PENGUKURAN VOLUME URUGAN DAN DPT

Tanggal : 24-Sep-23
Lokasi Koordinat : -7.56237, 110.71579

Titik Pasangan Batu : 1.518


Elevasi Lokas : 135.000
Hi : 136.518
ELEVASI RENCANA 1 ( 70 M ) : 135.100
ELEVASI RENCANA 2 ( 30 M) : 136.000

No FS FS Rata2 Elevasi ∆H(T) P L Volume ( m3 ) Keterangan

1 2.524
2 2.535
2.549 133.969 1.131 20 10 226.25 A
3 2.568
4 2.570
5 2.555
6 2.540
2.549 133.969 1.131 25 10 282.6875 B
7 2.570
8 2.530
9 2.980
10 2.810
2.865 133.653 1.447 25 10 361.75 C
11 2.860
12 2.810
13 3.290
14 3.285
3.202 133.316 2.684 15 10 402.5625 D
15 3.122
16 3.110
17 3.720
18 3.740
3.718 132.801 3.200 15 10 479.925 E
19 3.710
20 3.700
1753.175
1.24

2.94

140,254,000