Implementasi

BIM di PUPR

Pusat Data dan Teknologi Informasi


Sekretariat Jenderal
Kementerian Pekerjaan Umum dan Perumahan Rakyat
29 Agustus 2023
BIM PUPR
a. Regulasi BIM di PUPR
b. Instruksi Menteri PUPR No. 4/IN/M/2022
c. Arahan Menteri PUPR terkait BIM di IKN
d. Roadmap BIM di PUPR
Pengenalan BIM
a. Manfaat Implementasi BIM
b. Informasi pada BIM Model
c. Level Of Development dan Level of Detail
d. Tahapan Implementasi BIM
e. Dimensi BIM
f. Tahapan Pelaksanaan BIM
Outline Integrasi BIM PUPR
a. Workflow BIM PUPR
b. CDE Integrasi BIM
c. KPI BIM
d. Command Center IKN

Implementasi BIM PUPR


a. BIM 3D, 4D, 5D
b. Monitoring Progress Lapangan
c. Clash Detection
d. AR (Augmented Reality)
e. 3D As-Built Drawing
f. Scan To BIM
2
Konsep Building Information Modelling

BIM adalah proses untuk membuat dan


mengelola informasi tentang proyek konstruksi
di seluruh siklusnya secara digital dengan
prinsip kolaborasi.
01 Kenapa Kita Harus Implementasikan BIM?

Arahan Bapak Menteri PUPR er


in
g Qu
an

e Eng
i ne
T
Transparency
tit
y
Su
rv
lu ey
Va i ng
F
Fairness
A
Accountability

GG

Independency
I R
Responsibility

Peran Pusdatin dalam pengelolaan BIM PUPR yaitu Ketersediaan Ekosistem


(hardware/Software/Lisensi/ jaringan Internet, SDM) pendukung penerapan BIM di
Good Governance Implementation of PUPR, diantaranya :
(GG) BIM
a. Integrasi data BIM PUPR dalam CDE Terpusat di Pusdatin
b. Penyiapan Hardware dan Software Pendukung dalam proses Integrasi
Data BIM
Instruksi Menteri PUPR No. 4/IN/M/2022 : c. Standarisasi perangkat pendukung implementasi BIM Hardware
Implementasi BIM untuk Proyek Strategis d. Monitoring implementasi perangkat pendukung implementasi BIM di
Nasional Unit Organisasi teknis Kementerian PUPR (Software dan Hardware)

4
01 Regulasi BIM di Kementerian PUPR

SE Dirjen SDA 04 Tahun 2023


mengenai Implementasi BIM

Sumber : Paparan Kepala Subdirektorat Kelembagaan, Material, Peralatan,


dan Usaha Jasa Konstruksi, DIrektorat jenderal Bina Konstruksi. 20 Maret 2023
https://linktr.ee/teknologidksdk
5
01 Roadmap BIM PUPR

● Making Standard BIM Models for each ● Initiation of BIM Data Integration
Dimensions BMN (Barang Milik Negara) ● Finalization Dashboard BIM
● Update BIM SOP IKN to BIM SOP PUPR ● Development of Dashboard BIM PUPR (All of the Project from
● Development of Dashboard BIM PUPR PUPR PUPR use BIM)
● Initiate creation of BIM Library PUPR ● Development of BIM Library PUPR ● Continuing BIM Data Integration
● Development of Dashboard BIM PUPR ● Continuation of AIM Creation from As with BMN
● Continuation of AIM Creation from As built built Drawing
Drawing

2023 2024 2025 2026 2027 2028 2029

● Collecting BIM data for IKN ● Finalization Standard BIM Model ● All of PUPR projects must ● All of PUPR Projects already
Project and PSN for each Dimensions implementing BIM implementing BIM and
● Creating Asset Information ● BIM SOP for each infrastructure ● Continuing BIM Data integrated with BMN
Modelling from As Built Data ● Development of Dashboard BIM Integration with BMN
● Making Standard Operating PUPR ● Development of Dashboard
Procedure (SOP) BIM IKN ● Development of BIM Library PUPR BIM PUPR
Implementation ● Continuation of AIM Creation from ● Finalization of BIM Library
● Initiation of Dashboard BIM As built Drawing PUPR
PUPR

6
01 BIM di IKN

Menteri PUPR - Basuki


Hadimuljono

1. Kerja Kolaboratif dan Integrasi Data


○ Desain IKN menggunakan prinsip “Kerja Kolaboratif” dengan memanfaatkan teknologi
Building Information Modelling (BIM) dan Geographic Information System (GIS)
○ Desain menggunakan data yang sama dan “terintegrasi” antar Unit Organisasi dan K/L
serta pemanfaatan IoT, Real Time Data, dan Big Data dapat membantu 10 prioritas
pengelolaan kota
2. Tata Kelola Pelaksanaan Konstruksi & Pengelolaan BIM
○ Sesuai Instruksi Menteri PUPR No. 4/IN/M/2022, tugas Pusdatin sebagai penyedia
ekosistem antara lain : hardware/Software/Lisensi/ jaringan Internet, SDM pendukung
penerapan BIM di PUPR
○ Pembangunan 34 project fisik dari 160 project di IKN secara bersamaan (sumber data :
e-monitoring, 25 Mei 2023, pukul 16:00).
(sumber : Bisnis Indonesia, 16 Maret 2023)
7
02 Manfaat Implementasi BIM?

Kualitas Data yang Lebih Baik


Lifecycle building management Pendekatan Terkoordinasi
Penyelesaian konstruksi lebih baik

Kalkulasi dan Volume yang Transparan


Keandalan Anggaran Virtual Simulation
Pemahaman lebih baik oleh
semua pihak

Prefabrication
Pekerjaan yang Kolaboratif Reduksi kesalahan di lapangan
Bekerjasama mendapatkan hasil berkualitas

Mengurangi Hilangnya Data Virtual Model


Minimalisir kerja ulang/rework Deteksi kesalahan dan konflik lebih dini

8
02 Informasi pada BIM Model

DATA
Geo-Spatial Information
Model berbasis
dan terintegrasi
Geo Spasial

LOD & LOI


NON GRAPHICAL MODEL
Informasi yang
dibutuhkan pada
INFORMASI BIM Model BIM

BIM
Interoperability

BIM Model harus


dapat
dimanfaatkan oleh
proses engineering
lainnya

GRAPHICAL MODEL
9
02 Tahapan Pelaksanaan BIM

Pelaksanaan pemetaan oleh tim Clash detection dilakukan dengan Model BIM yang sudah memiliki
surveyor, mulai dari perencanaan melakukan pemeriksaan terhadap informasi cost, material, dan
pekerjaan, monitoring progress, dan desain secara 3D. Clash detection manufaktur pada setiap bagian dalam
pengukuran as-built. juga dilakukan antar desain untuk model sesuai dengan kondisi aslinya/
melihat kesesuaian antar desain. rencana.
- Titik kontrol acuan; Clash detection tidak hanya
- MC 0 (Surface awal pekerjaan); mencakup model, namun juga
- Foto udara pekerjaan berkala; mencakup timeline pekerjaan
- Surface progress berkala;
- MC 100 (Surface akhir pekerjaan)
Operation
3D Modelling 4D Schedule Maintenance

Survey Clash 5D Cost


Topografi Detection
Model BIM yang sudah memiliki Model BIM yang berisi informasi yang
Pemodelan infrastruktur secara 3D
informasi jadwal pelaksanaan setiap diperlukan dalam tahapan operasional
beserta utilitas dan ornamen di
tahapan pekerjaan. dalam model 4D dan maintenance. Di dalam model BIM
dalamnya oleh tim arsitek dan tim
ini akan dapat dilihat jika tejadi tersebut sudah mengakomodir
engineer. Model tersebut menjadi
keterlambatan. Model BIM 4D juga informasi terkait jadwal maintenance
acuan untuk pembangunan di
dapat berupa beberapa plan jadwal utilitas, model setiap lantai dan
lapangan.
untuk mengantisipasi keterlambatan. lainnya. Model BIM ini nantinya dapat
- Model Building/ Jalan dikombinasikan dengan Smart
- Model Struktur Building.
- Model Arsitektur
- Model MEP

10
02 Survey Topografi

11
02 Level Of Development dan Level of Detail

Level of Information (LOI), daftar


LOI informasi yang dibutuhkan pada
sebuah komponen/ objek

Level of Development
(LOD), menentukan
tahapan pengembangan
BIM Model

LOD

12
02 Tahapan Implementasi BIM

Pra Konstruksi Konstruksi Pasca Konstruksi

Unit Organisasi (Unor) PPK/Direksi bekerja sama dengan Penyedia Jasa menyerahkan Asset
diharuskan menyusun dan Manajemen Konstruksi Proyek Information Model (AIM) dengan LOD
menerbitkan Exchange melakukan monitoring & evaluasi 500 dan dokumen-dokumen
Information Requirements (EIR) pelaksanaan konstruksi mengacu ke kelengkapan BAST
sebagai dokumen tender. BIM Execution Plan (BEP) Penyedia
Jasa.

Kebutuhan Informasi Aset (AIR) Pra BEP, Capability & Capacity Post BEP, CDE, BIM
Input

Kebutuhan Pertukaran Informasi (EIR) Stmt., Mobilization Plan, Risk


Assessment.
Pra BEP, Capability & Capacity Post BEP, IT Security Plan, Asset Information Model
Output

Statement, Mobilization Plan, Risk Information Sharing Agreement,


Assessment. CDE, BIM Model 13
02 Dimensi BIM

1 Sources Data Preparation 2 Preliminary Design 3 Detailed Design

BIM LEVEL 2D BIM LEVEL 3D BIM LEVEL 4D


(Scheduling)

● Establishing Existing Conditions


● Sketch Object ● Design Validation

● Aerial Imaginary setup


● Surface setup BIM IKN
● Existing condition setup

6 Facility and Asset Management 5 Energy/Surrounding Analysis 4 Quantity Take Off

BIM LEVEL 7D BIM LEVEL 6D BIM LEVEL 5D


(Facility and Asset (Energy Analysis) (Detailed Cost)
Management)

● Asset Database
● Reconstruction/maintenance management ● Quality Control
● Quality Assurance
● Watershed Analysis
● Elevation/Slope Analysis
● Traffic Analysis & Simulation Preview
● Sight Analysis

14
02 Software BIM

15
03 Perubahan Cara Bekerja
Rancangan Workflow SOP BIM IKN

Data Integration

Pengiriman data Information Submission


melalui CDE Data pada folder
masing- masing Published
● Data Survey
Unor Workflow Control diintegrasikan
● DED
Periode dengan CDE
● For Construction
pengiriman data terintegrasi IKN
(3D Model)
● Asbuilt Workflow Setiap Unor progres ke CDE
● BIM 4D Approval diatur diharuskan diatur oleh
● BIM 5D oleh Unor memiliki admin masing-masing
● Project Progres pengelola unor*)
● Dokumen Administrasi BIM

16
03 Proses Bisnis BIM IKN

Inovasi :
1. Pendeteksian Clash antar project lebih
awal
2. Clash diketahui dan dibahas untuk
menetapkan cara penyelesaiannya
3. Dimungkinkan karena seluruh data
yang di superimpose bersumber dari
CDE
4. Publikasi Data BIM dan GIS
menggunakan Platform WebGIS 3D

Inovasi
17
03 CDE Integrasi PUPR

Target Integrasi BIM PUPR


Proyek Strategis Nasional : 125 Paket
Proyek IKN : 36 Paket
Proyek Non PSN : 202 Paket
Total : 363 Paket
18
03 CDE Integrasi BIM IKN
Pembangunan Ibu Kota Nusantara

CDE IKN

19
03 Parameter Penilaian KPI BIM IKN

KPI Implementasi BIM IKN terdiri dari


Kelengkapan Dokumen dan
01 INDIKATOR 1 Penunjang Penerapan BIM
beberapa indikator penilaian yang
digunakan sebagai acuan dalam
memberikan penilaian penerapan BIM
terhadap masing-masing paket pekerjaan
Pelaksanaan Monitoring dan
02 INDIKATOR 2 Evaluasi Penerapan BIM

Implementasi BIM 3D, 4D


03 INDIKATOR 3 dan 5D

Pelaksanaan Review dan


04 INDIKATOR 4
Persetujuan Desain
melalui CDE

Kolaborasi antar Pihak


05 INDIKATOR 5 melalui CDE

06 INDIKATOR 6
Kesesuaian Implementasi BIM

Mengacu kepada KPI BIM dari Bina Kontruksi


20
03 Pelaksanaan BIM di IKN

Nilai rata-rata KPI BIM IKN untuk


paket yang sedang konstruksi di
IKN adalah 75,750 dengan
predikat BAIK

21
03 BIM Command Center IKN

Command
Center IKN :
- Informasi Paket
pekerjaan
- Progres
- BIM 3D
- BIM 4D
- Foto
- Video
- CCTV
- Lokasi

Sumber : Command Center IKN https://nusantara.pu.go.id/ 22


03 Command Center IKN
(Web 3D Design VS Web 3D Progres)

Web 3D Progres

Web 3D Desain

23
04 Implementasi BIM di Istana Negara
Pemanfaatan Fotogrametri untuk pengambilan data Kontur

24
04 Implementasi BIM di Istana Negara
BIM 3D Istana Negara

25
04 Implementasi BIM di Istana Negara
BIM 4D Istana Negara

26
04 Implementasi BIM di Istana Negara
BIM 5D Istana Negara

27
04 Perbandingan Progres Lapangan dan Progress BIM

28
04 Implementasi BIM
Augmented Reality Istana Negara

29
04 Implementasi BIM

30
04 Clash Detection

31
04 Clash Detection

32
04 Clash Detection

Clash Detection Status


No Image Deskripsi Masalah Tindak Lanjut
Item 1 Item 2 OPEN CLOSE
Paket Pekerjaan : Paket Pekerjaan :
Sumbu Kebangsaan Sisi Embung E
Barat

● Aternatif 1 Membuat
PPK : PPK : DPT pada trase Sumbu
SDA Embung E Barat yang terkena
28/11/2022 7/02/2023
Lingkar Sepaku
Trase Sumbu Barat Embung
2 bersinggungan dengan
Area Embung E ● Alternatif 2 Membuat
Lokasi clash : Lokasi clash :
Semi Jembatan
STA 0+560 – 0+720 Embung E Pelengkung
STA 0+860 – 0+890
STA 0+930 – 0+990

Item clash : Item clash :


Trase Sumbu Barat Embung E

33
04 Clash Detection

34
04 Clash Detection

Clash Detection Status


No Image Deskripsi Masalah Tindak Lanjut
Item 1 Item 2 OPEN CLOSE
Paket Pekerjaan : Paket Pekerjaan :
Land Development tahap Embung KIPP
2
Alt1 : Realignment
Profil Horizontal

PPK : PPK :
Timbunan Land Alt2 : Dinding
Development 2 ROW Penahan Tanah 17/11/2022 08/02/2023
3 24B3 mengenai area
Embung D Rencana alternatif
Lokasi clash : Lokasi clash : yang akan digunakan
ROW 24B3 Embung D yaitu alternatif 1

Item clash : Item clash :


Timbunan ROW 24B3

35
04
03 Clash Detection

ALTERNATIF 1 - Realignment Profil Horizontal ALTERNATIF 1 - Dinding Penahan

36
04 BIM from As Built
Target BIM dari data Asbuilt : 100 paket untuk tahun 2023
Progres : 59%

37
04 BIM from As Built

Jembatan Kancing 1

38
04 BIM from As Built
Pembangunan Bendung Tewang Menyangen

39
04 Scan to BIM

40
04
05 Klinik BIM PUPR

Tema Klinik BIM


1. BIM untuk Pembangunan Infrastruktur PUPR – Implementasi, Kendala, dan Visi Kedepannya
2. BIM untuk Mendukung Pembangunan Infrastruktur Bidang Sumber Daya Air
3. BIM untuk Mendukung Pembangunan Infrastruktur Perumahan
4. BIM untuk Mendukung Pembangunan Infrastruktur Bidang Cipta Karya
5. Manajemen dan Strategi Pengelolaan BIM untuk Pembangunan Infrastruktur
6. Pemanfaatan BIM untuk Monitoring dan Evaluasi Paket Pekerjaan Konstruksi
7. Pemanfaatan Augmented Reality (AR) dalam Pembangunan Infrastruktur
8. Implementasi BIM dalam Pembangunan dan Proses PHO suatu Proyek
9. Pemanfaatan BIM dalam Project Manajemen
10. Implementasi BIM 3D, 4D, dan 5D dalam Pembangunan Infrastruktur
11. Penerapan AIR, EIR, PIR, OIR, dan BIM Level 3

Klinik BIM dilaksanakan setiap bulan


secara Daring. Jumlah peserta paling
banyak adalah 400 peserta dengan
rata-rata tiap pertemuannya adalah
100 peserta

41
Desain Dashboard BIM PUPR

Dashboard BIM Klinik BIM Pedoman BIM Video Tutorial BIM Library

Kementerian Koordinator PMK

Detail BIM

163 41 41 41 40
Paket (jumlah paket pekerjaan) (jumlah paket pekerjaan) (jumlah paket pekerjaan) (jumlah paket pekerjaan)

Pekerjaan Sumber Daya Status Data : 31 Juli


Bina Marga Cipta Karya Perumahan 2023
Air

42
Desain Dashboard BIM PUPR

Kementerian Detail Proyek 3D Model 3D Progres

Koordinator PMK
Paket Pembangunan
Kementerian Koordinator PMK DED
dimulai pada tanggal
29 Desember 2022 - 20 Oktober Shop Drawing
2024, Paket pekerjaan ini
dikerjakan oleh Balai Prasarana As Built Drawing
Permukiman Wilayah Kalimantan
Timur Foto
Video

Lokasi Proyek

street view

43
Desain Dashboard BIM PUPR

Detail Proyek 3D Model 3D Progres


Kementerian
Koordinator PMK
Paket Pembangunan
Kementerian Koordinator PMK DED
dimulai pada tanggal
29 Desember 2022 - 20 Oktober Shop Drawing
2024, Paket pekerjaan ini
dikerjakan oleh Balai Prasarana As Built Drawing
Permukiman Wilayah
Kalimantan Timur Foto
Video

Lokasi Proyek

street view

44
Desain Dashboard BIM PUPR

Kementerian Detail Proyek 3D Model 3D Progres


Koordinator PMK Membutuhkan verifikasi
akun (login account)

> DED
Jalan
Jembatan
Struktur
Arsitektur
MEP
Landscape
Infrastruktur

Shop Drawing
As Built Drawing
Foto
Video

1 / 999

45
Desain Dashboard BIM PUPR

Kementerian Detail Proyek 3D Model 3D Progres


Koordinator PMK

DED
Shop Drawing
As Built Drawing

> Foto
Video

1 / 999

46
Desain Dashboard BIM PUPR

Kementerian Detail Proyek 3D Model 3D Progres


Koordinator PMK

DED
Shop Drawing
As Built Drawing
Foto

> Video

1 / 999

47
Terima Kasih
pusdatin@pu.go.id

Mengelola Data dan Informasi agar memiliki nilai dan mudah


diakses

Sumber : paparan Amy Rachmadhani W, Klinik BIM ke 8