DAFTAR HARGA UPAH DAN BAHAN

PEKERJAAN : PEKERJAAN JALUR PEJALAN KAKI (PEDESTRIAN) JALAN SETAPAK


LOKASI : PENTADIO RESORT (Pentadio Barat, Kec. Talaga Biru, Kab, Gorontalo)
TAHUN : 2024

Halaman - 01
HARGA
NO. UPAH KERJA / BAHAN SATUAN KETERANGAN TKDN SUMBER
(Rp)
1 2 3 4 5 6 7
I. UPAH KERJA
1 Mandor Hari 150,000.00 21,428.57 100% SATUAN BIAYA UMUM 2024
2 Kepala Tukang Hari 150,000.00 21,428.57 100% SATUAN BIAYA UMUM 2024
3 Tukang Kayu, Batu, Besi, Cat Hari 140,000.00 20,000.00 100% SATUAN BIAYA UMUM 2024
4 Pekerja Hari 140,000.00 20,000.00 100% SATUAN BIAYA UMUM 2024

II. BAHAN MATERIAL


1. Tanah dan Pasir
Pasir Urug M3 90,000.00 100% STANDAR HARGA SATUAN 2024 KAB. GORONTALO
Pasir Pasang M3 140,000.00 100% STANDAR HARGA SATUAN 2024 KAB. GORONTALO
Pasir Beton/ Cor M3 120,000.00 85.714 100% TOKO SETIA BUDI
Sirtu M3 150,000.00 100% TOKO SETIA BUDI
Pasir Plester M3 120,000.00 100% TOKO SETIA BUDI
Tanah Timbunan M3 85,000.00 100% STANDAR HARGA SATUAN 2024 KAB. GORONTALO

2. Kerikil
Batu Pecah 2 - 3 (Spilt) M3 257,142.86 190.476 100% TOKO BANGUNAN BAROKAH

3. Batu - Batuan
Batu Utuh, Batu Kali, Batu Gunung M3 178,571.43 100% TOKO BANGUNAN BAROKAH
Batu Andesit Bintik 20 x 40 cm M2 240,000.00 100% CV. SHOHAT

4. Batu Cetak :
Paving Block Warna Merah & HitamT : 8 Cm M2 3,600.00 154,800.00 40% CV. SHOHAT
Paving Block Natural T : 8 Cm M2 3,200.00 137,600.00 40% CV. SHOHAT
Paving Block 3D Cacing Warna T : 8 Cm M2 6,000.00 168,000 40% CV. SHOHAT
Kansteen 15x30x60 K300 M1 70,000.00 81.15% CV. SHOHAT

III. BAHAN BANGUNAN


1. Semen
Semen Conch Zak 73,000.00 1,460 81.15% TOKO BANGUNAN BAROKAH

2 Bahan Finishing
Cat Tembok :
Cat Djarum Kg 42,000.00 0% TOKO PUSPITA

3. Sewa Peralatan
Stamper Hari 150,000.00
Peralatan/ Alat Bantu Set 39,063.00
Excavator Hari 2,000,000.00 100% OWNER: INDRA - 082292428447
Dump Truk Hari 353,430.00
Viibrator Roller Hari 2,000,000.00 100% OWMER: INDRA - 082292428447