BAB III

PENGUMPULAN DAN PENGOLAHAN DATA

3.1. Pengumpulan Data


3.1.1. Data Master Production Schedule
Tabel 3.1. Data Master Production Schedule
Periode Mater Production Schedule
1 742
2 3495
3 6671
4 5824
5 4594
6 706
7 700
8 2336
9 8079
10 2814
11 4100
12 2572
13 1522
14 3391
15 1349
16 115
17 969
18 7437
19 7870
20 1170
21 9178
22 5838
23 751
24 5800
Sumber: Pengumpulan Data Lab. PTI 2, 2023

3.1.2. Data Inventory Status Record


Tabel 3.2. Data Inventory Status Record
No. Part Coode Part Name On Hand Keterangan
1. RS-101 Rak Susun 2000 Unit Dibeli
2. A-201 Tatakan Bawah 3250 Unit Dibeli
3. A-202 Tatakan Tengah 5000 Unit Dibeli
4. A-203 Tatakan Atas 1500 Unit Dibeli
5. A-204 Tutup 50 Box 1 Box = 24 Unit, Dibeli
6. A-301 Penyangga Bawah 1 80 Box 1 Box = 18 Unit, Dibeli
7. A-302 Penyangga Bawah 2 40 Box 1 Box = 27 Unit, Dibeli
8. A-303 Penyangga Bawah 3 50 Box 1 Box = 21 Unit, Dibeli
9. A-304 Penyangga Bawah 4 35 Box 1 Box = 33 Unit, Dibeli
10. A-305 Tiang Bawah 1 20 Box 1 Box = 48 Unit, Dibeli
11. A-306 Tiang Bawah 2 40 Box 1 Box = 20 Unit, Dibeli
12. A-307 Tiang Bawah 3 25 Box 1 Box = 36 Unit, Dibeli
13. A-308 Tiang Bawah 4 15 Box 1 Box = 54 Unit, Dibeli
14. A-309 Tiang Tengah 1 60 Box 1 Box = 13 Unit, Dibeli
Sumber: Pengumpulan Data Lab. PTI 2, 2023
Tabel 3.2. Data Inventory Status Record (Lanjutan)
No. Part Coode Part Name On Hand Keterangan
15. A-310 Tiang Tengah 2 25 Box 1 Box = 50 Unit, Dibeli
16. A-311 Tiang Tengah 3 55 Box 1 Box = 19 Unit, Dibeli
17. A-312 Tiang Tengah 4 30 Box 1 Box = 25 Unit, Dibeli
18. A-313 Tutup Atas 1 40 Box 1 Box = 283 Unit, Dibeli
19. A-314 Tutup Atas 2 20 Box 1 Box = 367 Unit, Dibeli
20. A-315 Tutup Atas 3 10 Box 1 Box = 444 Unit, Dibeli
21. A-316 Tutup Atas 4 35 Box 1 Box = 321 Unit, Dibeli
Sumber: Pengumpulan Data Lab. PTI 2, 2023

Ongkos Simpan : Rp.200 Unit/Bulan


Ongkos Pesan : Rp.200.000

3.1.3. Bom Lama

Gambar 3.1. Data BOM Lama


3.1.4. Data Urutan Proses Kerja Hasil Metode LCR
Tabel 3.3. Data Urutan Proses Kerja Hasil Metode LCR
Stasiun Kum.
Operasi WB Efisiensi Uraian Kegiatan
Kerja WB
14 12,39 12,39
18 10,75 23,14 Proses pemasangan penyangga bawah
I 81%
6 9,77 32,91 pada tatakan rak bawah.
13 9,77 9,77
5 8,55 18,32
12 8,55 26,87
Proses pemasangan penyangga pada
II 17 8,46 35,33 87%
lobang tatakan pertama.
23 6,82 6,82
2 6,22 13,04
4 6,22 19,26
16 6,34 25,6 Proses pemasangan penyangga pada
III 7 6,11 31,71 92% lobang tatakan kedua. Pemasangan tutup
3 5,87 37,58 pada tatakan rak atas.
11 5,93 5,93
8 5,58 11,51
22 5,56 17,07
IV 66% Pemasangan tutup pada tatakan rak atas.
1 4,84 21,91
15 4,93 26,84
Sumber: Pengumpulan Data Lab. PTI 2, 2023
Tabel 3.3. Data Urutan Proses Kerja Hasil Metode LCR (Lanjutan)
Stasiun Uraian
Operasi WB Kum. WB Efisiensi
Kerja Kegiatan
9 4,36 31,2
21 4,49 35,69 Quality
V 98%
10 4,01 39,7 Control.
20 3,59 3,59
Sumber: Pengumpulan Data Lab. PTI 2, 2023

3.1.5. Bom Baru

Gambar 3.2. Data BOM Baru


3.1.6. Data Hari Kerja
Tabel 3.4. Data Hari Kerja
Periode Data Hari Kerja Utilitas
1 26
2 29
81%
3 29
4 30
5 28
6 27
7 29 87%
8 28
9 28
10 29
11 25
12 30 92%
13 26
14 29
15 29
16 30
17 28 66%
18 27
19 29
20 28
21 28
22 29 98%
23 25
24 30
Sumber: Pengumpulan Data Lab. PTI 2, 2023
3.1.7. Data Available Capacity (AC)
Tabel 3.4. Data Available Capacity
Stasiun Kerja
Periode
1 2 3 4 5
1 1213056 1302912 1377792 988416 1467648
2 1353024 1453248 1536768 1102464 1636992
3 1353024 1453248 1536768 1102464 1636992
4 1399680 1503360 1589760 1140480 1693440
5 1306368 1403136 1483776 1064448 1580544
6 1259712 1353024 1430784 1026432 1524096
7 1353024 1453248 1536768 1102464 1636992
8 1306368 1403136 1483776 1064448 1580544
9 1306368 1403136 1483776 1064448 1580544
10 1353024 1453248 1536768 1102464 1636992
11 1166400 1252800 1324800 950400 1411200
12 1399680 1503360 1589760 1140480 1693440
13 1213056 1302912 1377792 988416 1467648
14 1353024 1453248 1536768 1102464 1636992
15 1353024 1453248 1536768 1102464 1636992
16 1399680 1503360 1589760 1140480 1693440
17 1306368 1403136 1483776 1064448 1580544
18 1259712 1353024 1430784 1026432 1524096
19 1353024 1453248 1536768 1102464 1636992
20 1306368 1403136 1483776 1064448 1580544
21 1306368 1403136 1483776 1064448 1580544
22 1353024 1453248 1536768 1102464 1636992
23 1166400 1252800 1324800 950400 1411200
24 1399680 1503360 1589760 1140480 1693440
Sumber: Pengumpulan Data Lab. PTI 2, 2023

3.1.8. Data Set-Up/Time/Unit


Tabel 3.5. Data Set Up Time
No. Item Set Up
1. RAK 101 25
2. A 201 30
3. A 202 27
4. A 203 25
5. A 204 20
Sumber: Pengumpulan Data Lab. PTI 2, 2023.
3.2. Pengolahan Data
3.2.1. Pengolahan Data Master Production Schedule
3.2.1.1. Pengolahan Data dengan Software
Tabel 3.6. Pengolahan Data Sofware
Exploding Data Terpilih
N Nama
Biaya LFL
o Komponen
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

1 RS-101 Rp 104,189 4,142 9,376 2,288 4,958 2,281 4,531 6,751 386 422 3,152 985 6,491 7,657 9,754 8,115 57 2,696 1,693 5,953 3,261 3,062 25 7,324 296

2 A-201 Rp 104,189 9,376 2,288 4,958 2,281 4,531 6,751 386 422 3,152 985 6,491 7,657 9,754 8,115 57 2,696 1,693 5,953 3,261 3,062 25 7,324 296 0

3 A-202 Rp 104,189 9,376 2,288 4,958 2,281 4,531 6,751 386 422 3,152 985 6,491 7,657 9,754 8,115 57 2,696 1,693 5,953 3,261 3,062 25 7,324 296 0

4 A-203 Rp 104,189 9,376 2,288 4,958 2,281 4,531 6,751 386 422 3,152 985 6,491 7,657 9,754 8,115 57 2,696 1,693 5,953 3,261 3,062 25 7,324 296 0

5 A-204 Rp 104,189 9,376 2,288 4,958 2,281 4,531 6,751 386 422 3,152 985 6,491 7,657 9,754 8,115 57 2,696 1,693 5,953 3,261 3,062 25 7,324 296 0

6 A-301 Rp 104,189 2,288 4,958 2,281 4,531 6,751 386 422 3,152 985 6,491 7,657 9,754 8,115 57 2,696 1,693 5,953 3,261 3,062 25 7,324 296 0 0

7 A-302 Rp 104,189 2,288 4,958 2,281 4,531 6,751 386 422 3,152 985 6,491 7,657 9,754 8,115 57 2,696 1,693 5,953 3,261 3,062 25 7,324 296 0 0

8 A-303 Rp 104,189 2,288 4,958 2,281 4,531 6,751 386 422 3,152 985 6,491 7,657 9,754 8,115 57 2,696 1,693 5,953 3,261 3,062 25 7,324 296 0 0

9 A-304 Rp 104,189 2,288 4,958 2,281 4,531 6,751 386 422 3,152 985 6,491 7,657 9,754 8,115 57 2,696 1,693 5,953 3,261 3,062 25 7,324 296 0 0

10 A-305 Rp 104,189 2,288 4,958 2,281 4,531 6,751 386 422 3,152 985 6,491 7,657 9,754 8,115 57 2,696 1,693 5,953 3,261 3,062 25 7,324 296 0 0

11 A-306 Rp 104,189 2,288 4,958 2,281 4,531 6,751 386 422 3,152 985 6,491 7,657 9,754 8,115 57 2,696 1,693 5,953 3,261 3,062 25 7,324 296 0 0

12 A-307 Rp 104,189 2,288 4,958 2,281 4,531 6,751 386 422 3,152 985 6,491 7,657 9,754 8,115 57 2,696 1,693 5,953 3,261 3,062 25 7,324 296 0 0

13 A-308 Rp 104,189 2,288 4,958 2,281 4,531 6,751 386 422 3,152 985 6,491 7,657 9,754 8,115 57 2,696 1,693 5,953 3,261 3,062 25 7,324 296 0 0

14 A-309 Rp 104,189 2,288 4,958 2,281 4,531 6,751 386 422 3,152 985 6,491 7,657 9,754 8,115 57 2,696 1,693 5,953 3,261 3,062 25 7,324 296 0 0

15 A-310 Rp 104,189 2,288 4,958 2,281 4,531 6,751 386 422 3,152 985 6,491 7,657 9,754 8,115 57 2,696 1,693 5,953 3,261 3,062 25 7,324 296 0 0

16 A-311 Rp 104,189 2,288 4,958 2,281 4,531 6,751 386 422 3,152 985 6,491 7,657 9,754 8,115 57 2,696 1,693 5,953 3,261 3,062 25 7,324 296 0 0

17 A-312 Rp 104,189 2,288 4,958 2,281 4,531 6,751 386 422 3,152 985 6,491 7,657 9,754 8,115 57 2,696 1,693 5,953 3,261 3,062 25 7,324 296 0 0

18 A-313 Rp 104,189 2,288 4,958 2,281 4,531 6,751 386 422 3,152 985 6,491 7,657 9,754 8,115 57 2,696 1,693 5,953 3,261 3,062 25 7,324 296 0 0

19 A-314 Rp 104,189 2,288 4,958 2,281 4,531 6,751 386 422 3,152 985 6,491 7,657 9,754 8,115 57 2,696 1,693 5,953 3,261 3,062 25 7,324 296 0 0

Sumber: Pengolahan Data Lab. PTI 2, 2023.


3.2.1.2. Pengolahan Data Manual
1. (RS-101)
Tabel 3.8. Pengolahan Data Manual (RAK-101)
Part No :
RS-101 Lead Time : 1 Use : 1
Lot Size :
Safety Stock : 5000
LFL
Periode 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Gross
742 3495 6671 5824 4594 706 700 2336 8079 2814 41 2572 1522 3391 1349 115 969 7437 787 1170 9178 5838 751 5800
Requirement
Schedule
Receipt
Project On
2000 1258 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Hand
Net
2237 6671 5824 4594 706 700 2336 8079 2814 41 2572 1522 3391 1349 115 969 7437 787 1170 9178 5838 751 5800
Requirement
Plan Order
2237 6671 5824 4594 706 700 2336 8079 2814 41 2572 1522 3391 1349 115 969 7437 787 1170 9178 5838 751 5800
Receipt
Plan Order
2237 6671 5824 4594 706 700 2336 8079 2814 41 2572 1522 3391 1349 115 969 7437 787 1170 9178 5838 751 5800 0
Release
Sumber: Pengolahan Data Lab. PTI 2, 2023.

Biaya Simpan = Total Inventory x Ongkos Simpan


= Rp 400.000,00
Biaya Pesan = Jumlah berapa kali pesan x Ongkos Pesan
= Rp 4.600.000,00
Biaya Total = Biaya Simpan x Biaya Pesanan
= Rp 5.000.000,00
2. (A-201)
Tabel 3.9. Pengolahan Data Manual (A-201)
Part No : A-
Lead Time : 1 Use : 1
201
Lot Size :
Safety Stock : 5000
LFL
Periode 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Gross
3495 6671 5824 4594 706 700 2336 8079 2814 41 2572 1522 3391 1349 115 969 7437 787 1170 9178 5838 751 5800 0
Requirement
Schedule
Receipt
Project On
3250 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Hand
Net
245 6671 5824 4594 706 700 2336 8079 2814 41 2572 1522 3391 1349 115 969 7437 787 1170 9178 5838 751 5800 0
Requirement
Plan Order
245 6671 5824 4594 706 700 2336 8079 2814 41 2572 1522 3391 1349 115 969 7437 787 1170 9178 5838 751 5800 0
Receipt
Plan Order
6671 5824 4594 706 700 2336 8079 2814 41 2572 1522 3391 1349 115 969 7437 787 1170 9178 5838 751 5800 0 0
Release
Sumber: Pengolahan Data Lab. PTI 2, 2023.

Biaya Simpan = Total Inventory x Ongkos Simpan


= Rp 650.000,00
Biaya Pesan = Jumlah berapa kali pesan x Ongkos Pesan
= Rp 4.400.000,00
Biaya Total = Biaya Simpan x Biaya Pesanan
= Rp 5.050.000,00
3. (A-202)
Tabel 3.10. Pengolahan Data Manual (A-202)
Part No : A-
Lead Time : 1 Use : 1
202
Lot Size :
Safety Stock : 5000
LFL
Periode 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Gross
3495 6671 5824 4594 706 700 2336 8079 2814 41 2572 1522 3391 1349 115 969 7437 787 1170 9178 5838 751 5800 0
Requirement
Schedule
Receipt
Project On
5000 1505 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Hand
Net
5166 5824 4594 706 700 2336 8079 2814 41 2572 1522 3391 1349 115 969 7437 787 1170 9178 5838 751 5800 0
Requirement
Plan Order
5166 5824 4594 706 700 2336 8079 2814 41 2572 1522 3391 1349 115 969 7437 787 1170 9178 5838 751 5800 0
Receipt
Plan Order
5166 5824 4594 706 700 2336 8079 2814 41 2572 1522 3391 1349 115 969 7437 787 1170 9178 5838 751 5800 0 0
Release
Sumber: Pengolahan Data Lab. PTI 2, 2023.

Biaya Simpan = Total Inventory x Ongkos Simpan


= Rp 1.000.000,00
Biaya Pesan = Jumlah berapa kali pesan x Ongkos Pesan
= Rp 4.400.000,00
Biaya Total = Biaya Simpan x Biaya Pesanan
= Rp 5.400.000,00
4. (A-203)
Tabel 3.11. Pengolahan Data Manual (A-203)
Part No : A-
Lead Time : 1 Use : 1
203
Lot Size :
Safety Stock : 5000
LFL
Periode 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Gross
3495 6671 5824 4594 706 700 2336 8079 2814 41 2572 1522 3391 1349 115 969 7437 787 1170 9178 5838 751 5800 0
Requirement
Schedule
Receipt
Project On
1500 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Hand
Net
1995 6671 5824 4594 706 700 2336 8079 2814 41 2572 1522 3391 1349 115 969 7437 787 1170 9178 5838 751 5800 0
Requirement
Plan Order
1995 6671 5824 4594 706 700 2336 8079 2814 41 2572 1522 3391 1349 115 969 7437 787 1170 9178 5838 751 5800 0
Receipt
Plan Order
6671 5824 4594 706 700 2336 8079 2814 41 2572 1522 3391 1349 115 969 7437 787 1170 9178 5838 751 5800 0 0
Release
Sumber: Pengolahan Data Lab. PTI 2, 2023.

Biaya Simpan = Total Inventory x Ongkos Simpan


= Rp 300.000,00
Biaya Pesan = Jumlah berapa kali pesan x Ongkos Pesan
= Rp 4.400.000,00
Biaya Total = Biaya Simpan x Biaya Pesanan
= Rp 4.700.000,00
5. (A-204)
Tabel 3.12. Pengolahan Data Manual (A-204)
Part No : A-
Lead Time : 1 Use : 1
204
Lot Size :
Safety Stock : 5000
LFL
Periode 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Gross
3495 6671 5824 4594 706 700 2336 8079 2814 41 2572 1522 3391 1349 115 969 7437 787 1170 9178 5838 751 5800 0
Requirement
Schedule
Receipt
Project On
1200 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Hand
Net
2295 6671 5824 4594 706 700 2336 8079 2814 41 2572 1522 3391 1349 115 969 7437 787 1170 9178 5838 751 5800 0
Requirement
Plan Order
2295 6671 5824 4594 706 700 2336 8079 2814 41 2572 1522 3391 1349 115 969 7437 787 1170 9178 5838 751 5800 0
Receipt
Plan Order
6671 5824 4594 706 700 2336 8079 2814 41 2572 1522 3391 1349 115 969 7437 787 1170 9178 5838 751 5800 0 0
Release
Sumber: Pengolahan Data Lab. PTI 2, 2023.

Biaya Simpan = Total Inventory x Ongkos Simpan


= Rp 240.000,00
Biaya Pesan = Jumlah berapa kali pesan x Ongkos Pesan
= Rp 4.400.000,00
Biaya Total = Biaya Simpan x Biaya Pesanan
= Rp 4.640.000,00
6. (A-301)
Tabel 3.13. Pengolahan Data Manual (A-301)
Part No : A-
Lead Time : 1 Use : 1
301
Lot Size :
Safety Stock : 5000
LFL
Periode 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Gross
6671 5824 4594 706 700 2336 8079 2814 41 2572 1522 3391 1349 115 969 7437 787 1170 9178 5838 751 5800 0 0
Requirement
Schedule
Receipt
Project On
1440 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Hand
Net
5231 5824 4594 706 700 2336 8079 2814 41 2572 1522 3391 1349 115 969 7437 787 1170 9178 5838 751 5800 0 0
Requirement
Plan Order
5231 5824 4594 706 700 2336 8079 2814 41 2572 1522 3391 1349 115 969 7437 787 1170 9178 5838 751 5800 0 0
Receipt
Plan Order
5824 4594 706 700 2336 8079 2814 41 2572 1522 3391 1349 115 969 7437 787 1170 9178 5838 751 5800 0 0 0
Release
Sumber: Pengolahan Data Lab. PTI 2, 2023.

Biaya Simpan = Total Inventory x Ongkos Simpan


= Rp 288.000,00
Biaya Pesan = Jumlah berapa kali pesan x Ongkos Pesan
= Rp 4.200.000,00
Biaya Total = Biaya Simpan x Biaya Pesanan
= Rp 4.488.000,00
7. (A-302)
Tabel 3.14. Pengolahan Data Manual (A-302)
Part No : A-
Lead Time : 1 Use : 1
302
Lot Size :
Safety Stock : 5000
LFL
Periode 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Gross
6671 5824 4594 706 700 2336 8079 2814 41 2572 1522 3391 1349 115 969 7437 787 1170 9178 5838 751 5800 0 0
Requirement
Schedule
Receipt
Project On
1080 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Hand
Net
5591 5824 4594 706 700 2336 8079 2814 41 2572 1522 3391 1349 115 969 7437 787 1170 9178 5838 751 5800 0 0
Requirement
Plan Order
5591 5824 4594 706 700 2336 8079 2814 41 2572 1522 3391 1349 115 969 7437 787 1170 9178 5838 751 5800 0 0
Receipt
Plan Order
5824 4594 706 700 2336 8079 2814 41 2572 1522 3391 1349 115 969 7437 787 1170 9178 5838 751 5800 0 0 0
Release
Sumber: Pengolahan Data Lab. PTI 2, 2023.

Biaya Simpan = Total Inventory x Ongkos Simpan


= Rp 216.000,00
Biaya Pesan = Jumlah berapa kali pesan x Ongkos Pesan
= Rp 4.200.000,00
Biaya Total = Biaya Simpan x Biaya Pesanan
= Rp 4.416.000,00
8. (A-303)
Tabel 3.15. Pengolahan Data Manual (A-303)
Part No : A-
Lead Time : 1 Use : 1
303
Lot Size :
Safety Stock : 5000
LFL
Periode 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Gross
6671 5824 4594 706 700 2336 8079 2814 41 2572 1522 3391 1349 115 969 7437 787 1170 9178 5838 751 5800 0 0
Requirement
Schedule
Receipt
Project On
1050 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Hand
Net
5621 5824 4594 706 700 2336 8079 2814 41 2572 1522 3391 1349 115 969 7437 787 1170 9178 5838 751 5800 0 0
Requirement
Plan Order
5621 5824 4594 706 700 2336 8079 2814 41 2572 1522 3391 1349 115 969 7437 787 1170 9178 5838 751 5800 0 0
Receipt
Plan Order
5824 4594 706 700 2336 8079 2814 41 2572 1522 3391 1349 115 969 7437 787 1170 9178 5838 751 5800 0 0 0
Release
Sumber: Pengolahan Data Lab. PTI 2, 2023.

Biaya Simpan = Total Inventory x Ongkos Simpan


= Rp 210.000,00
Biaya Pesan = Jumlah berapa kali pesan x Ongkos Pesan
= Rp 4.200.000,00
Biaya Total = Biaya Simpan x Biaya Pesanan
= Rp 4.410.000,00
9. (A-304)
Tabel 3.16. Pengolahan Data Manual (A-304)
Part No : A-
Lead Time : 1 Use : 1
304
Lot Size :
Safety Stock : 5000
LFL
Periode 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Gross
6671 5824 4594 706 700 2336 8079 2814 41 2572 1522 3391 1349 115 969 7437 787 1170 9178 5838 751 5800 0 0
Requirement
Schedule
Receipt
Project On
1155 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Hand
Net
5516 5824 4594 706 700 2336 8079 2814 41 2572 1522 3391 1349 115 969 7437 787 1170 9178 5838 751 5800 0 0
Requirement
Plan Order
5516 5824 4594 706 700 2336 8079 2814 41 2572 1522 3391 1349 115 969 7437 787 1170 9178 5838 751 5800 0 0
Receipt
Plan Order
5824 4594 706 700 2336 8079 2814 41 2572 1522 3391 1349 115 969 7437 787 1170 9178 5838 751 5800 0 0 0
Release
Sumber: Pengolahan Data Lab. PTI 2, 2023.

Biaya Simpan = Total Inventory x Ongkos Simpan


= Rp 231.000,00
Biaya Pesan = Jumlah berapa kali pesan x Ongkos Pesan
= Rp 4.200.000,00
Biaya Total = Biaya Simpan x Biaya Pesanan
= Rp 4.431.000,00
10. (A-305)
Tabel 3.17. Pengolahan Data Manual (A-305)
Part No : A-
Lead Time : 1 Use : 1
305
Lot Size :
Safety Stock : 5000
LFL
Periode 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Gross
6671 5824 4594 706 700 2336 8079 2814 41 2572 1522 3391 1349 115 969 7437 787 1170 9178 5838 751 5800 0 0
Requirement
Schedule
Receipt
Project On
960 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Hand
Net
5711 5824 4594 706 700 2336 8079 2814 41 2572 1522 3391 1349 115 969 7437 787 1170 9178 5838 751 5800 0 0
Requirement
Plan Order
5711 5824 4594 706 700 2336 8079 2814 41 2572 1522 3391 1349 115 969 7437 787 1170 9178 5838 751 5800 0 0
Receipt
Plan Order
5824 4594 706 700 2336 8079 2814 41 2572 1522 3391 1349 115 969 7437 787 1170 9178 5838 751 5800 0 0 0
Release
Sumber: Pengolahan Data Lab. PTI 2, 2023.

Biaya Simpan = Total Inventory x Ongkos Simpan


= Rp 192.000,00
Biaya Pesan = Jumlah berapa kali pesan x Ongkos Pesan
= Rp 4.200.000,00
Biaya Total = Biaya Simpan x Biaya Pesanan
= Rp 4.392.000,00
11. (A-306)
Tabel 3.18. Pengolahan Data Manual (A-306)
Part No : A-
Lead Time : 1 Use : 1
306
Lot Size :
Safety Stock : 5000
LFL
Periode 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Gross
6671 5824 4594 706 700 2336 8079 2814 41 2572 1522 3391 1349 115 969 7437 787 1170 9178 5838 751 5800 0 0
Requirement
Schedule
Receipt
Project On
800 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Hand
Net
5871 5824 4594 706 700 2336 8079 2814 41 2572 1522 3391 1349 115 969 7437 787 1170 9178 5838 751 5800 0 0
Requirement
Plan Order
5871 5824 4594 706 700 2336 8079 2814 41 2572 1522 3391 1349 115 969 7437 787 1170 9178 5838 751 5800 0 0
Receipt
Plan Order
5824 4594 706 700 2336 8079 2814 41 2572 1522 3391 1349 115 969 7437 787 1170 9178 5838 751 5800 0 0 0
Release
Sumber: Pengolahan Data Lab. PTI 2, 2023.

Biaya Simpan = Total Inventory x Ongkos Simpan


= Rp 160.000,00
Biaya Pesan = Jumlah berapa kali pesan x Ongkos Pesan
= Rp 4.200.000,00
Biaya Total = Biaya Simpan x Biaya Pesanan
= Rp 4.360.000,00
12. (A-307)
Tabel 3.19. Pengolahan Data Manual (A-307)
Part No : A-
Lead Time : 1 Use : 1
307
Lot Size :
Safety Stock : 5000
LFL
Periode 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Gross
6671 5824 4594 706 700 2336 8079 2814 41 2572 1522 3391 1349 115 969 7437 787 1170 9178 5838 751 5800 0 0
Requirement
Schedule
Receipt
Project On
900 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Hand
Net
5771 5824 4594 706 700 2336 8079 2814 41 2572 1522 3391 1349 115 969 7437 787 1170 9178 5838 751 5800 0 0
Requirement
Plan Order
5771 5824 4594 706 700 2336 8079 2814 41 2572 1522 3391 1349 115 969 7437 787 1170 9178 5838 751 5800 0 0
Receipt
Plan Order
5824 4594 706 700 2336 8079 2814 41 2572 1522 3391 1349 115 969 7437 787 1170 9178 5838 751 5800 0 0 0
Release
Sumber: Pengolahan Data Lab. PTI 2, 2023.

Biaya Simpan = Total Inventory x Ongkos Simpan


= Rp 180.000,00
Biaya Pesan = Jumlah berapa kali pesan x Ongkos Pesan
= Rp 4.200.000,00
Biaya Total = Biaya Simpan x Biaya Pesanan
= Rp 4.380.000,00
13. (A-308)
Tabel 3.20. Pengolahan Data Manual (A-308)
Part No : A-
Lead Time : 1 Use : 1
308
Lot Size :
Safety Stock : 5000
LFL
Periode 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Gross
6671 5824 4594 706 700 2336 8079 2814 41 2572 1522 3391 1349 115 969 7437 787 1170 9178 5838 751 5800 0 0
Requirement
Schedule
Receipt
Project On
810 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Hand
Net
5861 5824 4594 706 700 2336 8079 2814 41 2572 1522 3391 1349 115 969 7437 787 1170 9178 5838 751 5800 0 0
Requirement
Plan Order
5861 5824 4594 706 700 2336 8079 2814 41 2572 1522 3391 1349 115 969 7437 787 1170 9178 5838 751 5800 0 0
Receipt
Plan Order
5824 4594 706 700 2336 8079 2814 41 2572 1522 3391 1349 115 969 7437 787 1170 9178 5838 751 5800 0 0 0
Release
Sumber: Pengolahan Data Lab. PTI 2, 2023.

Biaya Simpan = Total Inventory x Ongkos Simpan


= Rp 162.000,00
Biaya Pesan = Jumlah berapa kali pesan x Ongkos Pesan
= Rp 4.200.000,00
Biaya Total = Biaya Simpan x Biaya Pesanan
= Rp 4.362.000,00
14. (A-309)
Tabel 3.21. Pengolahan Data Manual (A-309)
Part No : A-
Lead Time : 1 Use : 1
309
Lot Size :
Safety Stock : 5000
LFL
Periode 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Gross
6671 5824 4594 706 700 2336 8079 2814 41 2572 1522 3391 1349 115 969 7437 787 1170 9178 5838 751 5800 0 0
Requirement
Schedule
Receipt
Project On
780 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Hand
Net
5891 5824 4594 706 700 2336 8079 2814 41 2572 1522 3391 1349 115 969 7437 787 1170 9178 5838 751 5800 0 0
Requirement
Plan Order
5891 5824 4594 706 700 2336 8079 2814 41 2572 1522 3391 1349 115 969 7437 787 1170 9178 5838 751 5800 0 0
Receipt
Plan Order
5824 4594 706 700 2336 8079 2814 41 2572 1522 3391 1349 115 969 7437 787 1170 9178 5838 751 5800 0 0 0
Release
Sumber: Pengolahan Data Lab. PTI 2, 2023.

Biaya Simpan = Total Inventory x Ongkos Simpan


= Rp 156.000,00
Biaya Pesan = Jumlah berapa kali pesan x Ongkos Pesan
= Rp 4.200.000,00
Biaya Total = Biaya Simpan x Biaya Pesanan
= Rp 4.356.000,00
15. (A-310)
Tabel 3.22. Pengolahan Data Manual (A-310)
Part No : A-
Lead Time : 1 Use : 1
310
Lot Size :
Safety Stock : 5000
LFL
Periode 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Gross
6671 5824 4594 706 700 2336 8079 2814 41 2572 1522 3391 1349 115 969 7437 787 1170 9178 5838 751 5800 0 0
Requirement
Schedule
Receipt
Project On
1250 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Hand
Net
5421 5824 4594 706 700 2336 8079 2814 41 2572 1522 3391 1349 115 969 7437 787 1170 9178 5838 751 5800 0 0
Requirement
Plan Order
5421 5824 4594 706 700 2336 8079 2814 41 2572 1522 3391 1349 115 969 7437 787 1170 9178 5838 751 5800 0 0
Receipt
Plan Order
5824 4594 706 700 2336 8079 2814 41 2572 1522 3391 1349 115 969 7437 787 1170 9178 5838 751 5800 0 0 0
Release
Sumber: Pengolahan Data Lab. PTI 2, 2023.

Biaya Simpan = Total Inventory x Ongkos Simpan


= Rp 250.000,00
Biaya Pesan = Jumlah berapa kali pesan x Ongkos Pesan
= Rp 4.200.000,00
Biaya Total = Biaya Simpan x Biaya Pesanan
= Rp 4.450.000,00
16. (A-311)
Tabel 3.23. Pengolahan Data Manual (A-311)
Part No : A-
Lead Time : 1 Use : 1
311
Lot Size :
Safety Stock : 5000
LFL
Periode 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Gross
6671 5824 4594 706 700 2336 8079 2814 41 2572 1522 3391 1349 115 969 7437 787 1170 9178 5838 751 5800 0 0
Requirement
Schedule
Receipt
Project On
1045 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Hand
Net
5626 5824 4594 706 700 2336 8079 2814 41 2572 1522 3391 1349 115 969 7437 787 1170 9178 5838 751 5800 0 0
Requirement
Plan Order
5626 5824 4594 706 700 2336 8079 2814 41 2572 1522 3391 1349 115 969 7437 787 1170 9178 5838 751 5800 0 0
Receipt
Plan Order
5824 4594 706 700 2336 8079 2814 41 2572 1522 3391 1349 115 969 7437 787 1170 9178 5838 751 5800 0 0 0
Release
Sumber: Pengolahan Data Lab. PTI 2, 2023.

Biaya Simpan = Total Inventory x Ongkos Simpan


= Rp 209.000,00
Biaya Pesan = Jumlah berapa kali pesan x Ongkos Pesan
= Rp 4.200.000,00
Biaya Total = Biaya Simpan x Biaya Pesanan
= Rp 4.409.000,00
17. (A-312)
Tabel 3.24. Pengolahan Data Manual (A-312)
Part No : A-
Lead Time : 1 Use : 1
312
Lot Size :
Safety Stock : 5000
LFL
Periode 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Gross
6671 5824 4594 706 700 2336 8079 2814 41 2572 1522 3391 1349 115 969 7437 787 1170 9178 5838 751 5800 0 0
Requirement
Schedule
Receipt
Project On
750 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Hand
Net
5921 5824 4594 706 700 2336 8079 2814 41 2572 1522 3391 1349 115 969 7437 787 1170 9178 5838 751 5800 0 0
Requirement
Plan Order
5921 5824 4594 706 700 2336 8079 2814 41 2572 1522 3391 1349 115 969 7437 787 1170 9178 5838 751 5800 0 0
Receipt
Plan Order
5824 4594 706 700 2336 8079 2814 41 2572 1522 3391 1349 115 969 7437 787 1170 9178 5838 751 5800 0 0 0
Release
Sumber: Pengolahan Data Lab. PTI 2, 2023.

Biaya Simpan = Total Inventory x Ongkos Simpan


= Rp 150.000,00
Biaya Pesan = Jumlah berapa kali pesan x Ongkos Pesan
= Rp 4.200.000,00
Biaya Total = Biaya Simpan x Biaya Pesanan
= Rp 4.350.000,00
18. (A-313)
Tabel 3.25. Pengolahan Data Manual (A-313)
Part No : A-
Lead Time : 1 Use : 1
313
Lot Size :
Safety Stock : 5000
LFL
Periode 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Gross
6671 5824 4594 706 700 2336 8079 2814 41 2572 1522 3391 1349 115 969 7437 787 1170 9178 5838 751 5800 0 0
Requirement
Schedule
Receipt
Project On
11320 4649 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Hand
Net
1175 4594 706 700 2336 8079 2814 41 2572 1522 3391 1349 115 969 7437 787 1170 9178 5838 751 5800 0 0
Requirement
Plan Order
1175 4594 706 700 2336 8079 2814 41 2572 1522 3391 1349 115 969 7437 787 1170 9178 5838 751 5800 0 0
Receipt
Plan Order
1175 4594 706 700 2336 8079 2814 41 2572 1522 3391 1349 115 969 7437 787 1170 9178 5838 751 5800 0 0 0
Release
Sumber: Pengolahan Data Lab. PTI 2, 2023.

Biaya Simpan = Total Inventory x Ongkos Simpan


= Rp 2.264.000,00
Biaya Pesan = Jumlah berapa kali pesan x Ongkos Pesan
= Rp 4.200.000,00
Biaya Total = Biaya Simpan x Biaya Pesanan
= Rp 6.464.000,00
19. (A-314)
Tabel 3.26. Pengolahan Data Manual (A-314)
Part No : A-
Lead Time : 1 Use : 1
314
Lot Size :
Safety Stock : 5000
LFL
Periode 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Gross
6671 5824 4594 706 700 2336 8079 2814 41 2572 1522 3391 1349 115 969 7437 787 1170 9178 5838 751 5800 0 0
Requirement
Schedule
Receipt
Project On
7340 669 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Hand
Net
5155 4594 706 700 2336 8079 2814 41 2572 1522 3391 1349 115 969 7437 787 1170 9178 5838 751 5800 0 0
Requirement
Plan Order
5155 4594 706 700 2336 8079 2814 41 2572 1522 3391 1349 115 969 7437 787 1170 9178 5838 751 5800 0 0
Receipt
Plan Order
5155 4594 706 700 2336 8079 2814 41 2572 1522 3391 1349 115 969 7437 787 1170 9178 5838 751 5800 0 0 0
Release
Sumber: Pengolahan Data Lab. PTI 2, 2023.

Biaya Simpan = Total Inventory x Ongkos Simpan


= Rp 1.468.000,00
Biaya Pesan = Jumlah berapa kali pesan x Ongkos Pesan
= Rp 4.200.000,00
Biaya Total = Biaya Simpan x Biaya Pesanan
= Rp 5.668.000,00
20. (A-315)
Tabel 3.27. Pengolahan Data Manual (A-315)
Part No : A-
Lead Time : 1 Use : 1
315
Lot Size :
Safety Stock : 5000
LFL
Periode 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Gross
6671 5824 4594 706 700 2336 8079 2814 41 2572 1522 3391 1349 115 969 7437 787 1170 9178 5838 751 5800 0 0
Requirement
Schedule
Receipt
Project On
4440 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Hand
Net
2231 5824 4594 706 700 2336 8079 2814 41 2572 1522 3391 1349 115 969 7437 787 1170 9178 5838 751 5800 0 0
Requirement
Plan Order
2231 5824 4594 706 700 2336 8079 2814 41 2572 1522 3391 1349 115 969 7437 787 1170 9178 5838 751 5800 0 0
Receipt
Plan Order
5824 4594 706 700 2336 8079 2814 41 2572 1522 3391 1349 115 969 7437 787 1170 9178 5838 751 5800 0 0 0
Release
Sumber: Pengolahan Data Lab. PTI 2, 2023.

Biaya Simpan = Total Inventory x Ongkos Simpan


= Rp 888.000,00
Biaya Pesan = Jumlah berapa kali pesan x Ongkos Pesan
= Rp 4.200.000,00
Biaya Total = Biaya Simpan x Biaya Pesanan
= Rp 5.088.000,00
21. (A-316)
Tabel 3.28. Pengolahan Data Manual (A-316)
Part No : A-
Lead Time : 1 Use : 1
316
Lot Size :
Safety Stock : 5000
LFL
Periode 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Gross
6671 5824 4594 706 700 2336 8079 2814 41 2572 1522 3391 1349 115 969 7437 787 1170 9178 5838 751 5800 0 0
Requirement
Schedule
Receipt
Project On
11235 4564 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Hand
Net
1260 4594 706 700 2336 8079 2814 41 2572 1522 3391 1349 115 969 7437 787 1170 9178 5838 751 5800 0 0
Requirement
Plan Order
1260 4594 706 700 2336 8079 2814 41 2572 1522 3391 1349 115 969 7437 787 1170 9178 5838 751 5800 0 0
Receipt
Plan Order
1260 4594 706 700 2336 8079 2814 41 2572 1522 3391 1349 115 969 7437 787 1170 9178 5838 751 5800 0 0 0
Release
Sumber: Pengolahan Data Lab. PTI 2, 2023.

Biaya Simpan = Total Inventory x Ongkos Simpan


= Rp 2.247.000,00
Biaya Pesan = Jumlah berapa kali pesan x Ongkos Pesan
= Rp 4.200.000,00
Biaya Total = Biaya Simpan x Biaya Pesanan
= Rp 6.447.000,00
3.2.1.3. Perbandingan Biaya Total
Tabel 3.29. Perbandingan Biaya Total
Biaya Total
Komponen Metode
Manual Software
RS-101 LFL Rp 5.000.000,00 Rp.1.041.666.88
A-201 LFL Rp 5.400.000,00 Rp.1.041.666.88
A-202 LFL Rp 5.400.000,00 Rp.1.041.666.88
A-203 LFL Rp 4.700.000,00 Rp.1.041.666.88
A-204 LFL Rp 4.640.000,00 Rp.1.041.666.88
A-301 LFL Rp 4.488.000,00 Rp.1.041.666.88
A-302 LFL Rp 4.416.000,00 Rp.1.041.666.88
A-303 LFL Rp 4.410.000,00 Rp.1.041.666.88
A-304 LFL Rp 4.431.000,00 Rp.1.041.666.88
A-305 LFL Rp 4.392.000,00 Rp.1.041.666.88
A-306 LFL Rp 4.360.000,00 Rp.1.041.666.88
A-307 LFL Rp 4.380.000,00 Rp.1.041.666.88
A-308 LFL Rp 4.362.000,00 Rp.1.041.666.88
A-309 LFL Rp 4.356.000,00 Rp.1.041.666.88
A-310 LFL Rp 4.450.000,00 Rp.1.041.666.88
A-311 LFL Rp 4.409.000,00 Rp.1.041.666.88
A-312 LFL Rp 4.350.000,00 Rp.1.041.666.88
A-313 LFL Rp 6.464.000,00 Rp.1.041.666.88
A-314 LFL Rp 5.668.000,00 Rp.1.041.666.88
A-315 LFL Rp 5.088.000,00 Rp.1.041.666.88
A-316 LFL Rp 6.447.000,00 Rp.1.041.666.88
Sumber: Pengolahan Data Lab. PTI 2, 2023.
3.2.2. Pengolahan Capacity Requirement Planning (CRP)
3.2.2.1. Rekapitulasi Rencana Pemesanan
Tabel 3.30. Rekapitulasi Rencana Pemesanan

Nama Exploding Data Terpilih


Biaya
Komponen
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
RS-101 Rp.1.041.666.88 742 3495 6671 5824 4594 706 700 2336 8079 2814 41 2572 1522 3391 1349 115 969 7437 787 1170 9178 5838 751 5800

A-201 Rp.1.041.666.88 3495 6671 5824 4594 706 700 233 8079 2814 41 2572 1522 3391 1349 115 969 743 787 1170 9178 5838 751 5800 0

A-202 Rp.1.041.666.88 3495 6671 5824 4594 706 700 233 8079 2814 41 2572 1522 3391 1349 115 969 743 787 1170 9178 5838 751 5800 0

A-203 Rp.1.041.666.88 3495 6671 5824 4594 706 700 233 8079 2814 41 2572 1522 3391 1349 115 969 743 787 1170 9178 5838 751 5800 0

A-204 Rp.1.041.666.88 3495 6671 5824 4594 706 700 233 8079 2814 41 2572 1522 3391 1349 115 969 743 787 1170 9178 5838 751 5800 0
Sumber: Pengolahan Data Lab. PTI 2, 2023.
3.2.2.2. Routing File
Tabel 3.31. Routing File
Stasiun Set Up Elemen Run Total
Item
Kerja Time Pekerjaan Time Time
Rak 101 25 1 12,39 37,39
Rak 101 25 3 10,75 35,75
I
Rak 101 25 4 9,77 34,77
Rak 101 25 7 9,77 34,77
A 201 30 2 8,55 38,55
A 201 30 5 8,55 38,55
II A 201 30 6 8,46 38,46
A 201 30 8 6,82 36,82
A 201 30 9 6,22 36,22
A 202 27 10 6,22 33,22
A 202 27 11 6,34 33,34
III A 202 27 12 6,11 33,11
A 202 27 13 5,87 32,87
A 202 27 14 5,93 32,93
A 203 25 15 5,58 30,58
A 203 25 16 5,56 30,56
IV
A 203 25 17 4,84 29,84
A 203 25 18 4,93 29,93
A 204 20 19 4,36 24,36
A 204 20 20 4,49 24,49
V A 204 20 21 4,01 24,01
A 204 20 22 3,59 23,59
A 204 20 23 2,69 22,69
Sumber: Pengumpulan Data Lab. PTI 2, 2023.
3.2.2.3. Work Center Master File
Tabel 3.32. Work Center Master File

Hari Kerja
WC
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
I 26 29 29 30 28 27 29 28 28 29 25 30 26 29 29 30 28 27 29 28 28 29 25 30

II 26 29 29 30 28 27 29 28 28 29 25 30 26 29 29 30 28 27 29 28 28 29 25 30

III 26 29 29 30 28 27 29 28 28 29 25 30 26 29 29 30 28 27 29 28 28 29 25 30

IV 26 29 29 30 28 27 29 28 28 29 25 30 26 29 29 30 28 27 29 28 28 29 25 30

V 26 29 29 30 28 27 29 28 28 29 25 30 26 29 29 30 28 27 29 28 28 29 25 30
Sumber: Pengolahan Data Lab. PTI 2, 2023.
3.2.2.4. Work Center Master Center
Tabel 3.33. Work Center Master Center

WC Periode

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
12130 1353 1353 1399 1306 1259 1353 1306 1306 1353 1166 1399 1213 1353 1353
I 1399680 1306368 1259712 1353024 1306368 1306368 1353024 1166400 1399680
56 024 024 680 368 712 024 368 368 024 400 680 056 024 024
13029 1453 1453 1503 1403 1353 1453 1403 1403 1453 1252 1503 1302 1453 1453
II 1503360 1403136 1353024 1453248 1403136 1403136 1453248 1252800 1503360
12 248 248 360 136 024 248 136 136 248 800 360 912 248 248
13777 1536 1536 1589 1483 1430 1536 1483 1483 1536 1324 1589 1377 1536 1536
III 1589760 1483776 1430784 1536768 1483776 1483776 1536768 1324800 1589760
92 768 768 760 776 784 768 776 776 768 800 760 792 768 768
98841 1102 1102 1140 1064 1026 1102 1064 1064 1102 9504 1140 9884 1102 1102
IV 1140480 1064448 1026432 1102464 1064448 1064448 1102464 950400 1140480
6 464 464 480 448 432 464 448 448 464 00 480 16 464 464
14676 1636 1636 1693 1580 1524 1636 1580 1580 1636 1411 1693 1467 1636 1636
V 1693440 1580544 1524096 1636992 1580544 1580544 1636992 1411200 1693440
48 992 992 440 544 096 992 544 544 992 200 440 648 992 992
Sumber: Pengolahan Data Lab. PTI 2, 2023
3.2.2.5. Run Time
Tabel 3.34. Run Time

Exploding Metode Terpilih


SK Item

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

I RAK 17177 80909 154433 134825 106351 16343 16205 54078 187028 65144 949 59541 35234 78501 31229 2662 22432 172166 18219 27085 212470 135149 17385 134270

II A 201 120123 229282 200170 157895 24265 24059 8008 277675 96717 1409 88399 52311 116548 46365 3952 33304 25536 27049 40212 315447 200652 25811 199346 0

III A 202 142071 271176 236745 186746 28698 28455 9471 328411 114389 1666 104551 61869 137844 54836 4674 39389 30202 31991 47560 373085 237314 30528 235770 0

IV A 203 106527 203332 177515 140025 21518 21336 7101 246247 85770 1249 78394 46390 103357 41117 3505 29535 22646 23987 35661 279745 177942 22890 176784 0

V A 204 80909 154433 134825 106351 16343 16205 5393 187028 65144 949 59541 35234 78501 31229 2662 22432 17200 18219 27085 212470 135149 17385 134270 0

Sumber: Pengolahan Data Lab. PTI 2, 2023


3.2.2.6. Capacity Requerement of Planned Release
Tabel 3.35. Capacity Requerement of Planned Release

WC Periode

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
12130 1353 1353 1399 1306 1259 1353 1306 1306 1353 1166 1399 1213 1353 1353
I 1399680 1306368 1259712 1353024 1306368 1306368 1353024 1166400 1399680
56 024 024 680 368 712 024 368 368 024 400 680 056 024 024
13029 1453 1453 1503 1403 1353 1453 1403 1403 1453 1252 1503 1302 1453 1453
II 1503360 1403136 1353024 1453248 1403136 1403136 1453248 1252800 1503360
12 248 248 360 136 024 248 136 136 248 800 360 912 248 248
13777 1536 1536 1589 1483 1430 1536 1483 1483 1536 1324 1589 1377 1536 1536
III 1589760 1483776 1430784 1536768 1483776 1483776 1536768 1324800 1589760
92 768 768 760 776 784 768 776 776 768 800 760 792 768 768
98841 1102 1102 1140 1064 1026 1102 1064 1064 1102 9504 1140 9884 1102 1102
IV 1140480 1064448 1026432 1102464 1064448 1064448 1102464 950400 1140480
6 464 464 480 448 432 464 448 448 464 00 480 16 464 464
14676 1636 1636 1693 1580 1524 1636 1580 1580 1636 1411 1693 1467 1636 1636
V 1693440 1580544 1524096 1636992 1580544 1580544 1636992 1411200 1693440
48 992 992 440 544 096 992 544 544 992 200 440 648 992 992
Sumber: Pengolahan Data Lab. PTI 2, 2023
3.2.2.7. Capacity Requerement By Release Order
Tabel 3.36. Capacity Requerement By Release Order

Exploding Metode Terpilih


SK Item

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

I RAK 18550 87375 166775 145600 114850 17650 17500 58400 201975 70350 1025 64300 38050 84775 33725 2875 24225 185925 19675 29250 229450 145950 18775 145000

II A 201 104850 200130 174720 137820 21180 21000 6990 242370 84420 1230 77160 45660 101730 40470 3450 29070 22290 23610 35100 275340 175140 22530 174000 0

III A 202 94365 180117 157248 124038 19062 18900 6291 218133 75978 1107 69444 41094 91557 36423 3105 26163 20061 21249 31590 247806 157626 20277 156600 0

IV A 203 87375 166775 145600 114850 17650 17500 5825 201975 70350 1025 64300 38050 84775 33725 2875 24225 18575 19675 29250 229450 145950 18775 145000 0

V A 204 69900 133420 116480 91880 14120 14000 4660 161580 56280 820 51440 30440 67820 26980 2300 19380 14860 15740 23400 183560 116760 15020 116000 0

Sumber: Pengolahan Data Lab. PTI 2, 2023


3.2.2.8. Capacity Requeement By Release Order
Tabel 3.37. Capacity Requerement By Release Order

Exploding Metode Terpilih


SK Item

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

I RAK 18550 87375 166775 145600 114850 17650 17500 58400 201975 70350 1025 64300 38050 84775 33725 2875 24225 185925 19675 29250 229450 145950 18775 145000

II A 201 104850 200130 174720 137820 21180 21000 6990 242370 84420 1230 77160 45660 101730 40470 3450 29070 22290 23610 35100 275340 175140 22530 174000 0

III A 202 94365 180117 157248 124038 19062 18900 6291 218133 75978 1107 69444 41094 91557 36423 3105 26163 20061 21249 31590 247806 157626 20277 156600 0

IV A 203 87375 166775 145600 114850 17650 17500 5825 201975 70350 1025 64300 38050 84775 33725 2875 24225 18575 19675 29250 229450 145950 18775 145000 0

V A 204 69900 133420 116480 91880 14120 14000 4660 161580 56280 820 51440 30440 67820 26980 2300 19380 14860 15740 23400 183560 116760 15020 116000 0

Sumber: Pengolahan Data Lab. PTI 2, 2023


3.2.2.9. Grafik Load Periode

SK I
400000 1600000
1400000
200000
1200000
0 1000000
1 3 5 7 9 11 13 15 17 19 21 23

RO AC

Gambar 3.1. Grafik Load Periode Stasiun Kerja I

SK II
300000 1600000
1500000
200000 1400000
100000 1300000
1200000
0 1100000
1 3 5 7 9 11 13 15 17 19 21 23

RO AC

Gambar 3.2. Grafik Load Periode Stasiun Kerja II

SK III
300000 1700000
1600000
200000 1500000
1400000
100000 1300000
1200000
0 1100000
1 4 7 10 13 16 19 22

RO AC

Gambar 3.3. Grafik Load Periode Stasiun Kerja III


SK IV
250000 1200000
200000 1100000
150000
1000000
100000
50000 900000
0 800000
1 3 5 7 9 11131517192123

RO AC

Gambar 3.4. Grafik Load Periode Stasiun Kerja IV

SK V
200000 1800000
1700000
150000
1600000
100000 1500000
1400000
50000
1300000
0 1200000
1 3 5 7 9 11131517192123

RO AC

Gambar 3.5. Grafik Load Periode Stasiun Kerja V


BAB IV
ANALISA DATA

4.1. Analisa MRP


4.1.1. Data BOM
Bill of material merupakan suatu rangkaian struktur semua komponen
yang digunakan untuk memproduksi barang atau produk. Dari bill of material akan
terlihat tingkatan atau level dari masing-masing part. Untuk BOM yang merupakan
tingkatan paling atas adalah RAK-101 disebut sebagai level 0, untuk A-201 sampai
A-204 sebagai level 1.
4.1.2. Data Inventory Status Record
Pada data ISR dapat juga menunjukkan ongkos pesan dan ongkos simpan
yang harus dikeluarkan oleh setiap komponen. Data ISR juga memberikan
informasi tentang banyaknya persediaan pada masing-masing komponen dan
informasi tersebut juga bisa digunakan pada saat melakukan penjadwalan produk
yang kita inginkan.
Ongkos Simpan = Rp 200 unit/bulan
Ongkos Pesan = Rp 200,000 Pesanan
4.1.3. Pengolahan Data Dengan Software
Pengolahan data dengan menggunakan software dilakukan terhadap
semua komponen dengan menggunakan empat metoda yaitu metoda LFL, EOQ,
FOQ dan metoda POQ. Metoda terpilih diambil berdasarkan ongkos terkecil pada
setiap metoda. Pada pratikum kali ini metoda terpilihnya yaitu metoda LFL.
4.1.4. Pengolahan Data Manual
Pengolahan data secara manual dilakukan berdasarkan metoda terpilih
yang kita dapatkan pada pengolahan data dengan software, yaitu dengan metoda
LFL.
4.1.5. Perbandingan Antara Software Dengan Manual
Pada pengolahan data manual yang menggunakan metoda LFL dan
Metoda POQ didapat biaya totalnya ada yang sama dan ada juga yang berbeda.
Perbedaan ini terjadi karena pembulatan angka pada jumlah periode pemesanan.
4.2. Analisa CRP
4.2.1. Analisa Bill Of Material Sistem Baru
Bill of material merupakan suatu rangkaian struktur semua komponen
yang digunakan untuk memproduksi barang atau produk. Dari bill of material akan
terlihat tingkatan atau level dari masing-masing part. Untuk BOM sistem baru yang
merupakan tingkatan paling atas adalah RAK-101 disebut sebagai level 0, untuk A-
201 sampai A-204 sebagai level 1.
4.2.2. Analisa Routing File
Pada routing file dapat diketahui waktu set-up lot terbesar terdapat pada
part A-201 yaitu run time bernilai 120123.
4.2.3.1. Analisa Work Centre Master File
Pada work center master file dapat diketahui tentang hari kerja, utilitas,
efisiensi yang akan mempengaruhi kapasitas yang tersedia (Available Capacity),
dengan nilai efisiensi untuk masing-masing stasiun adalah SK I (81%), SK II
(87%), SK III (92%) dan SK IV (98%) dengan nilai utilitasnya 100%.
4.2.3. Analisa Runtime Matrik
Pada run time matrik ini diketahui run time untuk masing-masing part,
nilai run time per perioda dijumlahkan berdasarkan stasiun kerja.
4.2.4. Analisa Capacity Requirement of Planned Release
Pada capacity requirement of planned release ini dapat diketahui kapasitas
yang dibutuhkan untuk masing-masing stasiun kerja pada tiap periode.
4.2.5. Analisa Capacity Requirement by Release Order
Dari capacity requirement by release order dapat dilihat total waktu dari
masing-masing item atau part dengan nilai total time calculation yang diperoleh
dari penjumlahan nilai run time/periode dengan set-up untuk masing-masing item
atau part.
4.2.6. Analisa Rekapitulasi Release Order Capacity Requirement Planning
Dapat diketahui kapasitas yang dibutuhkan pada masing-masing stasiun
yang diperoleh dari penjumlahan capacity requirement by release order untuk
masing-masing stasiun kerja pada seluruh item/part pada stasiun tersebut.
4.2.7. Analisa Grafik Load Capacity
Dari load profile dapat dilihat hubungan antara kapasitas yang tersedia
dengan kapasitas yang dibutuhkan, dari hasil yang telah didapatkan dapat dilihat
bahwa nilai AC > LC, hal ini berarti kapasitas yang dibutuhkan dapat dipenuhi oleh
nilai kapasitas yang disediakan.
Perencanaan kapasitas merupakan langkah penting untuk mencapai target
produksi. Jika terjadi kekurangan kapasitas, hasilnya berupa kekurangan
pencapaian target produksi, pengiriman produk ke konsumen terlambat dan
kehilangan kepercayaan sistem manajemen. Sebaliknya jika kapasitas berlebihan
mengakibatkan utilitas sumber rendah, operasi pabrik tidak efisien, biaya tinggi dan
berkurangnya margin keuntungan.