Terbayar Terbayar
SPM SPM
Saturday, July 29, 2023 Rp 126,931,725 Monday, August 28, 2023
### Rp 48,393,223 Wednesday, August 30, 2023
Selasar
Saturday, August 19, 2023
Sunday, August 20, 2023
Monday, August 21, 2023
Nb:
Rp 8,210,787
Rp 15,030,018
Rp 260,000
Rp 23,500,805
Rp 548,763,033
Rp 200,000,000
Rp 26,899,600
Rp 50,000,000
Rp 50,000,000
Rp 56,000,000
Rp 165,863,433
HARGA SATUAN (Rp) TOTAL
VOL SAT URAIAN PEKERJAAN VOL
UPAH BAHAN UPAH BAHAN
1 Galian Footplate (SELASAR 01) 0.75 0.75 1.27 18.00 12.86 1 Kolom
3 Gording
m btg bh Kg Kg
76 3 2.52 574.56
1.04 128 2.52 335.46
910.0224
HARGA SATUAN (Rp) VOL
VOL SAT URAIAN PEKERJAAN
UPAH BAHAN TEREALISASI
Pek. Pembuatan Beton Tumbuk ad. 1 Pc : 3 Ps : 5 Kr, (lantai kerja lantai Rp 150,000.00 Rp 572,225.00
17.56 m³ andesit) 15.10
175.58 m² Pek. Pemasangan batu alam andesit bakar 60x60, Rp 43,985.00 Rp 210,100.00 ###
175.58 m² Pek. Pengecatan batu alam andesit, Rp 9,000.00 Rp 74,880.00 ###
m2 Pek. Pasang Partisi Rp 20,125.00 127.00
m2 Pek. Urug tanah depan Hall Rp 30,000.00 44.00
m 2
Pek. Passang bata merah Rp 89,300.00 Rp 134,460.00 50.6
m 2 Pek. Plester Rp 44,150.00 Rp 22,800.00 50.60
m 2 Pek. Acian Rp 42,150.00 Rp 11,440.00 50.60
m3 urug tanah ramp untuk jalan kursi roda Rp 30,000.00 2.25
m2 rabat ramp iuntuk jalan kursi roda Rp 150,000.00 Rp 572,225.00 0.45
m2 Pek. Perapian Kramik dalam hall bagian depan Rp 39,520 6.5
JUMLAH TOTAL
No
m btg bh Kg Kg
1 Pondasi Footplate Melintang Bawah D13 1.1 7 22.00 1.04 176.18
Memanjang Bawah 1.1 7 22.00 1.04 176.18
Melintang Atas Bawah 1.1 7 22.00 1.04 176.18
Memanjang Bawah 1.1 7 22.00 1.04 176.18
Vertikal sisi melintang 0.25 7 22.00 1.04 40.04
vertikal sisi memanjang 0.25 7 22.00 1.04 40.04
hak tulangan 0.05 7 22.00 1.04 8.01
792.79
2 Pendestal Memanjang D13 1.55 8 22 1.04 283.71
Begeul D8 0.35 0.35 7 22 0.40 82.13
hak begeul D8 0.05 7 22 0.40 2.93
85.07
Peruntukan Type Dimensi Panjang Lebar Tinggi Banyak Unit Tiap M/M2 Jumlah Berat
Tulangan
m btg bh Kg Kg
Kolom WF 200 5.15 4 21.33 439.398
4.4 4 21.33 375.408
4.3 7 21.33 642.033
4.2 7 21.33 627.102
Foot 0.35 22 21.33 164.241
Rib 6 22 0.63 83.16
2331.342
Balok WF 200 5.35 6 21.33 684.693
6.45 4 21.33 550.314
7.5 1 21.33 159.975
1394.982
150 6 12 14.00 1008
1,3+5,7+4,7+5,7+1,3 18.7 2 14.00 523.6
Rib 32 0.31 9.92
Foot 0.35 8 14.00 39.2
1580.72
Gording CNP 150 32.3 5 4.97 802.1166667
Nb:
Pasangan pondasi dan bata pada pagar timur plang parkir belum masuk
Pekerjaan UDITCH belum keseluruhan
VOL VOL volume tambah volume HARGA SATUAN (Rp) HARGA SATUAN (Rp) Total Upah Total Bahan Total Upah Total Bahan jumlah total jumlah total
SAT URAIAN PEKERJAAN
oknam 1 oknam 2 oknam 2 cco UPAH BAHAN oknam 1 oknam1 oknam 2 oknam 2 upah bahan
IV. PEKERJAAN PEMBUATAN BANGUNAN SPM
IV.A. PEKERJAAN STRUKTUR
IV.A.1 PEKERJAAN PERSIAPAN DAN PEMBONGKARAN
Pek. Pembongkaran yang berdampak pada bangunan SPM (termasuk perapihan dan
pembuangan material bekas bongkaran) 1.00
pkt 1.00 Rp 10,000,000 Rp - Rp 10,000,000 Rp - Rp - Rp - Rp 10,000,000 Rp -
m Pek. Pengukuran dan Pasang Papan Bowplank, 97.00 36.00 62.60 Rp 22,150 Rp 33,650 Rp 2,148,550 Rp 3,264,050 Rp 797,400 Rp 1,211,400 Rp 2,945,950 Rp 4,475,450
Pek. Bongkar dinding eksisting sisi barat 24.00 Rp 25,000 Rp - Rp - Rp 600,000 Rp - Rp 600,000 Rp -
Pek. Langsir material bogkaran dinding eksisting barat 24.00 Rp 40,000 Rp - Rp - Rp 960,000 Rp - Rp 960,000 Rp -
IV.A.2. PEKERJAAN PONDASI FOOTPLAT + KOLOM PEDESTAL
m3 Pek. Galian Tanah berbatu Semi Mekanis sdalam >1 s/d 2 m, 12.19 0.86 13.05 16.42 Rp 50,000 Rp 11,875 Rp 609,375 Rp 144,727 Rp 43,200 Rp 10,260 Rp 652,575 Rp 154,987
m3 Pek. Pengurugan tanah bekas galian, 19.23 0.65 19.88 12.39 Rp 25,000 Rp - Rp 480,750 Rp - Rp 16,200 Rp - Rp 496,950 Rp -
m3 Pek. Pembuatan Beton Tumbuk ad. 1 Pc : 3 Ps : 5 Kr, t=10cm 0.98 0.11 1.08 0.97 Rp 150,000 Rp 572,225 Rp 146,250 Rp 557,919 Rp 16,200 Rp 61,800 Rp 162,450 Rp 619,720
m3 Pek. Pengurugan dengan pasir urug, t = 5 cm 0.49 0.54 1.03 0.49 Rp 30,000 Rp 75,000 Rp 14,625 Rp 36,563 Rp 16,200 Rp 40,500 Rp 30,825 Rp 77,063
m3 Pek. Pembuatan Beton dengan mutu K.225, 2.55 0.22 2.77 2.57 Rp 150,000 Rp 710,000 Rp 382,500 Rp 1,810,500 Rp 32,400 Rp 153,360 Rp 414,900 Rp 1,963,860
kg Pek. Pembesian dengan Besi Ulir, D13-150 464.90 66.49 531.39 735.06 Rp 1,150 Rp - Rp 534,635 Rp - Rp 76,459 Rp - Rp 611,094 Rp -
m2 Pek. Pemasangan Bekisting untuk pondasi, 23.38 0.31 23.68 27.41 Rp 61,590 Rp 18,217 Rp 1,439,666 Rp 425,822 Rp 18,847 Rp 5,574 Rp 1,458,513 Rp 431,397
Pek. Pemasangan Handle Pintu + Body Mortise + Kunci Silinder Knob, Setara Dekson
set
unit Pek. Pemasangan Pintu Geser ABS + Kusen (ruang Toilet Difable)
- Daun Pintu ABS + PVC Deco Shhet + Honeycomb
- Rel Pintu Sliding Alumunium Setara Dekson D4
unit Pek. Pemasangan Handle Pintu Geser + Kunci Setara Dekson RA-6,
Pekerjaan Bovenlight
m Pek. Pemasangan Kusen Aluminium 3", Setara Alexindo
m2 Pek. Pemasangan kaca bening t=5 mm,
unit Pek. Pemasangan kloset duduk / monoblok Setara toto CW421J, 11.00 11.00 451,115.00 Rp - Rp - Rp 4,962,265 Rp - Rp 4,962,265 Rp -
bh Pek. Pemasangan kloset jongkok Setara Toto CE9/TV150NWV12J, - Rp - Rp - Rp - Rp - Rp - Rp -
bh Pek. Pemasangan urinoir Setara Toto U57M, 4.00 4.00 336,500.00 Rp - Rp - Rp 1,346,000 Rp - Rp 1,346,000 Rp -
bh Pek. Pemasangan Partisi Urinoir Setara Toto A100, 2.00 2.00 94,500.00 Rp - Rp - Rp 189,000 Rp - Rp 189,000 Rp -
set Memasang 1 buah wastafel Setara Toto L546, 5.00 5.00 196,750.00 Rp - Rp - Rp 983,750 Rp - Rp 983,750 Rp -
bh Memasang 1 buah kran Wastafel Toto TLS04301A, 5.00 5.00 13,150.00 Rp - Rp - Rp 65,750 Rp - Rp 65,750 Rp -
bh Pek. Pemasangan Jet Shower Cebok Tx 403 SB - W, 11.00 11.00 13,150.00 Rp - Rp - Rp 144,650 Rp - Rp 144,650 Rp -
bh Memasang 1 buah floor drain Setara Toto TX1CV2, 11.00 11.00 13,150.00 Rp - Rp - Rp 144,650 Rp - Rp 144,650 Rp -
bh Memasang 1 buah kran dinding Setara Toto T23B13, 6.00 6.00 13,150.00 Rp - Rp - Rp 78,900 Rp - Rp 78,900 Rp -
m2 Pek. Pemasangan Kaca Cermin t=5 mm, 2.98 Rp - Rp - Rp - Rp - Rp - Rp -
m2 Pek. Pembuatan Meja Beton Bertulang, 2.76 3.26 130,836.00 372,032.00 Rp 361,107 Rp 1,026,808 Rp - Rp - Rp 361,107 Rp 1,026,808
m Pek. Pemasangan Grill Stainelss Tempat Wudhu 3.70 Rp - Rp - Rp - Rp - Rp - Rp -
m Pek. Pemasangan Pipa PVC tipe AW Ø 3/4", 91.00 35.00 10,890.00 15,147.00 Rp 990,990 Rp 1,378,377 Rp - Rp - Rp 990,990 Rp 1,378,377
m Pek. Pemasangan Pipa PVC tipe AW Ø 2" , 59.00 35.00 10,890.00 46,575.00 Rp 642,510 Rp 2,747,925 Rp - Rp - Rp 642,510 Rp 2,747,925
m Pek. Pemasangan Pipa PVC tipe AW Ø 4" (114 mm), 31.00 14.00 45.00 25.00 10,890.00 140,373.00 Rp 337,590 Rp 4,351,563 Rp 152,460 Rp 1,965,222 Rp 490,050 Rp 6,316,785
bh Pek. Pemasangan Toren Air kapasitas 2000L, 1.00 1.00 860,000.00 Rp - Rp - Rp 860,000 Rp - Rp 860,000 Rp -
pkt Pek. Pemasangan Rangka Toren - Rp - Rp - Rp - Rp - Rp - Rp -
unit Pek. Pembuatan Sepictank dan Sumur Resapan 1.00 1.00 6,000,000.00 Rp - Rp - Rp - Rp 6,000,000 Rp - Rp 6,000,000
m2 Pek. Partisi cubicle Toilet Phenolic, 47.20 Rp - Rp - Rp - Rp - Rp - Rp -
Jumlah Total Rp 163,862,850 Rp 228,615,458 Rp 65,487,465 Rp 76,848,397 Rp 227,790,316 Rp 305,463,855
PEKERJAAN PENATAAN STASIUN KERTOSONO
PEKERJAAN Galian
Ukuran Jumlah Volume
No Peruntukan
Panjang Lebar Tinggi bh m3
Galian Foot Plate & Kolom
1 0.65 0.60 1.25 25.00 12.19
Pendestal
TOTAL 49.56
Keterangan
sisi miring
Besi Pondasi Footplate dan Kolom Pendestal
Panjang Lebar Tinggi
No Peruntukan Type Dimensi
m
1 Pondasi Footplate Melintang Bawah D13 0.6
Memanjang Bawah 0.6
Melintang Atas Bawah 0.6
Memanjang Bawah 0.6
Vertikal sisi melintang 0.2
vertikal sisi memanjang 0.2
hak tulangan 0.1
4 3 0.89 9.08
4 6 1.04 17.47
6 6 1.04 3.74
66.49
Banyak
Unit Tiap M/M2 Jumlah Berat
Tulangan
btg bh Kg Kg
4 0.89 0.00
25 0.40 0.00
4 0.89 0.00
18 0.40 0.00
43 0.40 0.00
0.00
Banyak
Unit Tiap M/M2 Jumlah Berat
Tulangan
btg bh Kg Kg
6 3 0.89 60.88
25 3 0.40 21.28
25 3 0.40 1.52
83.68
Banyak
Unit Tiap M/M2 Jumlah Berat
Tulangan
btg bh Kg Kg
6 1 0.89 128.16
240 1 0.40 67.20
240 1 0.40 4.80
200.16
Banyak
Unit Tiap M/M2 Jumlah Berat
Tulangan
btg bh Kg Kg
21 0.89 0.00
20 0.89 0.00
0.00
Ukuran
No Item Pekerjaan
Panjang
Pek. Pemasangan Kuda-kuda Baja Ringan + Reng untuk rangka Atap C75 t =
1 mm, 6
m2
m2 Pek. Pemasangan atap UPVC, Setara Alderon tipe Twinwall t = 10 mm 6
m Pek. Pemasangan atap nok UPVC, 6
Pek. Pemasangan Aluminium Composite Panel PVDF Eksterior, untuk cover
talang datar
m2
m Pek. Pemasangan Talang Datar Galvalum t = 0.75 mm, 6
m Pek. Pemasangan Pipa PVC tipe AW Ø 4" (114 mm), pipa tegak 7.2
Pek. Pemasangan Pipa PVC tipe AW Ø 4" (114 mm), pipa tegak 44
kg Pek. Pemasangan Besi Hollow, uk 40x40x2 mm untuk rangka talang
Pek. Pemasangan rangka besi hollow galvalum 40x40x0.35 mm untuk plafond,
6
m2
Pek. Pemasangan Gypsum Board uk.120x240x9 mm untuk Partisi Dinding,
6
m2
m Pek. Pemasangan list Shadow Line, 6
m2 Pek. Pengecatan Plafond (Cat setara Dulux Pentalite Ceilling), 6
Ukuran Jumlah Volume
Keterangan
Lebar Tinggi bh Berat Kg m2 / m' / kg
2 12
2 14.4
44 Kerja Tambah
6 36
6 66 Termasuk penambahan dropsilling
Ukuran Jumlah
No Peruntukan Type
Panjang Lebar Tinggi bh
bata Ringan tebal
10 cm
Ukuran Jumlah
No Peruntukan Type
Panjang Lebar Tinggi bh
Granit
Kamar mandi Lantai 8.0 6 1.00
6 2 1
mushola - Roti O Lantai 13 6 1
6 4 1
Depan SPM 27 5.5 1
3 3 1
Kamar Mandi Dinding 60.8 3.2 1
CAT Eksterior 27 4
6 4
6 1.5
27 4
pintu 17.1 2.2
Volume
Keterangan
m2
24.00
24.00
13.50
4.50
66.00
48.00
48.00
27.00
9.00
132.00
48.00
48.00
27.00
9.00
132.00
Volume
Keterangan
m2
48.00
12.00
78.00
24.00
148.50
9.00
194.56
108
24
4.5
108
37.62 pengurangan
206.88
Banyak
Panjang Lebar Tinggi Unit
No Peruntukan Type Dimensi Sisi
m bh
1 Footplate Bekisting 0.6 0.6 0.2 4 3
2 Pendestal Bekisting 0.2 0.15 1 4 3
3 Sloof Bekisting 18 0.15 0.2 1 1
4 Kolom Praktis Pintu Bekisting
5 Kolom K1 Bekisting
6 Kolom K2 Bekisting 0.15 0.2 3.8 4 3
7 Balok Bekisting 24 0.15 0.2 2 1
TOTAL Bekisting
COR BETON
Panjang Lebar Tinggi Unit Volume
No Peruntukan Type Dimensi
m bh m3
1 Footplate Beton 0.6 0.6 0.2 3 0.22
2 Pendestal Beton 0.2 0.15 1 3 0.09
3 Sloof Beton 18 0.15 0.2 1 0.54
4 Kolom Praktis Pintu Beton
5 Kolom K1 Beton
6 Kolom K2 Beton 0.15 0.2 3.8 3 0.34
7 Balok Beton 24 0.15 0.2 1 0.72
21.66
Ket