DAFTAR HARGA SATUAN UPAH DAN BAHAN HASIL SURVEY

KECAMATAN RAMBUTAN TAHUN 2023


NO. URAIAN HARGA UPAH HARGA SATUAN
1 2 3 4
1 Pekerja Rp. 120,000.00 OH
2 Mandor Rp. 170,000.00 OH
3 Tukang Batu Rp. 150,000.00 OH
4 Tukang Kayu Rp. 150,000.00 OH
5 Tukang Besi Rp. 150,000.00 OH
6 Kepala Tukang Rp. 200,000.00 OH
7 Drafter Rp. 250,000.00 OH
8 Estimator Rp. 250,000.00 OH

NO. URAIAN HARGA BAHAN-BAHAN HARGA SATUAN


1 2 3 4
A. TIMBUNAN / GALIAN
1 Pasir Pasang Rp. 70,000.00 M3
2 Pasir Beton Rp. 70,000.00 M3

B. BAHAN PEREKAT
1 Portland Cement (PC) (40kg/zak) Rp. 1,450.00 Kg
2 Air kerja Rp. 450.00 Ltr

C. BATU
1 Batu Pecah / Split Rp. 350,000.00 M3

D. KAYU / LANGIT-LANGIT
1 Kayu Kaso 5/7 cm Rp. 4,200,000.00 M3
2 Multiflex 9 mm Rp. 95,000.00 Lbr

E. BESI / KAWAT / ALLUMINIUM


1 Besi Beton Polos Rp. 9,427.00 Kg
2 Kawat Beton Rp. 25,000.00 Kg
3 Paku 5 cm - 7 cm Rp. 18,000.00 Kg

F. CAT / MINYAK
1 Minyak Bekisting Rp. 10,000.00 Ltr

G. SEWA ALAT
1 Concrete Mixer (Kapasitas 0,3 m3) Rp. 350,000.00 hari
2 Jack Hammer Rp. 350,000.00 hari

Disetujui / Diketahui Oleh


Kuasa Pengguna Anggaran (KPA)
Kelurahan xxx
DAFTAR HARGA SATUAN UPAH DAN BAHAN HASIL SURVEY
KECAMATAN RAMBUTAN TAHUN 2023
NO. URAIAN HARGA UPAH HARGA SATUAN
1 2 3 4

xxx
NIP.xxx

Anda mungkin juga menyukai