MC - 2

Pembangunan Gedung Depo Arsip dan Perpustakaan

Jumlah Harga Jumlah Total


No. Jenis Barang/Jasa Harga Satuan PPN10% Keterangan
MC 1 Tambah Kurang MC MC
A GEDUNG DEPO ARSIP
I. PEKERJAAN PENDAHULUAN
1, Pekerjaan pembersihan lahan 13.768,27 17.447.701,50 - - 17.447.701,50 1.744.770,15 19.192.471,65
2, Pekerjaan urugan tanah+pemadatan 117.592,60 120.226.670,31 - - 120.226.670,31 12.022.667,03 132.249.337,34
3, Pekerjaan K3 21.580.000,00 21.580.000,00 - - 21.580.000,00 2.158.000,00 23.738.000,00
4, Pekerjaan Uitzet + Bowplank 75.126,79 10.668.003,96 - - 10.668.003,96 1.066.800,40 11.734.804,36
- - - - - -
II. PEKERJAAN TANAH - - - - - -
1, Galian tanah 64.768,75 5.254.041,00 - - 5.254.041,00 525.404,10 5.779.445,10
2, Urugan Pasir Bawah Pondasi, tbl=10cm 154.907,50 4.018.122,41 - - 4.018.122,41 401.812,24 4.419.934,65
3, Urugan Sirtu 126.622,60 51.605.039,06 - - 51.605.039,06 5.160.503,91 56.765.542,97
4, Urugan Pasir Bawah lantai, tbl=10cm 154.907,50 16.613.829,38 - - 16.613.829,38 1.661.382,94 18.275.212,31
5, Galian Strouse Pile Ø 30 cm 40.788,81 26.186.414,54 - - 26.186.414,54 2.618.641,45 28.805.055,99
- - - - - -
III. PEKERJAAN STRUKTUR - - - - - -
III. 1. PEKERJAAN PONDASI - - - - - -
1, Rabat Lantai Kerja fc'=14.53 Mpa (K-175), tbl=5cm 811.566,08 10.525.545,43 - - 10.525.545,43 1.052.554,54 11.578.099,97
2, Rabat Bawah Lantai fc'=14.53 Mpa (K-175), tbl=10cm 811.566,08 87.040.462,27 - - 87.040.462,27 8.704.046,23 95.744.508,49
3, Beton Pile Caps fc' = 20,75 MPa (K-250) - - - - - - -
PC1 180X90X45cm 4.768.683,56 55.602.850,34 - - 55.602.850,34 5.560.285,03 61.163.135,37
PC2 180X180X45cm 3.334.303,42 60.784.351,30 - - 60.784.351,30 6.078.435,13 66.862.786,43
4, Beton Strouse Pile Ø 30 cm, fc’ = 20.75 MPa (K-250) 3.210.643,71 145.634.798,60 - - 145.634.798,60 14.563.479,86 160.198.278,46
, Beton Sloof fc' = 20,75 MPa (K-250) - - - - - - -
S1 30X60cm 3.358.509,69 122.599.037,86 - - 122.599.037,86 12.259.903,79 134.858.941,65
S2 25X50cm 3.280.674,30 87.347.953,28 - - 87.347.953,28 8.734.795,33 96.082.748,60
S3 20X30cm 4.268.679,01 43.686.514,75 - - 43.686.514,75 4.368.651,48 48.055.166,23
S4 15X30cm 4.237.383,48 5.421.096,56 - - 5.421.096,56 542.109,66 5.963.206,22
- - - - - -
III. 2. PEKERJAAN STRUKTUR LANTAI - - - - - -
1, Beton Kolom fc' = 20,75 MPa (K-250) - - - - - -
K1 40x40cm 4.317.870,47 195.988.140,57 - 71.633.471,07 124.354.669,49 12.435.466,95 136.790.136,44
K2 30x30cm 4.026.038,35 41.750.017,72 - 6.530.234,21 35.219.783,51 3.521.978,35 38.741.761,86
2, Beton Ring balk 10x15 cm 105.073,48 22.820.909,58 - - 22.820.909,58 2.282.090,96 25.103.000,53
3, Beton Balok Latai 10x15 cm 105.073,48 8.617.076,27 - - 8.617.076,27 861.707,63 9.478.783,89
4, Kolom praktis 11x11 cm 84.027,30 40.232.273,00 - - 40.232.273,00 4.023.227,30 44.255.500,30
- - - - - -
III. 3. PEKERJAAN STRUKTUR LANTAI ATAP - - - - - -
1, Beton Balok fc' = 20,75 MPa (K-250) - - - - - -
B1 30x60 cm 4.401.791,61 44.986.310,26 - - 44.986.310,26 4.498.631,03 49.484.941,29
B2 25x50 cm 4.667.949,76 242.686.708,09 - 105.332.286,36 137.354.421,72 13.735.442,17 151.089.863,90
B3 15x30 cm 5.057.116,21 16.536.770,02 - 13.965.226,42 2.571.543,59 257.154,36 2.828.697,95
2, Beton Plat atap fc'=20,75 Mpa (K - 250), tbl=12cm 5.085.135,44 255.528.055,88 - 96.184.319,83 159.343.736,05 15.934.373,61 175.278.109,66
- - - - - -
III. 4. PEKERJAAN PENUTUP ATAP - - - - - -
1, Kuda Kuda WF 250.125.6.9 24.337,17 125.706.366,38 - 6.123.232,75 119.583.133,63 11.958.313,36 131.541.446,99
2, Penyambung WF 250.125.6.9 24.337,17 6.987.689,13 - - 6.987.689,13 698.768,91 7.686.458,05
3, Gording CNP 150.65.20.2,3 23.719,05 104.755.175,83 - - 104.755.175,83 10.475.517,58 115.230.693,41
4, Pekerjaan perakitan baja 1.058,79 5.772.874,48 - - 5.772.874,48 577.287,45 6.350.161,92
5, Baja Siku L 70.70.7 25.016,78 3.230.916,63 - - 3.230.916,63 323.091,66 3.554.008,30
6, Plat Rip/stiffner, tbl=10mm 24.390,92 7.961.197,29 - - 7.961.197,29 796.119,73 8.757.317,02
7, Pas. angker Ø 16, panjang 40 cm 25.000,00 2.250.000,00 - - 2.250.000,00 225.000,00 2.475.000,00
8, Plat Plendes, tbl=12mm 24.390,92 9.553.436,75 - - 9.553.436,75 955.343,68 10.508.780,43
9, Besi Track Stang dan Ikatan Angin, Ø 16 23.719,05 2.960.137,20 - - 2.960.137,20 296.013,72 3.256.150,92
10, Jarum Keras M-16 50.000,00 1.050.000,00 - - 1.050.000,00 105.000,00 1.155.000,00
11, Pas. Besi Ø10 Ikatan Gording 23.719,05 19.405.739,18 - - 19.405.739,18 1.940.573,92 21.346.313,10
12, Mur Baut Ø 14 15.000,00 2.700.000,00 5.700.000,00 - 8.400.000,00 840.000,00 9.240.000,00
13, Pas. penutup atap zincalume 114.640,48 95.253.629,07 10.605.046,95 - 105.858.676,02 10.585.867,60 116.444.543,62
14, Pas. Bubungan zincalume 125.000,00 3.418.750,00 331.250,00 - 3.750.000,00 375.000,00 4.125.000,00
15, Pas. Kaca laminated 5mm+5mm+sealent 175.000,00 5.880.000,00 - 5.880.000,00 - - -
16, Pas. Spider stainless kaki 4 250.000,00 5.000.000,00 - - 5.000.000,00 500.000,00 5.500.000,00
17, Pengecatan Baja 21.815,06 15.121.753,51 - 15.121.753,51 1.512.175,35 16.633.928,86
- - - - - -
IV. PEKERJAAN ARSITEKTURAL - - - - - -
IV. 1. PEKERJAAN PASANGAN - - - - - -
1, Pas. Rollag Batu Bata Untuk Pijakan 1pc : 4p 233.108,27 4.174.969,14 - - 4.174.969,14 417.496,91 4.592.466,06
2, Pas. Dinding Bata Ringan tebal 10 cm dengan mortar siap pakai 130.883,73 250.285.031,84 - - 250.285.031,84 25.028.503,18 275.313.535,02
3, Acian Dinding 49.783,35 190.397.928,45 - - 190.397.928,45 19.039.792,84 209.437.721,29
4, Benangan Dinding 18.286,78 12.251.413,58 - - 12.251.413,58 1.225.141,36 13.476.554,93
5, Benangan Beton 18.286,78 26.991.292,67 - - 26.991.292,67 2.699.129,27 29.690.421,94
6, Pas. Partisi PVC Cubicle t= 40mm, dan acesories 450.000,00 19.377.000,00 - - 19.377.000,00 1.937.700,00 21.314.700,00
7, Pas. GRC timbul tebal 3cm 672.556,92 79.462.600,46 - - 79.462.600,46 7.946.260,05 87.408.860,51
8, Pas. GRC tebal 2cm 528.271,54 20.454.673,97 - - 20.454.673,97 2.045.467,40 22.500.141,37
9, Plesteran Dinding 54.065,88 206.776.597,69 206.776.597,69 20.677.659,77 227.454.257,46
- - - - - -
IV. 2. PEKERJAAN KUSEN - - - - - -
1, Pasang Kusen P1 5.549.721,13 44.397.769,02 - - 44.397.769,02 4.439.776,90 48.837.545,93
2, Pasang Kusen P2 3.351.017,08 3.351.017,08 - - 3.351.017,08 335.101,71 3.686.118,79
3, Pasang Kusen P3 2.889.573,71 8.668.721,14 - - 8.668.721,14 866.872,11 9.535.593,26
4, Pasang Kusen P4 3.134.083,18 3.134.083,18 - - 3.134.083,18 313.408,32 3.447.491,50
5, Pasang Kusen PJ1 29.257.373,03 58.514.746,05 - - 58.514.746,05 5.851.474,61 64.366.220,66
6, Pasang Kusen Pintu Besi PB1 10.276.620,64 51.383.103,21 - - 51.383.103,21 5.138.310,32 56.521.413,53
7, Pasang Kusen J6 3.723.381,69 111.701.450,56 - - 111.701.450,56 11.170.145,06 122.871.595,62
- - - - - -
IV. 3. PEKERJAAN PENUTUP LANTAI - - - - - -
1, Pas. Granit Tile 60x60cm Polished 336.295,56 155.593.865,68 - - 155.593.865,68 15.559.386,57 171.153.252,25
2, Pas. Granit Tile 60x60cm Unpolished 330.297,06 15.887.288,48 - - 15.887.288,48 1.588.728,85 17.476.017,32
3, Pek. Lantai Floor Hardener Finishing Trowel, 5kg/m2 65.874,35 34.553.070,79 - - 34.553.070,79 3.455.307,08 38.008.377,87
4, Pas. Keramik dinding 30x60cm 188.185,26 9.689.659,14 - - 9.689.659,14 968.965,91 10.658.625,06
5, Pas. Keramik lantai 30x30cm unpolish 176.377,73 9.425.625,93 - - 9.425.625,93 942.562,59 10.368.188,53
- - - - - -
IV. 4. PEKERJAAN PLAFOND - - - - - -
1, Pas. Plafond Gypsum t=9mm 38.866,21 22.872.376,83 - - 22.872.376,83 2.287.237,68 25.159.614,51
2, Pas. Plafond Calsiboard t=4,5mm 40.822,71 8.684.623,65 - - 8.684.623,65 868.462,37 9.553.086,02
3, Pas. Rangka Plafond Hollow 40.40.4 & 20.40.0.4 80.103,21 64.181.096,18 - - 64.181.096,18 6.418.109,62 70.599.205,80
4, Pas. List Gypsum t=8cm 57.296,67 24.781.957,04 - - 24.781.957,04 2.478.195,70 27.260.152,74
- - - - - -
IV. 5. PEKERJAAN PENGECATAN - - - - - -
1, Finishing Cat Dinding Interior 21.815,06 17.836.427,47 - - 17.836.427,47 1.783.642,75 19.620.070,22
2, Finishing Cat plafond 21.815,06 17.478.878,67 - - 17.478.878,67 1.747.887,87 19.226.766,54
3, Finishing Cat Dinding Exterior Wheathershield 29.502,13 23.460.097,45 - - 23.460.097,45 2.346.009,74 25.806.107,19
4, Pek. Waterprofing 35.379,90 23.260.163,98 - - 23.260.163,98 2.326.016,40 25.586.180,38
- - - - - -
V. PEKERJAAN MEKANIKAL - - - - - -
1, Pas. Pipa Pvc AW 1/2" air bersih 20.294,14 710.294,88 - - 710.294,88 71.029,49 781.324,37
2, Pas. Pipa Pvc AW 3/4" Air Bersih 23.210,08 543.115,80 - - 543.115,80 54.311,58 597.427,38
3, Pas. Pipa Pvc AW 4'' Air Kotor 157.558,00 5.057.611,65 - - 5.057.611,65 505.761,16 5.563.372,81
4, Pas. Pipa Pvc AW 3" Air Buangan 105.487,68 4.114.019,63 - - 4.114.019,63 411.401,96 4.525.421,59
5, Pas. Pipa Pvc AW 4" talang tegak 157.568,99 22.374.797,04 - - 22.374.797,04 2.237.479,70 24.612.276,75
6, Pas. Handrail pipa stainlessteel Ø2"+asesoris 850.000,00 3.655.000,00 - - 3.655.000,00 365.500,00 4.020.500,00
7, Pas. Wastafel meja 2.082.411,44 16.659.291,54 - - 16.659.291,54 1.665.929,15 18.325.220,69
8, Pas. Wastafel dinding 2.383.411,44 2.383.411,44 - - 2.383.411,44 238.341,14 2.621.752,59
9, Pas. Urinoir 1.605.624,13 6.422.496,54 - - 6.422.496,54 642.249,65 7.064.746,19
10, Pas. Kran wastafel meja 281.265,48 2.250.123,85 - - 2.250.123,85 225.012,38 2.475.136,23
11, Pas. Kran wastafel dinding 281.265,48 281.265,48 - - 281.265,48 28.126,55 309.392,03
12, Pas. Kloset Duduk 2.396.629,81 16.776.408,65 - - 16.776.408,65 1.677.640,87 18.454.049,52
13, Pas. Kloset Jongkok 813.415,29 813.415,29 - - 813.415,29 81.341,53 894.756,82
14, Pas. Kran air 207.933,94 1.455.537,60 - - 1.455.537,60 145.553,76 1.601.091,36
15, Pas. Roof drain 77.015,48 1.540.309,62 - - 1.540.309,62 154.030,96 1.694.340,58
16, Pas. Floor drain 93.140,48 1.117.685,77 - - 1.117.685,77 111.768,58 1.229.454,35
17, Pas. Floor Clean Out 3" 50.000,00 100.000,00 - - 100.000,00 10.000,00 110.000,00
18, Pas. Floor Clean Out 4" 85.000,00 170.000,00 - - 170.000,00 17.000,00 187.000,00
19, Pas. Portable fire extinguisher co2 5 kg 1.800.000,00 25.200.000,00 - - 25.200.000,00 2.520.000,00 27.720.000,00
20, Pas. Resapan +tutup kedalaman 3 meter 4.000.000,00 8.000.000,00 - - 8.000.000,00 800.000,00 8.800.000,00
21, Pas. Biofilter kap. 4m3 5.000.000,00 5.000.000,00 - - 5.000.000,00 500.000,00 5.500.000,00
22, Pas. Tandon Tanam 4m3 4.000.000,00 4.000.000,00 - - 4.000.000,00 400.000,00 4.400.000,00
23, Pompa Transfer 6.000.000,00 6.000.000,00 - - 6.000.000,00 600.000,00 6.600.000,00
min.kapasitas 5 l/min - - - - - - -
daya dorong min.30m - - - - - - -
daya hisap min.11m - - - - - - -
water level - - - - - - -
24, Pompa Boster 8.000.000,00 8.000.000,00 - - 8.000.000,00 800.000,00 8.800.000,00
min.kapasitas 4 l/min - - - - - - -
daya dorong min.25m - - - - - - -
daya hisap min.8m - - - - - - -
25, Pas. Air mancur lengkap dengan acesoris 5.000.000,00 5.000.000,00 - - 5.000.000,00 500.000,00 5.500.000,00
26, Pek. saluran Buis Beton U30 (1/2 lingkaran) 75.163,17 17.249.948,22 - - 17.249.948,22 1.724.994,82 18.974.943,04
Pek. Dinding Batu Merah 1 Pc : 2 Pp tebal 1/2 bata 118.499,21 16.317.341,76 - - 16.317.341,76 1.631.734,18 17.949.075,94
Pek. Plesteran Halus 1 Pc : 4 Pp tebal 1.5 cm 54.065,88 14.889.744,62 - - 14.889.744,62 1.488.974,46 16.378.719,09
Pekerjaan Acian 49.783,35 13.710.335,52 - - 13.710.335,52 1.371.033,55 15.081.369,07
Benangan 18.286,78 8.393.633,70 - - 8.393.633,70 839.363,37 9.232.997,07
27, Pas. U-ditch+cover 40/60 gandar 5 ton 2.755.373,85 44.085.981,54 - - 44.085.981,54 4.408.598,15 48.494.579,69
- - - - - -
VI. PEKERJAAN ELEKTRIKAL - - - - - -
1, Pek. Tambah daya listrik dari daya 66.000 VA ke 131.000 VA 17.000.000,00 17.000.000,00 - - 17.000.000,00 1.700.000,00 18.700.000,00
Termasuk sertifikat layak operasional (SLO) - - - - - - -
2, MDP-GEDUNG KANTOR , Man Distribusi Panel 4.966.500,00 4.966.500,00 - - 4.966.500,00 496.650,00 5.463.150,00
3, PP DEPO, Panel Pembagi Penerangan 2.967.000,00 2.967.000,00 - - 2.967.000,00 296.700,00 3.263.700,00
4, PP.AC DEPO, Panel Pembagi AC 2.515.500,00 2.515.500,00 - - 2.515.500,00 251.550,00 2.767.050,00
5, Dari Panel PLN ke MDP-GEDUNG DEPO 307.077,88 15.562.707,19 - - 15.562.707,19 1.556.270,72 17.118.977,91
Kabel TR, NYFGbY 4 x 25 mm² + BC 50 mm² - - - - - - -
6, Dari MDP- ke PP DEPO, Panel Pembagi Penerangan 119.651,63 8.973.872,60 - - 8.973.872,60 897.387,26 9.871.259,86
Kabel TR, NYY 4 x 10 mm² + BC 6 mm² - - - - - - -
7, Dari MDP- ke PP.AC DEPO, Panel Pembagi AC 119.651,63 8.973.872,60 - - 8.973.872,60 897.387,26 9.871.259,86
Kabel TR, NYY 4 x 10 mm² + BC 6 mm² - - - - - - -
8, Instalasi titik lampu 297.650,96 36.313.417,31 - - 36.313.417,31 3.631.341,73 39.944.759,04
9, Instalasi titik stop kontak 258.950,96 16.054.959,62 - - 16.054.959,62 1.605.495,96 17.660.455,58
10, Instalasi titik saklar tunggal 71.727,31 1.506.273,46 - - 1.506.273,46 150.627,35 1.656.900,81
11, Instalasi titik saklar ganda 60.977,31 1.097.591,54 - - 1.097.591,54 109.759,15 1.207.350,69
12, Pas. Exhaust fan 20" 550.000,00 4.400.000,00 - - 4.400.000,00 440.000,00 4.840.000,00
13, Pas. Exhaust fan 75cfm 750.000,00 7.500.000,00 - - 7.500.000,00 750.000,00 8.250.000,00
14, Lampu Downlight LED downlight 6" 7 watt 267.123,44 2.136.987,54 - - 2.136.987,54 213.698,75 2.350.686,29
15, Lampu Downlight LED downlight 6" 13 watt 288.623,44 16.740.159,65 - - 16.740.159,65 1.674.015,97 18.414.175,62
16, Lampu RMI Led 2x18 w +Acrylic 321.135,58 17.983.592,31 - 17.983.592,31 - - -
17, Pasang Penangkal Petir 1 split, 1 grounding 8.000.000,00 32.000.000,00 - - 32.000.000,00 3.200.000,00 35.200.000,00
18, Pekerjaan fire alarm - - - - - - -
- Peralatan uatama - - - - - - -
Master Control Fire Alarm ( MCFA Kap : 1 Loop ) 5.636.307,69 5.636.307,69 - 5.636.307,69 - - -
Anounciator panel 6.132.461,54 6.132.461,54 - - 6.132.461,54 613.246,15 6.745.707,69
Kabel Loop UTP 2 Pair AWG#16 dalam konduit 175.000,00 43.750.000,00 - - 43.750.000,00 4.375.000,00 48.125.000,00
NYA 2 x 1,5 dalam konduit PVC 20 mm 41.862,98 10.465.745,19 - - 10.465.745,19 1.046.574,52 11.512.319,71
- Pekerjaan instalasi fire alarm - - - - - - -
Fixture - - - - - - -
Rate off rise heat detector 1.207.051,35 14.484.616,15 - - 14.484.616,15 1.448.461,62 15.933.077,77
Smoke detector 1.207.051,35 18.105.770,19 - - 18.105.770,19 1.810.577,02 19.916.347,21
Indicator Lamp 191.176,35 382.352,69 - - 382.352,69 38.235,27 420.587,96
Manual Push button 263.738,85 527.477,69 - - 527.477,69 52.747,77 580.225,46
Alarm bell 1.352.176,35 2.704.352,69 - - 2.704.352,69 270.435,27 2.974.787,96
End of line 7.261.831,73 21.785.495,19 - - 21.785.495,19 2.178.549,52 23.964.044,71
TBFA 3.232.028,85 3.232.028,85 - - 3.232.028,85 323.202,88 3.555.231,73
- Instalasi - - - - - - -
Instalasi Rate off rise heat detector ( NYA 2 x 1.5mm2 ) 275.000,00 3.300.000,00 - - 3.300.000,00 330.000,00 3.630.000,00
Instalasi Smoke detector ( NYA 2 x 1.5mm2 ) 319.415,58 4.791.233,65 - - 4.791.233,65 479.123,37 5.270.357,02
Instalasi Manual Push button ( NYA 2 x 1.5 mm2 ) 436.053,08 872.106,15 - - 872.106,15 87.210,62 959.316,77
Instalasi Indicator lamp ( NYA 2 x 1.5 mm2) 436.053,08 872.106,15 - - 872.106,15 87.210,62 959.316,77
Instalasi Alarm bell ( NYA 2 x 1.5 mm2) 436.053,08 872.106,15 - - 872.106,15 87.210,62 959.316,77
- - - - - -
VII. PEKERJAAN AKHIR - - - - - -
1, Perbaikan jalan paving existing akibat akses pekerjaan 15.000.000,00 15.000.000,00 - 15.000.000,00 - - -
2, Pembersihan akhir 10.000.000,00 10.000.000,00 - - 10.000.000,00 1.000.000,00 11.000.000,00
- - - - - -
B GEDUNG KANTOR - - - - - -
I. PEKERJAAN PENDAHULUAN - - - - - -
1, Pekerjaan Uitzet + Bowplank 75.126,79 11.118.764,69 - - 11.118.764,69 1.111.876,47 12.230.641,16
- - - - - -
II. PEKERJAAN TANAH - - - - - -
1, Galian tanah 64.768,75 8.487.297,00 - - 8.487.297,00 848.729,70 9.336.026,70
2, Urugan Pasir Bawah Pondasi, tbl=10cm 154.907,50 3.776.644,85 - - 3.776.644,85 377.664,49 4.154.309,34
3, Urugan Sirtu 126.622,60 40.178.615,99 - - 40.178.615,99 4.017.861,60 44.196.477,58
4, Urugan Pasir Bawah lantai, tbl=10cm 154.907,50 13.272.474,60 - - 13.272.474,60 1.327.247,46 14.599.722,06
5, Galian Strouse Pile Ø 30 cm 40.788,81 41.115.118,15 - - 41.115.118,15 4.111.511,82 45.226.629,97
- - - - - -
III. PEKERJAAN STRUKTUR - - - - - -
III. 1. PEKERJAAN PONDASI - - - - - -
1, Rabat Lantai Kerja fc'=14.53 Mpa (K-175), tbl=5cm 811.566,08 11.380.996,95 - - 11.380.996,95 1.138.099,69 12.519.096,64
2, Rabat Bawah Lantai fc'=14.53 Mpa (K-175), tbl=10cm 811.566,08 68.918.191,66 - - 68.918.191,66 6.891.819,17 75.810.010,83
3, Beton Pile Caps fc' = 20,75 MPa (K-250) - - - - - - -
PC1 180X90X45cm 4.768.683,56 41.725.981,17 - - 41.725.981,17 4.172.598,12 45.898.579,29
PC2 180X180X45cm 3.334.303,42 116.667.276,57 - - 116.667.276,57 11.666.727,66 128.334.004,23
4, Beton Strouse Pile Ø 30 cm, fc’ = 20.75 MPa (K-250) 3.210.643,71 228.662.044,89 - - 228.662.044,89 22.866.204,49 251.528.249,38
5, Beton Sloof fc' = 20,75 MPa (K-250) - - - - - - -
S1 30X60cm 3.358.509,69 30.058.661,76 - - 30.058.661,76 3.005.866,18 33.064.527,94
S2 25X50cm 3.280.674,30 136.771.311,63 - - 136.771.311,63 13.677.131,16 150.448.442,79
S3 20X30cm 4.268.679,01 5.045.578,59 - - 5.045.578,59 504.557,86 5.550.136,45
S4 15X30cm 4.237.383,48 3.509.824,74 - - 3.509.824,74 350.982,47 3.860.807,21
- - - - - -
III. 2. PEKERJAAN STRUKTUR LANTAI 1 - - - - - -
1, Beton Kolom fc' = 20,75 MPa (K-250) - - - - - -
K1 40x40cm 4.317.870,47 167.144.765,84 64.983.950,55 - 232.128.716,39 23.212.871,64 255.341.588,03
K2 30x30cm 4.026.038,35 26.088.728,53 - 5.652.557,85 20.436.170,68 2.043.617,07 22.479.787,75
2, Beton Ring balk 10x15 cm 105.073,48 22.837.721,33 - - 22.837.721,33 2.283.772,13 25.121.493,47
3, Beton Balok Latai 10x15 cm 105.073,48 9.984.082,27 - - 9.984.082,27 998.408,23 10.982.490,50
4, Kolom praktis 11x11 cm 84.027,30 28.586.088,71 - - 28.586.088,71 2.858.608,87 31.444.697,58
- - - - - -
III. 3. PEKERJAAN STRUKTUR LANTAI 2 - - - - - -
1, Beton Balok fc' = 20,75 MPa (K-250) - - - - - -
B1 30x60 cm 4.401.791,61 18.839.668,09 - - 18.839.668,09 1.883.966,81 20.723.634,90
B2 25x50 cm 4.667.949,76 2.707.410,86 - - 2.707.410,86 270.741,09 2.978.151,95
B3 15x30 cm 5.057.116,21 12.491.077,05 - - 12.491.077,05 1.249.107,70 13.740.184,75
2, Beton Plat atap fc'=18.68 Mpa (K - 250), tbl=12cm 5.085.135,44 22.933.960,84 - 3.004.298,02 19.929.662,82 1.992.966,28 21.922.629,10
3, Beton Balok Latai 10x15 cm 105.073,48 345.691,76 - - 345.691,76 34.569,18 380.260,93
4, Kolom praktis 11x11 cm 84.027,30 3.529.146,75 - - 3.529.146,75 352.914,68 3.882.061,43
- - - - - -
III. 4. PEKERJAAN STRUKTUR PLAT ATAP - - - - - -
1, Beton Balok fc' = 20,75 MPa (K-250) - - - - - -
B1 30x60 cm 4.401.791,61 39.396.034,92 - - 39.396.034,92 3.939.603,49 43.335.638,41
B2 25x50 cm 4.667.949,76 105.448.985,11 88.504.327,47 - 193.953.312,58 19.395.331,26 213.348.643,84
B3 15x30 cm 5.057.116,21 16.435.627,69 - 6.809.406,98 9.626.220,71 962.622,07 10.588.842,78
2, Beton Plat fc'=20,75 Mpa (K - 250), tbl=12cm 5.085.135,44 29.595.488,26 - 23.953.672,88 5.641.815,39 564.181,54 6.205.996,93
3, Beton Plat lisplank fc'=20,75 Mpa (K - 250), tbl=7cm 4.449.699,28 30.569.434,05 49.397.891,58 - 79.967.325,63 7.996.732,56 87.964.058,19
- - - - - -
III. 5. PEKERJAAN PENUTUP ATAP - - - - - -
1, Kuda Kuda WF 200.100.5,5.8 24.337,17 166.441.926,67 - - 166.441.926,67 16.644.192,67 183.086.119,34
2, Penyambung WF 200.100.5,5.8 24.337,17 16.774.883,29 - - 16.774.883,29 1.677.488,33 18.452.371,62
3, Gording CNP 150.65.20.2,3 23.719,05 136.716.593,12 - - 136.716.593,12 13.671.659,31 150.388.252,43
4, Pekerjaan perakitan baja 1.058,79 14.073.753,23 - - 14.073.753,23 1.407.375,32 15.481.128,55
5, Baja Siku L 70.70.7 25.016,78 8.861.942,77 - - 8.861.942,77 886.194,28 9.748.137,05
6, Plat Rip/stiffner, tbl=10mm 24.390,92 7.961.197,29 - - 7.961.197,29 796.119,73 8.757.317,02
7, Plat Penyambung tbl=10mm 24.390,92 1.344.183,77 - - 1.344.183,77 134.418,38 1.478.602,15
8, Pas. angker Ø 16, panjang 40 cm 25.000,00 6.600.000,00 - - 6.600.000,00 660.000,00 7.260.000,00
9, Plat Plendes, tbl=12mm 24.390,92 3.446.437,43 - - 3.446.437,43 344.643,74 3.791.081,17
10, Besi Track Stang dan Ikatan Angin, Ø 16 23.719,05 2.960.137,20 - - 2.960.137,20 296.013,72 3.256.150,92
11, Jarum Keras M-16 50.000,00 2.000.000,00 - - 2.000.000,00 200.000,00 2.200.000,00
12, Pas. Besi Ø10 Ikatan Gording 23.719,05 11.211.282,45 - - 11.211.282,45 1.121.128,25 12.332.410,70
13, Mur Baut Ø 14 15.000,00 12.840.000,00 6.120.000,00 - 18.960.000,00 1.896.000,00 20.856.000,00
14, Pas. Rangka atap usuk reng baja ringan 148.006,08 156.895.328,02 - - 156.895.328,02 15.689.532,80 172.584.860,82
15, Pas. penutup atap genteng bambe model karang pilang 118.387,68 125.498.046,91 - - 125.498.046,91 12.549.804,69 138.047.851,61
16, Pas. Bubungan genteng karang pilang 97.327,19 7.867.930,23 - - 7.867.930,23 786.793,02 8.654.723,25
17, Pas. Liplank 2/20 cm 95.381,44 3.829.564,91 - - 3.829.564,91 382.956,49 4.212.521,40
18, Pas. talang datar, seng BJLS 28 189.598,58 14.705.265,63 - - 14.705.265,63 1.470.526,56 16.175.792,19
19, Pas. Ornamen bubungan atap 200.000,00 800.000,00 - - 800.000,00 80.000,00 880.000,00
20, Pengecatan Baja 21.815,06 13.848.142,27 - 13.848.142,27 1.384.814,23 15.232.956,49
- - - - - -
III. 6. PEKERJAAN STRUKTUR TANGGA - - - - - -
PEKERJAAN STRUKTUR TANGGA LT. 1 Ke LT PENJAGA - - - - - -
1, Pondasi Tangga tbl=15cm, fc'=20.75 Mpa (K-250) 5.436.344,96 978.542,09 - - 978.542,09 97.854,21 1.076.396,30
2, Balok Bordes 20/30, fc'=20.75 Mpa (K-250) 6.101.175,33 732.141,04 - - 732.141,04 73.214,10 805.355,14
3, Beton Plat dan Bordes t=15cm, fc'=20.75 Mpa (K-250) 5.085.135,44 6.203.865,24 - - 6.203.865,24 620.386,52 6.824.251,76
4, Beton Anak Tangga, fc'=20.75 Mpa (K-250) 5.436.344,96 2.663.809,03 - - 2.663.809,03 266.380,90 2.930.189,93
- - - - - -
IV. PEKERJAAN ARSITEKTURAL - - - - - -
IV.1. PEKERJAAN ARSITEKTURAL LANTAI 1 - - - - - -
IV. 1.1. PEKERJAAN PASANGAN - - - - - -
1, Pas. Rollag Batu Bata Untuk Pijakan 1pc : 4p 233.108,27 4.174.969,14 - - 4.174.969,14 417.496,91 4.592.466,06
2, Pas. Dinding Bata Ringan tebal 10 cm dengan mortar siap pakai 130.883,73 147.697.054,82 - - 147.697.054,82 14.769.705,48 162.466.760,31
3, Acian Dinding 49.783,35 112.357.045,88 - - 112.357.045,88 11.235.704,59 123.592.750,47
4, Benangan Dinding 18.286,78 20.280.774,54 - - 20.280.774,54 2.028.077,45 22.308.852,00
5, Benangan Beton 18.286,78 26.332.968,46 - - 26.332.968,46 2.633.296,85 28.966.265,31
6, Pas. GRC timbul tebal 3cm 672.556,92 9.375.443,51 - - 9.375.443,51 937.544,35 10.312.987,86
7, Pas. GRC tebal 2cm 528.271,54 13.312.442,77 - - 13.312.442,77 1.331.244,28 14.643.687,05
8, Pas. partisi rangka metal stud penutup kalsipart 8mm double 134.685,10 34.145.365,58 - - 34.145.365,58 3.414.536,56 37.559.902,13
9, Plesteran Dinding 54.065,88 - 122.022.376,31 - 122.022.376,31 12.202.237,63 134.224.613,94
- - - - - -
IV. 1.2. PEKERJAAN KUSEN - - - - - -
1, Pasang Kusen PJ1 29.257.373,03 58.514.746,05 - - 58.514.746,05 5.851.474,61 64.366.220,66
2, Pasang Kusen PJ2 22.879.311,80 22.879.311,80 - - 22.879.311,80 2.287.931,18 25.167.242,98
3, Pasang Kusen PJ3 10.715.443,79 21.430.887,57 - - 21.430.887,57 2.143.088,76 23.573.976,33
4, Pasang Kusen PJ4 12.817.022,54 25.634.045,08 - - 25.634.045,08 2.563.404,51 28.197.449,58
5, Pasang Kusen PJ5 11.871.462,93 11.871.462,93 - - 11.871.462,93 1.187.146,29 13.058.609,22
6, Pasang Kusen PJ6 9.459.584,19 9.459.584,19 - - 9.459.584,19 945.958,42 10.405.542,61
7, Pasang Kusen PJ7 5.790.886,77 5.790.886,77 - - 5.790.886,77 579.088,68 6.369.975,44
8, Pasang Kusen P1 5.549.721,13 77.696.095,79 - - 77.696.095,79 7.769.609,58 85.465.705,37
9, Pasang Kusen P2 3.351.017,08 36.861.187,88 - - 36.861.187,88 3.686.118,79 40.547.306,67
10, Pasang Kusen P3 2.889.573,71 11.558.294,86 - - 11.558.294,86 1.155.829,49 12.714.124,35
11, Pasang Kusen P4 3.134.083,18 3.134.083,18 - - 3.134.083,18 313.408,32 3.447.491,50
12, Pasang Kusen P5 1.393.624,31 1.393.624,31 - - 1.393.624,31 139.362,43 1.532.986,74
13, Pasang Kusen J1 2.820.592,06 47.950.065,05 - - 47.950.065,05 4.795.006,51 52.745.071,56
14, Pasang Kusen J2 9.798.237,90 9.798.237,90 - - 9.798.237,90 979.823,79 10.778.061,69
15, Pasang Kusen J3 13.737.781,40 13.737.781,40 - - 13.737.781,40 1.373.778,14 15.111.559,54
16, Pasang Kusen J4 4.091.438,60 4.091.438,60 - - 4.091.438,60 409.143,86 4.500.582,46
17, Pasang Kusen J5 3.757.426,85 3.757.426,85 - - 3.757.426,85 375.742,69 4.133.169,54
18, Pasang Kusen J6 3.723.381,69 93.084.542,14 - - 93.084.542,14 9.308.454,21 102.392.996,35
19, Pasang Kusen J7 705.704,60 1.411.409,20 - - 1.411.409,20 141.140,92 1.552.550,12
- - - - - -
IV. 1.3. PEKERJAAN PENUTUP LANTAI - - - - - - -
1, Pas. Granit Tile 60x60cm Polished 336.295,56 190.244.352,67 - 142.044.814,57 48.199.538,10 4.819.953,81 53.019.491,90 0
2, Pas. Granit Tile 60x60cm Unpolished 330.297,06 8.544.784,88 - - 8.544.784,88 854.478,49 9.399.263,37
3, Pas. Granit Tile stepnosing 10X60cm 62.247,88 2.710.272,48 - - 2.710.272,48 271.027,25 2.981.299,73
4, Pas. Keramik dinding 30x60cm 188.185,26 10.540.256,53 - - 10.540.256,53 1.054.025,65 11.594.282,18
5, Pas. Keramik lantai 30x30cm unpolish 176.377,73 1.818.454,40 - - 1.818.454,40 181.845,44 2.000.299,84 0
6, Pas. Batu alam susun sirih 10x30cm 301.767,75 27.168.150,21 - - 27.168.150,21 2.716.815,02 29.884.965,23
- - - - - -
IV. 1.4. PEKERJAAN PLAFOND - - - - - - -
1, Pas. Plafond Gypsum t=9mm 38.866,21 27.017.458,29 - - 27.017.458,29 2.701.745,83 29.719.204,12
2, Pas. Plafond Calsiboard t=4,5mm 40.822,71 544.983,20 - - 544.983,20 54.498,32 599.481,52
3, Pas. Rangka Plafond Hollow 40.40.4 & 20.40.0.4 80.103,21 56.753.125,38 - - 56.753.125,38 5.675.312,54 62.428.437,91
4, Pas. List Gypsum t=7cm 57.296,67 31.029.013,30 - - 31.029.013,30 3.102.901,33 34.131.914,64
- - - - - -
IV. 1.5. PEKERJAAN PENGECATAN - - - - - - -
1, Finishing Cat Dinding Interior 21.815,06 43.977.847,40 - 43.977.847,40 - - - 0
2, Finishing Cat plafond Interior 21.815,06 15.455.968,38 - - 15.455.968,38 1.545.596,84 17.001.565,21
3, Finishing Cat Dinding Exterior Wheathershield 29.502,13 15.706.641,45 - - 15.706.641,45 1.570.664,14 17.277.305,59
4, Finishing Cat coating tranfaran batu alam 35.379,90 3.185.252,74 - - 3.185.252,74 318.525,27 3.503.778,02
- - - - - -
IV. 2. PEKERJAAN ARSITEKTUR LANTAI 2 - - - - - -
IV. 2.1. PEKERJAAN PASANGAN - - - - - -
1, Pas. Dinding Bata Ringan tebal 10 cm dengan mortar siap pakai 130.883,73 18.483.400,46 - - 18.483.400,46 1.848.340,05 20.331.740,51
2, Acian Dinding 49.783,35 14.060.312,49 - - 14.060.312,49 1.406.031,25 15.466.343,74
3, Benangan Dinding 18.286,78 1.977.167,05 - - 1.977.167,05 197.716,70 2.174.883,75
4, Benangan Beton 18.286,78 6.583.242,12 - - 6.583.242,12 658.324,21 7.241.566,33
5, Plesteran dinding 54.065,88 - 15.269.827,79 - 15.269.827,79 1.526.982,78 16.796.810,57
- - - - - -
IV. 2.2. PEKERJAAN KUSEN - - - - - -
1, Pasang Kusen P2 3.351.017,08 6.702.034,16 - - 6.702.034,16 670.203,42 7.372.237,58
2, Pasang Kusen P3 2.889.573,71 2.889.573,71 - - 2.889.573,71 288.957,37 3.178.531,09
3, Pasang Kusen P5 1.393.624,31 1.393.624,31 - - 1.393.624,31 139.362,43 1.532.986,74
- - - - - -
IV. 2.3. PEKERJAAN PENUTUP LANTAI - - - - - -
1, Pas. Granit Tile 60x60cm Polished 336.295,56 5.128.507,25 - - 5.128.507,25 512.850,73 5.641.357,98
2, Pas. Granit Tile 60x60cm Unpolished 330.297,06 6.259.129,24 - - 6.259.129,24 625.912,92 6.885.042,17
3, Pas. Granit Tile stepnosing 10X60cm 62.247,88 1.618.444,75 - - 1.618.444,75 161.844,48 1.780.289,23
4, Pas. Keramik dinding 30x60cm 188.185,26 3.534.119,22 - - 3.534.119,22 353.411,92 3.887.531,14
5, Pas. Keramik lantai 30x30cm unpolish 176.377,73 423.306,55 - - 423.306,55 42.330,66 465.637,21
- - - - - -
IV. 2.4. PEKERJAAN PLAFOND - - - - - -
1, Pas. Plafond Calsiboard t=4,5mm 40.822,71 1.305.510,32 - - 1.305.510,32 130.551,03 1.436.061,35
2, Pas. Rangka Plafond Hollow 40.40.4 & 20.40.0.4 80.103,21 2.561.700,71 - - 2.561.700,71 256.170,07 2.817.870,78
3, Pas. List Gypsum t=8cm 57.296,67 2.586.371,82 - - 2.586.371,82 258.637,18 2.845.009,00
- - - - - -
IV. 2.5. PEKERJAAN PENGECATAN - - - - - -
1, Finishing Cat Dinding Interior 21.815,06 1.827.229,23 - - 1.827.229,23 182.722,92 2.009.952,16
2, Pengecatan Plafond Kalsiboard t=4,5mm 21.815,06 697.645,55 - - 697.645,55 69.764,55 767.410,10
3, Pek. Waterprofing 35.379,90 11.077.094,10 - - 11.077.094,10 1.107.709,41 12.184.803,50
- - - - - -
V. PEKERJAAN MEKANIKAL - - - - - -
V. 1. PEKERJAAN MEKANIKAL LANTAI 1 - - - - - -
1, Pas. Pipa Pvc AW 1/2" air bersih 20.294,14 710.294,88 - - 710.294,88 71.029,49 781.324,37
2, Pas. Pipa Pvc AW 3/4" Air Bersih 23.210,08 543.115,80 - - 543.115,80 54.311,58 597.427,38
3, Pas. Pipa Pvc AW 4'' Air Kotor 157.558,00 5.057.611,65 - - 5.057.611,65 505.761,16 5.563.372,81
4, Pas. Pipa Pvc AW 3" Air Buangan 105.487,68 2.953.655,12 - - 2.953.655,12 295.365,51 3.249.020,63
5, Pas. Pipa Pvc AW 4" talang tegak 157.568,99 20.799.107,11 - - 20.799.107,11 2.079.910,71 22.879.017,82
6, Pas. Wastafel dinding 2.383.411,44 2.383.411,44 - - 2.383.411,44 238.341,14 2.621.752,59
7, Pas. Wastafel meja 2.082.411,44 2.082.411,44 - - 2.082.411,44 208.241,14 2.290.652,59
8, Pas. Kran wastafel 281.265,48 843.796,44 - - 843.796,44 84.379,64 928.176,09
9, Pas. Kloset Duduk 2.396.629,81 4.793.259,62 - - 4.793.259,62 479.325,96 5.272.585,58
10, Pas. Kran air 207.933,94 415.867,88 - - 415.867,88 41.586,79 457.454,67
11, Pas. Kitchen zink 1.500.000,00 1.500.000,00 - - 1.500.000,00 150.000,00 1.650.000,00
12, Pas. Roof drain 77.015,48 1.386.278,65 - - 1.386.278,65 138.627,87 1.524.906,52
13, Pas. Floor drain 93.140,48 745.123,85 - - 745.123,85 74.512,38 819.636,23
14, Pas. Floor Clean Out 3" 50.000,00 100.000,00 - - 100.000,00 10.000,00 110.000,00
15, Pas. Floor Clean Out 4" 85.000,00 170.000,00 - - 170.000,00 17.000,00 187.000,00
- - - - - -
V. 2. PEKERJAAN MEKANIKAL LANTAI 2 - - - - - - -
1, Pas. Pipa Pvc AW 1/2" air bersih 20.294,14 243.529,67 - - 243.529,67 24.352,97 267.882,64
2, Pas. Pipa Pvc AW 3/4" Air Bersih 23.210,08 139.260,46 - - 139.260,46 13.926,05 153.186,51
3, Pas. Pipa Pvc AW 4'' Air Kotor 157.558,00 1.260.463,96 - - 1.260.463,96 126.046,40 1.386.510,36
4, Pas. Pipa Pvc AW 3" Air Buangan 105.487,68 1.265.852,19 - - 1.265.852,19 126.585,22 1.392.437,41
5, Pas. Kloset Duduk 2.396.629,81 2.396.629,81 - - 2.396.629,81 239.662,98 2.636.292,79
6, Pas. Kran air 207.933,94 207.933,94 - - 207.933,94 20.793,39 228.727,34
7, Pas. Kitchen zink 1.500.000,00 1.500.000,00 - - 1.500.000,00 150.000,00 1.650.000,00
8, Pas. Floor drain 93.140,48 93.140,48 - - 93.140,48 9.314,05 102.454,53
- - - - - -
VI. PEKERJAAN ELEKTRIKAL - - - - - - -
VI. 1. PEKERJAAN ELEKTRIKAL LANTAI 1 - - - - - - -
1, PP- KANTOR, Panel Pembagi Penerangan 2.967.000,00 2.967.000,00 - - 2.967.000,00 296.700,00 3.263.700,00
2, PP-AC, Panel Pembagi AC 2.515.500,00 2.515.500,00 - - 2.515.500,00 251.550,00 2.767.050,00
3, Dari MDP-GEDUNG KANTOR ke PL-01, Panel Pembagi Penerangan 4.966.500,00 148.995.000,00 - - 148.995.000,00 14.899.500,00 163.894.500,00 0
Kabel TR, NYY 4 x 10 mm² + BC 6 mm² - - - - - - -
4, Dari MDP-GEDUNG KANTOR ke PP.AC-01, Panel Pembagi AC 4.966.500,00 148.995.000,00 - - 148.995.000,00 14.899.500,00 163.894.500,00
Kabel TR, NYY 4 x 10 mm² + BC 6 mm² - - - - - - -
5, Instalasi titik lampu 297.650,96 41.671.134,62 - - 41.671.134,62 4.167.113,46 45.838.248,08
6, Instalasi titik stop kontak 258.950,96 22.269.782,69 - - 22.269.782,69 2.226.978,27 24.496.760,96
7, Instalasi titik saklar tunggal 71.727,31 1.506.273,46 - - 1.506.273,46 150.627,35 1.656.900,81
8, Instalasi titik saklar ganda 60.977,31 1.097.591,54 - - 1.097.591,54 109.759,15 1.207.350,69
9, Pas. Exhaust fan 75 cfm 750.000,00 2.250.000,00 - - 2.250.000,00 225.000,00 2.475.000,00
10, Lampu Downlight LED downlight 6" 7 watt 267.123,44 1.602.740,65 - - 1.602.740,65 160.274,07 1.763.014,72
11, Lampu Downlight LED downlight 6" 13 watt 288.623,44 34.634.813,08 - - 34.634.813,08 3.463.481,31 38.098.294,38
12, Lampu RMI Led 2x18 w +Acrylic 321.135,58 4.495.898,08 - - 4.495.898,08 449.589,81 4.945.487,88
- - - - - -
VI. 2. PEKERJAAN ELEKTRIKAL LANTAI 2 - - - - - -
1, Instalasi titik lampu 297.650,96 2.381.207,69 - - 2.381.207,69 238.120,77 2.619.328,46
2, Instalasi titik saklar tunggal 71.727,31 71.727,31 - - 71.727,31 7.172,73 78.900,04
3, Instalasi titik saklar ganda 60.977,31 121.954,62 - - 121.954,62 12.195,46 134.150,08
4, Lampu Downlight LED downlight 6" 7 watt 267.123,44 534.246,88 - - 534.246,88 53.424,69 587.671,57
5, Lampu Downlight LED downlight 6" 13 watt 288.623,44 1.731.740,65 - - 1.731.740,65 173.174,07 1.904.914,72
6, Instalasi Outlet Telephone CAT-6, 4 Pair 980.978,85 11.771.746,15 - - 11.771.746,15 1.177.174,62 12.948.920,77
7, Instalasi Outlet Data & Access Point dengan Kabel UTP Cat 6 980.978,85 8.828.809,62 - - 8.828.809,62 882.880,96 9.711.690,58
dalam Pipa conduit PVC Hi dia. 20 mm - - - - - - -
8, Instalasi ke Ceilling Speaker NYMHY 2 x 1.5 mm2 131.931,44 1.187.382,98 - - 1.187.382,98 118.738,30 1.306.121,28
9, Instalasi ke Volume Control 94.223,75 376.895,00 - - 376.895,00 37.689,50 414.584,50
7.978.536.662,85 569.711.268,35 569.711.268,35 7.978.536.662,85 797.853.666,29 8.776.390.329,14 -

Pasuruan, 15 Desember 2019


Disetujui Oleh Diperiksa Oleh Dibuat Oleh
Pejabat Pembuat Komitmen (PPK) Konsultan Pengawas Kontraktor

Ir. Yudie Andi Prasetya, MS.i Cicik Yunius Grahanas Tutik, SE Moch. Isaneni Widodo
Pembina Utama Muda Direktur Direktur
NIP. 19680129 199202 1 00 1
BACKUP VOLUME PEKERJAAN

PEKERJAAN : PEMBANGUNAN DEPO ARSIP DAN DINAS PERPUSTAKAAN


LOKASI : LAHAN ASET DISEBELAH SELATAN GEDUNG PERPUSTAKAAN DAERAH KELURAHAN SEKARGADUNG

NO. URAIAN PEKERJAAN PANJANG LEBAR TINGGI JUMLAH TOTAL SAT.


1 2 3 4 5 6 3x4x5x6 7

A GEDUNG DEPO ARSIP


I. PEKERJAAN PENDAHULUAN
1, Pekerjaan pembersihan lahan
= 53,290 x 95,120 x 1,000 x 0,250 = 1.267,236 m2
1.267,24 m2
2, Pekerjaan urugan tanah+pemadatan
= 71,000 x 48,000 x 0,300 x 1,000 = 1.022,400 m2
1.022,40 m2
3, Pekerjaan K3
= 1,000 x 1,000 x 1,000 x 1,000 = 1,000 ls
1,000 ls
4, Pekerjaan Uitzet + Bowplank
= 32,000 x 1,000 x 1,000 x 2,000 = 64,000 m1
= 39,000 x 1,000 x 1,000 x 2,000 = 78,000 m1
142,000 m1
II. PEKERJAAN TANAH
1, Galian tanah
PC1 180x90x45cm = 1,100 x 2,000 x 0,600 x 16,000 = 21,120 m3
PC2 180x180x45cm = 2,000 x 2,000 x 0,600 x 25,000 = 60,000 m3
81,120 m3

2, Urugan Pasir Bawah Pondasi, tbl=10cm


PC1 180x90x45cm = 0,900 x 1,800 x 0,100 x 16,000 = 2,592 m3
PC2 180x180x45cm = 1,800 x 1,800 x 0,100 x 25,000 = 8,100 m3

S1 30x60cm
As 1 & 7 = 7,100 x 0,300 x 0,100 x 8,000 = 1,704 m3
As 2 - 6 = 14,600 x 0,300 x 0,100 x 10,000 = 4,380 m3
S2 25x50cm 0,100
Selasar 0,100
as G' & H' / as 8 - 9 = 7,700 x 0,250 x 0,100 x 2,000 = 0,385 m3
as G' & H' / as 6 - 8 = 6,700 x 0,250 x 0,100 x 2,000 = 0,335 m3
as G' & H' / as 4 - 6 = 4,700 x 0,250 x 0,100 x 4,000 = 0,470 m3
as G' & H' / as 1 - 4 = 7,200 x 0,250 x 0,100 x 4,000 = 0,720 m3
as G' & H' / as 1 = 1,700 x 0,250 x 0,100 x 2,000 = 0,085 m3
As 1- 9 = 5,600 x 0,250 x 0,100 x 9,000 = 1,260 m3
Arsip 0,100
as H-J-L = 4,600 x 0,250 x 0,100 x 18,000 = 2,070 m3
0,100
S3 20x30cm 0,100
As 1' = 14,750 x 0,200 x 0,100 x 1,000 = 0,295 m3
as 3' = 14,750 x 0,200 x 0,100 x 2,000 = 0,590 m3
as H' = 1,750 x 0,200 x 0,100 x 4,000 = 0,140 m3
= 4,700 x 0,200 x 0,100 x 4,000 = 0,376 m3
= 2,250 x 0,200 x 0,100 x 4,000 = 0,180 m3
= 4,780 x 0,200 x 0,100 x 4,000 = 0,382 m3
= 4,700 x 0,200 x 0,100 x 4,000 = 0,376 m3
= 4,700 x 0,200 x 0,100 x 4,000 = 0,376 m3
as I' = 1,750 x 0,200 x 0,100 x 4,000 = 0,140 m3
= 4,700 x 0,200 x 0,100 x 4,000 = 0,376 m3
= 2,250 x 0,200 x 0,100 x 4,000 = 0,180 m3
0,100
S4 15x30cm 0,100
as 4' = 4,025 x 0,150 x 0,100 x 1,000 = 0,060 m3
= 1,600 x 0,150 x 0,100 x 1,000 = 0,024 m3
as 5' = 4,025 x 0,150 x 0,100 x 1,000 = 0,060 m3
= 1,600 x 0,150 x 0,100 x 1,000 = 0,024 m3
as H' = 2,330 x 0,150 x 0,100 x 1,000 = 0,035 m3
= 1,780 x 0,150 x 0,100 x 1,000 = 0,027 m3
= 1,720 x 0,150 x 0,100 x 1,000 = 0,026 m3
= 0,900 x 0,150 x 0,100 x 1,000 = 0,014 m3
= 2,220 x 0,150 x 0,100 x 1,000 = 0,033 m3
= 1,280 x 0,150 x 0,100 x 1,000 = 0,019 m3
as I = 2,250 x 0,150 x 0,100 x 1,000 = 0,034 m3
= 4,700 x 0,150 x 0,100 x 1,000 = 0,071 m3
25,939 m3

1 - 35
NO. URAIAN PEKERJAAN PANJANG LEBAR TINGGI JUMLAH TOTAL SAT.
1 2 3 4 5 6 3x4x5x6 7

3, Urugan Sirtu
teras = 6,850 x 1,580 x 0,380 x 1,000 = 4,113 m3
galeri = 25,350 x 6,850 x 0,380 x 1,000 = 65,986 m3
Teras = 3,070 x 6,850 x 0,380 x 1,000 = 7,991 m3
Recepsionis = 5,850 x 4,770 x 0,380 x 1,000 = 10,604 m3
toilet = 3,350 x 1,800 x 0,380 x 1,000 = 2,291 m3
= 2,850 x 1,800 x 0,380 x 1,000 = 1,949 m3
= 4,880 x 4,080 x 0,380 x 2,000 = 15,132 m3
Janitor = 1,780 x 1,380 x 0,380 x 1,000 = 0,933 m3
Difabel = 2,380 x 1,820 x 0,380 x 1,000 = 1,646 m3
Anteroom = 15,030 x 2,350 x 0,380 x 1,000 = 13,422 m3
R,arsip = 5,850 x 4,850 x 0,380 x 1,000 = 10,782 m3
= 5,000 x 2,850 x 0,380 x 1,000 = 5,415 m3
R, Pengolahan = 5,850 x 9,350 x 0,380 x 1,000 = 20,785 m3
= 9,650 x 2,850 x 0,380 x 1,000 = 10,451 m3
R. preservasi = 5,850 x 9,350 x 0,380 x 1,000 = 20,785 m3
R.fumigasi = 3,830 x 2,770 x 0,380 x 1,000 = 4,031 m3
Transit = 10,880 x 2,880 x 0,380 x 1,000 = 11,907 m3
R.arsip statis = 23,780 x 9,770 x 0,380 x 1,000 = 88,286 m3
R.arsip = 19,770 x 14,780 x 0,380 x 1,000 = 111,036 m3
407,546 m3
4, Urugan Pasir Bawah lantai, tbl=10cm
teras = 6,850 x 1,580 x 0,100 x 1,000 = 1,082 m3
galeri = 25,350 x 6,850 x 0,100 x 1,000 = 17,365 m3
Teras = 3,070 x 6,850 x 0,100 x 1,000 = 2,103 m3
Recepsionis = 5,850 x 4,770 x 0,100 x 1,000 = 2,790 m3
toilet = 3,350 x 1,800 x 0,100 x 1,000 = 0,603 m3
= 2,850 x 1,800 x 0,100 x 1,000 = 0,513 m3
= 4,880 x 4,080 x 0,100 x 2,000 = 3,982 m3
Janitor = 1,780 x 1,380 x 0,100 x 1,000 = 0,246 m3
Difabel = 2,380 x 1,820 x 0,100 x 1,000 = 0,433 m3
Anteroom = 15,030 x 2,350 x 0,100 x 1,000 = 3,532 m3
R,arsip = 5,850 x 4,850 x 0,100 x 1,000 = 2,837 m3
= 5,000 x 2,850 x 0,100 x 1,000 = 1,425 m3
R, Pengolahan = 5,850 x 9,350 x 0,100 x 1,000 = 5,470 m3
= 9,650 x 2,850 x 0,100 x 1,000 = 2,750 m3
R. preservasi = 5,850 x 9,350 x 0,100 x 1,000 = 5,470 m3
R.fumigasi = 3,830 x 2,770 x 0,100 x 1,000 = 1,061 m3
Transit = 10,880 x 2,880 x 0,100 x 1,000 = 3,133 m3
R.arsip statis = 23,780 x 9,770 x 0,100 x 1,000 = 23,233 m3
R.arsip = 19,770 x 14,780 x 0,100 x 1,000 = 29,220 m3
107,249 m3

5, Galian Strouse Pile Ø 30 cm


PC1 180x90x45cm = 2,000 x 1,000 x 6,000 x 16,000 = 192,000 m1
PC2 180x180x45cm = 3,000 x 1,000 x 6,000 x 25,000 = 450,000 m1
642,000 m1

III. PEKERJAAN STRUKTUR


III. I. PEKERJAAN PONDASI
1, Rabat Lantai Kerja fc'=14.53 Mpa (K-175), tbl=5cm
PC1 180x90x45cm = 0,900 x 1,800 x 0,050 x 16,000 = 1,296 m3
PC2 180x180x45cm = 1,800 x 1,800 x 0,050 x 25,000 = 4,050 m3

S1 30x60cm
As 1 & 7 = 7,100 x 0,300 x 0,050 x 8,000 = 0,852 m3
As 2 - 6 = 14,600 x 0,300 x 0,050 x 10,000 = 2,190 m3
S2 25x50cm
Selasar
as G' & H' / as 8 - 9 = 7,700 x 0,250 x 0,050 x 2,000 = 0,193 m3
as G' & H' / as 6 - 8 = 6,700 x 0,250 x 0,050 x 2,000 = 0,168 m3
as G' & H' / as 4 - 6 = 4,700 x 0,250 x 0,050 x 4,000 = 0,235 m3
as G' & H' / as 1 - 4 = 7,200 x 0,250 x 0,050 x 4,000 = 0,360 m3
as G' & H' / as 1 = 1,700 x 0,250 x 0,050 x 2,000 = 0,043 m3
As 1- 9 = 5,600 x 0,250 x 0,050 x 9,000 = 0,630 m3
Arsip 0,050
as H-J-L = 4,600 x 0,250 x 0,050 x 18,000 = 1,035 m3

S3 20x30cm
As 1' = 14,750 x 0,200 x 0,050 x 1,000 = 0,148 m3
as 3' = 14,750 x 0,200 x 0,050 x 2,000 = 0,295 m3
as H' = 1,750 x 0,200 x 0,050 x 4,000 = 0,070 m3
= 4,700 x 0,200 x 0,050 x 4,000 = 0,188 m3

2 - 35
NO. URAIAN PEKERJAAN PANJANG LEBAR TINGGI JUMLAH TOTAL SAT.
1 2 3 4 5 6 3x4x5x6 7

= 2,250 x 0,200 x 0,050 x 4,000 = 0,090 m3


= 4,780 x 0,200 x 0,050 x 4,000 = 0,191 m3
= 4,700 x 0,200 x 0,050 x 4,000 = 0,188 m3
= 4,700 x 0,200 x 0,050 x 4,000 = 0,188 m3
as I' = 1,750 x 0,200 x 0,050 x 4,000 = 0,070 m3
= 4,700 x 0,200 x 0,050 x 4,000 = 0,188 m3
= 2,250 x 0,200 x 0,050 x 4,000 = 0,090 m3

S4 15x30cm
as 4' = 4,025 x 0,150 x 0,050 x 1,000 = 0,030 m3
= 1,600 x 0,150 x 0,050 x 1,000 = 0,012 m3
as 5' = 4,025 x 0,150 x 0,050 x 1,000 = 0,030 m3
= 1,600 x 0,150 x 0,050 x 1,000 = 0,012 m3
as H' = 2,330 x 0,150 x 0,050 x 1,000 = 0,017 m3
= 1,780 x 0,150 x 0,050 x 1,000 = 0,013 m3
= 1,720 x 0,150 x 0,050 x 1,000 = 0,013 m3
= 0,900 x 0,150 x 0,050 x 1,000 = 0,007 m3
= 2,220 x 0,150 x 0,050 x 1,000 = 0,017 m3
= 1,280 x 0,150 x 0,050 x 1,000 = 0,010 m3
as I = 2,250 x 0,150 x 0,050 x 1,000 = 0,017 m3
= 4,700 x 0,150 x 0,050 x 1,000 = 0,035 m3
12,969 m3

2, Rabat Bawah Lantai fc'=14.53 Mpa (K-175), tbl=10cm


teras = 6,850 x 1,580 x 0,100 x 1,000 = 1,082 m3
galeri = 25,350 x 6,850 x 0,100 x 1,000 = 17,365 m3
Teras = 3,070 x 6,850 x 0,100 x 1,000 = 2,103 m3
Recepsionis = 5,850 x 4,770 x 0,100 x 1,000 = 2,790 m3
toilet = 3,350 x 1,800 x 0,100 x 1,000 = 0,603 m3
= 2,850 x 1,800 x 0,100 x 1,000 = 0,513 m3
= 4,880 x 4,080 x 0,100 x 2,000 = 3,982 m3
Janitor = 1,780 x 1,380 x 0,100 x 1,000 = 0,246 m3
Difabel = 2,380 x 1,820 x 0,100 x 1,000 = 0,433 m3
Anteroom = 15,030 x 2,350 x 0,100 x 1,000 = 3,532 m3
R,arsip = 5,850 x 4,850 x 0,100 x 1,000 = 2,837 m3
= 5,000 x 2,850 x 0,100 x 1,000 = 1,425 m3
R, Pengolahan = 5,850 x 9,350 x 0,100 x 1,000 = 5,470 m3
= 9,650 x 2,850 x 0,100 x 1,000 = 2,750 m3
R. preservasi = 5,850 x 9,350 x 0,100 x 1,000 = 5,470 m3
R.fumigasi = 3,830 x 2,770 x 0,100 x 1,000 = 1,061 m3
Transit = 10,880 x 2,880 x 0,100 x 1,000 = 3,133 m3
R.arsip statis = 23,780 x 9,770 x 0,100 x 1,000 = 23,233 m3
R.arsip = 19,770 x 14,780 x 0,100 x 1,000 = 29,220 m3
107,249 m3
3, Beton Pile Caps fc' = 20,75 MPa (K-250)
PC1 180x90x45cm
= 0,900 x 1,800 x 0,450 x 16,000 = 11,664 m3
11,664 m3
PC2 180x180x45cm
= 0,900 x 1,800 x 0,450 x 25,000 = 18,225 m3
18,225 m3
4, Beton Strouse Pile Ø 30 cm, fc’ = 20.75 MPa (K-250)
PC1 180x90x45cm = 2,000 x 0,071 x 6,000 x 16,000 = 13,565 m3
PC2 180x180x45cm = 3,000 x 0,071 x 6,000 x 25,000 = 31,793 m3
45,357 m3

5, Beton Sloof fc' = 20,75 MPa (K-250)


S1 30x60cm
As 1 & 7 = 7,100 x 0,300 x 0,600 x 8,000 = 10,224 m3
As 2 - 6 = 14,600 x 0,300 x 0,600 x 10,000 = 26,280 m3
S2 25x50cm 36,504 m3
Selasar
as G' & H' / as 8 - 9 = 7,700 x 0,250 x 0,500 x 2,000 = 1,925 m3
as G' & H' / as 6 - 8 = 6,700 x 0,250 x 0,500 x 2,000 = 1,675 m3
as G' & H' / as 4 - 6 = 4,700 x 0,250 x 0,500 x 4,000 = 2,350 m3
as G' & H' / as 1 - 4 = 7,200 x 0,250 x 0,500 x 4,000 = 3,600 m3
as G' & H' / as 1 = 1,700 x 0,250 x 0,500 x 2,000 = 0,425 m3
As 1- 9 = 5,600 x 0,250 x 0,500 x 9,000 = 6,300 m3
Arsip 0,500
as H-J-L = 4,600 x 0,250 x 0,500 x 18,000 = 10,350 m3
26,625 m3
S3 20x30cm
As 1' = 14,750 x 0,200 x 0,300 x 1,000 = 0,885 m3

3 - 35
NO. URAIAN PEKERJAAN PANJANG LEBAR TINGGI JUMLAH TOTAL SAT.
1 2 3 4 5 6 3x4x5x6 7

as 3' = 14,750 x 0,200 x 0,300 x 2,000 = 1,770 m3


as H' = 1,750 x 0,200 x 0,300 x 4,000 = 0,420 m3
= 4,700 x 0,200 x 0,300 x 4,000 = 1,128 m3
= 2,250 x 0,200 x 0,300 x 4,000 = 0,540 m3
= 4,780 x 0,200 x 0,300 x 4,000 = 1,147 m3
= 4,700 x 0,200 x 0,300 x 4,000 = 1,128 m3
= 4,700 x 0,200 x 0,300 x 4,000 = 1,128 m3
as I' = 1,750 x 0,200 x 0,300 x 4,000 = 0,420 m3
= 4,700 x 0,200 x 0,300 x 4,000 = 1,128 m3
= 2,250 x 0,200 x 0,300 x 4,000 = 0,540 m3
10,234 m3
S4 15x30cm
as 4' = 4,025 x 0,150 x 0,300 x 1,000 = 0,181 m3
= 1,600 x 0,150 x 0,300 x 1,000 = 0,072 m3
as 5' = 4,025 x 0,150 x 0,300 x 1,000 = 0,181 m3
= 1,600 x 0,150 x 0,300 x 1,000 = 0,072 m3
as H' = 2,330 x 0,150 x 0,300 x 1,000 = 0,105 m3
= 1,780 x 0,150 x 0,300 x 1,000 = 0,080 m3
= 1,720 x 0,150 x 0,300 x 1,000 = 0,077 m3
= 0,900 x 0,150 x 0,300 x 1,000 = 0,041 m3
= 2,220 x 0,150 x 0,300 x 1,000 = 0,100 m3
= 1,280 x 0,150 x 0,300 x 1,000 = 0,058 m3
as I = 2,250 x 0,150 x 0,300 x 1,000 = 0,101 m3
= 4,700 x 0,150 x 0,300 x 1,000 = 0,212 m3
1,279 m3

III. 2. PEKERJAAN STRUKTUR LANTAI


1, Beton Kolom fc' = 20,75 MPa (K-250)
K1 40x40cm = 0,400 x 0,400 x 7,200 x 25,000 = 28,800 m3
28,800 m3
K2 30x30cm
K2 Drop Off = 0,300 x 0,300 x 5,400 x 2,000 = 0,972 m3
= 0,300 x 0,300 x 5,400 x 16,000 = 7,776 m3
8,748 m3
2, Beton Ring balk 10x15 cm
As A = 27,518 x 1,000 x 1,000 x 2,000 = 55,036 m1
= 7,100 x 1,000 x 1,000 x 2,000 = 14,200 m1
= 4,850 x 1,000 x 1,000 x 3,000 = 14,550 m1
= 27,518 x 1,000 x 1,000 x 1,000 = 27,518 m1
As 1 = 27,518 x 1,000 x 1,000 x 2,000 = 55,036 m1
= 9,600 x 1,000 x 1,000 x 5,000 = 48,000 m1
= 2,850 x 1,000 x 1,000 x 1,000 = 2,850 m1
217,190 m1
3, Beton Balok Latai 10x15 cm
Kusen P1 = 1,000 x 1,000 x 2,110 x 6,000 = 12,660 m1
Kusen P2 = 1,000 x 1,000 x 0,980 x 20,000 = 19,600 m1
Kusen J1 = 1,000 x 1,000 x 1,520 x 20,000 = 30,400 m1
Kusen J2 = 1,000 x 1,000 x 4,850 x 3,000 = 14,550 m1
Kusen PJ1 = 1,000 x 1,000 x 2,400 x 2,000 = 4,800 m1
82,010 m1
4, Kolom praktis 11x11 cm
= 1,000 x 6,300 x 1,000 x 76,000 = 478,800 m1
478,800 m1
III. 3. PEKERJAAN STRUKTUR LANTAI ATAP
1, Beton Balok fc' = 20,75 MPa (K-250)
B1 30x60 cm
as 1 & 7 = 7,100 x 0,300 x 0,600 x 8,000 = 10,224 m3
= 10,224 m3
B2 25x50 cm
Selasar
as G' & H' / as 8 - 9 = 7,700 x 0,250 x 0,500 x 2,000 = 1,925 m3
as G' & H' / as 6 - 8 = 6,700 x 0,250 x 0,500 x 2,000 = 1,675 m3
as G' & H' / as 4 - 6 = 4,700 x 0,250 x 0,500 x 4,000 = 2,350 m3
as G' & H' / as 1 - 4 = 7,200 x 0,250 x 0,500 x 4,000 = 3,600 m3
as G' & H' / as 1 = 1,700 x 0,250 x 0,500 x 2,000 = 0,425 m3
As 1- 9 = 5,600 x 0,250 x 0,500 x 10,000 = 7,000 m3
Konsol = 1,400 x 0,250 x 0,500 x 6,000 = 2,100 m3
Arsip 19,075 m3
as H-J-L = 4,600 x 0,250 x 0,500 x 18,000 = 10,350 m3
Total = 29,425 m3

B3 Tambahan Drop Off = 5,650 x 0,150 x 0,300 x 2,000 = 0,509 m3

4 - 35
NO. URAIAN PEKERJAAN PANJANG LEBAR TINGGI JUMLAH TOTAL SAT.
1 2 3 4 5 6 3x4x5x6 7

2, Beton Plat atap fc'=20,75 Mpa (K - 250), tbl=12cm


Plat Selasar = 5,600 x 2,200 x 0,100 x 1,000 = 1,232 m3
= 5,600 x 2,700 x 0,100 x 1,000 = 1,512 m3
= 5,300 x 2,450 x 0,100 x 2,000 = 2,597 m3
= 0,750 x 3,400 x 0,100 x 2,000 = 0,510 m3
= 0,750 x 6,250 x 0,100 x 2,000 = 0,938 m3
= 5,600 x 4,700 x 0,100 x 1,000 = 2,632 m3
= 5,600 x 4,700 x 0,100 x 1,000 = 2,632 m3
5,600 x 2,250 x 0,100 x 1,000 = 1,260 m3
13,313 m3

Lisplank Plat bawah = 31,300 x 0,650 x 0,120 x 2,000 = 4,883 m3


= 30,000 x 0,650 x 0,120 x 2,000 = 4,680 m3
dinding = 31,300 x 0,070 x 0,700 x 2,000 = 3,067 m3
30,000 x 0,070 x 0,700 x 2,000 = 2,940 m3
Plat Atas = 31,300 x 0,200 x 0,100 x 2,000 = 1,252 m3
30,000 x 0,200 x 0,100 x 2,000 = 1,200 m3
18,022 m3
Total = 31,335 m3
III. 4. PEKERJAAN PENUTUP ATAP
1, Kuda Kuda WF 250.125.6.9
kuda-kuda = 14,890 x 29,600 x 2,000 x 5,000 = 4.407,440 kg
= 2,360 x 29,600 x 1,000 x 5,000 = 349,280 kg
kaki atas = 0,530 x 29,600 x 2,000 x 5,000 = 156,880 kg
= 4.913,600 kg
2, Penyambung WF 250.125.6.9
kuda-kuda = 0,400 x 29,600 x 2,000 x 5,000 = 118,400 kg
= 0,330 x 29,600 x 2,000 x 5,000 = 97,680 kg
= 0,240 x 29,600 x 2,000 x 5,000 = 71,040 kg
= 287,120 kg
3, Gording CNP 150.65.20.2,3
= 27,500 x 5,500 x 2,000 x 14,000 = 4.235,000 kg
atap kaca = 0,920 x 5,500 x 2,000 x 5,000 = 50,600 kg
= 2,380 x 5,500 x 2,000 x 5,000 = 130,900 kg
= 4.416,500 kg
4, Pekerjaan perakitan baja
Kuda Kuda WF 250.125.6.9 = 4.913,600 x 1,000 x 1,000 x 1,000 = 4.913,600 kg
Penyambung WF 250.125.6.9 = 287,120 x 1,000 x 1,000 x 1,000 = 287,120 kg
= 5.200,720 kg
5, Baja Siku L 70.70.7
penyangga gording = 0,125 x 1,000 x 7,380 x 140,0 = 129,150 kg
= 129,150 kg
6, Plat Rip/stiffner, tbl=10mm
kuda-kuda WF 250.125.6.9 = 0,130 x 0,150 x 78,500 x 54,000 = 82,661 kg
= 0,230 x 0,250 x 78,500 x 54,000 = 243,743 kg
= 326,403 kg
7, Pas. angker Ø 16, panjang 40 cm
= 6,000 x 1,000 x 1,000 x 15,000 = 90,000 bh
= 90,000 bh
8, Plat Plendes, tbl=12mm
kuda-kuda WF 250.125.6.9 = 0,130 x 0,150 x 94,200 x 54,000 = 99,193 kg
= 0,230 x 0,250 x 94,200 x 54,000 = 292,491 kg
= 391,684 kg
9, Besi Track Stang dan Ikatan Angin, Ø 16
= 0,887 x 8,790 x 2,000 x 8,000 = 124,799 kg
= 124,799 kg
10, Jarum Keras M-16
kuda-kuda = 1,000 x 1,000 x 1,000 x 5,000 = 5,000 bh
ikatan angin = 1,000 x 1,000 x 2,000 x 8,000 = 16,000 bh
= 21,000 bh

11, Pas. Besi Ø10 Ikatan Gording


= 0,616 x 13,830 x 4,000 x 24,000 = 818,150 kg
818,150 kg
12, Mur Baut Ø 14
nok = 12,000 x 1,000 x 1,000 x 5,000 = 60,000 bh
kaki = 12,000 x 1,000 x 2,000 x 5,000 = 120,000 bh
= 180,000 bh
baut gording = 28,000 x 5,000 x 4,000 x 1,000 = 560,000 bh
Penambahan = 380,000 bh

13, Pas. penutup atap zincalume


= 15,190 x 27,350 x 1,000 x 2,000 = 830,893 m2

5 - 35
NO. URAIAN PEKERJAAN PANJANG LEBAR TINGGI JUMLAH TOTAL SAT.
1 2 3 4 5 6 3x4x5x6 7

830,893 m2
14, Pas. Bubungan zincalume
= 27,350 x 1,000 x 1,000 x 1,000 = 27,350 m1
27,350 m1
15, Pas. Kaca laminated 5mm+5mm+sealent
= 2,400 x 2,000 x 1,000 x 7,000 = 33,600 m2
33,600 m2
16, Pas. Spider stainless kaki 4
= 4,000 x 1,000 x 1,000 x 5,000 = 20,000 bh
20,000 bh

Pengecatan Baja
Kuda Kuda WF 250.125.6.9 = 0,232 x 12 x 2 = 5,568 m2
0,262 x 12 x 2 = 6,288 m2
11,856 m2

= 11,856 x 1 x 15 = 173,592 m2

Gording CNP 150.65.20.2,3 = 0,32 x 6 x 2 = 3,84 m2


= 3,84 x 1 x 134 = 513,920 m2

Baja Siku L 70.70.7 = 0,28 x 6 x 1 = 1,68 m2


= 1,68 x 1 x 3 = 5,668 m2

693,180 m2

IV. PEKERJAAN ARSITEKTURAL


IV. 1. PEKERJAAN PASANGAN
1, Pas. Rollag Batu Bata Untuk Pijakan 1pc : 4p
= 7,290 x 0,600 x 1,000 x 2,000 = 8,748 m2
= 4,600 x 0,600 x 1,000 x 2,000 = 5,520 m2
= 2,200 x 0,600 x 1,000 x 1,000 = 1,320 m2
= 5,800 x 0,400 x 1,000 x 1,000 = 2,320 m2
17,908 m2
2, Pas. Dinding Bata Ringan tebal 10 cm dengan mortar siap pakai
P L T Jumlah Total
5,520 x 3,700 20,424
4,600 x 4,590 21,114
4,600 x 4,590 21,114
5,700 x 4,590 26,163
8,750 x 3,980 34,825
5,700 x 3,980 22,686
8,750 x 3,980 34,825
5,700 x 3,980 22,686
5,700 x 3,980 22,686
8,750 x 3,980 34,825
2,750 x 3,000 8,250
11,750 x 3,000 35,250
4,870 x 3,980 19,383
5,880 x 3,980 23,402
4,590 x 5,550 25,475
4,590 x 3,000 13,770
15,000 x 5,470 82,050
468,928

3, Acian Dinding
Acian = 1.912,266 x 1,000 x 2,000 x 1,000 = 3.824,532 m2
3.824,532 m2
4, Benangan Dinding
Atap = 20,150 x 1,000 x 2,000 x 2,000 = 80,600 m1
= 48,200 x 1,000 x 2,000 x 2,000 = 192,800 m1
p1 = 4,420 + 1,480 x 2,000 x 8,000 = 94,400 m1
p2 = 4,420 + 1,480 x 2,000 x 1,000 = 11,800 m1
p3 = 4,420 + 1,960 x 2,000 x 3,000 = 38,280 m1
p4 = 4,420 + 1,000 x 2,000 x 1,000 = 10,840 m1
PJ1 = 2,250 + 0,960 x 2,000 x 2,000 = 12,840 m1
PB 1 = 2,750 + 2,450 x 2,000 x 5,000 = 52,000 m1
J6 = 0,940 + 2,000 x 2,000 x 30,000 = 176,400 m1
669,960 m1
5, Benangan Beton
Kolom = 6,000 x 1,000 x 6,000 x 41,000 = 1.476,000 m1
1.476,000 m1

6 - 35
NO. URAIAN PEKERJAAN PANJANG LEBAR TINGGI JUMLAH TOTAL SAT.
1 2 3 4 5 6 3x4x5x6 7

6, Pas. Partisi PVC Cubicle t= 40mm, dan acesories


= 1,350 x 2,000 x 1,000 x 9,000 = 24,300 m2
= 3,780 x 2,000 x 1,000 x 1,000 = 7,560 m2
= 2,800 x 2,000 x 1,000 x 2,000 = 11,200 m2
43,060 m2
7, Pas. GRC timbul tebal 3cm
jendela = 2,420 x 0,080 x 3,000 x 23,000 = 13,358 m2
= 1,300 x 0,080 x 4,000 x 23,000 = 9,568 m2
Jendela lengkung = 1,814 x 1,000 x 1,000 x 23,000 = 41,714 m2
Depo = 1,300 x 0,080 x 4,000 x 24,000 = 9,984 m2
Jendela lengkung = 1,814 x 1,000 x 1,000 x 24,000 = 43,528 m2
118,153 m2
8, Pas. GRC tebal 2cm
luar = 3,890 x 0,126 x 1,000 x 18,000 = 8,795 m2
patio = 4,700 x 0,126 x 1,000 x 8,000 = 4,723 m2
Depo = 4,000 x 2,100 x 1,000 x 3,000 = 25,200 m2
38,717 m2
9, Plesteran Dinding
8,180 x 1,000 x 1,800 x 1,000 = 14,724
4,860 x 1,000 x 1,800 x 1,000 = 8,748
5,900 x 1,000 x 1,800 x 1,000 = 10,620
5,900 x 1,000 x 1,800 x 1,000 = 10,620
11,920 x 1,000 x 1,860 x 1,000 = 22,171
11,920 x 1,000 x 1,800 x 1,000 = 21,456
4,550 x 1,000 x 1,850 x 1,000 = 8,418
2,300 x 1,000 x 1,900 x 1,000 = 4,370
4,590 x 1,000 x 1,850 x 1,000 = 8,492
4,600 x 1,000 x 1,850 x 1,000 = 8,510
1,800 x 1,000 x 1,800 x 1,000 = 3,240
4,570 x 1,000 x 1,900 x 1,000 = 8,683
2,200 x 1,000 x 2,000 x 1,000 = 4,400
4,240 x 1,000 x 1,860 x 1,000 = 7,886
5,810 x 1,000 x 1,800 x 1,000 = 10,458
5,300 x 1,000 x 1,900 x 1,000 = 10,070
4,000 x 1,000 x 1,800 x 1,000 = 7,200
2,000 x 1,000 x 1,800 x 1,000 = 3,600
1,970 x 1,000 x 2,000 x 1,000 = 3,940
5,890 x 1,000 x 2,000 x 1,000 = 11,780
5,580 x 1,000 x 1,800 x 1,000 = 10,044
4,550 x 1,000 x 1,800 x 1,000 = 8,190
2,100 x 1,000 x 1,900 x 1,000 = 3,990
1,980 x 1,000 x 1,800 x 1,000 = 3,564
5,900 x 1,000 x 2,000 x 1,000 = 11,800
1,800 x 1,000 x 1,800 x 1,000 = 3,240
4,560 x 1,000 x 1,880 x 1,000 = 8,573
2,200 x 1,000 x 1,800 x 1,000 = 3,960
6,040 x 1,000 x 2,000 x 1,000 = 12,080
3,600 x 1,000 x 2,000 x 1,000 = 7,200
3,600 x 1,000 x 2,000 x 1,000 = 7,200
1,980 x 1,000 x 1,800 x 1,000 = 3,564
2,100 x 1,000 x 1,900 x 1,000 = 3,990
6,150 x 1,000 x 1,800 x 1,000 = 11,070
11,490 x 1,000 x 1,800 x 1,000 = 20,682
308,532

IV. 2. PEKERJAAN KUSEN


1, Pasang Kusen P1 8,000 unit
2, Pasang Kusen P2 1,000 unit
3, Pasang Kusen P3 3,000 unit
4, Pasang Kusen P4 1,000 unit
5, Pasang Kusen PJ1 2,000 unit
6, Pasang Kusen Pintu Besi PB1 5,000 unit
7, Pasang Kusen J6 30,000 unit

IV. 3. PEKERJAAN PENUTUP LANTAI


1, Pas. Granit Tile 60X60cm Polish
galeri = 25,350 x 6,850 x 1,000 x 1,000 = 173,648 m2
Recepsionis = 5,850 x 4,770 x 1,000 x 1,000 = 27,905 m2
Difabel = 2,380 x 1,820 x 1,000 x 1,000 = 4,332 m2
Anteroom = 15,030 x 2,350 x 1,000 x 1,000 = 35,321 m2
R,arsip = 5,850 x 4,850 x 1,000 x 1,000 = 28,373 m2
= 5,000 x 2,850 x 1,000 x 1,000 = 14,250 m2

7 - 35
NO. URAIAN PEKERJAAN PANJANG LEBAR TINGGI JUMLAH TOTAL SAT.
1 2 3 4 5 6 3x4x5x6 7

R, Pengolahan = 5,850 x 9,350 x 1,000 x 1,000 = 54,698 m2


= 9,650 x 2,850 x 1,000 x 1,000 = 27,503 m2
R. preservasi = 5,850 x 9,350 x 1,000 x 1,000 = 54,698 m2
R.fumigasi = 3,830 x 2,770 x 1,000 x 1,000 = 10,609 m2
Transit = 10,880 x 2,880 x 1,000 x 1,000 = 31,334 m2
= 462,668 m2
2, Pas. Granit Tile 60X60cm unpolish
= 2,850 x 2,850 x 1,000 x 2,000 = 16,245 m2
teras = 6,850 x 1,580 x 1,000 x 1,000 = 10,823 m2
Teras = 3,070 x 6,850 x 1,000 x 1,000 = 21,030 m2
= 48,098 m2
3, Pek. Lantai Floor Hardener Finishing Trowel, 5kg/m2
R.arsip statis = 23,780 x 9,770 x 1,000 x 1,000 = 232,331 m2
R.arsip = 19,770 x 14,780 x 1,000 x 1,000 = 292,201 m2
= 524,531 m2
4, Pas. Keramik dinding 30x60cm
= 6,200 x 4,080 x 1,000 x 1,000 = 25,296 m2
= 6,660 x 1,380 x 1,000 x 2,850 = 26,194 m2
= 51,490 m2
5, Pas. Keramik lantai 30x30cm unpolish
toilet = 3,350 x 1,800 x 1,000 x 1,000 = 6,030 m2
= 2,850 x 1,800 x 1,000 x 1,000 = 5,130 m2
= 4,880 x 4,080 x 1,000 x 2,000 = 39,821 m2
= 1,780 x 1,380 x 1,000 x 1,000 = 2,456 m2
= 53,437 m2
IV. 4. PEKERJAAN PLAFOND
1, Pas. Plafond Gypsum t=9mm
Recepsionis = 5,850 x 6,850 x 1,000 x 1,000 = 40,073 m2
Anteroom = 15,030 x 2,850 x 1,000 x 1,000 = 42,836 m2
R,arsip = 5,850 x 2,850 x 1,000 x 1,000 = 16,673 m2
= 5,000 x 2,850 x 1,000 x 1,000 = 14,250 m2
= 5,850 x 2,850 x 1,000 x 1,000 = 16,673 m2
= 9,650 x 5,850 x 1,000 x 1,000 = 56,453 m2
= 5,850 x 8,850 x 1,000 x 1,000 = 51,773 m2
R.fumigasi = 3,830 x 10,850 x 1,000 x 1,000 = 41,556 m2
R.arsip statis = 23,780 x 6,850 x 1,000 x 1,000 = 162,893 m2
R.arsip = 19,770 x 7,350 x 1,000 x 1,000 = 145,310 m2
= 588,486 m2
2, Pas. Plafond Calsiboard t=4,5mm
toilet = 3,350 x 4,850 x 1,000 x 1,000 = 16,248 m2
= 2,850 x 2,850 x 1,000 x 1,000 = 8,123 m2
teras = 6,850 x 5,850 x 1,000 x 1,000 = 40,073 m2
= 25,350 x 5,850 x 1,000 x 1,000 = 148,298 m2
= 212,740 m2
3, Pas. Rangka Plafond Hollow 40.40.4 & 20.40.0.4
Pas. Plafond Gypsum t=9mm = 588,486 x 1,000 x 1,000 x 1,000 = 588,486 m2
Pas. Plafond Calsiboard t=4,5mm = 212,740 x 1,000 x 1,000 x 1,000 = 212,740 m2
= 801,226 m2
4, Pas. List Gypsum t=8cm
Recepsionis = 5,850 + 6,850 x 1,000 x 2,000 = 25,400 m1
Anteroom = 15,030 + 2,850 x 1,000 x 2,000 = 35,760 m1
R,arsip = 5,850 + 2,850 x 1,000 x 2,000 = 17,400 m1
= 5,000 + 2,850 x 1,000 x 2,000 = 15,700 m1
= 5,850 + 2,850 x 1,000 x 2,000 = 17,400 m1
= 9,650 + 5,850 x 1,000 x 2,000 = 31,000 m1
= 5,850 + 8,850 x 1,000 x 2,000 = 29,400 m1
R.fumigasi = 3,830 + 10,850 x 1,000 x 2,000 = 29,360 m1
R.arsip statis = 23,780 + 6,850 x 1,000 x 2,000 = 61,260 m1
R.arsip = 19,770 + 7,350 x 1,000 x 2,000 = 54,240 m1
toilet = 3,350 + 4,850 x 1,000 x 2,000 = 16,400 m1
= 2,850 + 2,850 x 1,000 x 2,000 = 11,400 m1
teras = 6,850 + 5,850 x 1,000 x 2,000 = 25,400 m1
= 25,350 + 5,850 x 1,000 x 2,000 = 62,400 m1
= 432,520 m1
IV. 5. PEKERJAAN PENGECATAN
1, Finishing Cat Dinding Interior
as A = 4,600 x 6,300 x 1,000 x 4,000 = 115,920 m2
as B = 4,600 x 6,300 x 1,000 x 2,000 = 57,960 m2
= 7,100 x 6,300 x 1,000 x 1,000 = 44,730 m2
= 1,050 x 6,300 x 1,000 x 1,000 = 6,615 m2
as B' = 4,600 x 6,300 x 1,000 x 1,000 = 28,980 m2
= 1,930 x 6,300 x 1,000 x 1,000 = 12,159 m2
as C = 1,280 x 6,300 x 1,000 x 1,000 = 8,064 m2
8 - 35
NO. URAIAN PEKERJAAN PANJANG LEBAR TINGGI JUMLAH TOTAL SAT.
1 2 3 4 5 6 3x4x5x6 7

= 7,100 x 6,300 x 1,000 x 1,000 = 44,730 m2


as C' = 10,000 x 1,500 x 1,000 x 1,000 = 15,000 m2
as D = 10,000 x 6,300 x 1,000 x 1,000 = 63,000 m2
as E = 4,850 x 6,300 x 1,000 x 1,000 = 30,555 m2
as F = 2,270 x 6,300 x 1,000 x 1,000 = 14,301 m2
= 2,200 x 6,300 x 1,000 x 1,000 = 13,860 m2
= 4,850 x 6,300 x 1,000 x 1,000 = 30,555 m2
as G = 1,280 x 6,300 x 1,000 x 1,000 = 8,064 m2
as 1 = 6,500 x 6,300 x 1,000 x 1,000 = 40,950 m2
as 2 = 2,770 x 6,300 x 1,000 x 1,000 = 17,451 m2
= 4,600 x 6,300 x 1,000 x 3,000 = 86,940 m2
as 3 = 2,770 x 6,300 x 1,000 x 1,000 = 17,451 m2
= 4,600 x 6,300 x 1,000 x 1,000 = 28,980 m2
= 5,700 x 6,300 x 1,000 x 1,000 = 35,910 m2
as 3' = 0,850 x 6,300 x 1,000 x 1,000 = 5,355 m2
= 1,780 x 6,300 x 1,000 x 1,000 = 11,214 m2
as 4 = 4,600 x 6,300 x 1,000 x 2,000 = 57,960 m2
= 2,850 x 6,300 x 1,000 x 2,000 = 35,910 m2
as 5 = 4,600 x 6,300 x 1,000 x 3,000 = 86,940 m2
= 1,770 x 6,300 x 1,000 x 1,000 = 11,151 m2
= 5,700 x 6,300 x 1,000 x 1,000 = 35,910 m2
as 6 = 4,600 x 6,300 x 1,000 x 2,000 = 57,960 m2
A = 1.024,575 m2
pengurang
p1 = 2,240 x 1,480 x 1,000 x 6,000 = 19,891 m2
p2 = 2,210 x 1,960 x 1,000 x 5,000 = 21,658 m2
p3 = 2,240 x 0,880 x 2,000 x 24,000 = 94,618 m2
P4 = 2,250 x 0,960 x 1,000 x 29,000 = 62,640 m2
J1 = 1,100 x 2,470 x 1,000 x 3,000 = 8,151 m2
B = 206,958 m2
= 817,617 m2
2, Finishing Cat plafond
= 588,486 x 1,000 x 1,000 x 1,000 = 588,486 m2
= 212,740 x 1,000 x 1,000 x 1,000 = 212,740 m2
= 801,226 m2

3, Finishing Cat Dinding Exterior Wheathershield


= 30,000 x 6,300 x 1,000 x 4,000 = 756,000 m2
= 10,000 x 0,800 x 1,000 x 4,000 = 32,000 m2
= 9,000 x 0,800 x 1,000 x 1,000 = 7,200 m2
= 795,200 m2
4, Pek. Waterprofing
penghubung = 7,950 x 5,800 x 1,000 x 1,000 = 46,110 m2
= 5,850 x 3,700 x 1,000 x 2,000 = 43,290 m2
= 5,850 x 4,750 x 1,000 x 5,000 = 138,938 m2
plat atap depo = 0,900 x 30,610 x 1,000 x 4,000 = 110,196 m2
= 20,550 + 44,860 x 0,200 x 2,000 = 26,164 m2
kantor
Talang = 0,650 x 31,000 x 1,000 x 2,000 = 63,300 m2
= 2,490 x 2,290 x 1,000 x 48,000 = 229,440 m2
= 657,438 m2

V. PEKERJAAN MEKANIKAL
1 Pas. Pipa Pvc AW 1/2" air bersih = 35,000 x 1,000 x 1,000 x 1,000 = 35,000 m1
2 Pas. Pipa Pvc AW 3/4" Air Bersih = 23,400 x 1,000 x 1,000 x 1,000 = 23,400 m1
3 Pas. Pipa Pvc AW 4'' Air Kotor = 32,100 x 1,000 x 1,000 x 1,000 = 32,100 m1
4 Pas. Pipa Pvc AW 3" Air Buangan = 39,000 x 1,000 x 1,000 x 1,000 = 39,000 m1
5 Pas. Pipa Pvc AW 4" talang tegak = 142,000 x 1,000 x 1,000 x 1,000 = 142,000 m1
6 Pas. Handrail pipa stainlessteel Ø2"+asesoris
= 1,810 x 1,000 x 1,000 x 1,000 = 1,810 m1
= 0,330 x 1,000 x 1,000 x 1,000 = 0,330 m1
= 1,260 x 1,000 x 1,000 x 1,000 = 1,260 m1
= 0,900 x 1,000 x 1,000 x 1,000 = 0,900 m1
= 4,300 m1
7 Pas. Wastafel meja = 8,000 x 1,000 x 1,000 x 1,000 = 8,000 bh
8 Pas. Wastafel dinding = 1,000 x 1,000 x 1,000 x 1,000 = 1,000 bh
9 Pas. Urinoir = 4,000 x 1,000 x 1,000 x 1,000 = 4,000 bh
10 Pas. Kran wastafel meja = 8,000 x 1,000 x 1,000 x 1,000 = 8,000 bh
10 Pas. Kran wastafel dinding = 1,000 x 1,000 x 1,000 x 1,000 = 1,000 bh
12 Pas. Kloset Duduk = 7,000 x 1,000 x 1,000 x 1,000 = 7,000 bh
13 Pas. Kloset Jongkok = 1,000 x 1,000 x 1,000 x 1,000 = 1,000 bh
14 Pas. Kran air = 7,000 x 1,000 x 1,000 x 1,000 = 7,000 bh
15 Pas. Roof drain = 20,000 x 1,000 x 1,000 x 1,000 = 20,000 bh

9 - 35
NO. URAIAN PEKERJAAN PANJANG LEBAR TINGGI JUMLAH TOTAL SAT.
1 2 3 4 5 6 3x4x5x6 7

16 Pas. Floor drain = 12,000 x 1,000 x 1,000 x 1,000 = 12,000 bh


17 Pas. Floor Clean Out 3" = 2,000 x 1,000 x 1,000 x 1,000 = 2,000 bh
18 Pas. Floor Clean Out 4" = 2,000 x 1,000 x 1,000 x 1,000 = 2,000 bh
19 Pas. Portable fire extinguisher co2 5 kg = 14,000 x 1,000 x 1,000 x 1,000 = 14,000 bh
20 Pas. Resapan +tutup kedalaman 3 meter = 1,000 x 1,000 x 1,000 x 1,000 = 1,000 bh
21 Pas. Biofilter kap. 4m3 = 1,000 x 1,000 x 1,000 x 1,000 = 1,000 bh
22 Pas. Tandon Tanam 4m3 = 1,000 x 1,000 x 1,000 x 1,000 = 1,000 bh
23 Pompa Transfer = 1,000 x 1,000 x 1,000 x 1,000 = 1,000 bh
24 Pompa Boster = 1,000 x 1,000 x 1,000 x 1,000 = 1,000 bh
25, Pas. Air mancur lengkap dengan acesoris = 1,000 x 1,000 x 1,000 x 1,000 = 1,000 unit
26, Pek. saluran Buis Beton U30 (1/2 lingkaran)
= 14,700 x 1,000 x 1,000 x 1,000 = 14,700 m1
= 31,730 x 1,000 x 1,000 x 4,000 = 126,920 m1
= 35,400 x 1,000 x 1,000 x 2,000 = 70,800 m1
= 8,930 x 1,000 x 1,000 x 1,000 = 8,930 m1
= 8,150 x 1,000 x 1,000 x 1,000 = 8,150 m1
229,500 m1
Pek. Dinding Batu Merah 1 Pc : 2 Pp tebal 1/2 bata
= 0,300 x 1,000 x 2,000 x 229,50 = 137,700 m2
137,700 m2
Pek. Plesteran Halus 1 Pc : 4 Pp tebal 1.5 cm
= 137,700 x 1,000 x 2,000 x 1,000 = 275,400 m2
275,400 m2
Pekerjaan Acian = 275,400 x 1,000 x 1,000 x 1,000 = 275,400 m2
275,400 m2
Benangan = 229,500 x 1,000 x 1,000 x 2,000 = 459,000 m1
459,000 m1
27, Pas. U-ditch+cover 40/60 gandar 5 ton = 16,000 x 1,000 x 1,000 x 1,000 = 16,000 bh

VI. PEKERJAAN ELEKTRIKAL


1, Pek. Tambah daya listrik dari daya 66.000 VA ke 131.000 VA
= 1,000 x 1,000 x 1,000 x 1,000 = 1,000 ls
1,000 ls
2, MDP-GEDUNG KANTOR , Man Distribusi Panel
= 1,000 x 1,000 x 1,000 x 1,000 = 1,000 Unit
1,000 Unit
3, PP DEPO, Panel Pembagi Penerangan
= 1,000 x 1,000 x 1,000 x 1,000 = 1,000 Unit
1,000 Unit
4, PP.AC DEPO, Panel Pembagi AC
= 1,000 x 1,000 x 1,000 x 1,000 = 1,000 Unit
1,000 Unit
3, Dari Panel PLN ke MDP-GEDUNG DEPO
Kabel TR, NYFGbY 4 x 25 mm² + BC 50 mm²
= 50,679 x 1,000 x 1,000 x 1,000 = 50,679 m1
50,679 m1
6, Dari MDP- ke PP DEPO, Panel Pembagi Penerangan
Kabel TR, NYY 4 x 10 mm² + BC 6 mm²
= 75,000 x 1,000 x 1,000 x 1,000 = 75,000 m1
75,000 m1
7, Dari MDP- ke PP.AC DEPO, Panel Pembagi AC
Kabel TR, NYY 4 x 10 mm² + BC 6 mm²
= 75,000 x 1,000 x 1,000 x 1,000 = 75,000 m1
75,000 m1
8, Instalasi titik lampu
= 122,000 x 1,000 x 1,000 x 1,000 = 122,000 titik
122,000 titik
9, Instalasi titik stop kontak
= 62,000 x 1,000 x 1,000 x 1,000 = 62,000 titik
62,000 titik
10, Instalasi titik saklar tunggal
= 21,000 x 1,000 x 1,000 x 1,000 = 21,000 titik
21,000 titik
11, Instalasi titik saklar ganda
= 18,000 x 1,000 x 1,000 x 1,000 = 18,000 titik
18,000 titik
12, Pas. Exhaust fan 20"
= 8,000 x 1,000 x 1,000 x 1,000 = 8,000 titik
8,000 titik

10 - 35
NO. URAIAN PEKERJAAN PANJANG LEBAR TINGGI JUMLAH TOTAL SAT.
1 2 3 4 5 6 3x4x5x6 7

13, Pas. Exhaust fan 75cfm


= 10,000 x 1,000 x 1,000 x 1,000 = 10,000 titik
10,000 titik
16, Lampu RMI Led 2x18 w +Acrylic
= 8,000 x 1,000 x 1,000 x 1,000 = 8,000 titik
8,000 titik
14, Lampu Downlight LED downlight 6" 7 watt
= 8,000 x 1,000 x 1,000 x 1,000 = 8,000 titik
8,000 titik
15, Lampu Downlight LED downlight 6" 13 watt
= 58,000 x 1,000 x 1,000 x 1,000 = 58,000 titik
58,000 titik
16, Lampu RMI Led 2x18 w +Acrylic
= 56,000 x 1,000 x 1,000 x 1,000 = 56,000 unit
56,000 unit
17, Pasang Penangkal Petir 1 split, 1 grounding
= 2,000 x 1,000 x 1,000 x 2,000 = 4,000 Unit
4,000 Unit
18, Pekerjaan fire alarm
Peralatan uatama
Master Control Fire Alarm ( MCFA Kap : 1 Loop )
= 1,000 x 1,000 x 1,000 x 1,000 = 1,000 unit
Anounciator panel = 1,000 x 1,000 x 1,000 x 1,000 = 1,000 unit

Kabel Loop UTP 2 Pair AWG#16 dalam konduit


= 250,000 x 1,000 x 1,000 x 1,000 = 250,000 mtr
NYA 2 x 1,5 dalam konduit PVC 20 mm
= 250,000 x 1,000 x 1,000 x 1,000 = 250,000 mtr
Pekerjaan instalasi fire alarm
Fixture
Rate off rise heat detector = 12,000 x 1,000 x 1,000 x 1,000 = 12,000 buah
Smoke detector = 15,000 x 1,000 x 1,000 x 1,000 = 15,000 buah
Indicator Lamp = 2,000 x 1,000 x 1,000 x 1,000 = 2,000 buah
Manual Push button = 2,000 x 1,000 x 1,000 x 1,000 = 2,000 buah
Alarm bell = 2,000 x 1,000 x 1,000 x 1,000 = 2,000 buah
End of line = 3,000 x 1,000 x 1,000 x 1,000 = 3,000 buah
TBFA = 1,000 x 1,000 x 1,000 x 1,000 = 1,000 buah
Instalasi
Instalasi Rate off rise heat detector ( NYA 2 x 1.5mm2 )
= 12,000 x 1,000 x 1,000 x 1,000 = 12,000 titik
Instalasi Smoke detector ( NYA 2 x 1.5mm2 )
= 15,000 x 1,000 x 1,000 x 1,000 = 15,000 titik
Instalasi Manual Push button ( NYA 2 x 1.5 mm2 )
= 2,000 x 1,000 x 1,000 x 1,000 = 2,000 titik
Instalasi Indicator lamp ( NYA 2 x 1.5 mm2)
= 2,000 x 1,000 x 1,000 x 1,000 = 2,000 titik
Instalasi Alarm bell ( NYA 2 x 1.5 mm2)
= 2,000 x 1,000 x 1,000 x 1,000 = 2,000 titik

VII. PEKERJAAN AKHIR


1, Perbaikan jalan paving existing akibat akses pekerjaan
= 1,000 x 1,000 x 1,000 x 1,000 = 1,000 ls
1,000 ls
2, Pembersihan akhir
= 1,000 x 1,000 x 1,000 x 1,000 = 1,000 ls
1,000 ls

B GEDUNG KANTOR
I. PEKERJAAN PENDAHULUAN
1, Pekerjaan Uitzet + Bowplank
= 32,000 + 42,000 x 1,000 x 2,000 = 148,000 m1
148,000 m1
II. PEKERJAAN TANAH
1, Galian tanah
PC1 180x90x45cm = 1,100 x 2,000 x 0,600 x 12,000 = 15,840 m3
PC2 180x180x45cm = 2,000 x 2,000 x 0,600 x 48,000 = 115,200 m3
131,040 m3
S1 30x60cm
As A-G = 7,100 x 0,300 x 0,600 x 7,000 = 8,946 m3
S2 25x50cm
as 1-7 = 27,600 x 0,250 x 0,500 x 6,000 = 20,700 m3

11 - 35
NO. URAIAN PEKERJAAN PANJANG LEBAR TINGGI JUMLAH TOTAL SAT.
1 2 3 4 5 6 3x4x5x6 7

As 4' = 4,600 x 0,250 x 0,500 x 4,000 = 2,300 m3


= 1,600 x 0,250 x 0,500 x 2,000 = 0,400 m3
S3 20x30cm
As 7' = 4,500 x 0,200 x 0,300 x 5,000 = 1,350 m3
= 7,000 x 0,200 x 0,300 x 1,000 = 0,420 m3
S4 15x30cm
= 2,100 x 0,150 x 0,300 x 3,000 = 0,284 m3
= 2,000 x 0,150 x 0,300 x 1,000 = 0,090 m3
296,570 m3
2, Urugan Pasir Bawah Pondasi, tbl=10cm
PC1 180x90x45cm = 1,100 x 2,000 x 0,100 x 12,000 = 2,640 m3
PC2 180x180x45cm = 2,000 x 2,000 x 0,100 x 48,000 = 19,200 m3
S1 30x60cm
As 1,2,3,4,5,6,7 = 7,100 x 0,300 x 0,100 x 7,000 = 1,491 m3
S2 25x50cm
as 1-7 = 27,600 x 0,250 x 0,100 x 6,000 = 4,140 m3
As 4' = 4,600 x 0,250 x 0,100 x 4,000 = 0,460 m3
= 1,600 x 0,250 x 0,100 x 2,000 = 0,080 m3
S3 20x30cm
As 7' = 4,500 x 0,200 x 0,100 x 5,000 = 0,450 m3
= 7,000 x 0,200 x 0,100 x 1,000 = 0,140 m3
S4 15x30cm
= 2,100 x 0,150 x 0,100 x 3,000 = 0,095 m3
= 2,000 x 0,150 x 0,100 x 1,000 = 0,030 m3
28,726 m3
3, Urugan Sirtu
teras = 9,850 x 1,440 x 0,380 x 1,000 = 5,390 m3
= 9,850 x 10,550 x 0,380 x 1,000 = 39,489 m3
kesekretariat = 9,880 x 4,860 x 0,380 x 1,000 = 18,246 m3
R, kasie = 5,020 x 2,910 x 0,380 x 1,000 = 5,551 m3
= 4,880 x 2,900 x 0,380 x 1,000 = 5,378 m3
Bendahara = 4,880 x 3,870 x 0,380 x 1,000 = 7,177 m3
R. sekretariat = 7,380 x 4,880 x 0,380 x 1,000 = 13,685 m3
= 4,880 x 2,490 x 0,380 x 1,000 = 4,617 m3
R.kadis = 7,880 x 4,880 x 0,380 x 1,000 = 14,613 m3
= 2,380 x 1,880 x 0,380 x 2,000 = 3,401 m3
teras = 2,380 x 1,740 x 0,380 x 1,000 = 1,574 m3
Lorong = 2,380 x 8,000 x 0,380 x 1,000 = 7,235 m3
Pantry = 2,380 x 2,880 x 0,380 x 1,000 = 2,605 m3
Mushola = 2,880 x 2,880 x 0,380 x 1,000 = 3,152 m3
toilet = 1,880 x 2,020 x 0,380 x 1,000 = 1,443 m3
Tangga = 5,020 x 1,880 x 0,380 x 1,000 = 3,586 m3
Lorong toilet = 5,620 x 1,880 x 0,380 x 1,000 = 4,015 m3
= 2,880 x 1,880 x 0,380 x 1,000 = 2,057 m3
G. arsip = 6,380 x 4,880 x 0,380 x 1,000 = 11,831 m3
R. Rapat = 19,880 x 7,380 x 0,380 x 1,000 = 55,751 m3
lorong = 9,880 x 4,440 x 0,380 x 1,000 = 16,670 m3
R. kabid = 4,880 x 4,880 x 0,380 x 1,000 = 9,049 m3
R. kasie = 4,880 x 4,880 x 0,380 x 1,000 = 9,049 m3
Lorong = 10,020 x 2,360 x 0,380 x 1,000 = 8,986 m3
= 6,000 x 1,920 x 0,380 x 1,000 = 4,378 m3
Patio = 6,000 x 6,000 x 0,230 x 1,000 = 8,280 m3
R.staff = 6,860 x 4,870 x 0,380 x 1,000 = 12,695 m3
R. laktasi = 2,880 x 2,380 x 0,380 x 1,000 = 2,605 m3
R.pelayanan = 2,500 x 2,880 x 0,380 x 1,000 = 2,736 m3
R, baca = 9,870 x 4,880 x 0,380 x 1,000 = 18,303 m3
Mini teater = 7,424 x 4,880 x 0,380 x 1,000 = 13,766 m3
317,313 m3
4, Urugan Pasir Bawah lantai, tbl=10cm
teras = 9,850 x 1,440 x 0,100 x 1,000 = 1,418 m3
= 9,850 x 10,550 x 0,100 x 1,000 = 10,392 m3
kesekretariat = 9,880 x 4,860 x 0,100 x 1,000 = 4,802 m3
R, kasie = 5,020 x 2,910 x 0,100 x 1,000 = 1,461 m3
= 4,880 x 2,900 x 0,100 x 1,000 = 1,415 m3
Bendahara = 4,880 x 3,870 x 0,100 x 1,000 = 1,889 m3
R. sekretariat = 7,380 x 4,880 x 0,100 x 1,000 = 3,601 m3
= 4,880 x 2,490 x 0,100 x 1,000 = 1,215 m3
R.kadis = 7,880 x 4,880 x 0,100 x 1,000 = 3,845 m3
= 2,380 x 1,880 x 0,100 x 1,000 = 0,447 m3
12 - 35
NO. URAIAN PEKERJAAN PANJANG LEBAR TINGGI JUMLAH TOTAL SAT.
1 2 3 4 5 6 3x4x5x6 7

teras = 2,380 x 1,740 x 0,100 x 1,000 = 0,414 m3


Lorong = 2,380 x 8,000 x 0,100 x 1,000 = 1,904 m3
Pantry = 2,380 x 2,880 x 0,100 x 1,000 = 0,685 m3
Mushola = 2,880 x 2,880 x 0,100 x 1,000 = 0,829 m3
toilet = 1,880 x 2,020 x 0,100 x 1,000 = 0,380 m3
Tangga = 5,020 x 1,880 x 0,100 x 1,000 = 0,944 m3
Lorong toilet = 5,620 x 1,880 x 0,100 x 1,000 = 1,057 m3
= 2,880 x 1,880 x 0,100 x 1,000 = 0,541 m3
G. arsip = 6,380 x 4,880 x 0,100 x 1,000 = 3,113 m3
R. Rapat = 19,880 x 7,380 x 0,100 x 1,000 = 14,671 m3
lorong = 9,880 x 4,440 x 0,100 x 1,000 = 4,387 m3
R. kabid = 4,880 x 4,880 x 0,100 x 1,000 = 2,381 m3
R. kasie = 4,880 x 4,880 x 0,100 x 1,000 = 2,381 m3
Lorong = 10,020 x 2,360 x 0,100 x 1,000 = 2,365 m3
= 6,000 x 1,920 x 0,100 x 1,000 = 1,152 m3
Patio = 6,000 x 6,000 x 0,100 x 1,000 = 3,600 m3
R.staff = 6,860 x 4,870 x 0,100 x 1,000 = 3,341 m3
R. laktasi = 2,880 x 2,380 x 0,100 x 1,000 = 0,685 m3
R.pelayanan = 2,500 x 2,880 x 0,100 x 1,000 = 0,720 m3
R, baca = 9,870 x 4,880 x 0,100 x 1,000 = 4,817 m3
Mini teater = 9,880 x 4,880 x 0,100 x 1,000 = 4,821 m3
85,676 m3
5, Galian Strouse Pile Ø 30 cm
PC1 180x90x45cm = 2,000 x 1,000 x 6,000 x 12,000 = 144,000 m1
PC2 180x180x45cm = 3,000 x 1,000 x 6,000 x 48,000 = 864,000 m1
1.008,000 m1

III. PEKERJAAN STRUKTUR


III. I. PEKERJAAN PONDASI
1, Rabat Lantai Kerja fc'=14.53 Mpa (K-175), tbl=5cm
PC1 180x90x45cm = 0,900 x 1,800 x 0,050 x 12,000 = 0,972 m3
PC2 180x180x45cm = 1,800 x 1,800 x 0,050 x 48,000 = 7,776 m3
S1 30x60cm
As A-G = 7,100 x 0,300 x 0,050 x 7,000 = 0,746 m3
S2 25x50cm
as 1-7 = 4,600 x 0,250 x 0,050 x 36,000 = 2,070 m3
As 4 = 4,600 x 0,250 x 0,050 x 4,000 = 0,230 m3
= 1,600 x 0,250 x 0,050 x 2,000 = 0,040 m3
As A-G = 4,600 x 0,250 x 0,050 x 24,000 = 1,380 m3
As A-E-F-G = 2,100 x 0,250 x 0,050 x 4,000 = 0,105 m3
As D = 4,600 x 0,250 x 0,050 x 3,000 = 0,173 m3
Taman = 8,600 x 0,250 x 0,050 x 2,000 = 0,215 m3
S3 20x30cm
As 1-2 / A-B = 5,450 x 0,200 x 0,050 x 1,000 = 0,055 m3
As 3 - 4 / A - B = 4,750 x 0,200 x 0,050 x 1,000 = 0,048 m3
As C - E = 9,500 x 0,200 x 0,050 x 1,000 = 0,095 m3
S4 15x30cm
As 2-3 = 2,100 x 0,150 x 0,050 x 3,000 = 0,047 m3
As 1-2 / A-B = 2,700 x 0,150 x 0,050 x 2,000 = 0,041 m3
As 1-2 / A-B = 1,700 x 0,150 x 0,050 x 1,000 = 0,013 m3
As 3 - 4 / A - B = 2,000 x 0,200 x 0,050 x 1,000 = 0,020 m3
= 14,024 m3
2, Rabat Bawah Lantai fc'=14.53 Mpa (K-175), tbl=10cm
teras = 9,850 x 1,440 x 0,100 x 1,000 = 1,418 m3
= 9,850 x 10,550 x 0,100 x 1,000 = 10,392 m3
kesekretariat = 9,880 x 4,860 x 0,100 x 1,000 = 4,802 m3
R, kasie = 5,020 x 2,910 x 0,100 x 1,000 = 1,461 m3
= 4,880 x 2,900 x 0,100 x 1,000 = 1,415 m3
Bendahara = 4,880 x 3,870 x 0,100 x 1,000 = 1,889 m3
R. sekretariat = 7,380 x 4,880 x 0,100 x 1,000 = 3,601 m3
= 4,880 x 2,490 x 0,100 x 1,000 = 1,215 m3
R.kadis = 7,880 x 4,880 x 0,100 x 1,000 = 3,845 m3
= 2,380 x 1,880 x 0,100 x 2,000 = 0,895 m3
teras = 2,380 x 1,740 x 0,100 x 1,000 = 0,414 m3
Lorong = 2,380 x 8,000 x 0,100 x 1,000 = 1,904 m3
Pantry = 2,380 x 2,880 x 0,100 x 1,000 = 0,685 m3
Mushola = 2,880 x 2,880 x 0,100 x 1,000 = 0,829 m3
13 - 35
NO. URAIAN PEKERJAAN PANJANG LEBAR TINGGI JUMLAH TOTAL SAT.
1 2 3 4 5 6 3x4x5x6 7

toilet = 1,880 x 2,020 x 0,100 x 1,000 = 0,380 m3


Tangga = 5,020 x 1,880 x 0,100 x 1,000 = 0,944 m3
Lorong toilet = 5,620 x 1,880 x 0,100 x 1,000 = 1,057 m3
= 2,880 x 1,880 x 0,100 x 1,000 = 0,541 m3
G. arsip = 6,380 x 4,880 x 0,100 x 1,000 = 3,113 m3
R. Rapat = 19,880 x 7,380 x 0,100 x 1,000 = 14,671 m3
lorong = 9,880 x 4,440 x 0,100 x 1,000 = 4,387 m3
R. kabid = 4,880 x 4,880 x 0,100 x 1,000 = 2,381 m3
R. kasie = 4,880 x 4,880 x 0,100 x 1,000 = 2,381 m3
Lorong = 10,020 x 2,360 x 0,100 x 1,000 = 2,365 m3
= 6,000 x 1,920 x 0,100 x 1,000 = 1,152 m3
Patio = 6,000 x 6,000 x 0,100 x 1,000 = 3,600 m3
R.staff = 6,860 x 4,870 x 0,100 x 1,000 = 3,341 m3
R. laktasi = 2,880 x 2,380 x 0,100 x 1,000 = 0,685 m3
R.pelayanan = 2,500 x 2,880 x 0,100 x 1,000 = 0,720 m3
R, baca = 9,870 x 4,880 x 0,100 x 1,000 = 4,817 m3
Mini teater = 7,424 x 4,880 x 0,100 x 1,000 = 3,623 m3
84,925 m3
3, Beton Pile Caps fc' = 20,75 MPa (K-250)
PC1 180x90x45cm
= 0,900 x 1,800 x 0,450 x 12,000 = 8,748 m3
8,748 m3

PC2 180x180x45cm
= 0,900 x 1,800 x 0,450 x 48,000 = 34,992 m3
34,992 m3
4, Beton Strouse Pile Ø 30 cm, fc’ = 20.75 MPa (K-250)
PC1 180x90x45cm = 2,000 x 0,071 x 6,000 x 12,000 = 10,174 m3
PC2 180x180x45cm = 3,000 x 0,071 x 6,000 x 48,000 = 61,042 m3
71,215 m3
5, Beton Sloof fc' = 20,75 MPa (K-250)
S1 30x60cm
As A-G = 7,100 x 0,300 x 0,600 x 7,000 = 8,946 m3
S2 25x50cm
as 1-7 = 4,600 x 0,250 x 0,500 x 36,000 = 20,700 m3
As 4 = 4,880 x 0,250 x 0,500 x 4,000 = 2,440 m3
= 1,600 x 0,250 x 0,500 x 2,000 = 0,400 m3
As A-G = 4,600 x 0,250 x 0,500 x 24,000 = 13,800 m3
As A-E-F-G = 2,100 x 0,250 x 0,500 x 4,000 = 1,050 m3
As D = 4,600 x 0,250 x 0,500 x 2,000 = 1,150 m3
Taman = 8,600 x 0,250 x 0,500 x 2,000 = 2,150 m3
41,690 m3
S3 20x30cm
As 1-2 / A-B = 5,450 x 0,200 x 0,300 x 1,000 = 0,327 m3
As 3 - 4 / A - B = 4,750 x 0,200 x 0,300 x 1,000 = 0,285 m3
As C - E = 9,500 x 0,200 x 0,300 x 1,000 = 0,570 m3
1,182 m3
S4 15x30cm
As 2-3 = 2,880 x 0,150 x 0,300 x 3,000 = 0,389 m3
As 1-2 / A-B = 2,700 x 0,150 x 0,300 x 2,000 = 0,243 m3
As 1-2 / A-B = 1,700 x 0,150 x 0,300 x 1,000 = 0,077 m3
As 3 - 4 / A - B = 2,000 x 0,200 x 0,300 x 1,000 = 0,120 m3
= 0,828 m3
III. 2. PEKERJAAN STRUKTUR LANTAI 1
1, Beton Kolom fc' = 20,75 MPa (K-250)
K1 40x40cm = 0,400 x 0,400 x 7,000 x 48,000 = 53,760 m3
53,760 m3
K2 30x30cm
= 0,300 x 0,300 x 4,700 x 12,000 = 5,076 m3
5,076 m3
2, Beton Ring balk 10x15 cm
As A = 27,600 x 1,000 x 1,000 x 2,000 = 55,200 m1
= 7,100 x 1,000 x 1,000 x 2,000 = 14,200 m1
= 4,850 x 1,000 x 1,000 x 3,000 = 14,550 m1
= 27,518 x 1,000 x 1,000 x 1,000 = 27,518 m1
As 1 = 27,518 x 1,000 x 1,000 x 2,000 = 55,036 m1
= 9,600 x 1,000 x 1,000 x 5,000 = 48,000 m1
= 2,850 x 1,000 x 1,000 x 1,000 = 2,850 m1
217,354 m1
14 - 35
NO. URAIAN PEKERJAAN PANJANG LEBAR TINGGI JUMLAH TOTAL SAT.
1 2 3 4 5 6 3x4x5x6 7

3, Beton Balok Latai 10x15 cm


Pasang Kusen PJ2 = 1,000 x 1,000 x 9,800 x 1,000 = 9,800 m1
Pasang Kusen PJ3 = 1,000 x 1,000 x 4,600 x 2,000 = 9,200 m1
Pasang Kusen PJ4 = 1,000 x 1,000 x 4,600 x 1,000 = 4,600 m1
Pasang Kusen PJ5 = 1,000 x 1,000 x 4,900 x 1,000 = 4,900 m1
Pasang Kusen PJ6 = 1,000 x 1,000 x 4,880 x 1,000 = 4,880 m1
Pasang Kusen PJ7 = 1,000 x 1,000 x 1,770 x 1,000 = 1,770 m1
Pasang Kusen P1 = 1,000 x 1,000 x 0,900 x 5,000 = 4,500 m1
Pasang Kusen P2 = 1,000 x 1,000 x 0,900 x 11,000 = 9,900 m1
Pasang Kusen P3 = 1,000 x 1,000 x 0,900 x 2,000 = 1,800 m1
Pasang Kusen J1 = 1,000 x 1,000 x 1,770 x 17,000 = 30,090 m1
Pasang Kusen J2 = 1,000 x 1,000 x 4,600 x 2,000 = 9,200 m1
Pasang Kusen J4 = 1,000 x 1,000 x 2,060 x 1,000 = 2,060 m1
Pasang Kusen J5 = 1,000 x 1,000 x 2,320 x 1,000 = 2,320 m1
95,020 m1

4, Kolom praktis 11x11 cm


= 1,000 x 6,300 x 1,000 x 54,000 = 340,200 m1
340,200 m1
III. 3. PEKERJAAN STRUKTUR LANTAI 2
1, Beton Balok fc' = 20,75 MPa (K-250)
B1 30x60 cm = 7,300 x 0,300 x 0,600 x 2,000 = 2,628 m3
= 4,600 x 0,300 x 0,600 x 2,000 = 1,656 m3
= 4,284 m3
B2 25x50 cm = 4,600 x 0,250 x 0,500 x 1,000 = 0,575 m3
= 0,575 m3
B3 15x30 cm = 2,290 x 0,150 x 0,300 x 24,000 = 2,473 m3
= 2,473 m3
2, Beton Plat lantai fc'=18.68 Mpa (K - 250), tbl=12cm
Plat Elev. +3m = 7,100 x 4,600 x 0,120 x 1,000 = 3,919 m3
Bordes = 1,900 x 1,900 x 0,120 x 1,000 = 0,433 m3
3,919 m3
3, Beton Balok Latai 10x15 cm
Kusen P2 = 1,000 x 1,000 x 0,980 x 2,000 = 1,960 m1
Kusen P3 = 1,000 x 1,000 x 0,880 x 1,000 = 0,880 m1
Kusen P5 = 1,000 x 1,000 x 0,450 x 1,000 = 0,450 m1
3,290 m1
4, Kolom praktis 11x11 cm
= 1,000 x 3,000 x 1,000 x 14,000 = 42,000 m1
42,000 m1

III. 4. PEKERJAAN STRUKTUR LANTAI ATAP


1, Beton Balok fc' = 20,75 MPa (K-250)
B1 30x60 cm
rinbalk = 7,100 x 0,300 x 0,600 x 7,000 = 8,946 m3
= 8,946 m3
B2 25x50 cm
as 1-7 = 4,600 x 0,250 x 0,500 x 36,000 = 20,700 m3
As 4 = 4,600 x 0,250 x 0,500 x 4,000 = 2,300 m3
As A-G = 4,600 x 0,250 x 0,500 x 24,000 = 13,800 m3
As A-E-F-G = 2,100 x 0,250 x 0,500 x 4,000 = 1,050 m3
As D = 4,600 x 0,250 x 0,500 x 2,000 = 1,150 m3
Taman = 5,100 x 0,250 x 0,500 x 4,000 = 2,550 m3
= 41,550 m3
B3 15x30 cm
As 2-3 = 2,100 x 0,150 x 0,300 x 3,000 = 0,284 m3
Plat Elev. +3m = 7,100 x 0,150 x 0,300 x 2,000 = 0,639 m3
= 4,600 x 0,150 x 0,300 x 2,000 = 0,414 m3
= 5,400 x 0,150 x 0,300 x 1,000 = 0,243 m3
= 2,700 x 0,150 x 0,300 x 2,000 = 0,243 m3
= 1,800 x 0,150 x 0,300 x 1,000 = 0,081 m3
= 1,904 m3
2, Beton Plat fc'=20,75 Mpa (K - 250), tbl=12cm
Plat Atas Elev. +6m = 7,280 x 1,270 x 0,120 x 1,000 = 1,109 m3
1,109 m3
3, Beton Plat lisplank fc'=20,75 Mpa (K - 250), tbl=7cm
Lisplank Plat bawah = 31,300 x 0,650 x 0,120 x 2,000 = 4,883 m3
= 30,000 x 0,650 x 0,120 x 2,000 = 4,680 m3
15 - 35
NO. URAIAN PEKERJAAN PANJANG LEBAR TINGGI JUMLAH TOTAL SAT.
1 2 3 4 5 6 3x4x5x6 7

dinding = 31,300 x 0,070 x 0,700 x 2,000 = 3,067 m3


30,000 x 0,070 x 0,700 x 2,000 = 2,940 m3
Plat Atas = 31,300 x 0,200 x 0,100 x 2,000 = 1,252 m3
28,730 x 0,200 x 0,100 x 2,000 = 1,149 m3
17,971 m3

III. 5. PEKERJAAN PENUTUP ATAP


1, Kuda Kuda WF 200.100.5,5.8
kuda-kuda = 5,650 x 21,300 x 2,000 x 4,000 = 962,760 kg
= 2,990 x 21,300 x 1,000 x 4,000 = 254,748 kg
= 5,650 x 21,300 x 2,000 x 8,000 = 1.925,520 kg
kaki atas = 0,450 x 21,300 x 2,000 x 16,000 = 306,720 kg
= 0,610 x 21,300 x 2,000 x 4,000 = 103,944 kg
Jurai dalam = 11,680 x 21,300 x 1,000 x 4,000 = 995,136 kg
Jurai luar = 7,930 x 21,300 x 1,000 x 4,000 = 675,636 kg
= 0,850 x 21,300 x 2,000 x 9,000 = 325,890 kg
= 0,850 x 21,300 x 2,000 x 9,000 = 325,890 kg
1/2 kuda-kuda = 5,650 x 21,300 x 2,000 x 4,000 = 962,760 kg
Penambahan Balok Selasar = 10,000 x 21,300 x 1,000 x 1,000 = 213,000 kg
= 6.839,004 kg

2, Penyambung WF 200.100.5,5.8
kuda-kuda = 0,400 x 21,300 x 2,000 x 16,000 = 272,640 kg
= 0,520 x 21,300 x 1,000 x 16,000 = 177,216 kg
= 0,520 x 21,300 x 1,000 x 16,000 = 177,216 kg
konsol = 0,400 x 21,300 x 1,000 x 4,000 = 34,080 kg
= 0,330 x 21,300 x 1,000 x 4,000 = 28,116 kg
= 689,268 kg
3, Gording CNP 150.65.20.2,3
Sisi dalam = 19,720 x 5,500 x 1,000 x 4,000 = 433,840 kg
= 17,810 x 5,500 x 1,000 x 4,000 = 391,820 kg
= 15,910 x 5,500 x 1,000 x 4,000 = 350,020 kg
= 14,010 x 5,500 x 1,000 x 4,000 = 308,220 kg
= 12,100 x 5,500 x 1,000 x 4,000 = 266,200 kg
= 10,540 x 5,500 x 1,000 x 4,000 = 231,880 kg
= 8,640 x 5,500 x 1,000 x 4,000 = 190,080 kg
= 6,730 x 5,500 x 1,000 x 4,000 = 148,060 kg
= 5,000 x 5,500 x 1,000 x 4,000 = 110,000 kg
sisi luar = 20,490 x 5,500 x 1,000 x 4,000 = 450,780 kg
= 22,400 x 5,500 x 1,000 x 4,000 = 492,800 kg
= 24,300 x 5,500 x 1,000 x 4,000 = 534,600 kg
= 26,210 x 5,500 x 1,000 x 4,000 = 576,620 kg
= 28,120 x 5,500 x 1,000 x 4,000 = 618,640 kg
= 30,020 x 5,500 x 1,000 x 4,000 = 660,440 kg
= 5.764,000 kg
4, Pekerjaan perakitan baja
Kuda Kuda WF 200.100.5,5.8 = 6.839,004 x 1,000 x 1,000 x 1,000 = 6.839,004 kg
Penyambung WF 200.100.5,5.8 = 689,268 x 1,000 x 1,000 x 1,000 = 689,268 kg
Gording CNP 150.65.20.2,3 = 5.764,000 x 1,000 x 1,000 x 1,000 = 5.764,000 kg
= 13.292,272 kg
5, Baja Siku L 70.70.7
penyangga gording = 0,125 x 1,000 x 7,380 x 384,0 = 354,240 kg
= 354,240 kg
6, Plat Rip/stiffner, tbl=10mm
kuda-kuda 200.100.5,5.8 = 0,130 x 0,150 x 78,500 x 54,000 = 82,661 kg
= 0,230 x 0,250 x 78,500 x 54,000 = 243,743 kg
= 326,403 kg
7, Plat Penyambung tbl=10mm
= 0,130 x 0,150 x 78,500 x 36,000 = 55,107 kg
8, Pas. angker Ø 16, panjang 40 cm
= 6,000 x 1,000 x 9,000 x 4,000 = 216,000 bh
= 6,000 x 1,000 x 2,000 x 4,000 = 48,000 bh
= 264,000 bh
9, Plat Plendes, tbl=12mm
kuda-kuda 200.100.5,5.8 = 0,150 x 0,250 x 94,200 x 40,000 = 141,300 kg
= 141,300 kg
10, Besi Track Stang dan Ikatan Angin, Ø 16
= 0,887 x 8,790 x 2,000 x 8,000 = 124,799 kg
= 124,799 kg

16 - 35
NO. URAIAN PEKERJAAN PANJANG LEBAR TINGGI JUMLAH TOTAL SAT.
1 2 3 4 5 6 3x4x5x6 7

11, Jarum Keras M-16


kuda-kuda = 1,000 x 1,000 x 1,000 x 8,000 = 8,000 bh
ikatan angin = 1,000 x 1,000 x 2,000 x 16,000 = 32,000 bh
= 40,000 bh
12, Pas. Besi Ø10 Ikatan Gording
= 0,616 x 6,030 x 4,000 x 8,000 = 118,907 kg
= 0,616 x 9,010 x 4,000 x 8,000 = 177,670 kg
= 0,616 x 6,030 x 4,000 x 8,000 = 118,907 kg
= 0,616 x 5,800 x 4,000 x 4,000 = 57,186 kg
472,669 kg
13, Mur Baut Ø 14
nok = 6,000 x 2,000 x 1,000 x 4,000 = 48,000 bh
= 6,000 x 2,000 x 1,000 x 4,000 = 48,000 bh
Kaki = 10,000 x 1,000 x 1,000 x 16,000 = 160,000 bh
= 20,000 x 1,000 x 1,000 x 16,000 = 320,000 bh
= 10,000 x 1,000 x 1,000 x 4,000 = 40,000 bh
= 20,000 x 1,000 x 1,000 x 4,000 = 80,000 bh
Konsol = 20,000 x 1,000 x 1,000 x 4,000 = 80,000 bh
= 20,000 x 1,000 x 1,000 x 4,000 = 80,000 bh
= 856,000 bh
Baut Gording = 15,000 x 1,000 x 1,000 x 1,000 = 15,000 titik
= 12,000 x 1,000 x 1,000 x 2,000 = 24,000 titik
= 6,000 x 1,000 x 1,000 x 2,000 = 12,000 titik
= 14,000 x 1,000 x 1,000 x 2,000 = 28,000 titik
79,000 titik
Total Baut Gording = 79,000 x 4,000 x 4,000 x 1,000 = 1.264,000 bh
Belum terpasang = 17,000 x 4,000 x 4,000 x 1,000 = 272,000 bh
Total terpasang = 992,000 bh

14, Pas. Rangka atap usuk reng baja ringan


P bawah P atas Tinggi Jumlah
21,250 30,550 6,000 x 25,900 = 155,4 m2
12,000 12,000 6,000 x 12,000 = 72 m2
21,250 30,550 6,000 x 25,900 = 155,4 m2
6,000 6,000 6,000 x 6,000 = 36 m2
22,000 16,400 5,500 x 19,200 = 105,6 m2
6,000 6,000 6,000 x 6,000 = 36 m2
12,000 12,000 6,000 x 12,000 = 72 m2
16,600 17,200 6,000 x 16,900 = 101,4 m2
733,800 m2
Dikurang 10% = 660,420 m2
15, Pas. penutup atap genteng karang pilang
= 605,774 x 1,000 x 1,000 x 1,000 = 605,774 m2
= 454,284 x 1,000 x 1,000 x 1,000 = 454,284 m2
1.060,058 m2
16, Pas. Bubungan genteng karang pilang
= 20,210 x 1,000 x 1,000 x 4,000 = 80,840 m1
80,840 m1
17, Pas. Liplank 2/20 cm
= 5,019 x 1,000 x 2,000 x 4,000 = 40,151 m1
40,151 m1
18, Pas. talang datar, seng BJLS 28
= 11,680 x 1,000 x 1,000 x 4,000 = 46,720 m1
= 2,570 x 1,000 x 2,000 x 6,000 = 30,840 m1
77,560 m1
19, Pas. Ornamen bubungan atap
= 4,000 x 1,000 x 1,000 x 1,000 = 4,000 bh
4,000 bh

Pengecatan Baja
Kuda Kuda WF 200.100.5,5.8 = 0,102 x 12,000 x 2,000 x 1,000 = 2,448 m2
0,215 x 12,000 x 2,000 x 1,000 = 5,16 m2
7,608 m2
= 7,608 x 29,407 x = 224 m2

Gording CNP 150.65.20.2,3 = 0,32 x 6,000 x 2,000 x 1,000 = 3,84 m2


= 3,84 x 103,000 = 396 m2

Baja Siku L 70.70.7 = 0,28 x 6,000 x 1,000 x 1,000 = 1,68 m2


17 - 35
NO. URAIAN PEKERJAAN PANJANG LEBAR TINGGI JUMLAH TOTAL SAT.
1 2 3 4 5 6 3x4x5x6 7

= 1,68 x 9,254 = 16 m2
635 m2

18 - 35
NO. URAIAN PEKERJAAN PANJANG LEBAR TINGGI JUMLAH TOTAL SAT.
1 2 3 4 5 6 3x4x5x6 7

III. 6. PEKERJAAN STRUKTUR TANGGA


PEKERJAAN STRUKTUR TANGGA LT. 1 Ke LT. R. PENJAGA
1, Pondasi Tangga tbl=15cm, fc'=20.75 Mpa (K-250)
= 2,000 x 0,200 x 0,300 x 1,500 = 0,180 m3
0,180 m3
2, Balok Bordes 20/30, fc'=20.75 Mpa (K-250)
= 2,000 x 0,200 x 0,300 x 1,000 = 0,120 m3
0,120 m3
3, Beton Plat dan Bordes t=15cm, fc'=20.75 Mpa (K-250)
= 1,000 x 2,000 x 0,150 x 1,000 = 0,300 m3
= 2,960 x 1,000 x 0,150 x 1,000 = 0,444 m3
= 3,150 x 1,000 x 0,150 x 1,000 = 0,473 m3
1,217 m3
4, Beton Anak Tangga, fc'=20.75 Mpa (K-250)
= 0,180 x 0,300 x 1,000 x 18,000 = 0,486 m3
0,486 m3

IV. PEKERJAAN ARSITEKTURAL


IV.1. PEKERJAAN ARSITEKTURAL LANTAI 1
IV. 1.1 PEKERJAAN PASANGAN
1, Pas. Rollag Batu Bata Untuk Pijakan 1pc : 4p
= 7,290 x 0,600 x 1,000 x 2,000 = 8,748 m2
= 4,600 x 0,600 x 1,000 x 2,000 = 5,520 m2
= 2,200 x 0,600 x 1,000 x 1,000 = 1,320 m2
= 5,800 x 0,400 x 1,000 x 1,000 = 2,320 m2
17,908 m2
2, Pas. Dinding Bata Ringan tebal 10 cm dengan mortar siap pakai
as A = 4,600 x 6,000 x 1,000 x 4,000 = 110,400 m2
= 7,100 x 6,000 x 1,000 x 1,000 = 42,600 m2
= 4,850 x 6,000 x 1,000 x 1,000 = 29,100 m2
= 2,350 x 6,000 x 1,000 x 2,000 = 28,200 m2
= 2,850 x 6,000 x 1,000 x 1,000 = 17,100 m2
= 1,780 x 6,000 x 1,000 x 1,000 = 10,680 m2
as B = 4,600 x 6,000 x 1,000 x 2,000 = 55,200 m2
= 7,100 x 6,000 x 1,000 x 1,000 = 42,600 m2
= 1,050 x 6,000 x 1,000 x 1,000 = 6,300 m2
as B' = 4,600 x 6,000 x 1,000 x 1,000 = 27,600 m2
= 1,930 x 6,000 x 1,000 x 1,000 = 11,580 m2
as C = 1,280 x 6,000 x 1,000 x 1,000 = 7,680 m2
= 7,100 x 6,000 x 1,000 x 1,000 = 42,600 m2
as C' = 10,000 x 6,000 x 1,000 x 1,000 = 60,000 m2
as D = 10,000 x 6,000 x 1,000 x 1,000 = 60,000 m2
as E = 4,850 x 6,000 x 1,000 x 1,000 = 29,100 m2
as F = 2,270 x 6,000 x 1,000 x 1,000 = 13,620 m2
= 2,200 x 6,000 x 1,000 x 1,000 = 13,200 m2
= 4,850 x 6,000 x 1,000 x 1,000 = 29,100 m2
as G = 1,280 x 6,000 x 1,000 x 1,000 = 7,680 m2
= 3,270 x 6,000 x 1,000 x 1,000 = 19,620 m2
= 4,600 x 6,000 x 1,000 x 1,000 = 27,600 m2
= 2,280 x 6,000 x 1,000 x 1,000 = 13,680 m2
= 2,350 x 6,000 x 1,000 x 2,000 = 28,200 m2
= 2,270 x 6,000 x 1,000 x 1,000 = 13,620 m2
= 2,200 x 6,000 x 1,000 x 1,000 = 13,200 m2
= 7,280 x 6,000 x 1,000 x 1,000 = 43,680 m2
as 1 = 6,500 x 6,000 x 1,000 x 1,000 = 39,000 m2
= 4,600 x 6,000 x 1,000 x 6,000 = 165,600 m2
= 2,770 x 6,000 x 1,000 x 2,000 = 33,240 m2
as 2 = 2,770 x 6,000 x 1,000 x 1,000 = 16,620 m2
= 4,600 x 6,000 x 1,000 x 3,000 = 82,800 m2
as 3 = 2,770 x 6,000 x 1,000 x 1,000 = 16,620 m2
= 4,600 x 6,000 x 1,000 x 1,000 = 27,600 m2
= 5,700 x 6,000 x 1,000 x 1,000 = 34,200 m2
as 3' = 0,850 x 6,000 x 1,000 x 1,000 = 5,100 m2
= 1,780 x 6,000 x 1,000 x 1,000 = 10,680 m2
as 4 = 4,600 x 6,000 x 1,000 x 2,000 = 55,200 m2
= 2,850 x 6,000 x 1,000 x 2,000 = 34,200 m2
= 1,770 x 6,000 x 1,000 x 1,000 = 10,620 m2
A = 1.335,420 m2
pengurang
19 - 35
NO. URAIAN PEKERJAAN PANJANG LEBAR TINGGI JUMLAH TOTAL SAT.
1 2 3 4 5 6 3x4x5x6 7

p1 = 2,240 x 1,480 x 1,000 x 6,000 = 19,891 m2


p2 = 2,210 x 1,960 x 1,000 x 5,000 = 21,658 m2
p3 = 2,240 x 0,880 x 2,000 x 24,000 = 94,618 m2
P4 = 2,250 x 0,960 x 1,000 x 29,000 = 62,640 m2
J1 = 1,100 x 2,470 x 1,000 x 3,000 = 8,151 m2
B = 206,958 m2
A-B= 1.128,462 m2
3, Acian Dinding
Acian = 1.128,462 x 1,000 x 2,000 x 1,000 = 2.256,924 m2
2.256,924 m2
4, Benangan Dinding
Atap = 20,150 x 1,000 x 2,000 x 2,000 = 80,600 m1
= 48,200 x 1,000 x 2,000 x 2,000 = 192,800 m1
P1 = 4,480 + 1,400 x 2,000 x 5,000 = 58,800 m1
P2 = 4,420 + 1,960 x 2,000 x 4,000 = 51,040 m1
P3 = 4,480 + 0,880 x 2,000 x 25,000 = 268,000 m1
P4 = 4,500 + 0,960 x 2,000 x 21,000 = 229,320 m1
J1 = 2,200 + 4,940 x 2,000 x 16,000 = 228,480 m1
1.109,040 m1
5, Benangan Beton
Kolom = 6,000 x 1,000 x 4,000 x 60,000 = 1.440,000 m1
1.440,000 m1
6, Pas. GRC timbul tebal 3cm
jendela = 2,420 x 0,080 x 3,000 x 24,000 = 13,939 m2
13,939 m2
7, Pas. GRC tebal 2cm
= 4,000 x 2,100 x 1,000 x 3,000 = 25,200 m2
25,200 m2
8, Pas. partisi rangka metal stud penutup kalsipart 8mm double
type 1 = 4,990 x 4,000 x 1,000 x 4,000 = 79,840 m2
type 2 = 4,600 x 4,000 x 1,000 x 1,000 = 18,400 m2
type 3 = 4,600 x 4,000 x 1,000 x 1,000 = 18,400 m2
type 4 = 4,600 x 4,000 x 1,000 x 1,000 = 18,400 m2
type 5 = 4,880 x 4,000 x 1,000 x 1,000 = 19,520 m2
type 6 = 5,120 x 4,000 x 1,000 x 1,000 = 20,480 m2
type 7 = 4,600 x 4,000 x 1,000 x 1,000 = 18,400 m2
type 8 = 4,600 x 4,000 x 1,000 x 2,000 = 36,800 m2
type 9 = 4,470 x 4,000 x 1,000 x 1,000 = 17,880 m2
type 10 = 1,350 x 4,000 x 1,000 x 1,000 = 5,400 m2
253,520 m2

IV. 1.2 PEKERJAAN KUSEN


1, Pasang Kusen PJ1 2,000 unit
2, Pasang Kusen PJ2 1,000 unit
3, Pasang Kusen PJ3 2,000 unit
4, Pasang Kusen PJ4 2,000 unit
5, Pasang Kusen PJ5 1,000 unit
6, Pasang Kusen PJ6 1,000 unit
7, Pasang Kusen PJ7 1,000 unit
8, Pasang Kusen P1 14,000 unit
9, Pasang Kusen P2 11,000 unit
10, Pasang Kusen P3 4,000 unit
11, Pasang Kusen P4 1,000 unit
12, Pasang Kusen P5 1,000 unit
13, Pasang Kusen J1 17,000 unit
14, Pasang Kusen J2 1,000 unit
15, Pasang Kusen J3 1,000 unit
16, Pasang Kusen J4 1,000 unit
17, Pasang Kusen J5 1,000 unit
18, Pasang Kusen J6 25,000 unit
19, Pasang Kusen J7 2,000 unit

1, Pasang Kusen PJ1


Pas. Kusen Alluminium 4"
Vertikal = 3,960 x 1,000 x 1,000 x 6,000 = 23,760 m1
= 1,120 x 1,000 x 1,000 x 2,000 = 2,240 m1
horizontal = 6,880 x 1,000 x 1,000 x 1,000 = 6,880 m1
= 2,850 x 1,000 x 1,000 x 1,000 = 2,850 m1
= 0,950 x 1,000 x 1,000 x 12,000 = 11,400 m1
20 - 35
NO. URAIAN PEKERJAAN PANJANG LEBAR TINGGI JUMLAH TOTAL SAT.
1 2 3 4 5 6 3x4x5x6 7

47,130 m1
Pas. Kaca Mati tbl=8mm
= 1,840 x 0,970 x 1,000 x 4,000 = 7,139 m2
= 1,640 x 0,970 x 1,000 x 4,000 = 6,363 m2
= 0,420 x 0,970 x 1,000 x 4,000 = 1,630 m2
= 1,140 x 0,940 x 1,000 x 3,000 = 3,215 m2
18,347 m2
Pas. Selimar Alluminium
Vertikal = 0,950 x 2,000 x 1,000 x 4,000 = 7,600 m1
horizontal = 0,280 x 2,000 x 1,000 x 4,000 = 2,240 m1
9,840 m1
Pas. Friction stay 6"
= 4,000 x 1,000 x 1,000 x 1,000 = 4,000 set
4,000 set
Pas. Handle casement
= 8,000 x 1,000 x 1,000 x 1,000 = 8,000 bh
8,000 bh
Kaca Tempered Glass 12mm
= 1,150 x 2,510 x 1,000 x 2,000 = 5,773 m2
5,773 m2
Bottom patch lock + cylinder US.10
= 1,000 x 1,000 x 1,000 x 2,000 = 2,000 bh
2,000 bh
Bottom patch fitting PT.10
= 1,000 x 1,000 x 1,000 x 2,000 = 2,000 bh
2,000 bh
Top patch fitting PT.20
= 1,000 x 1,000 x 1,000 x 2,000 = 2,000 set
2,000 set
Floor hinges
= 1,000 x 1,000 x 1,000 x 2,000 = 2,000 set
2,000 set
Pull handle
= 1,000 x 1,000 x 1,000 x 2,000 = 2,000 bh
2,000 bh
Pas. Granit
= 0,300 x 4,000 x 1,000 x 2,000 = 2,400 bh
2,400 bh
Pasang Kusen PJ2
Pas. Kusen Alluminium 4"
Vertikal = 3,960 x 1,000 x 1,000 x 10,000 = 39,600 m1
= 1,820 x 1,000 x 1,000 x 2,000 = 3,640 m1
horizontal = 9,880 x 1,000 x 1,000 x 1,000 = 9,880 m1
= 0,700 x 1,000 x 1,000 x 2,000 = 1,400 m1
= 0,760 x 1,000 x 1,000 x 2,000 = 1,520 m1
= 0,880 x 1,000 x 1,000 x 4,000 = 3,520 m1
= 1,010 x 1,000 x 1,000 x 2,000 = 2,020 m1
= 0,950 x 1,000 x 1,000 x 1,000 = 0,950 m1
62,530 m1
Pas. Kaca Mati tbl=8mm
= 0,720 x 1,840 x 1,000 x 2,000 = 2,650 m2
= 0,780 x 1,840 x 1,000 x 2,000 = 2,870 m2
= 0,900 x 1,840 x 1,000 x 4,000 = 6,624 m2
= 1,030 x 1,840 x 1,000 x 2,000 = 3,790 m2
= 0,970 x 1,840 x 1,000 x 1,000 = 1,785 m2
= 0,720 x 1,640 x 1,000 x 2,000 = 2,362 m2
= 0,780 x 1,640 x 1,000 x 2,000 = 2,558 m2
= 1,030 x 1,640 x 1,000 x 2,000 = 3,378 m2
= 0,970 x 1,640 x 1,000 x 1,000 = 1,591 m2
= 0,720 x 0,420 x 1,000 x 2,000 = 0,605 m2
= 0,780 x 0,420 x 1,000 x 2,000 = 0,655 m2
= 1,030 x 0,420 x 1,000 x 2,000 = 0,865 m2
= 0,970 x 0,420 x 1,000 x 1,000 = 0,407 m2
pintu = 1,960 x 0,760 x 1,000 x 4,000 = 5,958 m2
36,099 m2
Pas. Selimar Alluminium (Jendela)
Vertikal = 0,730 x 2,000 x 1,000 x 4,000 = 5,840 m1
= 0,990 x 2,000 x 1,000 x 3,000 = 5,940 m1
horizontal = 0,280 x 2,000 x 1,000 x 4,000 = 2,240 m1
21 - 35
NO. URAIAN PEKERJAAN PANJANG LEBAR TINGGI JUMLAH TOTAL SAT.
1 2 3 4 5 6 3x4x5x6 7

= 0,280 x 2,000 x 1,000 x 3,000 = 1,680 m1


15,700 m1
Pas. Friction stay 6"
= 7,000 x 1,000 x 1,000 x 1,000 = 7,000 set
7,000 set
Pas. Handle casement
= 7,000 x 1,000 x 1,000 x 2,000 = 14,000 bh
14,000 bh
Pas. Selimar Alluminium (Pintu)
Vertikal = 2,100 x 4,000 x 1,000 x 2,000 = 16,800 m1
horizontal = 0,740 x 4,000 x 1,000 x 2,000 = 5,920 m1
22,720 m1
Pas. Engsel Kuningan Daun Pintu
pintu = 1,500 x 1,000 x 1,000 x 4,000 = 6,000 set
6,000 set
Pas. Kunci 2X putar
= 1,000 x 1,000 x 1,000 x 2,000 = 2,000 set
2,000 set

Pasang Kusen PJ3


Pas. Kusen Alluminium 4"
Vertikal = 3,960 x 1,000 x 1,000 x 5,000 = 19,800 m1
= 1,820 x 1,000 x 1,000 x 1,000 = 1,820 m1
horizontal = 4,600 x 1,000 x 1,000 x 1,000 = 4,600 m1
= 0,870 x 1,000 x 1,000 x 9,000 = 7,830 m1
= 0,880 x 1,000 x 1,000 x 2,000 = 1,760 m1
35,810 m1
Pas. Kaca Mati tbl=8mm
= 0,890 x 1,840 x 1,000 x 3,000 = 4,913 m2
= 0,900 x 1,840 x 1,000 x 2,000 = 3,312 m2
= 0,890 x 1,640 x 1,000 x 3,000 = 4,379 m2
= 0,890 x 0,420 x 1,000 x 3,000 = 1,121 m2
13,725 m2
Pas. Selimar Alluminium (Jendela)
Vertikal = 0,870 x 2,000 x 1,000 x 3,000 = 5,220 m1
horizontal = 0,280 x 2,000 x 1,000 x 3,000 = 1,680 m1
6,900 m1
Pas. Friction stay 6"
= 3,000 x 1,000 x 1,000 x 1,000 = 3,000 set
3,000 set
Pas. Handle casement
= 3,000 x 1,000 x 1,000 x 2,000 = 6,000 bh
6,000 bh
Pas. Selimar Alluminium (Pintu)
Vertikal = 2,100 x 2,000 x 1,000 x 2,000 = 8,400 m1
horizontal = 0,740 x 2,000 x 1,000 x 2,000 = 2,960 m1
11,360 m1
Pas. Engsel Kuningan Daun Pintu
= 1,500 x 1,000 x 1,000 x 2,000 = 3,000 set
3,000 set
Pas. Kunci 2X putar
= 1,000 x 1,000 x 1,000 x 1,000 = 1,000 set
1,000 set
Pasang Kusen PJ4
Pas. Kusen Alluminium 4"
Vertikal = 3,960 x 1,000 x 1,000 x 6,000 = 23,760 m1
horizontal = 4,600 x 1,000 x 1,000 x 1,000 = 4,600 m1
= 1,170 x 1,000 x 1,000 x 12,000 = 14,040 m1
= 0,900 x 1,000 x 1,000 x 1,000 = 0,900 m1
43,300 m1
Pas. Kaca Mati tbl=8mm
= 1,190 x 1,840 x 1,000 x 4,000 = 8,758 m2
= 0,920 x 1,840 x 1,000 x 1,000 = 1,693 m2
= 1,190 x 1,640 x 1,000 x 4,000 = 7,806 m2
= 1,190 x 0,420 x 1,000 x 4,000 = 1,999 m2
20,257 m2
Pas. Selimar Alluminium (Jendela)
Vertikal = 0,870 x 2,000 x 1,000 x 4,000 = 6,960 m1
horizontal = 0,280 x 2,000 x 1,000 x 4,000 = 2,240 m1
22 - 35
NO. URAIAN PEKERJAAN PANJANG LEBAR TINGGI JUMLAH TOTAL SAT.
1 2 3 4 5 6 3x4x5x6 7

9,200 m1
Pas. Friction stay 6"
= 4,000 x 1,000 x 1,000 x 1,000 = 4,000 set
4,000 set
Pas. Handle casement
= 4,000 x 1,000 x 1,000 x 1,000 = 4,000 bh
4,000 bh
Pas. Selimar Alluminium (Pintu)
Vertikal = 2,100 x 2,000 x 1,000 x 1,000 = 4,200 m1
horizontal = 0,740 x 2,000 x 1,000 x 1,000 = 1,480 m1
5,680 m1

Pas. Engsel Kuningan Daun Pintu


= 1,500 x 1,000 x 1,000 x 1,000 = 1,500 set
1,500 set
Pas. Kunci 2X putar
= 1,000 x 1,000 x 1,000 x 1,000 = 1,000 set
1,000 set

Pasang Kusen PJ5


Pas. Kusen Alluminium 4"
Vertikal = 3,960 x 1,000 x 1,000 x 6,000 = 23,760 m1
horizontal = 4,880 x 1,000 x 1,000 x 1,000 = 4,880 m1
= 0,940 x 1,000 x 1,000 x 12,000 = 11,280 m1
= 0,900 x 1,000 x 1,000 x 1,000 = 0,900 m1
40,820 m1
Pas. Kaca Mati tbl=8mm
= 0,960 x 1,840 x 1,000 x 4,000 = 7,066 m2
= 0,920 x 1,840 x 1,000 x 1,000 = 1,693 m2
= 0,960 x 1,640 x 1,000 x 4,000 = 6,298 m2
= 0,960 x 0,420 x 1,000 x 4,000 = 1,613 m2
16,669 m2
Pas. Selimar Alluminium (Jendela)
Vertikal = 0,940 x 2,000 x 1,000 x 4,000 = 7,520 m1
horizontal = 0,280 x 2,000 x 1,000 x 4,000 = 2,240 m1
9,760 m1
Pas. Friction stay 6"
= 4,000 x 1,000 x 1,000 x 1,000 = 4,000 set
4,000 set
Pas. Handle casement
= 4,000 x 1,000 x 1,000 x 1,000 = 4,000 bh
4,000 bh
Pas. Selimar Alluminium (Pintu)
Vertikal = 1,940 x 2,000 x 1,000 x 1,000 = 3,880 m1
horizontal = 0,900 x 2,000 x 1,000 x 1,000 = 1,800 m1
5,680 m1
Pas. Engsel Kuningan Daun Pintu
= 1,500 x 1,000 x 1,000 x 1,000 = 1,500 set
1,500 set
Pas. Kunci 2X putar
= 1,000 x 1,000 x 1,000 x 1,000 = 1,000 set
1,000 set
Pasang Kusen PJ6
Pas. Kusen Alluminium 4"
Vertikal = 3,960 x 1,000 x 1,000 x 5,000 = 19,800 m1
horizontal = 3,880 x 1,000 x 1,000 x 1,000 = 3,880 m1
= 0,930 x 1,000 x 1,000 x 9,000 = 8,370 m1
= 0,900 x 1,000 x 1,000 x 1,000 = 0,900 m1
32,950 m1
Pas. Kaca Mati tbl=8mm
= 0,950 x 1,840 x 1,000 x 3,000 = 5,244 m2
= 0,920 x 1,840 x 1,000 x 1,000 = 1,693 m2
= 0,950 x 1,640 x 1,000 x 3,000 = 4,674 m2
= 0,950 x 0,420 x 1,000 x 3,000 = 1,197 m2
12,808 m2

Pas. Selimar Alluminium (Jendela)


23 - 35
NO. URAIAN PEKERJAAN PANJANG LEBAR TINGGI JUMLAH TOTAL SAT.
1 2 3 4 5 6 3x4x5x6 7

Vertikal = 0,930 x 2,000 x 1,000 x 3,000 = 5,580 m1


horizontal = 0,280 x 2,000 x 1,000 x 3,000 = 1,680 m1
7,260 m1
Pas. Friction stay 6"
= 3,000 x 1,000 x 1,000 x 1,000 = 3,000 set
3,000 set
Pas. Handle casement
= 3,000 x 1,000 x 1,000 x 1,000 = 3,000 bh
3,000 bh
Pas. Selimar Alluminium (Pintu)
Vertikal = 1,940 x 2,000 x 1,000 x 1,000 = 3,880 m1
horizontal = 0,900 x 2,000 x 1,000 x 1,000 = 1,800 m1
5,680 m1
Pas. Engsel Kuningan Daun Pintu
= 1,500 x 1,000 x 1,000 x 1,000 = 1,500 set
1,500 set
Pas. Kunci 2X putar
= 1,000 x 1,000 x 1,000 x 1,000 = 1,000 set
1,000 set
Pasang Kusen PJ7
Pas. Kusen Alluminium 4"
Vertikal = 3,960 x 1,000 x 1,000 x 6,000 = 23,760 m1
horizontal = 1,740 x 1,000 x 1,000 x 1,000 = 1,740 m1
= 0,900 x 1,000 x 1,000 x 1,000 = 0,900 m1
= 0,720 x 1,000 x 1,000 x 3,000 = 2,160 m1
28,560 m1
Pas. Kaca Mati tbl=8mm
= 0,740 x 1,840 x 1,000 x 1,000 = 1,362 m2
= 0,920 x 1,840 x 1,000 x 1,000 = 1,693 m2
= 0,740 x 1,640 x 1,000 x 1,000 = 1,214 m2
= 0,740 x 0,420 x 1,000 x 1,000 = 0,311 m2
4,579 m2
Pas. Selimar Alluminium (Jendela)
Vertikal = 0,720 x 2,000 x 1,000 x 1,000 = 1,440 m1
horizontal = 0,280 x 2,000 x 1,000 x 1,000 = 0,560 m1
2,000 m1
Pas. Friction stay 6"
= 1,000 x 1,000 x 1,000 x 1,000 = 1,000 set
1,000 set
Pas. Handle casement
= 2,000 x 1,000 x 1,000 x 1,000 = 2,000 bh
2,000 bh
Pas. Selimar Alluminium (Pintu)
Vertikal = 1,940 x 2,000 x 1,000 x 1,000 = 3,880 m1
horizontal = 0,900 x 2,000 x 1,000 x 1,000 = 1,800 m1
5,680 m1
Pas. Engsel Kuningan Daun Pintu
= 1,500 x 1,000 x 1,000 x 1,000 = 1,500 set
1,500 set
Pas. Kunci 2X putar
= 1,000 x 1,000 x 1,000 x 1,000 = 1,000 set
1,000 set

Pasang Kusen P1
Pas. Kusen Alluminium 4"
Vertikal = 2,100 x 1,000 x 1,000 x 2,000 = 4,200 m1
horizontal = 1,800 x 1,000 x 1,000 x 1,000 = 1,800 m1
6,000 m1
Pas. Daun Pintu Solid Wood Plastic Composite
= 2,100 x 0,900 x 1,000 x 2,000 = 3,780 m2
3,780 m2
Pas. Engsel Kuningan Daun Pintu
= 1,500 x 1,000 x 1,000 x 2,000 = 3,000 set
3,000 set
Pas. Kunci 2X putar
= 1,000 x 1,000 x 1,000 x 1,000 = 1,000 set
1,000 set
24 - 35
NO. URAIAN PEKERJAAN PANJANG LEBAR TINGGI JUMLAH TOTAL SAT.
1 2 3 4 5 6 3x4x5x6 7

Cat melamin duco


= 2,100 x 0,900 x 2,000 x 2,000 = 7,560 m2
7,560 m2
Pas. Kunci selot
= 2,000 x 1,000 x 1,000 x 1,000 = 2,000 bh
2,000 bh

Pasang Kusen P2
Pas. Kusen Alluminium 4"
Vertikal = 2,100 x 1,000 x 1,000 x 2,000 = 4,200 m1
horizontal = 0,900 x 1,000 x 1,000 x 1,000 = 0,900 m1
5,100 m1
Pas. Daun Pintu Solid Wood Plastic Composite
= 2,100 x 0,900 x 1,000 x 1,000 = 1,890 m2
1,890 m2
Pas. Engsel Kuningan Daun Pintu
= 1,500 x 1,000 x 1,000 x 1,000 = 1,500 set
1,500 set
Pas. Kunci 2X putar
= 1,000 x 1,000 x 1,000 x 1,000 = 1,000 set
1,000 set
Cat melamin duco
= 2,100 x 0,900 x 2,000 x 1,000 = 3,780 m2
3,780 m2
Pas. Kunci selot
= 2,000 x 1,000 x 1,000 x 1,000 = 2,000 bh
2,000 bh
Pasang Kusen P3
Pas. Kusen Alluminium 4"
Vertikal = 2,100 x 1,000 x 1,000 x 2,000 = 4,200 m1
horizontal = 0,800 x 1,000 x 1,000 x 1,000 = 0,800 m1
5,000 m1
Pas. Daun Pintu Solid Wood Plastic Composite
= 2,100 x 0,800 x 1,000 x 1,000 = 1,680 m2
1,680 m2
Pas. Engsel Kuningan Daun Pintu
= 1,500 x 1,000 x 1,000 x 1,000 = 1,500 set
1,500 set
Pas. Kunci 2X putar
= 1,000 x 1,000 x 1,000 x 1,000 = 1,000 set
1,000 set

Cat melamin duco


= 2,100 x 0,800 x 2,000 x 1,000 = 3,360 m2
3,360 m2
Pas. Kunci selot
= 1,000 x 1,000 x 1,000 x 1,000 = 1,000 bh
1,000 bh
Pasang Kusen P4
Pas. Kusen Alluminium 4"
Vertikal = 2,100 x 1,000 x 1,000 x 2,000 = 4,200 m1
horizontal = 1,000 x 1,000 x 1,000 x 1,000 = 1,000 m1
5,200 m1
Pas. Daun Pintu Solid Wood Plastic Composite
= 2,100 x 0,900 x 1,000 x 1,000 = 1,890 m2
1,890 m2
Pas. Engsel Kuningan Daun Pintu
= 1,500 x 1,000 x 1,000 x 1,000 = 1,500 set
1,500 set
Pas. Kunci 2X putar
= 1,000 x 1,000 x 1,000 x 1,000 = 1,000 set
1,000 set
Cat melamin duco
= 2,100 x 0,900 x 2,000 x 1,000 = 3,780 m2
3,780 m2
Pas. Kunci selot
= 1,000 x 1,000 x 1,000 x 1,000 = 1,000 bh
1,000 bh

25 - 35
NO. URAIAN PEKERJAAN PANJANG LEBAR TINGGI JUMLAH TOTAL SAT.
1 2 3 4 5 6 3x4x5x6 7

Pasang Kusen P5
Pas. Kusen Alluminium 4"
Vertikal = 1,150 x 1,000 x 1,000 x 2,000 = 2,300 m1
horizontal = 0,430 x 1,000 x 1,000 x 2,000 = 0,860 m1
3,160 m1
Pas. Daun Pintu Solid Wood Plastic Composite
= 1,070 x 0,430 x 1,000 x 1,000 = 0,460 m2
0,460 m2
Pas. Engsel Kuningan Daun Pintu
= 1,500 x 1,000 x 1,000 x 1,000 = 1,500 set
1,500 set
Pas. Kunci 2X putar
= 1,000 x 1,000 x 1,000 x 1,000 = 1,000 set
Cat melamin duco
= 1,070 x 0,430 x 2,000 x 1,000 = 0,920 m2
0,920 m2
Pas. Kunci selot
= 1,000 x 1,000 x 1,000 x 1,000 = 1,000 bh
1,000 bh

Pasang Kusen PB1


Pas. Kusen Baja, ex. Fabrikan
Vertikal = 2,760 x 1,000 x 1,000 x 2,000 = 5,520 m1
horizontal = 1,790 x 1,000 x 1,000 x 1,000 = 1,790 m1
7,310 m1
Pas. Daun Pintu Besi, ex. Fabrikan
= 2,620 x 1,120 x 1,000 x 2,000 = 5,869 m2
5,869 m2

Pas. Engsel besi


= 1,500 x 1,000 x 1,000 x 2,000 = 3,000 set
3,000 set
Pas. Kunci 2X putar
= 1,000 x 1,000 x 1,000 x 1,000 = 1,000 set
Cat melamin duco
= 2,620 x 1,120 x 2,000 x 1,000 = 5,869 m2
5,869 m2
Pas. Kunci selot
= 2,000 x 1,000 x 2,000 x 1,000 = 4,000 bh
4,000 bh
Pasang Kusen J1
Pas. Kusen Alluminium 4"
Vertikal = 0,700 x 3,000 x 1,000 x 6,000 = 12,600 m1
horizontal = 0,550 x 3,000 x 1,000 x 6,000 = 9,900 m1
22,500 m1
Pas. Kaca Mati tbl=6mm
= 0,250 x 0,290 x 4,000 x 6,000 = 1,740 m2
1,740 m2
1 unit Pasang Kusen J2
Pas. Kusen Alluminium 4"
Vertikal = 4,000 x 1,000 x 1,000 x 4,000 = 16,000 m1
horizontal = 1,040 x 4,000 x 1,000 x 3,000 = 12,480 m1
28,480 m1
Pas. Kaca Mati tbl=8mm
= 1,620 x 1,040 x 1,000 x 3,000 = 5,054 m2
= 1,820 x 1,040 x 4,000 x 3,000 = 22,714 m2
= 0,400 x 1,040 x 4,000 x 3,000 = 4,992 m2
32,760 m2

1 unit Pasang Kusen J3


Pas. Kusen Alluminium 4"
Vertikal = 4,000 x 1,000 x 1,000 x 5,000 = 20,000 m1
horizontal = 1,120 x 4,000 x 1,000 x 4,000 = 17,920 m1
37,920 m1
Pas. Kaca Mati tbl=8mm
= 1,620 x 1,120 x 1,000 x 4,000 = 7,258 m2
= 0,400 x 1,120 x 4,000 x 4,000 = 7,168 m2
= 1,820 x 1,120 x 4,000 x 4,000 = 32,614 m2
47,040 m2
26 - 35
NO. URAIAN PEKERJAAN PANJANG LEBAR TINGGI JUMLAH TOTAL SAT.
1 2 3 4 5 6 3x4x5x6 7

1 unit Pasang Kusen J4


Pas. Kusen Alluminium 4"
Vertikal = 4,000 x 1,000 x 1,000 x 3,000 = 12,000 m1
horizontal = 1,060 x 4,000 x 1,000 x 2,000 = 8,480 m1
20,480 m1
Pas. Kaca Mati tbl=8mm
= 1,620 x 1,060 x 1,000 x 2,000 = 3,434 m2
= 0,400 x 1,060 x 4,000 x 2,000 = 3,392 m2
= 0,250 x 1,060 x 4,000 x 2,000 = 2,120 m2
8,946 m2

1 unit Pasang Kusen J5


Pas. Kusen Alluminium 4"
Vertikal = 4,000 x 1,000 x 1,000 x 3,000 = 12,000 m1
horizontal = 0,990 x 4,000 x 1,000 x 2,000 = 7,920 m1
19,920 m1
Pas. Kaca Mati tbl=8mm
= 1,620 x 0,990 x 1,000 x 2,000 = 3,208 m2
= 0,400 x 0,990 x 1,000 x 2,000 = 0,792 m2
= 1,820 x 0,990 x 1,000 x 2,000 = 3,604 m2
7,603 m2
1 unit Pasang J6
Pas. Kusen Alluminium 4"
Vertikal = 0,700 x 3,000 x 1,000 x 6,000 = 12,600 m1
horizontal = 0,550 x 3,000 x 1,000 x 6,000 = 9,900 m1
22,500 m1
Loover alumunium
= 0,250 x 0,290 x 4,000 x 6,000 = 1,740 m2
1,740 m2

1 unit Pasang J7
Pas. Kusen Alluminium 4"
Vertikal = 0,830 x 1,000 x 1,000 x 2,000 = 1,660 m1
horizontal = 0,800 x 1,000 x 1,000 x 2,000 = 1,600 m1
3,260 m1
Loover alumunium
= 0,700 x 0,700 x 1,000 x 1,000 = 0,490 m2
0,490 m2
IV. 1.3 PEKERJAAN PENUTUP LANTAI
1, Pas. Granit Tile 60x60cm Polished
kesekretariat = 9,880 x 4,860 x 1,000 x 1,000 = 48,017 m2
R, kasie = 5,020 x 2,910 x 1,000 x 1,000 = 14,608 m2
= 4,880 x 2,900 x 1,000 x 1,000 = 14,152 m2
Bendahara = 4,880 x 3,870 x 1,000 x 1,000 = 18,886 m2
R. sekretariat = 7,380 x 4,880 x 1,000 x 1,000 = 36,014 m2
= 4,880 x 2,490 x 1,000 x 1,000 = 12,151 m2
R.kadis = 7,880 x 4,880 x 1,000 x 1,000 = 38,454 m2
= 2,380 x 1,880 x 1,000 x 2,000 = 8,949 m2
teras = 2,380 x 1,740 x 1,000 x 1,000 = 4,141 m2
Lorong = 2,380 x 8,000 x 1,000 x 1,000 = 19,040 m2
Pantry = 2,380 x 2,880 x 1,000 x 1,000 = 6,854 m2
Mushola = 2,880 x 2,880 x 1,000 x 1,000 = 8,294 m2
toilet = 1,880 x 2,020 x 1,000 x 1,000 = 3,798 m2
Tangga = 5,020 x 1,880 x 1,000 x 1,000 = 9,438 m2
Lorong toilet = 5,620 x 1,880 x 1,000 x 1,000 = 10,566 m2
= 2,880 x 1,880 x 1,000 x 1,000 = 5,414 m2
G. arsip = 6,380 x 4,880 x 1,000 x 1,000 = 31,134 m2
R. Rapat = 19,880 x 7,380 x 1,000 x 1,000 = 146,714 m2
lorong = 9,880 x 4,440 x 1,000 x 1,000 = 43,867 m2
R. kabid = 4,880 x 4,880 x 1,000 x 1,000 = 23,814 m2
R. kasie = 4,880 x 4,880 x 1,000 x 1,000 = 23,814 m2
Lorong = 10,020 x 2,360 x 1,000 x 1,000 = 23,647 m2
= 6,000 x 1,920 x 1,000 x 1,000 = 11,520 m2
Patio = 6,000 x 6,000 x 1,000 x 1,000 = 36,000 m2
27 - 35
NO. URAIAN PEKERJAAN PANJANG LEBAR TINGGI JUMLAH TOTAL SAT.
1 2 3 4 5 6 3x4x5x6 7

R.staff = 6,860 x 4,870 x 1,000 x 1,000 = 33,408 m2


R. laktasi = 2,880 x 2,380 x 1,000 x 1,000 = 6,854 m2
R.pelayanan = 2,500 x 2,880 x 1,000 x 1,000 = 7,200 m2
R, baca = 9,870 x 4,880 x 1,000 x 1,000 = 48,166 m2
Mini teater = 7,424 x 4,880 x 1,000 x 1,000 = 36,227 m2
Tangga = 0,820 x 0,200 x 22,000 x 1,000 = 3,608 m2
= 0,170 x 0,300 x 22,000 x 1,000 = 1,122 m2
= 735,874 m2
Vol Pengurang = 422,381 m2
= 313,493 m2
2, Pas. Granit Tile 60x60cm Unpolished
teras = 1,440 x 9,880 x 1,000 x 1,000 = 14,227 m2
= 7,300 x 0,200 x 1,000 x 3,000 = 4,380 m2
= 1,800 x 0,300 x 1,000 x 1,000 = 0,540 m2
= 1,800 x 0,200 x 1,000 x 2,000 = 0,720 m2
ramp = 1,500 x 2,000 x 1,000 x 2,000 = 6,000 m2
= 25,867 m2
3, Pas. Granit Tile stepnosing 10X60cm
Teras = 7,300 x 1,000 x 1,000 x 3,000 = 21,900 m1
= 1,800 x 1,000 x 1,000 x 2,000 = 3,600 m1
Tangga = 1,000 x 0,820 x 11,000 x 2,000 = 18,040 m1
= 43,540 m1
4, Pas. Keramik dinding 30x60cm
KM type 1 = 2,380 x 2,800 x 1,000 x 2,000 = 13,328 m2
= 1,890 x 2,800 x 1,000 x 2,000 = 10,584 m2
KM type 2 = 1,880 x 2,800 x 1,000 x 2,000 = 10,528 m2
= 2,020 x 2,800 x 1,000 x 2,000 = 11,312 m2
KM type 3 = 1,460 x 2,800 x 1,000 x 2,000 = 8,176 m2
= 1,380 x 2,800 x 1,000 x 2,000 = 7,728 m2
= 61,656 m2
P3 = 2,140 x 0,880 x 1,000 x 3,000 = 5,650 m2
56,006 m2
5, Pas. Keramik lantai 30x30cm unpolish
= 2,380 x 1,890 x 1,000 x 1,000 = 4,498 m2
= 1,880 x 2,020 x 1,000 x 1,000 = 3,798 m2
= 1,460 x 1,380 x 1,000 x 1,000 = 2,015 m2
10,311 m2
6, Pas. Batu alam susun sirih 10x30cm
= 30,000 x 0,500 x 1,000 x 3,000 = 45,000 m2
= 28,930 x 0,500 x 1,000 x 2,000 = 28,930 m2
= 32,200 x 0,500 x 1,000 x 1,000 = 16,100 m2
90,030 m2

IV. 1.4 PEKERJAAN PLAFOND


1, Pas. Plafond Gypsum t=9mm
kesekretariat = 9,880 x 4,860 x 1,000 x 1,000 = 48,017 m2
R, kasie = 5,020 x 2,910 x 1,000 x 1,000 = 14,608 m2
= 4,880 x 2,900 x 1,000 x 1,000 = 14,152 m2
Bendahara = 4,880 x 3,870 x 1,000 x 1,000 = 18,886 m2
R. sekretariat = 7,380 x 4,880 x 1,000 x 1,000 = 36,014 m2
= 4,880 x 2,490 x 1,000 x 1,000 = 12,151 m2
R.kadis = 7,880 x 4,880 x 1,000 x 1,000 = 38,454 m2
= 2,380 x 1,880 x 1,000 x 2,000 = 8,949 m2
teras = 2,380 x 1,740 x 1,000 x 1,000 = 4,141 m2
Lorong = 2,380 x 8,000 x 1,000 x 1,000 = 19,040 m2
Pantry = 2,380 x 2,880 x 1,000 x 1,000 = 6,854 m2
Mushola = 2,880 x 2,880 x 1,000 x 1,000 = 8,294 m2
toilet = 1,880 x 2,020 x 1,000 x 1,000 = 3,798 m2
Tangga = 5,020 x 1,880 x 1,000 x 1,000 = 9,438 m2
Lorong toilet = 5,620 x 1,880 x 1,000 x 1,000 = 10,566 m2
= 2,880 x 1,880 x 1,000 x 1,000 = 5,414 m2
G. arsip = 6,380 x 4,880 x 1,000 x 1,000 = 31,134 m2
R. Rapat = 19,880 x 7,380 x 1,000 x 1,000 = 146,714 m2
lorong = 9,880 x 4,440 x 1,000 x 1,000 = 43,867 m2
R. kabid = 4,880 x 4,880 x 1,000 x 1,000 = 23,814 m2
R. kasie = 4,880 x 4,880 x 1,000 x 1,000 = 23,814 m2
Lorong = 10,020 x 2,360 x 1,000 x 1,000 = 23,647 m2
= 6,000 x 1,920 x 1,000 x 1,000 = 11,520 m2
R.staff = 6,860 x 4,870 x 1,000 x 1,000 = 33,408 m2
28 - 35
NO. URAIAN PEKERJAAN PANJANG LEBAR TINGGI JUMLAH TOTAL SAT.
1 2 3 4 5 6 3x4x5x6 7

R. laktasi = 2,880 x 2,380 x 1,000 x 1,000 = 6,854 m2


R.pelayanan = 2,500 x 2,880 x 1,000 x 1,000 = 7,200 m2
R, baca = 9,870 x 4,880 x 1,000 x 1,000 = 48,166 m2
Mini teater = 7,424 x 4,880 x 1,000 x 1,000 = 36,227 m2
695,144 m2
2, Pas. Plafond Calsiboard t=4,5mm
teras = 2,380 x 1,740 x 1,000 x 1,000 = 4,141 m2
toilet = 1,880 x 2,020 x 1,000 x 1,000 = 3,798 m2
= 2,880 x 1,880 x 1,000 x 1,000 = 5,414 m2
13,353 m2

3, Pas. Rangka Plafond Hollow 40.40.4 & 20.40.0.4


Pas. Plafond Gypsum t=9mm = 695,144 x 1,000 x 1,000 x 1,000 = 695,144 m2
Pas. Plafond Calsiboard t=4,5mm = 13,353 x 1,000 x 1,000 x 1,000 = 13,353 m2
708,497 m2
4, Pas. List Gypsum t=7cm
kesekretariat = 9,880 + 4,860 x 2,000 x 1,000 = 29,480 m1
R, kasie = 5,020 + 2,910 x 2,000 x 1,000 = 15,860 m1
= 4,880 + 2,900 x 2,000 x 1,000 = 15,560 m1
Bendahara = 4,880 + 3,870 x 2,000 x 1,000 = 17,500 m1
R. sekretariat = 7,380 + 4,880 x 2,000 x 1,000 = 24,520 m1
= 4,880 + 2,490 x 2,000 x 1,000 = 14,740 m1
R.kadis = 7,880 + 4,880 x 2,000 x 1,000 = 25,520 m1
= 2,380 + 1,880 x 2,000 x 2,000 = 17,040 m1
teras = 2,380 + 1,740 x 2,000 x 1,000 = 8,240 m1
Lorong = 2,380 + 8,000 x 2,000 x 1,000 = 20,760 m1
Pantry = 2,380 + 2,880 x 2,000 x 1,000 = 10,520 m1
Mushola = 2,880 + 2,880 x 2,000 x 1,000 = 11,520 m1
toilet = 1,880 + 2,020 x 2,000 x 1,000 = 7,800 m1
Tangga = 5,020 + 1,880 x 2,000 x 1,000 = 13,800 m1
Lorong toilet = 5,620 + 1,880 x 2,000 x 1,000 = 15,000 m1
= 2,880 + 1,880 x 2,000 x 1,000 = 9,520 m1
G. arsip = 6,380 + 4,880 x 2,000 x 1,000 = 22,520 m1
R. Rapat = 19,880 + 7,380 x 2,000 x 1,000 = 54,520 m1
lorong = 9,880 + 4,440 x 2,000 x 1,000 = 28,640 m1
R. kabid = 4,880 + 4,880 x 2,000 x 1,000 = 19,520 m1
R. kasie = 4,880 + 4,880 x 2,000 x 1,000 = 19,520 m1
Lorong = 10,020 + 2,360 x 2,000 x 1,000 = 24,760 m1
= 6,000 + 1,920 x 2,000 x 1,000 = 15,840 m1
R.staff = 6,860 + 4,870 x 2,000 x 1,000 = 23,460 m1
R. laktasi = 2,880 + 2,380 x 2,000 x 1,000 = 10,520 m1
R.pelayanan = 2,500 + 2,880 x 2,000 x 1,000 = 10,760 m1
R, baca = 9,870 + 4,880 x 2,000 x 1,000 = 29,500 m1
Mini teater = 7,424 + 4,880 x 2,000 x 1,000 = 24,607 m1
541,547 m1

IV. 1.5 PEKERJAAN PENGECATAN


1, Finishing Cat Dinding Interior
as A = 5,850 x 3,000 x 1,000 x 1,000 = 17,550 m2
= 5,850 x 3,000 x 1,000 x 1,000 = 17,550 m2
= 5,850 x 3,000 x 1,000 x 1,000 = 17,550 m2
= 7,850 x 3,000 x 1,000 x 1,000 = 23,550 m2
= 5,850 x 3,000 x 1,000 x 1,000 = 17,550 m2
as B = 5,850 x 3,000 x 1,000 x 1,000 = 17,550 m2
= 5,850 x 3,000 x 1,000 x 1,000 = 17,550 m2
= 5,850 x 3,000 x 1,000 x 1,000 = 17,550 m2
= 3,000 x 3,000 x 1,000 x 1,000 = 9,000 m2
= 4,000 x 3,000 x 1,000 x 1,000 = 12,000 m2
= 2,080 x 3,000 x 1,000 x 1,000 = 6,240 m2
= 9,850 x 3,000 x 1,000 x 1,000 = 29,550 m2
= 5,850 x 3,000 x 1,000 x 1,000 = 17,550 m2
-= 5,850 x 3,000 x 1,000 x 1,000 = 17,550 m2
= 7,870 x 3,000 x 1,000 x 1,000 = 23,610 m2
= 2,330 x 3,000 x 1,000 x 1,000 = 6,990 m2
= 1,350 x 3,000 x 1,000 x 1,000 = 4,050 m2
= 2,850 x 3,000 x 1,000 x 1,000 = 8,550 m2
= 1,850 x 3,000 x 1,000 x 1,000 = 5,550 m2
29 - 35
NO. URAIAN PEKERJAAN PANJANG LEBAR TINGGI JUMLAH TOTAL SAT.
1 2 3 4 5 6 3x4x5x6 7

= 1,850 x 3,000 x 1,000 x 1,000 = 5,550 m2


= 2,850 x 3,000 x 1,000 x 1,000 = 8,550 m2
= 2,850 x 3,000 x 1,000 x 1,000 = 8,550 m2
= 2,850 x 3,000 x 1,000 x 1,000 = 8,550 m2
= 8,850 x 3,000 x 1,000 x 1,000 = 26,550 m2
as B' = 1,330 x 2,350 x 1,000 x 1,000 = 3,126 m2
= 1,850 x 2,350 x 1,000 x 1,000 = 4,348 m2
= 2,000 x 2,350 x 1,000 x 1,000 = 4,700 m2
= 2,850 x 2,350 x 1,000 x 1,000 = 6,698 m2
= 2,850 x 2,350 x 1,000 x 1,000 = 6,698 m2
= 4,850 x 2,350 x 1,000 x 1,000 = 11,398 m2
= 1,850 x 2,350 x 1,000 x 1,000 = 4,348 m2
= 2,850 x 2,350 x 1,000 x 1,000 = 6,698 m2
= 2,350 x 2,350 x 1,000 x 1,000 = 5,523 m2
= 2,350 x 2,350 x 1,000 x 1,000 = 5,523 m2
= 4,000 x 2,350 x 1,000 x 1,000 = 9,400 m2
= 4,000 x 2,350 x 1,000 x 1,000 = 9,400 m2
= 2,850 x 2,350 x 1,000 x 1,000 = 6,698 m2
= 2,850 x 2,350 x 1,000 x 1,000 = 6,698 m2
= 2,000 x 2,350 x 1,000 x 1,000 = 4,700 m2
= 1,850 x 2,350 x 1,000 x 1,000 = 4,348 m2
= 1,850 x 2,350 x 1,000 x 1,000 = 4,348 m2
= 1,850 x 2,350 x 1,000 x 1,000 = 4,348 m2
= 1,850 x 2,350 x 1,000 x 1,000 = 4,348 m2
= 4,350 x 2,350 x 1,000 x 1,000 = 10,223 m2
= 1,350 x 2,350 x 1,000 x 1,000 = 3,173 m2
= 2,850 x 2,350 x 1,000 x 1,000 = 6,698 m2
= 2,850 x 2,350 x 1,000 x 1,000 = 6,698 m2
= 2,850 x 2,350 x 1,000 x 1,000 = 6,698 m2
= 2,850 x 2,350 x 1,000 x 1,000 = 6,698 m2
= 3,850 x 2,350 x 1,000 x 1,000 = 9,048 m2
= 4,000 x 2,350 x 1,000 x 1,000 = 9,400 m2
= 1,380 x 2,350 x 1,000 x 1,000 = 3,243 m2
as C = 7,200 x 2,350 x 1,000 x 1,000 = 16,920 m2
= 8,850 x 2,350 x 1,000 x 1,000 = 20,798 m2
= 2,850 x 2,350 x 1,000 x 1,000 = 6,698 m2
= 1,850 x 2,350 x 1,000 x 1,000 = 4,348 m2
= 2,850 x 2,350 x 1,000 x 1,000 = 6,698 m2
= 2,350 x 2,350 x 1,000 x 1,000 = 5,523 m2
= 5,350 x 2,350 x 1,000 x 1,000 = 12,573 m2
= 10,840 x 2,350 x 1,000 x 1,000 = 25,474 m2
= 3,850 x 2,350 x 1,000 x 1,000 = 9,048 m2
= 6,860 x 2,350 x 1,000 x 1,000 = 16,121 m2
= 1,850 x 2,350 x 1,000 x 1,000 = 4,348 m2
= 1,850 x 2,350 x 1,000 x 1,000 = 4,348 m2
= 4,350 x 2,350 x 1,000 x 1,000 = 10,223 m2
= 7,350 x 2,350 x 1,000 x 1,000 = 17,273 m2
= 2,850 x 2,350 x 1,000 x 1,000 = 6,698 m2
= 2,980 x 2,350 x 1,000 x 1,000 = 7,003 m2
= 3,850 x 2,350 x 1,000 x 1,000 = 9,048 m2
= 6,230 x 2,350 x 1,000 x 1,000 = 14,641 m2
= 5,850 x 2,350 x 1,000 x 1,000 = 13,748 m2
= 2,850 x 2,350 x 1,000 x 1,000 = 6,698 m2
as C' = 7,350 x 4,850 x 1,000 x 1,000 = 35,648 m2
= 7,350 x 4,850 x 1,000 x 1,000 = 35,648 m2
= 2,850 x 4,850 x 1,000 x 1,000 = 13,823 m2
= 2,850 x 4,850 x 1,000 x 1,000 = 13,823 m2
= 2,850 x 4,850 x 1,000 x 1,000 = 13,823 m2
= 2,850 x 4,850 x 1,000 x 1,000 = 13,823 m2
as D = 8,850 x 4,850 x 1,000 x 1,000 = 42,923 m2
= 5,850 x 3,000 x 1,000 x 1,000 = 17,550 m2
= 5,850 x 3,000 x 1,000 x 1,000 = 17,550 m2
= 5,850 x 3,000 x 1,000 x 1,000 = 17,550 m2
= 1,840 x 3,000 x 1,000 x 1,000 = 5,520 m2
= 10,840 x 4,850 x 1,000 x 1,000 = 52,574 m2
= 6,860 x 4,850 x 1,000 x 1,000 = 33,271 m2
= 4,850 x 3,000 x 1,000 x 1,000 = 14,550 m2
= 4,850 x 3,000 x 1,000 x 1,000 = 14,550 m2
= 2,850 x 3,000 x 1,000 x 1,000 = 8,550 m2
30 - 35
NO. URAIAN PEKERJAAN PANJANG LEBAR TINGGI JUMLAH TOTAL SAT.
1 2 3 4 5 6 3x4x5x6 7

= 2,850 x 3,000 x 1,000 x 1,000 = 8,550 m2


= 7,350 x 4,850 x 1,000 x 1,000 = 35,648 m2
= 1,350 x 3,000 x 1,000 x 1,000 = 4,050 m2
= 2,850 x 3,000 x 1,000 x 1,000 = 8,550 m2
= 2,850 x 4,850 x 1,000 x 1,000 = 13,823 m2
= 5,850 x 4,850 x 1,000 x 1,000 = 28,373 m2
= 2,850 x 3,000 x 1,000 x 1,000 = 8,550 m2
= 8,850 x 3,000 x 1,000 x 1,000 = 26,550 m2
= 5,850 x 3,000 x 1,000 x 1,000 = 17,550 m2
= 1,840 x 3,000 x 1,000 x 1,000 = 5,520 m2
= 4,850 x 3,000 x 1,000 x 1,000 = 14,550 m2
= 4,850 x 3,000 x 1,000 x 1,000 = 14,550 m2
= 2,850 x 3,000 x 1,000 x 1,000 = 8,550 m2
= 2,850 x 3,000 x 1,000 x 1,000 = 8,550 m2
= 2,850 x 4,850 x 1,000 x 1,000 = 13,823 m2
as E' = 8,850 x 4,850 x 1,000 x 1,000 = 42,923 m2
as 1 = 2,850 x 3,000 x 1,000 x 1,000 = 8,550 m2
= 2,350 x 3,000 x 1,000 x 1,000 = 7,050 m2
= 4,350 x 4,850 x 1,000 x 1,000 = 21,098 m2
= 6,850 x 4,850 x 1,000 x 1,000 = 33,223 m2
= 2,850 x 4,850 x 1,000 x 1,000 = 13,823 m2
as 2 = 2,850 x 3,000 x 1,000 x 1,000 = 8,550 m2
= 2,850 x 3,000 x 1,000 x 1,000 = 8,550 m2
= 2,350 x 3,000 x 1,000 x 1,000 = 7,050 m2
= 4,350 x 4,850 x 1,000 x 1,000 = 21,098 m2
= 6,850 x 4,850 x 1,000 x 1,000 = 33,223 m2
= 2,850 x 3,000 x 1,000 x 1,000 = 8,550 m2
as 2' = 3,850 x 3,000 x 1,000 x 1,000 = 11,550 m2
= 2,350 x 3,000 x 1,000 x 1,000 = 7,050 m2
= 2,850 x 3,000 x 1,000 x 1,000 = 8,550 m2
= 4,350 x 3,000 x 1,000 x 1,000 = 13,050 m2
= 6,850 x 4,850 x 1,000 x 1,000 = 33,223 m2
= 6,850 x 4,850 x 1,000 x 1,000 = 33,223 m2
as 3 = 2,850 x 3,000 x 1,000 x 1,000 = 8,550 m2
= 2,850 x 3,000 x 1,000 x 1,000 = 8,550 m2
= 3,850 x 3,000 x 1,000 x 1,000 = 11,550 m2
= 3,850 x 3,000 x 1,000 x 1,000 = 11,550 m2
= 2,850 x 3,000 x 1,000 x 1,000 = 8,550 m2
= 6,850 x 3,000 x 1,000 x 1,000 = 20,550 m2
as 4 = 2,850 x 3,000 x 1,000 x 1,000 = 8,550 m2
= 1,850 x 3,000 x 1,000 x 1,000 = 5,550 m2
= 1,850 x 3,000 x 1,000 x 1,000 = 5,550 m2
= 4,010 x 3,000 x 1,000 x 1,000 = 12,030 m2
= 2,850 x 3,000 x 1,000 x 1,000 = 8,550 m2
as 4' = 1,850 x 3,000 x 1,000 x 1,000 = 5,550 m2
= 1,850 x 3,000 x 1,000 x 1,000 = 5,550 m2
= 4,000 x 3,000 x 1,000 x 1,000 = 12,000 m2
= 2,840 x 3,000 x 1,000 x 1,000 = 8,520 m2
= 2,850 x 3,000 x 1,000 x 1,000 = 8,550 m2
= 2,850 x 3,000 x 1,000 x 1,000 = 8,550 m2
as 5 = 2,850 x 3,000 x 1,000 x 1,000 = 8,550 m2
= 2,350 x 3,000 x 1,000 x 1,000 = 7,050 m2
= 1,350 x 3,000 x 1,000 x 1,000 = 4,050 m2
= 7,010 x 3,000 x 1,000 x 1,000 = 21,030 m2
= 1,350 x 3,000 x 1,000 x 1,000 = 4,050 m2
as 5' = 2,350 x 3,000 x 1,000 x 1,000 = 7,050 m2
= 1,350 x 3,000 x 1,000 x 1,000 = 4,050 m2
= 3,850 x 4,850 x 1,000 x 1,000 = 18,673 m2
= 2,850 x 3,000 x 1,000 x 1,000 = 8,550 m2
as 6 = 2,080 x 3,000 x 1,000 x 1,000 = 6,240 m2
= 1,850 x 3,000 x 1,000 x 1,000 = 5,550 m2
= 1,850 x 3,000 x 1,000 x 1,000 = 5,550 m2
= 2,850 x 3,000 x 1,000 x 1,000 = 8,550 m2
= 5,000 x 3,000 x 1,000 x 1,000 = 15,000 m2
as 6' = 2,850 x 3,000 x 1,000 x 1,000 = 8,550 m2
= 3,000 x 3,000 x 1,000 x 1,000 = 9,000 m2
= 1,850 x 3,000 x 1,000 x 1,000 = 5,550 m2
= 1,850 x 3,000 x 1,000 x 1,000 = 5,550 m2
= 3,850 x 3,000 x 1,000 x 1,000 = 11,550 m2
31 - 35
NO. URAIAN PEKERJAAN PANJANG LEBAR TINGGI JUMLAH TOTAL SAT.
1 2 3 4 5 6 3x4x5x6 7

= 2,850 x 3,000 x 1,000 x 1,000 = 8,550 m2


= 2,850 x 3,000 x 1,000 x 1,000 = 8,550 m2
as 7 = 1,850 x 3,000 x 1,000 x 1,000 = 5,550 m2
= 1,850 x 3,000 x 1,000 x 1,000 = 5,550 m2
= 2,850 x 3,000 x 1,000 x 1,000 = 8,550 m2
= 1,350 x 4,850 x 1,000 x 1,000 = 6,548 m2
= 2,350 x 4,850 x 1,000 x 1,000 = 11,398 m2
= 2,850 x 4,850 x 1,000 x 1,000 = 13,823 m2
= 13,850 x 3,000 x 1,000 x 1,000 = 41,550 m2
= 2,850 x 3,000 x 1,000 x 1,000 = 8,550 m2
= 2,850 x 3,000 x 1,000 x 1,000 = 8,550 m2
as 7' = 1,850 x 3,000 x 1,000 x 1,000 = 5,550 m2
= 1,850 x 3,000 x 1,000 x 1,000 = 5,550 m2
= 3,850 x 3,000 x 1,000 x 1,000 = 11,550 m2
= 2,850 x 3,000 x 1,000 x 1,000 = 8,550 m2
= 2,850 x 3,000 x 1,000 x 1,000 = 8,550 m2
= 2,850 x 3,000 x 1,000 x 1,000 = 8,550 m2
= 5,850 x 3,000 x 1,000 x 1,000 = 17,550 m2
as 8 = 2,850 x 3,000 x 1,000 x 1,000 = 8,550 m2
as 8' = 2,850 x 4,850 x 1,000 x 1,000 = 13,823 m2
= 3,850 x 4,850 x 1,000 x 1,000 = 18,673 m2
= 2,850 x 4,850 x 1,000 x 1,000 = 13,823 m2
= 5,850 x 3,000 x 1,000 x 1,000 = 17,550 m2
A = 2.214,742 m2
pengurang
p1 = 2,240 x 1,480 x 1,000 x 6,000 = 19,891 m2
p2 = 2,210 x 1,960 x 1,000 x 5,000 = 21,658 m2
p3 = 2,240 x 0,880 x 2,000 x 24,000 = 94,618 m2
P4 = 2,250 x 0,960 x 1,000 x 29,000 = 62,640 m2
J1 = 1,100 x 2,470 x 1,000 x - = - m2
B = 198,807 m2
A-B = 2.015,935 m2
2, Finishing Cat plafond Interior
= 708,497 x 1,000 x 1,000 x 1,000 = 708,497 m2
= 708,497 m2

3, Finishing Cat Dinding Exterior Wheathershield


Samping = 30,000 x 6,300 x 1,000 x 1,000 = 189,000 m2
Balakang = 30,000 x 6,300 x 1,000 x 1,000 = 189,000 m2
Depan = 30,000 x 6,300 x 1,000 x 1,000 = 189,000 m2
Kanopy induk = 10,500 x 0,800 x 1,000 x 2,000 = 16,800 m2
= 9,000 x 0,800 x 1,000 x 1,000 = 7,200 m2
Kanopy induk = 11,000 x 0,800 x 1,000 x 1,000 = 8,800 m2
= 2,000 x 0,800 x 1,000 x 2,000 = 3,200 m2
A = 603,000 m2
pengurang
PJ1 = 2,250 x 0,960 x 1,000 x 3,000 = 6,480 m2
PJ2 = 2,250 x 0,960 x 1,000 x 3,000 = 6,480 m2
J1 = 1,100 x 2,470 x 1,000 x 17,000 = 46,189 m2
J3 = 0,910 x 0,630 x 1,000 x 20,000 = 11,466 m2
B = 70,615 m2
A-B = 532,385 m2
4, Finishing Cat coating tranfaran batu alam
= 30,000 x 0,500 x 1,000 x 3,000 = 45,000 m2
= 28,930 x 0,500 x 1,000 x 2,000 = 28,930 m2
= 32,200 x 0,500 x 1,000 x 1,000 = 16,100 m2
90,030 m2

IV. 2. PEKERJAAN ARSITEKTUR LANTAI 2


IV. 2.1 PEKERJAAN DINDING
1, Pas. Dinding Bata Ringan tebal 10 cm dengan mortar siap pakai
= 8,020 x 3,000 x 1,000 x 2,000 = 48,120 m2
= 5,000 x 3,000 x 1,000 x 1,000 = 15,000 m2
= 3,000 x 3,000 x 1,000 x 2,000 = 18,000 m2
= 2,000 x 3,000 x 1,000 x 1,000 = 6,000 m2
atap = 4,600 x 0,490 x 1,000 x 20,000 = 45,080 m2
= 2,100 x 0,490 x 1,000 x 2,000 = 2,058 m2
= 7,100 x 0,490 x 1,000 x 2,000 = 6,958 m2
= 141,216 m2
32 - 35
NO. URAIAN PEKERJAAN PANJANG LEBAR TINGGI JUMLAH TOTAL SAT.
1 2 3 4 5 6 3x4x5x6 7

2, Acian Dinding = 141,216 x 1,000 x 1,000 x 2,000 = 282,432 m2

3, Benangan Dinding = 8,020 x 3,000 x 1,000 x 2,000 = 48,120 m2


= 5,000 x 3,000 x 1,000 x 2,000 = 30,000 m2
= 3,000 x 3,000 x 1,000 x 2,000 = 18,000 m2
= 2,000 x 3,000 x 1,000 x 2,000 = 12,000 m2
= 108,120 m2

4, Benangan Beton = 30,000 x 6,000 x 1,000 x 2,000 = 360,000 m1

IV. 2.2 PEKERJAAN KUSEN


1, Pasang Kusen P2 2,000 unit
2, Pasang Kusen P3 1,000 unit
3, Pasang Kusen P5 1,000 unit

1, Pasang Kusen J1
Pas. Kusen Alluminium 4"
Vertikal = 1,020 x 1,000 x 1,000 x 4,000 = 4,080 m1
horizontal = 2,400 x 1,000 x 1,000 x 2,000 = 4,800 m1
8,880 m1
Kaca polos t. 6 mm
= 0,780 x 1,040 x 1,000 x 2,000 = 1,622 m2
= 0,820 x 1,040 x 1,000 x 1,000 = 0,853 m2
2,475 m2
2, Pasang Kusen J1
Pas. Kusen Alluminium 4"
Vertikal = 1,020 x 1,000 x 1,000 x 4,000 = 4,080 m1
horizontal = 2,400 x 1,000 x 1,000 x 2,000 = 4,800 m1
8,880 m1
Kaca polos t. 8 mm
= 0,780 x 1,040 x 1,000 x 2,000 = 1,622 m2
= 0,820 x 1,040 x 1,000 x 1,000 = 0,853 m2
2,475 m2
3, 1 unit Pasang J8
Pas. Kusen Alluminium 4"
Vertikal = 0,450 x 1,000 x 1,000 x 2,000 = 0,900 m1
horizontal = 2,000 x 1,000 x 1,000 x 2,000 = 4,000 m1
4,900 m1
Loover alumunium
= 0,400 x 2,000 x 1,000 x 1,000 = 0,800 m2
0,800 m2
IV. 2.3. PEKERJAAN PENUTUP LANTAI
1 Pas. Granit Tile 60x60cm Polished
R.penjaga = 2,850 x 5,350 x 1,000 x 1,000 = 15,248 m2
= 15,248 m2
2 Pas. Granit Tile 60x60cm Unpolished
jemur = 1,770 x 9,350 x 1,000 x 1,000 = 16,550 m2
pantry = 1,780 x 1,350 x 1,000 x 1,000 = 2,403 m2
= 18,953 m2

3 Pas. Granit Tile stepnosing 10X60cm


= 1,000 x 1,000 x 2,000 x 13,000 = 26,000 m1
= 26,000 m1
4 Pas. Keramik dinding 30x60cm
= 1,780 x 3,000 x 2,000 x 1,000 = 10,680 m2
= 1,350 x 3,000 x 2,000 x 1,000 = 8,100 m2
= 18,780 m2
5 Pas. Keramik lantai 30x30cm unpolish
= 1,780 x 1,350 x 1,000 x 1,000 = 2,403 m2
= 2,403 m2

IV. 2.3 PEKERJAAN PLAFOND


1, Pas. Plafond Calsiboard t=4,5mm
= 5,350 x 2,850 x 1,000 x 1,000 = 15,248 m2
= 1,780 x 1,350 x 1,000 x 2,000 = 4,806 m2
= 6,180 x 1,930 x 1,000 x 1,000 = 11,927 m2
31,981 m2
33 - 35
NO. URAIAN PEKERJAAN PANJANG LEBAR TINGGI JUMLAH TOTAL SAT.
1 2 3 4 5 6 3x4x5x6 7

2, Pas. Rangka Plafond Hollow 40.40.4 & 20.40.0.4


= 5,350 x 2,850 x 1,000 x 1,000 = 15,248 m2
= 1,780 x 1,350 x 1,000 x 2,000 = 4,806 m2
= 6,180 x 1,930 x 1,000 x 1,000 = 11,927 m2
31,981 m2
3, Pas. List Gypsum t=8cm
= 5,350 + 2,850 x 2,000 x 1,000 = 16,400 m1
= 1,780 + 1,350 x 2,000 x 2,000 = 12,520 m1
= 6,180 + 1,930 x 2,000 x 1,000 = 16,220 m1
45,140 m1
IV. 2.4 PEKERJAAN PENGECATAN
1, Finishing Cat Dinding Interior
= 8,020 x 3,000 x 1,000 x 2,000 = 48,120 m2
= 5,000 x 3,000 x 1,000 x 1,000 = 15,000 m2
= 3,000 x 3,000 x 1,000 x 2,000 = 18,000 m2
2,000 x 3,000 x 1,000 x 1,000 = 6,000 m2
= 87,120 m2
P3 = 2,100 x 0,900 x 1,000 x 1,000 = 1,890 m2
P4 = 2,100 x 0,700 x 1,000 x 1,000 = 1,470 m2
B = 3,360 m2
A-B = 83,760 m2
2, Pengecatan Plafond Kalsiboard t=4,5mm
= 31,981 x 1,000 x 1,000 x 1,000 = 31,981 m2
31,981 m2
3, Pek. Waterprofing
= #REF! x #REF! x 1,000 x #REF! = #REF! m2
= 2,490 x 2,290 x 1,000 x 48,000 = 273,701 m2
#REF! m2

V. PEKERJAAN MEKANIKAL
V. 1. PEKERJAAN MEKANIKAL LANTAI 1
1, Pas. Pipa Pvc AW 1/2" air bersih = 35,000 x 1,000 x 1,000 x 1,000 = 35,000 m1
2, Pas. Pipa Pvc AW 3/4" Air Bersih = 23,400 x 1,000 x 1,000 x 1,000 = 23,400 m1
3, Pas. Pipa Pvc AW 4'' Air Kotor = 32,100 x 1,000 x 1,000 x 1,000 = 32,100 m1
4, Pas. Pipa Pvc AW 3" Air Buangan = 28,000 x 1,000 x 1,000 x 1,000 = 28,000 m1
5, Pas. Pipa Pvc AW 4" talang tegak = 132,000 x 1,000 x 1,000 x 1,000 = 132,000 m1
6, Pas. Wastafel dinding = 1,000 x 1,000 x 1,000 x 1,000 = 1,000 bh
7, Pas. Wastafel meja = 1,000 x 1,000 x 1,000 x 1,000 = 1,000 bh
8, Pas. Kran wastafel = 3,000 x 1,000 x 1,000 x 1,000 = 3,000 bh
9, Pas. Kloset Duduk = 2,000 x 1,000 x 1,000 x 1,000 = 2,000 bh
10, Pas. Kran air = 2,000 x 1,000 x 1,000 x 1,000 = 2,000 bh
11, Pas. Kitchen zink = 1,000 x 1,000 x 1,000 x 1,000 = 1,000 bh
12, Pas. Roof drain = 18,000 x 1,000 x 1,000 x 1,000 = 18,000 bh
13, Pas. Floor drain = 8,000 x 1,000 x 1,000 x 1,000 = 8,000 bh
14, Pas. Floor Clean Out 3" = 2,000 x 1,000 x 1,000 x 1,000 = 2,000 bh
15, Pas. Floor Clean Out 4" = 2,000 x 1,000 x 1,000 x 1,000 = 2,000 bh

V. 2. PEKERJAAN MEKANIKAL LANTAI 2


1, Pas. Pipa Pvc AW 1/2" air bersih = 12,000 x 1,000 x 1,000 x 1,000 = 12,000 m1
2, Pas. Pipa Pvc AW 3/4" Air Bersih = 6,000 x 1,000 x 1,000 x 1,000 = 6,000 m1
3, Pas. Pipa Pvc AW 4'' Air Kotor = 8,000 x 1,000 x 1,000 x 1,000 = 8,000 m1
4, Pas. Pipa Pvc AW 3" Air Buangan = 12,000 x 1,000 x 1,000 x 1,000 = 12,000 m1
5, Pas. Kloset Duduk = 1,000 x 1,000 x 1,000 x 1,000 = 1,000 bh
6, Pas. Kran air = 1,000 x 1,000 x 1,000 x 1,000 = 1,000 bh
7, Pas. Kitchen zink = 1,000 x 1,000 x 1,000 x 1,000 = 1,000 bh
8, Pas. Floor drain = 1,000 x 1,000 x 1,000 x 1,000 = 1,000 bh

VI. PEKERJAAN ELEKTRIKAL


VI. 1. PEKERJAAN ELEKTRIKAL LANTAI 1
1, PP- KANTOR, Panel Pembagi Penerangan
= 1,000 x 1,000 x 1,000 x 1,000 = 1,000 Unit
1,000 Unit
2, PP- KANTOR, Panel Pembagi Penerangan
= 1,000 x 1,000 x 1,000 x 1,000 = 1,000 Unit
1,000 Unit
4, Dari MDP-GEDUNG KANTOR ke PL-01, Panel Pembagi Penerangan
Kabel TR, NYY 4 x 10 mm² + BC 6 mm²
= 30,000 x 1,000 x 1,000 x 1,000 = 30,000 m1
30,000 m1

34 - 35
NO. URAIAN PEKERJAAN PANJANG LEBAR TINGGI JUMLAH TOTAL SAT.
1 2 3 4 5 6 3x4x5x6 7

5, Dari MDP-GEDUNG KANTOR ke PP.AC-01, Panel Pembagi AC


Kabel TR, NYY 4 x 10 mm² + BC 6 mm²
= 30,000 x 1,000 x 1,000 x 1,000 = 30,000 m1
30,000 m1
6, Instalasi titik lampu
= 140,000 x 1,000 x 1,000 x 1,000 = 140,000 titik
140,000 titik
7, Instalasi titik stop kontak
= 86,000 x 1,000 x 1,000 x 1,000 = 86,000 titik
86,000 titik
8, Instalasi titik saklar tunggal
= 21,000 x 1,000 x 1,000 x 1,000 = 21,000 titik
21,000 titik
9, Instalasi titik saklar ganda
= 18,000 x 1,000 x 1,000 x 1,000 = 18,000 titik
18,000 titik

9, Pas. Exhaust fan 75 cfm


= 3,000 x 1,000 x 1,000 x 1,000 = 3,000 titik
3,000 titik
10, Lampu Downlight LED downlight 6" 7 watt
= 6,000 x 1,000 x 1,000 x 1,000 = 6,000 titik
6,000 titik
11, Lampu Downlight LED downlight 6" 13 watt
= 120,000 x 1,000 x 1,000 x 1,000 = 120,000 titik
120,000 titik

12, Lampu RMI Led 2x18 w +Acrylic


= 14,000 x 1,000 x 1,000 x 1,000 = 14,000 unit
14,000 unit
VI. 2. PEKERJAAN ELEKTRIKAL LANTAI 2
1, Instalasi titik lampu = 8,000 x 1,000 x 1,000 x 1,000 = 8,000 titik
8,000 titik

2, Instalasi titik saklar tunggal = 1,000 x 1,000 x 1,000 x 1,000 = 1,000 titik
1,000 titik

3, Instalasi titik saklar ganda = 2,000 x 1,000 x 1,000 x 1,000 = 2,000 titik
2,000 titik

4, Lampu Downlight Led 13 Watt = 2,000 x 1,000 x 1,000 x 1,000 = 2,000 titik
2,000 titik
5, Lampu Downlight Led 7 Watt = 6,000 x 1,000 x 1,000 x 1,000 = 6,000 titik
6,000 titik
6, Instalasi Outlet Telephone CAT-6, 4 Pair
= 12,000 x 1,000 x 1,000 x 1,000 = 12,000 titik
12,000 titik
7, Instalasi Outlet Data & Access Point dengan Kabel UTP Cat 6
dalam Pipa conduit PVC Hi dia. 20 mm
= 9,000 x 1,000 x 1,000 x 1,000 = 9,000 titik
9,000 titik
8, Instalasi ke Ceilling Speaker NYMHY 2 x 1.5 mm2
= 9,000 x 1,000 x 1,000 x 1,000 = 9,000 titik
9,000 titik
9, Instalasi ke Volume Control
= 4,000 x 1,000 x 1,000 x 1,000 = 4,000 titik
4,000 titik

35 - 35