ANGGARAN PELAKSANAAN PROYEK

PROYEK : PEMBANGUNAN SALURAN DRAINASE/GORONG-GORONG RW. 10, KEL. GEBANG RAYA

ANGGARAN PELAKSANAAN
NO NAMA BIAYA SATUAN
VOLUME HARGA SATUAN HARGA JUMLAH %
A MATERIAL & PEKERJA
1 Komitmen 10 % (fee dns) ls 1 27.092.284,89 27.092.284,89 12,651
2 Bendera 2,5 % ls 1 6.773.071,22 6.773.071,22 3,163
3 Pekerja/tukang ls 1 32.510.741,87 32.510.741,87 15,181
4 U-Ditch 50 x 50 + Tutup, dan Box Culvert ls 1 142.780.700,00 142.780.700,00 66,671
JUMLAH MATERIAL & PEKERJA 209.156.797,98 97,665
B PERALATAN
1 Sewa Jack Hammer ls 1 3.000.000,00 3.000.000,00 1,401
2 Operasional Lap ls 1 2.000.000,00 2.000.000,00 0,934
JUMLAH PERALATAN 5.000.000,00 2,335
TOTAL ANGGARAN BIAYA PELAKSANAAN PROYEK 214.156.797,98 100

NILAI KONTRAK 311.405.573,44


PEMASUKAN (NILAI KONTRAK-PAJAK (PPN+PPh) 13%) 270.922.848,89
TOTAL ANGGARAN BIAYA PELAKSANAAN PROYEK 214.156.797,98
PROFIT (KEUNTUNGAN) RENCANA 56.766.050,91
KEUNTUNGAN ASLI DENGAN BIAYA REAL 164.032.498,89

Jumlah Tenaga : 8 Orang


CATATAN PENGELUARAN

NO NAMA BIAYA TANGGAL HARGA %


A Komitmen 10 % (fee dns)
1 Fee Dinas 21/09/2022 3.000.000 11,07
Total 3.000.000 11,07
B Bendera 2,5 %

Total 0 0
C Pekerja/tukang
1 Jaminan 2,5 dan opra 1 U-Ditch 3.500.000 10,77
2 Kasbon tukang U-Ditch tangkot 1.000.000 3,08
3 Kasbon dan Kontrakan Mandor 6.000.000 18,46
4 Mandor 4.000.000 12,30
5 Kasbon Mandor 24/09/2022 2.000.000 6,15
6 Kasbon Tukang 29/09/2022 3.000.000 9,23
7 Tenaga 4/10/2022 5.000.000 15,38
0,00
0,00
Total 24.500.000 75,36
D U-Ditch 50 x 50 + Tutup, dan Box Culvert
DP 50 % 3/10/2022 71.390.350 50,00
Total 71.390.350 50,00
E Sewa Jack Hammer
1 Jack Hammer 29/09/2022 3.000.000 100,00
Total 3.000.000 100,00
F Operasional Lap
1 Operasional Lap 4/4/2022 1.000.000
Total 1.000.000 3,69
G LAIN-LAIN
Beli alkon, perlengkapan proyek (rompi, helm) 2/10/2022 4.000.000
Total 4.000.000
TOTAL KESELURUHAN PENGELUARAN 106.890.350 49,91