SATKER : …..............................
KEGIATAN : …...............................
PEKERJAAN : PEMBANGUNAN JALAN AKSES RUANG UJI
LOKASI : KABUPATEN POHUWATO
TAHUN ANGG. : 2023
HARGA
NO URAIAN PEKERJAAN SAT VOLUME
SATUAN (Rp)
1 DIVISI 1. UMUM
1.2 Mobilisasi Ls 1.00 48,188,000.00
1.8(1) Keselamatan dan Kesehatan Kerja (K3) Ls 1.00 8,671,000.00
Marisa, 2023
….............................
…........................
NIP. …............................
JUMLAH HARGA
(Rp)
56,859,000.00
48,188,000.00
8,671,000.00
968,587.20
968,587.20
285,192,000.00
147,960,000.00
137,232,000.00
107,430,865.79
5,554,752.00
101,566,388.45
309,725.34
450,450,452.99
49,549,549.83
500,000,002.81
500,000,000.00
..................
......................
RENCANA ANGGARAN BIAYA
SATKER : …..............................
KEGIATAN : …...............................
PEKERJAAN : PEMBUATAN LANTAI COR RUANG UJI
LOKASI : KABUPATEN POHUWATO
TAHUN ANGG. : 2023
HARGA
NO URAIAN PEKERJAAN SAT VOLUME
SATUAN (Rp)
A PERSIAPAN
1 Pembersihan Awal Ls 1.00 250,000.00
2 Pemasangan Papan Nama Proyek Ls 1.00 450,000.00
3 Administrasi dan Pengujian Mutu Ls 1.00 10,000,000.00
4 Penyediaan Air Kerja Ls 1.00 500,000.00
5 Penyediaan Listrik Kerja Ls 1.00 500,000.00
B PEKERJAAN BETON
1 Pengecoran Beton Bertulang Mutu K300 M3 28.80 1,247,000.00
2 Pembesian Kg 2,282.52 18,500.00
C PEKERJAAN AKHIR
1 Pembersihan Akhir Ls 1.00 250,000.00
SUB TOTAL
PPN 11%
TOTAL
DIBULATKAN
Marisa, 2023
….............................
…........................
NIP. …............................
JUMLAH HARGA
(Rp)
11,700,000.00
250,000.00
450,000.00
10,000,000.00
500,000.00
500,000.00
78,140,127.50
35,913,600.00
42,226,527.50
250,000.00
250,000.00
90,090,127.50
9,909,914.03
100,000,041.53
100,000,000.00
..................
......................