEBAL


PANJANG
NO. URUT STASION A B RATA-RATA (M) LEFT CL RIGHT
(M)
M³ M1 M1 M1 M1 M1
1 2 3 4 5 6 7 8 9 10

1 03+250 8.00 12.00 10.00 0.20 0.20 0.20


50.00 500.00
2 03+300

3 04+300 8.00 12.00 10.00 0.20 0.20 0.20


50.00 500.00
4 04+350 8.00 12.00 10.00 0.25 0.25 0.25
50.00 500.00
5 04+400 8.00 12.00 10.00 0.15 0.15 0.15
50.00 500.00
6 04+450 8.00 12.00 10.00 0.10 0.10 0.10
50.00 500.00
7 04+500 8.00 12.00 10.00 0.45 0.45 0.45
50.00 500.00
8 04+550 8.00 12.00 10.00 0.20 0.20 0.20
50.00 500.00
9 04+600

10

11

12

13

14

15

16

17

18

19
TOTAL 350.00

Mengetahui / Menyetujui Diperiksa Oleh, Dibuat Oleh,


DPU Bina Marga Kab. Ogan Ilir Konsultan Pengawas Kontraktor / Pelak

1 SUHARYONO 1. …………………..
NIP.

IR. ENDANG PU IR. SYAHRI


2 ZAKARIA 2. ………………….. Site Enginerring Kordinator Pelak
NIP.

3 MUCHLISUN 3. …………………..
NIP.

BACK UP DATA
NO. DEVISI / PEKERJAAN
3.2 ( 2 ) TIMBUNAN PILIHAN
BULAN APRIL 2008

PROYEK / BAGPRO : KEGIATAN BIDANG BINA MARGA DINAS PU KABUPATEN OGAN ILIR
NO. PAKET KONTRAK : 109/PU-BM.P-PPK.PK/JAMAK/OI/V/2007
NAMA PAKET : PENINGKATAN JALAN DENGAN ATB RUAS BURAI - SAKATIGA
PROP. / KAB / KODYA : SUM - SEL / OGAN ILIR
PENYEDIA JASA : PT. CHANDRATEX INDO ARTHA
KONSULTAN : PT. POLA TEKNIK KONSULTAN
A
CL
L
1:1

B
EXISTING

LEBAR LUAS TEBAL


PANJANG
NO. URUT STASION A B RATA-RATA (M) LEFT CL RIGHT
(M)
M³ M1 M1 M1 M1 M1
1 2 3 4 5 6 7 8 9 10

1 09+650 8.00 12.00 10.00 0.10 0.10 0.10


50.00 500.00
2 09+700 8.00 12.00 10.00 0.20 0.20 0.20
50.00 500.00
3 09+750 8.00 12.00 10.00 0.20 0.20 0.20
50.00 500.00
4 09+800 8.00 12.00 10.00 0.15 0.15 0.15
50.00 500.00
5 09+850 8.00 12.00 10.00 0.15 0.15 0.15
50.00 500.00
6 09+900 8.00 12.00 10.00 0.10 0.10 0.10
50.00 500.00
7 09+950 8.00 12.00 10.00 0.10 0.10 0.10
50.00 500.00
8 10+000 8.00 12.00 10.00 0.15 0.15 0.15
50.00 500.00
9 10+050 8.00 12.00 10.00 0.15 0.15 0.15
50.00 500.00
10 10+100

11

12

13
14

15

16

17

18

19

TOTAL 450.00

Mengetahui / Menyetujui Diperiksa Oleh, Dibuat Oleh


DPU Bina Marga Kab. Ogan Ilir Konsultan Pengawas Kontraktor / Pela

1 SUHARYONO 1. …………………..
NIP.

IR. ENDANG PU IR. SYAHR


2 ZAKARIA 2. ………………….. Kordinator Pela
Site Enginerring
NIP.

3 MUCHLISUN 3. …………………..
NIP.
1
BACK UP DATA
NO. DEVISI / PEKERJAAN
30-05/04/08 3.2 ( 2 ) TIMBUNAN PILIHAN
BULAN APRIL 2008

PROYEK / BAGPRO : KEGIATAN BIDANG BINA MARGA DINAS PU KABUPATEN OGAN ILIR
NO. PAKET KONTRAK : 109/PU-BM.P-PPK.PK/JAMAK/OI/V/2007
NAMA PAKET : PENINGKATAN JALAN DENGAN ATB RUAS LBG. KARANGAN - TJG. SENEH
PROP. / KAB / KODYA : SUM - SEL / OGAN ILIR
PENYEDIA JASA : PT. CHANDRATEX INDO ARTHA
KONSULTAN : PT. POLA TEKNIK KONSULTAN
A
CL
R L
1:1 1:1

LEBAR LUAS
VOLUME PANJANG
RATA-RATA KETERANGAN NO. URUT STASION A B RATA-RATA (M) LEFT
( M3 ) (M)
M1 M³ M1 M1 M1
11 12 13 1 2 3 4 5 6 7 8

1 02+100 8.00 12.00 10.00 0.15


0.10 50.00 50.00 500.00
2 02+150 8.00 12.00 10.00 0.15
0.10 50.00 50.00 500.00
3 02+200 8.00 12.00 10.00 0.10
0.10 50.00 50.00 500.00
4 02+250
0.05 25.00
5 01+750 8.00 12.00 10.00 0.10
50.00 500.00
6 01+800 8.00 12.00 10.00 0.10
50.00 500.00
7 01+850 8.00 12.00 10.00 0.10
50.00 500.00
8 01+900 8.00 12.00 10.00 0.10
50.00 500.00
9 01+950 8.00 12.00 10.00 0.10
50.00 500.00
10 02+000 8.00 12.00 10.00 0.15
50.00 500.00
11 02+050 8.00 12.00 10.00 0.15
50.00 500.00
12 02+100

13

14

15

16

17

18

19

175.00 TOTAL 500.00

Mengetahui / Menyetujui
Dibuat Oleh, DPU Bina Marga Kab. Ogan Ilir Diperiksa Oleh,
Kontraktor / Pelaksana Konsultan Pengawas

1 SUHARYONO 1. …………………..
NIP.

IR. SYAHRI IR. ENDANG PU


Kordinator Pelaksana Site Enginerring
2 ZAKARIA 2. …………………..
IR. SYAHRI IR. ENDANG PU
Kordinator Pelaksana NIP. Site Enginerring

3 MUCHLISUN 3. …………………..
NIP.

BACK UP DATA
NO. DEVISI / PEKERJAAN
3.2 ( 2 ) TIMBUNAN PILIHAN
BULAN APRIL 2008

PROYEK / BAGPRO : KEGIATAN BIDANG BINA MARGA DINAS PU KABUPATEN OGAN ILIR
NO. PAKET KONTRAK : 109/PU-BM.P-PPK.PK/JAMAK/OI/V/2007
NAMA PAKET : PENINGKATAN JALAN DENGAN ATB RUAS LBG. TJG SEJARO - TJG. SENEH
PROP. / KAB / KODYA : SUM - SEL / OGAN ILIR
PENYEDIA JASA : PT. CHANDRATEX INDO ARTHA
KONSULTAN : PT. POLA TEKNIK KONSULTAN
A
CL
R L
1:1 1:1

LEBAR LUAS
VOLUME PANJANG
RATA-RATA KETERANGAN NO. URUT STASION A B RATA-RATA (M) LEFT
( M3 ) (M)
M1 M³ M1 M1 M1
11 12 13 1 2 3 4 5 6 7 8

1 03+200 8.00 12.00 10.00 0.25


0.10 50.00 50.00 500.00
2 03+250 8.00 12.00 10.00 0.30
50.00 500.00
3 03+300 8.00 12.00 10.00 0.30
0.23 112.50 50.00 500.00
4 03+350 8.00 12.00 10.00 0.30
0.20 100.00 50.00 500.00
5 03+400 8.00 12.00 10.00 0.40
0.13 62.50 50.00 500.00
6 03+450 8.00 12.00 10.00 0.40
0.28 137.50 50.00 500.00
7 03+500 8.00 12.00 10.00 0.30
0.33 162.50 50.00 500.00
8 03+550
0.10 50.00
9 04+400 8.00 12.00 10.00 0.40
50.00 500.00
10 04+450 8.00 12.00 10.00 0.30
50.00 500.00
11 04+500 8.00 12.00 10.00 0.30
50.00 500.00
12 04+550

13

14

15

16

17

18

19
675.00 TOTAL 500.00

Dibuat Oleh, Mengetahui / Menyetujui Diperiksa Oleh,


Kontraktor / Pelaksana DPU Bina Marga Kab. Ogan Ilir Konsultan Pengawas

1 SUHARYONO 1. …………………..
NIP.

IR. SYAHRI IR. ENDANG PU


Kordinator Pelaksana 2 ZAKARIA 2. ………………….. Site Enginerring
NIP.

3 MUCHLISUN 3. …………………..
NIP.

BACK UP DATA
NO. DEVISI / PEKERJAAN
3.2 ( 2 ) TIMBUNAN PILIHAN
BULAN APRIL 2008

PROYEK / BAGPRO : KEGIATAN BIDANG BINA MARGA DINAS PU KABUPATEN OGAN ILIR
NO. PAKET KONTRAK : 109/PU-BM.P-PPK.PK/JAMAK/OI/V/2007
NAMA PAKET : PENINGKATAN JALAN DENGAN ATB RUAS BURAI - SAKATIGA
PROP. / KAB / KODYA : SUM - SEL / OGAN ILIR
PENYEDIA JASA : PT. CHANDRATEX INDO ARTHA
KONSULTAN : PT. POLA TEKNIK KONSULTAN
A
CL
R L
1:1 1:1

LEBAR LUAS
VOLUME PANJANG
RATA-RATA KETERANGAN NO. URUT STASION A B RATA-RATA (M) LEFT
( M3 ) (M)
M1 M³ M1 M1 M1
11 12 13 1 2 3 4 5 6 7 8

1 09+600 8.00 12.00 10.00 0.10


0.15 75.00 50.00 500.00
2 09+650 8.00 12.00 10.00 0.20
0.20 100.00 50.00 500.00
3 09+700 8.00 12.00 10.00 0.25
0.18 87.50 50.00 500.00
4 09+750 8.00 12.00 10.00 0.20
0.15 75.00 50.00 500.00
5 09+800 8.00 12.00 10.00 0.20
0.13 62.50 50.00 500.00
6 09+850 8.00 12.00 10.00 0.40
0.10 50.00 50.00 500.00
7 09+900 8.00 12.00 10.00 0.40
0.13 62.50 50.00 500.00
8 09+950 8.00 12.00 10.00 0.15
0.15 75.00 50.00 500.00
9 10+000 8.00 12.00 10.00 0.15
0.08 37.50 50.00 500.00
10 10+050 8.00 12.00 10.00 0.20
50.00 500.00
11 10+100 8.00 12.00 10.00 0.20
50.00 500.00
12 10+150

13
14

15

16

17

18

19

625.00 TOTAL 550.00

Dibuat Oleh, Mengetahui / Menyetujui Diperiksa Oleh,


Kontraktor / Pelaksana DPU Bina Marga Kab. Ogan Ilir Konsultan Pengawas

1 SUHARYONO 1. …………………..
NIP.

IR. SYAHRI IR. ENDANG PU


Kordinator Pelaksana 2 ZAKARIA 2. ………………….. Site Enginerring
NIP.

3 MUCHLISUN 3. …………………..
NIP.
TA 2
BACK UP D
AN 06-19/04/08 NO. DEVISI / PEK
IHAN 3.2 ( 2 ) TIMBUNAN
BULAN APRIL

PROYEK / BAGPRO : KEGIATAN BIDANG BINA MARGA DINAS PU KABUPATEN OGAN


NO. PAKET KONTRAK : 109/PU-BM.P-PPK.PK/JAMAK/OI/V/2007
NAMA PAKET : PENINGKATAN JALAN DENGAN ATB RUAS LBG. KARANGAN - TJ
PROP. / KAB / KODYA : SUM - SEL / OGAN ILIR
PENYEDIA JASA : PT. CHANDRATEX INDO ARTHA
KONSULTAN : PT. POLA TEKNIK KONSULTAN

R L
1:1 1:1

EXISTING

TEBAL LEBAR
VOLUME NO. PANJANG
CL RIGHT RATA-RATA KETERANGAN STASION A B RATA-RATA
( M3 ) URUT (M)
M1 M1 M1 M³ M1 M1
9 10 11 12 13 1 2 3 4 5 6

0.15 0.15 1 01+950 8.00 12.00 10.00


0.15 75.00 50.00
0.15 0.15 2 02+000 8.00 12.00 10.00
0.10 50.00 50.00
0.10 0.10 3 02+050 8.00 12.00 10.00
0.05 25.00 50.00
4 02+100 8.00 12.00 10.00
50.00
0.10 0.10 5 02+150 8.00 12.00 10.00
0.10 50.00 50.00
0.10 0.10 6 02+200 8.00 12.00 10.00
0.10 50.00 50.00
0.10 0.10 7 02+250 8.00 12.00 10.00
0.10 50.00 50.00
0.10 0.10 8 02+300 8.00 12.00 10.00
0.10 50.00 50.00
0.10 0.10 9 02+350 8.00 12.00 10.00
0.13 62.50 50.00
0.15 0.15 10 02+400 8.00 12.00 10.00
0.15 75.00 50.00
0.15 0.15 11 02+450 8.00 12.00 10.00
0.08 37.50 50.00
12 02+500 8.00 12.00 10.00
50.00
13 02+550 8.00 12.00 10.00
50.00
14 02+600 8.00 12.00 10.00
50.00
15 02+650

16

17

18

19

525.00 TOTAL 700.00

Mengetahui / Menyetujui Diperiksa Oleh,


Dibuat Oleh, DPU Bina Marga Kab. Ogan Ilir Konsultan Pengaw
Kontraktor / Pelaksana

1 SUHARYONO 1. …………………..
NIP.

IR. ENDANG PU
IR. SYAHRI Site Enginerring
Kordinator Pelaksana
IR. ENDANG PU
2 ZAKARIA 2. ………………….. Site Enginerring
IR. SYAHRI
Kordinator Pelaksana NIP.

3 MUCHLISUN 3. …………………..
NIP.

TA BACK UP D
AN NO. DEVISI / PEK
IHAN 3.2 ( 2 ) TIMBUNAN
BULAN APRIL

PROYEK / BAGPRO : KEGIATAN BIDANG BINA MARGA DINAS PU KABUPATEN OGAN


NO. PAKET KONTRAK : 109/PU-BM.P-PPK.PK/JAMAK/OI/V/2007
NAMA PAKET : PENINGKATAN JALAN DENGAN ATB RUAS LBG. TJG SEJARO - TJ
PROP. / KAB / KODYA : SUM - SEL / OGAN ILIR
PENYEDIA JASA : PT. CHANDRATEX INDO ARTHA
KONSULTAN : PT. POLA TEKNIK KONSULTAN

R L
1:1 1:1

EXISTING

TEBAL LEBAR
VOLUME NO. PANJANG
CL RIGHT RATA-RATA KETERANGAN STASION A B RATA-RATA
( M3 ) URUT (M)
M1 M1 M1 M³ M1 M1
9 10 11 12 13 1 2 3 4 5 6

0.25 0.25 1 04+000 8.00 12.00 10.00


0.28 137.50 50.00
0.30 0.30 2 04+050 8.00 12.00 10.00
0.10 50.00 50.00
0.30 0.30 3 04+100 8.00 12.00 10.00
0.30 150.00 50.00
0.30 0.30 4 04+150 8.00 12.00 10.00
0.35 175.00 50.00
0.40 0.40 5 04+200 8.00 12.00 10.00
0.40 200.00 50.00
0.40 0.40 6 04+250
0.35 175.00
0.30 0.30 7
0.15 75.00
8

0.40 0.40 9
0.35 175.00
0.30 0.30 10
0.30 150.00
0.30 0.30 11
0.15 75.00
12

13

14

15

16

17

18

19
1,362.50 TOTAL 250.00

Dibuat Oleh, Mengetahui / Menyetujui Diperiksa O


Kontraktor / Pelaksana DPU Bina Marga Kab. Ogan Ilir Konsultan Pe

1 SUHARYONO 1. …………………..
NIP.

IR. SYAHRI IR. ENDAN


Kordinator Pelaksana 2 ZAKARIA 2. ………………….. Site Engine
NIP.

3 MUCHLISUN 3. …………………..
NIP.

TA
AN
IHAN

R
1:1

EXISTING

TEBAL
VOLUME
CL RIGHT RATA-RATA KETERANGAN
( M3 )
M1 M1 M1
9 10 11 12 13

0.10 0.10
0.15 75.00
0.20 0.20
0.10 50.00
0.25 0.25
0.23 112.50
0.20 0.20
0.20 100.00
0.20 0.20
0.30 150.00
0.40 0.40
0.40 200.00
0.40 0.40
0.28 137.50
0.15 0.15
0.15 75.00
0.15 0.15
0.18 87.50
0.20 0.20
0.20 100.00
0.20 0.20
0.10 50.00
1,137.50

Dibuat Oleh,
Kontraktor / Pelaksana

IR. SYAHRI
Kordinator Pelaksana
ACK UP DATA 3

. DEVISI / PEKERJAAN 20-26/04/08


2 ) TIMBUNAN PILIHAN
BULAN APRIL 2008

KABUPATEN OGAN ILIR PROYEK / BAGPRO : KEGIATAN BIDANG BINA MARG


NO. PAKET KONTRAK : 109/PU-BM.P-PPK.PK/JAMAK/OI/V
LBG. KARANGAN - TJG. SENEH NAMA PAKET : PENINGKATAN JALAN DENGAN
PROP. / KAB / KODYA : SUM - SEL / OGAN ILIR
PENYEDIA JASA : PT. CHANDRATEX INDO ARTHA
KONSULTAN : PT. POLA TEKNIK KONSULTAN
A
CL
R L
1:1 1:1

B
EXISTING

LUAS TEBAL LE
VOLUME PANJANG
(M) LEFT CL RIGHT RATA-RATA KETERANGAN NO. URUT STASION A
( M3 ) (M)
M1 M1 M1 M1 M³
7 8 9 10 11 12 13 1 2 3 4

0.10 0.10 0.10 1 04+000 8.00


500.00 0.10 50.00 50.00
0.10 0.10 0.10 2 04+050 8.00
500.00 0.10 50.00 50.00
0.10 0.10 0.10 3 04+100 8.00
500.00 0.10 50.00 50.00
0.10 0.10 0.10 4 04+150 8.00
500.00 0.10 50.00 50.00
0.10 0.10 0.10 5 04+200 8.00
500.00 0.10 50.00 50.00
0.10 0.10 0.10 6 04+250 8.00
500.00 0.10 50.00 50.00
0.10 0.10 0.10 7 04+300 8.00
500.00 0.10 50.00 50.00
0.10 0.10 0.10 8 04+350 8.00
500.00 0.10 50.00 50.00
0.10 0.10 0.10 9 04+400
500.00 0.10 50.00
0.10 0.10 0.10 10
500.00 0.10 50.00
0.10 0.10 0.10 11
500.00 0.10 50.00
0.10 0.10 0.10 12
500.00 0.10 50.00
0.10 0.10 0.10 13
500.00 0.10 50.00
0.10 0.10 0.10 14
500.00 0.05 25.00
15

16

17

18

19

675.00 TOTAL 400.00

Diperiksa Oleh, Dibuat Oleh, Mengetahui / Menyetujui


onsultan Pengawas Kontraktor / Pelaksana DPU Bina Marga Kab. Ogan Ilir

1 SUHARYONO 1. …………………..
NIP.

IR. ENDANG PU IR. SYAHRI


Site Enginerring Kordinator Pelaksana
IR. ENDANG PU IR. SYAHRI
Site Enginerring Kordinator Pelaksana 2 ZAKARIA 2. …………………..
NIP.

3 MUCHLISUN 3. …………………..
NIP.

ACK UP DATA
. DEVISI / PEKERJAAN
2 ) TIMBUNAN PILIHAN
BULAN APRIL 2008

KABUPATEN OGAN ILIR

LBG. TJG SEJARO - TJG. SENEH

A
CL
R
1:1

B
EXISTING

LUAS TEBAL
VOLUME
(M) LEFT CL RIGHT RATA-RATA KETERANGAN
( M3 )
M1 M1 M1 M1
7 8 9 10 11 12 13

1.20 1.20 1.20


500.00 1.20 600.00
1.20 1.20 1.20
500.00 0.10 50.00
1.20 1.20 1.20
500.00 1.20 600.00
1.20 1.20 1.20
500.00 1.20 600.00
1.20 1.20 1.20
500.00 0.60 300.00
2,150.00

Diperiksa Oleh, Dibuat Oleh,


Konsultan Pengawas Kontraktor / Pelaksana

IR. ENDANG PU IR. SYAHRI


Site Enginerring Kordinator Pelaksana
BACK UP DATA 4

NO. DEVISI / PEKERJAAN 27-03/04/08


3.2 ( 2 ) TIMBUNAN PILIHAN
BULAN APRIL 2008

NG BINA MARGA DINAS PU KABUPATEN OGAN ILIR PROYEK / BAGPRO :


PK/JAMAK/OI/V/2007 NO. PAKET KONTRAK :
ALAN DENGAN ATB RUAS TJG. SEJARO - TJG. SENEH NAMA PAKET :
PROP. / KAB / KODYA :
X INDO ARTHA PENYEDIA JASA :
KONSULTAN KONSULTAN :
A
CL
R
1:1

B
EXISTING

LEBAR LUAS TEBAL


VOLUME
B RATA-RATA (M) LEFT CL RIGHT RATA-RATA KETERANGAN NO. URUT STASION
( M3 )
M1 M1 M1 M1 M1 M1
5 6 7 8 9 10 11 12 13 1 2

12.00 10.00 0.20 0.20 0.20 1 03+500


500.00 0.23 112.50
12.00 10.00 0.25 0.25 0.25 2 03+550
500.00 0.10 50.00
12.00 10.00 0.25 0.25 0.25 3 03+600
500.00 0.25 125.00
12.00 10.00 0.25 0.25 0.25 4 03+650
500.00 0.25 125.00
12.00 10.00 0.25 0.25 0.25 5 03+700
500.00 0.28 137.50
12.00 10.00 0.30 0.30 0.30 6 03+750
500.00 0.25 125.00
12.00 10.00 0.20 0.20 0.20 7 03+800
500.00 0.15 75.00
12.00 10.00 0.10 0.10 0.10 8 03+850
500.00 0.05 25.00
9 03+900

10 03+950

11 04+000

12

13

14

15

16

17

18

19

775.00 TOTAL

Diperiksa Oleh, Dibuat Oleh, Mengetahui / Menyetu


Konsultan Pengawas Kontraktor / Pelaksana DPU Bina Marga Kab. Og

1 SUHARYONO 1. ………
NIP.

IR. ENDANG PU IR. SYAHRI


Site Enginerring Kordinator Pelaksana
IR. ENDANG PU IR. SYAHRI
Site Enginerring Kordinator Pelaksana 2 ZAKARIA 2. ………
NIP.

3 MUCHLISUN 3. ………
NIP.
BACK UP DATA
NO. DEVISI / PEKERJAAN
3.2 ( 2 ) TIMBUNAN PILIHAN
BULAN APRIL 2008

KEGIATAN BIDANG BINA MARGA DINAS PU KABUPATEN OGAN ILIR


109/PU-BM.P-PPK.PK/JAMAK/OI/V/2007
PENINGKATAN JALAN DENGAN ATB RUAS TJG. SEJARO - TJG. SENEH
SUM - SEL / OGAN ILIR
PT. CHANDRATEX INDO ARTHA
PT. POLA TEKNIK KONSULTAN
A
CL
L R
1:1 1:1

B
EXISTING

LEBAR LUAS TEBAL


PANJANG VOLUME
A B RATA-RATA (M) LEFT CL RIGHT RATA-RATA KETERANGAN
(M) ( M3 )
M³ M1 M1 M1 M1 M1 M1
3 4 5 6 7 8 9 10 11 12 13

8.00 12.00 10.00 1.50 1.50 1.50


50.00 500.00 1.50 750.00
8.00 12.00 10.00 1.50 1.50 1.50
50.00 500.00 0.10 50.00
8.00 12.00 10.00 1.05 1.05 1.05
50.00 500.00 1.05 525.00
8.00 12.00 10.00 1.05 1.05 1.05
50.00 500.00 1.05 525.00
8.00 12.00 10.00 1.05 1.05 1.05
50.00 500.00 1.05 525.00
8.00 12.00 10.00 1.05 1.05 1.05
50.00 500.00 1.05 525.00
8.00 12.00 10.00 1.05 1.05 1.05
50.00 500.00 1.05 525.00
8.00 12.00 10.00 1.05 1.05 1.05
50.00 500.00 1.05 525.00
8.00 12.00 10.00 1.05 1.05 1.05
50.00 500.00 1.58 787.50
8.00 12.00 10.00 2.10 2.10 2.10
50.00 500.00 1.05 525.00

500.00 5,262.50

ui / Menyetujui Diperiksa Oleh, Dibuat Oleh,


rga Kab. Ogan Ilir Konsultan Pengawas Kontraktor / Pelaksana

1. …………………..

IR. ENDANG PU IR. SYAHRI


Site Enginerring Kordinator Pelaksana
IR. ENDANG PU IR. SYAHRI
2. ………………….. Site Enginerring Kordinator Pelaksana

3. …………………..
LAPORAN KEMAJUAN FISIK
PEMBANGUNAN JEMBATAN

NO URAIAN PEKERJAAN VOLUME SAT NO URAIAN PEKERJAAN VOLUME SAT


Pemb. Jembatan MA. Penimbung Pemb. Jembatan Koramil - Tjg. Seneh

1 Memencang Tiang Jembatan Ø 6 198.53 M' 1 Memencang Tiang Jembatan Ø 8 170.80 M'

2 Pasangan Tiang Sayap Ø 6 21.41 M' 2 Pasangan Gelagar Memanjang Ø 6 140.00 M'

3 Pasangan Skur Tiang Sayap Ø 4 29.91 M' 3 Pasangan Gelagar Memanjang Ø 8 22.50 M'

4 Pasangan Gelagar Melintang Ø 6 20.00 M' 4 Pasangan kait Angin Ø 8 18.00 M'

5 Pasangan Gelagar Memanjang Ø 6 100.00 M' 5 Pasangan kait Angin Ø 6 41.60 M'

6 Pasangan Skur Lantai Ø 3 102.00 M' 6 Pasangan Tiang Sayap Ø 8 55.62 M'

7 Pasangan Silang Angin Ø 6 64.00 M' 7 Pasangan Skur Tiang Sayap Ø 4 58.40 M'

8 Pasangan Shok Ø 6 5.00 M' 8 Pasangan Skur Lantai Ø 3 116.28 M'

9 Pasangan Tiang Lening Ø 3 26.00 M' 9 Pasangan Skur Tiang Ø 4 135.87 M'

10 Pasangan Lening Ø 2 80.00 M' 10 Pasangan Leneng Ø 2 80.00 M'

11 Pasangan Skur Tiang Ø 4 97.61 M' 11 Pasangan Tiang Leneng Ø 3 30.90 M'

12 Pasangan Behel Ø 10 20.00 Btg 12 Pasangan Behel Ø 10 65.00 Btg

13 Cor Sayap 13.44 M3 13 Pasangan Plat Lantai 6 mm 30.00 Kpg

14 Pasangan Plat Lantai 6 mm 25.00 Kpg 14 Cor Sayap Jembatan 15.30 M3


BACK UP DATA
JENIS PEKERJAAN
PENYIAPAN BADAN JALAN PADA GALIAN BIASA
BULAN DESEMBER 2007

PROYEK / BAGPRO : KEGIATAN BIDANG BINA MARGA DINAS PU KABUPATEN OGAN ILIR
NO. PAKET KONTRAK : 109/PU-BM.P-PPK.PK/JAMAK/OI/V/2007
NAMA PAKET :

PROP. / KAB / KODYA : SUM - SEL / OGAN ILIR


PENYEDIA JASA : PT. CHANDRATEX INDO ARTHA
KONSULTAN : PT. POLA TEKNIK KONSULTAN

CL

PANJANG LEBAR VOLUME


NO. URUT STASION ( M1 ) ( M1) ( M3 ) KETERANGAN

1 2 3 4 5 6

1 00+000
100.00 7.00 700.00
2 00+100
100.00 7.00 700.00
3 00+200
100.00 7.00 700.00
4 00+300
100.00 7.00 700.00
5 00+400
100.00 7.00 700.00
6 00+500
100.00 7.00 700.00
7 00+600
100.00 7.00 700.00
8 00+700
100.00 7.00 700.00
9 00+800
100.00 7.00 700.00
10 00+900
100.00 7.00 700.00
11 01+000
100.00 7.00 700.00
12 01+100
100.00 7.00 700.00
13 01+200
100.00 7.00 700.00
14 01+300
100.00 7.00 700.00
15 01+400
16
17

TOTAL 1,400.00 9,800.00

Mengetahui / Menyetujui Diperiksa Oleh, Dibuat Oleh,


DPU Bina Marga Kab. Ogan Ilir Konsultan Pengawas Kontraktor / Pelaksana

1 SUHARYONO 1. …………………..
NIP.

IR. ASRULLAH, MT AMAL KAMALA, ST


2 ZAKARIA 2. ………………….. Site Enginerring General Superintendent