tahun ke Tahun (x) Indeks (y) x^2 y^2 x*y

1 1995 381.1 1 145237.2 381.1 Grafik Inde


2 1996 381.7 4 145694.9 763.4 700
3 1997 386.5 9 149382.3 1159.5 600
4 1998 389.5 16 151710.3 1558 500 f(x) = 20.8157575757576
400 R² = 0.888422291745911
5 1999 390.6 25 152568.4 1953

indeks
300
6 2000 394.1 36 155314.8 2364.6 200
7 2001 394.3 49 155472.5 2760.1 100
8 2002 395.6 64 156499.4 3164.8 0
2000 2002 2004 2006
9 2003 402 81 161604 3618
Tahun
10 2004 444.2 100 197313.6 4442
11 2005 468.2 121 219211.2 5150.2
12 2006 499.6 144 249600.2 5995.2
13 2007 525.4 169 276045.2 6830.2
14 2008 575.4 196 331085.2 8055.6
15 2009 521.9 225 272379.6 7828.5
16 2010 550.8 256 303380.6 8812.8
17 2011 585.7 289 343044.5 9956.9
18 2012 584.6 324 341757.2 10522.8
19 2013 567.3 361 321829.3 10778.7
20 2014 576.1 400 331891.2 11522
21 2015 556.8 441 310026.2 11692.8
total 231 42105 9971.4 3311 4871048 119310.2

y= mx + c
m= 8.868059
c= 337.3314

y= 461.4843 indeks ta hun 2018


559.0329 indeks ta hun 2025

mencari harga tangki tahun 2025


harga tangki pada t 30.847 US $
indeks ta hun 2018 461.484
indeks tahun 2025 559.033
harga tangki pada t 37.36747 US $

Nama
Jumlah harga alat US $
alat indeks total
tahun 2018tahun 2025 2018 2025 harga
Reaktor 1 461.484 559.033 26.792 32.45532 32.45532
Compress 3 461.484 559.033 8.992 10.89274 32.67822
Seperator 1 461.484 559.033 24.221 29.34086 29.34086
MD 1 461.484 559.033 17.48 21.17494 21.17494
Heater 3 461.484 559.033 16.566 20.06774 60.20322
Pompa 30 461.484 559.033 2.513 3.044201 91.32602
COOLER 4 461.484 559.033 10.511 12.73283 50.93131
Condense 2 461.484 559.033 12.796 15.50083 31.00167
MIXER 1 461.484 559.033 27.991 33.90777 33.90777
Tangki 19
produk 461.484 559.033 30.847 37.36747 709.982
Reboiler 1 461.484 559.033 2.576.565 30.619 977.352
Acc 1 461.484 559.033 3.999
EV 1 461.484 559.033 228
Bak 5 461.484 559.033 6.284
Clarifier 1 461.484 559.033 6.626
Generator 1 461.484 559.033 48.432
B.C.T 1 34.618

nilai tukar 14000 per US $


Harga alat 0

Fixed Capital Investment

Purchased Equipment cost (PEC)


harga alat (FOB) US $ 0
biaya pengangkutan US $ 0
asuransi pengangkutaUS $ 0
provisi bank (0,2% FOUS $ 0
EMKL (diambil 10% F US $ 0
transportasi dari pel US $ 0
bea masuk (20% FOB)US $ 0
total PEC US $ 0

Instalasi
Biaya instalasi sebesar 25-55% dari PEC (Aries&Newton, hal 77),
diambil sebesar 30% PEC yang terdiri dari material 10% dan buruh 20%.
material = 0
labor = 0
pemasangan alat menggunakan 5% tenaga asing dan 95% tenaga Indonesia.
Tenaga asing: tenaga indonesia = 1:3
1 man hour 15
1 man hour 150000
jumlah man 0
ongkos bur 0
ongkos bur 0
ongkos bur #DIV/0!
total biaya #DIV/0!
Grafik Indeks

f(x) = 20.8157575757576 x − 41268.2618181818


R² = 0.888422291745911

00 2002 2004 2006 2008 2010 2012


Tahun