PT.
INDOSEIKI METAL UTAMA
PARTNER IN FORGING & FASTENERS
TIME STUDY
DEPARTMENT ENGINEERING
NAMA PRODUK Boss Rotor WAKTU STUDY 15 Oktober 2021
UKURAN LOKASI Gedung 1
CYCLE TIME
WAKTU
NO MESIN PROSES
DESC. CT1 CT2 CT3 CT1 CT2 CT3 CT1 CT2 CT3 CT1 CT2 CT3 CT1 CT2 CT3 CT1 CT2 CT3
Loading
Processing
Unloading
Iddle
OVERALL 9.7 11.2 8.5
OUTPUT
WAKTU
NO MESIN PROSES
DESC. OK NG NC OK NG NC OK NG NC OK NG NC OK NG NC OK NG NC
QUALITY
JUMLAH 290 689 949 1316 1418 1478
DURASI JUMLAH CT per
NO WAKTU KEGIATAN KETERANGAN
(MENIT) PRODUKSI PERIODE
1 8:00 - 8:08 8 Pembagian man power dan persiapan alat kerja
2 8:08 - 8:14 6 Setting Mesin Forming (Memanaskan Pin)
3 8:14 - 9:00 46 Proses 290 9.5
4 9:00 - 10:00 60 Proses 399 9.0
5 10:00 - 10:27 27 Proses 168 9.6
6 10:27 - 10:30 3 Ambil Ramudo
7 10:30 - 10:34 4 Top Up ramudo ke tabung
8 10:34 - 10:37 3 Mengembalikan ember ke station ramudo
9 10:37 - 10:39 2 Memanaskan produk di mesin induction
10 10:39 - 11:00 21 Proses 94 13.4
Produk Tidak matang
saat proses induction
11 11:00 - 11:07 7 Proses 14 30.0
12 11:07 - 12:50 103 Istirahat
Memanaskan produk di mesin induction dan
13 12:50 - 13:00 10
memanaskan pin
14 13:00 - 13:54 54 Proses 353 9.2
Mesin triming turun
15 13:54 - 14:15 21 Grinding Pin & Mesin triming konslet
sendiri
16 14:15 - 14:35 20 Proses 102 11.8
17 14:35 - 14:40 5 Repair dies
18 14:40 - 14:50 10 Proses 60 10.0
19 14:50 - 15:45 55 Ganti Dies
20 15:45 - 15:55 10 Memanaskan dies
21 15:55 - 16:00 5 Proses
480 1480
SUM WAKTU PROSES 250
EFISIENSI (AVAILIBILITY) 66%
CYCLE TIME RATA-RATA 10.14
PT. INDOSEIKI METAL UTAMA
PARTNER IN FORGING & FASTENERS
TIME STUDY
DEPARTMENT ENGINEERING
NAMA PRODUK Boss Center K16R WAKTU STUDY 15 Oktober 2021
UKURAN Dia. 22 S20C LOKASI Gedung 1
CYCLE TIME
WAKTU
NO MESIN PROSES
DESC. CT1 CT2 CT3 CT1 CT2 CT3 CT1 CT2 CT3 CT1 CT2 CT3 CT1 CT2 CT3 CT1 CT2 CT3
Loading
Processing
Unloading
Iddle
OVERALL 12.7 15.7
OUTPUT
WAKTU
NO MESIN PROSES
DESC. OK NG NC OK NG NC OK NG NC OK NG NC OK NG NC OK NG NC
QUALITY 142 6 352 9 596 14 808 15 995 1205
JUMLAH 148 361 610 823 995 1205
NO WAKTU DURASI KEGIATAN JUMLAH CT per KETERANGAN
(MENIT) PRODUKSI PERIODE
1 8:00 - 8:06 6 Pembagian man power dan persiapan alat kerja
2 8:06 - 8:20 14 Setting Mesin Forming (Memanaskan Pin)
3 8:14 - 8:16 2 Ambil Oli di F5
4 8:20 - 9:00 40 Proses 148 16.2
5 9:00 - 9:52 52 Proses 213 14.6
6 9:52 - 9:53 1 Ambil Kunci ke F8
7 9:53 - 10:00 7 Setting mesin trimming (Pin kurang turun)
8 10:00 - 10:25 25 Proses 99 15.2
9 10:25 - 10:27 2 Grinding pin forming
10 10:27 - 11:00 33 Proses 150 13.2
11 11:00 - 11:09 9 Proses 35 15.4
12 11:09 - 12:50 101 Istirahat
13 12:50 - 12:53 3 Ambil Gerinda ke F1
14 12:53 - 12:58 5 Gerinding Pin
15 12:58 - 13:15 17 Memanaskan Pin
16 13:15 - 14:00 45 Proses 178 15.2
17 14:00 - 14:13 13 Amplas Pin
18 14:13 - 14:20 7 Proses 26 16.2
19 14:20 - 14:30 10 Amplas Dies
20 14:30 - 15:00 30 Proses 146 12.3
21 15:00 - 15:40 40 Proses 210 11.4
22 15:40 - 15:50 10 Isi Ramudo Ke Station
23 15:50 - 16:00 10 5R
480 995
SUM WAKTU PROSES 281
EFISIENSI (AVAILIBILITY) 74%
CYCLE TIME RATA-RATA 16.94