Halaman - 01
HARGA
NO. UPAH KERJA / BAHAN SATUAN KETERANGAN TKDN SUMBER
(Rp)
1 2 3 4 5 6 7
I. UPAH KERJA
1 Mandor Hari 150,000.00 21,428.57 100% SATUAN BIAYA UMUM 2024
2 Kepala Tukang Hari 150,000.00 21,428.57 100% SATUAN BIAYA UMUM 2024
3 Tukang Kayu, Batu, Besi, Cat Hari 140,000.00 20,000.00 100% SATUAN BIAYA UMUM 2024
4 Pekerja Hari 140,000.00 20,000.00 100% SATUAN BIAYA UMUM 2024
2. Kerikil
Batu Pecah 2 - 3 (Spilt) M3 257,142.86 190.476 100% TOKO BANGUNAN BAROKAH
3. Batu - Batuan
Batu Utuh, Batu Kali, Batu Gunung M3 178,571.43 100% TOKO BANGUNAN BAROKAH
Batu Andesit Bintik 20 x 40 cm M2 240,000.00 100% CV. SHOHAT
4. Batu Cetak :
Paving Block Warna Merah & HitamT : 8 Cm M2 3,600.00 154,800.00 40% CV. SHOHAT
Paving Block Natural T : 8 Cm M2 3,200.00 137,600.00 40% CV. SHOHAT
Paving Block 3D Cacing Warna T : 8 Cm M2 6,000.00 168,000 40% CV. SHOHAT
Kansteen 15x30x60 K300 M1 70,000.00 81.15% CV. SHOHAT
2 Bahan Finishing
Cat Tembok :
Cat Djarum Kg 42,000.00 0% TOKO PUSPITA
3. Sewa Peralatan
Stamper Hari 150,000.00
Peralatan/ Alat Bantu Set 39,063.00
Excavator Hari 2,000,000.00 100% OWNER: INDRA - 082292428447
Dump Truk Hari 353,430.00
Viibrator Roller Hari 2,000,000.00 100% OWMER: INDRA - 082292428447