DAFTAR HARGA SATUAN PEKERJAAN

TAHUN ANGGARAN 2023


(KONTRAKTUAL)

KODE HARGA SATUAN (Rp.) JUMLAH


No URAIAN PEKERJAAN
ANALISA UPAH BAHAN ALAT (Rp.)
1 2 3 4 5 6 7 = (4+5+6)

A PEKERJAAN PERSIAPAN A
1 1 M' PENGUKURAN DAN PEMASANGAN BOUWPLANK A.1 22,726.00 57,768.98 0.00 80,494.00
2 1 M' PEMASANGAN DAN PENGUKURAN BOUWPLANK (ALAT UKUR) A.2 39,611.00 57,768.98 27,500.00 124,879.00
3 1 M2 PEMBUATAN KANTOR SEMENTARA (DIREKSI KEET) LANTAI PLESTERAN A.3 573,100.00 850,223.55 0.00 1,423,323.00
4 1 M' PEMBUATAN PAGAR SEMENTARA DARI SENG GELOMBANG TINGGI 2 METER A.4 71,060.00 579,448.49 0.00 650,508.00
5 1 M2 PEMBUATAN PAPAN NAMA PROYEK DIGITAL PRINTING A.5 60,500.00 284,247.92 0.00 344,747.00
6 1 M2 MEMBERSIHKAN LAPANGAN DAN PERATAAN A.6 15,730.00 0.00 0.00 15,730.00
7 1 M2 PEMBUATAN STEGER/PERANCA DARI BAMBU A.7 360,580.00 29,218.75 0.00 389,798.00
8 1 UNIT PEKERJAAN PERANCAH DARI SCAFFOLDING (SEWA per BULAN) A.8 111,430.00 68,750.00 0.00 180,180.00
9 1 BUAH PEMBUATAN KOTAK ADUKAN UKURAN 40 X 50 X 25 CM A.9 39,996.00 191,835.82 0.00 231,831.00
10 1 TITIK CERUCUK BAMBU Ø 8 CM - 10 CM, Uk. P. 1 M - 1,5 M A.10 1,268.08 5,610.00 0.00 6,878.00
11 1 M2 PASANGAN STOOT WERK A.11 64,268.60 225,028.32 0.00 289,296.00
12 1 M3 BONGKARAN BETON BERTULANG A.12 1,252,497.40 0.00 0.00 1,252,497.00
13 1 M3 BONGKARAN DINDING TEMBOK BATA A.13 626,248.70 0.00 0.00 626,248.00

B PEKERJAAN TANAH B
1 1 M3 GALIAN TANAH BIASA SEDALAM 1 METER B.1 68,695.00 0.00 0.00 68,695.00
2 1 M3 GALIAN TANAH BIASA SEDALAM 2 METER B.2 84,546.00 0.00 0.00 84,546.00
3 1 M3 GALIAN TANAH BIASA SEDALAM 3 METER B.3 74,149.90 0.00 0.00 74,149.00
4 1 M3 GALIAN TANAH KERAS SEDALAM 1 METER B.4 91,405.60 0.00 0.00 91,405.00
5 1 M3 GALIAN TANAH CADAS SEDALAM 1 METER B.5 138,798.00 0.00 0.00 138,798.00
6 1 M3 GALIAN TANAH LUMPUR SEDALAM 1 METER B.6 110,616.00 0.00 0.00 110,616.00
7 1 M2 PEKERJAAN STRIPING TANAH TEBING SETINGGI 1 METER B.7 5,049.00 0.00 0.00 5,049.00
8 1 M3 PEMBUANGAN TANAH SEJAUH 30 METER B.8 30,085.00 0.00 0.00 30,085.00
9 1 M3 URUGAN KEMBALI GALIAN TANAH B.9 50,490.00 0.00 0.00 50,490.00
10 1 M3 PEMADATAN TANAH B.10 4,509.34 0.00 6,132.50 10,641.00
11 1 M3 URUGAN TANAH LOKAL B.11 27,478.00 90,882.00 0.00 118,360.00
12 1 M3 URUGAN PASIR B.12 27,478.00 256,938.00 0.00 284,416.00
13 1 M3 URUGAN TANAH MERAH B.13 27,478.00 264,792.00 0.00 292,270.00
14 1 M3 URUGAN SIRTU B.14 25,245.00 313,038.00 0.00 338,283.00
15 1 M3 URUGAN LIMESTONE B.15 25,245.00 241,230.00 0.00 266,475.00
16 1 M2 PEMBUATAN JALAN SEMENTARA B.16 87,604.00 89,189.65 0.00 176,793.00

C PEKERJAAN PONDASI C
1 1 M3 PASANG PONDASI BATU KALI 1 Pc : 2 Ps C.1 235,125.00 875,548.96 0.00 1,110,673.00
2 1 M3 PASANG PONDASI BATU KALI 1 Pc : 3 Ps C.2 235,125.00 801,089.30 0.00 1,036,214.00
3 1 M3 PASANG PONDASI BATU KALI 1 Pc : 4 Ps C.3 235,125.00 756,471.10 0.00 991,596.00
4 1 M3 PASANG PONDASI BATU KALI 1 Pc : 5 Ps C.4 235,125.00 725,515.12 0.00 960,640.00
5 #N/A C.5 #N/A #N/A #N/A #N/A
6 #N/A C.6 #N/A #N/A #N/A #N/A
7 #N/A C.7 #N/A #N/A #N/A #N/A
8 #N/A C.8 #N/A #N/A #N/A #N/A
9 #N/A C.9 #N/A #N/A #N/A #N/A
10 #N/A C.10 #N/A #N/A #N/A #N/A
11 #N/A C.11 #N/A #N/A #N/A #N/A
12 #N/A C.12 #N/A #N/A #N/A #N/A

D PEKERJAAN DINDING PASANGAN D


1 #N/A D.1 #N/A #N/A #N/A #N/A
2 #N/A D.2 #N/A #N/A #N/A #N/A
3 #N/A D.3 #N/A #N/A #N/A #N/A
4 #N/A D.4 #N/A #N/A #N/A #N/A
5 #N/A D.5 #N/A #N/A #N/A #N/A
6 #N/A D.6 #N/A #N/A #N/A #N/A
7 #N/A D.7 #N/A #N/A #N/A #N/A
8 #N/A D.8 #N/A #N/A #N/A #N/A

DHSP ___ Hal. 1 of 61


KODE HARGA SATUAN (Rp.) JUMLAH
No URAIAN PEKERJAAN
ANALISA UPAH BAHAN ALAT (Rp.)
1 2 3 4 5 6 7 = (4+5+6)
9 #N/A D.9 #N/A #N/A #N/A #N/A

E PEKERJAAN PLESTERAN E
1 #N/A E.1 #N/A #N/A #N/A #N/A
2 #N/A E.2 #N/A #N/A #N/A #N/A
3 #N/A E.3 #N/A #N/A #N/A #N/A
4 #N/A E.4 #N/A #N/A #N/A #N/A
5 #N/A E.5 #N/A #N/A #N/A #N/A
6 #N/A E.6 #N/A #N/A #N/A #N/A
7 #N/A E.7 #N/A #N/A #N/A #N/A
8 #N/A E.8 #N/A #N/A #N/A #N/A
9 #N/A E.9 #N/A #N/A #N/A #N/A

F PEKERJAAN KAYU DAN ALUMINIUM F


1 #N/A F.1 #N/A #N/A #N/A #N/A
2 #N/A F.2 #N/A #N/A #N/A #N/A
3 #N/A F.3 #N/A #N/A #N/A #N/A
4 #N/A F.4 #N/A #N/A #N/A #N/A
5 #N/A F.5 #N/A #N/A #N/A #N/A
6 #N/A F.6 #N/A #N/A #N/A #N/A
7 #N/A F.7 #N/A #N/A #N/A #N/A
8 #N/A F.8 #N/A #N/A #N/A #N/A
9 #N/A F.9 #N/A #N/A #N/A #N/A
10 #N/A F.10 #N/A #N/A #N/A #N/A
11 #N/A F.11 #N/A #N/A #N/A #N/A
12 #N/A F.12 #N/A #N/A #N/A #N/A
13 #N/A F.13 #N/A #N/A #N/A #N/A
14 #N/A F.14 #N/A #N/A #N/A #N/A
15 #N/A F.15 #N/A #N/A #N/A #N/A
16 #N/A F.16 #N/A #N/A #N/A #N/A
17 #N/A F.17 #N/A #N/A #N/A #N/A
18 #N/A F.18 #N/A #N/A #N/A #N/A
19 #N/A F.19 #N/A #N/A #N/A #N/A
20 #N/A F.20 #N/A #N/A #N/A #N/A
21 #N/A F.21 #N/A #N/A #N/A #N/A
22 #N/A F.22 #N/A #N/A #N/A #N/A
23 #N/A F.23 #N/A #N/A #N/A #N/A
24 #N/A F.24 #N/A #N/A #N/A #N/A
25 #N/A F.25 #N/A #N/A #N/A #N/A
26 #N/A F.26 #N/A #N/A #N/A #N/A

G PEKERJAAN BETON G
1 1 M3 MEMBUAT BETON TUMBUK, 1Pc : 3Ps : 5Kr G.1 186,054.00 755,255.60 0.00 941,309.00
2 1 M3 COR BETON SITE MIX K. 175 G.2 194,568.00 939,422.55 4,125.00 1,138,115.00
3 1 M3 COR BETON SITE MIX K. 225 G.3 194,568.00 991,941.50 3,850.00 1,190,359.00
4 1 M3 COR BETON K. 175 READY MIX G.4 259,303.00 1,060,290.00 2,113.65 1,321,706.00
5 1 M3 COR BETON K. 225 READY MIX G.5 259,303.00 1,052,810.00 2,113.65 1,314,226.00
6 1 M3 COR BETON K. 250 READY MIX G.6 259,303.00 1,093,015.00 2,113.65 1,354,431.00
7 1 M3 COR BETON K. 300 READY MIX G.7 259,303.00 1,114,520.00 2,113.65 1,375,936.00
8 1 M3 COR BETON K. 350 READY MIX G.8 259,303.00 1,191,190.00 2,113.65 1,452,606.00
9 1 M3 COR BETON K. 400 READY MIX G.9 259,303.00 1,235,135.00 2,113.65 1,496,551.00
10 1 M3 COR BETON K. 450 READY MIX G.10 259,303.00 1,300,585.00 2,113.65 1,562,001.00
11 1 M3 COR BETON K. 500 READY MIX G.11 259,303.00 1,392,215.00 2,113.65 1,653,631.00
12 1 M2 MEMASANG FLOOR HARDENER G.12 26,347.20 40,205.00 22,000.00 88,552.00
13 1 M3 COR BETON 1 PC : 2 PS : 3 SCREENING G.13 194,568.00 1,001,787.05 3,850.00 1,200,205.00
14 1 M2 BEKISTING MULTIPLEX 9 MM G.14 64,658.00 149,314.83 0.00 213,972.00
15 1 M2 BEKISTING MULTIPLEX 12 MM G.15 64,658.00 168,781.53 0.00 233,439.00
16 1 M2 BEKISTING UNTUK PONDASI G.16 83,512.00 198,687.50 0.00 282,199.00
17 1 M2 BEKISTING UNTUK SLOOF G.17 83,512.00 222,530.00 0.00 306,042.00
18 1 M2 BEKISTING MULTIPLEX 9 MM UNTUK KOLOM G.18 105,996.00 523,010.95 0.00 629,006.00
19 1 M2 BEKISTING MULTIPLEX 9 MM UNTUK BALOK G.19 105,996.00 621,703.94 0.00 727,699.00
20 1 M2 BEKISTING MULTIPLEX 9 MM UNTUK LANTAI G.20 105,996.00 381,606.23 0.00 487,602.00

DHSP ___ Hal. 2 of 61


KODE HARGA SATUAN (Rp.) JUMLAH
No URAIAN PEKERJAAN
ANALISA UPAH BAHAN ALAT (Rp.)
1 2 3 4 5 6 7 = (4+5+6)
21 1 M2 BEKISTING MULTIPLEX 9 MM UNTUK DINDING G.21 105,996.00 608,803.80 0.00 714,799.00
22 1 M2 BEKISTING MULTIPLEX 9 MM UNTUK TANGGA G.22 105,996.00 767,242.30 0.00 873,238.00
23 1 M2 PASANG BEKISTING PAPAN G.23 64,658.00 171,579.98 0.00 236,237.00
24 1 KG PEMBESIAN DENGAN BESI POLOS G.24 1,543.96 15,231.15 0.00 16,775.00
25 1 KG PEMBESIAN DENGAN BESI ULIR G.25 1,543.96 15,722.03 0.00 17,265.00
26 1 M2 WIREMESH M-5 G.26 6,468.00 44,226.60 220.00 50,914.00
27 1 M2 WIREMESH M-6 G.27 6,468.00 52,369.35 220.00 59,057.00
28 1 M2 WIREMESH M-8 G.28 6,468.00 75,931.35 220.00 82,619.00
29 1 M2 WIREMESH M-10 G.29 6,468.00 130,909.35 220.00 137,597.00
30 1 M' PASANG PVC WATERSTOP LEBAR 150 G.30 9,405.00 88,001.10 0.00 97,406.00
31 1 M' PASANG PVC WATERSTOP LEBAR 200 G.31 9,405.00 114,681.60 0.00 124,086.00
32 1 M2 BEKISTING LANTAI FLOORDECK / BONDECK TIPE PLAT (JAP ≤ 0,6 M) G.32 16,764.00 269,116.94 0.00 285,880.00
33 1 M2 BEKISTING LANTAI FLOORDECK / BONDECK TIPE PLAT (JAP ≤ 0,8 M) G.33 13,411.20 271,840.78 0.00 285,251.00

PEMBESIAN MUTU BETON


1 PEMBESIAN SLOOF 15/20 GB.1 257,331.81 2,620,389.91 2,877,721.72
2 PEMBESIAN SLOOF 15/25 GB.2 252,391.14 2,570,079.43 2,822,470.57
3 PEMBESIAN SLOOF 20/25 GB.3 216,771.98 2,207,372.31 2,424,144.29
4 PEMBESIAN SLOOF 20/30 GB.4 192,995.00 1,965,253.13 2,158,248.13
5 PEMBESIAN KOLOM PRAKTIS 12/12 GB.5 363,479.06 3,701,279.13 4,064,758.19
6 PEMBESIAN KOLOM 20/20 GB.6 308,792.00 3,144,405.00 3,453,197.00
7 PEMBESIAN KOLOM 20/25 GB.7 279,147.97 2,842,542.12 3,121,690.09
8 PEMBESIAN KOLOM 25/25 GB.8 297,428.45 3,028,690.90 3,326,119.35
9 PEMBESIAN KOLOM 25/30 GB.9 309,610.30 3,152,737.67 3,462,347.97
10 PEMBESIAN KOLOM 30/30 GB.10 266,240.46 2,711,105.99 2,977,346.45
11 PEMBESIAN KOLOM 30/35 GB.11 277,032.74 2,821,002.95 3,098,035.69
12 PEMBESIAN KOLOM 40/40 GB.12 278,684.78 2,837,825.51 3,116,510.29
13 PEMBESIAN RINGBALK 15/20 GB.13 257,331.81 2,620,389.91 2,877,721.72
14 PEMBESIAN BALOK 15/25 GB.14 252,391.14 2,570,079.43 2,822,470.57
15 PEMBESIAN BALOK 15/30 GB.15 310,166.12 3,158,397.60 3,468,563.73
16 PEMBESIAN BALOK LATEI 10/10 GB.16 494,067.20 5,031,048.00 5,525,115.20
17 PEMBESIAN PLAT DAK BETON T. 12 CM GB.17 235,330.38 2,396,351.05 2,631,681.43
18 PEMBESIAN PLAT DAK BETON T. 10 CM GB.18 183,885.64 1,872,493.18 2,056,378.81
19 PEMBESIAN BALOK 20/30 GB.19 293,352.40 2,987,184.75 3,280,537.15
20 PEMBESIAN BALOK 20/40 GB.20 329,249.47 3,352,721.83 3,681,971.30
21 PEMBESIAN BALOK 25/50 GB.21 297,675.49 3,031,206.42 3,328,881.91
22 PEMBESIAN BALOK 30/60 GB.22 294,217.02 2,995,989.08 3,290,206.10
23 PEMBESIAN PONDASI POOR GB.23 162,115.80 1,650,812.63 1,812,928.43
24 PEMBESIAN PONDASI FOOT PLAT T.20 CM GB.24 256,297.36 2,609,856.15 2,866,153.51
25 PEMBESIAN PONDASI FOOT PLAT T.25 CM GB.25 212,757.69 2,166,495.05 2,379,252.73
26 PEMBESIAN PONDASI FOOT PLAT T.15 CM GB.26 322,486.93 3,283,859.36 3,606,346.29
27 PEMBESIAN BALOK 20/35 GB.27 336,135.53 3,422,842.06 3,758,977.59
28 PEMBESIAN BALOK 25/40 GB.28 315,894.22 3,216,726.32 3,532,620.53
29 PEMBESIAN BALOK 25/45 GB.29 305,765.84 3,113,589.83 3,419,355.67
30 PEMBESIAN BALOK 30/55 GB.30 289,137.39 2,944,263.62 3,233,401.01
31 PEMBESIAN KOLOM 15/15 GB.31 326,640.18 3,326,151.61 3,652,791.79
32 PEMBESIAN KOLOM 15/20 GB.32 348,934.96 3,553,177.65 3,902,112.61
33 PEMBESIAN KOLOM 15/25 GB.33 289,029.31 2,943,163.08 3,232,192.39
34 PEMBESIAN KOLOM 15/30 GB.34 310,166.12 3,158,397.60 3,468,563.73
35 PEMBESIAN KOLOM 20/30 GB.35 309,826.45 3,154,938.76 3,464,765.21
36 PEMBESIAN KOLOM 30/40 GB.36 284,088.64 2,892,852.60 3,176,941.24
37 PEMBESIAN KOLOM 50/50 GB.37 272,107.51 2,770,849.69 3,042,957.20
38 PEMBESIAN KOLOM 35/35 GB.38 278,298.79 2,833,895.01 3,112,193.80
39 PEMBESIAN KOLOM 45/45 GB.39 272,045.75 2,770,220.80 3,042,266.56
40 PEMBESIAN PLAT LISTPLANK, KANOPI T. 8 CM GB.40 128,349.39 1,306,971.94 1,435,321.33

H PEKERJAAN ATAP H
1 1 M3 PASANG KONSTRUKSI KUDA-KUDA KAYU KAMPER H.1 1,975,600.00 13,322,067.00 0.00 15,297,667.00
2 1 M3 PASANG GORDING KAYU KAMPER H.2 1,185,360.00 13,268,585.00 0.00 14,453,945.00
3 1 M3 PASANG KONSTRUKSI KUDA-KUDA KAYU BORNEO H.3 1,975,600.00 6,165,764.00 0.00 8,141,364.00
4 1 M3 PASANG GORDING KAYU BORNEO H.4 1,185,360.00 6,112,282.00 0.00 7,297,642.00
5 1 M3 PASANG KONSTRUKSI KUDA-KUDA KAYU KRUING H.5 1,975,600.00 10,241,709.50 0.00 12,217,309.00

DHSP ___ Hal. 3 of 61


KODE HARGA SATUAN (Rp.) JUMLAH
No URAIAN PEKERJAAN
ANALISA UPAH BAHAN ALAT (Rp.)
1 2 3 4 5 6 7 = (4+5+6)
6 1 M3 PASANG GORDING KAYU KRUING H.6 1,185,360.00 10,188,227.50 0.00 11,373,587.00
7 1 M3 PASANG KONSTRUKSI KUDA-KUDA KAYU LAMA H.7 1,975,600.00 311,542.00 0.00 2,287,142.00
8 1 M2 PASANG KASO + RENG KAYU BORNEO untuk GENTENG PALENTONG H.8 22,726.00 78,368.89 0.00 101,094.00
9 1 M2 PASANG KASO + RENG KAYU KRUING untuk GENTENG PALENTONG H.9 22,726.00 109,956.00 0.00 132,682.00
10 1 M2 PASANG RANGKA ATAP KASO LAMA, RENG KAYU KRUING H.10 22,726.00 26,277.24 0.00 49,003.00
11 1 M2 PASANG KASO + RENG KAYU DOLKEN untuk GENTENG PALENTONG H.11 22,726.00 47,498.00 0.00 70,224.00
12 1 M2 PASANG KASO DOLKEN + RENG BAMBU untuk ATAP IJUK H.12 22,726.00 55,913.00 0.00 78,639.00
13 1 M2 PASANG KASO DOLKEN + RENG KAYU BORNEO untuk GENTENG PALENTONG H.13 22,726.00 38,911.90 0.00 61,637.00
14 1 M2 PASANG RANGKA ATAP KASO LAMA + RENG KAYU BORNEO H.14 22,726.00 21,146.90 0.00 43,872.00
15 1 M2 PASANG KASO + RENG KAYU BORNEO untuk GENTENG MORANDO H.15 22,726.00 78,368.89 0.00 101,094.00
16 1 M2 PASANG KASO + RENG KAYU KRUING untuk GENTENG MORANDO H.16 22,726.00 123,902.46 0.00 146,628.00
17 1 M2 PASANG RANGKA ATAP KAYU BORNEO untuk GENTENG TEGOLA H.17 22,726.00 60,307.50 0.00 83,033.00
18 1 M2 PASANG KUDA-KUDA BAJA RINGAN PROFIL C75 + RENG untuk ATAP SPANDEK/ASBES H.18 76,637.00 78,018.27 7,732.76 162,388.00
19 1 M2 PASANG KUDA-KUDA BAJA RINGAN PROFIL C75 + RENG untuk ATAP GENTENG BIASA H.19 76,637.00 112,938.65 9,478.78 199,054.00
20 1 M2 PASANG PENUTUP ATAP GENTENG LAMA H.20 24,160.40 0.00 0.00 24,160.00
21 1 M2 PASANG ATAP GENTENG PALENTONG KECIL H.21 24,160.40 46,750.00 0.00 70,910.00
22 1 M2 PASANG ATAP GENTENG KODOK GLAZUUR H.22 24,160.40 93,500.00 0.00 117,660.00
23 1 M2 PASANG ATAP GENTENG KODOK NATURAL H.23 24,160.40 93,500.00 0.00 117,660.00
24 1 M2 PASANG ATAP GENTENG MORANDO NATURAL H.24 24,160.40 67,320.00 0.00 91,480.00
25 1 M2 PASANG ATAP GENTENG MORANDO TRANSPARANT H.25 24,160.40 67,320.00 0.00 91,480.00
26 1 M2 PASANG ATAP GENTENG MORANDO WARNA H.26 24,160.40 84,150.00 0.00 108,310.00
27 1 M2 PASANG ATAP GENTENG PALENTONG SUPER / BESAR H.27 24,160.40 33,660.00 0.00 57,820.00
28 1 M2 PASANG ATAP GENTENG BETON H.28 32,120.00 62,327.10 0.00 94,447.00
29 1 M2 PASANG ATAP GENTENG BETON (SETARA CISANGKAN) H.29 32,120.00 133,717.10 0.00 165,837.00
30 1 M2 PASANG ATAP GENTENG METAL BERPASIR H.30 32,120.00 150,142.30 0.00 182,262.00
31 1 M2 PASANG ATAP ASBES GELOMBANG (2,25 x 0,92) x 4 mm H.31 23,353.00 59,466.00 0.00 82,819.00
32 1 M2 PASANG ATAP ASBES GELOMBANG (2,25 x 0,92) x 5 mm (GORDING CANAI) H.32 23,353.00 62,271.00 0.00 85,624.00
33 1 M2 PASANG ATAP ASBES GELOMBANG (2,25 x 0,92) x 5 mm (GORDING KAYU) H.33 23,353.00 53,856.00 0.00 77,209.00
34 1 M2 PASANG ATAP ASBES GELOMBANG (2,50 x 0,92) x 4 mm H.34 23,353.00 56,754.50 0.00 80,107.00
35 1 M2 PASANG ATAP ASBES GELOMBANG (2,50 x 0,92) x 5 mm H.35 23,353.00 57,689.50 0.00 81,042.00
36 1 M2 PASANG ATAP SENG GELOMBANG BJLS 28 RANGKA CANAL H.36 19,272.00 55,539.00 0.00 74,811.00
37 1 M2 PASANG ATAP SENG GELOMBANG BJLS 28 RANGKA KAYU H.37 19,272.00 43,683.20 0.00 62,955.00
38 1 M2 PASANG ATAP ZINCALUME (SPANDEK) H.38 23,278.20 76,358.33 0.00 99,636.00
39 1 M2 PASANG ATAP BITUMEN MOTIF GENTENG T. 3 MM H.39 22,484.00 173,665.09 0.00 196,149.00
40 1 M2 PASANG ATAP BITUMEN BERGELOMBANG T. 3 MM H.40 22,484.00 65,459.35 0.00 87,943.00
41 1 M2 PASANG ATAP TEGOLA H.41 22,484.00 296,625.01 0.00 319,109.00
42 1 M2 PASANG ATAP GENTENG BITUMEN (ONDULINE) - Uk.200x97x0.3 cm H.42 22,484.00 175,242.49 0.00 197,726.00
43 1 M2 PASANG ATAP GENTENG BITUMEN (ONDUVILA) - Uk.106x40x0.3 cm H.43 32,120.00 286,377.86 0.00 318,497.00
44 1 M' PASANG BUBUNG GENTENG PALENTONG H.44 61,705.60 48,485.36 0.00 110,190.00
45 1 M' PASANG BUBUNG GENTENG KODOK GLAZUUR H.45 61,705.60 57,835.36 0.00 119,540.00
46 1 M' PASANG BUBUNG GENTENG KODOK / ALTO NATURAL H.46 61,705.60 48,485.36 0.00 110,190.00
47 1 M' PASANG BUBUNG GENTENG MORANDO NATURAL H.47 61,705.60 46,615.36 0.00 108,320.00
48 1 M' PASANG BUBUNG GENTENG MORANDO TRANSPARANT H.48 61,705.60 50,355.36 0.00 112,060.00
49 1 M' PASANG BUBUNG GENTENG MORANDO WARNA H.49 61,705.60 54,095.36 0.00 115,800.00
50 1 M' PASANG BUBUNG GENTENG PALENTONG BESAR H.50 61,705.60 42,875.36 0.00 104,580.00
51 1 M' PASANG BUBUNG STEEL GELOMBANG 0.92 M H.51 24,589.40 120,895.50 0.00 145,484.00
52 1 M' PASANG NOK GENTENG BETON H.52 64,240.00 67,428.46 0.00 131,668.00
53 1 M' PASANG NOK GENTENG BETON (SETARA CISANGKAN) H.53 64,240.00 107,880.96 0.00 172,120.00
54 1 M' PASANG NOK GENTENG METAL H.54 43,553.40 59,840.00 0.00 103,393.00
55 1 M' PASANG NOK SENG H.55 23,335.40 18,643.90 0.00 41,979.00
56 PEMASANGAN 1 M PANJANG NOK BITUMEN H.56 24,589.40 151,576.59 0.00 176,165.00
57 1 M' PASANG LISTPLANK (3 x 20) cm, KAYU KAMPER H.57 36,058.00 148,952.61 0.00 185,010.00
58 1 M' PASANG LISTPLANK (3 x 20) cm, KAYU KRUING H.58 36,058.00 110,782.17 0.00 146,840.00
59 1 M' PASANG LISTPLANK (3 x 5) cm, KAYU BORNEO H.59 36,058.00 86,365.20 0.00 122,423.00
60 1 M' PASANG LISTPLANK (3 x 30) cm, KAYU KAMPER H.60 36,058.00 151,672.90 0.00 187,730.00
61 1 M' PASANG LISTPLANK (3 x 30) cm, KAYU KRUING H.61 36,058.00 112,795.60 0.00 148,853.00
62 1 M' PASANG LISTPLANK 2 (3 x 20) cm, KAYU KAMPER H.62 36,058.00 295,848.21 0.00 331,906.00
63 1 M' PASANG LISTPLANK 2 (3 x 20) cm, KAYU KRUING H.63 36,058.00 219,507.33 0.00 255,565.00
64 1 M' PASANG LISTPLANK GRC TUMPANGSARI (1/20 +1/10) CM H.64 36,058.00 56,944.62 0.00 93,002.00
65 1 M' PASANG LISTPLANK GRC TUMPANGSARI (1/30 +1/10) CM H.65 36,058.00 69,021.70 0.00 105,079.00
66 1 M' PASANG LISTPLANK GRC 1/30 CM H.66 36,058.00 44,477.95 0.00 80,535.00
67 1 M' PASANG LISTPLANK (3 x 20) cm, KAYU KRUING H.67 36,058.00 110,782.17 0.00 146,840.00

DHSP ___ Hal. 4 of 61


KODE HARGA SATUAN (Rp.) JUMLAH
No URAIAN PEKERJAAN
ANALISA UPAH BAHAN ALAT (Rp.)
1 2 3 4 5 6 7 = (4+5+6)
68 1 M' PASANG LISTPLANK (3 x 30) cm, KAYU KRUING H.68 36,058.00 111,767.10 0.00 147,825.00
69 1 M2 PASANGAN TALANG DATAR / JUREY SENG BJLS 28 L. 90 cm H.69 70,268.00 191,881.64 0.00 262,149.00
70 1 M' PASANG TALANG MIRING, SENG BJLS 28 H.70 70,268.00 187,206.64 0.00 257,474.00

I PEKERJAAN LANGIT-LANGIT I
1 1 M2 LANGIT-LANGIT ASBES (1,00 X 1,00) M, TEBAL 5 mm I.1 12,502.60 82,523.10 0.00 95,025.00
2 1 M2 LANGIT-LANGIT ASBES (1,00 X 1,00) M, TEBAL 4 mm I.2 12,502.60 30,069.60 0.00 42,572.00
3 1 M2 LANGIT-LANGIT ASBES (1,00x1,00) m, TEBAL 4 mm, RANGKA BORNEO I.3 12,502.60 93,933.84 0.00 106,436.00
4 1 M2 LANGIT-LANGIT ASBES (1,00x1,00) m, TEBAL 4 mm, RANGKA KRUING I.4 12,502.60 139,614.20 0.00 152,116.00
5 1 M2 LANGIT-LANGIT ASBES (1,00x1,00) m, TEBAL 4 mm, RANGKA KAYU LAMA I.5 12,502.60 31,285.10 0.00 43,787.00
6 1 M2 LANGIT-LANGIT TRIPLEK 6 mm, RANGKA BORNEO I.6 22,726.00 107,720.42 0.00 130,446.00
7 1 M2 LANGIT-LANGIT TRIPLEK 6 mm, KAYU LAMA I.7 22,726.00 1,968.18 0.00 24,694.00
8 1 M2 LANGIT-LANGIT GRC, RANGKA KAYU BORNEO I.8 12,502.60 103,847.44 0.00 116,350.00
9 1 M2 LANGIT-LANGIT GRC, RANGKA KAYU KRUING I.9 12,502.60 148,312.30 0.00 160,814.00
10 1 M2 LANGIT-LANGIT GRC, RANGKA KAYU LAMA I.10 12,502.60 39,983.20 0.00 52,485.00
11 1 M2 LANGIT-LANGIT GRC, TANPA RANGKA I.11 16,060.00 42,535.75 0.00 58,595.00
12 1 M2 LANGIT-LANGIT GYPSUM BOARD TEBAL 9 mm, RANGKA BORNEO I.12 59,571.60 114,674.94 0.00 174,246.00
13 1 M2 LANGIT-LANGIT GYPSUM BOARD TEBAL 9 mm, RANGKA KRUING I.13 59,571.60 159,139.81 0.00 218,711.00
14 1 M2 LANGIT-LANGIT GYPSUM BOARD, TEBAL 9 mm, TANPA RANGKA I.14 16,060.00 49,576.51 0.00 65,636.00
1 1 M2 LANGIT-LANGIT GRC, TEBAL 9 mm, Rangka Hollo I.14a 20,900.00 101,729.56 0.00 122,629.00
15 1 M2 LANGIT-LANGIT PVC (POLOS) I.15 59,571.60 107,961.15 0.00 167,532.00
16 1 M2 LANGIT-LANGIT PVC (MOTIF) I.16 59,571.60 111,772.65 0.00 171,344.00
17 1 M2 LANGIT-LANGIT PVC (URAT JATI) I.17 59,571.60 115,699.65 0.00 175,271.00
18 1 M2 LANGIT-LANGIT AKUSTIK (60 X 120) CM I.18 22,726.00 274,890.00 0.00 297,616.00
19 1 M2 LANGIT-LANGIT LAMBRISERING KAYU 9 CM I.19 181,808.00 207,668.18 0.00 389,476.00
20 1 M2 PLAFOND SPANDRELL I.20 188,376.32 540,559.80 0.00 728,936.00
21 1 M2 PASANG RANGKA LANGIT-LANGIT (1.00 x 1.00) m, KAYU BORNEO I.21 56,925.00 65,921.24 0.00 122,846.00
22 1 M2 PASANG RANGKA LANGIT-LANGIT (1.00 x 1.00) m, KAYU KRUING I.22 56,925.00 110,386.10 0.00 167,311.00
23 1 M2 PASANG RANGKA HOLLOW GALVALUME untuk PLAFON, MODUL 60x60 CM I.23 16,060.00 56,910.15 0.00 72,970.00
24 1 M' PASANG LIST PLAFOND - KAYU PROFIL I.24 11,433.40 8,097.10 0.00 19,530.00
25 1 M' PASANG LIST PLAFOND GYPSUM PROFIL 10 cm I.25 13,635.60 18,442.88 0.00 32,078.00
26 1 M' PASANG LIST PLAFOND GYPSUM PROFIL 12 cm I.26 13,635.60 22,369.88 0.00 36,005.00
27 1 M' PASANG LIST PLAFOND GYPSUM PROFIL 15 cm I.27 13,635.60 24,333.38 0.00 37,968.00
28 1 M' PASANG LIST PLAFON PVC, L.4 cm I.28 13,635.60 24,923.25 0.00 38,558.00
29 1 M' PASANG LIST PLAFON PVC, L.7 cm I.29 13,635.60 28,388.25 0.00 42,023.00
30 1 M' PEKERJAAN SHADOW LINE I.30 13,635.60 20,303.25 0.00 33,938.00
31 1 KG GANTUNGAN PLAFOND BESI D. 10 mm I.31 6,468.00 15,062.85 220.00 21,750.00
32 1 M' PASANG DROP CEILING GYPSUM BOARD, RANGKA HOLLOW, TINGGI 30 CM I.32 16,060.00 58,700.08 0.00 74,760.00

J PEKERJAAN SANITASI J
1 MEMASANG 1 BUAH KLOSET DUDUK / MONOBLOK (SETARA INA) J.1 434,051.20 1,843,820.00 0.00 2,277,871.00
2 MEMASANG 1 BUAH KLOSET DUDUK / MONOBLOK (SETARA TOTO) J.2 434,051.20 2,671,014.50 0.00 3,105,065.00
3 MEMASANG 1 BUAH KLOSET JONGKOK PORSELEN J.3 297,858.00 238,499.80 0.00 536,357.00
4 MEMASANG 1 BUAH URINOIR J.4 219,560.00 2,778,988.30 0.00 2,998,548.00
5 MEMASANG 1 BUAH WASHTAFEL J.5 295,493.00 1,577,644.20 0.00 1,873,137.00
6 MEMASANG 1 BUAH BATHTUB J.6 101,154.90 5,017,584.00 0.00 5,118,738.00
7 MEMASANG 1 BUAH BAK MANDI BATU BATA LAPIS KERAMIK VOLUME 0,3 M3 J.7 902,484.00 789,523.35 0.00 1,692,007.00
8 MEMASANG 1 BUAH BAK KONTROL PASANGAN BATU BATA (30 x 30) cm, T = 35 cm J.8 279,699.20 187,542.30 0.00 467,241.00
9 MEMASANG 1 BUAH BAK KONTROL PASANGAN BATU BATA (45 x 45) cm, T = 50 cm J.9 411,983.00 289,691.05 0.00 701,674.00
10 MEMASANG 1 M' PIPA GALVANIS DIAMETER 1/2" J.10 19,800.00 42,028.25 0.00 61,828.00
11 MEMASANG 1 M' PIPA GALVANIS DIAMETER 3/4" J.11 19,800.00 59,419.25 0.00 79,219.00
12 MEMASANG 1 M' PIPA PVC TIPE AW d. 1/2" J.12 10,947.20 10,144.75 0.00 21,091.00
13 MEMASANG 1 M' PIPA PVC TIPE AW d. 3/4" J.13 10,947.20 13,043.25 0.00 23,990.00
14 MEMASANG 1 M' PIPA PVC TIPE AW d. 1" J.14 10,947.20 23,188.00 0.00 34,135.00
15 MEMASANG 1 M' PIPA PVC TIPE AW d. 1 1/2" J.15 16,420.80 47,825.25 0.00 64,246.00
16 MEMASANG 1 M' PIPA PVC TIPE AW d. 3" J.16 24,560.80 81,158.00 0.00 105,718.00
17 MEMASANG 1 M' PIPA PVC TIPE AW d. 4" J.17 24,560.80 115,940.00 0.00 140,500.00
18 MEMASANG 1 M' PIPA PVC TIPE AW d. 6" J.18 24,560.80 233,329.25 0.00 257,890.00
19 MEMASANG 1 BUAH BAK CUCI PIRING STAINLESS STEEL J.19 40,504.20 470,305.00 0.00 510,809.00
20 MEMASANG 1 BUAH KRAN d. 3/4" ATAU d. 1/2" J.20 51,821.00 95,463.50 0.00 147,284.00
21 MEMASANG 1 BUAH FLOOR DRAIN PLASTIK J.21 14,135.00 12,155.00 0.00 26,290.00
22 MEMASANG 1 BUAH FLOOR DRAIN STAINLESS J.22 14,135.00 160,820.00 0.00 174,955.00

DHSP ___ Hal. 5 of 61


KODE HARGA SATUAN (Rp.) JUMLAH
No URAIAN PEKERJAAN
ANALISA UPAH BAHAN ALAT (Rp.)
1 2 3 4 5 6 7 = (4+5+6)
23 MEMASANG 1 BUAH ROOF DRAIN PLASTIK J.23 14,135.00 21,780.00 0.00 35,915.00
24 MEMASANG 1 BUAH ROOF DRAIN BESI/STAINLESS J.24 14,135.00 84,700.00 0.00 98,835.00
25 MEMASANG 1 UNIT SEPTIKTANK 2.5 x 1.5 x 2 + REMBESAN (KANTOR TIPE BESAR) J.25 #REF! #REF! 2,268.75 #REF!
26 MEMASANG 1 UNIT SEPTIKTANK 2.5 x 1.5 x 1.5 + REMBESAN (KANTOR TIPE KECIL) J.26 #REF! #REF! 1,361.25 #REF!
27 MEMASANG 1 UNIT SEPTIKTANK 1.5 x 1 x 1.5 + REMBESAN (RUMAH TIPE KECIL) J.27 #REF! #REF! 680.63 #REF!
28 1 M' SALURAN GREVEL BETON 1/2 d. 20 CM + PASANGAN J.28 #REF! #REF! 0.00 #REF!
29 1 M' SALURAN GREVEL BETON 1/2 d. 30 CM + PASANGAN J.29 #REF! #REF! 0.00 #REF!
30 1 M' SALURAN AIR LIMBAH BUIS BETON D = 30 Cm J.30 59,565.00 229,859.47 0.00 289,424.00
31 1 M' SALURAN AIR LIMBAH BUIS BETON D = 60 Cm J.31 59,565.00 266,099.13 0.00 325,664.00
32 1 BUAH TANGKI AIR FIBREGLASS (TORN) VOLUME 1000 LITER J.32 434,051.20 2,717,507.94 0.00 3,151,559.00
33 1 BUAH TANGKI AIR FIBREGLASS (TORN) VOLUME 500 LITER J.33 434,051.20 1,829,813.70 0.00 2,263,864.00

K PEKERJAAN BESI DAN BAJA K


1 1 KG PEKERJAAN BAJA PROFIL K.1 13,635.60 20,429.75 0.00 34,065.00
2 1 KG PEKERJAAN BESI SIKU K.2 13,635.60 18,279.25 0.00 31,914.00
3 1 KG PEKERJAAN PERAKITAN / PEMASANGAN BAJA K.3 208.47 134.64 5,194.64 5,537.00
4 1 CM PEK. PENGELASAN LAS LISTRIK TEBAL KAWAT 4 MM K.4 642.40 1,646.53 800.36 3,089.00
5 1 TITIK MELUBANGI KONSTRUKSI BESI DENGAN BETON K.5 7,275.40 0.00 2,750.00 10,025.00
6 1 M2 PASANG ROLLING DOOR ALUMINIUM K.6 225,060.00 525,470.00 0.00 750,530.00
7 1 M2 PASANG PINTU LIPAT BESI (REL HENDERSON) K.7 225,060.00 1,045,000.00 0.00 1,270,060.00
8 1 M2 PASANG PINTU LIPAT BESI K.8 225,060.00 935,000.00 0.00 1,160,060.00
9 1 M2 PASANG PINTU BESI HARMONIKA K.9 225,060.00 528,000.00 0.00 753,060.00
10 1 M2 PEKERJAAN PINTU BESI PLAT BAJA TEBAL. 2 mm RANGKAP, RANGKA BAJA SIKU K.10 238,552.60 627,478.50 0.00 866,031.00
11 1 M2 PASANGAN TRALIS BESI STRIP (2 x 3 mm) K.11 379,453.80 172,872.06 0.00 552,325.00
12 1 M2 PASANGAN KAWAT HARMONIKA K.12 22,092.40 63,023.30 0.00 85,115.00
13 1 M2 PASANGAN KAWAT NYAMUK (KAYU) K.13 22,092.40 54,795.30 0.00 76,887.00
14 1 M2 PASANGAN KAWAT NYAMUK (BESI) K.14 22,092.40 52,288.94 0.00 74,381.00

L PEKERJAAN KUNCI DAN KACA L


1 1 BH PASANG KUNCI TANAM DOUBLE SLAAG L.1 63,305.00 147,730.00 0.00 211,035.00
2 1 BH PASANG KUNCI TANAM DOUBLE SLAAG BESAR L.2 63,305.00 231,880.00 0.00 295,185.00
3 1 BH PASANG ENGSEL PINTU L.3 21,407.10 48,620.00 0.00 70,027.00
4 1 BH PASANG ENGSEL JENDELA KUPU-KUPU L.4 14,271.40 32,725.00 0.00 46,996.00
5 1 BH PASANG KAIT ANGIN L.5 21,407.10 22,440.00 0.00 43,847.00
6 1 BH PASANG KUNCI SELOT L.6 14,271.40 15,895.00 0.00 30,166.00
7 1 BH PASANG PEGANGAN PINTU / DOOR HOLDER L.7 71,357.00 185,130.00 0.00 256,487.00
8 1 M2 PASANG KACA POLOS, TEBAL 5 mm L.8 21,414.14 162,503.00 0.00 183,917.00
9 1 M2 PASANG KACA RAYBAND, TEBAL 5 mm L.9 21,414.14 197,472.00 0.00 218,886.00
10 1 M2 PASANG KACA, TEBAL 10 mm L.10 69,648.92 442,838.00 0.00 512,486.00
11 1 M2 PASANG KACA, TEBAL 12 mm L.11 83,452.64 787,385.50 0.00 870,838.00
12 1 M2 PASANG CURTAIN WALL (DINDING KACA) L.12 158,633.20 1,370,754.00 0.00 1,529,387.00
13 1 UNIT PINTU KACA TEMPERED 12 mm TYPE PU ; Uk. 0,9 M x 2,1 M L.13 550,000.00 6,897,551.10 0.00 7,447,551.00
14 1 UNIT PINTU KACA TEMPERED 12 mm TYPE PU ; Uk. 1,8 M x 2 M L.14 550,000.00 12,830,444.00 0.00 13,380,444.00
15 1 UNIT PINTU KACA TEMPERED 12 mm TYPE PU ; Uk. 1,6 M x 2 M L.15 550,000.00 12,473,648.00 0.00 13,023,648.00
16 1 UNIT PINTU KACA TEMPERED 12 mm TYPE PU ; Uk. 1,4 M x 2 M L.16 550,000.00 12,116,852.00 0.00 12,666,852.00
17 1 UNIT PINTU KACA TEMPERED 12 mm TYPE PU ; Uk. 1,2 M x 2 M L.17 550,000.00 11,760,056.00 0.00 12,310,056.00
18 1 M2 PASANG PINTU KACA RANGKA ALUMINIUM L.18 19,297.30 677,193.00 0.00 696,490.00
19 1 M2 PASANG SANDBLAST KACA MOTIF POLOS L.19 28,754.00 57,750.00 5,500.00 92,004.00

M PEKERJAAN PENUTUP LANTAI M


1 1 M2 PASANG LANTAI TEGEL BADAK WARNA 30 X 30 CM M.1 40,755.00 116,020.39 0.00 156,775.00
2 1 M2 PASANG LANTAI TEGEL BADAK LAMA M.2 40,755.00 27,232.79 0.00 67,987.00
3 1 M2 PASANG LANTAI KERAMIK PUTIH UKURAN 30 x 30 cm M.3 109,725.00 120,050.26 0.00 229,775.00
4 1 M2 PASANG LANTAI KERAMIK 40 x 40 cm (setara Roman) M.4 109,725.00 363,106.31 0.00 472,831.00
5 1 M2 PASANG LANTAI KERAMIK WARNA UKURAN 30 x 30 cm M.5 109,725.00 125,599.48 0.00 235,324.00
6 1 M2 PASANG LANTAI KERAMIK WARNA UKURAN 33 x 33 cm M.6 109,725.00 205,508.32 0.00 315,233.00
7 1 M2 PASANG LANTAI KERAMIK PUTIH UKURAN 40 x 40 cm M.7 109,725.00 132,258.56 0.00 241,983.00
8 1 M2 PASANG LANTAI KERAMIK WARNA UKURAN 40 x 40 cm M.8 109,725.00 134,478.25 0.00 244,203.00
9 1 M2 PASANG LANTAI KERAMIK WARNA UKURAN 50 x 50 cm M.9 109,725.00 179,981.89 0.00 289,706.00
10 1 M2 PASANG LANTAI MARMER M.10 109,725.00 1,805,993.64 0.00 1,915,718.00
11 1 M2 PASANG LANTAI GRANIT SLAB DN M.11 148,225.00 2,209,888.39 0.00 2,358,113.00
12 1 M2 PASANG LANTAI GRANIT TILE UKURAN 60 x 60 cm M.12 109,725.00 480,749.88 0.00 590,474.00

DHSP ___ Hal. 6 of 61


KODE HARGA SATUAN (Rp.) JUMLAH
No URAIAN PEKERJAAN
ANALISA UPAH BAHAN ALAT (Rp.)
1 2 3 4 5 6 7 = (4+5+6)
13 1 M2 PASANG LANTAI GRANIT TILE UKURAN 60 x 60 cm (setara indogress) M.13 109,725.00 245,462.75 0.00 355,187.00
14 1 M2 PASANG LANTAI GRANIT TILE UKURAN 60 x 60 cm (Ex. Cina) M.14 109,725.00 194,409.88 0.00 304,134.00
15 1 M2 PASANG LANTAI GRANIT TILE UKURAN 80 x 80 cm M.15 109,725.00 585,075.32 0.00 694,800.00
16 1 M2 PASANG LANTAI GRANIT TILE UKURAN 80 x 80 cm (setara Indogress) M.16 109,725.00 440,795.46 0.00 550,520.00
17 1 M2 PASANG LANTAI GRANIT TILE UKURAN 80 x 80 cm (setara marco) M.17 109,725.00 424,147.79 0.00 533,872.00
18 1 M2 PASANG LANTAI GRANIT TILE 3D UKURAN 60 x 60 cm M.18 109,725.00 549,560.27 0.00 659,285.00
19 1 M2 PASANG LANTAI KERAMIK WARNA 20 x 20 cm, ANTI SLIP KM/WC M.19 109,725.00 144,466.85 0.00 254,191.00
20 1 M2 PASANG LANTAI KERAMIK WARNA 30 x 30 cm, ANTI SLIP KM/WC M.20 109,725.00 154,455.46 0.00 264,180.00
21 1 M2 PASANG LANTAI PARQUET JATI M.21 112,420.00 325,239.75 0.00 437,659.00
22 1 M2 PASANG LANTAI VYNIL Uk. 15 x 90 Cm setara DAICHI M.22 112,420.00 318,483.00 0.00 430,903.00
23 1 M2 PASANG LANTAI VYNIL Uk. 15 x 90 Cm setara TACO M.23 38,704.60 259,798.00 0.00 298,502.00
24 1 M2 PASANG BATU KORAL BENGKULU HITAM M.24 194,700.00 127,515.30 0.00 322,215.00
25 1 M2 PASANG BATU KORAL FLORES HIJAU M.25 194,700.00 127,515.30 0.00 322,215.00
26 1 M2 PASANG BATU KORAL ORANGE BALI M.26 194,700.00 127,515.30 0.00 322,215.00
27 1 M2 PASANG BATU KORAL HITAM GARUT M.27 194,700.00 127,515.30 0.00 322,215.00
28 1 M2 PASANG BATU SIKAT M.28 194,700.00 127,515.30 0.00 322,215.00
29 1 M2 PASANG BATU SIKAT MOTIF M.29 217,800.00 127,515.30 0.00 345,315.00
30 1 M' PASANG PLIN KAYU BORNEO T. 2 cm L.10 cm M.30 27,271.20 24,447.45 0.00 51,718.00

N PEKERJAAN PENUTUP DINDING


1 1 M2 PASANG DINDING KERAMIK WARNA 20 x 25 cm N.1 109,725.00 138,917.63 0.00 248,642.00
2 1 M2 PASANG DINDING KERAMIK WARNA 25 x 33 cm N.2 109,725.00 153,345.61 0.00 263,070.00
3 1 M2 PASANG DINDING KERAMIK WARNA 25 x 40 cm N.3 109,725.00 161,114.53 0.00 270,839.00
4 1 M2 PASANG DINDING GRANIT TILE UKURAN 60 x 60 cm N.4 109,725.00 318,796.67 0.00 428,521.00
5 1 M2 PASANG DINDING GRANIT TILE UKURAN 60 x 60 cm (setara indogress) N.5 109,725.00 207,793.47 0.00 317,518.00
6 1 M2 PASANG DINDING GRANIT TILE UKURAN 60 x 60 cm (Ex. Cina) N.6 109,725.00 162,202.87 0.00 271,927.00
7 1 M2 PASANG DINDING GRANIT TILE UKURAN 60 x 120 cm N.7 109,725.00 952,459.37 0.00 1,062,184.00
8 1 M2 PASANG DINDING GRANIT TILE UKURAN 60 x 120 cm (setara indogress) N.8 109,725.00 796,215.37 0.00 905,940.00
9 1 M2 PASANG DINDING GRANIT TILE UKURAN 60 x 120 cm (Ex. Cina) N.9 109,725.00 446,415.37 0.00 556,140.00
10 1 M2 PASANG DINDING MARMER UK. 1 X 1 m N.10 204,149.00 1,807,428.87 0.00 2,011,577.00
11 1 M2 PASANG BATU ANDESIT ALUR UK. 10 X 20 CM N.11 147,400.00 158,678.85 0.00 306,078.00
12 1 M2 PASANG BATU ANDESIT ALUR UK. 15 X 30 CM N.12 147,400.00 180,398.90 0.00 327,798.00
13 1 M2 PASANG BATU ANDESIT ALUR UK. 20 X 40 CM N.13 147,400.00 180,398.90 0.00 327,798.00
14 1 M2 PASANG BATU ANDESIT BAKAR POLOS UK. 10 X 20 CM N.14 147,400.00 154,901.45 0.00 302,301.00
15 1 M2 PASANG BATU ANDESIT BAKAR POLOS UK. 10 X 30 CM N.15 147,400.00 163,400.60 0.00 310,800.00
16 1 M2 PASANG BATU ANDESIT BAKAR POLOS UK. 15 X 30 CM N.16 147,400.00 180,398.90 0.00 327,798.00
17 1 M2 PASANG BATU ANDESIT BAKAR POLOS UK. 15 X 15 CM N.17 147,400.00 178,510.20 0.00 325,910.00
18 1 M2 PASANG BATU ANDESIT BAKAR POLOS UK. 20 X 30 CM N.18 147,400.00 199,285.90 0.00 346,685.00
19 1 M2 PASANG BATU ANDESIT BAKAR POLOS UK. 20 X 20 CM N.19 147,400.00 180,398.90 0.00 327,798.00
20 1 M2 PASANG BATU ANDESIT BAKAR POLOS UK. 30 X 30 CM N.20 147,400.00 208,729.40 0.00 356,129.00
21 1 M2 PASANG BATU ANDESIT BAKAR POLOS UK. 30 X 60 CM N.21 147,400.00 222,894.65 0.00 370,294.00
22 1 M2 PASANG BATU ANDESIT BAKAR TEBAL 10 CM UK. 10 X 10 CM N.22 147,400.00 108,628.30 0.00 256,028.00
23 1 M2 PASANG BATU ANDESIT BAKAR BINTIK Uk.10 X 30 CM N.23 147,400.00 120,904.85 0.00 268,304.00
24 1 M2 PASANG BATU ANDESIT BAKAR BINTIK UK. 30 X 30 CM N.24 147,400.00 156,790.15 0.00 304,190.00
25 1 M2 PASANG BATU ANDESIT BAKAR TEBAL 5 CM UK. 10 X 10 CM N.25 147,400.00 283,333.05 0.00 430,733.00
26 1 M2 PASANG BATU ANDESIT BAKAR TEBAL 5 CM UK. 15 X 15 CM N.26 147,400.00 391,933.30 0.00 539,333.00
27 1 M2 PASANG BATU ANDESIT BAKAR TEBAL 5 CM UK. 30 X 30 CM N.27 147,400.00 433,484.70 0.00 580,884.00
28 1 M2 PASANG BATU ANDESIT BAKAR TEBAL 3 CM UK. 10 X 10 CM N.28 147,400.00 215,339.85 0.00 362,739.00
29 1 M2 PASANG BATU ANDESIT BAKAR TEBAL 3 CM UK. 15 X 15 CM, 15 x 30 CM, 20 X 20 CM N.29 147,400.00 297,498.30 0.00 444,898.00
30 1 M2 PASANG BATU ANDESIT BAKAR TEBAL 3 CM UK. 30 X 30 CM N.30 147,400.00 323,940.10 0.00 471,340.00
31 1 M2 PASANG BATU TEMPLEK ACAK N.31 140,800.00 119,960.50 0.00 260,760.00
32 1 M2 PASANG BATU TEMPLEK MOTIF N.32 188,100.00 119,960.50 0.00 308,060.00
33 1 M2 PASANG BATU TEMPLEK UK. 10 X 20 CM N.33 140,800.00 119,960.50 0.00 260,760.00
34 1 M2 PASANG BATU TEMPLEK UK. 10 X 30 CM N.34 140,800.00 128,459.65 0.00 269,259.00
35 1 M2 PASANG BATU TEMPLEK UK. 15 X 30 CM N.35 140,800.00 135,070.10 0.00 275,870.00
36 1 M2 PASANG BATU TEMPLEK UK. 20 X 40 CM, & 30 X 30 CM N.36 140,800.00 193,619.80 0.00 334,419.00
37 1 M2 PASANG BATU TEMPLEK UK. 10 X 20 CM N.37 140,800.00 135,579.68 0.00 276,379.00
38 1 M2 PASANG BATU BOBOS PALIMANAN CORAK UK. 10 X 20 CM N.38 140,800.00 90,685.65 0.00 231,485.00
39 1 M2 PASANG BATU BOBOS PALIMANAN CORAK UK. 20 X 20 CM N.39 135,300.00 90,685.65 0.00 225,985.00
40 1 M2 PASANG BATU BOBOS PALIMANAN CORAK UK. 20 X 40 CM N.40 135,300.00 108,628.30 0.00 243,928.00
41 1 M2 PASANG BATU BOBOS PALIMANAN CORAK UK. 15 X 30 CM N.41 135,300.00 97,296.10 0.00 232,596.00
42 1 M2 PASANG BATU ANDESIT SUSUN SIRI UK. 3 X 20 CM N.42 188,100.00 155,845.80 0.00 343,945.00

DHSP ___ Hal. 7 of 61


KODE HARGA SATUAN (Rp.) JUMLAH
No URAIAN PEKERJAAN
ANALISA UPAH BAHAN ALAT (Rp.)
1 2 3 4 5 6 7 = (4+5+6)
43 1 M2 PASANG BATU ANDESIT SUSUN SIRI UK. 3 X 30 CM N.43 188,100.00 168,122.35 0.00 356,222.00
44 1 M2 PASANG BATU ANDESIT SUSUN SIRI UK. 3 X 40 CM N.44 188,100.00 186,065.00 0.00 374,165.00
45 1 M2 PASANG BATU ANDESIT SUSUN SIRI UK. 3 X 50 CM N.45 188,100.00 180,398.90 0.00 368,498.00
46 1 M2 PASANG BATU ANDESIT SUSUN SIRI UK. 3 X 60 CM N.46 188,100.00 97,296.10 0.00 285,396.00
47 1 M2 PASANG BATU PROFIL UK. 3 X 50 CM, 4 x 50 CM & 5 X 50 CM N.47 135,300.00 74,631.70 0.00 209,931.00
48 1 M2 PASANG BATU CANDI UK. 10 X 20 CM N.48 147,400.00 127,515.30 0.00 274,915.00
49 1 M2 PASANG BATU CANDI UK. 15 X 30 CM N.49 147,400.00 135,070.10 0.00 282,470.00
50 1 M2 PASANG BATU CANDI UK. 20 X 40 CM N.50 147,400.00 140,736.20 0.00 288,136.00
51 1 M2 PASANG DINDING BILIK RANGKA KAYU BORNEO N.51 15,675.00 100,688.28 0.00 116,363.00
52 1 M2 MEMBUAT DINDING LAMBRIZERING DARI PAPAN BORNEO N.52 296,340.00 61,609.96 0.00 357,949.00
53 1 M2 MEMBUAT DINDING LAMBRISERING PLYWOOD UK. 120 X 240 cm N.53 12,373.90 62,925.50 0.00 75,299.00
54 1 M2 PASANG RANGKA DINDING PARTISI KAYU KAMPER N.54 74,155.40 429,472.62 0.00 503,628.00
55 1 M2 PASANG RANGKA DINDING PARTISI KAYU BORNEO N.55 74,155.40 206,746.27 0.00 280,901.00
56 1 M2 PASANG RANGKA DINDING PARTISI KAYU KRUING N.56 74,155.40 326,323.42 0.00 400,478.00
57 1 M2 PASANG DINDING PARTISI TEAKWOOD RANGKAP, RANGKA KAYU KAMPER N.57 74,155.40 576,809.92 0.00 650,965.00
58 1 M2 PASANG DINDING PARTISI TEAKWOOD RANGKAP, RANGKA KAYU BORNEO N.58 74,155.40 354,083.57 0.00 428,238.00
59 1 M2 PASANG DINDING PARTISI TEAKWOOD RANGKAP, RANGKA KAYU KRUING N.59 74,155.40 473,660.72 0.00 547,816.00
60 1 M2 PASANG DINDING PARTISI MULTIPLEK 9 MM, RANGKA KAYU KRUING (DUA MUKA) N.60 74,155.40 446,444.94 0.00 520,600.00
61 1 M2 PASANG DINDING PARTISI MULTIPLEK 9 MM, RANGKA KAYU KRUING (SATU MUKA) N.61 74,155.40 386,384.18 0.00 460,539.00
62 1 M2 PASANG DINDING PARTISI TRIPLEK 3 MM, RANGKA KAYU BORNEO N.62 74,155.40 280,106.37 0.00 354,261.00
63 1 M2 PASANG PARTISI RANGKA METAL FURING LAPIS GYPSUM DUA MUKA N.63 98,639.20 275,073.36 0.00 373,712.00
64 1 M2 PASANG PARTISI RANGKA METAL FURING LAPIS GRC DUA MUKA N.64 98,639.20 264,035.17 0.00 362,674.00
65 1 M2 PASANG PARTISI RANGKA BLOCKBOARD DUA MUKA FINISH HPL (POLOS/BIASA) N.65 238,286.40 641,953.28 0.00 880,239.00
66 1 M2 PASANG PARTISI RANGKA BLOCKBOARD SATU MUKA FINISH HPL (POLOS/BIASA) N.66 238,286.40 365,360.83 0.00 603,647.00
67 1 M2 PASANG PARTISI RANGKA BLOCKBOARD DUA MUKA FINISH HPL (TEXTURE) N.67 238,286.40 604,410.54 0.00 842,696.00
68 1 M2 PASANG PARTISI RANGKA BLOCKBOARD SATU MUKA FINISH HPL (TEXTURE) N.68 238,286.40 346,589.46 0.00 584,875.00
69 1 M2 PASANG DINDING WALLPAPER L. 50 cm N.69 27,214.00 94,061.00 0.00 121,275.00

O PEKERJAAN PAGAR & HALAMAN O


1 1 M' PASANG PAGAR BETON PRACETAK (5 x40 x 240) CM, TINGGI 2 M O.1 50,903.60 373,994.02 0.00 424,897.00
2 1 BTG PASANG TIANG PAGAR PRACETAK TINGGI 3 M O.2 50,903.60 646,272.00 0.00 697,175.00
3 1 M2 PAGAR BRC LENGKAP DENGAN TIANG t. 120 cm P. 240 cm O.3 50,903.60 404,843.78 0.00 455,747.00
4 1 M2 PASANGAN PAVING BLOCK WARNA TEBAL 6 cm (Uk. 20 x 10 cm) O.4 90,218.04 81,532.00 0.00 171,750.00
5 1 M2 PASANGAN PAVING BLOCK WARNA TEBAL 8 cm (Uk. 20 x 10 cm) O.5 90,218.04 95,257.80 0.00 185,475.00
6 1 M2 PASANGAN PAVING BLOCK NATURAL TEBAL 6 cm (Uk. 20 x 10 cm) O.6 87,377.40 73,032.85 0.00 160,410.00
7 1 M2 PASANGAN PAVING BLOCK NATURAL TEBAL 8 cm (Uk. 20 x 10 cm) O.7 90,218.04 88,647.35 0.00 178,865.00
8 1 M2 PASANGAN PAVING BLOCK LAMA O.8 90,218.04 21,411.50 0.00 111,629.00
9 1 M2 PASANGAN PAVING TON NATURAL TEBAL 6 cm (Uk. 20 x 10 cm) O.9 87,377.40 125,845.50 0.00 213,222.00
10 1 M2 PASANGAN PAVING TON NATURAL TEBAL 8 cm (Uk. 20 x 10 cm) O.10 87,377.40 138,066.50 0.00 225,443.00
11 1 M2 PASANGAN PAVING TON WARNA T. 6 cm (Uk. 20 x 10 cm) O.11 87,377.40 138,066.50 0.00 225,443.00
12 1 M2 PASANGAN PAVING TON WARNA T. 8 cm (Uk. 20 x 10 cm) O.12 87,377.40 150,287.50 0.00 237,664.00
13 1 M2 PASANGAN PAVING TON TEBAL 6 CM (setara CISANGKAN) (Uk. 20 x 10 cm) O.13 87,377.40 267,886.85 0.00 355,264.00
14 1 M2 PASANGAN PAVING TON TEBAL 8 CM (setara CISANGKAN) (Uk. 20 x 10 cm) O.14 87,377.40 309,438.25 0.00 396,815.00
15 1 M2 PAGAR BESI TEMPA MOTIF BATIK (SINGLE) O.15 0.00 808,500.00 0.00 808,500.00
16 1 M2 PAGAR BESI TEMPA MOTIF BATIK (DOUBLE) O.16 0.00 1,501,500.00 0.00 1,501,500.00

DHSP ___ Hal. 8 of 61


KODE HARGA SATUAN (Rp.) JUMLAH
No URAIAN PEKERJAAN
ANALISA UPAH BAHAN ALAT (Rp.)
1 2 3 4 5 6 7 = (4+5+6)
P PEKERJAAN PENGECATAN P
1 1 M2 MENGIKIS / MENGEROK PERMUKAAN CAT DINDING LAMA P.1 13,457.40 2,711.50 0.00 16,168.00
2 1 M2 MENDEMPUL DAN MENGGOSOK KAYU P.2 8,852.80 10,303.70 0.00 19,156.00
3 1 M2 PENGECATAN BIDANG KAYU LAMA P.3 15,856.50 38,281.33 0.00 54,137.00
4 1 M2 PENGECATAN BID. KAYU BARU (1 LAPIS PLAMIR), 1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP P.4 8,264.30 49,311.90 0.00 57,576.00
5 1 M2 PENGECATAN KANSTIN P.5 8,193.90 24,655.95 0.00 32,849.00
6 1 M2 PENGECATAN BIDANG KAYU BARU (1 LAPIS PLAMIR), 1 LAPIS CAT DASAR, 3 LAPIS CAT PENUTUP P.6 18,894.70 55,791.45 0.00 74,686.00
7 1 M' PENGECATAN KUSEN PINTU/JENDELA KAYU, 1 LAPIS CAT DASAR, 3 LAPIS CAT PENUTUP P.7 9,447.35 27,895.73 0.00 37,343.00
8 1 M2 PENGECATAN BIDANG KAYU DENGAN MELAMIK P.8 106,964.00 138,374.50 0.00 245,338.00
9 1 M' PENGECATAN KUSEN PINTU/JENDELA KAYU DENGAN MELAMIK P.9 53,482.00 69,187.25 0.00 122,669.00
10 1 M2 PELABURAN BIDANG KAYU DENGAN POLITUR P.10 12,667.60 46,531.21 0.00 59,198.00
11 1 M2 PELABURAN BIDANG KAYU DENGAN CAT RESIDU DAN TER P.11 9,534.80 22,580.25 0.00 32,115.00
12 1 M2 PENGECATAN TEMBOK BARU 1 LAPIS PLAMIR, 1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP P.12 10,074.46 23,253.45 0.00 33,327.00
13 1 M2 PENGECATAN TEMBOK BARU 1 LAPIS PLAMIR, 1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP DULUX P.13 10,004.06 30,658.65 0.00 40,662.00
14 1 M2 PENGECATAN TEMBOK LAMA 1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP P.14 8,131.64 18,110.95 0.00 26,242.00
15 1 M2 PENGECATAN TEMBOK LAMA 1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP DULUX P.15 8,061.24 24,281.95 0.00 32,343.00
16 1 M2 PENGECATAN PLAFOND 1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP P.16 10,074.46 20,915.95 0.00 30,990.00
17 1 M2 MENGECAT PERMUKAAN BAJA DENGAN MENI BESI P.17 27,214.00 4,703.05 0.00 31,917.00
18 1 M2 MENGECAT PERMUKAAN BAJA DENGAN MENI BESI ZINGCHROMATE P.18 28,270.00 6,573.05 0.00 34,843.00
19 1 M2 MENGECAT DENGAN CAT DUCO P.19 28,270.00 10,219.55 0.00 38,489.00
20 1 M2 MENGECAT BESI ( 3x ) P.20 56,474.00 31,166.36 0.00 87,640.00
21 1 M2 MENGECAT BESI ( 3x ) POLLY URETHANE P.21 56,474.00 38,590.26 0.00 95,064.00
22 1 M2 MENGECAT BESI LAMA ( 3x ) P.22 40,568.00 23,515.25 0.00 64,083.00

Indramayu, ……………... 2023

Dibuat,
KONSULTAN PERENCANA
CV. PRATAMA DIPA

DARMOKO, S.T.
Direktur

DHSP ___ Hal. 9 of 61


ANALISA HARGA SATUAN

A.J.11 M' Neon Box LED Akrilik


No Uraian Satuan Koefisien* Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
1. Pembantu Instalator OH 1.500 80,000.00 120,000.00
2. Instalator OH 0.750 103,000.00 77,250.00
3. Mandor OH 0.025 128,000.00 3,200.00
JUMLAH HARGA TENAGA 200,450.00

B BAHAN
1. Neon Box M' 0.733 1,500,000.00 1,098,901.10
2. Kabel Eterna 3 x 2,5 M' 0.400 22,000.00 8,800.00
3. LED Strip M' 0.528 12,000.00 6,333.33
4. Sakelar Tunggal Setara Broco M' 1 10,000.00 10,000.00
JUMLAH HARGA TENAGA 1,124,034.43
C PERALATAN - - - -
JUMLAH HARGA PERALATAN 0
D JUMLAH (A+B+C) 1,324,484.43
E OVERHEAD & PROFIT 11% x D 145,693.29
F JUMLAH HARGA SATUAN PEKERJAAN (D+E) 1,470,177.72
G JUMLAH HARGA SATUAN DIBULATKAN 1,470,100.00

Indramayu, ……………... 2023

Dibuat,
KONSULTAN PERENCANA
CV. PRATAMA DIPA

DARMOKO, S.T.
Direktur
ANALISA HARGA SATUAN

A.2.21 M2 Pembuatan Pagar Sementara dari Kayu Tinggi 2 Meter


No Uraian Satuan Koefisien* Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
1. Pekerja OH 0.400 79,000.00 31,600.00
2. Tukang Kayu OH 0.200 110,000.00 22,000.00
3. Kepala Tukang OH 0.020 112,000.00 2,240.00
4. Mandor OH 0.020 128,000.00 2,560.00
JUMLAH HARGA TENAGA 58,400.00

B BAHAN
1. Dolken Bambu ϕ8-10/400 cm Btg 1.250 9,648.00 12,060.00
2. Semen Portland Kg 5.000 1,404.00 7,020.00
3. Pasir Beton Ex Palu M3 0.005 428,800.00 2,144.00
4. Koral Beton 1-2 cm M3 0.009 536,000.00 4,824.00
5. Kayu 5/7 Kayu Meranthi M3 0.072 2,358,400.00 169,804.80
6. Paku Biasa 2" - 5" Kg 0.060 27,121.00 1,627.26
7. Residu Liter 0.400 14,310.00 5,724.00
JUMLAH HARGA BAHAN 203,204.06
C PERALATAN - - - -
JUMLAH HARGA BAHAN 0
D JUMLAH (A+B+C) 261,604.06
E OVERHEAD & PROFIT 11% x D 28,776.45
F JUMLAH HARGA SATUAN PEKERJAAN (D+E) 290,380.51
G JUMLAH HARGA SATUAN DIBULATKAN 290,300.00

Indramayu, ……………... 2023

Dibuat,
KONSULTAN PERENCANA
CV. PRATAMA DIPA

DARMOKO, S.T.
Direktur
ANALISA HARGA SATUAN

V001Memasang 1m2 pagar besi hollow 40 x 40 mm & 20 x 40 mm tebal 1,2 mm stainless steel standar
No Uraian Satuan Koefisien* Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
1. Pekerja OH 1.200 79,000.00 94,800.00
2. Tukang Besi OH 0.900 103,000.00 92,700.00
3. Kepala Tukang OH 0.100 112,000.00 11,200.00
4. Mandor OH 0.020 128,000.00 2,560.00
JUMLAH HARGA TENAGA 201,260.00

B BAHAN
1. Besi Hollow Stainless steel Uk 20 x 40 mm tbl 1,2 mm M' 3.000 33,365.00 100,095.00
2. Besi Hollow Stainless steel Uk 40 x 40 mm tbl 1,2 mm M' 1.300 40,000.00 52,000.00
3. Plat Besi Stainless Steel Tebal 2 mm M2 0.900 364,583.33 328,125.00
4. Rel Besi Siku 40 X 40 mm Tbl 2 mm Stainless Steel M' 0.700 27,000.00 18,900.00
5. Pengelasan M2 1.000 80,000.00 80,000.00
6. Aksesoris Ls 1.000 100,000.00 100,000.00
JUMLAH HARGA BAHAN 679,120.00
C PERALATAN - - - -
JUMLAH HARGA BAHAN 0
D JUMLAH (A+B+C) 880,380.00
E OVERHEAD & PROFIT 11% x D 96,841.80
F JUMLAH HARGA SATUAN PEKERJAAN (D+E) 977,221.80
G JUMLAH HARGA SATUAN DIBULATKAN 977,200.00
V002Memasang 1m2 pintu besi hollow stainless steel + plat stainless steel
No Uraian Satuan Koefisien* Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
1. Pekerja OH 1.400 79,000.00 110,600.00
2. Tukang Besi OH 1.050 171,000.00 179,550.00
3. Kepala Tukang OH 0.105 112,000.00 11,760.00
4. Mandor OH 0.035 128,000.00 4,480.00
JUMLAH HARGA TENAGA 306,390.00

B BAHAN
1. Besi Hollow Stainless steel Uk 60 x 60 mm M' 2.500 43,300.00 108,250.00
2. Besi Hollow Stainless steel Uk 40 x 40 mm M' 1.500 40,000.00 60,000.00
3. Plat Besi Stainless Steel Tebal 2 mm M2 0.500 364,583.33 182,291.67
4. Pengelasan M2 1.000 80,000.00 80,000.00
5. Aksesoris Ls 1.000 100,000.00 100,000.00
JUMLAH HARGA BAHAN 530,541.67
C PERALATAN - - - -
JUMLAH HARGA BAHAN 0
D JUMLAH (A+B+C) 836,931.67
E OVERHEAD & PROFIT 11% x D 92,062.48
F JUMLAH HARGA SATUAN PEKERJAAN (D+E) 928,994.15
G JUMLAH HARGA SATUAN DIBULATKAN 928,900.00

Indramayu, ……………... 2023

Dibuat,
KONSULTAN PERENCANA
CV. PRATAMA DIPA

DARMOKO, S.T.
Direktur
ANALISA HARGA SATUAN

A.X.1M2 PEMASANGAN PENUTUP ATAP MENGGUNAKAN PLASTIK UV + INSECT NET


No Uraian Satuan Koefisien* Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
1. Pekerja OH 0.200 79,000.00 15,800.00
2. Instalator OH 0.100 110,000.00 11,000.00
3. Mandor OH 0.020 112,000.00 2,240.00
JUMLAH HARGA TENAGA 29,040.00

B BAHAN
1. Plastik UV M2 1.100 12,000.00 13,200.00
2. Insect Net M2 1.100 4,850.00 5,335.00
2. Spring Clip M' 0.500 32,000.00 16,000.00
JUMLAH HARGA BAHAN 34,535.00
C PERALATAN - - - -
JUMLAH HARGA BAHAN 0
D JUMLAH (A+B+C) 63,575.00
E OVERHEAD & PROFIT 11% x D 6,993.25
F JUMLAH HARGA SATUAN PEKERJAAN (D+E) 70,568.25
G JUMLAH HARGA SATUAN DIBULATKAN 70,600.00

Indramayu, ……………... 2023

Dibuat,
KONSULTAN PERENCANA
CV. PRATAMA DIPA

DARMOKO, S.T.
Direktur
ANALISA HARGA SATUAN

Ab.0PEMASANGAN 1 M2 RANGKA BESI HOLLOW 150 X 150 X 2 MM


No Uraian Satuan Koefisien* Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
1. Pekerja OH 0.250 79,000.00 19,750.00
2. Tukang Besi OH 0.250 103,000.00 25,750.00
2. Kepala Tukang OH 0.025 112,000.00 2,800.00
3. Mandor OH 0.013 128,000.00 1,664.00
JUMLAH HARGA TENAGA 49,964.00

B BAHAN
1. Rangka Metal Hollow 150.150.3 M' 1.500 50,000.00 75,000.00
2. Aksesoris (Perkuatan, Las, dll) Ls 1.000 50,000.00 50,000.00
JUMLAH HARGA TENAGA 125,000.00
C PERALATAN - - - -
JUMLAH HARGA PERALATAN 0
D JUMLAH (A+B+C) 174,964.00
E OVERHEAD & PROFIT 11% x D 19,246.04
F JUMLAH HARGA SATUAN PEKERJAAN (D+E) 194,210.04
G JUMLAH HARGA SATUAN DIBULATKAN 194,200.00

Indramayu, ……………... 2023

Dibuat,
KONSULTAN PERENCANA
CV. PRATAMA DIPA

DARMOKO, S.T.
Direktur
T001 Pek. Pasangan Tera Cota Uk, 5,5 x 23, 5x 2 Cm
Harga Satuan
No. Uraian Kode Satuan Koefisien Jumlah Harga ( Rp)
(Rp)
A TENAGA
Pekerja oh 0.900 79,000.00 71,100.00
Tukang oh 0.450 103,000.00 46,350.00
Kepala Tukang oh 0.045 112,000.00 5,040.00
Mandor oh 0.045 128,000.00 5,760.00
JUMLAH TENAGA KERJA 128,250.00
B. BAHAN
Tera Cota Uk, 5,5 x 23, 5x 2 Cm m2 1.100 385,000 423,500.00
Semen Portland Kg 9.600 1,700.00 16,320.00
Pasir Pasang m3 0.045 265,000.00 11,925.00
JUMLAH BAHAN 451,745.00
Jumlah harga tenaga, bahan dan peralatan 579,995.00
Overhead & profit 10 % 57,999.50
Harga satuan pekerjaan 637,994.50

A.4.1.1.6 1M3 Pembuatan Beton Mutu f'c=16,9 MPa (K-200) Setara 1Pc:2Ps:3Kr
Harga Satuan
No. Uraian Kode Satuan Koefisien Jumlah Harga ( Rp)
(Rp)
A TENAGA
Pekerja oh 1.650 79,000.00 130,350.00
Tukang oh 0.275 103,000.00 28,325.00
Kepala Tukang oh 0.028 112,000.00 3,136.00
Mandor oh 0.083 128,000.00 10,624.00
JUMLAH TENAGA KERJA 172,435.00
B. BAHAN
Semen Portland Kg 352.000 1,275 448,800.00
Pasir Beton Kg 731.000 142.86 104,430.66
Koral Kg 1031.000 185.19 190,930.89
Air Tawar ltr 215.000 2.00 430.00
JUMLAH BAHAN 744,591.55
Jumlah harga tenaga, bahan dan peralatan 917,026.55
Overhead & profit 10 % 91,702.66
Harga satuan pekerjaan 1,008,729.21

A.4.1.1.1 1M3 Pembuatan Lantai Kerja Beton Mutu f'c=7,4 MPa (K-100) atau Setara 1Pc:3Ps:5Kr
Harga Satuan
No. Uraian Kode Satuan Koefisien Jumlah Harga ( Rp)
(Rp)
A TENAGA
Pekerja oh 1.650 79,000.00 130,350.00
Tukang oh 0.275 103,000.00 28,325.00
Kepala Tukang oh 0.028 112,000.00 3,136.00
Mandor oh 0.083 128,000.00 10,624.00
JUMLAH TENAGA KERJA 172,435.00
B. BAHAN
Semen Portland Kg 247.000 1,275 314,925.00
Pasir Beton Kg 869.000 142.86 124,145.34
Koral Kg 999.000 185.19 185,004.81
Air Tawar ltr 215.000 2.00 430.00
JUMLAH BAHAN 624,505.15
Jumlah harga tenaga, bahan dan peralatan 796,940.15
Overhead & profit 10 % 79,694.02
Harga satuan pekerjaan 876,634.17
2.2.6.1.b Pembesian 100Kg dengan Besi Polos
Harga Satuan
No. Uraian Kode Satuan Koefisien Jumlah Harga ( Rp)
(Rp)
A TENAGA
Pekerja oh 0.700 79,000.00 55,300.00
Tukang oh 0.700 103,000.00 72,100.00
Kepala Tukang oh 0.070 112,000.00 7,840.00
Mandor oh 0.040 128,000.00 5,120.00
JUMLAH TENAGA KERJA 140,360.00
B. BAHAN
Besi Beton Polos Kg 150.000 16,000 2,400,000.00
Kawat Bendrat Kg 1.500 25,000.00 37,500.00
JUMLAH BAHAN 2,437,500.00
Jumlah harga tenaga, bahan dan peralatan 2,577,860.00
Jumlah 1 Kg 25,778.60
Overhead & profit 10 % 2,577.86
Harga satuan pekerjaan 28,356.46

Indramayu, ……………... 2023

Dibuat,
KONSULTAN PERENCANA
CV. PRATAMA DIPA

DARMOKO, S.T.
Direktur
ANALISIS HARGA SATUAN PEKERJAAN (AHSP)
BANGUNAN GEDUNG DAN PERUMAHAN
TAHUN ANGGARAN 2023
(KONTRAKTUAL)
LANTAI - 1 (DASAR)

NO URAIAN INDEKS SAT. HARGA SAT. UPAH BAHAN ALAT JUMLAH


(KODE) (Rp.) (Rp.) (Rp.) (Rp.) (Rp.)
1 2 3 4 5 6 = (3 x 5) 7 = (3 x 5) 8 = (3 x 5) 9 = (6+7+8)
A PEKERJAAN PERSIAPAN
A.5 1 M2 PEMBUATAN PAPAN NAMA PROYEK DIGITAL PRINTING
BAHAN
Cetak nama digital 1.0000 M2 35,000.00 - 35,000.00 - 35,000.00
Kayu Reng 2/3 (Kruing) 0.0060 M3 7,027,800.00 - 42,166.80 - 42,166.80
Kayu Kaso 5/7 (Kruing) 0.0280 M3 6,339,300.00 - 177,500.40 - 177,500.40
Paku Biasa 2" - 5" 0.2000 Kg 18,700.00 - 3,740.00 - 3,740.00
UPAH
Disain Cetak Digital 1.0000 Ls 30,000.00 30,000.00 - - 30,000.00
Ongkos Pasang 1.0000 Ls 25,000.00 25,000.00 - - 25,000.00
ALAT

JUMLAH 55,000.00 258,407.20 0.00 313,407.20


OVERHEAD & PROFIT (10 %) 5,500.00 25,840.72 0.00 31,340.72
HARGA SATUAN PEKERJAAN 60,500.00 284,247.92 0.00 344,747.92
A.5 DIBULATKAN 60,500.00 284,247.92 0.00 344,747.00

A.6 1 M2 MEMBERSIHKAN LAPANGAN DAN PERATAAN


UPAH
Pekerja 0.1000 Org 79,000.00 7,900.00 - - 7,900.00
Mandor 0.0500 Org 128,000.00 6,400.00 - - 6,400.00
JUMLAH 14,300.00 0.00 0.00 14,300.00
OVERHEAD & PROFIT (15 %) 1,430.00 0.00 0.00 1,430.00
HARGA SATUAN PEKERJAAN 15,730.00 0.00 0.00 15,730.00
A.6 DIBULATKAN 15,730.00 0.00 0.00 15,730.00

A.12 1 M3 BONGKARAN BETON BERTULANG


UPAH
Pekerja 13.3340 Org 79,000.00 1,053,386.00 - - 1,053,386.00
Mandor 0.6660 Org 128,000.00 85,248.00 - - 85,248.00
ALAT

JUMLAH 1,138,634.00 0.00 0.00 1,138,634.00


OVERHEAD & PROFIT (15 %) 113,863.40 0.00 0.00 113,863.40
HARGA SATUAN PEKERJAAN 1,252,497.40 0.00 0.00 1,252,497.40
A.12 DIBULATKAN 1,252,497.40 0.00 0.00 1,252,497.00

A.13 1 M3 BONGKARAN DINDING TEMBOK BATA


UPAH
Pekerja 6.6670 Org 79,000.00 526,693.00 - - 526,693.00
Mandor 0.3330 Org 128,000.00 42,624.00 - - 42,624.00
ALAT

JUMLAH 569,317.00 0.00 0.00 569,317.00


OVERHEAD & PROFIT (15 %) 56,931.70 0.00 0.00 56,931.70
HARGA SATUAN PEKERJAAN 626,248.70 0.00 0.00 626,248.70
A.13 DIBULATKAN 626,248.70 0.00 0.00 626,248.00

B PEKERJAAN TANAH
B.2 1 M3 GALIAN TANAH BIASA SEDALAM 2 METER
UPAH
Pekerja 0.9000 Org 79,000.00 71,100.00 - - 71,100.00
Mandor 0.0450 Org 128,000.00 5,760.00 - - 5,760.00
ALAT

JUMLAH 76,860.00 0.00 0.00 76,860.00


OVERHEAD & PROFIT (15 %) 7,686.00 0.00 0.00 7,686.00
HARGA SATUAN PEKERJAAN 84,546.00 0.00 0.00 84,546.00
B.2 DIBULATKAN 84,546.00 0.00 0.00 84,546.00

AHSP Hal ___ 17 of 61


NO URAIAN INDEKS SAT. HARGA SAT. UPAH BAHAN ALAT JUMLAH
(KODE) (Rp.) (Rp.) (Rp.) (Rp.) (Rp.)
1 2 3 4 5 6 = (3 x 5) 7 = (3 x 5) 8 = (3 x 5) 9 = (6+7+8)
B.9 1 M3 URUGAN KEMBALI GALIAN TANAH
UPAH
Pekerja 0.5000 Org 79,000.00 39,500.00 - - 39,500.00
Mandor 0.0500 Org 128,000.00 6,400.00 - - 6,400.00
ALAT

JUMLAH 45,900.00 0.00 0.00 45,900.00


OVERHEAD & PROFIT (15 %) 4,590.00 0.00 0.00 4,590.00
HARGA SATUAN PEKERJAAN 50,490.00 0.00 0.00 50,490.00
B.9 DIBULATKAN 50,490.00 0.00 0.00 50,490.00

B.12 1 M3 URUGAN PASIR


BAHAN
Pasir Urug 1.2000 M3 194,650.00 - 233,580.00 233,580.00
UPAH
Pekerja 0.3000 Org 79,000.00 23,700.00 - - 23,700.00
Mandor 0.0100 Org 128,000.00 1,280.00 - - 1,280.00
ALAT

JUMLAH 24,980.00 233,580.00 0.00 258,560.00


OVERHEAD & PROFIT (15 %) 2,498.00 23,358.00 0.00 25,856.00
HARGA SATUAN PEKERJAAN 27,478.00 256,938.00 0.00 284,416.00
B.12 DIBULATKAN 27,478.00 256,938.00 0.00 284,416.00

C.4 1 M3 PASANG PONDASI BATU KALI 1 Pc : 5 Ps


BAHAN
Batu Belah 15 cm / 20 cm 1.2000 M3 286,450.00 - 343,740.00 - 343,740.00
Semen Portland 136.0000 Kg 1,275.00 - 173,400.00 - 173,400.00
Pasir Pasang 0.5440 M3 261,800.00 - 142,419.20 - 142,419.20
UPAH
Pekerja 1.5000 Org 79,000.00 118,500.00 - - 118,500.00
Tukang Batu 0.7500 Org 103,000.00 77,250.00 - - 77,250.00
Kepala Tukang 0.0750 Org 112,000.00 8,400.00 - - 8,400.00
Mandor 0.0750 Org 128,000.00 9,600.00 - - 9,600.00
ALAT

JUMLAH 213,750.00 659,559.20 0.00 873,309.20


OVERHEAD & PROFIT (15 %) 21,375.00 65,955.92 0.00 87,330.92
HARGA SATUAN PEKERJAAN 235,125.00 725,515.12 0.00 960,640.12
C.4 DIBULATKAN 235,125.00 725,515.12 0.00 960,640.00
G PEKERJAAN BETON

AHSP Hal ___ 18 of 61


NO URAIAN INDEKS SAT. HARGA SAT. UPAH BAHAN ALAT JUMLAH
(KODE) (Rp.) (Rp.) (Rp.) (Rp.) (Rp.)
1 2 3 4 5 6 = (3 x 5) 7 = (3 x 5) 8 = (3 x 5) 9 = (6+7+8)
G.16 1 M2 BEKISTING UNTUK PONDASI
BAHAN
Kayu Kelas III (Borneo/dll) 0.0400 M3 4,335,000.00 - 173,400.00 - 173,400.00
Paku Biasa 2" - 5" 0.3000 Kg 18,700.00 - 5,610.00 - 5,610.00
Minyak Bekisting 0.1000 Liter 16,150.00 - 1,615.00 - 1,615.00
UPAH
Pekerja 0.5200 Org 79,000.00 41,080.00 - - 41,080.00
Tukang Kayu 0.2600 Org 110,000.00 28,600.00 - - 28,600.00
Kepala Tukang 0.0260 Org 112,000.00 2,912.00 - - 2,912.00
Mandor 0.0260 Org 128,000.00 3,328.00 - - 3,328.00
ALAT

JUMLAH 75,920.00 180,625.00 0.00 256,545.00


OVERHEAD & PROFIT (15 %) 7,592.00 18,062.50 0.00 25,654.50
HARGA SATUAN PEKERJAAN 83,512.00 198,687.50 0.00 282,199.50
G.16 DIBULATKAN 83,512.00 198,687.50 0.00 282,199.00

G.23 1 M2 PASANG BEKISTING PAPAN


BAHAN
Kaso 5/7 Borneo (2x Pakai) 50% 0.0170 M3 4,335,000.00 - 73,695.00 - 73,695.00
Papan Terentang (3x Pakai) 75% 0.0240 M3 3,116,950.00 - 74,806.80 - 74,806.80
Paku Biasa 2" - 5" 0.4000 Kg 18,700.00 - 7,480.00 - 7,480.00
UPAH
Pekerja 0.1200 Org 79,000.00 9,480.00 - - 9,480.00
Tukang Kayu 0.1500 Org 110,000.00 16,500.00 - - 16,500.00
Kepala Tukang 0.1500 Org 112,000.00 16,800.00 - - 16,800.00
Pembantu Tukang 0.1200 Org 80,000.00 9,600.00 - - 9,600.00
Mandor 0.0500 Org 128,000.00 6,400.00 - - 6,400.00
ALAT

JUMLAH 58,780.00 155,981.80 0.00 214,761.80


OVERHEAD & PROFIT (10 %) 5,878.00 15,598.18 0.00 21,476.18
HARGA SATUAN PEKERJAAN 64,658.00 171,579.98 0.00 236,237.98
G.23 DIBULATKAN 64,658.00 171,579.98 0.00 236,237.00

G.24 1 KG PEMBESIAN DENGAN BESI POLOS


BAHAN
Besi Beton Polos 1.0500 Kg 12,750.00 - 13,387.50 - 13,387.50
Kawat Beton 0.0150 Kg 30,600.00 - 459.00 - 459.00
UPAH
Pekerja 0.0070 Org 79,000.00 553.00 - - 553.00
Tukang Besi 0.0070 Org 103,000.00 721.00 - - 721.00
Kepala Tukang 0.0007 Org 112,000.00 78.40 - - 78.40
Mandor 0.0004 Org 128,000.00 51.20 - - 51.20
ALAT

JUMLAH 1,403.60 13,846.50 0.00 15,250.10


OVERHEAD & PROFIT (10 %) 140.36 1,384.65 0.00 1,525.01
HARGA SATUAN PEKERJAAN 1,543.96 15,231.15 0.00 16,775.11
G.24 DIBULATKAN 1,543.96 15,231.15 0.00 16,775.00

AHSP Hal ___ 19 of 61


NO URAIAN INDEKS SAT. HARGA SAT. UPAH BAHAN ALAT JUMLAH
(KODE) (Rp.) (Rp.) (Rp.) (Rp.) (Rp.)
1 2 3 4 5 6 = (3 x 5) 7 = (3 x 5) 8 = (3 x 5) 9 = (6+7+8)
P PEKERJAAN PENGECATAN
P.1 1 M2 MENGIKIS / MENGEROK PERMUKAAN CAT DINDING LAMA
BAHAN
Soda Api 0.0500 Kg 49,300.00 - 2,465.00 - 2,465.00
UPAH
Pekerja 0.1500 Org 79,000.00 11,850.00 - - 11,850.00
Mandor 0.0030 Org 128,000.00 384.00 - - 384.00
ALAT

JUMLAH 12,234.00 2,465.00 0.00 14,699.00


OVERHEAD & PROFIT (15 %) 1,223.40 246.50 0.00 1,469.90
HARGA SATUAN PEKERJAAN 13,457.40 2,711.50 0.00 16,168.90
P.1 DIBULATKAN 13,457.40 2,711.50 0.00 16,168.00

P.15 1 M2 PENGECATAN TEMBOK LAMA 1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP DULUX
BAHAN
Cat Dasar Dulux 0.1200 Kg 61,200.00 - 7,344.00 - 7,344.00
Cat Penutup 2x Dulux 0.1800 Kg 61,200.00 - 11,016.00 - 11,016.00
Roll Cat 0.0100 Bh 31,450.00 - 314.50 - 314.50
Ampelas 0.5000 Lbr 6,800.00 - 3,400.00 - 3,400.00
UPAH
Pekerja 0.0280 Org 79,000.00 2,212.00 - - 2,212.00
Tukang Cat 0.0420 Org 103,000.00 4,326.00 - - 4,326.00
Kepala Tukang 0.0042 Org 112,000.00 470.40 - - 470.40
Mandor 0.0025 Org 128,000.00 320.00 - - 320.00
ALAT

JUMLAH 7,328.40 22,074.50 0.00 29,402.90


OVERHEAD & PROFIT (15 %) 732.84 2,207.45 0.00 2,940.29
HARGA SATUAN PEKERJAAN 8,061.24 24,281.95 0.00 32,343.19
P.15 DIBULATKAN 8,061.24 24,281.95 0.00 32,343.00

AHSP Hal ___ 20 of 61


NO URAIAN INDEKS SAT. HARGA SAT. UPAH BAHAN ALAT JUMLAH
(KODE) (Rp.) (Rp.) (Rp.) (Rp.) (Rp.)
1 2 3 4 5 6 = (3 x 5) 7 = (3 x 5) 8 = (3 x 5) 9 = (6+7+8)
P.20 1 M2 MENGECAT BESI ( 3x )
BAHAN
Meni Besi 0.1670 Kg 41,650.00 - 6,955.55 - 6,955.55
Cat Besi 0.2000 Kg 66,300.00 - 13,260.00 - 13,260.00
Ampelas Besi 0.4000 Lbr 6,800.00 - 2,720.00 - 2,720.00
Minyak Cat Thiner 0.1500 Ltr 32,300.00 - 4,845.00 - 4,845.00
Kuas 0.0500 Bh 11,050.00 - 552.50 - 552.50
UPAH
Pekerja 0.2000 Org 79,000.00 15,800.00 - - 15,800.00
Tukang Cat 0.3000 Org 103,000.00 30,900.00 - - 30,900.00
Kepala Tukang 0.0300 Org 112,000.00 3,360.00 - - 3,360.00
Mandor 0.0100 Org 128,000.00 1,280.00 - - 1,280.00
ALAT

JUMLAH 51,340.00 28,333.05 0.00 79,673.05


OVERHEAD & PROFIT (15 %) 5,134.00 2,833.31 0.00 7,967.31
HARGA SATUAN PEKERJAAN 56,474.00 31,166.36 0.00 87,640.36
P.20 DIBULATKAN 56,474.00 31,166.36 0.00 87,640.00

Indramayu, ……………... 2023


0.00
Dibuat,
KONSULTAN PERENCANA
CV. PRATAMA DIPA

DARMOKO, S.T.
Direktur

AHSP Hal ___ 21 of 61


PEMERINTAH KABUPATEN INDRAMAYU
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
Jl. Pahlawan No. 61 Telp. (0234) 274264 Fax (0234) 272741
I N D R A M A Y U - 45212

HARGA DASAR SATUAN BAHAN (EE)


TAHUN ANGGARAN 2023

NO. JENIS BAHAN SATUAN HARGA (Rp.) KETERANGAN


1 2 3 4 5
A BAHAN AGGREGAT, BAHAN PELEKAT, BAHAN JADINYA
2 Pasir pasang M3 261,800.00
3 Pasir beton M3 296,650.00
8 Batu pecah 2 - 3 cm M3 313,650.00
41 Semen portland (PC) Tipe I (1 Zak = 50 Kg) Kg 1,275.00
42 Semen warna Kg 17,391.00
43 Semen putih Kg 3,740.00
47 Semen Plesteran Dinding Bata Ringan (PM - 200) Kg 3,230.00
48 Semen Acian Dinding Bata Ringan (PM - 300) Kg 4,930.00
49 Semen Perekat Dinding Bata Ringan (PM -110) Kg 4,250.00
51 Compound Zak 79,050.00

B BAHAN KAYU BERIKUT BAHAN JADINYA


8 Papan Terentang (Albasia) M3 3,116,950.00
23 Kayu kaso 5/7 Borneo M3 4,335,000.00
24 Kayu kaso 5/7 Kruing M3 6,339,300.00
26 Kayu reng 2/3 Kruing M3 7,027,800.00

BAHAN LOGAM DAN BAHAN JADINYA


35 Hollow Galvanis 20.20.2 ( 6 m) Btg 47,600.00
39 Hollow Galvanis 40.40.2 ( 6 m) Btg 119,850.00
88 Kawat beton Kg 30,600.00
96 Paku sekrup Bh 297.50
101 Paku payung Sekrup Kg 1,190.00
102 Paku biasa 2"-5" Kg 18,700.00
103 Paku biasa 1/2" - 1" Kg 22,100.00
111 Dina Bolt M 12 P. 6 - 12 cm Bh 6,545.00
129 Kusen Aluminium Standar Natural 4" M' 104,550.00

E BAHAN PENUTUP ATAP, PLAFOND & RANGKANYA


8 Papan GRC ( 120 x 240 ) cm Lbr 63,750.00
9 Papan Lisplank GRC L = 0,30 M, P. 2,40 M Lbr 94,350.00
11 Papan Lisplank GRC L = 0,10 M, P. 2,40 M Lbr 53,550.00
42 Baja Ringan Zincallume t. 0,75 mm M2 173,400.00
45 Rangka Baja Ringan Zincallume C70 t. 0,75 mm (6 m) Btg 85,850.00
51 Reng Baja Ringan Zincallume t.0,75 mm (6 m) Btg 48,450.00
63 Genteng metal pasir 2 x 4 M2 133,450.00
88 Genteng decra bond M' 48,450.00

F BAHAN LANTAI & PELAPIS DINDING


5 Keramik putih 40 x 40 cm Kw.1 M2 58,650.00
11 Keramik putih 20 x 20 cm Anti Slip Kw.1 M2 58,650.00
14 Keramik dinding Warna 20 x 25 cm M2 63,750.00

G BAHAN KACA
2 Kaca polos 5 mm M2 134,300.00

HDS BAHAN ___ 22 of 61


NO. JENIS BAHAN SATUAN HARGA (Rp.) KETERANGAN
1 2 3 4 5
H BAHAN FINISHING, LABURAN, PENGISI DAN ALATNYA
1 Plamir tembok Kg 21,250.00
3 Roll cat tembok Bh 31,450.00
5 Kuwas 3" Bh 11,050.00
14 Ampelas Lbr 6,800.00
22 Cat tembok setara Metrolite Kg 42,500.00

K BAHAN ALAT LISTRIK


1 Titik lampu komplit Ttk 121,550.00
2 Sakelar tunggal Setara Broco Bh 18,700.00
3 Sakelar double Setara Broco Bh 21,250.00
4 Sakelar Triple Setara Broco Bh 23,800.00
5 Stop kontak Bh 19,550.00
6 Stop kontak AC Bh 73,100.00
7 Lampu Downlight philips Glass recessed (18 Watt) Bh 156,000.00

L ALAT BANTU
1 Cangkul atau sekop Bh 80,750.00
2 Parang Bh 69,700.00
3 Pikulan dan 2 Bakul Bh 48,450.00
4 Palu / Godam Pemecah Batu Bh 48,450.00
5 Stamper 250 Kg Hari 250,000.00

Catatan : Harga tidak termasuk keuntungan


Indramayu, ……………... 2023

Dibuat,
KONSULTAN PERENCANA
CV. PRATAMA DIPA

DARMOKO, S.T.
Direktur

HDS BAHAN ___ 23 of 61


PEMERINTAH KABUPATEN INDRAMAYU
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
Jl. Pahlawan No. 61 Telp. (0234) 274264 Fax (0234) 272741
I N D R A M A Y U - 45212

HARGA DASAR SATUAN UPAH (EE)


TAHUN ANGGARAN 2023

NO. JENIS PEKERJA UPAH (RP.) SATUAN KETERANGAN


1 2 3 4 5
I UPAH
A PEKERJA KONSTRUKSI
1 Mandor 128,000.00 Orang / Hari
2 Kepala Tukang 112,000.00 Orang / Hari
3 Tukang Batu 103,000.00 Orang / Hari
4 Tukang Besi 103,000.00 Orang / Hari
5 Tukang Cat 103,000.00 Orang / Hari
6 Tukang Kayu 110,000.00 Orang / Hari
7 Tukang Las 110,000.00 Orang / Hari
8 Tukang Besi Konstruksi 103,000.00 Orang / Hari
9 Tukang Bor 110,000.00 Orang / Hari
10 Pembantu Tukang 80,000.00 Orang / Hari
11 Pekerja 79,000.00 Orang / Hari
12 Operator Terlatih 121,000.00 Orang / Hari
13 Operator Kurang Terlatih 112,000.00 Orang / Hari
14 Pembantu Operator 107,000.00 Orang / Hari
15 Supir Truck 128,000.00 Orang / Hari
16 Pembantu Supir 105,000.00 Orang / Hari
17 Buruh Lapangan Tak Terlatih 79,000.00 Orang / Hari
18 Buruh Lapangan Terlatih 94,000.00 Orang / Hari

B KELOMPOK TUKANG KHUSUS


1 UB1 Tukang Aluminium 108,000.00 Orang / Hari
2 UB2 Juru Ukur 118,000.00 Orang / Hari
3 UB3 Asisten Juru Ukur 98,000.00 Orang / Hari

Indramayu, ……………... 2023

Dibuat,
KONSULTAN PERENCANA
CV. PRATAMA DIPA

DARMOKO, S.T.
Direktur

HDS UPAH ___ Hal. 24 of 61


BESI BETON POLOS

Diameter Berat Besi


No mm Kg/m
1.00 6.00 0.22 2.64
2.00 8.00 0.39 4.72
3.00 10.00 0.62 7.44
4.00 12.00 0.89 10.64
5.00 14.00 1.21 14.50
6.00 16.00 1.58 18.96
7.00 19.00 2.25 27.00

PERHITUNGAN KEBUTUHAN BESI & BEKISTING BETON BERTULANG

Volume
No Sub Komponen Ukuran Beton (m3) Perhitungan Kebutuhan Besi Beton

1.00 Kolom 1.00 1.00 - Panjang kolom 1 m3 = 11.11 m


0.30 8.00 - Isi 8 btg besi d. 16 mm = 140.44 Kg 0.25
0.30 - Besi Begel d. 10 mm jarak 15 cm = 30.86 Kg 0.25
- 1 m3 kolom memerlukan besi = 171.30 Kg
- 1 m3 kolom memerlukan bekisting = 13.33 m2
DAFTAR HARGA SATUAN PEKERJAAN
TAHUN ANGGARAN 2022
(KONTRAKTUAL)

KODE HARGA SATUAN (Rp.) JUMLAH


No URAIAN PEKERJAAN
ANALISA UPAH BAHAN ALAT (Rp.)
1 2 3 4 5 6 7 = (4+5+6)

1 1 M2 PEMBUATAN PAPAN NAMA PROYEK DIGITAL PRINTING A.5 60,500.00 284,247.92 0.00 344,747.00
2 1 M2 MEMBERSIHKAN LAPANGAN DAN PERATAAN A.6 15,730.00 0.00 0.00 15,730.00
3 1 M3 BONGKARAN BETON BERTULANG A.12 1,252,497.40 0.00 0.00 1,252,497.00
4 1 M3 BONGKARAN DINDING TEMBOK BATA A.13 626,248.70 0.00 0.00 626,248.00
5 1 M3 GALIAN TANAH BIASA SEDALAM 2 METER B.2 84,546.00 0.00 0.00 84,546.00
6 1 M3 URUGAN KEMBALI GALIAN TANAH B.9 50,490.00 0.00 0.00 50,490.00
7 1 M3 URUGAN PASIR B.12 27,478.00 256,938.00 0.00 284,416.00
8 1 M3 PASANG PONDASI BATU KALI 1 Pc : 5 Ps C.4 235,125.00 725,515.12 0.00 960,640.00
9 1 M2 BEKISTING UNTUK PONDASI G.16 83,512.00 198,687.50 0.00 282,199.00
10 1 M2 PASANG BEKISTING PAPAN G.23 64,658.00 171,579.98 0.00 236,237.00
11 1 KG PEMBESIAN DENGAN BESI POLOS G.24 1,543.96 15,231.15 0.00 16,775.00

DHSP ___ Hal. 26 of 61


KODE HARGA SATUAN (Rp.) JUMLAH
No URAIAN PEKERJAAN
ANALISA UPAH BAHAN ALAT (Rp.)
1 2 3 4 5 6 7 = (4+5+6)
12 1 M2 MENGIKIS / MENGEROK PERMUKAAN CAT DINDING LAMA P.1 13,457.40 2,711.50 0.00 16,168.00
13 1 M2 PENGECATAN TEMBOK LAMA 1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP DULUX P.15 8,061.24 24,281.95 0.00 32,343.00
14 1 M2 MENGECAT BESI ( 3x ) P.20 56,474.00 31,166.36 0.00 87,640.00
15 1M' INSTALASI NEON BOX LED AKRILIK A.J.1 200,450.00 1,124,034.43 0.00 1,470,100.00
16 1M3 PEMBUATAN LANTAI KERJA BETON MUTU F'C=7,4 MPA (K-100) ATAU SETARA 1PC:3 A.4.1.1.1 172,435.00 624,505.15 0.00 876,634.17
17 1M3 PEMBUATAN BETON MUTU F'C=16,9 MPA (K-200) SETARA 1PC:2PS:3KR A.4.1.1.6 172,435.00 744,591.55 0.00 1,008,729.21
18 1M2 PEKERJAAN PASANGAN TERACOTA UK 5,5 X 23,5 X 2 CM T001 128,250.00 451,745.00 0.00 637,994.50
19 1M2 PEMBUATAN PAGAR SEMENTARA DARI KAYU TINGGI 2 METER A.2.2.1.1.a 58,400.00 203,204.06 0.00 290,300.00
20 1M2 MEMASANG PAGAR BESI HOLLOW 40 X 40 MM & 20 X 40 MM TEBAL 1,2 MM STAINL V001 201,260.00 679,120.00 0.00 977,200.00
21 1M2 MEMASANG PINTU PAGAR BESI HOLLOW STAINLESS STEEL STANDAR V002 306,390.00 530,541.67 0.00 928,900.00

Indramayu, ……………... 2023

Dibuat,
KONSULTAN PERENCANA
CV. PRATAMA DIPA

DARMOKO, S.T.
Direktur

DHSP ___ Hal. 27 of 61


A PENGECATAN PAGAR BALAI BENIH HORTIKULTURA KEBULEN KABUPATEN INDRAMAYU
I PEKERJAAN PERSIAPAN
1 Pek. Papan Nama Kegiatan Digital Printing
P X L = JUMLAH
1.00 1.00 = 1.00 M2
3 Pembersihan Lapangan
P X L X JML SISI = JUMLAH
198.35 1.00 2.00 = 396.70

II PEKERJAAN PENGIKISAN CAT DINDING LAMA


1 Pek. Pengikisan Cat Kolom 40/40
((Pk x Lk) X JML SISI) + ((Pprofil
0.40 1.85 4.00 0.50
2 Pek. Pengikisan Cat Kolom 20/20
((Pk x Lk) X JML SISI) + ((Pprofil
0.20 1.85 4.00 0.35
3 Pek. Pengikisan Cat Dinding Pagar
(Pd x Ld X JML SISI X JML dinding)
3.00 1.70 2.00 1.00
((Pd x Ld) X JML SISI) X JML dinding
3.35 0.75 2.00 40.00
((Pd x Ld) X JML SISI) X JML dinding
2.30 0.75 2.00 5.00
((Pd x Ld) X JML SISI) X JML dinding
1.85 0.70 2.00 1.00
((Pd x Ld) X JML SISI) X JML dinding
1.85 0.30 2.00 5.00
((Pd x Ld) X JML SISI) X JML dinding
0.90 0.30 2.00 1.00
((Pd x Ld) X JML SISI) X JML dinding
1.00 1.60 2.00 2.00
((Pd x Ld) X JML SISI) X JML dinding
40.00 0.20 2.00 1.00
((Pd x Ld) X JML SISI) X JML dinding
147.00 0.20 2.00 1.00
(Patas bag pagar x Latas bag pagar X JML SISI) + (Patas bag pagar
3.35 0.62 1.00 2.30
JUMLAH VOLUME DINDING
405.23 M2

IV PEKERJAAN PENGECATAN
1 Pek. Pengecatan Kolom 40/40
((Pk x Lk) X JML SISI) + ((Pprofil
0.40 1.85 4.00 0.50
2 Pek. Pengecatan Kolom 20/20
((Pk x Lk) X JML SISI) + ((Pprofil
0.20 1.85 4.00 0.35
4 Pek. Pengecatan Dinding Pagar
(Pd x Ld X JML SISI X JML dinding)
3.00 1.70 2.00 1.00
((Pd x Ld) X JML SISI) X JML dinding
3.35 0.75 2.00 41.00
((Pd x Ld) X JML SISI) X JML dinding
2.30 0.75 2.00 5.00
((Pd x Ld) X JML SISI) X JML dinding
1.85 0.70 2.00 1.00
((Pd x Ld) X JML SISI) X JML dinding
1.85 0.30 2.00 5.00
((Pd x Ld) X JML SISI) X JML dinding
0.90 0.30 2.00 1.00
((Pd x Ld) X JML SISI) X JML dinding
1.00 1.60 2.00 2.00
((Pd x Ld) X JML SISI) X JML dinding
40.00 0.20 2.00 1.00
((Pd x Ld) X JML SISI) X JML dinding
147.00 0.20 2.00 1.00
(Patas bag pagar x Latas bag pagar X JML SISI) + (Patas bag pagar
3.35 0.62 1.00 2.30
JUMLAH VOLUME DINDING
388.88 M2
5 Pek. Pengecatan Pagar Besi
Ppagar x Lpagar X JML SISI = JUMLAH
2.30 1.62 2.00 = 7.45
Ppagar x Lpagar X JML SISI = JUMLAH
3.00 1.62 2.00 = 9.72
Pbesipagar x Lbesipagar X JML SISI X JML PANEL
3.15 0.91 2.00 41.00
Pbesipagar x Lbesipagar X JML SISI X JML PANEL
2.19 0.90 2.00 5.00
JUMLAH VOLUME PAGAR
271.94 M2
V PEKERJAAN AKRILIK LED BACKLIT LETTERS
1 Pek. Akrilik LED Backlit Letters
Tpagar indramayu X Jumlah Huruf indramayu X JML SISI =
0.45 20.00 2.00 =

B PEMBUATAN GAPURA TERACOTA BALAI BENIH HORTIKULTURA KEBULEN KABUPATEN INDRAMAYU


I PEKERJAAN PEMBONGKARAN
1 Pek. Pembongkaran Pas. Beton Bertulang
Ppond X Lpond X Tpond X JML SISI
0.50 0.50 0.27 2.00
Pk X Lk) X Tk X JML SISI
0.25 0.25 4.42 2.00
Pponddind X Lponddind X Tponddind X JML SISI
0.50 0.52 0.20 1.00
Pponddind X Lponddind X Tponddind X JML SISI
0.50 5.00 0.20 1.00
Pk X Lk) X Tk X JML SISI
0.40 0.40 2.30 1.00
JUMLAH VOLUME KOLOM+POND
1.61 M3
2 Pek. Pembongkaran Pas. Dinding Lama
Pgap X Lgap X Tgap X JML SISI
5.25 0.25 1.28 2.00
Pd X Ld X Td X JML SISI
0.50 0.15 1.60 1.00
Pd X Ld X Td X JML SISI
1.50 0.15 0.80 1.00
JUMLAH VOLUME
3.66 M3
II PEKERJAAN TANAH DAN PASIR
1 Pek. Galian Tanah Pondasi
Pgal X Lgal X Tgal X JML SISI
1.65 1.65 2.13 2.00
2 Pek. Urugan Kembali Bekas Galian
Pgal X Lgal X Tgal X JML SISI
1.65 1.65 2.13 2.00
3 Pek. Lapisan pasir bawah pondasi t. 5 cm
P X L X T X JML SISI
1.65 1.65 0.05 2.00
III PEKERJAAN PONDASI FOOTPLAT 130x130x13
1 Pek. Beton Lantai Kerja K-100
Pltkerja X Lltkerja X Tltkerja X JML SISI
1.65 1.65 0.05 2.00
2 Pek. Beton Footplat K-200
Penampang atas ((Luasatas + Luasbawah) : 2) X TEBAL
0.09 1.69 2.00 0.13
Penampang bawah P X L X T X JML SISI
1.30 1.30 0.13 2.00
JUMLAH VOLUME BETON K-200
0.67 M3
3 Pek. Besi Beton Polos
Besi atas Pbesi X JMLbesi X KOEFbesi X JML POND
1.70 8.00 1.58 2.00
Pbesi X JMLbesi X KOEFbesi X JML POND
1.70 8.00 1.58 2.00
Besi bawah Pbesi X JMLbesi X KOEFbesi X JML POND
1.70 8.00 1.58 2.00
Pbesi X JMLbesi X KOEFbesi X JML POND
1.70 8.00 1.58 2.00
JUMLAH VOLUME BETON POLOS
171.71 KG
4 Pek. Bekisting Footplat
P X L X JML SISI X JML POND
0.13 1.30 4.00 2.00

IV PEKERJAAN KOLOM 30/30


1 Cor Beton K.200 Site mix
(Pk X Lk X Tk X JML SISI)
0.30 0.30 7.37 2.00
2 Pek. Bekisting dengan papan terentang
P X L X JML SISI X JML POND
0.30 0.30 4.00 2.00
3 Pek. Pembesian U-24
JML VOL BESI X JML SISI = JUMLAH
171.30 2.00 = 342.60 M2
V PEKERJAAN PONDASI BATU KALI 195x155
1 Pek. Pondasi Batu Kali 1Pc : 5Ps
(Ppond X Lpond X Tpond X JML SISI)
1.55 1.55 1.95 2.00

VI PEKERJAAN TERACOTA
1 Pas. Batu Teracota Untuk Kolom
(Pk X Lk X JML SISI) = JUMLAH
1.40 0.29 2.00 = 0.81
(Pk X Lk X JML SISI) = JUMLAH
1.40 0.12 2.00 = 0.34
(Pk X Lk X JML SISI) = JUMLAH
1.40 0.41 2.00 = 1.15
(Pk X Lk X JML SISI) = JUMLAH
1.40 0.24 2.00 = 0.67
(Pk X Lk X JML SISI) = JUMLAH
1.40 1.00 2.00 = 2.80
(Pk X Lk X JML SISI) = JUMLAH
1.40 0.46 2.00 = 1.29
(Pk X Lk X JML SISI) = JUMLAH
1.40 0.22 2.00 = 0.62
(Pk X Lk X JML SISI) = JUMLAH
1.40 0.19 2.00 = 0.53
(Pk X Lk X JML SISI) = JUMLAH
1.40 0.37 2.00 = 1.04
(Pk X Lk X JML SISI) = JUMLAH
1.40 0.11 2.00 = 0.31
(Pk X Lk X JML SISI) = JUMLAH
1.40 0.32 2.00 = 0.90
(Pk X Lk X JML SISI) = JUMLAH
1.40 0.11 2.00 = 0.31
(Pk X Lk X JML SISI) = JUMLAH
1.40 0.10 2.00 = 0.28
(Pk X Lk X JML SISI) = JUMLAH
1.40 0.17 2.00 = 0.48
(Pk X Lk X JML SISI) = JUMLAH
1.40 0.32 2.00 = 0.90
(Pk X Lk X JML SISI) = JUMLAH
1.40 0.25 2.00 = 0.70
(Pk X Lk X JML SISI) = JUMLAH
1.40 1.05 2.00 = 2.94
(Pk X Lk X JML SISI) = JUMLAH
1.40 0.32 2.00 = 0.90
(Pk X Lk X JML SISI) = JUMLAH
1.40 0.25 2.00 = 0.70
(Pk X Lk X JML SISI) = JUMLAH
1.40 1.05 2.00 = 2.94
JUMLAH VOLUME TERACOTA
20.58 M3

C PEMBUATAN PAGAR BALAI BENIH HORTIKULTURA KEBULEN KABUPATEN INDRAMAYU


I PEKERJAAN PEMAGARAN
1 Pek. Pagar kayu anyaman
P X L = JUMLAH
58.00 2.00 = 116.00 M2
2 Pek. Pagar Besi Hollow 40 x 40 mm
P X L = JUMLAH
8.00 2.00 = 16.00 M2
3 Pek. Pintu Pagar Besi Hollow
P X L = JUMLAH
2.00 2.00 = 4.00 M2
M2

X Lprofil) X JML SISI) X JML K = JUMLAH


0.40 4.00 57.00 = 214.32 M2

X Lprofil) X JML SISI) X JML K = JUMLAH


0.35 4.00 2.00 = 3.94 M2

+ (Patas X Latas) = JUMLAH


3.00 0.15 = 10.65 M2
+ (Patas X Latas) = JUMLAH
3.35 0.15 = 221.10 M2
+ (Patas X Latas) = JUMLAH
2.30 0.15 = 18.98 M2
+ (Patas X Latas) = JUMLAH
0.70 0.15 = 2.70 M2
+ (Patas X Latas) = JUMLAH
0.30 0.15 = 5.78 M2
+ (Patas X Latas) = JUMLAH
0.30 0.15 = 0.59 M2
+ (Patas X Latas) = JUMLAH
1.50 0.15 = 6.85 M2
+ (Patas X Latas X JML SISI X JML SEGMEN) =
3.35 0.18 2.00 11.00 =
+ (Patas X Latas X JML SISI X JML SEGMEN) =
3.35 0.18 2.00 39.00 =
x Latas bag pagar X JML SISI) = JUMLAH
0.62 1.00 = 3.50 M2

X Lprofil) X JML SISI) X JML K = JUMLAH


0.40 4.00 58.00 = 218.08 M2

X Lprofil) X JML SISI) X JML K = JUMLAH


0.35 4.00 2.00 = 3.94 M2

+ (Patas X Latas) = JUMLAH


3.00 0.15 = 10.65 M2
+ (Patas X Latas) = JUMLAH
3.35 0.15 = 206.53 M2
+ (Patas X Latas) = JUMLAH
2.30 0.15 = 17.60 M2
+ (Patas X Latas) = JUMLAH
0.70 0.15 = 2.70 M2
+ (Patas X Latas) = JUMLAH
0.30 0.15 = 5.60 M2
+ (Patas X Latas) = JUMLAH
0.30 0.15 = 0.59 M2
+ (Patas X Latas) = JUMLAH
1.50 0.15 = 6.63 M2
+ (Patas X Latas X JML SISI X JML SEGMEN) =
3.35 0.18 2.00 11.00 =
+ (Patas X Latas X JML SISI X JML SEGMEN) =
3.35 0.18 2.00 39.00 =
x Latas bag pagar X JML SISI) = JUMLAH
0.62 1.00 = 3.50 M2

M2

M2
= JUMLAH
= 235.05 M2
= JUMLAH
= 19.71 M2

JUMLAH
18.00 M'

N INDRAMAYU

= JUMLAH
= 0.14 M3
= JUMLAH
= 0.55 M3
= JUMLAH
= 0.05 M3
= JUMLAH
= 0.50 M3
= JUMLAH
= 0.37 M3

= JUMLAH
= 3.36 M3
= JUMLAH
= 0.12 M3
= JUMLAH
= 0.18 M3

= JUMLAH
= 11.60 M3

= JUMLAH
= 11.60 M3

= JUMLAH
= 0.27 M3

= JUMLAH
= 0.27 M3

X JML SISI = JUMLAH


2.00 = 0.23 M3
= JUMLAH
= 0.44 M3

= JUMLAH Koef besi dxdx0.006165


= 42.93 KG besi 8Φ16
= JUMLAH
= 42.93 KG
= JUMLAH
= 42.93 KG
= JUMLAH
= 42.93 KG

= JUMLAH
= 1.35 M2

= JUMLAH
= 1.33 M3

= JUMLAH
= 0.72 M2 T K 7.37
begel Φ10
- VOLfootplat = JUMLAH
0.24 = 9.13 M3

M3 besi 8Φ16
begel 15 x 0.60 tambah lekukan bendrat 5 cm
M3 jarak 15 cm
keb begelTkolom/jar 49.13 50.00
M3
58.96 59.00 4.92
M3 59 meter 5.00 btg
93.22
M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3
JUMLAH
29.27 M2
JUMLAH
105.83 M2
JUMLAH
29.27 M2
JUMLAH
105.83 M2
0.70 1 begel panjang 70cm
35.00 50 begel 3 2.92 3 batang
21.70

114.92
RENCANA ANGGARAN BIAYA (RAB)

KEGIATAN : PENGELOLAAN SUMBER DAYA GENETIK (SDG) HEWAN, TUMBUHAN, DAN MIKRO ORGANISME KEWENANGAN KABUPATEN INDRAMAYU
SUB KEGIATAN : PEMANFAATAN SDG HEWAN / TANAMAN
PEKERJAAN : REHABILITASI PAGAR BALAI BENIH HORTIKULTURA KEBULEN KABUPATEN INDRAMAYU
SUMBER DANA : APBD TAHUN ANGGARAN 2023
LOKASI : DESA KEBULEN KECAMATAN JATIBARANG KABUPATEN INDRAMAYU

HARGA JUMLAH
NO. URAIAN PEKERJAAN VOLUME SATUAN ANALISA SATUAN TOTAL
(Rp.) (Rp.)
1 2 3 4 5 6 7

A PENGECATAN PAGAR BALAI BENIH HORTIKULTURA KEBULEN KABUPATEN INDRAMAYU


I PEKERJAAN PERSIAPAN
1 Pek. Papan Nama Kegiatan Digital Printing 1.00 M2 A.5 344,747.00 344,747.00
2 Pek. Pengukuran 1.00 Ls - 489,500.00 489,500.00
3 Pembersihan Lapangan 396.70 M2 A.6 15,730.00 6,240,091.00
4 Biaya Adm. dan Dokumentasi 1.00 Ls - 489,500.00 489,500.00
7,563,838.00
II PEKERJAAN PENGIKISAN CAT DINDING LAMA
1 Pek. Pengikisan Cat Kolom 40/40 214.32 M2 P.1 16,168.00 3,465,125.76
2 Pek. Pengikisan Cat Kolom 20/20 3.94 M2 P.1 16,168.00 63,701.92
3 Pek. Pengikisan Cat Dinding Pagar 405.23 M2 P.1 16,168.00 6,551,807.14
10,080,634.82
III PEKERJAAN PENGIKISAN CAT PAGAR BESI
1 Pek. Pengikisan Cat Pagar Besi 1.00 Ls - 250,000.00 250,000.00
250,000.00
IV PEKERJAAN PENGECATAN
1 Pek. Pengecatan Kolom 40/40 218.08 M2 P.15 32,343.00 7,053,361.44
2 Pek. Pengecatan Kolom 20/20 3.94 M2 P.15 32,343.00 127,431.42
4 Pek. Pengecatan Dinding Pagar 388.88 M2 P.15 32,343.00 12,577,400.30
5 Pek. Pengecatan Pagar Besi 271.94 M2 P.20 87,640.00 23,832,383.40
43,590,576.56
V PEKERJAAN AKRILIK LED BACKLIT LETTERS
1 Pek. Akrilik LED Backlit Letters 18.00 M' A.J.1 1,470,100.00 26,461,800.00
26,461,800.00
B PEMBUATAN GAPURA TERACOTA BALAI BENIH HORTIKULTURA KEBULEN KABUPATEN INDRAMAYU
I PEKERJAAN PEMBONGKARAN
1 Pek. Pembongkaran Pas. Beton Bertulang 1.61 M3 A.12 1,252,497.00 2,013,388.93
2 Pek. Pembongkaran Pas. Dinding Lama 3.66 M3 A.13 626,248.00 2,292,067.68
4,305,456.61
II PEKERJAAN TANAH DAN PASIR
1 Pek. Galian Tanah Pondasi 11.60 M3 B.2 84,546.00 980,551.83
2 Pek. Urugan Kembali Bekas Galian 11.60 M3 B.9 50,490.00 585,575.45
3 Pek. Lapisan pasir bawah pondasi t. 5 cm 0.27 M3 B.12 284,416.00 77,432.26
1,566,127.27
III PEKERJAAN PONDASI FOOTPLAT 130x130x13
1 Pek. Beton Lantai Kerja K-100 0.27 M3 A.4.1.1.1 876,634.17 238,663.65
2 Pek. Beton Footplat K-200 0.67 M3 A.4.1.1.6 1,008,729.21 676,655.55
3 Pek. Besi Beton Polos 171.71 KG G.24 16,775.00 2,880,477.39
4 Pek. Bekisting Footplat 1.35 M2 G.16 282,199.00 381,533.05
4,177,329.64
IV PEKERJAAN KOLOM 30/30
1 Cor Beton K.200 Site mix 1.33 M3 A.4.1.1.6 1,008,729.21 1,338,180.16
2 Pek. Bekisting dengan papan terentang 0.72 M2 G.23 236,237.00 170,090.64
3 Pek. Pembesian U-24 342.60 KG G.24 16,775.00 5,747,189.56
7,255,460.36
V PEKERJAAN PONDASI BATU KALI 195x155
1 Pek. Pondasi Batu Kali 1Pc : 5Ps 9.13 M3 C.4 960,640.00 8,773,573.15
8,773,573.15
VI PEKERJAAN TERACOTA
1 Pas. Batu Teracota Untuk Kolom 20.58 M2 T001 637,994.50 13,129,926.81
13,129,926.81
C PEMBUATAN PAGAR BALAI BENIH HORTIKULTURA KEBULEN KABUPATEN INDRAMAYU
I PEKERJAAN PEMAGARAN
1 Pek. Pagar kayu anyaman 116.00 M2 A.2.2.1.1.a 290,300.00 33,674,800.00
2 Pek. Pagar Besi Hollow 40 x 40 mm 16.00 M2 V001 977,200.00 15,635,200.00
3 Pek. Pintu Pagar Besi Hollow 4.00 M2 V002 928,900.00 3,715,600.00
53,025,600.00
SUB JUMLAH 180,180,323.22
PPN 11% 19,819,835.55
JUMLAH TOTAL 200,000,158.77
DIBULATKAN 200,000,000.00
Terbilang : Dua Ratus Juta Rupiah
REKAPITULASI RENCANA ANGGARAN BIAYA (RAB)

KEGIATAN : PENGELOLAAN SUMBER DAYA GENETIK (SDG) HEWAN, TUMBUHAN, DAN MIKRO ORGANISME
KEWENANGAN KABUPATEN INDRAMAYU
SUB KEGIATAN : PEMANFAATAN SDG HEWAN / TANAMAN
PEKERJAAN : REHABILITASI PAGAR BALAI BENIH HORTIKULTURA KEBULEN KABUPATEN INDRAMAYU
SUMBER DANA : APBD TAHUN ANGGARAN 2023
LOKASI : DESA KEBULEN KECAMATAN JATIBARANG KABUPATEN INDRAMAYU

JUMLAH
NO. URAIAN PEKERJAAN
(RP.)
1 2 3
A PENGECATAN PAGAR BALAI BENIH HORTIKULTURA KEBULEN KABUPATEN INDRAMAYU
I PEKERJAAN PERSIAPAN 7,563,838.00
II PEKERJAAN PENGIKISAN CAT DINDING LAMA 10,080,634.82
III PEKERJAAN PENGIKISAN CAT PAGAR BESI 250,000.00
IV PEKERJAAN PENGECATAN 43,590,576.56
V PEKERJAAN AKRILIK LED BACKLIT LETTERS 26,461,800.00
87,946,849.38
B PEMBUATAN GAPURA TERACOTA BALAI BENIH HORTIKULTURA KEBULEN KABUPATEN INDRAMAYU
I PEKERJAAN PEMBONGKARAN 4,305,456.61
II PEKERJAAN TANAH DAN PASIR 1,566,127.27
III PEKERJAAN PONDASI FOOTPLAT 130x130x13 4,177,329.64
IV PEKERJAAN KOLOM 30/30 7,255,460.36
V PEKERJAAN PONDASI BATU KALI 195x155 8,773,573.15
VI PEKERJAAN TERACOTA 13,129,926.81
39,207,873.84
C PEMBUATAN PAGAR BALAI BENIH HORTIKULTURA KEBULEN KABUPATEN INDRAMAYU
I PEKERJAAN PEMAGARAN 53,025,600.00
53,025,600.00
JUMLAH TOTAL PEKERJAAN 180,180,323.22
PPN 11% 19,819,835.55
JUMLAH TOTAL 200,000,158.77
DIBULATKAN 200,000,000.00

Terbilang Dua Ratus Juta Rupiah

DISETUJUI, DIBUAT,
PEJABAT PELAKSANA TEKNIS KEGIATAN KONSULTAN PERENCANA
(PPTK) CV. PRATAMA DIPA

YUNIAH, S.P. DARMOKO, S.T.


NIP. 1972 0713 200801 2 002 Direktur

MENGETAHUI,
PEJABAT PEMBUAT KOMITMEN (PPK)

MOH. IKHWAN FARKHANI, S. I.P.


NIP. 1976 0516 200801 1 002
DAFTAR HARGA SATUAN PEKERJAAN
TAHUN ANGGARAN 2023
(KONTRAKTUAL)

KODE HARGA SATUAN (Rp.) JUMLAH


No URAIAN PEKERJAAN
ANALISA UPAH BAHAN ALAT (Rp.)
1 2 3 4 5 6 7 = (4+5+6)

1 1 M2 PEMBUATAN PAPAN NAMA PROYEK DIGITAL PRINTING A.5 60,500.00 284,247.92 0.00 344,747.00
2 1 M3 BONGKARAN DINDING TEMBOK BATA A.13 626,248.70 0.00 0.00 626,248.00
3 1 M3 PEMADATAN TANAH B.10 4,509.34 0.00 6,132.50 10,641.00
4 1 M3 URUGAN SIRTU B.14 25,245.00 313,038.00 0.00 338,283.00
5 1 M2 PASANG ATAP ZINCALUME (SPANDEK) H.38 23,278.20 76,358.33 0.00 99,636.00
6 1 M' PASANG LISTPLANK GRC 1/30 CM H.66 36,058.00 44,477.95 0.00 80,535.00

DHSP ___ Hal. 45 of 61


KODE HARGA SATUAN (Rp.) JUMLAH
No URAIAN PEKERJAAN
ANALISA UPAH BAHAN ALAT (Rp.)
1 2 3 4 5 6 7 = (4+5+6)
7 1 M2 MENGIKIS / MENGEROK PERMUKAAN CAT DINDING LAMA P.1 13,457.40 2,711.50 0.00 16,168.00
8 1 M' PENGECATAN KUSEN PINTU/JENDELA KAYU, 1 LAPIS CAT DASAR, 3 LAPIS CAT PENUTUP P.7 9,447.35 27,895.73 0.00 37,343.00
9 1 M2 PENGECATAN TEMBOK LAMA 1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP DULUX P.15 8,061.24 24,281.95 0.00 32,343.00
10 1M2 MEMASANG RANGKA BESI HOLLOW 150 X 150 X 2 MM Ab.004 49,964.00 125,000.00 0.00 194,200.00
11 1M2 PEMASANGAN PENUTUP ATAP MENGGUNAKAN PLASTIK UV + INSECT NET A.X.01 29,040.00 34,535.00 0.00 70,600.00
12 1 M2 MEMASANG LANGIT-LANGIT GRC, TEBAL 9 mm, Rangka Hollo I.14a 19,000.00 92,481.42 0.00 122,629.00
13 1 M2 PASANGAN PAVING BLOCK WARNA TEBAL 8 cm (Uk. 20 x 10 cm) O.5 82,016.40 86,598.00 0.00 185,475.00

Indramayu, ……………... 2023

Dibuat,
KONSULTAN PERENCANA
CV. PRATAMA DIPA

DARMOKO, S.T.
Direktur

DHSP ___ Hal. 46 of 61


RENCANA ANGGARAN BIAYA (RAB)

KEGIATAN : #REF!
SUB KEGIATAN : #REF!
PEKERJAAN : REHABILITASI GREENHOUSE BALAI BENIH HORTIKULTURA KEBULEN KABUPATEN INDRAMAYU
SUMBER DANA : #REF!
LOKASI : #REF!

HARGA JUMLAH
NO. URAIAN PEKERJAAN VOLUME SATUAN ANALISA SATUAN TOTAL
(Rp.) (Rp.)
1 2 3 4 5 6 7

A REHABILITASI GREENHOUSE A BALAI BENIH HORTIKULTURA KEBULEN KABUPATEN INDRAMAYU


I PEKERJAAN PERSIAPAN
1 Pek. Papan Nama Kegiatan Digital Printing 1.00 M2 A.5 344,747.00 344,747.00
2 Pek. Pengukuran 1.00 Ls - 200,000.00 200,000.00
3 Pembersihan Lapangan 1.00 Ls - 227,000.00 227,000.00
4 Biaya Adm. dan Dokumentasi 1.00 Ls - 227,500.00 227,500.00
999,247.00
II PEKERJAAN PEMBONGKARAN
1 Pek. Pembongkaran Pas. Dinding Lama 3.45 M3 A.13 626,248.00 2,160,555.60
2,160,555.60
III PEKERJAAN STRUKTUR
1 Pek. Rangka Besi Hollow 23.09 M2 Ab.004 194,200.00 4,484,466.40
2 Pek. Pemasangan Plastik UV 233.81 M2 A.X.01 70,600.00 16,507,289.16
20,991,755.56
B REHABILITASI GREENHOUSE B BALAI BENIH HORTIKULTURA KEBULEN KABUPATEN INDRAMAYU
I PEKERJAAN PERSIAPAN
1 Pek. Pengukuran 1.00 Ls - 200,000.00 200,000.00
2 Pembersihan Lapangan 1.00 Ls - 300,000.00 300,000.00
500,000.00
II PEKERJAAN PEMBONGKARAN
1 Pek. Bongkaran Dinding Tembok Bata 3.90 M3 A.13 626,248.00 2,442,367.20
2,442,367.20
III PEKERJAAN STRUKTUR
1 Pek. Rangka Besi Hollow 26.00 M2 Ab.004 194,200.00 5,049,200.00
2 Pek. Pemasangan Plastik UV 302.57 M2 A.X.01 70,600.00 21,361,230.20
26,410,430.20
C REHABILITASI GREENHOUSE C BALAI BENIH HORTIKULTURA KEBULEN KABUPATEN INDRAMAYU
I PEKERJAAN PERSIAPAN
1 Pek. Pengukuran 1.00 Ls - 200,000.00 200,000.00
2 Pembersihan Lapangan 1.00 Ls - 300,000.00 300,000.00
500,000.00
II PEKERJAAN PEMBONGKARAN
1 Pek. Bongkaran Dinding Tembok Bata 3.90 M3 A.13 626,248.00 2,442,367.20
2,442,367.20
III PEKERJAAN STRUKTUR
1 Pek. Rangka Besi Hollow 26.00 M2 Ab.004 194,200.00 5,049,200.00
2 Pek. Pemasangan Plastik UV 302.57 M2 A.X.01 70,600.00 21,361,230.20
26,410,430.20
D REHABILITASI RUANG PETUGAS PEMBIBITAN GREENHOUSE D BALAI BENIH HORTIKULTURA KEBULEN KABUPATEN INDRAMAYU
I PEKERJAAN PERSIAPAN
1 Pek. Pengukuran 1.00 Ls - 200,000.00 200,000.00
2 Pembersihan Lapangan 1.00 Ls - 300,000.00 300,000.00
500,000.00
II PEKERJAAN ATAP
1 Pek. Pas Zincalume (Sepandek) 59.40 M2 H.38 99,636.00 5,918,378.40
2 Pek. Pas. Listplank GRC (1/30) cm 28.96 M' H.66 80,535.00 2,332,293.60
8,250,672.00
III PEKERJAAN LANGIT LANGIT
1 Pek Plafond GRC Rangka Hollo 59.40 M2 I.14a 122,629.00 7,284,162.60
7,284,162.60
IV PEKERJAAN PENGIKISAN
1 Pek. Pengikisan Cat Dinding 140.80 M2 P.1 16,168.00 2,276,454.40
2,276,454.40
V PEKERJAAN PENGECATAN
1 Pek. Pengecatan Dinding 140.80 M2 P.15 32,343.00 4,553,894.40
2 Pek. Pengecatan Kusen 23.80 M2 P.7 37,343.00 888,770.87
5,442,665.27
E REHABILITASI RUMAH POMPA GREENHOUSE BALAI BENIH HORTIKULTURA KEBULEN KABUPATEN INDRAMAYU
I PEKERJAAN PERSIAPAN
1 Pek. Pengukuran 1.00 Ls - 200,000.00 200,000.00
2 Pembersihan Lapangan 1.00 Ls - 300,000.00 300,000.00
500,000.00
II PEKERJAAN PENGIKISAN
1 Pek. Pengikisan Cat Dinding 21.38 M2 P.1 16,168.00 345,671.84
345,671.84
III PEKERJAAN PENGECATAN
1 Pek. Pengecatan Dinding 21.38 M2 P.15 32,343.00 691,493.34
2 Pek. Pengecatan Kusen 3.39 M2 P.7 37,343.00 126,592.77
818,086.11
F REHABILITASI TOWER AIR BETON GREENHOUSE BALAI BENIH HORTIKULTURA KEBULEN KABUPATEN INDRAMAYU
I PEKERJAAN PERSIAPAN
1 Pek. Pengukuran 1.00 Ls - 200,000.00 200,000.00
2 Pembersihan Lapangan 1.00 Ls - 300,000.00 300,000.00
500,000.00
II PEKERJAAN PENGIKISAN
1 Pek. Pengikisan Cat Dinding 385.56 M2 P.1 16,168.00 6,233,734.08
6,233,734.08
III PEKERJAAN PENGECATAN
1 Pek. Pengecatan Dinding 385.56 M2 P.15 32,343.00 12,470,167.08
12,470,167.08
G PEKERJAAN PAVING BLOCK GREENHOUSE BALAI BENIH HORTIKULTURA KEBULEN KABUPATEN INDRAMAYU
I PEKERJAAN TANAH
1 Pek. Pemadatan Sirtu T. 5 cm 37.48 M3 B.10 10,641.00 398,771.48
2 Pek. Urugan Sirtu 37.48 M3 B.14 338,283.00 12,677,155.43
13,075,926.90
II PEKERJAAN PAVING BLOCK
1 Pemasangan Paving Block 191.80 M2 O.5 185,475.00 35,574,105.00
35,574,105.00
III DAN LAIN-LAIN
1 Kursi Meja Lipat Taman 5.00 BH - 450,000.00 2,250,000.00
2,250,000.00
SUB JUMLAH 178,378,798.24
PPN 11% 19,621,667.81
JUMLAH TOTAL 198,000,466.04
DIBULATKAN 198,000,000.00
Terbilang : Seratus Sembilan Puluh Delapan Juta Rupiah
REKAPITULASI RENCANA ANGGARAN BIAYA (RAB)

KEGIATAN : #REF!

SUB KEGIATAN : #REF!


PEKERJAAN : REHABILITASI GREENHOUSE BALAI BENIH HORTIKULTURA KEBULEN KABUPATEN INDRAMAYU
SUMBER DANA : #REF!
LOKASI : #REF!

JUMLAH
NO. URAIAN PEKERJAAN
(RP.)
1 2 3
A REHABILITASI GREENHOUSE A BALAI BENIH HORTIKULTURA KEBULEN KABUPATEN INDRAMAYU
I PEKERJAAN PERSIAPAN 999,247.00
II PEKERJAAN PEMBONGKARAN 2,160,555.60
III PEKERJAAN STRUKTUR 20,991,755.56
24,151,558.16
B REHABILITASI GREENHOUSE B BALAI BENIH HORTIKULTURA KEBULEN KABUPATEN INDRAMAYU
I PEKERJAAN PERSIAPAN 500,000.00
II PEKERJAAN PEMBONGKARAN 2,442,367.20
III PEKERJAAN STRUKTUR 26,410,430.20
29,352,797.40
C REHABILITASI GREENHOUSE C BALAI BENIH HORTIKULTURA KEBULEN KABUPATEN INDRAMAYU
I PEKERJAAN PERSIAPAN 500,000.00
II PEKERJAAN PEMBONGKARAN 2,442,367.20
III PEKERJAAN STRUKTUR 26,410,430.20
29,352,797.40
D REHABILITASI RUANG PETUGAS PEMBIBITAN GREENHOUSE D BALAI BENIH HORTIKULTURA KEBULEN KABUPATEN INDRAMAYU
I PEKERJAAN PERSIAPAN 500,000.00
II PEKERJAAN ATAP 8,250,672.00
III PEKERJAAN LANGIT LANGIT 7,284,162.60
IV PEKERJAAN PENGIKISAN 2,276,454.40
V PEKERJAAN PENGECATAN 5,442,665.27
23,753,954.27
E REHABILITASI RUMAH POMPA GREENHOUSE BALAI BENIH HORTIKULTURA KEBULEN KABUPATEN INDRAMAYU
I PEKERJAAN PERSIAPAN 500,000.00
II PEKERJAAN PENGIKISAN 345,671.84
III PEKERJAAN PENGECATAN 818,086.11
1,663,757.95
F REHABILITASI TOWER AIR BETON GREENHOUSE BALAI BENIH HORTIKULTURA KEBULEN KABUPATEN INDRAMAYU
I PEKERJAAN PERSIAPAN 500,000.00
II PEKERJAAN PENGIKISAN 6,233,734.08
III PEKERJAAN PENGECATAN 12,470,167.08
19,203,901.16
G PEKERJAAN PAVING BLOCK GREENHOUSE BALAI BENIH HORTIKULTURA KEBULEN KABUPATEN INDRAMAYU
I PEKERJAAN TANAH 13,075,926.90
II PEKERJAAN PAVING BLOCK 35,574,105.00
III DAN LAIN-LAIN 2,250,000.00
50,900,031.90
JUMLAH TOTAL PEKERJAAN 178,378,798.24
PPN 11% 19,621,667.81
JUMLAH TOTAL 198,000,466.04
DIBULATKAN 198,000,000.00

Terbilang Seratus Sembilan Puluh Delapan Juta Rupiah

DISETUJUI, DIBUAT,
PEJABAT PELAKSANA TEKNIS KEGIATAN KONSULTAN PERENCANA
(PPTK) CV. PRATAMA DIPA

YUNIAH, S.P. DARMOKO, S.T.


NIP. 1972 0713 200801 2 002 Direktur

MENGETAHUI,
PEJABAT PEMBUAT KOMITMEN (PPK)

MOH. IKHWAN FARKHANI, S. I.P.


NIP. 1976 0516 200801 1 002
DAFTAR HARGA SATUAN PEKERJAAN
TAHUN ANGGARAN 2023
(KONTRAKTUAL)

KODE HARGA SATUAN (Rp.) JUMLAH


No URAIAN PEKERJAAN
ANALISA UPAH BAHAN ALAT (Rp.)
1 2 3 4 5 6 7 = (4+5+6)

1 1 M2 PEMBUATAN PAPAN NAMA PROYEK DIGITAL PRINTING A.5 60,500.00 284,247.92 0.00 344,747.00
2 1 M3 BONGKARAN DINDING TEMBOK BATA A.13 626,248.70 0.00 0.00 626,248.00
3 1 M3 PEMADATAN TANAH B.10 4,509.34 0.00 6,132.50 10,641.00
4 1 M3 URUGAN PASIR B.12 27,478.00 256,938.00 0.00 284,416.00
5 1 M3 URUGAN SIRTU B.14 25,245.00 313,038.00 0.00 338,283.00
6 1 M3 COR BETON SITE MIX K. 175 G.2 194,568.00 939,422.55 4,125.00 1,138,115.00
7 PEMBESIAN BALOK LATEI 10/10 GB.16 494,067.20 5,031,048.00 5,525,115.20
8 1M2 LANGIT-LANGIT GRC I.33 37,566.80 139,614.20 0.00 177,181.00
9 1 M2 PASANG LANTAI KERAMIK PUTIH UKURAN 40 x 40 cm M.7 109,725.00 132,258.56 0.00 241,983.00

DHSP ___ Hal. 50 of 61


KODE HARGA SATUAN (Rp.) JUMLAH
No URAIAN PEKERJAAN
ANALISA UPAH BAHAN ALAT (Rp.)
1 2 3 4 5 6 7 = (4+5+6)
10 1 M2 MENGIKIS / MENGEROK PERMUKAAN CAT DINDING LAMA P.1 13,457.40 2,711.50 0.00 16,168.00
11 1 M2 PENGECATAN TEMBOK LAMA 1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP DULUX P.15 8,061.24 24,281.95 0.00 32,343.00
12 1 M2 PENGECATAN PLAFOND 1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP P.16 10,074.46 20,915.95 0.00 30,990.00
13 1 M2 PASANGAN PAVING BLOCK WARNA TEBAL 8 cm (Uk. 20 x 10 cm) O.5 90,218.04 95,257.80 0.00 185,475.00

Indramayu, ……………... 2023

Dibuat,
KONSULTAN PERENCANA
CV. PRATAMA DIPA

DARMOKO, S.T.
Direktur

DHSP ___ Hal. 51 of 61


RENCANA ANGGARAN BIAYA (RAB)

KEGIATAN : #REF!
SUB KEGIATAN : #REF!
PEKERJAAN : REHABILITASI GEDUNG AULA BALAI BENIH HORTIKULTURA KEBULEN KABUPATEN INDRAMAYU
SUMBER DANA : #REF!
LOKASI : #REF!

HARGA JUMLAH
NO. URAIAN PEKERJAAN VOLUME SATUAN ANALISA SATUAN TOTAL
(Rp.) (Rp.)
1 2 3 4 5 6 7

A REHABILITASI GEDUNG AULA A BALAI BENIH HORTIKULTURA KEBULEN KABUPATEN INDRAMAYU


I PEKERJAAN PERSIAPAN
1 Pek. Papan Nama Kegiatan Digital Printing 1.00 M2 A.5 344,747.00 344,747.00
2 Pek. Pengukuran 1.00 Ls - 565,000.00 565,000.00
3 Biaya Adm. dan Dokumentasi 1.00 Ls - 1,000,000.00 1,000,000.00
1,909,747.00
II PEKERJAAN PENGIKISAN
1 Pek. Pengikisan Lantai 1.00 Ls - 1,000,000.00 1,000,000.00
2 Pek. Pengikisan Pas.Dinding 162.84 M2 P.1 16,168.00 2,632,745.38
3 Pek. Pengikisan Plat Beton Teras 16.50 M2 P.15 32,343.00 533,659.50
4,166,404.88
III PEKERJAAN PEMBONGKARAN DINDING
1 Pek. Pembongkaran Pas. Dinding lama 12.95 M2 A.13 626,248.00 8,108,659.10
8,108,659.10
IV PEKERJAAN KUSEN
1 Pas. Kusen + Jendela alumunium Type J1 (4 unit)
- Frame Kusen Alumunium 4 warna coklat 72.80 m' Ls 148,500.00 10,810,800.00
- Engsel Casment + Jendela + Kaca 5 mm 8.00 Bh Ls 715,000.00 5,720,000.00
- Kaca 5 mm 31.10 M2 Ls 13,200.00 410,520.00
2 Pas. Kusen + Jendela alumunium Type J2 (1 unit)
- Frame Kusen Alumunium 4 warna coklat 7.25 m' Ls 148,500.00 1,076,625.00
- Engsel Casment + Jendela + Kaca 5 mm 1.00 Bh Ls 715,000.00 715,000.00
- Kaca 5 mm 1.88 M2 Ls 13,200.00 24,750.00
3 Pas. Kusen + Jendela alumunium Type J3 (2 unit)
- Frame Kusen Alumunium 4 warna coklat 36.40 m' Ls 148,500.00 5,405,400.00
- Engsel Casment + Jendela + Kaca 5 mm 4.00 Bh Ls 715,000.00 2,860,000.00
- Kaca 5 mm 15.92 M2 Ls 13,200.00 210,144.00
4 Pas. Kusen + Jendela alumunium Type J4 (3 unit)
- Frame Kusen Alumunium 4 warna coklat 18.00 m' Ls 148,500.00 2,673,000.00
- Engsel Casment + Jendela + Kaca 5 mm 6.00 Bh Ls 715,000.00 4,290,000.00
- Kaca 5 mm 1.62 M2 Ls 13,200.00 21,384.00
5 Pas. Kusen + Pintu Alumunium Type P1 (1 unit)
- Frame Kusen Alumunium 4"warna coklat doff" 5.70 m' Ls 148,500.00 846,450.00
- Pintu Swing +Daun + Kaca 5 mm 2.00 Bh Ls 715,000.00 1,430,000.00
- Kaca 5 mm 0.68 M2 Ls 13,200.00 8,976.00
6 Pas. Kusen + Pintu Alumunium Type P2 (1 unit)
- Frame Kusen Alumunium 4"warna coklat doff" 16.50 m' Ls 148,500.00 2,450,250.00
- Pintu Swing +Daun + Kaca 5 mm 2.00 Bh Ls 715,000.00 1,430,000.00
- Kaca 5 mm 3.94 M2 Ls 13,200.00 52,008.00
7 Pas. Kusen + Pintu Alumunium Type P3 (1 unit)
- Frame Kusen Alumunium 4"warna coklat doff" 5.70 m' Ls 148,500.00 846,450.00
- Pintu Swing +Daun + Kaca 5 mm 2.00 Bh Ls 715,000.00 1,430,000.00
- Kaca 5 mm 1.02 M2 Ls 13,200.00 13,464.00
8 Pas. Kusen + Pintu Alumunium Type P4 (1 unit)
- Frame Kusen Alumunium 4"warna coklat doff" 5.10 m' Ls 148,500.00 757,350.00
- Pintu Swing +Daun + Kaca 5 mm 1.00 Bh Ls 715,000.00 715,000.00
- Kaca 5 mm 0.45 M2 Ls 13,200.00 5,940.00
44,203,511.00
V PEKERJAAN BETON
1 Pek. Balok Latei 10/10
- Cor beton K175 0.19 M3 G.2 1,138,115.00 216,241.85
- Pembesian 0.28 Kg GB.16 5,525,115.20 1,547,032.26
1,763,274.11
HARGA JUMLAH
NO. URAIAN PEKERJAAN VOLUME SATUAN ANALISA SATUAN TOTAL
(Rp.) (Rp.)
1 2 3 4 5 6 7
VI PEKERJAAN PENUTUP LANTAI
1 Pek.penutup lantai keramik 40 x 40 cm 163.40 M2 M.7 241,983.00 39,540,022.20
39,540,022.20
VII PEKERJAAN PENGECATAN
1 Pek. Pengecatan Pas. Dinding 162.84 M2 P.15 32,343.00 5,266,630.62
2 Pek. Pengecatan Plafon 146.90 M2 P.16 30,990.00 4,552,431.00
3 Pek. Pengecatan Plat Beton Teras 16.50 M2 P.15 32,343.00 533,659.50
10,352,721.12
VIII PEKERJAAN PLAFON
1 Pek. Pemasangan Plafon GRC 21.51 M2 I33 177,181.00 3,811,163.31
3,811,163.31
IX PEKERJAAN LISTRIK
1 Pek. Pas. Titik Lampu Komplit 6.00 TTK Ls 158,015.00 948,090.000
2 Pas. Stop Kontak 1.00 Bh Ls 25,415.00 25,415.000
3 Pas. Saklar Tunggal 3.00 Bh Ls 24,310.00 72,930.000
4 Pas. Lampu Dowlight Philips Glas Recessed (18 Watt) 6.00 Bh Ls 135,000.00 810,000.000
1,856,435.00
X PEKERJAAN DAN LAIN LAIN
1 Kursi taman 4.00 Bh - 450,000.00 1,800,000.00
1,800,000.00
B REHABILITASI GEDUNG AULA B BALAI BENIH HORTIKULTURA KEBULEN KABUPATEN INDRAMAYU
I PEKERJAAN PENGIKISAN
1 Pek. Pengikisan Pas.Dinding 85.50 M2 P.1 16,168.00 1,382,428.67
2 Pek.Pengikisan Profil Kanopi 4.48 M2 P.15 32,343.00 144,896.64
1,527,325.31
II PEKERJAAN PENGECATAN
1 Pek. Pengecatan Pas. Dinding 85.50 P.15 32,343.00 2,765,455.87
2 Pek. Pengecatan Plafon 40.80 P.16 30,990.00 1,264,392.00
4,029,847.87
C PEKERJAAN PAVING BLOCK AULA BALAI BENIH HORTIKULTURA KEBULEN KABUPATEN INDRAMAYU
I PEKERJAAN TANAH
1 Pek. Pemadatan Sirtu T. 5 mm 11.82 M2 B.10 10,641.00 125,728.74
2 Pek. Urugan Pasir T. 5 mm 11.82 M2 B.12 284,416.00 3,360,517.25
3 Pek. Urugan Sirtu 23.63 M2 B.14 338,283.00 7,993,965.57
11,480,211.56
II PEKERJAAN PAVING BLOCK
1 Pemasangan Paving Block 236.31 M2 O.5 185,475.00 43,829,597.25
43,829,597.25
SUB JUMLAH 178,378,919.72
PPN 11% 19,621,681.17
JUMLAH TOTAL 198,000,600.88
DIBULATKAN 198,000,000.00
Terbilang : Seratus Sembilan Puluh Delapan Juta Rupiah
REKAPITULASI RENCANA ANGGARAN BIAYA (RAB)

KEGIATAN : #REF!

SUB KEGIATAN : #REF!


PEKERJAAN : REHABILITASI GEDUNG AULA BALAI BENIH HORTIKULTURA KEBULEN KABUPATEN INDRAMAYU
SUMBER DANA : #REF!
LOKASI : #REF!

JUMLAH
NO. URAIAN PEKERJAAN
(RP.)
1 2 3
A REHABILITASI GEDUNG AULA A BALAI BENIH HORTIKULTURA KEBULEN KABUPATEN INDRAMAYU
I PEKERJAAN PERSIAPAN 1,909,747.00
II PEKERJAAN PENGIKISAN 4,166,404.88
III PEKERJAAN PEMBONGKARAN DINDING 8,108,659.10
IV PEKERJAAN KUSEN 44,203,511.00
V PEKERJAAN BETON 1,763,274.11
VI PEKERJAAN PENUTUP LANTAI 39,540,022.20
VII PEKERJAAN PENGECATAN 10,352,721.12
VIII PEKERJAAN PLAFON 3,811,163.31
IX PEKERJAAN LISTRIK 1,856,435.00
X PEKERJAAN DAN LAIN LAIN 1,800,000.00
117,511,937.72
B REHABILITASI GEDUNG AULA B BALAI BENIH HORTIKULTURA KEBULEN KABUPATEN INDRAMAYU
I PEKERJAAN PENGIKISAN 1,527,325.31
II PEKERJAAN PENGECATAN 4,029,847.87
5,557,173.18
C PEKERJAAN PAVING BLOCK AULA BALAI BENIH HORTIKULTURA KEBULEN KABUPATEN INDRAMAYU
I PEKERJAAN TANAH 11,480,211.56
II PEKERJAAN PAVING BLOCK 43,829,597.25
55,309,808.81
JUMLAH TOTAL PEKERJAAN 178,378,919.72
PPN 11% 19,621,681.17
JUMLAH TOTAL 198,000,600.88
DIBULATKAN 198,000,000.00

Terbilang Seratus Sembilan Puluh Delapan Juta Rupiah

DISETUJUI, DIBUAT,
PEJABAT PELAKSANA TEKNIS KEGIATAN KONSULTAN PERENCANA
(PPTK) CV. PRATAMA DIPA

YUNIAH, S.P. DARMOKO, S.T.


NIP. 1972 0713 200801 2 002 Direktur

MENGETAHUI,
PEJABAT PEMBUAT KOMITMEN (PPK)

MOH. IKHWAN FARKHANI, S. I.P.


NIP. 1976 0516 200801 1 002
LAPORAN MINGGUAN
PENYEDIAAN DAN PENYALURAN BAHAN BAKU INDUSTRI PENGOLAHAN IKAN DALAM 1 (SATU) DAERAH KABUPATEN/ KOTA
KEGIATAN :
SUB KEGIATAN : PEMBERIAN FASILITAS BAGI PELAKU USAHA PERIKANAN SKALA MIKRO DAN KECIL DALAM 1 (SATU) DAERAH KABUPATEN/ KOTA
PEKERJAAN : BEDAH UPI SKALA KECIL DESA CEMARA KULON KEC. LOSARANG (DAK 2022) Tanggal : #REF!
SUMBER DANA : DANA ANGGARAN KHUSUS (DAK) TAHUN 2022 Minggu ke : 6 (ENAM)
LOKASI : KELOMPOK MINASARI MULYA, KEC LOSARANG (OLAHAN IKAN ASIN) Bulan ke : 2 (DUA)

PRESTASI SAMPAI MINGGU LALU PRESTASI MINGGU INI PRESTASI SAMPAI MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN VOLUME SATUAN Minggu Lalu (%) Minggu Ini (%) Komulatif (%)
% Vol Prestasi Rerata Vol Prestasi Rerata Vol Prestasi Rerata
1 2 3 4 5 6 7 8 9 10 11 12 13 14

A BEDAH UPI SKALA KECIL DESA CEMARA KULON KEC. LOSARANG (DAK 2022)
I PEKERJAAN PERSIAPAN
1 Pek. Papan Nama Kegiatan Digital Printing #REF! M2 #REF! 100.00 0.62 #REF! #REF! #REF! 100.00 #REF!
2 Pek. Pengukuran Kembali #REF! Ls #REF! 100.00 2.17 #REF! #REF! #REF! 100.00 #REF!
3 Pek. Bongkaran Dingding #REF! Ls #REF! 100.00 2.53 #REF! #REF! #REF! 100.00 #REF!
4 Biaya Adm. dan Dokumentasi #REF! Ls #REF! 100.00 1.92 #REF! #REF! #REF! 100.00 #REF!
- - - - -
II PEKERJAAN BETON - - - - -
1 Pek. Beton Tumbuk 1Pc : 3Ps : 5Kr Trap Samping t = 5 cm #REF! M3 #REF! #REF! #REF! #REF! - #REF!
#REF! - - - - -
- Cor Beton K.175 Site mix #REF! M3 #REF! #REF! #REF! #REF! - #REF!
- Pek. Begisting dengan papan terentang #REF! M2 #REF! #REF! #REF! #REF! - #REF!
- Pek. Pembesian U-24 #REF! KG #REF! #REF! #REF! #REF! - #REF!
- - - - -
#REF! - - - - -
#REF! #REF! #REF! #REF! #REF! #REF! #REF! - #REF!
- - - - -
2 Kolom Ampig 10/10 cm - - - - -
- Cor Beton K.175 Site mix #REF! M3 #REF! #REF! #REF! #REF! - #REF!
- Pek. Begisting dengan papan terentang #REF! M2 #REF! #REF! #REF! #REF! - #REF!
- Pek. Pembesian U-24 #REF! KG #REF! #REF! #REF! #REF! - #REF!
- - - - -
3 Pek. Balok Ampig 10/10 cm 6.50 M - - - - -
- Cor Beton K.175 Site mix #REF! M3 #REF! #REF! #REF! #REF! - #REF!
- Pek. Begisting dengan papan terentang #REF! M2 #REF! #REF! #REF! #REF! - #REF!
- Pek. Pembesian U-24 #REF! KG #REF! #REF! #REF! #REF! - #REF!
- - - - -
4 Pek. Balok Luifel 10/10 cm - - - - -
- Cor Beton K.175 Site mix #REF! M3 #REF! #REF! #REF! #REF! - #REF!
- Pek. Begisting dengan papan terentang #REF! M2 #REF! #REF! #REF! #REF! - #REF!
- Pek. Pembesian U-24 #REF! KG #REF! #REF! #REF! #REF! - #REF!
- - - - -
III PEKERJAAN PASANGAN DAN PLESTERAN - - - - -
1 Pek. Pasangan dinding bata ringan t.10 cm #REF! M2 #REF! 30.00 #REF! #REF! #REF! #REF! 30.00 #REF!
2 Pek. Plesteran Bata Ringan #REF! M2 #REF! 60.00 #REF! #REF! #REF! #REF! 60.00 #REF!
3 Pek. Acian Bata Ringan #REF! M2 #REF! 30.00 1.10 #REF! #REF! #REF! 30.00 #REF!
4 Pek. Pas GRC Rangka Hollow Sekat Dingding #REF! m2 #REF! #REF! #REF! #REF! - #REF!
- - - - -
IV PEKERJAAN PENUTUP LANTAI - - - - -
1 Pek. Lantai Keramik Putih 40x40 cm #REF! M2 #REF! 30.00 #REF! #REF! 70.00 #REF! #REF! 100.00 #REF!
- - - - -
V PEKERJAAN ATAP - - - - -
1 Pek. Kuda-kuda + rangka atap baja ringan (Zincallume) t. 0,75 mm #REF! M2 #REF! #REF! #REF! #REF! - #REF!
2 Pek. Pas Zincalume (Sepandek) #REF! M2 #REF! #REF! #REF! #REF! - #REF!
3 Pek. Pas. Listplank GRC (1/30) cm #REF! M #REF! #REF! #REF! #REF! - #REF!
- - - - -
VI PEKERJAAN LANGIT LANGIT - - - - -
1 Pek Plafond GRC Rangka Hollo #REF! M2 #REF! #REF! #REF! #REF! - #REF!
- - - - -
VII PEKERJAAN PINTU DAN JENDELA LENGKAP DENGAN ASESORIS - - - - -
1 Pek. Kusen alumunium Natural 4" #REF! M #REF! #REF! #REF! #REF! - #REF!
2 Pek. Daun Pintu Alumunium Lengkap Aksesoris Tanpa Kaca 80x205 cm #REF! Unit #REF! #REF! #REF! #REF! - #REF!
3 Pas. Daun jendela alumunium Warna Coklat lengkap dengan Kaca dan Aksesoris #REF! Unit #REF! #REF! #REF! #REF! - #REF!
- - - - -
VIII PEKERJAAN PENGECATAN - - - - -
1 Pek. Pengecatan Dingding #REF! M2 #REF! #REF! #REF! #REF! - #REF!
2 Pek. Pengecatan Plafond #REF! M2 #REF! #REF! #REF! #REF! - #REF!
3 Pek. Pengecatan Listplank #REF! M2 #REF! #REF! #REF! #REF! - #REF!
- - - - -
IX PEKERJAAN LISTRIK - - - - -
1 Pek. Pas. Titik lampu komplit #REF! TTK #REF! #REF! #REF! #REF! - #REF!
2 Pas. Stop kontak #REF! Bh #REF! #REF! #REF! #REF! - #REF!
3 Pas. Saklar Tunggal #REF! Bh #REF! #REF! #REF! #REF! - #REF!
4 Pas. Saklar Ganda #REF! Bh #REF! #REF! #REF! #REF! - #REF!
5 Pas. Lampu Downlight philips Glass recessed (18 Watt) #REF! Bh #REF! #REF! #REF! #REF! - #REF!
- - - - -
X PEKERJAAN BAK CUCI - - - - -
1 Pek. Pasangan 1/2 bata 1 Pc : 5 Psr #REF! M2 #REF! #REF! #REF! #REF! - #REF!
2 Pek. Plesteran 1 Pc : 5 Psr #REF! M2 #REF! #REF! #REF! #REF! - #REF!
3 Pek. Acian #REF! M2 #REF! #REF! #REF! #REF! - #REF!
4 Pek. Plat Beton t = 10 mm #REF! M3 #REF! #REF! #REF! #REF! - #REF!
5 Pek. Begisting dengan papan terentang #REF! M2 #REF! #REF! #REF! #REF! - #REF!
6 Pek. Pembesian U-24 #REF! KG #REF! #REF! #REF! #REF! - #REF!
7 Pek. Pas. Pipa Pvc d.1/2'' #REF! M #REF! #REF! #REF! #REF! - #REF!
8 Pek. Pas Pipa Pvc d. 3'' (Pembuang Uap Air) #REF! M #REF! #REF! #REF! #REF! - #REF!
9 Pas. Tempat Cuci/ Pencucian BCP lobang double sink + Aksesoris #REF! Unit #REF! #REF! #REF! #REF! - #REF!
10 Pek. keramik Warna 20x25 cm #REF! M2 #REF! #REF! #REF! #REF! - #REF!
11 Pek. Washtafel #REF! Unit #REF! #REF! #REF! #REF! - #REF!
12 pek.closet duduk setara toto #REF! Bh #REF! #REF! #REF! #REF! - #REF!

JUMLAH #REF! #REF! #REF!

Dibuat Oleh :
Konsultan Pengawas
PT. SAMUDRA JAYA KONSULTAN
LAPORAN MINGGUAN
PENYEDIAAN DAN PENYALURAN BAHAN BAKU INDUSTRI PENGOLAHAN IKAN DALAM 1 (SATU) DAERAH KABUPATEN/ KOTA
KEGIATAN :
SUB KEGIATAN : PEMBERIAN FASILITAS BAGI PELAKU USAHA PERIKANAN SKALA MIKRO DAN KECIL DALAM 1 (SATU) DAERAH KABUPATEN/ KOTA
PEKERJAAN : BEDAH UPI SKALA KECIL DESA CEMARA KULON KEC. LOSARANG (DAK 2022) Tanggal : #REF!
SUMBER DANA : DANA ANGGARAN KHUSUS (DAK) TAHUN 2022 Minggu ke : 7 (TUJUH)
LOKASI : KELOMPOK MINASARI MULYA, KEC LOSARANG (OLAHAN IKAN ASIN) Bulan ke : 2 (DUA)

PRESTASI SAMPAI MINGGU LALU PRESTASI MINGGU INI PRESTASI SAMPAI MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN VOLUME SATUAN Minggu Lalu (%) Minggu Ini (%) Komulatif (%)
% Vol Prestasi Rerata Vol Prestasi Rerata Vol Prestasi Rerata
1 2 3 4 5 6 7 8 9 10 11 12 13 14

A BEDAH UPI SKALA KECIL DESA CEMARA KULON KEC. LOSARANG (DAK 2022)
I PEKERJAAN PERSIAPAN
1 Pek. Papan Nama Kegiatan Digital Printing #REF! M2 #REF! 100.00 0.62 #REF! #REF! #REF! 100.00 #REF!
2 Pek. Pengukuran Kembali #REF! Ls #REF! 100.00 2.17 #REF! #REF! #REF! 100.00 #REF!
3 Pek. Bongkaran Dingding #REF! Ls #REF! 100.00 2.53 #REF! #REF! #REF! 100.00 #REF!
4 Biaya Adm. dan Dokumentasi #REF! Ls #REF! 100.00 1.92 #REF! #REF! #REF! 100.00 #REF!
- - - - -
II PEKERJAAN BETON - - - - -
1 Pek. Beton Tumbuk 1Pc : 3Ps : 5Kr Trap Samping t = 5 cm #REF! M3 #REF! #REF! #REF! #REF! - #REF!
#REF! - - - - -
- Cor Beton K.175 Site mix #REF! M3 #REF! #REF! #REF! #REF! - #REF!
- Pek. Begisting dengan papan terentang #REF! M2 #REF! #REF! #REF! #REF! - #REF!
- Pek. Pembesian U-24 #REF! KG #REF! #REF! #REF! #REF! - #REF!
- - - - -
#REF! - - - - -
#REF! #REF! #REF! #REF! #REF! #REF! #REF! - #REF!
- - - - -
2 Kolom Ampig 10/10 cm - - - - -
- Cor Beton K.175 Site mix #REF! M3 #REF! #REF! #REF! #REF! - #REF!
- Pek. Begisting dengan papan terentang #REF! M2 #REF! #REF! #REF! #REF! - #REF!
- Pek. Pembesian U-24 #REF! KG #REF! #REF! #REF! #REF! - #REF!
- - - - -
3 Pek. Balok Ampig 10/10 cm 6.50 M - - - - -
- Cor Beton K.175 Site mix #REF! M3 #REF! #REF! #REF! #REF! - #REF!
- Pek. Begisting dengan papan terentang #REF! M2 #REF! #REF! #REF! #REF! - #REF!
- Pek. Pembesian U-24 #REF! KG #REF! #REF! #REF! #REF! - #REF!
- - - - -
4 Pek. Balok Luifel 10/10 cm - - - - -
- Cor Beton K.175 Site mix #REF! M3 #REF! #REF! #REF! #REF! - #REF!
- Pek. Begisting dengan papan terentang #REF! M2 #REF! #REF! #REF! #REF! - #REF!
- Pek. Pembesian U-24 #REF! KG #REF! #REF! #REF! #REF! - #REF!
- - - - -
III PEKERJAAN PASANGAN DAN PLESTERAN - - - - -
1 Pek. Pasangan dinding bata ringan t.10 cm #REF! M2 #REF! 30.00 #REF! #REF! #REF! #REF! 30.00 #REF!
2 Pek. Plesteran Bata Ringan #REF! M2 #REF! 60.00 #REF! #REF! #REF! #REF! 60.00 #REF!
3 Pek. Acian Bata Ringan #REF! M2 #REF! 30.00 1.10 #REF! #REF! #REF! 30.00 #REF!
4 Pek. Pas GRC Rangka Hollow Sekat Dingding #REF! m2 #REF! #REF! #REF! #REF! - #REF!
- - - - -
IV PEKERJAAN PENUTUP LANTAI - - - - -
1 Pek. Lantai Keramik Putih 40x40 cm #REF! M2 #REF! 30.00 #REF! #REF! 70.00 #REF! #REF! 100.00 #REF!
- - - - -
V PEKERJAAN ATAP - - - - -
1 Pek. Kuda-kuda + rangka atap baja ringan (Zincallume) t. 0,75 mm #REF! M2 #REF! #REF! #REF! #REF! - #REF!
2 Pek. Pas Zincalume (Sepandek) #REF! M2 #REF! #REF! #REF! #REF! - #REF!
3 Pek. Pas. Listplank GRC (1/30) cm #REF! M #REF! #REF! #REF! #REF! - #REF!
- - - - -
VI PEKERJAAN LANGIT LANGIT - - - - -
1 Pek Plafond GRC Rangka Hollo #REF! M2 #REF! #REF! #REF! #REF! - #REF!
- - - - -
VII PEKERJAAN PINTU DAN JENDELA LENGKAP DENGAN ASESORIS - - - - -
1 Pek. Kusen alumunium Natural 4" #REF! M #REF! #REF! #REF! #REF! - #REF!
2 Pek. Daun Pintu Alumunium Lengkap Aksesoris Tanpa Kaca 80x205 cm #REF! Unit #REF! #REF! #REF! #REF! - #REF!
3 Pas. Daun jendela alumunium Warna Coklat lengkap dengan Kaca dan Aksesoris #REF! Unit #REF! #REF! #REF! #REF! - #REF!
- - - - -
VIII PEKERJAAN PENGECATAN - - - - -
1 Pek. Pengecatan Dingding #REF! M2 #REF! #REF! #REF! #REF! - #REF!
2 Pek. Pengecatan Plafond #REF! M2 #REF! #REF! #REF! #REF! - #REF!
3 Pek. Pengecatan Listplank #REF! M2 #REF! #REF! #REF! #REF! - #REF!
- - - - -
IX PEKERJAAN LISTRIK - - - - -
1 Pek. Pas. Titik lampu komplit #REF! TTK #REF! #REF! #REF! #REF! - #REF!
2 Pas. Stop kontak #REF! Bh #REF! #REF! #REF! #REF! - #REF!
3 Pas. Saklar Tunggal #REF! Bh #REF! #REF! #REF! #REF! - #REF!
4 Pas. Saklar Ganda #REF! Bh #REF! #REF! #REF! #REF! - #REF!
5 Pas. Lampu Downlight philips Glass recessed (18 Watt) #REF! Bh #REF! #REF! #REF! #REF! - #REF!
- - - - -
X PEKERJAAN BAK CUCI - - - - -
1 Pek. Pasangan 1/2 bata 1 Pc : 5 Psr #REF! M2 #REF! #REF! #REF! #REF! - #REF!
2 Pek. Plesteran 1 Pc : 5 Psr #REF! M2 #REF! #REF! #REF! #REF! - #REF!
3 Pek. Acian #REF! M2 #REF! #REF! #REF! #REF! - #REF!
4 Pek. Plat Beton t = 10 mm #REF! M3 #REF! #REF! #REF! #REF! - #REF!
5 Pek. Begisting dengan papan terentang #REF! M2 #REF! #REF! #REF! #REF! - #REF!
6 Pek. Pembesian U-24 #REF! KG #REF! #REF! #REF! #REF! - #REF!
7 Pek. Pas. Pipa Pvc d.1/2'' #REF! M #REF! #REF! #REF! #REF! - #REF!
8 Pek. Pas Pipa Pvc d. 3'' (Pembuang Uap Air) #REF! M #REF! #REF! #REF! #REF! - #REF!
9 Pas. Tempat Cuci/ Pencucian BCP lobang double sink + Aksesoris #REF! Unit #REF! #REF! #REF! #REF! - #REF!
10 Pek. keramik Warna 20x25 cm #REF! M2 #REF! #REF! #REF! #REF! - #REF!
11 Pek. Washtafel #REF! Unit #REF! #REF! #REF! #REF! - #REF!
12 pek.closet duduk setara toto #REF! Bh #REF! #REF! #REF! #REF! - #REF!
LAPORAN MINGGUAN
PENYEDIAAN DAN PENYALURAN BAHAN BAKU INDUSTRI PENGOLAHAN IKAN DALAM 1 (SATU) DAERAH KABUPATEN/ KOTA
KEGIATAN :
SUB KEGIATAN : PEMBERIAN FASILITAS BAGI PELAKU USAHA PERIKANAN SKALA MIKRO DAN KECIL DALAM 1 (SATU) DAERAH KABUPATEN/ KOTA
PEKERJAAN : BEDAH UPI SKALA KECIL DESA CEMARA KULON KEC. LOSARANG (DAK 2022) Tanggal : #REF!
SUMBER DANA : DANA ANGGARAN KHUSUS (DAK) TAHUN 2022 Minggu ke : 8 (DELAPAN)
LOKASI : KELOMPOK MINASARI MULYA, KEC LOSARANG (OLAHAN IKAN ASIN) Bulan ke : 2 (DUA)

PRESTASI SAMPAI MINGGU LALU PRESTASI MINGGU INI PRESTASI SAMPAI MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN VOLUME SATUAN Minggu Lalu (%) Minggu Ini (%) Komulatif (%)
% Vol Prestasi Rerata Vol Prestasi Rerata Vol Prestasi Rerata
1 2 3 4 5 6 7 8 9 10 11 12 13 14

A BEDAH UPI SKALA KECIL DESA CEMARA KULON KEC. LOSARANG (DAK 2022)
I PEKERJAAN PERSIAPAN
1 Pek. Papan Nama Kegiatan Digital Printing #REF! M2 #REF! 100.00 0.62 #REF! #REF! #REF! 100.00 #REF!
2 Pek. Pengukuran Kembali #REF! Ls #REF! 100.00 2.17 #REF! #REF! #REF! 100.00 #REF!
3 Pek. Bongkaran Dingding #REF! Ls #REF! 100.00 2.53 #REF! #REF! #REF! 100.00 #REF!
4 Biaya Adm. dan Dokumentasi #REF! Ls #REF! 100.00 1.92 #REF! #REF! #REF! 100.00 #REF!
- - - - -
II PEKERJAAN BETON - - - - -
1 Pek. Beton Tumbuk 1Pc : 3Ps : 5Kr Trap Samping t = 5 cm #REF! M3 #REF! #REF! #REF! #REF! - #REF!
#REF! - - - - -
- Cor Beton K.175 Site mix #REF! M3 #REF! #REF! #REF! #REF! - #REF!
- Pek. Begisting dengan papan terentang #REF! M2 #REF! #REF! #REF! #REF! - #REF!
- Pek. Pembesian U-24 #REF! KG #REF! #REF! #REF! #REF! - #REF!
- - - - -
#REF! - - - - -
#REF! #REF! #REF! #REF! #REF! #REF! #REF! - #REF!
- - - - -
2 Kolom Ampig 10/10 cm - - - - -
- Cor Beton K.175 Site mix #REF! M3 #REF! #REF! #REF! #REF! - #REF!
- Pek. Begisting dengan papan terentang #REF! M2 #REF! #REF! #REF! #REF! - #REF!
- Pek. Pembesian U-24 #REF! KG #REF! #REF! #REF! #REF! - #REF!
- - - - -
3 Pek. Balok Ampig 10/10 cm 6.50 M - - - - -
- Cor Beton K.175 Site mix #REF! M3 #REF! #REF! #REF! #REF! - #REF!
- Pek. Begisting dengan papan terentang #REF! M2 #REF! #REF! #REF! #REF! - #REF!
- Pek. Pembesian U-24 #REF! KG #REF! #REF! #REF! #REF! - #REF!
- - - - -
4 Pek. Balok Luifel 10/10 cm - - - - -
- Cor Beton K.175 Site mix #REF! M3 #REF! #REF! #REF! #REF! - #REF!
- Pek. Begisting dengan papan terentang #REF! M2 #REF! #REF! #REF! #REF! - #REF!
- Pek. Pembesian U-24 #REF! KG #REF! #REF! #REF! #REF! - #REF!
- - - - -
III PEKERJAAN PASANGAN DAN PLESTERAN - - - - -
1 Pek. Pasangan dinding bata ringan t.10 cm #REF! M2 #REF! 30.00 #REF! #REF! #REF! #REF! 30.00 #REF!
2 Pek. Plesteran Bata Ringan #REF! M2 #REF! 60.00 #REF! #REF! #REF! #REF! 60.00 #REF!
3 Pek. Acian Bata Ringan #REF! M2 #REF! 30.00 1.10 #REF! #REF! #REF! 30.00 #REF!
4 Pek. Pas GRC Rangka Hollow Sekat Dingding #REF! m2 #REF! #REF! #REF! #REF! - #REF!
- - - - -
IV PEKERJAAN PENUTUP LANTAI - - - - -
1 Pek. Lantai Keramik Putih 40x40 cm #REF! M2 #REF! 30.00 #REF! #REF! 70.00 #REF! #REF! 100.00 #REF!
- - - - -
V PEKERJAAN ATAP - - - - -
1 Pek. Kuda-kuda + rangka atap baja ringan (Zincallume) t. 0,75 mm #REF! M2 #REF! #REF! #REF! #REF! - #REF!
2 Pek. Pas Zincalume (Sepandek) #REF! M2 #REF! #REF! #REF! #REF! - #REF!
3 Pek. Pas. Listplank GRC (1/30) cm #REF! M #REF! #REF! #REF! #REF! - #REF!
- - - - -
VI PEKERJAAN LANGIT LANGIT - - - - -
1 Pek Plafond GRC Rangka Hollo #REF! M2 #REF! #REF! #REF! #REF! - #REF!
- - - - -
VII PEKERJAAN PINTU DAN JENDELA LENGKAP DENGAN ASESORIS - - - - -
1 Pek. Kusen alumunium Natural 4" #REF! M #REF! #REF! #REF! #REF! - #REF!
2 Pek. Daun Pintu Alumunium Lengkap Aksesoris Tanpa Kaca 80x205 cm #REF! Unit #REF! #REF! #REF! #REF! - #REF!
3 Pas. Daun jendela alumunium Warna Coklat lengkap dengan Kaca dan Aksesoris #REF! Unit #REF! #REF! #REF! #REF! - #REF!
- - - - -
VIII PEKERJAAN PENGECATAN - - - - -
1 Pek. Pengecatan Dingding #REF! M2 #REF! #REF! #REF! #REF! - #REF!
2 Pek. Pengecatan Plafond #REF! M2 #REF! #REF! #REF! #REF! - #REF!
3 Pek. Pengecatan Listplank #REF! M2 #REF! #REF! #REF! #REF! - #REF!
- - - - -
IX PEKERJAAN LISTRIK - - - - -
1 Pek. Pas. Titik lampu komplit #REF! TTK #REF! #REF! #REF! #REF! - #REF!
2 Pas. Stop kontak #REF! Bh #REF! #REF! #REF! #REF! - #REF!
3 Pas. Saklar Tunggal #REF! Bh #REF! #REF! #REF! #REF! - #REF!
4 Pas. Saklar Ganda #REF! Bh #REF! #REF! #REF! #REF! - #REF!
5 Pas. Lampu Downlight philips Glass recessed (18 Watt) #REF! Bh #REF! #REF! #REF! #REF! - #REF!
- - - - -
X PEKERJAAN BAK CUCI - - - - -
1 Pek. Pasangan 1/2 bata 1 Pc : 5 Psr #REF! M2 #REF! #REF! #REF! #REF! - #REF!
2 Pek. Plesteran 1 Pc : 5 Psr #REF! M2 #REF! #REF! #REF! #REF! - #REF!
3 Pek. Acian #REF! M2 #REF! #REF! #REF! #REF! - #REF!
4 Pek. Plat Beton t = 10 mm #REF! M3 #REF! #REF! #REF! #REF! - #REF!
5 Pek. Begisting dengan papan terentang #REF! M2 #REF! #REF! #REF! #REF! - #REF!
6 Pek. Pembesian U-24 #REF! KG #REF! #REF! #REF! #REF! - #REF!
7 Pek. Pas. Pipa Pvc d.1/2'' #REF! M #REF! #REF! #REF! #REF! - #REF!
8 Pek. Pas Pipa Pvc d. 3'' (Pembuang Uap Air) #REF! M #REF! #REF! #REF! #REF! - #REF!
9 Pas. Tempat Cuci/ Pencucian BCP lobang double sink + Aksesoris #REF! Unit #REF! #REF! #REF! #REF! - #REF!
10 Pek. keramik Warna 20x25 cm #REF! M2 #REF! #REF! #REF! #REF! - #REF!
11 Pek. Washtafel #REF! Unit #REF! #REF! #REF! #REF! - #REF!
12 pek.closet duduk setara toto #REF! Bh #REF! #REF! #REF! #REF! - #REF!
LAPORAN MINGGUAN
PENYEDIAAN DAN PENYALURAN BAHAN BAKU INDUSTRI PENGOLAHAN IKAN DALAM 1 (SATU) DAERAH KABUPATEN/ KOTA
KEGIATAN :
SUB KEGIATAN : PEMBERIAN FASILITAS BAGI PELAKU USAHA PERIKANAN SKALA MIKRO DAN KECIL DALAM 1 (SATU) DAERAH KABUPATEN/ KOTA
PEKERJAAN : BEDAH UPI SKALA KECIL DESA CEMARA KULON KEC. LOSARANG (DAK 2022) Tanggal : #REF!
SUMBER DANA : DANA ANGGARAN KHUSUS (DAK) TAHUN 2022 Minggu ke : 9 (SEMBILAN)
LOKASI : KELOMPOK MINASARI MULYA, KEC LOSARANG (OLAHAN IKAN ASIN) Bulan ke : 3 ( TIGA)

PRESTASI SAMPAI MINGGU LALU PRESTASI MINGGU INI PRESTASI SAMPAI MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN VOLUME SATUAN Minggu Lalu (%) Minggu Ini (%) Komulatif (%)
% Vol Prestasi Rerata Vol Prestasi Rerata Vol Prestasi Rerata
1 2 3 4 5 6 7 8 9 10 11 12 13 14

A BEDAH UPI SKALA KECIL DESA CEMARA KULON KEC. LOSARANG (DAK 2022)
I PEKERJAAN PERSIAPAN
1 Pek. Papan Nama Kegiatan Digital Printing #REF! M2 #REF! 100.00 0.62 #REF! #REF! #REF! 100.00 #REF!
2 Pek. Pengukuran Kembali #REF! Ls #REF! 100.00 2.17 #REF! #REF! #REF! 100.00 #REF!
3 Pek. Bongkaran Dingding #REF! Ls #REF! 100.00 2.53 #REF! #REF! #REF! 100.00 #REF!
4 Biaya Adm. dan Dokumentasi #REF! Ls #REF! 100.00 1.92 #REF! #REF! #REF! 100.00 #REF!
- - - - -
II PEKERJAAN BETON - - - - -
1 Pek. Beton Tumbuk 1Pc : 3Ps : 5Kr Trap Samping t = 5 cm #REF! M3 #REF! #REF! #REF! #REF! - #REF!
#REF! - - - - -
- Cor Beton K.175 Site mix #REF! M3 #REF! #REF! #REF! #REF! - #REF!
- Pek. Begisting dengan papan terentang #REF! M2 #REF! #REF! #REF! #REF! - #REF!
- Pek. Pembesian U-24 #REF! KG #REF! #REF! #REF! #REF! - #REF!
- - - - -
#REF! - - - - -
#REF! #REF! #REF! #REF! #REF! #REF! #REF! - #REF!
- - - - -
2 Kolom Ampig 10/10 cm - - - - -
- Cor Beton K.175 Site mix #REF! M3 #REF! #REF! #REF! #REF! - #REF!
- Pek. Begisting dengan papan terentang #REF! M2 #REF! #REF! #REF! #REF! - #REF!
- Pek. Pembesian U-24 #REF! KG #REF! #REF! #REF! #REF! - #REF!
- - - - -
3 Pek. Balok Ampig 10/10 cm 6.50 M - - - - -
- Cor Beton K.175 Site mix #REF! M3 #REF! #REF! #REF! #REF! - #REF!
- Pek. Begisting dengan papan terentang #REF! M2 #REF! #REF! #REF! #REF! - #REF!
- Pek. Pembesian U-24 #REF! KG #REF! #REF! #REF! #REF! - #REF!
- - - - -
4 Pek. Balok Luifel 10/10 cm - - - - -
- Cor Beton K.175 Site mix #REF! M3 #REF! #REF! #REF! #REF! - #REF!
- Pek. Begisting dengan papan terentang #REF! M2 #REF! #REF! #REF! #REF! - #REF!
- Pek. Pembesian U-24 #REF! KG #REF! #REF! #REF! #REF! - #REF!
- - - - -
III PEKERJAAN PASANGAN DAN PLESTERAN - - - - -
1 Pek. Pasangan dinding bata ringan t.10 cm #REF! M2 #REF! 30.00 #REF! #REF! #REF! #REF! 30.00 #REF!
2 Pek. Plesteran Bata Ringan #REF! M2 #REF! 60.00 #REF! #REF! #REF! #REF! 60.00 #REF!
3 Pek. Acian Bata Ringan #REF! M2 #REF! 30.00 1.10 #REF! #REF! #REF! 30.00 #REF!
4 Pek. Pas GRC Rangka Hollow Sekat Dingding #REF! m2 #REF! #REF! #REF! #REF! - #REF!
- - - - -
IV PEKERJAAN PENUTUP LANTAI - - - - -
1 Pek. Lantai Keramik Putih 40x40 cm #REF! M2 #REF! 30.00 #REF! #REF! 70.00 #REF! #REF! 100.00 #REF!
- - - - -
V PEKERJAAN ATAP - - - - -
1 Pek. Kuda-kuda + rangka atap baja ringan (Zincallume) t. 0,75 mm #REF! M2 #REF! #REF! #REF! #REF! - #REF!
2 Pek. Pas Zincalume (Sepandek) #REF! M2 #REF! #REF! #REF! #REF! - #REF!
3 Pek. Pas. Listplank GRC (1/30) cm #REF! M #REF! #REF! #REF! #REF! - #REF!
- - - - -
VI PEKERJAAN LANGIT LANGIT - - - - -
1 Pek Plafond GRC Rangka Hollo #REF! M2 #REF! #REF! #REF! #REF! - #REF!
- - - - -
VII PEKERJAAN PINTU DAN JENDELA LENGKAP DENGAN ASESORIS - - - - -
1 Pek. Kusen alumunium Natural 4" #REF! M #REF! #REF! #REF! #REF! - #REF!
2 Pek. Daun Pintu Alumunium Lengkap Aksesoris Tanpa Kaca 80x205 cm #REF! Unit #REF! #REF! #REF! #REF! - #REF!
3 Pas. Daun jendela alumunium Warna Coklat lengkap dengan Kaca dan Aksesoris #REF! Unit #REF! #REF! #REF! #REF! - #REF!
- - - - -
VIII PEKERJAAN PENGECATAN - - - - -
1 Pek. Pengecatan Dingding #REF! M2 #REF! #REF! #REF! #REF! - #REF!
2 Pek. Pengecatan Plafond #REF! M2 #REF! #REF! #REF! #REF! - #REF!
3 Pek. Pengecatan Listplank #REF! M2 #REF! #REF! #REF! #REF! - #REF!
- - - - -
IX PEKERJAAN LISTRIK - - - - -
1 Pek. Pas. Titik lampu komplit #REF! TTK #REF! #REF! #REF! #REF! - #REF!
2 Pas. Stop kontak #REF! Bh #REF! #REF! #REF! #REF! - #REF!
3 Pas. Saklar Tunggal #REF! Bh #REF! #REF! #REF! #REF! - #REF!
4 Pas. Saklar Ganda #REF! Bh #REF! #REF! #REF! #REF! - #REF!
5 Pas. Lampu Downlight philips Glass recessed (18 Watt) #REF! Bh #REF! #REF! #REF! #REF! - #REF!
- - - - -
X PEKERJAAN BAK CUCI - - - - -
1 Pek. Pasangan 1/2 bata 1 Pc : 5 Psr #REF! M2 #REF! #REF! #REF! #REF! - #REF!
2 Pek. Plesteran 1 Pc : 5 Psr #REF! M2 #REF! #REF! #REF! #REF! - #REF!
3 Pek. Acian #REF! M2 #REF! #REF! #REF! #REF! - #REF!
4 Pek. Plat Beton t = 10 mm #REF! M3 #REF! #REF! #REF! #REF! - #REF!
5 Pek. Begisting dengan papan terentang #REF! M2 #REF! #REF! #REF! #REF! - #REF!
6 Pek. Pembesian U-24 #REF! KG #REF! #REF! #REF! #REF! - #REF!
7 Pek. Pas. Pipa Pvc d.1/2'' #REF! M #REF! #REF! #REF! #REF! - #REF!
8 Pek. Pas Pipa Pvc d. 3'' (Pembuang Uap Air) #REF! M #REF! #REF! #REF! #REF! - #REF!
9 Pas. Tempat Cuci/ Pencucian BCP lobang double sink + Aksesoris #REF! Unit #REF! #REF! #REF! #REF! - #REF!
10 Pek. keramik Warna 20x25 cm #REF! M2 #REF! #REF! #REF! #REF! - #REF!
11 Pek. Washtafel #REF! Unit #REF! #REF! #REF! #REF! - #REF!
12 pek.closet duduk setara toto #REF! Bh #REF! #REF! #REF! #REF! - #REF!
LAPORAN MINGGUAN
PENYEDIAAN DAN PENYALURAN BAHAN BAKU INDUSTRI PENGOLAHAN IKAN DALAM 1 (SATU) DAERAH KABUPATEN/ KOTA
KEGIATAN :
SUB KEGIATAN : PEMBERIAN FASILITAS BAGI PELAKU USAHA PERIKANAN SKALA MIKRO DAN KECIL DALAM 1 (SATU) DAERAH KABUPATEN/ KOTA
PEKERJAAN : BEDAH UPI SKALA KECIL DESA CEMARA KULON KEC. LOSARANG (DAK 2022) Tanggal : #REF!
SUMBER DANA : DANA ANGGARAN KHUSUS (DAK) TAHUN 2022 Minggu ke : 10 (SEPULUH)
LOKASI : KELOMPOK MINASARI MULYA, KEC LOSARANG (OLAHAN IKAN ASIN) Bulan ke : 3 ( TIGA)

PRESTASI SAMPAI MINGGU LALU PRESTASI MINGGU INI PRESTASI SAMPAI MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN VOLUME SATUAN Minggu Lalu (%) Minggu Ini (%) Komulatif (%)
% Vol Prestasi Rerata Vol Prestasi Rerata Vol Prestasi Rerata
1 2 3 4 5 6 7 8 9 10 11 12 13 14

A BEDAH UPI SKALA KECIL DESA CEMARA KULON KEC. LOSARANG (DAK 2022)
I PEKERJAAN PERSIAPAN
1 Pek. Papan Nama Kegiatan Digital Printing #REF! M2 #REF! 100.00 0.62 #REF! #REF! #REF! 100.00 #REF!
2 Pek. Pengukuran Kembali #REF! Ls #REF! 100.00 2.17 #REF! #REF! #REF! 100.00 #REF!
3 Pek. Bongkaran Dingding #REF! Ls #REF! 100.00 2.53 #REF! #REF! #REF! 100.00 #REF!
4 Biaya Adm. dan Dokumentasi #REF! Ls #REF! 100.00 1.92 #REF! #REF! #REF! 100.00 #REF!
- - - - -
II PEKERJAAN BETON - - - - -
1 Pek. Beton Tumbuk 1Pc : 3Ps : 5Kr Trap Samping t = 5 cm #REF! M3 #REF! #REF! #REF! #REF! - #REF!
#REF! - - - - -
- Cor Beton K.175 Site mix #REF! M3 #REF! #REF! #REF! #REF! - #REF!
- Pek. Begisting dengan papan terentang #REF! M2 #REF! #REF! #REF! #REF! - #REF!
- Pek. Pembesian U-24 #REF! KG #REF! #REF! #REF! #REF! - #REF!
- - - - -
#REF! - - - - -
#REF! #REF! #REF! #REF! #REF! #REF! #REF! - #REF!
- - - - -
2 Kolom Ampig 10/10 cm - - - - -
- Cor Beton K.175 Site mix #REF! M3 #REF! #REF! #REF! #REF! - #REF!
- Pek. Begisting dengan papan terentang #REF! M2 #REF! #REF! #REF! #REF! - #REF!
- Pek. Pembesian U-24 #REF! KG #REF! #REF! #REF! #REF! - #REF!
- - - - -
3 Pek. Balok Ampig 10/10 cm 6.50 M - - - - -
- Cor Beton K.175 Site mix #REF! M3 #REF! #REF! #REF! #REF! - #REF!
- Pek. Begisting dengan papan terentang #REF! M2 #REF! #REF! #REF! #REF! - #REF!
- Pek. Pembesian U-24 #REF! KG #REF! #REF! #REF! #REF! - #REF!
- - - - -
4 Pek. Balok Luifel 10/10 cm - - - - -
- Cor Beton K.175 Site mix #REF! M3 #REF! #REF! #REF! #REF! - #REF!
- Pek. Begisting dengan papan terentang #REF! M2 #REF! #REF! #REF! #REF! - #REF!
- Pek. Pembesian U-24 #REF! KG #REF! #REF! #REF! #REF! - #REF!
- - - - -
III PEKERJAAN PASANGAN DAN PLESTERAN - - - - -
1 Pek. Pasangan dinding bata ringan t.10 cm #REF! M2 #REF! 30.00 #REF! #REF! #REF! #REF! 30.00 #REF!
2 Pek. Plesteran Bata Ringan #REF! M2 #REF! 60.00 #REF! #REF! #REF! #REF! 60.00 #REF!
3 Pek. Acian Bata Ringan #REF! M2 #REF! 30.00 1.10 #REF! #REF! #REF! 30.00 #REF!
4 Pek. Pas GRC Rangka Hollow Sekat Dingding #REF! m2 #REF! #REF! #REF! #REF! - #REF!
- - - - -
IV PEKERJAAN PENUTUP LANTAI - - - - -
1 Pek. Lantai Keramik Putih 40x40 cm #REF! M2 #REF! 30.00 #REF! #REF! 70.00 #REF! #REF! 100.00 #REF!
- - - - -
V PEKERJAAN ATAP - - - - -
1 Pek. Kuda-kuda + rangka atap baja ringan (Zincallume) t. 0,75 mm #REF! M2 #REF! #REF! #REF! #REF! - #REF!
2 Pek. Pas Zincalume (Sepandek) #REF! M2 #REF! #REF! #REF! #REF! - #REF!
3 Pek. Pas. Listplank GRC (1/30) cm #REF! M #REF! #REF! #REF! #REF! - #REF!
- - - - -
VI PEKERJAAN LANGIT LANGIT - - - - -
1 Pek Plafond GRC Rangka Hollo #REF! M2 #REF! #REF! #REF! #REF! - #REF!
- - - - -
VII PEKERJAAN PINTU DAN JENDELA LENGKAP DENGAN ASESORIS - - - - -
1 Pek. Kusen alumunium Natural 4" #REF! M #REF! #REF! #REF! #REF! - #REF!
2 Pek. Daun Pintu Alumunium Lengkap Aksesoris Tanpa Kaca 80x205 cm #REF! Unit #REF! #REF! #REF! #REF! - #REF!
3 Pas. Daun jendela alumunium Warna Coklat lengkap dengan Kaca dan Aksesoris #REF! Unit #REF! #REF! #REF! #REF! - #REF!
- - - - -
VIII PEKERJAAN PENGECATAN - - - - -
1 Pek. Pengecatan Dingding #REF! M2 #REF! #REF! #REF! #REF! - #REF!
2 Pek. Pengecatan Plafond #REF! M2 #REF! #REF! #REF! #REF! - #REF!
3 Pek. Pengecatan Listplank #REF! M2 #REF! #REF! #REF! #REF! - #REF!
- - - - -
IX PEKERJAAN LISTRIK - - - - -
1 Pek. Pas. Titik lampu komplit #REF! TTK #REF! #REF! #REF! #REF! - #REF!
2 Pas. Stop kontak #REF! Bh #REF! #REF! #REF! #REF! - #REF!
3 Pas. Saklar Tunggal #REF! Bh #REF! #REF! #REF! #REF! - #REF!
4 Pas. Saklar Ganda #REF! Bh #REF! #REF! #REF! #REF! - #REF!
5 Pas. Lampu Downlight philips Glass recessed (18 Watt) #REF! Bh #REF! #REF! #REF! #REF! - #REF!
- - - - -
X PEKERJAAN BAK CUCI - - - - -
1 Pek. Pasangan 1/2 bata 1 Pc : 5 Psr #REF! M2 #REF! #REF! #REF! #REF! - #REF!
2 Pek. Plesteran 1 Pc : 5 Psr #REF! M2 #REF! #REF! #REF! #REF! - #REF!
3 Pek. Acian #REF! M2 #REF! #REF! #REF! #REF! - #REF!
4 Pek. Plat Beton t = 10 mm #REF! M3 #REF! #REF! #REF! #REF! - #REF!
5 Pek. Begisting dengan papan terentang #REF! M2 #REF! #REF! #REF! #REF! - #REF!
6 Pek. Pembesian U-24 #REF! KG #REF! #REF! #REF! #REF! - #REF!
7 Pek. Pas. Pipa Pvc d.1/2'' #REF! M #REF! #REF! #REF! #REF! - #REF!
8 Pek. Pas Pipa Pvc d. 3'' (Pembuang Uap Air) #REF! M #REF! #REF! #REF! #REF! - #REF!
9 Pas. Tempat Cuci/ Pencucian BCP lobang double sink + Aksesoris #REF! Unit #REF! #REF! #REF! #REF! - #REF!
10 Pek. keramik Warna 20x25 cm #REF! M2 #REF! #REF! #REF! #REF! - #REF!
11 Pek. Washtafel #REF! Unit #REF! #REF! #REF! #REF! - #REF!
12 pek.closet duduk setara toto #REF! Bh #REF! #REF! #REF! #REF! - #REF!
LAPORAN MINGGUAN
PENYEDIAAN DAN PENYALURAN BAHAN BAKU INDUSTRI PENGOLAHAN IKAN DALAM 1 (SATU) DAERAH KABUPATEN/ KOTA
KEGIATAN :
SUB KEGIATAN : PEMBERIAN FASILITAS BAGI PELAKU USAHA PERIKANAN SKALA MIKRO DAN KECIL DALAM 1 (SATU) DAERAH KABUPATEN/ KOTA
PEKERJAAN : BEDAH UPI SKALA KECIL DESA CEMARA KULON KEC. LOSARANG (DAK 2022) Tanggal : #REF!
SUMBER DANA : DANA ANGGARAN KHUSUS (DAK) TAHUN 2022 Minggu ke : 11 (SEBELAS)
LOKASI : KELOMPOK MINASARI MULYA, KEC LOSARANG (OLAHAN IKAN ASIN) Bulan ke : 4 (EMPAT)

PRESTASI SAMPAI MINGGU LALU PRESTASI MINGGU INI PRESTASI SAMPAI MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN VOLUME SATUAN Minggu Lalu (%) Minggu Ini (%) Komulatif (%)
% Vol Prestasi Rerata Vol Prestasi Rerata Vol Prestasi Rerata
1 2 3 4 5 6 7 8 9 10 11 12 13 14

A BEDAH UPI SKALA KECIL DESA CEMARA KULON KEC. LOSARANG (DAK 2022)
I PEKERJAAN PERSIAPAN
1 Pek. Papan Nama Kegiatan Digital Printing #REF! M2 #REF! 100.00 0.62 #REF! #REF! #REF! 100.00 #REF!
2 Pek. Pengukuran Kembali #REF! Ls #REF! 100.00 2.17 #REF! #REF! #REF! 100.00 #REF!
3 Pek. Bongkaran Dingding #REF! Ls #REF! 100.00 2.53 #REF! #REF! #REF! 100.00 #REF!
4 Biaya Adm. dan Dokumentasi #REF! Ls #REF! 100.00 1.92 #REF! #REF! #REF! 100.00 #REF!
- - - - -
II PEKERJAAN BETON - - - - -
1 Pek. Beton Tumbuk 1Pc : 3Ps : 5Kr Trap Samping t = 5 cm #REF! M3 #REF! #REF! #REF! #REF! - #REF!
#REF! - - - - -
- Cor Beton K.175 Site mix #REF! M3 #REF! #REF! #REF! #REF! - #REF!
- Pek. Begisting dengan papan terentang #REF! M2 #REF! #REF! #REF! #REF! - #REF!
- Pek. Pembesian U-24 #REF! KG #REF! #REF! #REF! #REF! - #REF!
- - - - -
#REF! - - - - -
#REF! #REF! #REF! #REF! #REF! #REF! #REF! - #REF!
- - - - -
2 Kolom Ampig 10/10 cm - - - - -
- Cor Beton K.175 Site mix #REF! M3 #REF! #REF! #REF! #REF! - #REF!
- Pek. Begisting dengan papan terentang #REF! M2 #REF! #REF! #REF! #REF! - #REF!
- Pek. Pembesian U-24 #REF! KG #REF! #REF! #REF! #REF! - #REF!
- - - - -
3 Pek. Balok Ampig 10/10 cm 6.50 M - - - - -
- Cor Beton K.175 Site mix #REF! M3 #REF! #REF! #REF! #REF! - #REF!
- Pek. Begisting dengan papan terentang #REF! M2 #REF! #REF! #REF! #REF! - #REF!
- Pek. Pembesian U-24 #REF! KG #REF! #REF! #REF! #REF! - #REF!
- - - - -
4 Pek. Balok Luifel 10/10 cm - - - - -
- Cor Beton K.175 Site mix #REF! M3 #REF! #REF! #REF! #REF! - #REF!
- Pek. Begisting dengan papan terentang #REF! M2 #REF! #REF! #REF! #REF! - #REF!
- Pek. Pembesian U-24 #REF! KG #REF! #REF! #REF! #REF! - #REF!
- - - - -
III PEKERJAAN PASANGAN DAN PLESTERAN - - - - -
1 Pek. Pasangan dinding bata ringan t.10 cm #REF! M2 #REF! 30.00 #REF! #REF! #REF! #REF! 30.00 #REF!
2 Pek. Plesteran Bata Ringan #REF! M2 #REF! 60.00 #REF! #REF! #REF! #REF! 60.00 #REF!
3 Pek. Acian Bata Ringan #REF! M2 #REF! 30.00 1.10 #REF! #REF! #REF! 30.00 #REF!
4 Pek. Pas GRC Rangka Hollow Sekat Dingding #REF! m2 #REF! #REF! #REF! #REF! - #REF!
- - - - -
IV PEKERJAAN PENUTUP LANTAI - - - - -
1 Pek. Lantai Keramik Putih 40x40 cm #REF! M2 #REF! 30.00 #REF! #REF! 70.00 #REF! #REF! 100.00 #REF!
- - - - -
V PEKERJAAN ATAP - - - - -
1 Pek. Kuda-kuda + rangka atap baja ringan (Zincallume) t. 0,75 mm #REF! M2 #REF! #REF! #REF! #REF! - #REF!
2 Pek. Pas Zincalume (Sepandek) #REF! M2 #REF! #REF! #REF! #REF! - #REF!
3 Pek. Pas. Listplank GRC (1/30) cm #REF! M #REF! #REF! #REF! #REF! - #REF!
- - - - -
VI PEKERJAAN LANGIT LANGIT - - - - -
1 Pek Plafond GRC Rangka Hollo #REF! M2 #REF! #REF! #REF! #REF! - #REF!
- - - - -
VII PEKERJAAN PINTU DAN JENDELA LENGKAP DENGAN ASESORIS - - - - -
1 Pek. Kusen alumunium Natural 4" #REF! M #REF! #REF! #REF! #REF! - #REF!
2 Pek. Daun Pintu Alumunium Lengkap Aksesoris Tanpa Kaca 80x205 cm #REF! Unit #REF! #REF! #REF! #REF! - #REF!
3 Pas. Daun jendela alumunium Warna Coklat lengkap dengan Kaca dan Aksesoris #REF! Unit #REF! #REF! #REF! #REF! - #REF!
- - - - -
VIII PEKERJAAN PENGECATAN - - - - -
1 Pek. Pengecatan Dingding #REF! M2 #REF! #REF! #REF! #REF! - #REF!
2 Pek. Pengecatan Plafond #REF! M2 #REF! #REF! #REF! #REF! - #REF!
3 Pek. Pengecatan Listplank #REF! M2 #REF! #REF! #REF! #REF! - #REF!
- - - - -
IX PEKERJAAN LISTRIK - - - - -
1 Pek. Pas. Titik lampu komplit #REF! TTK #REF! #REF! #REF! #REF! - #REF!
2 Pas. Stop kontak #REF! Bh #REF! #REF! #REF! #REF! - #REF!
3 Pas. Saklar Tunggal #REF! Bh #REF! #REF! #REF! #REF! - #REF!
4 Pas. Saklar Ganda #REF! Bh #REF! #REF! #REF! #REF! - #REF!
5 Pas. Lampu Downlight philips Glass recessed (18 Watt) #REF! Bh #REF! #REF! #REF! #REF! - #REF!
- - - - -
X PEKERJAAN BAK CUCI - - - - -
1 Pek. Pasangan 1/2 bata 1 Pc : 5 Psr #REF! M2 #REF! #REF! #REF! #REF! - #REF!
2 Pek. Plesteran 1 Pc : 5 Psr #REF! M2 #REF! #REF! #REF! #REF! - #REF!
3 Pek. Acian #REF! M2 #REF! #REF! #REF! #REF! - #REF!
4 Pek. Plat Beton t = 10 mm #REF! M3 #REF! #REF! #REF! #REF! - #REF!
5 Pek. Begisting dengan papan terentang #REF! M2 #REF! #REF! #REF! #REF! - #REF!
6 Pek. Pembesian U-24 #REF! KG #REF! #REF! #REF! #REF! - #REF!
7 Pek. Pas. Pipa Pvc d.1/2'' #REF! M #REF! #REF! #REF! #REF! - #REF!
8 Pek. Pas Pipa Pvc d. 3'' (Pembuang Uap Air) #REF! M #REF! #REF! #REF! #REF! - #REF!
9 Pas. Tempat Cuci/ Pencucian BCP lobang double sink + Aksesoris #REF! Unit #REF! #REF! #REF! #REF! - #REF!
10 Pek. keramik Warna 20x25 cm #REF! M2 #REF! #REF! #REF! #REF! - #REF!
11 Pek. Washtafel #REF! Unit #REF! #REF! #REF! #REF! - #REF!
12 pek.closet duduk setara toto #REF! Bh #REF! #REF! #REF! #REF! - #REF!
LAPORAN MINGGUAN
PENYEDIAAN DAN PENYALURAN BAHAN BAKU INDUSTRI PENGOLAHAN IKAN DALAM 1 (SATU) DAERAH KABUPATEN/ KOTA
KEGIATAN :
SUB KEGIATAN : PEMBERIAN FASILITAS BAGI PELAKU USAHA PERIKANAN SKALA MIKRO DAN KECIL DALAM 1 (SATU) DAERAH KABUPATEN/ KOTA
PEKERJAAN : BEDAH UPI SKALA KECIL DESA CEMARA KULON KEC. LOSARANG (DAK 2022) Tanggal : #REF!
SUMBER DANA : DANA ANGGARAN KHUSUS (DAK) TAHUN 2022 Minggu ke : 12 (DUA BELAS)
LOKASI : KELOMPOK MINASARI MULYA, KEC LOSARANG (OLAHAN IKAN ASIN) Bulan ke : 4 (EMPAT)

PRESTASI SAMPAI MINGGU LALU PRESTASI MINGGU INI PRESTASI SAMPAI MINGGU INI
BOBOT
NO. URAIAN PEKERJAAN VOLUME SATUAN Minggu Lalu (%) Minggu Ini (%) Komulatif (%)
% Vol Prestasi Rerata Vol Prestasi Rerata Vol Prestasi Rerata
1 2 3 4 5 6 7 8 9 10 11 12 13 14

A BEDAH UPI SKALA KECIL DESA CEMARA KULON KEC. LOSARANG (DAK 2022)
I PEKERJAAN PERSIAPAN
1 Pek. Papan Nama Kegiatan Digital Printing #REF! M2 #REF! 100.00 0.62 #REF! #REF! #REF! 100.00 #REF!
2 Pek. Pengukuran Kembali #REF! Ls #REF! 100.00 2.17 #REF! #REF! #REF! 100.00 #REF!
3 Pek. Bongkaran Dingding #REF! Ls #REF! 100.00 2.53 #REF! #REF! #REF! 100.00 #REF!
4 Biaya Adm. dan Dokumentasi #REF! Ls #REF! 100.00 1.92 #REF! #REF! #REF! 100.00 #REF!
- - - - -
II PEKERJAAN BETON - - - - -
1 Pek. Beton Tumbuk 1Pc : 3Ps : 5Kr Trap Samping t = 5 cm #REF! M3 #REF! #REF! #REF! #REF! - #REF!
#REF! - - - - -
- Cor Beton K.175 Site mix #REF! M3 #REF! #REF! #REF! #REF! - #REF!
- Pek. Begisting dengan papan terentang #REF! M2 #REF! #REF! #REF! #REF! - #REF!
- Pek. Pembesian U-24 #REF! KG #REF! #REF! #REF! #REF! - #REF!
- - - - -
#REF! - - - - -
#REF! #REF! #REF! #REF! #REF! #REF! #REF! - #REF!
- - - - -
2 Kolom Ampig 10/10 cm - - - - -
- Cor Beton K.175 Site mix #REF! M3 #REF! #REF! #REF! #REF! - #REF!
- Pek. Begisting dengan papan terentang #REF! M2 #REF! #REF! #REF! #REF! - #REF!
- Pek. Pembesian U-24 #REF! KG #REF! #REF! #REF! #REF! - #REF!
- - - - -
3 Pek. Balok Ampig 10/10 cm 6.50 M - - - - -
- Cor Beton K.175 Site mix #REF! M3 #REF! #REF! #REF! #REF! - #REF!
- Pek. Begisting dengan papan terentang #REF! M2 #REF! #REF! #REF! #REF! - #REF!
- Pek. Pembesian U-24 #REF! KG #REF! #REF! #REF! #REF! - #REF!
- - - - -
4 Pek. Balok Luifel 10/10 cm - - - - -
- Cor Beton K.175 Site mix #REF! M3 #REF! #REF! #REF! #REF! - #REF!
- Pek. Begisting dengan papan terentang #REF! M2 #REF! #REF! #REF! #REF! - #REF!
- Pek. Pembesian U-24 #REF! KG #REF! #REF! #REF! #REF! - #REF!
- - - - -
III PEKERJAAN PASANGAN DAN PLESTERAN - - - - -
1 Pek. Pasangan dinding bata ringan t.10 cm #REF! M2 #REF! 30.00 #REF! #REF! #REF! #REF! 30.00 #REF!
2 Pek. Plesteran Bata Ringan #REF! M2 #REF! 60.00 #REF! #REF! #REF! #REF! 60.00 #REF!
3 Pek. Acian Bata Ringan #REF! M2 #REF! 30.00 1.10 #REF! #REF! #REF! 30.00 #REF!
4 Pek. Pas GRC Rangka Hollow Sekat Dingding #REF! m2 #REF! #REF! #REF! #REF! - #REF!
- - - - -
IV PEKERJAAN PENUTUP LANTAI - - - - -
1 Pek. Lantai Keramik Putih 40x40 cm #REF! M2 #REF! 30.00 #REF! #REF! 70.00 #REF! #REF! 100.00 #REF!
- - - - -
V PEKERJAAN ATAP - - - - -
1 Pek. Kuda-kuda + rangka atap baja ringan (Zincallume) t. 0,75 mm #REF! M2 #REF! #REF! #REF! #REF! - #REF!
2 Pek. Pas Zincalume (Sepandek) #REF! M2 #REF! #REF! #REF! #REF! - #REF!
3 Pek. Pas. Listplank GRC (1/30) cm #REF! M #REF! #REF! #REF! #REF! - #REF!
- - - - -
VI PEKERJAAN LANGIT LANGIT - - - - -
1 Pek Plafond GRC Rangka Hollo #REF! M2 #REF! #REF! #REF! #REF! - #REF!
- - - - -
VII PEKERJAAN PINTU DAN JENDELA LENGKAP DENGAN ASESORIS - - - - -
1 Pek. Kusen alumunium Natural 4" #REF! M #REF! #REF! #REF! #REF! - #REF!
2 Pek. Daun Pintu Alumunium Lengkap Aksesoris Tanpa Kaca 80x205 cm #REF! Unit #REF! #REF! #REF! #REF! - #REF!
3 Pas. Daun jendela alumunium Warna Coklat lengkap dengan Kaca dan Aksesoris #REF! Unit #REF! #REF! #REF! #REF! - #REF!
- - - - -
VIII PEKERJAAN PENGECATAN - - - - -
1 Pek. Pengecatan Dingding #REF! M2 #REF! #REF! #REF! #REF! - #REF!
2 Pek. Pengecatan Plafond #REF! M2 #REF! #REF! #REF! #REF! - #REF!
3 Pek. Pengecatan Listplank #REF! M2 #REF! #REF! #REF! #REF! - #REF!
- - - - -
IX PEKERJAAN LISTRIK - - - - -
1 Pek. Pas. Titik lampu komplit #REF! TTK #REF! #REF! #REF! #REF! - #REF!
2 Pas. Stop kontak #REF! Bh #REF! #REF! #REF! #REF! - #REF!
3 Pas. Saklar Tunggal #REF! Bh #REF! #REF! #REF! #REF! - #REF!
4 Pas. Saklar Ganda #REF! Bh #REF! #REF! #REF! #REF! - #REF!
5 Pas. Lampu Downlight philips Glass recessed (18 Watt) #REF! Bh #REF! #REF! #REF! #REF! - #REF!
- - - - -
X PEKERJAAN BAK CUCI - - - - -
1 Pek. Pasangan 1/2 bata 1 Pc : 5 Psr #REF! M2 #REF! #REF! #REF! #REF! - #REF!
2 Pek. Plesteran 1 Pc : 5 Psr #REF! M2 #REF! #REF! #REF! #REF! - #REF!
3 Pek. Acian #REF! M2 #REF! #REF! #REF! #REF! - #REF!
4 Pek. Plat Beton t = 10 mm #REF! M3 #REF! #REF! #REF! #REF! - #REF!
5 Pek. Begisting dengan papan terentang #REF! M2 #REF! #REF! #REF! #REF! - #REF!
6 Pek. Pembesian U-24 #REF! KG #REF! #REF! #REF! #REF! - #REF!
7 Pek. Pas. Pipa Pvc d.1/2'' #REF! M #REF! #REF! #REF! #REF! - #REF!
8 Pek. Pas Pipa Pvc d. 3'' (Pembuang Uap Air) #REF! M #REF! #REF! #REF! #REF! - #REF!
9 Pas. Tempat Cuci/ Pencucian BCP lobang double sink + Aksesoris #REF! Unit #REF! #REF! #REF! #REF! - #REF!
10 Pek. keramik Warna 20x25 cm #REF! M2 #REF! #REF! #REF! #REF! - #REF!
11 Pek. Washtafel #REF! Unit #REF! #REF! #REF! #REF! - #REF!
12 pek.closet duduk setara toto #REF! Bh #REF! #REF! #REF! #REF! - #REF!