Anda di halaman 1dari 10

PEMERINTAH PROVINSI NUSA TENGGARA TIMUR

DINAS PEKERJAAN UMUM DAN PERUMAHAN RAKYAT

DAFTAR KUANTITAS
BILL OF QUANTITY

PAKET KEGIATAN :
Peningkatan Jalan Pota - Waeklambu (Bts. Kab) (2,00 Km)
Kabupaten Manggarai Timur

KUPANG, 17 FEBRUARI 2022


REKAPITULASI
DAFTAR KUANTITAS DAN HARGA

Nama Penawar : ............................................


Program : Penyelenggaraan Jalan Provinsi
Paket Kegiatan : Peningkatan Jalan Pota - Waeklambu (Bts. Kab) (2,00 Km)
Konstruksi : Lataston Lapis Pondasi (HRS-Base)
Kabupaten : Manggarai Timur
Provinsi : Nusa Tenggara Timur
Tahun Anggaran : 2022

No. URAIAN HARGA


DIVISI PEKERJAAN
( Rp. )

1 UMUM ...........................
2 DRAINASE ...........................
3 PEKERJAAN TANAH DAN GEOSINTETIK ...........................
4 PELEBARAN PREVENTIF ...........................
5 PERKERASAN BERBUTIR DAN PERKERASAN BETON SEMEN ...........................
6 PERKERASAN ASPAL ...........................
7 STRUKTUR ...........................
8 REHABILITASI JEMBATAN ...........................
9 PEKERJAAN HARIAN DAN PEKERJAAN LAIN-LAIN ...........................
10 PEKERJAAN PEMELIHARAAN KINERJA ...........................

(A) Jumlah Harga ( Termasuk Biaya Umum dan Keuntungan ) ...........................


(B) Pajak Pertambahan Nilai ( PPn ) : 10 % x ( A ) ...........................
(C) Jumlah Total Harga : ( A ) + ( B ) ...........................

Terbilang : .............................................................................................
.............................................................................................

.........................., .... ......................... 2022

Penawar :

PT/CV/Fa ...........................................

( ............................................... )
Direktur/Direktris/Kepala Cabang
DAFTAR KUANTITAS DAN HARGA
Nama Penawar : ............................................
Program : Penyelenggaraan Jalan Provinsi
Paket Kegiatan : Peningkatan Jalan Pota - Waeklambu (Bts. Kab) (2,00 Km)
Konstruksi : Lataston Lapis Pondasi (HRS-Base)
Kabupaten : Manggarai Timur
Provinsi : Nusa Tenggara Timur
Tahun Anggaran : 2022 Halaman ... dari ...

SA HARGA JUMLAH
NO. URAIAN PEKERJAAN TU KUANTITAS SATUAN HARGA
AN Rp. Rp.
a b c d e f = (dxe)

Divisi 1. UMUM
1.2 Mobilisasi Ls 1,00 ............... ...............
1.8 (1) Manajemen dan Keselamatan Lalu Lintas Ls 1,00 ............... ...............
1.19 Keselamatan dan Kesehatan Kerja Ls 1,00 ............... ...............

Jumlah Harga Divisi 1 (Masuk pada Rekapitulasi Daftar Kuantitas dan Harga) ...............

Divisi 2. DRAINASE
2.1.(1) Galian untuk Selokan Drainase dan Saluran Air M³ 574,20 ............... ...............
2.2.(1) Pasangan batu dengan mortar M³ 169,13 ............... ...............

Jumlah Harga Divisi 2 (Masuk pada Rekapitulasi Daftar Kuantitas dan Harga) ...............

Divisi 3. PEKERJAAN TANAH DAN GEOSINTETIK


3.1.(1) Galian Biasa M³ 3.200,00 ............... ...............
3.2.(1a) Timbunan Biasa dari sumber galian M³
3.2.(2a) Timbunan Pilihan dari sumber galian M³ 4.708,21 ............... ...............
2
3.3.(1) Penyiapan Badan Jalan M 9.000,00 ............... ...............

Jumlah Harga Divisi 3 (Masuk pada Rekapitulasi Daftar Kuantitas dan Harga) ...............

Divisi 5. PERKERASAN BERBUTIR DAN PERKERASAN BETON SEMEN


5,1.(1) Lapis Pondasi Agregat Kelas A M³ 2.169,90 ............... ...............
5.1.(2) Lapis Pondasi Agregat Kelas B M³ 1.356,19 ............... ...............
5.1.(3) Lapis Pondasi Agregat Kelas S M³ 133,35 ............... ...............

Jumlah Harga Divisi 5 (Masuk pada Rekapitulasi Daftar Kuantitas dan Harga)

Divisi 6. PERKERASAN ASPAL


6.1 (1) Lapis Resap Pengikat - Aspal Cair/Emulsi Liter 5.850,00 ............... ...............
6.1 (2a) Lapis Perekat - Aspal Cair/Emulsi Liter
6.3.(4) Lataston Lapis Pondasi (HRS-Base) Ton 985,13 ............... ...............
6.3.(8) Bahan anti pengelupasan Kg 192,10 ............... ...............

Jumlah Harga Divisi 6 (Masuk pada Rekapitulasi Daftar Kuantitas dan Harga)
DAFTAR KUANTITAS DAN HARGA
Nama Penawar : ............................................
Program : Penyelenggaraan Jalan Provinsi
Paket Kegiatan : Peningkatan Jalan Pota - Waeklambu (Bts. Kab) (2,00 Km)
Konstruksi : Lataston Lapis Pondasi (HRS-Base)
Kabupaten : Manggarai Timur
Provinsi : Nusa Tenggara Timur
Tahun Anggaran : 2022 Halaman ... dari ...

SA HARGA JUMLAH
NO. URAIAN PEKERJAAN TU KUANTITAS SATUAN HARGA
AN Rp. Rp.
a b c d e f = (dxe)

Divisi 7. STRUKTUR
7.1 (7a) Beton struktur, fc’20 MPa M³ 1,96 ............... ...............
7.1.(8) Beton, fc’15 Mpa M³ 45,00
7.3 (1) Baja Tulangan Polos-BjTP 280 Kg 584,81 ............... ...............
7.3 (3) Baja Tulangan Sirip-BjTS 420A Kg
7.9.(1) Pasangan Batu M³ 1.520,10 ............... ...............

Jumlah Harga Divisi 7 (Masuk pada Rekapitulasi Daftar Kuantitas dan Harga) ...............

Divisi 9. PEKERJAAN HARIAN DAN PEKERJAAN LAIN-LAIN


9.2.(1) Marka Jalan Termoplastik M2 108,23 ............... ...............
9.2.(3a) Rambu Jalan Tunggal dengan Permukaan Pemantul Engineering Grade Buah
9.2.(5) Patok Pengarah Buah 50,00 ............... ...............

Jumlah Harga Divisi 9 (Masuk pada Rekapitulasi Daftar Kuantitas dan Harga) ...............

Divisi 10. Pekerjaan Pemeliharaan


10.1.(4) Perbaikan Lapis Fondasi Agregat Kelas A M3
10.1.(9) Perbaikan Campuran Aspal Panas M3
10.1.(13) Residu Bitumen untuk Pemeliharaan M3

Jumlah Harga Divisi 9 (Masuk pada Rekapitulasi Daftar Kuantitas dan Harga)
ANALISA HARGA LUMPSUMP UNTUK MOBILISASI
Nama Penawar : ............................................
Program : Penyelenggaraan Jalan Provinsi
Paket Kegiatan : Peningkatan Jalan Pota - Waeklambu (Bts. Kab) (2,00 Km)
Konstruksi : Lataston Lapis Pondasi (HRS-Base)
Kabupaten : Manggarai Timur
Provinsi : Nusa Tenggara Timur
Tahun Anggaran : 2022
Item Pembayaran No. : 1.2
Jenis Pekerjaan : Mobilisasi
Satuan Pekerjaan : Ls

HARGA JUMLAH
No. URAIAN SATUAN VOL. SATUAN HARGA
(Rp.) (Rp.)

A. Sewa Tanah M2 25.000,00 .................... ....................

B. PERALATAN
Periksa lembar 1.2-2 ....................

C. Kantor Lapangan dan Fasilitas


1 Base Camp M2 50,00 .................... ....................
2 Kantor M2 50,00 .................... ....................
3 Barak M2
4 Bengkel M2
5 Gudang, dan lain-lain M2
6 ...................... ....

D. MOBILISASI FASILITAS LABORATORIUM Set 1,00 .................... ....................


1 Ruang Laboratorium (sesuai Gambar)
2 Soil & Aggregate Testing
Compaction Test
CBR Test
Specific Gravity
Atterberg Limits
Grain Size Analysis
Field Density Test by Sand Cone Methode
Moisture Content
Abrasion of Aggregate by Los Angeles Machine

3 Bituminous Testing
Marshall Asphalt Test
Extraction Test, Centrifuge/Refflux Method
Specific Gravity for Coarse Aggregate
Specific Gravity for Fine Aggregate
Mix Air Viod Content (Accurate Method)
Core Drill
Metal Thermometer
Accessories and Tolls
Penetration Test
Softening Point
Refusal Density Compactor

4 Concrete Testing
Slump Cone
Cylinder/Cube Mould for Compressive Strength
Beam Mould for Flexural Strength (RIGID)
Crushing Machine
5 Pendukung (Periksa Fasilitas Laboratorium)

6 Operasional (Periksa Fasilitas Laboratorium)

E. MOBILISASI PERSONIL
E.I. Personil sesuai Struktur Organisasi
1 Manajer Pelaksana / Proyek
2 Manajer Teknik
3 Manajer Keuangan
4 Ahli Muda K3 Konstruksi
5 ......................
6 ......................

E.II. Personil Lainnya Set


1 Koordinator Manajemen dan Keselamatan Lalu Lintas …………
2 Manajer Kendali Mutu …………

E.III. Lainnya
1 Pelaporan dan Adminstrasi Kontrak Bulan
2 Papan Proyek Buah
3 Dokumentasi Ls
4 As Build Drawing Ls

F. Manajemen dan Keselamatan lalu lintas LS

G. DEMOBILISASI LS 1,00 .................... ....................

Total Biaya Mobilisasi ....................


Catatan : Jumlah yang tercantum pada masing-masing item mobilisasi di atas sudah termasuk over-head dan laba
serta seluruh pajak dan bea (kecuali PPn), dan pengeluaran lainnya.
Nama Penawar : ............................................
Program : Penyelenggaraan Jalan Provinsi
Paket Kegiatan : Peningkatan Jalan Pota - Waeklambu (Bts. Kab) (2,00 Km)
Konstruksi : Lataston Lapis Pondasi (HRS-Base)
Kabupaten : Manggarai Timur
Provinsi : Nusa Tenggara Timur
Tahun Anggaran : 2022
Item Pembayaran No. : 1.2
Jenis Pekerjaan : Mobilisasi
Satuan Pekerjaan : Ls

HARGA JUMLAH
No. JENIS ALAT SATUAN VOL. SATUAN HARGA
(Rp.) (Rp.)

B. PERALATAN

1 ASPHALT MIXING PLANT Unit 1,00 ............ ......................


2 ASPHALT FINISHER Unit 1,00 ............ ......................
3 POWER BROOM Unit
4 BULLDOZER 100-150 HP Unit
5 COMPRESSOR 4000-6500 L\M Unit 1,00 ............ ......................
6 CONCRETE MIXER 0.3-0.6 M3 Unit 4,00 ............ ......................
7 CRANE 10-15 TON Unit
8 DUMP TRUCK 3-4 M3 Unit 14,00 ............ ......................
9 DUMP TRUCK 6-8 M3 Unit
10 EXCAVATOR 80-140 HP Unit 1,00 ............ ......................
11 FLAT BED TRUCK 3-4 TON Unit
12 GENERATOR SET Unit 1,00 ............ ......................
13 MOTOR GRADER >100 HP Unit 1,00 ............ ......................
14 TRACK LOADER 75-100 HP Unit
15 WHEEL LOADER 1.0-1.6 M3 Unit 1,00 ............ ......................
16 THREE WHEEL ROLLER 6-8 T Unit
17 TANDEM ROLLER 6-8 T. Unit 1,00 ............ ......................
18 TIRE ROLLER 8-10 T. Unit 1,00 ............ ......................
19 VIBRATORY ROLLER 5-8 T. Unit 1,00 ............ ......................
20 CONCRETE VIBRATOR Unit 2,00 ............ ......................
21 STONE CRUSHER Unit 1,00 ............ ......................
22 WATER PUMP 70-100 mm Unit
23 WATER TANKER 3000-4500 L. Unit 1,00 ............ ......................
24 PEDESTRIAN ROLLER Unit
25 TAMPER Unit
26 JACK HAMMER Unit
27 FULVI MIXER Unit
28 CONCRETE PUMP Unit
29 TRAILER 20 TON Unit
30 PILE DRIVER + HAMMER Unit
31 CRANE ON TRACK 35 TON Unit
32 WELDING SET Unit
33 BORE PILE MACHINE Unit
34 ASPHALT LIQUID MIXER Unit
35 TRONTON 15 TON Unit
36 COLD MILLING MACHINE Unit
37 ROCK DRILL BREAKER Unit
38 COLD RECYCLER Unit
39 HOT RECYCLER Unit
40 AGGREGAT (CHIP) SPREADER Unit
41 ASPHALT DISTRIBUTOR Unit 1,00 ............ ......................
42 SLIP FORM PAVER Unit
43 CONCRETE PAN MIXER Unit
44 CONCRETE BREAKER Unit
45 ASPAHLT TANKER Unit
46 CEMENT TANKER Unit
47 CONDRETE MIXER (350) Unit
48 VIBRATING RAMMER Unit
49 TRUK MIXER (AGITATOR) Unit
50 BORE PILE MACHINE Unit
51 CRANE ON TRACK 75-100 TON Unit

Total untuk Item B pada Lembar 1 ......................


FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

Nama Penawar : ............................................


Program : Penyelenggaraan Jalan Provinsi
Paket Kegiatan : Peningkatan Jalan Pota - Waeklambu (Bts. Kab) (2,00 Km)
Konstruksi : Lataston Lapis Pondasi (HRS-Base)
Kabupaten : Manggarai Timur
Provinsi : Nusa Tenggara Timur
Tahun Anggaran : 2022
Item Pembayaran No. : 1.8(1)
Jenis Pekerjaan : Manajemen dan Keselamatan Lalu Lintas
Satuan Pekerjaan : Ls

PERKIRAAN HARGA JUMLAH


No. URAIAN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. DATA DAN ASUMSI


1 Panjang Lokasi Pekerjaan KM 2,00 -
2 Total Masa Pelaksanaan Kegiatan Bulan 6,00 -
3 Masa Mobilisasi Bulan 1,00 -
4 Periode Pekerjaan Perkerasan Jalan Bulan 5,00 -
5 Panjang zona kerja Perkerasan Jalan M 2.000,00 -

B. URUTAN KERJA
1 Penyedia menyiapkan perlengkapan keselamatan jalan selama
periode konstruksi sesuai ketentuan
2 Buat rencana kerja manajemen lalu-lintas sesuai schedule
pekerjaan dan koordinasikan dengan seluruh personil yang terkait
3 Kelompok kerja pengatur lalu-lintas selama konstruksi
menggunakan tenaga pengatur dan flagman dengan 3 shift
4 Pengalihan arus lalu-lintas harus ijin PPK dan pihak terkait
5 Semua rambu harus jelas dan terbaca oleh Pengguna Jalan

C. PERALATAN KESELAMATAN LALU LINTAS


1 Rambu Batas Kecepatan Buah
2 Rambu Perintah Mengikuti Lajur Buah
3 Rambu Pengarah Tikungan Buah
4 Rambu Larangan Berjalan Terus (Giveaway) Buah
5 Rambu Larangan Menyalip Kendaraan Lain Buah
6 Rambu Peringatan Jalan Licin Buah
7 Rambu Pengarah Tikungan Ganda Buah
8 Rambu APILL Buah
9 Rambu Peringatan dengan Kata-Kata Buah
10 Rambu Peringatan Pekerjaan di Jalan Buah
11 Rambu Peringatan Lalu Lintas Dua Arah Buah
12 Water Barrier Buah
13 Traffic Cone Buah 1,00 ....................... .......................
14 Police Line Buah
15 Concrete Barrier Buah
16 Lampu Sementara Buah
17 APILL Sementara Buah
18 Marka Jalan Sementara M2
19 Jalur Evakuasi (Escape Road ) Ls
20 Tongkat Pengatur Lalu Lintas (Warning Light Stick ) Buah 1,00 ....................... .......................
21 Lampu Putar (Rotary Lamp ) Buah
22 Lampu Selang Lalu Lintas Ls
23 Pagar jaring pengaman termasuk perlengkapannya M'
24 Peralatan komunikasi dan Lainnya …… Set
25 Alat Bantu Ls

D. TENAGA / PERSONIL

1 Pekerja (Flagman) OB 6,00 ....................... .......................


2 Koordinator / Pengatur OB 6,00 ....................... .......................

E TOTAL BIAYA MANAJEMEN DAN KESELAMATAN LALU LINTAS


Nama Penawar : ............................................
Program : Penyelenggaraan Jalan Provinsi
Paket Kegiatan : Peningkatan Jalan Pota - Waeklambu (Bts. Kab) (2,00 Km)
Konstruksi : Lataston Lapis Pondasi (HRS-Base)
Kabupaten : Manggarai Timur
Provinsi : Nusa Tenggara Timur
Tahun Anggaran : 2022
Item Pembayaran No. : 1.19
Jenis Pekerjaan : Keselamatan dan Kesehatan Kerja
Satuan Pekerjaan : Ls

PERKIRAAN HARGA JUMLAH


No. URAIAN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. DATA DAN ASUMSI SE Menteri No. 11 Tahun 2019

1 Pekerjaan Jalan dan Jembatan


Nilai Pekerjaan Jalan Asumsi Rp
Nilai Pekerjaan Jembatan Asumsi Rp

2 Jangka Waktu Pekerjaan Jalan Merujuk Ke Masa Pelaksanaan Bulan 6,00


Jangka Waktu Pekerjaan Jembatan Merujuk Ke Masa Pelaksanaan Bulan

3 Penyuluhan Penanggulangan HIVAIDS Jika disebutkan dalam kontrak Org 30

B. Keselamatan dan Kesehatan Kerja SE Menteri No. 11 Tahun 2019


1 Penyiapan RKK :
a Pembuatan Dokumen Rencana Keselematan Konstruksi
b Pembuatan Prosedur dan Instruksi Kerja Set 1 ....................... .......................
c Penyiapan Formulir

2 Sosialisasi dan Promosi Dan Pelatihan:


a Induksi K3 (Safety Induction) Org
b Pengarahan K3 (Safety briefing).
c Pertemuan keselamatan (Safety Talk /Tool Box Meeting Org
d Pelatihan K3
e P3K Org 1,00 ....................... .......................
f Bekerja Di Ketinggian Org
g Simulasi K3 Org
h Spanduk (Banner) Lbr 2,00 ....................... .......................
i Poster Lbr 2,00 ....................... .......................
j Papan Informasi K3 Buah 2,00 ....................... .......................

3 Alat Pelindung Kerja (APK) dan Alat Pelindung Diri (APD)


Alat Pelindung Kerja (APK)antara lains:
a Jaring pengaman (Safety Net) Sesuai kebutuhan Ls
b Tali keselamatan (Life Line) Sesuai kebutuhan Ls
c Penahan Jatuh (Safety Deck) Sesuai kebutuhan Ls
d Pagar pengaman (Guard Railling) Sesuai kebutuhan Ls
e Pembatas Area (Restricted Area) Sesuai kebutuhan Ls
Alat Pelindung Diri (APD) terdiri atas:
a Topi pelindung (Safety helmet) Pekerja, Staf, dan Tamu Buah 10,00 ....................... .......................
b Pelindung mata (Goggles, Spectacles) Sesuai Kebutuhan Psg 10,00 ....................... .......................
c Tameng muka (Face shield) Sesuai Kebutuhan Buah
d Pelindung pernafasan dan mulut (Masker) Sesuai Kebutuhan Box
e Sarung tangan (Safety gloves) Sesuai Kebutuhan Psg
f Sepatu keselamatan (Safety shoes) Pekerja, Staf, dan Tamu Psg 10,00 ....................... .......................
g Penunjang seluruh tubuh (Full bodu harness) Sesuai Kebutuhan Buah
h Rompi keselamatan (Safety vest) Sesuai Kebutuhan Buah
i Celemek (A[ron/coveralls) Sesuai Kebutuhan Buah
k Pelindung jatuh (Fall arrester) Sesuai Kebutuhan Buah

4 Asuransi dan Perizinan


a Asuransi dan Perizinan Ls
b Surat izin Laik Operasi Buah
c Sertifikat Kompetensi Operator yang diterbitkan oleh Lembaga/Instansi yang
Buah
berwenang sesuai dengan ketentuan peraturan perundang-undangan
d Surat Pengesahan Organisasi K3 (P2K3), seusai dengan ketentuan peraturan
Ls
perundang-undangan
e Perizinan terkait lingkungan kerja
PERKIRAAN HARGA JUMLAH
No. URAIAN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

5 Personel K3 Konstruksi Bulan


a Ahli K3 Risiko K3 Tinggi OB
b Petugas K3 Risiko K3 Sedang/kecil OB 6,0 ....................... .......................
c Petugas tanggap darurat OB
d Petugas P3K OB
e Petugas Paramedis OB

6 Fasilitas sarana kesehatan


a Peralatan P3K (Kotak P3K, Tandu, Obat Luka, Perban, Dll) Ls 1 ....................... .......................
b Ruang P3K (tempat Tidur Pasien, Stetoskop, Timbangan berat badan) Ls
c Peralatan pengasapan (fogging) LS

7 Rambu-rambu terdiri atas: Ada di 1.8 (Manajemen Keselamatan Lalu Lintas)

8 Konsultasi dengan Ahli Terkait Keselamatan Konstruksi


a Ahli Keselamatan terkait Jembatan OJ
b Ahli Keselamatan terkait Jalan OJ

9 Lain-lain terkait pengendalian risiko K3


a Alat pemadam api ringan (APAR) Buah 1 ....................... .......................
b Bendera K3 Buah 1 ....................... .......................
c Lampu darurat (Emergency lamp) Buah
d Pembuatan Kartu Identitas Pekerja (KIP) Lb
e Program inspeksi Ls
f Pelaporan dan penyelidikan insiden Ls
g Titik Kumpul (assembly Poin) Ls
h Ambulance atau Mobil untuk angkutan ke RS Bulan

E TOTAL BIAYA KESELAMATAN DAN KESEHATAN KERJA

Catatan : 1. Perkiraan Kuantitas harus disesuaikan dengan kebutuhan di lapangan


2. Harga perlu disesuaikan dengan harga terbaru, termasuk biaya personil
3. Yang dimaksud dengan konsultansi dengan Ahli terkait keselamatan konstruksi termasuk pakar dan praktisi

Anda mungkin juga menyukai