BAR CHART PENYELESAIAN

PEMBANGUNAN SUTT 150 kV GI KASONGAN - GI KUALA KURUN

NOPEMBER 2019
NO SPAN TOWER PEKERJAAN SISA PEKERJAAN Group Pekerja
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
PONDASI Selesai 150/150 0
1 KONSTRUKSI
ERECTION Selesai 150/150 0 Lansir T.047 Erected T.047

T.027 T.028 T.029 T.030 T.031 T.032


STRINGING (Penarikan)
T.033 T.034 T.035 T.036 T.037 T.038
Fase R Line OPGW selesai span T.039 T.040 T.041 T.042 T.043 T.044
andongan/apungan. T.045 T.046 T.047 T.048 T.049 T.050
Fase S Line OPGW selesai belum span T.051, T.052 T.051, T.053 T.051, T.054
andongan/apungan. T.055 T.056 T.057 T.058 T.059 T.060
T.061 T.062 T.063 T.064 1 Group (30 org)
Fase T Line OPGW tarik balik pancingan
tambang dan Sling
Belum terpasang Insulator
On Going penarikan sampai pada
Konduktor belum dinaikan ke Roll

STRINGING
(T.027 - T.064)
STRINGING (Finishing)
38 Tower 12 Span T.027 T.028 T.029 T.030 T.031 T.032
ACSR Line OPGW T.033 T.034 T.035 T.036 T.037 T.038
Sagging/Jumper ACSR T.039 T.040 T.041 T.042 T.043 T.044
Clamping ACSR T.045 T.046 T.047 T.048 T.049 T.050
2
Spacer dumper line T.051, T.052 T.051, T.053 T.051, T.054
T.055 T.056 T.057 T.058 T.059 T.060
ACSR Line GSW T.061 T.062 T.063 T.064
Sagging/Jumper ACSR
Clamping ACSR
Spacer dumper line
1 Group

OPGW 70 mm2
Sagging (Formed,Jumper OPGW)
Clamping/Jumper OPGW

GSW 55 mm2
Sagging (Jumper GSW)
Clamping/Jumper GSW

T.44 - T.87
PONDASI
T.164 - ~ (T.238)

REVISI TOWER (Setelah 1 Group (10 org)


3 Erection/Selesai
Penarikan)
T.064 T.065 T.066 T.067 T.068 T.069
T.070 T.071 T.072 T.073 T.074 T.075
T.076 T.077 T.072 T.073 T.074 T.075
T.082 T.083 T.084 T.085 T.086 T.087
T.088 T.089 T.090 T.091 T.092 T.093
T.094 T.095 T.096 T.097 T.098 T.099
T.100 T.101 T.102 T.103 T.104 T.105
T.106 T.107 T.108 T.109 T.110 T.111
Gelombang I (Revisi pending item T.112 T.113 T.114 T.115 T.116 T.117
PLN Pusertif Sect.1)
T.118 T.119 T.120 T.121 T.122 T.123
T.124 T.125 T.126 T.127 T.128 T.129
T.130 T.131 T.132 T.133 T.134 T.135
T.136 T.137

REVISI PENDING ITEM Selesai


4
PUSERTIF On Going

Gelombang II (Revisi pending item


PLN Pusertif Sect.1)

T.067 - T.088 (22 twr) ; T.088 - T.110


Gelombang I (71 Tower Sect.1) (22 twr) ; T.110 - 133 (23 twr) dan 2 Tim
T.133 - T.137 (4 twr)

T.001 - T.026 (26 twr) ; T.138 - T.150 5 TIM


Gelombang II (13 Tower Sect.1)
(13 twr)
5 FINAL CHECK PUSERTIF

REVISI FINAL CHECK


REVISI FINAL CHECK
6 PUSERTIF & PERSIAPAN PENGUJIAN
RLB
RLB