PEMERINTAH PROVINSI NUSA TENGGARA TIMUR

DINAS PEKERJAAN UMUM DAN PERUMAHAN


RAKYAT

DAFTAR KUANTITAS
BILL OF QUANTITY

PAKET KEGIATAN :
Rehabilitasi Ruas Jalan Maubesi - Wini
(Pinjaman Daerah - PT. SMI)
Kabupaten Timor Tengah Utara

KUPANG, 25 FEBRUARI 2021


REKAPITULASI
DAFTAR KUANTITAS DAN HARGA

Nama Penawar : ............................................


Program : ............................................
Paket Kegiatan : Rehabilitasi Ruas Jalan Maubesi - Wini (Pinjaman Daerah - PT. SMI)
Konstruksi : ............................................
Kabupaten : ............................................
Provinsi : ............................................
Tahun Anggaran : 2021

JUMLAH HARGA
No. URAIAN PEKERJAAN
DIVISI
(RP.)
a b c

1 UMUM ...........................
2 DRAINASE ...........................
3 PEKERJAAN TANAH DAN GEOSINTETIK ...........................
4 PEKERJAAN PREVENTIF ...........................
5 PERKERASAN BERBUTIR ...........................
6 PERKERASAN ASPAL ...........................
7 STRUKTUR ...........................
8 REHABILITASI JEMBATAN ...........................
9 PEKERJAAN HARIAN & PEKERJAAN LAIN-LAIN ...........................
10 PEKERJAAN PEMELIHARAAN KINERJA ...........................

(A) Jumlah Harga ( Termasuk Biaya Umum dan Keuntungan ) ...........................


(B) Pajak Pertambahan Nilai ( PPn ) : 10% x ( A ) ...........................
(C) Jumlah Total Harga : ( A ) + ( B ) ...........................
(D) Dibulatkan ...........................

Terbilang : …......................................................................................................
:

….................,….........20…...
PT / CV / FIRMA…....

(NAMA)
JABATAN
DAFTAR KUANTITAS DAN HARGA
Nama Penawar : ............................................
Program : ............................................

Paket Kegiatan : Rehabilitasi Ruas Jalan Maubesi - Wini (Pinjaman Daerah - PT. SMI)
Konstruksi : ............................................
Kabupaten : ............................................
Provinsi : ............................................
Tahun Anggaran : 2021

SA HARGA KONSTRUKSI
NO. URAIAN PEKERJAAN TU SATUAN HRS - Base
AN Rp. KUANTITAS JUMLAH HARGA
(Rp.)
a b c d e f = (dxe)

Divisi 1. UMUM
1.2 Mobilisasi dan Demobilisasi LS ................ 1.00 .....................
1.8.(1) Manajemen dan Keselamatan Lalu Lintas LS ................ 1.00 .....................
1.19 Keselamatan dan Kesehatan Kerja LS ................ 1.00 .....................

Jumlah Harga Divisi 1 (Masuk pada Rekapitulasi Daftar Kuantitas dan Harga) ......................

Divisi 2. DRAINASE
2.1.(1) Galian untuk Selokan Drainase dan Saluran Air M³ ................ 592.91 .....................
2.2.(1) Pasangan Batu dengan Mortar M³ ................ 185.02 .....................

Jumlah Harga Divisi 2 (Masuk pada Rekapitulasi Daftar Kuantitas dan Harga) ......................

Divisi 3. PEKERJAAN TANAH DAN GEOSINTETIK


3.1.(9) Galian Perkerasan berbutir M³ ................ 52.85 .....................
3.2.(1a) Timbunan Biasa dari Sumber Galian M³ ................ 306.50 .....................
3.2.(2a) Timbunan Pilihan dari sumber galian M³ ................ 420.00 .....................
3.3.(1) Penyiapan Badan Jalan M² ................ 4,000.00 .....................

Jumlah Harga Divisi 3 (Masuk pada Rekapitulasi Daftar Kuantitas dan Harga) ......................

Divisi 5. PERKERASAN BERBUTIR DAN PERKERASAN BETON SEMEN


5.1.(1) Lapis Pondasi Agregat Kelas A M³ ................ 343.65 .....................
5.1.(2) Lapis Pondasi Agregat Kelas B M³ ................ 400.00 .....................

Jumlah Harga Divisi 5 (Masuk pada Rekapitulasi Daftar Kuantitas dan Harga) ......................

DIVISI 6. PERKERASAN ASPAL


6.1 (1) Lapis Resap Pengikat - Aspal Cair/Emulsi Liter ................ 2,291.00 .....................
6.1 (2a) Lapis Perekat - Aspal Cair/Emulsi Liter ................ 598.15 .....................
6.3.(4) Lataston Lapis Fondasi (HRS-Base) Ton ................ 320.60 .....................
6.3.(8) Bahan anti pengelupasan Kg ................ 62.52 .....................

Jumlah Harga Divisi 6 (Masuk pada Rekapitulasi Daftar Kuantitas dan Harga) ......................

Divisi 7. STRUKTUR
7.9.(1) Pasangan Batu M³ ................ 106.36 .....................

Jumlah Harga Divisi 7 (Masuk pada Rekapitulasi Daftar Kuantitas dan Harga) ......................

Divisi 9. PEKERJAAN HARIAN & PEKERJAAN LAIN-LAIN


9.2.(1) Marka Jalan Termoplastik M² ................ 95.25 .....................
9.2.(6a) Patok Kilometer Buah ................ 47.00 .....................

Jumlah Harga Divisi 9 (Masuk pada Rekapitulasi Daftar Kuantitas dan Harga) ......................
Divisi 10. PEKERJAAN HARIAN & PEKERJAAN LAIN-LAIN
10.1.(21) Pembersihan Drainase M¹ ................ 5.00 .....................
10.1.(22) Pengendalian Tanaman M² ................ 11,220.70 .....................

Jumlah Harga Divisi 10 (Masuk pada Rekapitulasi Daftar Kuantitas dan Harga) ......................
ANALISA HARGA LUMPSUMP UNTUK MOBILISASI
Nama Penawar : .........................................
Program : ….......................................
Paket Kegiatan : Rehabilitasi Ruas Jalan Maubesi - Wini (Pinjaman Daerah - PT. SMI)
Konstruksi : ........................................
Kabupaten : ........................................
Provinsi : ........................................
Tahun Anggaran : 2021
ITEM PEMBAYARAN NO. : 1.2
JENIS PEKERJAAN : MOBILISASI
Lembar 1.2-1
HARGA JUMLAH
No. URAIAN SATUAN VOL. SATUAN HARGA
(Rp.) (Rp.)

A. Sewa Tanah M2 10,000 …................ …....................

B. PERALATAN
Periksa lembar 1.2-2 …....................

C. Kantor Lapangan dan Fasilitas


1 Base Camp M2 36 …................ …....................
2 Kantor M2 36 …................ …....................
3 Barak
4 Bengkel
5 Gudang, dan lain-lain
6 ...................... ....

D. MOBILISASI FASILITAS LABORATORIUM set 1 …................ …....................


1 Ruang Laboratorium (sesuai Gambar)

2 Soil & Aggregate Testing

3 Bituminous Testing

4 Concrete Testing

5 Pendukung (Periksa Fasilitas Laboratorium)

6 Operasional (Periksa Fasilitas Laboratorium)

E. MOBILISASI PERSONIL
E.I. Personil Sesuai Struktur Organisasi LS 1 …................ …....................
1 GS
2 Tenaga Ahli Jalan
3 Tenaga Ahli K3 ....

E.II
1 Pelaporan dan Administrasi Proyek Bulan 5 …................ …....................
2 Papan Proyek Buah 2 …................ …....................
3 Dokumentasi LS 1 …................ …....................
…....................

F. Manajemen dan Keselamatan lalu lintas

G. DEMOBILISASI LS 1 …................ …....................

Total Biaya Mobilisasi …....................

Catatan :Jumlah yang tercantum pada masing-masing item mobilisasi di atas sudah termasuk over-head dan laba
serta seluruh pajak dan bea (kecuali PPn), dan pengeluaran lainnya.
ITEM PEMBAYARAN NO. :
JENIS PEKERJAAN :
Lembar 1.2-2
HARGA JUMLAH
No. JENIS ALAT KAPASITAS SATUAN VOL. SATUAN HARGA
(Rp.) (Rp.)

B. PERALATAN

1 ASPHALT MIXING PLANT - Unit 1 …............... ….................


2 ASPHALT FINISHER - Unit 1 …............... ….................
3 POWER BROOM - Unit - - -
4 BULLDOZER ≥ 100 HP Unit - - -
5 COMPRESSOR ≥ 4000 L\M Unit 1 …............... ….................
6 CONCRETE MIXER ≥ 0.3 M3 Unit 4 …............... ….................
7 CRANE ≥ 10 TON Unit - - -
8 DUMP TRUCK ≥ 3 M3 Unit 5 …............... ….................
9 DUMP TRUCK ≥ 6 M3 Unit 1 …............... ….................
10 EXCAVATOR ≥ 80 HP Unit 1 …............... ….................
11 FLAT BED TRUCK ≥ 3 TON Unit - - -
12 GENERATOR SET - Unit 1 …............... ….................
13 MOTOR GRADER ≥ 100 HP Unit 1 …............... ….................
14 TRACK LOADER ≥ 75 HP Unit - - -
15 WHEEL LOADER ≥ 1.0 M3 Unit 1 …............... ….................
16 THREE WHEEL ROLLER ≥6T Unit - - -
17 TANDEM ROLLER ≥6T Unit 1 …............... …...............
18 TIRE ROLLER ≥8T Unit 1 …............... ….................
19 VIBRATORY ROLLER ≥ 5 T. Unit 1 …............... ….................
20 CONCRETE VIBRATOR - Unit - …............... ….................
21 STONE CRUSHER - Unit 1 …............... ….................
22 WATER PUMP ≥ 70 mm Unit - - -
23 WATER TANKER ≥ 3000 L. Unit 1 …............... ….................
24 PEDESTRIAN ROLLER - Unit 1 …............... ….................
25 TAMPER - Unit 1 …............... ….................
26 JACK HAMMER - Unit - -
27 TRAKTOR DAN ROTAVATOR - Unit - - -
28 CONCRETE PUMP - Unit - - -
29 TRAILER ≥ 20 TON Unit - - -
30 PILE DRIVER + HAMMER - Unit - - -
31 CRANE ON TRACK ≥ 35 TON Unit - - -
32 WELDING SET - Unit - - -
33 BORE PILE MACHINE - Unit - - -
34 ASPHALT LIQUID MIXER - Unit - - -
35 TRONTON ≥ 15 TON Unit - - -
36 COLD MILLING MACHINE - Unit - - -
37 ROCK DRILL BREAKER - Unit - - -
38 COLD RECYCLER - Unit - - -
39 HOT RECYCLER - Unit - - -
40 AGGREGAT (CHIP) SPREADER - Unit - - -
41 ASPHALT DISTRIBUTOR/SPRAYER - Unit 1 …............... ….................
42 SLIP FORM PAVER - Unit - - -
43 CONCRETE PAN MIXER - Unit - - -
44 CONCRETE BREAKER - Unit - - -
45 ASPAHLT TANKER - Unit - - -
46 CEMENT TANKER - Unit - - -
47 CONDRETE MIXER (350) - Unit - - -
48 VIBRATING RAMMER - Unit - - -
49 TRUK MIXER (AGITATOR) - Unit - - -
50 BORE PILE MACHINE - Unit - - -
51 CRANE ON TRACK ≥ 75 TON Unit - - -
52 TRUCK SCALE Unit 1 …............... ….................
53 MESIN PEMOTONG RUMPUT Unit 2 …............... ….................

Total untuk Item B pada Lembar 1 ….................


SATUAN PENGUKURAN : Lump sum
HARGA SATUAN : Rp. …...........
Lembar 1.2-3
HARGA
NO. URAIAN SATUAN VOLUME TOTAL KET.
SATUAN

I. Laboratory Building
1. Laboratory Building m2 -

II. Soil & Aggregate Testing Set 1.00 …............ …............


1. Compaction Test
2. CBR Test
3 Specifc Gravity
4 Atterberg Limits
5 Grain Size Analysis
6 Field Density Test by Sand Cone Methode
7 Moisture Content
8 Abrasion of Aggregate by Los Angeles Machine

III. Bituminous Testing Set 1.00 …............ …............


1. Marshall Asphalt Test
2. Extraction Test, Centrifuge/Reflux Method
3 Specific Gravity of Coarse Aggregate
4 Specific Gravity of Fine Aggregate
5 Mix Air Viod Content (Accurate Method)
6 Core Drill
7 Metal Thermometer
8 Accessories and Tolls
9 Penetration Test
10 Softening Point
11 Refusal Density Compactor

IV. Concrete Testing Set 1.00 …............ …............


1 Slump Cone
2 Cylinder/Cube Mould for Compressive Strength
3 Beam Mould for Flexural Strength
4 Crushing Machine

V. Peralatan pendukung Set 1.00 …............ …............


1 Mobil Pick Up
2 Komputer + Printer
3 Furniture

VI. Operasional

VII. Test Luar


Test Luar, sesuai kebutuhan atau atas
perintah Pengawas Pekerjaan

TOTAL BIAYA MOBILISASI Rp …...........

Catatan :
1. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar kontrak) dan biaya lain-lainnya.
2. Test luar adalah test ke lembaga pengujian yang disetujui oleh Konsultan Pengawas.
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

Nama Penawar : .........................................


Program : ….......................................
Paket Kegiatan : Rehabilitasi Ruas Jalan Maubesi - Wini (Pinjaman Daerah - PT. SMI)
Konstruksi : ........................................
Kabupaten : ........................................
Provinsi : ........................................
Tahun Anggaran : 2021
ITEM PEMBAYARAN NO. : 1.8.(1)
JENIS PEKERJAAN : Manajemen dan Keselamatan Lalu Lintas
SATUAN PEMBAYARAN : Lump Sum

PERKIRAAN HARGA JUMLAH


No. URAIAN SATUAN KUANTITAS SATUAN HARGA KETERANGAN
(Rp.) (Rp.)

A. DATA DAN ASUMSI


1 Panjang Lokasi Pekerjaan KM 1.00
2 Total Masa Pelaksanaan Kegiatan Bulan 5.00
3 Masa Mobilisasi Bulan 2.00
4 Periode Pekerjaan Perkerasan Jalan Bulan 5.00
5 Panjang zona kerja Perkerasan Jalan M 1,000

B. URUTAN KERJA
1 Penyedia menyiapkan perlengkapan keselamatan jalan selama
periode konstruksi sesuai ketentuan
2 Buat rencana kerja manajemen lalu-lintas sesuai schedule
pekerjaan dan koordinasikan dengan seluruh personil yang terkait
3 Kelompok kerja pengatur lalu-lintas selama konstruksi
menggunakan tenaga pengatur dan flagman dengan 3 shift
4 Pengalihan arus lalu-lintas harus ijin PPK dan pihak terkait
5 Semua rambu harus jelas dan terbaca oleh Pengguna Jalan

C. PERALATAN KESELAMATAN LALU LINTAS


1 Rambu Batas Kecepatan Tabel 1.8.B.1 Lampiran Buah 10.00 - -
2 Rambu Perintah Mengikuti Lajur Tabel 1.8.B.1 Lampiran Buah 2.00 - -
3 Rambu Pengarah Tikungan Tabel 1.8.B.1 Lampiran Buah 3.00 - -
4 Rambu Larangan Berjalan Terus (Giveaway) Tabel 1.8.B.1 Lampiran Buah - - -
5 Rambu Larangan Menyalip Kendaraan Lain Tabel 1.8.B.1 Lampiran Buah 2.00 - -
6 Rambu Peringatan Jalan Licin Tabel 1.8.B.1 Lampiran Buah
7 Rambu Pengarah Tikungan Ganda Tabel 1.8.B.1 Lampiran Buah
8 Rambu APILL Tabel 1.8.B.1 Lampiran Buah
9 Rambu Peringatan dengan Kata-Kata Tabel 1.8.B.1 Lampiran Buah 4.00 - -
10 Rambu Peringatan Pekerjaan di Jalan Tabel 1.8.B.1 Lampiran Buah 2.00 - -
11 Rambu Peringatan Lalu Lintas Dua Arah Tabel 1.8.B.1 Lampiran Buah
12 Water Barrier Tabel 1.8.B.1 Lampiran Buah
13 Traffic Cone Tabel 1.8.B.1 Lampiran Buah 15.00 - -
14 Police Line Tabel 1.8.B.1 Lampiran Buah
15 Concrete Barrier Tabel 1.8.B.1 Lampiran Buah
16 Lampu Sementara Tabel 1.8.B.1 Lampiran Buah
17 APILL Sementara Tabel 1.8.B.1 Lampiran Buah
18 Marka Jalan Sementara M2
19 Jalur Evakuasi (Escape Road ) SE No. 11 Tahun 2019 Ls
20 Tongkat Pengatur Lalu Lintas (Warning Light Stick ) SE No. 11 Tahun 2019 Buah
21 Lampu Putar (Rotary Lamp ) SE No. 11 Tahun 2019 Buah
22 Lampu Selang Lalu Lintas SE No. 11 Tahun 2019 Ls
23 Pagar jaring pengaman termasuk perlengkapannya M'
24 Peralatan komunikasi dan Lainnya …… Set 2.00 - -
25 Alat Bantu Ls - -

D. TENAGA / PERSONIL

1 Pekerja (Flagman) OB 12.00

2 Koordinator / Pengatur OB 5.00 - -

E TOTAL BIAYA MANAJEMEN DAN KESELAMATAN LALU LINTAS -

Catatan : 1. Harga Satuan Personil tersebut sudah termasuk seluruh pajak dan bea (kecuali PPN),
Asuransi Tenaga Kerja dan pengeluaran lainnya.
2. Biaya Satuan tersebut sudah termasuk biaya perlengkapan personil pengatur lalu-lintas dan
biaya perijinan yang diperlukan dengan pihak terkait dengan manajemen lalu-lintas
3. Biaya satuan tersebut sudah termasuk kebutuhan perlengkapan dan peralatan pendukung yang
diperlukan seperti material habis pakai baterai, lampu dan sebagainya
4. Jumlah atau Kuantitas disesuaikan Pada Lampiran Spesifikasi 2018 Tabel 1.8.B.1 Kondisi Zona 7
5. Harga Peralatan Lalu Lintas ditambah 20% (asumsi ongkir dan biaya pasang)
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

Nama Penawar : .........................................


Program : ….......................................
Paket Kegiatan : Rehabilitasi Ruas Jalan Maubesi - Wini (Pinjaman Daerah - PT. SMI)
Konstruksi : ........................................
Kabupaten : ........................................
Provinsi : ........................................
Tahun Anggaran : 2021
ITEM PEMBAYARAN NO. : 1.19.
JENIS PEKERJAAN : Keselamatan dan Kesehatan Kerja
SATUAN PEMBAYARAN : Lump Sum

NO URAIAN SAT. VOL. HARGA TOTAL


KET.
SATUAN HARGA

Penyiapan RK3K terdiri atas :


1 a Pembuatan Manual, Prosedur, Instruksi Kerja, ijin kerja Set 3 …............ …............
b Pembuatan Kartu identitas Pekerja (KIP) Lb 30 …............ …............

2 Sosialisasi dan Promosi K3 terdiri atas :


a Induksi K3(safety induction) org 30 - - Tidak Perlu Biaya
b Pengarahan K3 (safety briefing) ,Pertemuan keselamatan org 30 …............ …............
c Pelatihan K3 org 30 …............ …............
d Simulasi K3 org 30 …............ …............
e Spanduk (banner) lb 1 …............ …............
f Poster lb 1 …............ …............
g Papan informasi K3 bh 1 …............ …............

3 Alat Pelindung Kerja : -


a Jaring Pengaman (Safety net) Ls - - -
b Tali Keselamatan(Life Line) Ls - - -
c Penahan Jatuh ( Safety Deck) Ls - - -
d Pagar pengaman (Guard ralling) Ls - - -
e Pembatas area (restrictic area) Ls 1 …............ …............

4 Alat Pelindung Diri : -


a Topi Pelindung (Safety Helmet) bh 30 …............ …............
b Pelindung mata(Googlass) psg - - -
c Tameng muka (Face Shield) bh - - -
d Masker selam (breathing apparatus) bh
e Pelindung Telinga ( Ear plug) psg - - -
f Pelindung pernapasan dan mulut (masker) bh 30 …............ …............
g Sarung Tangan (safety gloves) psg 30 …............ …............
h Sepatu keselamatan ( Safety shoes) psg 30 …............ …............
i Penunjang seluruh tubuh ( Fullbody Harness) bh - - -
j Jaket Pelampung (Life Vest) bh - - -
k Rompi Keselamatan ( Safety Vast ) bh 30 …............ …............
l celemek (apron) bh - - -
m Pelindung Jatuh (Fall Arester) bh - - -

5 Asuransi dan Perijinan


a BPJS Ketenagakerjaan dan Kesehatan ls 1 …............ …............
b Surat ijin kelaikan alat alat/kend 3 …............ …............
c Surat ijin Operator lb/alat 3 …............ …............
d Surat Ijin Pengesahan Panitia Pembina Keselamatan ls 1 …............ …............

6 Personil K3
a Ahli K3 OB 5 …............ …............
b Petugas K3 OB - - -
c Petugas Tanggap Darurat OB - - -
d Petugas P3K OB - - -
e Petugas Pengatur Lalu Lintas (Flagman) OB - - -
f Petugas Medis OB 5 …............ …............

7 Fasilitas sarana kesehatan -


a Peralatan P3K ls 1 …............ …............
b Ruang P3K ls 1 …............ …............
c Pearalatan Pengasapan(Fogging) bh - - -
d Obat Pengasapan ls - - -
NO URAIAN SAT. VOL. HARGA TOTAL
KET.
SATUAN HARGA
8 Rambu-rambu -
a Rambu Petunjuk bh - - -
b Rambu Larangan bh - - -
c Rambu Peringatan bh - - -
d Rambu kewajiban bh - - -
e Rambu informasi bh - - -
f Rambu pekerjaan sementara bh - - -
g Tongkat pengatur lalu lintas bh 2 …............ …............
h Kerucut lalu lintas bh - - -
i Lampu putar bh 1 …............ …............
j Lampu selang lalu lintas bh - - -
-
9 Lain-lain terkait Pengedalian risiko K3
a Alat Pemadam kebakaran api ringan bh - - -
b sirine bh - - -
c bendera K3 bh 1 …............ …............
d Jalur evakuasi ls - - -
e lampu darurat bh - - -
f program inspeksi dan audit internal ls 1 …............ …............
g pelaporan dan penyelidikan insiden ls 1 …............ …............