Anda di halaman 1dari 87

Perhitungan Plat "a" T= 10 cm

Diketahui :
BJ Beton = 2400 kg/m3 T. Aspal = 5 cm Perhitungan Pembebanan:

fc' = 30 Mpa BJ Aspal = 14 kg/m2 Beban Mati:

Berat
fy lentur = 320 Mpa Sendiri = 240
Plat
fy geser = 320 Mpa Plafond = 11
Penggant
Tebal Plat = 10 cm = 0.1 m ung = 7
Plafond
Instalasi
Ly = 4.2 m = 4200 mm Listrik
= 40
Lx = 4 m = 4000 mm Aspal = 70
ρ min = 0.0025 Keramik = 0
ρ max = Spesi = 0
M = 12.5490 Qd total = 368
β1 = 0.85 Beban Hidup:
Beban
ρb = 0.0442 = 100
orang
B = 1000 mm Ql total = 100
Ly/Lx = 1.1 < 2 two way slab 1.1 Beban Ultimate Rencana:
φ = 0.8 Dx = 64 mm Qu = 1,2Qd+1,6Ql
Dy = 54 mm = 601.6

Mn As Perlu
X Mu kgm/m Rn ρ ρ' As Pasang mm2 D-S
Nmm/m mm2

Lx 25 240.64 3008000 0.73 0.0023 0.0025 160.00 #N/A D8 - 130


Ly 21 202.1376 2526720 0.8665 0.0028 0.0025 135.00 #N/A D8 - 120
Tx 59 567.9104 7098880 1.7331 0.0056 0.0056 359.28 #N/A D8 - 130
Ty 54 519.7824 6497280 2.2281 0.0073 0.0073 394.04 #N/A D8 - 120
TP x #N/A #N/A D8 - 350
TP y #N/A #N/A D8 - 350

D8 - 350
1

D8 - 350
D8 - 350

D8 - 120 D8 - 120
D8 - 130

4
D8 - 350
D8 - 130
4.2
Perhitungan Plat "b" T= 10 cm
Diketahui :
BJ Beton = 2400 kg/m3 T. Aspal = 5 cm Perhitungan Pembebanan:
fc' = 30 Mpa BJ Aspal = 14 kg/m2 Beban Mati:
Berat
fy lentur = 320 Mpa Sendiri = 240
Plat
fy geser = 320 Mpa Plafond = 11
Penggant
Tebal Plat = 10 cm = 0.1 m ung = 7
Plafond
Instalasi
Ly = 4 m = 4000 mm Listrik
= 40
Lx = 3.9 m = 3900 mm Aspal = 70
ρ min = 0.0025 Keramik = 0
ρ max = Spesi = 0
M = 12.5490 Qd total = 368
β1 = 0.85 Beban Hidup:
Beban
ρb = 0.0442 orang
= 100
B = 1000 mm Ql total = 100
Ly/Lx = 1 < 2 two way slab 1.0 Beban Ultimate Rencana:
φ = 0.8 Dx = 64 mm Qu = 1,2Qd+1,6Ql
Dy = 54 mm = 601.6

Mn As Perlu
X Mu kgm/m Rn ρ ρ' As Pasang mm2 D-S
Nmm/m mm2

Lx 21 192.15706 2401963.2 0.586 0.0019 0.0025 160.00 #N/A D8 - 160


Ly 21 192.15706 2401963.2 0.8237 0.0026 0.0025 135.00 #N/A D8 - 130
Tx 52 475.81747 5947718.4 1.4521 0.0047 0.0047 299.19 #N/A D8 - 160
Ty 52 475.81747 5947718.4 2.0397 0.0067 0.0067 359.19 #N/A D8 - 130
TP x #N/A #N/A D8 - 350
TP y #N/A #N/A D8 - 350

0.975

D8 - 350
0.975

D8 - 350
D8 - 350
D8 - 160

D8 - 130 D8 - 130
3.9
D8 - 350
D8 - 160
4
Perhitungan Plat "c" T= 10 cm
Diketahui :
BJ Beton = 2400 kg/m3 T. Aspal = 5 cm Perhitungan Pembebanan:
fc' = 30 Mpa BJ Aspal = 14 kg/m2 Beban Mati:
Berat
fy lentur = 320 Mpa Sendiri = 240
Plat
fy geser = 320 Mpa Plafond = 11
Penggant
Tebal Plat = 10 cm = 0.1 m ung = 7
Plafond
Instalasi
Ly = 1 m = 1000 mm Listrik
= 0
Lx = 1 m = 1000 mm Aspal = 70
ρ min = 0.0025 Keramik = 0
ρ max = Spesi = 0
M = 12.5490 Qd total = 328
β1 = 0.85 Beban Hidup:
Beban
ρb = 0.0442 = 100
orang
B = 1000 mm Ql total = 100
Ly/Lx = 1 < 2 two way slab 1.0 Beban Ultimate Rencana:
φ = 0.8 Dx = 64 mm Qu = 1,2Qd+1,6Ql
Dy = 54 mm = 553.6

Mn As Perlu
X Mu kgm/m Rn ρ ρ' As Pasang mm2 D-S
Nmm/m mm2

Lx 28 15.5008 193760 0.047 0.0001 0.0025 160.00 #N/A D8 - 310


Ly 28 15.5008 193760 0.0664 0.0002 0.0025 135.00 #N/A D8 - 350
Tx 68 37.6448 470560 0.1149 0.0004 0.0025 160.00 #N/A D8 - 310
Ty 68 37.6448 470560 0.1614 0.0005 0.0025 135.00 #N/A D8 - 350
TP x #N/A #N/A D8 - 350
TP y #N/A #N/A D8 - 350
0.25

D8 - 350
0.25

D8 - 350
D8 - 350

D8 - 350 D8 - 350
1
D8 - 310

D8 - 350
D8 - 310
1
Perhitungan Plat "d" T= 10 cm
Diketahui :
BJ Beton = 2400 kg/m3 T. Aspal = 5 cm Perhitungan Pembebanan:
fc' = 30 Mpa BJ Aspal = 14 kg/m2 Beban Mati:
Berat
fy lentur = 320 Mpa Sendiri = 240
Plat
fy geser = 320 Mpa Plafond = 11
Penggant
Tebal Plat = 10 cm = 0.1 m ung = 7
Plafond
Instalasi
Ly = 4 m = 4000 mm Listrik
= 0
Lx = 1 m = 1000 mm Aspal = 70
ρ min = 0.0025 Keramik = 0
ρ max = Spesi = 0
M = 12.5490 Qd total = 328
β1 = 0.85 Beban Hidup:
Beban
ρb = 0.0442 = 100
orang
B = 1000 mm Ql total = 100
Ly/Lx = 4 > 2 one way slab > 2,5 Beban Ultimate Rencana:
φ = 0.8 Dx = 64 mm Qu = 1,2Qd+1,6Ql
Dy = 54 mm = 553.6

Mn As Perlu
X Mu kgm/m Rn ρ ρ' As Pasang mm2 D-S
Nmm/m mm2

Lx 63 34.8768 435960 0.106 0.0003 0.0025 160.00 #N/A D8 - 310


Ly 13 7.1968 89960 0.0309 0.0001 0.0025 135.00 #N/A D8 - 350
Tx 125 69.2 865000 0.2112 0.0007 0.0025 160.00 #N/A D8 - 310
Ty 79 43.7344 546680 0.1875 0.0006 0.0025 135.00 #N/A D8 - 350
TP x #N/A #N/A D8 - 350
TP y #N/A #N/A D8 - 350

0.25

D8 - 350
0.25

D8 - 350
D8 - 350

D8 - 350 D8 - 350
1
D8 - 310

D8 - 350
D8 - 310
4
Perhitungan Plat "e" T= 10 cm
Diketahui :
BJ Beton = 2400 kg/m3 T. Aspal = 5 cm Perhitungan Pembebanan:
fc' = 30 Mpa BJ Aspal = 14 kg/m2 Beban Mati:
Berat
fy lentur = 320 Mpa Sendiri = 240
Plat
fy geser = 320 Mpa Plafond = 11
Penggant
Tebal Plat = 10 cm = 0.1 m ung = 7
Plafond
Instalasi
Ly = 4.2 m = 4200 mm Listrik
= 0
Lx = 1 m = 1000 mm Aspal = 70
ρ min = 0.0025 Keramik = 0
ρ max = Spesi = 0
M = 12.5490 Qd total = 328
β1 = 0.85 Beban Hidup:
Beban
ρb = 0.0442 = 100
orang
B = 1000 mm Ql total = 100
Ly/Lx = 4.2 > 2 one way slab > 2,5 Beban Ultimate Rencana:
φ = 0.8 Dx = 64 mm Qu = 1,2Qd+1,6Ql
Dy = 54 mm = 553.6
Mn As Perlu
X Mu kgm/m Rn ρ ρ' As Pasang mm2 D-S
Nmm/m mm2

Lx 63 34.8768 435960 0.106 0.0003 0.0025 160.00 #N/A D8 - 310


Ly 13 7.1968 89960 0.0309 0.0001 0.0025 135.00 #N/A D8 - 350
Tx 125 69.2 865000 0.2112 0.0007 0.0025 160.00 #N/A D8 - 310
Ty 79 43.7344 546680 0.1875 0.0006 0.0025 135.00 #N/A D8 - 350
TP x #N/A #N/A D8 - 350
TP y #N/A #N/A D8 - 350
0.25

D8 - 350
0.25

D8 - 350
D8 - 350

D8 - 350 D8 - 350
1
D8 - 310

D8 - 350
D8 - 310
4.2
Perhitungan Plat "f" T= 10 cm
Diketahui :
BJ Beton = 2400 kg/m3 T. Aspal = 5 cm Perhitungan Pembebanan:
fc' = 30 Mpa BJ Aspal = 14 kg/m2 Beban Mati:
Berat
fy lentur = 320 Mpa Sendiri = 240
Plat
fy geser = 320 Mpa Plafond = 11
Penggant
Tebal Plat = 10 cm = 0.1 m ung = 7
Plafond
Instalasi
Ly = 3.9 m = 3900 mm = 0
Listrik
Lx = 1 m = 1000 mm Aspal = 70
ρ min = 0.0025 Keramik = 0
ρ max = Spesi = 0
M = 12.5490 Qd total = 328
β1 = 0.85 Beban Hidup:
Beban
ρb = 0.0442 = 100
orang
B = 1000 mm Ql total = 100
Ly/Lx = 3.9 > 2 one way slab > 2,5 Beban Ultimate Rencana:
φ = 0.8 Dx = 64 mm Qu = 1,2Qd+1,6Ql
Dy = 54 mm = 553.6
Mn As Perlu As Pasang
X Mu kgm/m Rn ρ ρ' D-S
Nmm/m mm2 mm2

Lx 63 34.8768 435960 0.106 0.0003 0.0025 160.00 #N/A D8 - 310


Ly 13 7.1968 89960 0.0309 0.0001 0.0025 135.00 #N/A D8 - 350
Tx 125 69.2 865000 0.2112 0.0007 0.0025 160.00 #N/A D8 - 310
Ty 79 43.7344 546680 0.1875 0.0006 0.0025 135.00 #N/A D8 - 350
TP x #N/A #N/A D8 - 350
TP y #N/A #N/A D8 - 350
0.25

D8 - 350
0.25

D8 - 350
D8 - 350

D8 - 350 D8 - 350
1
D8 - 310

D8 - 350
D8 - 310
3.9
ngan Pembebanan:

kg/m2

kg/m2

kg/m2

kg/m2
kg/m2
kg/m2
kg/m2
kg/m2

kg/m2

kg/m2
Ultimate Rencana:
1,2Qd+1,6Ql
kg/m2
ngan Pembebanan:

kg/m2

kg/m2

kg/m2

kg/m2
kg/m2
kg/m2
kg/m2
kg/m2

kg/m2
kg/m2
n Ultimate Rencana:
1,2Qd+1,6Ql
kg/m2
ngan Pembebanan:

kg/m2

kg/m2

kg/m2

kg/m2
kg/m2
kg/m2
kg/m2
kg/m2

kg/m2

kg/m2
Ultimate Rencana:
1,2Qd+1,6Ql
kg/m2
ngan Pembebanan:

kg/m2

kg/m2

kg/m2

kg/m2
kg/m2
kg/m2
kg/m2
kg/m2

kg/m2

kg/m2
Ultimate Rencana:
1,2Qd+1,6Ql
kg/m2
ngan Pembebanan:

kg/m2

kg/m2

kg/m2

kg/m2
kg/m2
kg/m2
kg/m2
kg/m2

kg/m2

kg/m2
n Ultimate Rencana:
1,2Qd+1,6Ql
kg/m2
ngan Pembebanan:

kg/m2

kg/m2

kg/m2

kg/m2

kg/m2
kg/m2
kg/m2
kg/m2

kg/m2

kg/m2
Ultimate Rencana:
1,2Qd+1,6Ql
kg/m2
TABEL PENULANGAN PLAT JEPIT PENUH II JEPIIT SEBAGIAN III
D-S AS Ly/Lx Lx Ly/Lx Lx
Ø8 - 70 718.08 1 21 1 28
Ø8 - 80 628.32 1.1 25 1.1 33
Ø8 - 90 558.51 1.2 28 1.2 38
Ø8 - 100 502.66 1.3 31 1.3 42
Ø8 - 110 456.96 1.4 34 1.4 45
Ø8 - 120 418.88 1.5 36 1.5 48
Ø8 - 130 386.66 1.6 37 1.6 51
Ø8 - 140 359.04 1.7 38 1.7 53
Ø8 - 150 335.1 1.8 40 1.8 55
Ø8 - 160 314.16 1.9 40 1.9 57
Ø8 - 170 295.68 2 41 2 58
Ø8 - 180 279.25 2.1 41 2.1 59
Ø8 - 190 264.56 2.2 41 2.2 59
Ø8 - 200 251.33 2.3 42 2.3 60
Ø8 - 210 239.36 2.4 42 2.4 61
Ø8 - 220 228.48 2.5 42 2.5 61
Ø8 - 230 218.55 > 2,5 42 > 2,5 63
Ø8 - 240 209.44 Ly/Lx Ly Ly/Lx Ly
Ø8 - 250 201.06 1 21 1 28
Ø8 - 260 193.33 1.1 21 1.1 28
Ø8 - 270 186.17 1.2 20 1.2 28
Ø8 - 280 179.52 1.3 19 1.3 27
Ø8 - 290 173.33 1.4 18 1.4 26
Ø8 - 300 167.55 1.5 17 1.5 25
Ø8 - 310 162.15 1.6 16 1.6 23
Ø8 - 320 157.08 1.7 14 1.7 23
Ø8 - 330 152.32 1.8 13 1.8 22
Ø8 - 340 147.84 1.9 12 1.9 21
Ø8 - 350 143.62 2 12 2 19
D9 - 70 908.82 2.1 11 2.1 18
D9 - 80 795.22 2.2 11 2.2 17
D9 - 90 706.86 2.3 11 2.3 17
D9 - 100 636.17 2.4 10 2.4 16
D9 - 110 578.34 2.5 10 2.5 16
D9 - 120 530.15 > 2,5 8 > 2,5 13
D9 - 130 489.36 Ly/Lx Tx Ly/Lx Tx
D9 - 140 454.41 1 52 1 68
D9 - 150 424.12 1.1 59 1.1 77
D9 - 160 397.61 1.2 64 1.2 85
D9 - 170 374.22 1.3 69 1.3 92
D9 - 180 353.43 1.4 73 1.4 98
D9 - 190 334.83 1.5 76 1.5 103
D9 - 200 318.09 1.6 79 1.6 107
D9 - 210 302.94 1.7 81 1.7 111
D9 - 220 289.17 1.8 82 1.8 113
D9 - 230 276.6 1.9 83 1.9 116
D9 - 240 265.07 2 83 2 118
D9 - 250 254.47 2.1 83 2.1 119
D9 - 260 244.68 2.2 83 2.2 120
D9 - 270 235.62 2.3 83 2.3 121
D9 - 280 227.21 2.4 83 2.4 122
D9 - 290 219.37 2.5 83 2.5 122
D9 - 300 212.06 > 2,5 83 > 2,5 125
D9 - 310 205.22 Ly/Lx Ty Ly/Lx Ty
D9 - 320 198.8 1 52 1 68
D9 - 330 192.78 1.1 54 1.1 72
D9 - 340 187.11 1.2 56 1.2 74
D9 - 350 181.76 1.3 57 1.3 76
D10 - 70 1122 1.4 57 1.4 77
D10 - 80 981.75 1.5 57 1.5 77
D10 - 90 872.67 1.6 57 1.6 78
D10 - 100 785.4 1.7 57 1.7 78
D10 - 110 714 1.8 57 1.8 78
D10 - 120 654.5 1.9 57 1.9 78
D10 - 130 604.15 2 57 2 79
D10 - 140 561 2.1 57 2.1 79
D10 - 150 523.6 2.2 57 2.2 79
D10 - 160 490.88 2.3 57 2.3 79
D10 - 170 462 2.4 57 2.4 79
D10 - 180 436.33 2.5 57 2.5 79
D10 - 190 413.37 > 2,5 57 > 2,5 79
D10 - 200 392.7
D10 - 210 374
D10 - 220 357
D10 - 230 341.48
D10 - 240 327.25
D10 - 250 314.16
D10 - 260 302.08
D10 - 270 290.89
D10 - 280 280.5
D10 - 290 270.83
D10 - 300 261.8
D10 - 310 253.35
D10 - 320 245.44
D10 - 330 238
D10 - 340 231
D10 - 350 224.4
D11 - 70 1357.62
D11 - 80 1187.92
D11 - 90 1055.93
D11 - 100 950.33
D11 - 110 863.94
D11 - 120 791.95
D11 - 130 731.03
D11 - 140 678.81
D11 - 150 633.56
D11 - 160 593.96
D11 - 170 559.02
D11 - 180 527.96
D11 - 190 500.18
D11 - 200 475.17
D11 - 210 452.54
D11 - 220 431.97
D11 - 230 413.19
D11 - 240 395.97
D11 - 250 380.13
D11 - 260 365.51
D11 - 270 351.98
D11 - 280 339.41
D11 - 290 327.7
D11 - 300 316.78
D11 - 310 306.56
D11 - 320 296.98
D11 - 330 287.98
D11 - 340 279.51
D11 - 350 271.52
D12 - 70 1615.68
D12 - 80 1413.72
D12 - 90 1256.64
D12 - 100 1130.98
D12 - 110 1028.16
D12 - 120 942.48
D12 - 130 869.98
D12 - 140 807.84
D12 - 150 753.98
D12 - 160 706.86
D12 - 170 665.28
D12 - 180 628.32
D12 - 190 595.25
D12 - 200 565.49
D12 - 210 538.56
D12 - 220 514.08
D12 - 230 491.73
D12 - 240 471.24
D12 - 250 452.39
D12 - 260 434.99
D12 - 270 418.88
D12 - 280 403.92 7.2
D12 - 290 389.99
D12 - 300 376.99 3
D12 - 310 364.83
D12 - 320 353.43
D12 - 330 342.72
D12 - 340 332.64
D12 - 350 323.14
D13 - 70 1896.18
D13 - 80 1659.16
D13 - 90 1474.81
D13 - 100 1327.33
D13 - 110 1206.66
D13 - 120 1106.11
D13 - 130 1021.02
D13 - 140 948.09
D13 - 150 884.88
D13 - 160 829.58
D13 - 170 780.78
D13 - 180 737.4
D13 - 190 698.59
D13 - 200 663.66
D13 - 210 632.06
D13 - 220 603.33
D13 - 230 577.1
D13 - 240 553.05
D13 - 250 530.93
D13 - 260 510.51
D13 - 270 491.6
D13 - 280 474.05
D13 - 290 457.7
D13 - 300 442.44
D13 - 310 428.17
D13 - 320 414.79
D13 - 330 402.22
D13 - 340 390.39
D13 - 350 379.24
D14 - 70 2199.12
D14 - 80 1924.23
D14 - 90 1710.43
D14 - 100 1539.38
D14 - 110 1399.44
D14 - 120 1282.82
D14 - 130 1184.14
D14 - 140 1099.56
D14 - 150 1026.26
D14 - 160 962.12
D14 - 170 905.52
D14 - 180 855.21
D14 - 190 810.2
D14 - 200 769.69
D14 - 210 733.04
D14 - 220 699.72
D14 - 230 669.3
D14 - 240 641.41
D14 - 250 615.75
D14 - 260 592.07
D14 - 270 570.14
D14 - 280 549.78
D14 - 290 530.82
D14 - 300 513.13
D14 - 310 496.58
D14 - 320 481.06
D14 - 330 466.48
D14 - 340 452.76
D14 - 350 439.82
D16 - 70 2872.32
D16 - 80 2513.28
D16 - 90 2234.03
D16 - 100 2010.62
D16 - 110 1827.84
D16 - 120 1675.52
D16 - 130 1546.63
D16 - 140 1436.16
D16 - 150 1340.42
D16 - 160 1256.64
D16 - 170 1182.72
D16 - 180 1117.01
D16 - 190 1058.22
D16 - 200 1005.31
D16 - 210 957.44
D16 - 220 913.92
D16 - 230 874.18
D16 - 240 837.76
D16 - 250 804.25
D16 - 260 773.32
D16 - 270 744.68
D16 - 280 718.08
D16 - 290 693.32
D16 - 300 670.21
D16 - 310 648.59
D16 - 320 628.32
D16 - 330 609.28
D16 - 340 591.36
D16 - 350 574.46
D19 - 70 4050.42
D19 - 80 3544.12
D19 - 90 3150.33
D19 - 100 2835.29
D19 - 110 2577.54
D19 - 120 2362.75
D19 - 130 2181
D19 - 140 2025.21
D19 - 150 1890.2
D19 - 160 1772.06
D19 - 170 1667.82
D19 - 180 1575.16
D19 - 190 1492.26
D19 - 200 1417.65
D19 - 210 1350.14
D19 - 220 1288.77
D19 - 230 1232.74
D19 - 240 1181.37
D19 - 250 1134.12
D19 - 260 1090.5
D19 - 270 1050.11
D19 - 280 1012.61
D19 - 290 977.69
D19 - 300 945.1
D19 - 310 914.61
D19 - 320 886.03
D19 - 330 859.18
D19 - 340 833.91
D19 - 350 810.08
D22 - 70 5430.48
D22 - 80 4751.67
D22 - 90 4223.71
D22 - 100 3801.34
D22 - 110 3455.76
D22 - 120 3167.78
D22 - 130 2924.1
D22 - 140 2715.24
D22 - 150 2534.22
D22 - 160 2375.84
D22 - 170 2236.08
D22 - 180 2111.85
D22 - 190 2000.7
D22 - 200 1900.67
D22 - 210 1810.16
D22 - 220 1727.88
D22 - 230 1652.75
D22 - 240 1583.89
D22 - 250 1520.53
D22 - 260 1462.05
D22 - 270 1407.9
D22 - 280 1357.62
D22 - 290 1310.81
D22 - 300 1267.11
D22 - 310 1226.24
D22 - 320 1187.92
D22 - 330 1151.92
D22 - 340 1118.04
D22 - 350 1086.1
D25 - 70 7012.5
D25 - 80 6135.94
D25 - 90 5454.17
D25 - 100 4908.75
D25 - 110 4462.5
D25 - 120 4090.63
D25 - 130 3775.96
D25 - 140 3506.25
D25 - 150 3272.5
D25 - 160 3067.97
D25 - 170 2887.5
D25 - 180 2727.08
D25 - 190 2583.55
D25 - 200 2454.38
D25 - 210 2337.5
D25 - 220 2231.25
D25 - 230 2134.24
D25 - 240 2045.31
D25 - 250 1963.5
D25 - 260 1887.98
D25 - 270 1818.06
D25 - 280 1753.13
D25 - 290 1692.67
D25 - 300 1636.25
D25 - 310 1583.47
D25 - 320 1533.98
D25 - 330 1487.5
D25 - 340 1443.75
D25 - 350 1402.5
D28 - 70 8796.48
D28 - 80 7696.92
D28 - 90 6841.71
D28 - 100 6157.54
D28 - 110 5597.76
D28 - 120 5131.28
D28 - 130 4736.57
D28 - 140 4398.24
D28 - 150 4105.02
D28 - 160 3848.46
D28 - 170 3622.08
D28 - 180 3420.85
D28 - 190 3240.81
D28 - 200 3078.77
D28 - 210 2932.16
D28 - 220 2798.88
D28 - 230 2677.19
D28 - 240 2565.64
D28 - 250 2463.01
D28 - 260 2368.28
D28 - 270 2280.57
D28 - 280 2199.12
D28 - 290 2123.29
D28 - 300 2052.51
D28 - 310 1986.3
D28 - 320 1924.23
D28 - 330 1865.92
D28 - 340 1811.04
D28 - 350 1759.3
JEPIT SEBAGIAN VIA
Ly/Lx Lx
1 21
1.1 26
1.2 31
1.3 36
1.4 40
1.5 43
1.6 46
1.7 49
1.8 51
1.9 53
2 55
2.1 56
2.2 57
2.3 58
2.4 59
2.5 60
> 2,5 63
Ly/Lx Ly
1 26
1.1 27
1.2 28
1.3 28
1.4 27
1.5 26
1.6 25
1.7 23
1.8 22
1.9 21
2 21
2.1 20
2.2 20
2.3 19
2.4 19
2.5 18
> 2,5 13
Ly/Lx Tx
1 55
1.1 65
1.2 74
1.3 82
1.4 89
1.5 94
1.6 99
1.7 103
1.8 106
1.9 110
2 114
2.1 116
2.2 117
2.3 118
2.4 119
2.5 120
> 2,5 125
Ly/Lx Ty
1 60
1.1 65
1.2 69
1.3 72
1.4 74
1.5 76
1.6 77
1.7 78
1.8 78
1.9 78
2 78
2.1 78
2.2 78
2.3 78
2.4 79
2.5 79
> 2,5 79
BALOK AS 3 B-C
Dimensi Balok : b = 30 cm =
h = 50 cm =
Luas Balok = 150000 mm2
Kell Balok = 1600 mm
T pelat = 10 cm = 0.1 m
BJ Beton = 2400 kg/m3
fc' = 30 Mpa Pakai :
fy lentur = 320 Mpa φ =
fy geser = 320 Mpa βi =
l = 4.2 m Selimut beton =
Misal : agregat =
Cover = 40 mm D sengkang =
D Sengkang = 10 mm D Tul Utama =
D Tul Utama = 19 mm
d' = 440.5 mm d" = 59.5
Plat kiri : ly = 4.2 m
(plat "d") lx = 4 m
Qd = 328 kg/m2
Ql = 100 kg/m2
Plat Kanan : ly = 4.2 m
(plat "a") lx = 4 m
Qd = 368 kg/m2
Ql = 100 kg/m2
Beban Mati
Berat merata ekwivalen trapesium
Kiri = 1/6*Qd plat*lx*(3-(lx/ly)2) = 457.662887377173
Kanan = 1/6*Qd plat*lx*(3-(lx/ly)2) = 513.475434618292
Berat Merata ekwivalen segitiga
Kiri = 1/2*Qd plat*lx = 656
Kanan = 1/2*Qd plat*lx = 736
Beban Hidup
Berat merata ekwivalen trapesium
Kiri = 1/6*Qd plat*lx*(3-(lx/ly)2) = 139.53
Kanan = 1/6*Qd plat*lx*(3-(lx/ly) )
2
= 139.53
Berat Merata ekwivalen segitiga
Kiri = 1/2*Ql plat*lx = 133.33
Kanan = 1/2*Ql plat*lx = 133.33

Penulangan Xb Xr
Mu N Mn N Asc mm Mnc Nmm
Lentur mm mm

Tumpuan 348115.8 435144.8 287.2826 143.6413 2918.8 354419050


Lapangan 174057.9 217572.4 287.2826 143.6413 2918.8 354419050
Penulangan Vs min
Vu N Vc N Kondisi 1 Kontrol
Geser N
0,5*Ø*Vc
Tumpuan 42921.1936507936 120635.9 44050 48254.357 Tidak Perlu Tulangan Geser
Lapangan 0 120635.9 44050 48254.357 Tidak Perlu Tulangan Geser
Lebar
Kontrol D n As Aktual As' Aktual d Aktual
Perlu
mm buah mm mm mm mm
Tumpuan 19 13 299 1133.54 566.77 438.5
Lapangan 19 13 299 1133.54 566.77 438.5

Tumpuan Lapangan
13 D19 2 D19
50
2 D19 13 D19

30 30
300 mm Pembebanan B:
500 mm Beban Mati :
B. Sendiri = 360 kg/m2
B. merata ekwivalen trapesium
kiri = 457.66 kg/m2
kanan = 513.48 kg/m2
B. Merata ekwivalen segitiga
0.8 kiri = 0.0 kg/m2
0.85 kanan = 0.0 kg/m2
30 mm Qd total = 1331.1 kg/m2
30 mm Berat Hidup :
12 mm B. merata ekwivalen trapesium
19 mm kiri = 139.53 kg/m2
kanan = 139.531368102797 kg/m2
mm B. Merata ekwivalen segitiga
kiri = 0.0 kg/m2
kanan = 0.0 kg/m2
Ql total = 279.1 kg/m2
Qu = 1,2 Qd + 1,6 Ql
= 2043.86636432351 kg/m2
VuAS = 1/2*Qu*l
= 4292.11936507936 kg
= 42921.1936507936 N
Tumpuan:
Cs' = T2 = -929091.6151
fs' = 351.46
As' = -2850.286891
Ass = -2903.411297
Lapangan:
Cs' = T2 = -929662.6712
fs' = 351.46
As' = -2852.038789
Ass = -2905.195848

Tulangan Tekan Tulangan Tarik Tul.


Mn - Mnc Nmm Tekan
Cs' = T2 fs' As' Ass Asc + Ass As Pas. n - D
n-D
-353983905 0 0 0 0 2918.84 3685.88 13 D19 2 D19
-354201478 0 0 0 0 2918.84 3685.88 13 D19 2 D19

a Mn Aktual Kontrol
N
23.71 1296041.9 OK
23.71 1296041.9 OK
50
PLAT TIPE a

● Propertis ● Pembebanan
◦ Tebal plat = 20 cm ◦ Tebal aspal = 0
◦ BJ beton = 2400 kg/m3 ◦ BJ aspal (per cm tebal) = 0
◦ fc' beton = 24.90 Mpa ◦ Tebal spesi = 0
◦ fy tul.lentur = 400 Mpa ◦ BJ spesi (per cm tebal) = 0
◦ Beban mati
◦ Berat sendiri = 480
● Perencanaan ◦ Aspal = 0
◦ Lx = 1m ◦ Plafond = 0
◦ Ly = 1m ◦ Penggantung plafond = 0
◦ cover beton = 40 mm ◦ Instalasi listrik & pipa = 0
◦ Øtul.renc. = 13 mm ◦ Spesi = 0
◦ b = 1000 mm ◦ Keramik = 0
◦ dx = 153.5 mm qd total = 480
◦ dy = 140.5 mm ◦ Beban hidup
◦ ρ min = 0.0035 ◦ Beban pekerja = 1050
◦ ρ max = 0.0202 ql total = 1050
◦ M = 18.8991 ◦ Beban ultimate rencana
◦ β1 = 0.85 ◦ qu = 1,2qd + 1,6ql
◦ ρb = 0.0270 = 2256 kg/m2
◦ φ = 0.8
◦ Ly/Lx = 1.00 < 2 two way slab
= 1.0
● Tabel perhitungan
x Mu Mn Rn ρ ρ' As perlu As pasang D-S
kgm/m Nmm/m mm mm
Lx 21 47 592200 0.03 0.0001 0.0035 537.25 565.5 D12 200
Ly 21 47 592200 0.03 0.0001 0.0035 491.75 565.5 D12 200
Tx 52 117 1466400 0.06 0.0002 0.0035 537.25 565.5 D12 200
Ty 52 117 1466400 0.07 0.0002 0.0035 491.75 565.5 D12 200
TP x 113.10 143.62 Ø8 - 350
TP y 113.10 143.62 Ø8 - 350

● Kontrol Lendutan ● Gambar penulangan


◦ ρ=As/(b*d) = 0.003684 0.25
◦ λ=ζ/1+50*ρ = 1.6889011 ,ζ= 2
◦ Ie = 1/12*b*h 3
= 666666666.66667 Ø8 - 350
0.25

◦ Ec = 4700*√ fc' = 23452.953 D12 Ø8 - 350

◦ δg =λ*5/384*Qu*Lx /(Ec*Ie)
4
= 3.173042E-05 D12

◦ δe= 5/384*Qu*Lx4/(Ec*Ie) = 1.878761E-05


Ø8 - 350

Syarat
D12

δg + δe < L/240
ok
D12

5.0518E-05 < 4.1667

1 m
PLAT TIPE b

● Propertis ● Pembebanan
◦ Tebal plat = 10 cm ◦ Tebal aspal = 5
◦ BJ beton = 2400 kg/m3 ◦ BJ aspal (per cm tebal) = 14
◦ fc' beton = 30 Mpa ◦ Tebal spesi = 0
◦ fy tul.lentur = 320 Mpa ◦ BJ spesi (per cm tebal) = 21
◦ fy tul.geser = 320 Mpa ◦ Beban mati
◦ Berat sendiri = 240
● Perencanaan ◦ Aspal = 70
◦ Lx = 3.9 m ◦ Plafond = 11
◦ Ly = 4m ◦ Penggantung plafond = 7
◦ cover beton = 30 mm ◦ Instalasi listrik & pipa = 40
◦ Øtul.renc. = 8 mm ◦ Spesi = 0
◦ b = 1000 mm ◦ Keramik = 0
◦ dx = 66 mm qd total = 368
◦ dy = 58 mm ◦ Beban hidup
◦ ρ min = 0.0025 ◦ Beban pekerja = 100
◦ ρ max = 0.0331 ql total = 100
◦ M = 12.5490 ◦ Beban ultimate rencana
◦ β1 = 0.85 ◦ qu = 1,2qd + 1,6ql
◦ ρb = 0.0442 = 601.6 kg/m2
◦ φ = 0.8
◦ Ly/Lx = 1.03 < 2 two way slab
= 1.0
● Tabel perhitungan
x Mu Mn Rn ρ ρ' As perlu As pasang D-S
kgm/m Nmm/m mm mm
Lx 21 192 2401963.2 0.55 0.0014 0.0035 231.00 295.68 Ø8 - 170
Ly 21 192 2401963.2 0.71 0.0018 0.0035 203.00 335.1 Ø8 - 150
Tx 52 476 5947718.4 1.37 0.0035 0.0035 233.07 295.68 Ø8 - 170
Ty 52 476 5947718.4 1.77 0.0046 0.0046 268.08 335.1 Ø8 - 150
TP x 59.14 143.62 Ø8 - 350
TP y 67.02 143.62 Ø8 - 350

● Kontrol Lendutan ● Gambar penulangan


◦ ρ=As/(b*d) = 0.00448 0.975
◦ λ=ζ/1+50*ρ = 1.6339869 ,ζ= 2
◦ Ie = 1/12*b*h = 83333333.333333 Ø8 - 350
0.975

◦ Ec = 4700*√ fc' = 25742.96 Ø8 - 150 Ø8 - 350

◦ δg =λ*5/384*Qu*Lx /(Ec*Ie)
4
= 0.0552123669 Ø8 - 150

◦ δe= 5/384*Qu*Lx4/(Ec*Ie) = 0.0337899686


Ø8 - 350
Ø8 - 170

Syarat
δg + δe < L/240
Ø8 - 170

0.089002335 < 16.25 ok


4 m

PLAT TIPE c

● Propertis ● Pembebanan
◦ Tebal plat = 10 cm ◦ Tebal aspal = 5
◦ BJ beton = 2400 kg/m3 ◦ BJ aspal (per cm tebal) = 14
◦ fc' beton = 30 Mpa ◦ Tebal spesi = 0
◦ fy tul.lentur = 320 Mpa ◦ BJ spesi (per cm tebal) = 21
◦ fy tul.geser = 320 Mpa ◦ Beban mati
◦ Berat sendiri = 240
● Perencanaan ◦ Aspal = 70
◦ Lx = 1m ◦ Plafond = 11
◦ Ly = 1m ◦ Penggantung plafond = 7
◦ cover beton = 30 mm ◦ Instalasi listrik & pipa = 40
◦ Øtul.renc. = 8 mm ◦ Spesi = 0
◦ b = 1000 mm ◦ Keramik = 0
◦ dx = 66 mm qd total = 368
◦ dy = 58 mm ◦ Beban hidup
◦ ρ min = 0.0025 ◦ Beban pekerja = 100
◦ ρ max = 0.0331 ql total = 100
◦ M = 12.5490 ◦ Beban ultimate rencana
◦ β1 = 0.85 ◦ qu = 1,2qd + 1,6ql
◦ ρb = 0.0442 = 601.6 kg/m2
◦ φ = 0.8
◦ Ly/Lx = 1.00 < 2 two way slab
= 1.0
● Tabel perhitungan
x Mu Mn Rn ρ ρ' As perlu As pasang D-S
kgm/m Nmm/m mm mm
Lx 28 17 210560 0.05 0.0001 0.0035 231.00 167.55 Ø8 - 300
Ly 28 17 210560 0.06 0.0002 0.0035 203.00 147.84 Ø8 - 340
Tx 68 41 511360 0.12 0.0003 0.0035 231.00 167.55 Ø8 - 300
Ty 68 41 511360 0.15 0.0004 0.0035 203.00 147.84 Ø8 - 340
TP x 33.51 143.62 Ø8 - 350
TP y 29.57 143.62 Ø8 - 350

● Kontrol Lendutan ● Gambar penulangan


◦ ρ=As/(b*d) = 0.0025386 0.25
◦ λ=ζ/1+50*ρ = 1.7747303 ,ζ= 2
◦ Ie = 1/12*b*h3 = 83333333.333333 Ø8 - 350
0.25

◦ Ec = 4700*√ fc' = 25742.96 Ø8 - 340 Ø8 - 350

◦ δg =λ*5/384*Qu*Lx /(Ec*Ie)
4
= 0.000065 Ø8 - 340

◦ δe= 5/384*Qu*Lx /(Ec*Ie)


4
= 0.000037
Ø8 - 350
Ø8 - 300

Syarat
δg + δe < L/240
Ø8 - 300
Ø8 - 300
0.000101 < 4.1667 ok

1 m

PLAT TIPE d

● Propertis ● Pembebanan
◦ Tebal plat = 10 cm ◦ Tebal aspal = 5
◦ BJ beton = 2400 kg/m3 ◦ BJ aspal (per cm tebal) = 14
◦ fc' beton = 30 Mpa ◦ Tebal spesi = 0
◦ fy tul.lentur = 320 Mpa ◦ BJ spesi (per cm tebal) = 21
◦ fy tul.geser = 320 Mpa ◦ Beban mati
◦ Berat sendiri = 240
● Perencanaan ◦ Aspal = 70
◦ Lx = 1m ◦ Plafond = 11
◦ Ly = 4m ◦ Penggantung plafond = 7
◦ cover beton = 30 mm ◦ Instalasi listrik & pipa = 40
◦ Øtul.renc. = 8 mm ◦ Spesi = 0
◦ b = 1000 mm ◦ Keramik = 0
◦ dx = 66 mm qd total = 368
◦ dy = 58 mm ◦ Beban hidup
◦ ρ min = 0.0025 ◦ Beban pekerja = 100
◦ ρ max = 0.0331 ql total = 100
◦ M = 12.5490 ◦ Beban ultimate rencana
◦ β1 = 0.85 ◦ qu = 1,2qd + 1,6ql
◦ ρb = 0.0442 = 601.6 kg/m2
◦ φ = 0.8
◦ Ly/Lx = 4.00 > 2 one way slab
= > 2,5
● Tabel perhitungan
x Mu Mn Rn ρ ρ' As perlu As pasang D-S
kgm/m Nmm/m mm mm
Lx 63 38 473760 0.11 0.0003 0.0035 231.00 167.55 Ø8 - 300
Ly 13 8 97760 0.03 0.0001 0.0035 203.00 147.84 Ø8 - 340
Tx 125 75 940000 0.22 0.0005 0.0035 231.00 167.55 Ø8 - 300
Ty 79 48 594080 0.18 0.0004 0.0035 203.00 147.84 Ø8 - 340
TP x 33.51 143.62 Ø8 - 350
TP y 29.57 143.62 Ø8 - 350

● Kontrol Lendutan ● Gambar penulangan


◦ ρ=As/(b*d) = 0.0025386 0.25
◦ λ=ζ/1+50*ρ = 1.7747303 ,ζ= 2
◦ Ie = 1/12*b*h 3
= 83333333.333333 Ø8 - 350
0.25

◦ Ec = 4700*√ fc' = 25742.96 Ø8 - 340 Ø8 - 350

◦ δg =λ*5/384*Qu*Lx /(Ec*Ie)
4
= 0.000259 Ø8 - 340

◦ δe= 5/384*Qu*Lx /(Ec*Ie)


4
= 0.000146
Ø8 - 350
Ø8 - 300
Ø8 - 350
Ø8 - 300
Syarat
δg + δe < L/240

Ø8 - 300
0.000405 < 4.1667 ok

4 m

PLAT TIPE e

● Propertis ● Pembebanan
◦ Tebal plat = 10 cm ◦ Tebal aspal = 5
◦ BJ beton = 2400 kg/m3 ◦ BJ aspal (per cm tebal) = 14
◦ fc' beton = 30 Mpa ◦ Tebal spesi = 0
◦ fy tul.lentur = 320 Mpa ◦ BJ spesi (per cm tebal) = 21
◦ fy tul.geser = 320 Mpa ◦ Beban mati
◦ Berat sendiri = 240
● Perencanaan ◦ Aspal = 70
◦ Lx = 1m ◦ Plafond = 11
◦ Ly = 6m ◦ Penggantung plafond = 7
◦ cover beton = 30 mm ◦ Instalasi listrik & pipa = 40
◦ Øtul.renc. = 8 mm ◦ Spesi = 0
◦ b = 1000 mm ◦ Keramik = 0
◦ dx = 66 mm qd total = 368
◦ dy = 58 mm ◦ Beban hidup
◦ ρ min = 0.0025 ◦ Beban pekerja = 100
◦ ρ max = 0.0331 ql total = 100
◦ M = 12.5490 ◦ Beban ultimate rencana
◦ β1 = 0.85 ◦ qu = 1,2qd + 1,6ql
◦ ρb = 0.0442 = 601.6 kg/m2
◦ φ = 0.8
◦ Ly/Lx = 6.00 > 2 one way slab
= > 2,5
● Tabel perhitungan
x Mu Mn Rn ρ ρ' As perlu As pasang D-S
kgm/m Nmm/m mm mm
Lx 63 38 473760 0.11 0.0003 0.0035 231.00 167.55 Ø8 - 300
Ly 13 8 97760 0.03 0.0001 0.0035 203.00 147.84 Ø8 - 340
Tx 125 75 940000 0.22 0.0005 0.0035 231.00 167.55 Ø8 - 300
Ty 79 48 594080 0.18 0.0004 0.0035 203.00 147.84 Ø8 - 340
TP x 33.51 143.62 Ø8 - 350
TP y 29.57 143.62 Ø8 - 350

● Kontrol Lendutan ● Gambar penulangan


◦ ρ=As/(b*d) = 0.0025386 0.25
◦ λ=ζ/1+50*ρ = 1.7747303 ,ζ= 2
◦ Ie = 1/12*b*h3 = 83333333.333333 Ø8 - 350
0.25

◦ Ec = 4700*√ fc' = 25742.96 Ø8 - 340 Ø8 - 350


◦ δg =λ*5/384*Qu*Lx4/(Ec*Ie) = 0.000389 Ø8 - 340

◦ δe= 5/384*Qu*Lx4/(Ec*Ie) = 0.000219

Ø8 - 350
Ø8 - 300
Syarat
δg + δe < L/240

Ø8 - 300
0.000608 < 4.1667 ok

6 m

PLAT TIPE f

● Propertis ● Pembebanan
◦ Tebal plat = 10 cm ◦ Tebal aspal = 5
◦ BJ beton = 2400 kg/m3 ◦ BJ aspal (per cm tebal) = 14
◦ fc' beton = 30 Mpa ◦ Tebal spesi = 0
◦ fy tul.lentur = 320 Mpa ◦ BJ spesi (per cm tebal) = 21
◦ fy tul.geser = 320 Mpa ◦ Beban mati
◦ Berat sendiri = 240
● Perencanaan ◦ Aspal = 70
◦ Lx = 1m ◦ Plafond = 11
◦ Ly = 4m ◦ Penggantung plafond = 7
◦ cover beton = 30 mm ◦ Instalasi listrik & pipa = 40
◦ Øtul.renc. = 8 mm ◦ Spesi = 0
◦ b = 1000 mm ◦ Keramik = 0
◦ dx = 66 mm qd total = 368
◦ dy = 58 mm ◦ Beban hidup
◦ ρ min = 0.0025 ◦ Beban pekerja = 100
◦ ρ max = 0.0331 ql total = 100
◦ M = 12.5490 ◦ Beban ultimate rencana
◦ β1 = 0.85 ◦ qu = 1,2qd + 1,6ql
◦ ρb = 0.0442 = 601.6 kg/m2
◦ φ = 0.8
◦ Ly/Lx = 4.00 > 2 one way slab
= > 2,5
● Tabel perhitungan
x Mu Mn Rn ρ ρ' As perlu As pasang D-S
kgm/m Nmm/m mm mm
Lx 63 38 473760 0.11 0.0003 0.0035 231.00 167.55 Ø8 - 300
Ly 13 8 97760 0.03 0.0001 0.0035 203.00 147.84 Ø8 - 340
Tx 125 75 940000 0.22 0.0005 0.0035 231.00 167.55 Ø8 - 300
Ty 79 48 594080 0.18 0.0004 0.0035 203.00 147.84 Ø8 - 340
TP x 33.51 143.62 Ø8 - 350
TP y 29.57 143.62 Ø8 - 350

● Kontrol Lendutan ● Gambar penulangan


◦ ρ=As/(b*d) = 0.0025386 0.25
◦ λ=ζ/1+50*ρ = 1.7747303 ,ζ= 2
◦ Ie = 1/12*b*h3 = 83333333.333333 Ø8 - 350

0.25
◦ Ec = 4700*√ fc' = 25742.96 Ø8 - 340 Ø8 - 350

◦ δg =λ*5/384*Qu*Lx4/(Ec*Ie) = 0.000259 Ø8 - 340

◦ δe= 5/384*Qu*Lx /(Ec*Ie)


4
= 0.000146

Ø8 - 350
Ø8 - 300
Syarat
δg + δe < L/240

Ø8 - 300
0.000405 < 4.1667 ok

4 m

PLAT TIPE g

● Propertis ● Pembebanan
◦ Tebal plat = 10 cm ◦ Tebal aspal = 5
◦ BJ beton = 2400 kg/m3 ◦ BJ aspal (per cm tebal) = 14
◦ fc' beton = 30 Mpa ◦ Tebal spesi = 0
◦ fy tul.lentur = 320 Mpa ◦ BJ spesi (per cm tebal) = 21
◦ fy tul.geser = 320 Mpa ◦ Beban mati
◦ Berat sendiri = 240
● Perencanaan ◦ Aspal = 70
◦ Lx = 4m ◦ Plafond = 11
◦ Ly = 4.2 m ◦ Penggantung plafond = 7
◦ cover beton = 30 mm ◦ Instalasi listrik & pipa = 40
◦ Øtul.renc. = 8 mm ◦ Spesi = 0
◦ b = 1000 mm ◦ Keramik = 0
◦ dx = 66 mm qd total = 368
◦ dy = 58 mm ◦ Beban hidup
◦ ρ min = 0.0025 ◦ Beban pekerja = 100
◦ ρ max = 0.0331 ql total = 100
◦ M = 12.5490 ◦ Beban ultimate rencana
◦ β1 = 0.85 ◦ qu = 1,2qd + 1,6ql
◦ ρb = 0.0442 = 601.6 kg/m2
◦ φ = 0.8
◦ Ly/Lx = 1.05 < 2 one way slab
= 1.1
● Tabel perhitungan
x Mu Mn Rn ρ ρ' As perlu As pasang D-S
kgm/m Nmm/m mm mm
Lx #N/A #N/A #N/A #N/A #N/A #N/A #N/A 359.04 Ø8 - 140
Ly #N/A #N/A #N/A #N/A #N/A #N/A #N/A 386.66 Ø8 - 130
Tx #N/A #N/A #N/A #N/A #N/A #N/A #N/A 359.04 Ø8 - 140
Ty #N/A #N/A #N/A #N/A #N/A #N/A #N/A 386.66 Ø8 - 130
TP x 71.81 143.62 Ø8 - 350
TP y 77.33 143.62 Ø8 - 350

● Kontrol Lendutan ● Gambar penulangan


◦ ρ=As/(b*d) = 0.00544 1
◦ λ=ζ/1+50*ρ = 1.572327 ,ζ= 2
◦ Ie = 1/12*b*h 3
= 83333333.333333 Ø8 - 350

1
◦ Ec = 4700*√ fc' = 25742.96 Ø8 - 130 Ø8 - 350

◦ δg =λ*5/384*Qu*Lx /(Ec*Ie)
4
= 0.0617307436 Ø8 - 130

◦ δe= 5/384*Qu*Lx /(Ec*Ie)


4
= 0.0392607529

Ø8 - 350
Ø8 - 140
Syarat
δg + δe < L/240

Ø8 - 140
0.100991497 < 16.667 ok

4.2 m

PLAT TIPE h

● Propertis ● Pembebanan
◦ Tebal plat = 10 cm ◦ Tebal aspal = 5
◦ BJ beton = 2400 kg/m3 ◦ BJ aspal (per cm tebal) = 14
◦ fc' beton = 30 Mpa ◦ Tebal spesi = 0
◦ fy tul.lentur = 320 Mpa ◦ BJ spesi (per cm tebal) = 21
◦ fy tul.geser = 320 Mpa ◦ Beban mati
◦ Berat sendiri = 240
● Perencanaan ◦ Aspal = 70
◦ Lx = 3.9 m ◦ Plafond = 11
◦ Ly = 4m ◦ Penggantung plafond = 7
◦ cover beton = 30 mm ◦ Instalasi listrik & pipa = 40
◦ Øtul.renc. = 8 mm ◦ Spesi = 0
◦ b = 1000 mm ◦ Keramik = 0
◦ dx = 66 mm qd total = 368
◦ dy = 58 mm ◦ Beban hidup
◦ ρ min = 0.0025 ◦ Beban pekerja = 100
◦ ρ max = 0.0331 ql total = 100
◦ M = 12.5490 ◦ Beban ultimate rencana
◦ β1 = 0.85 ◦ qu = 1,2qd + 1,6ql
◦ ρb = 0.0442 = 601.6 kg/m2
◦ φ = 0.8
◦ Ly/Lx = 1.03 < 2 one way slab
= 1.0
● Tabel perhitungan
x Mu Mn Rn ρ ρ' As perlu As pasang D-S
kgm/m Nmm/m mm mm
Lx 21 192 2401963.2 0.55 0.0014 0.0035 231.00 295.68 Ø8 - 170
Ly 52 476 5947718.4 1.77 0.0046 0.0046 268.08 335.1 Ø8 - 150
Tx 52 476 5947718.4 1.37 0.0035 0.0035 233.07 295.68 Ø8 - 170
Ty #N/A #N/A #N/A #N/A #N/A #N/A #N/A 335.1 Ø8 - 150
TP x 59.14 143.62 Ø8 - 350
TP y 67.02 143.62 Ø8 - 350
● Kontrol Lendutan ● Gambar penulangan
◦ ρ=As/(b*d) = 0.00448 0.975
◦ λ=ζ/1+50*ρ = 1.6339869 ,ζ= 2
◦ Ie = 1/12*b*h = 83333333.333333 Ø8 - 350

0.975
3

◦ Ec = 4700*√ fc' = 25742.96 Ø8 - 150 Ø8 - 350

◦ δg =λ*5/384*Qu*Lx /(Ec*Ie)
4
= 0.0552123669 Ø8 - 150

◦ δe= 5/384*Qu*Lx /(Ec*Ie)


4
= 0.0337899686

Ø8 - 350
Ø8 - 170
Syarat
δg + δe < L/240

Ø8 - 170
0.089002335 < 16.25 ok

4 m

PLAT TIPE i

● Propertis ● Pembebanan
◦ Tebal plat = 10 cm ◦ Tebal aspal = 5
◦ BJ beton = 2400 kg/m3 ◦ BJ aspal (per cm tebal) = 14
◦ fc' beton = 30 Mpa ◦ Tebal spesi = 0
◦ fy tul.lentur = 320 Mpa ◦ BJ spesi (per cm tebal) = 21
◦ fy tul.geser = 320 Mpa ◦ Beban mati
◦ Berat sendiri = 240
● Perencanaan ◦ Aspal = 70
◦ Lx = 1m ◦ Plafond = 11
◦ Ly = 1m ◦ Penggantung plafond = 7
◦ cover beton = 30 mm ◦ Instalasi listrik & pipa = 40
◦ Øtul.renc. = 8 mm ◦ Spesi = 0
◦ b = 1000 mm ◦ Keramik = 0
◦ dx = 66 mm qd total = 368
◦ dy = 58 mm ◦ Beban hidup
◦ ρ min = 0.0025 ◦ Beban pekerja = 100
◦ ρ max = 0.0331 ql total = 100
◦ M = 12.5490 ◦ Beban ultimate rencana
◦ β1 = 0.85 ◦ qu = 1,2qd + 1,6ql
◦ ρb = 0.0442 = 601.6 kg/m2
◦ φ = 0.8
◦ Ly/Lx = 1.00 < 2 one way slab
= 1.0
● Tabel perhitungan
x Mu Mn Rn ρ ρ' As perlu As pasang D-S
kgm/m Nmm/m mm mm
Lx 28 17 210560 0.05 0.0001 0.0035 231.00 167.55 Ø8 - 300
Ly 68 41 511360 0.15 0.0004 0.0035 203.00 147.84 Ø8 - 340
Tx 68 41 511360 0.12 0.0003 0.0035 231.00 167.55 Ø8 - 300
Ty #N/A #N/A #N/A #N/A #N/A #N/A #N/A 147.84 Ø8 - 340
TP x 33.51 143.62 Ø8 - 350
TP y 29.57 143.62 Ø8 - 350

● Kontrol Lendutan ● Gambar penulangan


◦ ρ=As/(b*d) = 0.0025386 0.25
◦ λ=ζ/1+50*ρ = 1.7747303 ,ζ= 2
◦ Ie = 1/12*b*h 3
= 83333333.333333 Ø8 - 350

0.25
◦ Ec = 4700*√ fc' = 25742.96 Ø8 - 340 Ø8 - 350

◦ δg =λ*5/384*Qu*Lx /(Ec*Ie)
4
= 0.000065 Ø8 - 340

◦ δe= 5/384*Qu*Lx /(Ec*Ie)


4
= 0.000037

Ø8 - 350
Ø8 - 300
Syarat
δg + δe < L/240

Ø8 - 300
0.000101 < 4.1667 ok

1 m

PLAT TIPE j

● Propertis ● Pembebanan
◦ Tebal plat = 10 cm ◦ Tebal aspal = 5
◦ BJ beton = 2400 kg/m3 ◦ BJ aspal (per cm tebal) = 14
◦ fc' beton = 30 Mpa ◦ Tebal spesi = 0
◦ fy tul.lentur = 320 Mpa ◦ BJ spesi (per cm tebal) = 21
◦ fy tul.geser = 320 Mpa ◦ Beban mati
◦ Berat sendiri = 240
● Perencanaan ◦ Aspal = 70
◦ Lx = 1m ◦ Plafond = 11
◦ Ly = 4m ◦ Penggantung plafond = 7
◦ cover beton = 30 mm ◦ Instalasi listrik & pipa = 40
◦ Øtul.renc. = 8 mm ◦ Spesi = 0
◦ b = 1000 mm ◦ Keramik = 0
◦ dx = 66 mm qd total = 368
◦ dy = 58 mm ◦ Beban hidup
◦ ρ min = 0.0025 ◦ Beban pekerja = 100
◦ ρ max = 0.0331 ql total = 100
◦ M = 12.5490 ◦ Beban ultimate rencana
◦ β1 = 0.85 ◦ qu = 1,2qd + 1,6ql
◦ ρb = 0.0442 = 601.6 kg/m2
◦ φ = 0.8
◦ Ly/Lx = 4.00 > 2 one way slab
= > 2,5
● Tabel perhitungan
x Mu Mn Rn ρ ρ' As perlu As pasang D-S
kgm/m Nmm/m mm mm
Lx 125 75 940000 0.22 0.0005 0.0035 231.00 167.55 Ø8 - 300
Ly 79 48 594080 0.18 0.0004 0.0035 203.00 147.84 Ø8 - 340
Tx 79 48 594080 0.14 0.0003 0.0035 231.00 167.55 Ø8 - 300
Ty 79 48 594080 0.18 0.0004 0.0035 203.00 147.84 Ø8 - 340
TP x 33.51 143.62 Ø8 - 350
TP y 29.57 143.62 Ø8 - 350

● Kontrol Lendutan ● Gambar penulangan


◦ ρ=As/(b*d) = 0.0025386 0.25
◦ λ=ζ/1+50*ρ = 1.7747303 ,ζ= 2
◦ Ie = 1/12*b*h3 = 83333333.333333 Ø8 - 350

0.25
◦ Ec = 4700*√ fc' = 25742.96 Ø8 - 340 Ø8 - 350

◦ δg =λ*5/384*Qu*Lx4/(Ec*Ie) = 0.000259 Ø8 - 340

◦ δe= 5/384*Qu*Lx /(Ec*Ie)


4
= 0.000146

Ø8 - 350
Ø8 - 300
Syarat
δg + δe < L/240

Ø8 - 300
0.000405 < 4.1667 ok

4 m

PLAT TIPE k

● Propertis ● Pembebanan
◦ Tebal plat = 10 cm ◦ Tebal aspal = 5
◦ BJ beton = 2400 kg/m3 ◦ BJ aspal (per cm tebal) = 14
◦ fc' beton = 30 Mpa ◦ Tebal spesi = 0
◦ fy tul.lentur = 320 Mpa ◦ BJ spesi (per cm tebal) = 21
◦ fy tul.geser = 320 Mpa ◦ Beban mati
◦ Berat sendiri = 240
● Perencanaan ◦ Aspal = 70
◦ Lx = 1m ◦ Plafond = 11
◦ Ly = 6m ◦ Penggantung plafond = 7
◦ cover beton = 30 mm ◦ Instalasi listrik & pipa = 40
◦ Øtul.renc. = 8 mm ◦ Spesi = 0
◦ b = 1000 mm ◦ Keramik = 0
◦ dx = 66 mm qd total = 368
◦ dy = 58 mm ◦ Beban hidup
◦ ρ min = 0.0025 ◦ Beban pekerja = 100
◦ ρ max = 0.0331 ql total = 100
◦ M = 12.5490 ◦ Beban ultimate rencana
◦ β1 = 0.85 ◦ qu = 1,2qd + 1,6ql
◦ ρb = 0.0442 = 601.6 kg/m2
◦ φ = 0.8
◦ Ly/Lx = 6.00 > 2 one way slab
= > 2,5
● Tabel perhitungan
x Mu Mn Rn ρ ρ' As perlu As pasang D-S
kgm/m Nmm/m mm mm
Lx 125 75 940000 0.22 0.0005 0.0035 231.00 167.55 Ø8 - 300
Ly 79 48 594080 0.18 0.0004 0.0035 203.00 147.84 Ø8 - 340
Tx 79 48 594080 0.14 0.0003 0.0035 231.00 167.55 Ø8 - 300
Ty 79 48 594080 0.18 0.0004 0.0035 203.00 147.84 Ø8 - 340
TP x 33.51 143.62 Ø8 - 350
TP y 29.57 143.62 Ø8 - 350

● Kontrol Lendutan ● Gambar penulangan


◦ ρ=As/(b*d) = 0.0025386 0.25
◦ λ=ζ/1+50*ρ = 1.7747303 ,ζ= 2
◦ Ie = 1/12*b*h3 = 83333333.333333 Ø8 - 350

0.25
◦ Ec = 4700*√ fc' = 25742.96 Ø8 - 340 Ø8 - 350

◦ δg =λ*5/384*Qu*Lx /(Ec*Ie)
4
= 0.000389 Ø8 - 340

◦ δe= 5/384*Qu*Lx /(Ec*Ie)


4
= 0.000219

Ø8 - 350
Ø8 - 300
Syarat
δg + δe < L/240

Ø8 - 300
0.000608 < 4.1667 ok

6 m

PLAT TIPE l

● Propertis ● Pembebanan
◦ Tebal plat = 10 cm ◦ Tebal aspal = 5
◦ BJ beton = 2400 kg/m3 ◦ BJ aspal (per cm tebal) = 14
◦ fc' beton = 30 Mpa ◦ Tebal spesi = 0
◦ fy tul.lentur = 320 Mpa ◦ BJ spesi (per cm tebal) = 21
◦ fy tul.geser = 320 Mpa ◦ Beban mati
◦ Berat sendiri = 240
● Perencanaan ◦ Aspal = 70
◦ Lx = 1m ◦ Plafond = 11
◦ Ly = 4m ◦ Penggantung plafond = 7
◦ cover beton = 30 mm ◦ Instalasi listrik & pipa = 40
◦ Øtul.renc. = 8 mm ◦ Spesi = 0
◦ b = 1000 mm ◦ Keramik = 0
◦ dx = 66 mm qd total = 368
◦ dy = 58 mm ◦ Beban hidup
◦ ρ min = 0.0025 ◦ Beban pekerja = 100
◦ ρ max = 0.0331 ql total = 100
◦ M = 12.5490 ◦ Beban ultimate rencana
◦ β1 = 0.85 ◦ qu = 1,2qd + 1,6ql
◦ ρb = 0.0442 = 601.6 kg/m2
◦ φ = 0.8
◦ Ly/Lx = 4.00 > 2 one way slab
= > 2,5
● Tabel perhitungan
x Mu Mn Rn ρ ρ' As perlu As pasang D-S
kgm/m Nmm/m mm mm
Lx 125 75 940000 0.22 0.0005 0.0035 231.00 167.55 Ø8 - 300
Ly 79 48 594080 0.18 0.0004 0.0035 203.00 147.84 Ø8 - 340
Tx 79 48 594080 0.14 0.0003 0.0035 231.00 167.55 Ø8 - 300
Ty 79 48 594080 0.18 0.0004 0.0035 203.00 147.84 Ø8 - 340
TP x 33.51 143.62 Ø8 - 350
TP y 29.57 143.62 Ø8 - 350

● Kontrol Lendutan ● Gambar penulangan


◦ ρ=As/(b*d) = 0.0025386 0.25
◦ λ=ζ/1+50*ρ = 1.7747303 ,ζ= 2
◦ Ie = 1/12*b*h 3
= 83333333.333333 Ø8 - 350

0.25
◦ Ec = 4700*√ fc' = 25742.96 Ø8 - 340 Ø8 - 350

◦ δg =λ*5/384*Qu*Lx /(Ec*Ie)
4
= 0.000259 Ø8 - 340

◦ δe= 5/384*Qu*Lx /(Ec*Ie)


4
= 0.000146

Ø8 - 350
Ø8 - 300
Syarat
δg + δe < L/240

Ø8 - 300
0.000405 < 4.1667 ok

4 m

PLAT TIPE m

● Propertis ● Pembebanan
◦ Tebal plat = 10 cm ◦ Tebal aspal = 5
◦ BJ beton = 2400 kg/m3 ◦ BJ aspal (per cm tebal) = 14
◦ fc' beton = 30 Mpa ◦ Tebal spesi = 0
◦ fy tul.lentur = 320 Mpa ◦ BJ spesi (per cm tebal) = 21
◦ fy tul.geser = 320 Mpa ◦ Beban mati
◦ Berat sendiri = 240
● Perencanaan ◦ Aspal = 70
◦ Lx = 1m ◦ Plafond = 11
◦ Ly = 4m ◦ Penggantung plafond = 7
◦ cover beton = 30 mm ◦ Instalasi listrik & pipa = 40
◦ Øtul.renc. = 8 mm ◦ Spesi = 0
◦ b = 1000 mm ◦ Keramik = 0
◦ dx = 66 mm qd total = 368
◦ dy = 58 mm ◦ Beban hidup
◦ ρ min = 0.0025 ◦ Beban pekerja = 100
◦ ρ max = 0.0331 ql total = 100
◦ M = 12.5490 ◦ Beban ultimate rencana
◦ β1 = 0.85 ◦ qu = 1,2qd + 1,6ql
◦ ρb = 0.0442 = 601.6 kg/m2
◦ φ = 0.8
◦ Ly/Lx = 4.00 > 2 one way slab
= > 2,5
● Tabel perhitungan
x Mu Mn Rn ρ ρ' As perlu As pasang D-S
kgm/m Nmm/m mm mm
Lx 79 48 594080 0.14 0.0003 0.0035 231.00 167.55 Ø8 - 300
Ly 79 48 594080 0.18 0.0004 0.0035 203.00 147.84 Ø8 - 340
Tx 79 48 594080 0.14 0.0003 0.0035 231.00 167.55 Ø8 - 300
Ty 79 48 594080 0.18 0.0004 0.0035 203.00 147.84 Ø8 - 340
TP x 33.51 143.62 Ø8 - 350
TP y 29.57 143.62 Ø8 - 350

● Kontrol Lendutan ● Gambar penulangan


◦ ρ=As/(b*d) = 0.0025386 0.25
◦ λ=ζ/1+50*ρ = 1.7747303 ,ζ= 2
◦ Ie = 1/12*b*h 3
= 83333333.333333 Ø8 - 350

0.25
◦ Ec = 4700*√ fc' = 25742.96 Ø8 - 340 Ø8 - 350

◦ δg =λ*5/384*Qu*Lx /(Ec*Ie)
4
= 0.000259 Ø8 - 340

◦ δe= 5/384*Qu*Lx /(Ec*Ie)


4
= 0.000146

Ø8 - 350
Ø8 - 300
Syarat
δg + δe < L/240

Ø8 - 300
0.000405 < 4.1667 ok

4 m

PLAT TIPE n

● Propertis ● Pembebanan
◦ Tebal plat = 10 cm ◦ Tebal aspal = 5
◦ BJ beton = 2400 kg/m3 ◦ BJ aspal (per cm tebal) = 14
◦ fc' beton = 30 Mpa ◦ Tebal spesi = 0
◦ fy tul.lentur = 320 Mpa ◦ BJ spesi (per cm tebal) = 21
◦ fy tul.geser = 320 Mpa ◦ Beban mati
◦ Berat sendiri = 240
● Perencanaan ◦ Aspal = 70
◦ Lx = 1m ◦ Plafond = 11
◦ Ly = 4m ◦ Penggantung plafond = 7
◦ cover beton = 30 mm ◦ Instalasi listrik & pipa = 40
◦ Øtul.renc. = 8 mm ◦ Spesi = 0
◦ b = 1000 mm ◦ Keramik = 0
◦ dx = 66 mm qd total = 368
◦ dy = 58 mm ◦ Beban hidup
◦ ρ min = 0.0025 ◦ Beban pekerja = 100
◦ ρ max = 0.0331 ql total = 100
◦ M = 12.5490 ◦ Beban ultimate rencana
◦ β1 = 0.85 ◦ qu = 1,2qd + 1,6ql
◦ ρb = 0.0442 = 601.6 kg/m2
◦ φ = 0.8
◦ Ly/Lx = 4.00 > 2 one way slab
= > 2,5
● Tabel perhitungan
x Mu Mn Rn ρ ρ' As perlu As pasang D-S
kgm/m Nmm/m mm mm
Lx 79 48 594080 0.14 0.0003 0.0035 231.00 167.55 Ø8 - 300
Ly 79 48 594080 0.18 0.0004 0.0035 203.00 147.84 Ø8 - 340
Tx 79 48 594080 0.14 0.0003 0.0035 231.00 167.55 Ø8 - 300
Ty 79 48 594080 0.18 0.0004 0.0035 203.00 147.84 Ø8 - 340
TP x 33.51 143.62 Ø8 - 350
TP y 29.57 143.62 Ø8 - 350

● Kontrol Lendutan ● Gambar penulangan


◦ ρ=As/(b*d) = 0.0025386 0.25
◦ λ=ζ/1+50*ρ = 1.7747303 ,ζ= 2
◦ Ie = 1/12*b*h3 = 83333333.333333 Ø8 - 350

0.25
◦ Ec = 4700*√ fc' = 25742.96 Ø8 - 340 Ø8 - 350

◦ δg =λ*5/384*Qu*Lx4/(Ec*Ie) = 0.000259 Ø8 - 340

◦ δe= 5/384*Qu*Lx /(Ec*Ie)


4
= 0.000146

Ø8 - 350
Ø8 - 300
Syarat
δg + δe < L/240

Ø8 - 300
0.000405 < 4.1667 ok

4 m
PLAT TIPE a

● Propertis ● Pembebanan
cm ◦ Tebal plat = 15 cm ◦ Tebal aspal = 0 cm
kg/m2 ◦ BJ beton = 2400 kg/m3 ◦ BJ aspal (per cm tebal) = 0 kg/m2
cm ◦ fc' beton = 29.05 Mpa ◦ Tebal spesi = 0 cm
kg/m2 ◦ fy tul.lentur = 500 Mpa ◦ BJ spesi (per cm tebal) = 0 kg/m2
◦ Beban mati
kg/m2 ● Perencanaan ◦ Berat sendiri = 360 kg/m2
kg/m2 ◦ Lx = 4m ◦ Aspal = 0 kg/m2
kg/m2 ◦ Ly = 4.1 m ◦ Plafond = 0 kg/m2
kg/m2 ◦ cover beton = 30 mm ◦ Penggantung plafond = 0 kg/m2
kg/m2 ◦ Øtul.renc. = 8 mm ◦ Instalasi listrik & pipa = 0 kg/m2
kg/m2 ◦ b = 1000 mm ◦ Spesi = 0 kg/m2
kg/m2 ◦ dx = 116 mm ◦ Keramik = 0 kg/m2
kg/m2 ◦ dy = 108 mm qd total = 360 kg/m2
◦ ρ min = 0.0028 ◦ Beban hidup
kg/m2 ◦ ρ max = 0.0172 ◦ Beban pekerja = 300 kg/m2
kg/m2 ◦ m = 20.2491 ql total = 300 kg/m2
◦ β1 = 0.85 ◦ Beban ultimate rencana
◦ ρb = 0.0229 ◦ qu = 1,2qd + 1,6ql
◦ φ = 0.8 = 912 kg/m2
◦ Ly/Lx = 1.03 < 2 two way slab
= 1.1

● Tabel perhitungan
x Mu Mn Rn ρ ρ' As perlu As pasang D-S
kgm/m Nmm/m mm mm
Lx 21 306 3830400 0.28 0.0006 0.0028 324.80 335.1 Ø8 - 150
Ly 21 306 3830400 0.33 0.0007 0.0028 302.40 335.1 Ø8 - 150
Tx 52 759 9484800 0.70 0.0014 0.0028 324.80 335.1 Ø8 - 150
Ty 52 759 9484800 0.81 0.0017 0.0028 302.40 335.1 Ø8 - 150
TP x 67.02 143.62 Ø8 - 350
TP y 67.02 143.62 Ø8 - 350

● Kontrolρ ● Gambar penulangan


0.25 syarat, 1
ρ min < ρ pasang < ρ max
Lx 0.0028 < 0.0029 < 0.0172 ok Ø8 - 350
1

Ly 0.0028 < 0.0031 < 0.0172 ok Ø8 - 150 Ø8 - 350

Tx 0.0028 < 0.0029 < 0.0172 ok Ø8 - 150

1m Ty 0.0028 < 0.0031 < 0.0172 ok


Ø8 - 350

Ø8 - 350

Ø8 - 350
Ø8 - 150

maka tulangan plat termasuk kondisi


balance
Ø8 - 150

4.1 m
PLAT TIPE b

● Propertis ● Pembebanan
cm ◦ Tebal plat = 10 cm ◦ Tebal aspal = 2 cm
kg/m2 ◦ BJ beton = 2400 kg/m3 ◦ BJ aspal (per cm tebal) = 14 kg/m2
cm ◦ fc' beton = 30 Mpa ◦ Tebal spesi = 0 cm
kg/m2 ◦ fy tul.lentur = 320 Mpa ◦ BJ spesi (per cm tebal) = 21 kg/m2
◦ Beban mati
kg/m2 ● Perencanaan ◦ Berat sendiri = 240 kg/m2
kg/m2 ◦ Lx = 3.9 m ◦ Aspal = 28 kg/m2
kg/m2 ◦ Ly = 4m ◦ Plafond = 11 kg/m2
kg/m2 ◦ cover beton = 30 mm ◦ Penggantung plafond = 7 kg/m2
kg/m2 ◦ Øtul.renc. = 8 mm ◦ Instalasi listrik & pipa = 40 kg/m2
kg/m2 ◦ b = 1000 mm ◦ Spesi = 0 kg/m2
kg/m2 ◦ dx = 66 mm ◦ Keramik = 0 kg/m2
kg/m2 ◦ dy = 58 mm qd total = 326 kg/m2
◦ ρ min = 0.0044 ◦ Beban hidup
kg/m2 ◦ ρ max = 0.0331 ◦ Beban pekerja = 100 kg/m2
kg/m2 ◦ m = 12.5490 ql total = 100 kg/m2
◦ β1 = 0.85 ◦ Beban ultimate rencana
◦ ρb = 0.0442 ◦ qu = 1,2qd + 1,6ql
◦ φ = 0.8 = 551.2 kg/m2
◦ Ly/Lx = 1.03 < 2 two way slab
= 1.0

● Tabel perhitungan
x Mu Mn Rn ρ ρ' As perlu As pasang D-S
kgm/m Nmm/m mm mm
Lx 21 176 2200734.9 0.51 0.0016 0.0044 288.75 335.1 Ø8 - 150
Ly 21 176 2200734.9 0.65 0.0021 0.0044 253.75 335.1 Ø8 - 150
Tx 52 436 5449438.8 1.25 0.0040 0.0044 288.75 335.1 Ø8 - 150
Ty 52 436 5449438.8 1.62 0.0052 0.0052 303.58 335.1 Ø8 - 150
TP x 67.02 143.62 Ø8 - 350
TP y 67.02 143.62 Ø8 - 350

● Kontrolρ ● Gambar penulangan


0.975 syarat, 0.975
ρ min < ρ pasang < ρ max
Lx 0.0044 < 0.0051 < 0.0331 ok Ø8 - 350
0.975

Ly 0.0044 < 0.0058 < 0.0331 ok Ø8 - 150 Ø8 - 350

Tx 0.0044 < 0.0051 < 0.0331 ok Ø8 - 150

3.9 m Ty 0.0044 < 0.0058 < 0.0331 ok


Ø8 - 350

Ø8 - 350

Ø8 - 350
Ø8 - 150

maka tulangan plat termasuk kondisi


balance
Ø8 - 150
4 m

PLAT TIPE c

● Propertis ● Pembebanan
cm ◦ Tebal plat = 10 cm ◦ Tebal aspal = 2 cm
kg/m2 ◦ BJ beton = 2400 kg/m3 ◦ BJ aspal (per cm tebal) = 14 kg/m2
cm ◦ fc' beton = 30 Mpa ◦ Tebal spesi = 0 cm
kg/m2 ◦ fy tul.lentur = 320 Mpa ◦ BJ spesi (per cm tebal) = 21 kg/m2
◦ Beban mati
kg/m2 ● Perencanaan ◦ Berat sendiri = 240 kg/m2
kg/m2 ◦ Lx = 1m ◦ Aspal = 28 kg/m2
kg/m2 ◦ Ly = 1m ◦ Plafond = 11 kg/m2
kg/m2 ◦ cover beton = 30 mm ◦ Penggantung plafond = 7 kg/m2
kg/m2 ◦ Øtul.renc. = 8 mm ◦ Instalasi listrik & pipa = 40 kg/m2
kg/m2 ◦ b = 1000 mm ◦ Spesi = 0 kg/m2
kg/m2 ◦ dx = 66 mm ◦ Keramik = 0 kg/m2
kg/m2 ◦ dy = 58 mm qd total = 326 kg/m2
◦ ρ min = 0.0044 ◦ Beban hidup
kg/m2 ◦ ρ max = 0.0331 ◦ Beban pekerja = 100 kg/m2
kg/m2 ◦ m = 12.5490 ql total = 100 kg/m2
◦ β1 = 0.85 ◦ Beban ultimate rencana
◦ ρb = 0.0442 ◦ qu = 1,2qd + 1,6ql
◦ φ = 0.8 = 551.2 kg/m2
◦ Ly/Lx = 1.00 < 2 two way slab
= 1.0

● Tabel perhitungan
Mu Mn Rn ρ ρ' As perlu As pasang D-S
kgm/m Nmm/m mm mm
TP x 67.02 143.62 Ø8 - 350
TP y 67.02 143.62 Ø8 - 350

● Kontrolρ ● Gambar penulangan


0.25 syarat,
ρ min < ρ pasang < ρ max
TP x 0.0044 > 0.0025 < 0.0331 ok Ø8 - 350

TP y 0.0044 > 0.0025 < 0.0331 ok Ø8 - 350

maka tulangan plat termasuk kondisi


1m underreinforce
Ø8 - 350

Ø8 - 350

Ø8 - 350
1 m

PLAT TIPE d

● Propertis ● Pembebanan
cm ◦ Tebal plat = 10 cm ◦ Tebal aspal = 2 cm
kg/m2 ◦ BJ beton = 2400 kg/m3 ◦ BJ aspal (per cm tebal) = 14 kg/m2
cm ◦ fc' beton = 30 Mpa ◦ Tebal spesi = 0 cm
kg/m2 ◦ fy tul.lentur = 320 Mpa ◦ BJ spesi (per cm tebal) = 21 kg/m2
◦ Beban mati
kg/m2 ● Perencanaan ◦ Berat sendiri = 240 kg/m2
kg/m2 ◦ Lx = 1m ◦ Aspal = 28 kg/m2
kg/m2 ◦ Ly = 4m ◦ Plafond = 11 kg/m2
kg/m2 ◦ cover beton = 30 mm ◦ Penggantung plafond = 7 kg/m2
kg/m2 ◦ Øtul.renc. = 8 mm ◦ Instalasi listrik & pipa = 40 kg/m2
kg/m2 ◦ b = 1000 mm ◦ Spesi = 0 kg/m2
kg/m2 ◦ dx = 66 mm ◦ Keramik = 0 kg/m2
kg/m2 ◦ dy = 58 mm qd total = 326 kg/m2
◦ ρ min = 0.0044 ◦ Beban hidup
kg/m2 ◦ ρ max = 0.0331 ◦ Beban pekerja = 100 kg/m2
kg/m2 ◦ m = 12.5490 ql total = 100 kg/m2
◦ β1 = 0.85 ◦ Beban ultimate rencana
◦ ρb = 0.0442 ◦ qu = 1,2qd + 1,6ql
◦ φ = 0.8 = 551.2 kg/m2
◦ Ly/Lx = 4.00 > 2 one way slab
= > 2,5

● Tabel perhitungan
Mu Mn Rn ρ ρ' As perlu As pasang D-S
kgm/m Nmm/m mm mm
Tump 276 3445000 0.79 0.0025 0.0044 288.75 335.1 Ø8 - 150
Bebas 0 0 - 0.0000 0.0044 253.75 335.1 Ø8 - 150
TP y 67.02 143.62 Ø8 - 350

● Kontrolρ ● Gambar penulangan


0.25 syarat,
ρ min < ρ pasang < ρ max
Tump 0.0044 < 0.0051 < 0.0331 ok Ø8 - 350

Beba 0.0044 < 0.0058 < 0.0331 ok Ø8 - 350

maka tulangan plat termasuk kondisi


Ø8 - 150

1m balance
Ø8 - 350

Ø8 - 150
Ø8 - 150
Ø8 - 350

Ø8 - 150
Ø8 - 350

4 m

PLAT TIPE e

● Propertis ● Pembebanan
cm ◦ Tebal plat = 10 cm ◦ Tebal aspal = 2 cm
kg/m2 ◦ BJ beton = 2400 kg/m3 ◦ BJ aspal (per cm tebal) = 14 kg/m2
cm ◦ fc' beton = 30 Mpa ◦ Tebal spesi = 0 cm
kg/m2 ◦ fy tul.lentur = 320 Mpa ◦ BJ spesi (per cm tebal) = 21 kg/m2
◦ Beban mati
kg/m2 ● Perencanaan ◦ Berat sendiri = 240 kg/m2
kg/m2 ◦ Lx = 1m ◦ Aspal = 28 kg/m2
kg/m2 ◦ Ly = 4.2 m ◦ Plafond = 11 kg/m2
kg/m2 ◦ cover beton = 30 mm ◦ Penggantung plafond = 7 kg/m2
kg/m2 ◦ Øtul.renc. = 8 mm ◦ Instalasi listrik & pipa = 40 kg/m2
kg/m2 ◦ b = 1000 mm ◦ Spesi = 0 kg/m2
kg/m2 ◦ dx = 66 mm ◦ Keramik = 0 kg/m2
kg/m2 ◦ dy = 58 mm qd total = 326 kg/m2
◦ ρ min = 0.0044 ◦ Beban hidup
kg/m2 ◦ ρ max = 0.0331 ◦ Beban pekerja = 100 kg/m2
kg/m2 ◦ m = 12.5490 ql total = 100 kg/m2
◦ β1 = 0.85 ◦ Beban ultimate rencana
◦ ρb = 0.0442 ◦ qu = 1,2qd + 1,6ql
◦ φ = 0.8 = 551.2 kg/m2
◦ Ly/Lx = 4.20 > 2 one way slab
= > 2,5

● Tabel perhitungan
Mu Mn Rn ρ ρ' As perlu As pasang D-S
kgm/m Nmm/m mm mm
Tump 276 3445000 0.79 0.0025 0.0044 288.75 335.1 Ø8 - 150
Bebas 0 0 - 0.0000 0.0044 253.75 335.1 Ø8 - 150
TP y 67.02 143.62 Ø8 - 350

● Kontrolρ ● Gambar penulangan


0.25 syarat,
ρ min < ρ pasang < ρ max
Tump 0.0044 < 0.0051 < 0.0331 ok Ø8 - 350

Beba 0.0044 < 0.0058 < 0.0331 ok Ø8 - 350


maka tulangan plat termasuk kondisi

Ø8 - 150
1m balance
Ø8 - 350

Ø8 - 150
Ø8 - 350

4.2 m

PLAT TIPE f

● Propertis ● Pembebanan
cm ◦ Tebal plat = 10 cm ◦ Tebal aspal = 2 cm
kg/m2 ◦ BJ beton = 2400 kg/m3 ◦ BJ aspal (per cm tebal) = 14 kg/m2
cm ◦ fc' beton = 30 Mpa ◦ Tebal spesi = 0 cm
kg/m2 ◦ fy tul.lentur = 320 Mpa ◦ BJ spesi (per cm tebal) = 21 kg/m2
◦ Beban mati
kg/m2 ● Perencanaan ◦ Berat sendiri = 240 kg/m2
kg/m2 ◦ Lx = 1m ◦ Aspal = 28 kg/m2
kg/m2 ◦ Ly = 3.9 m ◦ Plafond = 11 kg/m2
kg/m2 ◦ cover beton = 30 mm ◦ Penggantung plafond = 7 kg/m2
kg/m2 ◦ Øtul.renc. = 8 mm ◦ Instalasi listrik & pipa = 40 kg/m2
kg/m2 ◦ b = 1000 mm ◦ Spesi = 0 kg/m2
kg/m2 ◦ dx = 66 mm ◦ Keramik = 0 kg/m2
kg/m2 ◦ dy = 58 mm qd total = 326 kg/m2
◦ ρ min = 0.0044 ◦ Beban hidup
kg/m2 ◦ ρ max = 0.0331 ◦ Beban pekerja = 100 kg/m2
kg/m2 ◦ m = 12.5490 ql total = 100 kg/m2
◦ β1 = 0.85 ◦ Beban ultimate rencana
◦ ρb = 0.0442 ◦ qu = 1,2qd + 1,6ql
◦ φ = 0.8 = 551.2 kg/m2
◦ Ly/Lx = 3.90 > 2 one way slab
= > 2,5

● Tabel perhitungan
Mu Mn Rn ρ ρ' As perlu As pasang D-S
kgm/m Nmm/m mm mm
Tump 276 3445000 0.79 0.0025 0.0044 288.75 335.1 Ø8 - 150
Bebas 0 0 - 0.0000 0.0044 253.75 335.1 Ø8 - 150
TP y 67.02 143.62 Ø8 - 350

● Kontrolρ ● Gambar penulangan


0.25 syarat,
ρ min < ρ pasang < ρ max
Tump 0.0044 < 0.0051 < 0.0331 ok Ø8 - 350

Beba 0.0044 < 0.0058 < 0.0331 ok Ø8 - 350

maka tulangan plat termasuk kondisi

Ø8 - 150
1m balance
Ø8 - 350

Ø8 - 150
Ø8 - 350

3.9 m

PLAT TIPE g

● Propertis ● Pembebanan
cm ◦ Tebal plat = 12 cm ◦ Tebal aspal = 0 cm
kg/m2 ◦ BJ beton = 2400 kg/m3 ◦ BJ aspal (per cm tebal) = 14 kg/m2
cm ◦ fc' beton = 30 Mpa ◦ Tebal spesi = 2 cm
kg/m2 ◦ fy tul.lentur = 320 Mpa ◦ BJ spesi (per cm tebal) = 21 kg/m2
◦ Beban mati
kg/m2 ● Perencanaan ◦ Berat sendiri = 288 kg/m2
kg/m2 ◦ Lx = 4m ◦ Aspal = 0 kg/m2
kg/m2 ◦ Ly = 4.2 m ◦ Plafond = 11 kg/m2
kg/m2 ◦ cover beton = 30 mm ◦ Penggantung plafond = 7 kg/m2
kg/m2 ◦ Øtul.renc. = 8 mm ◦ Instalasi listrik & pipa = 40 kg/m2
kg/m2 ◦ b = 1000 mm ◦ Spesi = 42 kg/m2
kg/m2 ◦ dx = 86 mm ◦ Keramik = 24 kg/m2
kg/m2 ◦ dy = 78 mm qd total = 412 kg/m2
◦ ρ min = 0.0044 ◦ Beban hidup
kg/m2 ◦ ρ max = 0.0331 ◦ Beban ruang arsip = 400 kg/m2
kg/m2 ◦ m = 12.5490 ql total = 400 kg/m2
◦ β1 = 0.85 ◦ Beban ultimate rencana
◦ ρb = 0.0442 ◦ qu = 1,2qd + 1,6ql
◦ φ = 0.8 = 1134.4 kg/m2
◦ Ly/Lx = 1.05 < 2 two way slab
= 1.1

● Tabel perhitungan
x Mu Mn Rn ρ ρ' As perlu As pasang D-S
kgm/m Nmm/m mm mm
Lx 25 454 5672000 0.77 0.0024 0.0044 376.25 558.51 Ø8 - 90
Ly 21 381 4764480 0.78 0.0025 0.0044 341.25 558.51 Ø8 - 90
Tx 59 1071 13385920 1.81 0.0059 0.0059 505.01 558.51 Ø8 - 90
Ty 54 980 12251520 2.01 0.0066 0.0066 511.93 558.51 Ø8 - 90
TP x 111.70 143.62 Ø8 - 350
TP y 111.70 143.62 Ø8 - 350

● Kontrolρ ● Gambar penulangan


1 syarat, 1
ρ min < ρ pasang < ρ max
Lx 0.0044 < 0.0065 < 0.0331 ok Ø8 - 350

1
Ly 0.0044 < 0.0072 < 0.0331 ok Ø8 - 90 Ø8 - 350

Tx 0.0044 < 0.0065 < 0.0331 ok Ø8 - 90

4m Ty 0.0044 < 0.0072 < 0.0331 ok


Ø8 - 350

Ø8 - 350

Ø8 - 350
Ø8 - 90
maka tulangan plat termasuk kondisi
balance

Ø8 - 90
4.2 m

PLAT TIPE h

● Propertis ● Pembebanan
cm ◦ Tebal plat = 12 cm ◦ Tebal aspal = 0 cm
kg/m2 ◦ BJ beton = 2400 kg/m3 ◦ BJ aspal (per cm tebal) = 14 kg/m2
cm ◦ fc' beton = 30 Mpa ◦ Tebal spesi = 2 cm
kg/m2 ◦ fy tul.lentur = 320 Mpa ◦ BJ spesi (per cm tebal) = 21 kg/m2
◦ Beban mati
kg/m2 ● Perencanaan ◦ Berat sendiri = 288 kg/m2
kg/m2 ◦ Lx = 3.9 m ◦ Aspal = 0 kg/m2
kg/m2 ◦ Ly = 4m ◦ Plafond = 11 kg/m2
kg/m2 ◦ cover beton = 30 mm ◦ Penggantung plafond = 7 kg/m2
kg/m2 ◦ Øtul.renc. = 8 mm ◦ Instalasi listrik & pipa = 40 kg/m2
kg/m2 ◦ b = 1000 mm ◦ Spesi = 42 kg/m2
kg/m2 ◦ dx = 86 mm ◦ Keramik = 24 kg/m2
kg/m2 ◦ dy = 78 mm qd total = 412 kg/m2
◦ ρ min = 0.0044 ◦ Beban hidup
kg/m2 ◦ ρ max = 0.0331 ◦ Beban ruang arsip = 400 kg/m2
kg/m2 ◦ m = 12.5490 ql total = 400 kg/m2
◦ β1 = 0.85 ◦ Beban ultimate rencana
◦ ρb = 0.0442 ◦ qu = 1,2qd + 1,6ql
◦ φ = 0.8 = 1134.4 kg/m2
◦ Ly/Lx = 1.03 < 2 two way slab
= 1.0

● Tabel perhitungan
x Mu Mn Rn ρ ρ' As perlu As pasang D-S
kgm/m Nmm/m mm mm
Lx 21 362 4529233.8 0.61 0.0019 0.0044 376.25 558.51 Ø8 - 90
Ly 21 362 4529233.8 0.74 0.0024 0.0044 341.25 558.51 Ø8 - 90
Tx 52 897 11215246 1.52 0.0049 0.0049 420.43 558.51 Ø8 - 90
Ty 52 897 11215246 1.84 0.0060 0.0060 466.86 558.51 Ø8 - 90
TP x 111.70 143.62 Ø8 - 350
TP y 111.70 143.62 Ø8 - 350
● Kontrolρ ● Gambar penulangan
0.975 syarat, 0.975
ρ min < ρ pasang < ρ max
Lx 0.0044 < 0.0065 < 0.0331 ok Ø8 - 350

0.975
Ly 0.0044 < 0.0072 < 0.0331 ok Ø8 - 90 Ø8 - 350

Tx 0.0044 < 0.0065 < 0.0331 ok Ø8 - 90

3.9 m Ty 0.0044 < 0.0072 < 0.0331 ok


Ø8 - 350

Ø8 - 350

Ø8 - 350
Ø8 - 90
maka tulangan plat termasuk kondisi
balance

Ø8 - 90
4 m

PLAT TIPE i

● Propertis ● Pembebanan
cm ◦ Tebal plat = 12 cm ◦ Tebal aspal = 0 cm
kg/m2 ◦ BJ beton = 2400 kg/m3 ◦ BJ aspal (per cm tebal) = 14 kg/m2
cm ◦ fc' beton = 30 Mpa ◦ Tebal spesi = 2 cm
kg/m2 ◦ fy tul.lentur = 320 Mpa ◦ BJ spesi (per cm tebal) = 21 kg/m2
◦ Beban mati
kg/m2 ● Perencanaan ◦ Berat sendiri = 288 kg/m2
kg/m2 ◦ Lx = 2m ◦ Aspal = 0 kg/m2
kg/m2 ◦ Ly = 2.1 m ◦ Plafond = 11 kg/m2
kg/m2 ◦ cover beton = 30 mm ◦ Penggantung plafond = 7 kg/m2
kg/m2 ◦ Øtul.renc. = 8 mm ◦ Instalasi listrik & pipa = 40 kg/m2
kg/m2 ◦ b = 1000 mm ◦ Spesi = 42 kg/m2
kg/m2 ◦ dx = 86 mm ◦ Keramik = 24 kg/m2
kg/m2 ◦ dy = 78 mm qd total = 412 kg/m2
◦ ρ min = 0.0044 ◦ Beban hidup
kg/m2 ◦ ρ max = 0.0331 ◦ Beban ruang arsip = 400 kg/m2
kg/m2 ◦ m = 12.5490 ql total = 400 kg/m2
◦ β1 = 0.85 ◦ Beban ultimate rencana
◦ ρb = 0.0442 ◦ qu = 1,2qd + 1,6ql
◦ φ = 0.8 = 1134.4 kg/m2
◦ Ly/Lx = 1.05 < 2 two way slab
= 1.1

● Tabel perhitungan
x Mu Mn Rn ρ ρ' As perlu As pasang D-S
kgm/m Nmm/m mm mm
Lx 25 113 1418000 0.19 0.0006 0.0044 376.25 558.51 Ø8 - 90
Ly 21 95 1191120 0.20 0.0006 0.0044 341.25 558.51 Ø8 - 90
Tx 59 268 3346480 0.45 0.0014 0.0044 376.25 558.51 Ø8 - 90
Ty 54 245 3062880 0.50 0.0016 0.0044 341.25 558.51 Ø8 - 90
TP x 111.70 143.62 Ø8 - 350
TP y 111.70 143.62 Ø8 - 350

● Kontrolρ ● Gambar penulangan


0.25 syarat, 0.5
ρ min < ρ pasang < ρ max
Lx 0.0044 < 0.0065 < 0.0331 ok Ø8 - 350

0.5
Ly 0.0044 < 0.0072 < 0.0331 ok Ø8 - 90 Ø8 - 350

Tx 0.0044 < 0.0065 < 0.0331 ok Ø8 - 90

1m Ty 0.0044 < 0.0072 < 0.0331 ok


Ø8 - 350

Ø8 - 350

Ø8 - 350
Ø8 - 90
maka tulangan plat termasuk kondisi
balance

Ø8 - 90
2.1 m

PLAT TIPE j

● Propertis ● Pembebanan
cm ◦ Tebal plat = 12 cm ◦ Tebal aspal = 0 cm
kg/m2 ◦ BJ beton = 2400 kg/m3 ◦ BJ aspal (per cm tebal) = 14 kg/m2
cm ◦ fc' beton = 30 Mpa ◦ Tebal spesi = 2 cm
kg/m2 ◦ fy tul.lentur = 320 Mpa ◦ BJ spesi (per cm tebal) = 21 kg/m2
◦ Beban mati
kg/m2 ● Perencanaan ◦ Berat sendiri = 288 kg/m2
kg/m2 ◦ Lx = 2m ◦ Aspal = 0 kg/m2
kg/m2 ◦ Ly = 4.2 m ◦ Plafond = 11 kg/m2
kg/m2 ◦ cover beton = 30 mm ◦ Penggantung plafond = 7 kg/m2
kg/m2 ◦ Øtul.renc. = 8 mm ◦ Instalasi listrik & pipa = 40 kg/m2
kg/m2 ◦ b = 1000 mm ◦ Spesi = 42 kg/m2
kg/m2 ◦ dx = 86 mm ◦ Keramik = 24 kg/m2
kg/m2 ◦ dy = 78 mm qd total = 412 kg/m2
◦ ρ min = 0.0044 ◦ Beban hidup
kg/m2 ◦ ρ max = 0.0331 ◦ Beban ruang arsip = 400 kg/m2
kg/m2 ◦ m = 12.5490 ql total = 400 kg/m2
◦ β1 = 0.85 ◦ Beban ultimate rencana
◦ ρb = 0.0442 ◦ qu = 1,2qd + 1,6ql
◦ φ = 0.8 = 1134.4 kg/m2
◦ Ly/Lx = 2.10 > 2 one way slab
= 2.1

● Tabel perhitungan
x Mu Mn Rn ρ ρ' As perlu As pasang D-S
kgm/m Nmm/m mm mm
Lx 41 186 2325520 0.31 0.0010 0.0044 376.25 558.51 Ø8 - 90
Ly 11 50 623920 0.10 0.0003 0.0044 341.25 558.51 Ø8 - 90
Tx 83 377 4707760 0.64 0.0020 0.0044 376.25 558.51 Ø8 - 90
Ty 57 259 3233040 0.53 0.0017 0.0044 341.25 558.51 Ø8 - 90
TP x 111.70 558.51 Ø8 - 90
TP y 111.70 143.62 Ø8 - 350

● Kontrolρ ● Gambar penulangan


0.25 syarat, 0.5
ρ min < ρ pasang < ρ max
Lx 0.0044 < 0.0065 < 0.0331 ok Ø8 - 350

0.5
Ly 0.0044 < 0.0072 < 0.0331 ok Ø8 - 350

Tx 0.0044 < 0.0065 < 0.0331 ok


1m Ty 0.0044 < 0.0072 < 0.0331 ok
Ø8 - 350

Ø8 - 90
maka tulangan plat termasuk kondisi
balance Ø8 - 350

Ø8 - 90
4.2 m

PLAT TIPE k

● Propertis ● Pembebanan
cm ◦ Tebal plat = 12 cm ◦ Tebal aspal = 0 cm
kg/m2 ◦ BJ beton = 2400 kg/m3 ◦ BJ aspal (per cm tebal) = 14 kg/m2
cm ◦ fc' beton = 30 Mpa ◦ Tebal spesi = 2 cm
kg/m2 ◦ fy tul.lentur = 320 Mpa ◦ BJ spesi (per cm tebal) = 21 kg/m2
◦ Beban mati
kg/m2 ● Perencanaan ◦ Berat sendiri = 288 kg/m2
kg/m2 ◦ Lx = 1m ◦ Aspal = 0 kg/m2
kg/m2 ◦ Ly = 1m ◦ Plafond = 11 kg/m2
kg/m2 ◦ cover beton = 30 mm ◦ Penggantung plafond = 7 kg/m2
kg/m2 ◦ Øtul.renc. = 8 mm ◦ Instalasi listrik & pipa = 40 kg/m2
kg/m2 ◦ b = 1000 mm ◦ Spesi = 42 kg/m2
kg/m2 ◦ dx = 86 mm ◦ Keramik = 24 kg/m2
kg/m2 ◦ dy = 78 mm qd total = 412 kg/m2
◦ ρ min = 0.0044 ◦ Beban hidup
kg/m2 ◦ ρ max = 0.0331 ◦ Beban ruang arsip = 400 kg/m2
kg/m2 ◦ m = 12.5490 ql total = 400 kg/m2
◦ β1 = 0.85 ◦ Beban ultimate rencana
◦ ρb = 0.0442 ◦ qu = 1,2qd + 1,6ql
◦ φ = 0.8 = 1134.4 kg/m2
◦ Ly/Lx = 1.00 < 2 two way slab
= 1.0

● Tabel perhitungan
Mu Mn Rn ρ ρ' As perlu As pasang D-S
kgm/m Nmm/m mm mm
TP x 111.70 143.62 Ø8 - 350
TP y 111.70 143.62 Ø8 - 350

● Kontrolρ ● Gambar penulangan


0.25 syarat,
ρ min < ρ pasang < ρ max
TP x 0.0044 > 0.0018 < 0.0331 ok Ø8 - 350

TP y 0.0044 > 0.0018 < 0.0331 ok Ø8 - 350

maka tulangan plat termasuk kondisi


1m underreinforce
Ø8 - 350

Ø8 - 350

Ø8 - 350
1 m

PLAT TIPE l

● Propertis ● Pembebanan
cm ◦ Tebal plat = 12 cm ◦ Tebal aspal = 0 cm
kg/m2 ◦ BJ beton = 2400 kg/m3 ◦ BJ aspal (per cm tebal) = 14 kg/m2
cm ◦ fc' beton = 30 Mpa ◦ Tebal spesi = 2 cm
kg/m2 ◦ fy tul.lentur = 320 Mpa ◦ BJ spesi (per cm tebal) = 21 kg/m2
◦ Beban mati
kg/m2 ● Perencanaan ◦ Berat sendiri = 288 kg/m2
kg/m2 ◦ Lx = 1m ◦ Aspal = 0 kg/m2
kg/m2 ◦ Ly = 4m ◦ Plafond = 11 kg/m2
kg/m2 ◦ cover beton = 30 mm ◦ Penggantung plafond = 7 kg/m2
kg/m2 ◦ Øtul.renc. = 8 mm ◦ Instalasi listrik & pipa = 40 kg/m2
kg/m2 ◦ b = 1000 mm ◦ Spesi = 42 kg/m2
kg/m2 ◦ dx = 86 mm ◦ Keramik = 24 kg/m2
kg/m2 ◦ dy = 78 mm qd total = 412 kg/m2
◦ ρ min = 0.0044 ◦ Beban hidup
kg/m2 ◦ ρ max = 0.0331 ◦ Beban ruang arsip = 400 kg/m2
kg/m2 ◦ m = 12.5490 ql total = 400 kg/m2
◦ β1 = 0.85 ◦ Beban ultimate rencana
◦ ρb = 0.0442 ◦ qu = 1,2qd + 1,6ql
◦ φ = 0.8 = 1134.4 kg/m2
◦ Ly/Lx = 4.00 > 2 one way slab
= > 2,5

● Tabel perhitungan
Mu Mn Rn ρ ρ' As perlu As pasang D-S
kgm/m Nmm/m mm mm
Tump 567 7090000 1.63 0.0053 0.0053 452.36 558.51 Ø8 - 90
Bebas 0 0 - 0.0000 0.0044 341.25 558.51 Ø8 - 90
TP y 111.70 143.62 Ø8 - 350

● Kontrolρ ● Gambar penulangan


0.25 syarat,
ρ min < ρ pasang < ρ max
Tum 0.0044 < 0.0065 < 0.0331 ok Ø8 - 350

Beba 0.0044 < 0.0072 < 0.0331 ok Ø8 - 350

maka tulangan plat termasuk kondisi


1m balance
Ø8 - 350

Ø8 - 90

Ø8 - 90
Ø8 - 350

4 m

PLAT TIPE m

● Propertis ● Pembebanan
cm ◦ Tebal plat = 12 cm ◦ Tebal aspal = 0 cm
kg/m2 ◦ BJ beton = 2400 kg/m3 ◦ BJ aspal (per cm tebal) = 14 kg/m2
cm ◦ fc' beton = 30 Mpa ◦ Tebal spesi = 2 cm
kg/m2 ◦ fy tul.lentur = 320 Mpa ◦ BJ spesi (per cm tebal) = 21 kg/m2
◦ Beban mati
kg/m2 ● Perencanaan ◦ Berat sendiri = 288 kg/m2
kg/m2 ◦ Lx = 1m ◦ Aspal = 0 kg/m2
kg/m2 ◦ Ly = 4.2 m ◦ Plafond = 11 kg/m2
kg/m2 ◦ cover beton = 30 mm ◦ Penggantung plafond = 7 kg/m2
kg/m2 ◦ Øtul.renc. = 8 mm ◦ Instalasi listrik & pipa = 40 kg/m2
kg/m2 ◦ b = 1000 mm ◦ Spesi = 42 kg/m2
kg/m2 ◦ dx = 86 mm ◦ Keramik = 24 kg/m2
kg/m2 ◦ dy = 78 mm qd total = 412 kg/m2
◦ ρ min = 0.0044 ◦ Beban hidup
kg/m2 ◦ ρ max = 0.0331 ◦ Beban ruang arsip = 400 kg/m2
kg/m2 ◦ m = 12.5490 ql total = 400 kg/m2
◦ β1 = 0.85 ◦ Beban ultimate rencana
◦ ρb = 0.0442 ◦ qu = 1,2qd + 1,6ql
◦ φ = 0.8 = 1134.4 kg/m2
◦ Ly/Lx = 4.20 > 2 one way slab
= > 2,5
● Tabel perhitungan
Mu Mn Rn ρ ρ' As perlu As pasang D-S
kgm/m Nmm/m mm mm
Tump 567 7090000 1.63 0.0053 0.0053 452.36 558.51 Ø8 - 90
Bebas 0 0 - 0.0000 0.0044 341.25 558.51 Ø8 - 90
TP y 111.70 143.62 Ø8 - 350

● Kontrolρ ● Gambar penulangan


0.25 syarat,
ρ min < ρ pasang < ρ max
Tum 0.0044 < 0.0065 < 0.0331 ok Ø8 - 350

Beba 0.0044 < 0.0072 < 0.0331 ok Ø8 - 350

maka tulangan plat termasuk kondisi


1m balance
Ø8 - 350

Ø8 - 90

Ø8 - 90
Ø8 - 350

4.2 m

PLAT TIPE n

● Propertis ● Pembebanan
cm ◦ Tebal plat = 12 cm ◦ Tebal aspal = 0 cm
kg/m2 ◦ BJ beton = 2400 kg/m3 ◦ BJ aspal (per cm tebal) = 14 kg/m2
cm ◦ fc' beton = 30 Mpa ◦ Tebal spesi = 2 cm
kg/m2 ◦ fy tul.lentur = 320 Mpa ◦ BJ spesi (per cm tebal) = 21 kg/m2
◦ Beban mati
kg/m2 ● Perencanaan ◦ Berat sendiri = 288 kg/m2
kg/m2 ◦ Lx = 1m ◦ Aspal = 0 kg/m2
kg/m2 ◦ Ly = 3.9 m ◦ Plafond = 11 kg/m2
kg/m2 ◦ cover beton = 30 mm ◦ Penggantung plafond = 7 kg/m2
kg/m2 ◦ Øtul.renc. = 8 mm ◦ Instalasi listrik & pipa = 40 kg/m2
kg/m2 ◦ b = 1000 mm ◦ Spesi = 42 kg/m2
kg/m2 ◦ dx = 86 mm ◦ Keramik = 24 kg/m2
kg/m2 ◦ dy = 78 mm qd total = 412 kg/m2
◦ ρ min = 0.0044 ◦ Beban hidup
kg/m2 ◦ ρ max = 0.0331 ◦ Beban ruang arsip = 400 kg/m2
kg/m2 ◦ m = 12.5490 ql total = 400 kg/m2
◦ β1 = 0.85 ◦ Beban ultimate rencana
◦ ρb = 0.0442 ◦ qu = 1,2qd + 1,6ql
◦ φ = 0.8 = 1134.4 kg/m2
◦ Ly/Lx = 3.90 > 2 one way slab
= > 2,5

● Tabel perhitungan
Mu Mn Rn ρ ρ' As perlu As pasang D-S
kgm/m Nmm/m mm mm
Tump 567 7090000 1.63 0.0053 0.0053 452.36 558.51 Ø8 - 90
Bebas 0 0 - 0.0000 0.0044 341.25 558.51 Ø8 - 90
TP y 111.70 143.62 Ø8 - 350

● Kontrolρ ● Gambar penulangan


0.25 syarat,
ρ min < ρ pasang < ρ max
Tum 0.0044 < 0.0065 < 0.0331 ok Ø8 - 350

Beba 0.0044 < 0.0072 < 0.0331 ok Ø8 - 350

maka tulangan plat termasuk kondisi


1m balance
Ø8 - 350

Ø8 - 90

Ø8 - 90
Ø8 - 350

3.9 m
PRELIM TEBAL PLAT
● Propertis
◦ Tebal plat = 15 cm
◦ BJ beton = 2400 kg/m3
kg/m2 ◦ fc' beton = 29.05 Mpa
◦ fy tul.lentur = 500 Mpa
kg/m2 ◦ fy tul.geser = 500 Mpa

kg/m2 ● plat kantilever 1arah = L bentang pendek/10


kg/m2 = 100 mm
kg/m2
kg/m2 ● plat 2arah
kg/m2 ◦ misal plat tipe a, direncanakan tebal (h) = 15 cm
kg/m2 panjang bersih bentang panjang (Ly) = 390 cm
kg/m2 b balok as B 3-4 = 30 cm
kg/m2 b balok as C 3-4 = 30 cm → Rasio panjang bersih adalah
panjang bersih bentang pendek (Lx) = 390 cm β= 1
kg/m2 b balok as 3 B-C = 30 cm
kg/m2 b balok as 4 B-C = 30 cm

tinjau balok as B 3-4


data balok induk as B 3-4
b= 30 cm
h= 50 cm
dicari lebar efektif (be) → be= b+2hb = 100 cm
be= b+8hf = 150 cm
diambil yang terkecil, be= 100 cm
b

mencari nilai k
k = 1+(be/bw-1)x(hf/h)*(4-(6*(hf/h))+(4*(hf/h)^2)+(((be/bw)-1)x(hf/h/)^3))
1+((be/bw)-1)x(hf/h)
k= 2.836

mencari momen inersia penampang


Ibalok= k*1/12*b*h3 = 886281 cm4
Iplat= 1/12*b*h3 = 115313 cm4
maka rasio kekakuan balok terhadap plat adalah
α1 = 7.7
maka nilaiαm = 7.7
untukαm > 2, tebal plat tidak boleh kurang dari

4m h= 98
dan tidak boleh kurang dari 90mm

maka diambil tebal plat 100 mm


kg/m2

kg/m2

kg/m2
kg/m2
kg/m2
kg/m2
kg/m2
kg/m2
kg/m2
kg/m2

kg/m2
kg/m2

3.9 m
kg/m2

kg/m2

kg/m2
kg/m2
kg/m2
kg/m2
kg/m2
kg/m2
kg/m2
kg/m2

kg/m2
kg/m2

1m
kg/m2

kg/m2

kg/m2
kg/m2
kg/m2
kg/m2
kg/m2
kg/m2
kg/m2
kg/m2

kg/m2
kg/m2

1m
kg/m2

kg/m2

kg/m2
kg/m2
kg/m2
kg/m2
kg/m2
kg/m2
kg/m2
kg/m2

kg/m2
kg/m2
1m

kg/m2

kg/m2

kg/m2
kg/m2
kg/m2
kg/m2
kg/m2
kg/m2
kg/m2
kg/m2

kg/m2
kg/m2
1m

PRELIM TEBAL PLAT


● Propertis
◦ Tebal plat = 12 cm
◦ BJ beton = 2400 kg/m3
kg/m2 ◦ fc' beton = 30 Mpa
◦ fy tul.lentur = 320 Mpa
kg/m2 ◦ fy tul.geser = 320 Mpa

kg/m2 ● plat kantilever 1arah = L bentang pendek/10


kg/m2 = 100 mm
kg/m2
kg/m2 ● plat 2arah
kg/m2 ◦ misal plat tipe a, direncanakan tebal (h) = 12 cm
kg/m2 panjang bersih bentang panjang (Ly) = 390 cm
kg/m2 b balok as B 3-4 = 30 cm
kg/m2 b balok as C 3-4 = 30 cm → Rasio panjang bersih adalah
panjang bersih bentang pendek (Lx) = 390 cm β= 1
kg/m2 b balok as 3 B-C = 30 cm
kg/m2 b balok as 4 B-C = 30 cm

tinjau balok as B 3-4


data balok induk as B 3-4
b= 30 cm
h= 50 cm
dicari lebar efektif (be) → be= b+2hb = 106 cm
be= b+8hf = 126 cm
diambil yang terkecil, be= 106 cm

mencari nilai k
k = 1+(be/bw-1)x(hf/h)*(4-(6*(hf/h))+(4*(hf/h)^2)+(((be/bw)-1)x(hf/h/)^3))
1+((be/bw)-1)x(hf/h)
k= 2.718
b

mencari momen inersia penampang


Ibalok= k*1/12*b*h3 = 849330 cm4
Iplat= 1/12*b*h3 = 59040 cm4
maka rasio kekakuan balok terhadap plat adalah
α1 = 14
maka nilaiαm = 14
untukαm > 2, tebal plat tidak boleh kurang dari

4m h= 88
dan tidak boleh kurang dari 90mm

maka diambil tebal plat 100 mm

kg/m2

kg/m2

kg/m2
kg/m2
kg/m2
kg/m2
kg/m2
kg/m2
kg/m2
kg/m2

kg/m2
kg/m2
3.9 m

kg/m2

kg/m2

kg/m2
kg/m2
kg/m2
kg/m2
kg/m2
kg/m2
kg/m2
kg/m2

kg/m2
kg/m2
2m

kg/m2

kg/m2

kg/m2
kg/m2
kg/m2
kg/m2
kg/m2
kg/m2
kg/m2
kg/m2

kg/m2
kg/m2
2m

kg/m2

kg/m2

kg/m2
kg/m2
kg/m2
kg/m2
kg/m2
kg/m2
kg/m2
kg/m2

kg/m2
kg/m2
1m

kg/m2

kg/m2

kg/m2
kg/m2
kg/m2
kg/m2
kg/m2
kg/m2
kg/m2
kg/m2

kg/m2
kg/m2
1m

kg/m2

kg/m2

kg/m2
kg/m2
kg/m2
kg/m2
kg/m2
kg/m2
kg/m2
kg/m2

kg/m2
kg/m2
1m

kg/m2

kg/m2

kg/m2
kg/m2
kg/m2
kg/m2
kg/m2
kg/m2
kg/m2
kg/m2

kg/m2
kg/m2
1m
dalah
dalah
TABEL TABEL
D-n AS D-n AS
1 D6 28.29 1 D8 50.27
2 D6 56.57 2 D8 100.53
3 D6 84.86 3 D8 150.8
4 D6 113.14 4 D8 201.06
5 D6 141.43 5 D8 251.33
6 D6 189.71 6 D8 301.59
7 D6 198 7 D8 351.86
8 D6 226.29 8 D8 402.12
9 D6 254.57 9 D8 452.39
10 D6 282.86 10 D8 502.66
11 D6 311.14 11 D8 552.92
12 D6 339.43 12 D8 603.19
13 D6 367.71 13 D8 653.45
14 D6 396 14 D8 703.72
15 D6 424.29 15 D8 753.98
16 D6 452.57 16 D8 804.25
17 D6 480.86 17 D8 854.52
18 D6 509.14 18 D8 904.78
19 D6 537.43 19 D8 955.05
20 D6 565.71 20 D8 1005.31
21 D6 594 21 D8 1055.58
22 D6 622.29 22 D8 1105.84
23 D6 650.57 23 D8 1156.11
24 D6 678.86 24 D8 1206.37
25 D6 707.14 25 D8 1256.64
26 D6 735.43 26 D8 1306.91
27 D6 763.71 1 D9 63.62
28 D6 792 2 D9 127.23
29 D6 820.29 3 D9 190.85
30 D6 848.57 4 D9 254.47
1 D8 50.29 5 D9 318.09
2 D8 100.57 6 D9 381.7
3 D8 150.86 7 D9 445.32
4 D8 201.14 8 D9 508.94
5 D8 251.43 9 D9 572.56
6 D8 301.71 10 D9 636.17
7 D8 352 11 D9 699.79
8 D8 402.29 12 D9 763.41
9 D8 452.57 13 D9 827.03
10 D8 502.86 14 D9 890.64
11 D8 553.14 15 D9 954.26
12 D8 603.43 16 D9 1017.88
13 D8 653.71 17 D9 1081.5
14 D8 704 18 D9 1145.11
15 D8 754.29 19 D9 1208.73
16 D8 804.57 20 D9 1272.35
17 D8 854.86 21 D9 1335.97
18 D8 905.14 22 D9 1399.58
19 D8 955.43 23 D9 1463.2
20 D8 1005.71 24 D9 1526.82
21 D8 1056 25 D9 1590.44
22 D8 1106.29 26 D9 1654.05
23 D8 1156.57 1 D10 78.54
24 D8 1206.86 2 D10 157.08
25 D8 1257.14 3 D10 235.62
26 D8 1307.43 4 D10 314.16
27 D8 1357.71 5 D10 392.7
28 D8 1408 6 D10 471.24
29 D8 1458.29 7 D10 549.78
30 D8 1508.57 8 D10 628.32
1 D10 78.57 9 D10 706.86
2 D10 157.14 10 D10 785.4
3 D10 235.71 11 D10 863.94
4 D10 314.29 12 D10 942.48
5 D10 392.86 13 D10 1021.02
6 D10 471.43 14 D10 1099.56
7 D10 550 15 D10 1178.1
8 D10 628.57 16 D10 1256.64
9 D10 707.14 17 D10 1335.18
10 D10 785.71 18 D10 1413.72
11 D10 864.29 19 D10 1492.26
12 D10 942.86 20 D10 1570.8
13 D10 1021.43 21 D10 1649.34
14 D10 1100 22 D10 1727.88
15 D10 1178.57 23 D10 1806.42
16 D10 1257.14 24 D10 1884.96
17 D10 1335.71 25 D10 1963.5
18 D10 1414.29 26 D10 2042.04
19 D10 1492.86 1 D11 95.03
20 D10 1571.43 2 D11 190.07
21 D10 1650 3 D11 285.1
22 D10 1728.57 4 D11 380.13
23 D10 1807.14 5 D11 475.17
24 D10 1885.71 6 D11 570.2
25 D10 1964.29 7 D11 665.23
26 D10 2042.86 8 D11 760.27
27 D10 2121.43 9 D11 855.3
28 D10 2200 10 D11 950.33
29 D10 2278.57 11 D11 1045.37
30 D10 2357.14 12 D11 1140.4
1 D12 113.1 13 D11 1235.43
2 D12 226.2 14 D11 1330.47
3 D12 339.29 15 D11 1425.5
4 D12 452.39 16 D11 1520.53
5 D12 565.49 17 D11 1615.57
6 D12 678.59 18 D11 1710.6
7 D12 791.68 19 D11 1805.63
8 D12 904.78 20 D11 1900.67
9 D12 1017.88 21 D11 1995.7
10 D12 1130.98 22 D11 2090.73
11 D12 1244.07 23 D11 2185.77
12 D12 1357.17 24 D11 2280.8
13 D12 1470.27 25 D11 2375.84
14 D12 1583.37 26 D11 2470.87
15 D12 1696.46 1 D12 113.1
16 D12 1809.56 2 D12 226.2
17 D12 1922.66 3 D12 339.29
18 D12 2035.76 4 D12 452.39
19 D12 2148.85 5 D12 565.49
20 D12 2261.95 6 D12 678.59
21 D12 2375.05 7 D12 791.68
22 D12 2488.15 8 D12 904.78
23 D12 2601.24 9 D12 1017.88
24 D12 2714.34 10 D12 1130.98
25 D12 2827.44 11 D12 1244.07
26 D12 2940.54 12 D12 1357.17
27 D12 13 D12 1470.27
28 D12 14 D12 1583.37
29 D12 15 D12 1696.46
30 D12 16 D12 1809.56
17 D12 1922.66
18 D12 2035.76
19 D12 2148.85
20 D12 2261.95
21 D12 2375.05
22 D12 2488.15
23 D12 2601.24
24 D12 2714.34
25 D12 2827.44
26 D12 2940.54
1 D13 132.73
2 D13 265.47
3 D13 398.2
4 D13 530.93
5 D13 663.66
6 D13 796.4
7 D13 929.13
8 D13 1061.86
9 D13 1194.59
10 D13 1327.33
11 D13 1460.06
12 D13 1592.79
13 D13 1725.52
14 D13 1858.26
15 D13 1990.99
16 D13 2123.72
17 D13 2256.45
18 D13 2389.19
19 D13 2521.92
20 D13 2654.65
21 D13 2787.38
22 D13 2920.12
23 D13 3052.85
24 D13 3185.58
25 D13 3318.32
26 D13 3451.05
1 D14 153.94
2 D14 307.88
3 D14 461.82
4 D14 615.75
5 D14 769.69
6 D14 923.63
7 D14 1077.57
8 D14 1231.51
9 D14 1385.45
10 D14 1539.38
11 D14 1693.32
12 D14 1847.26
D13 - 1 132.73 13 D14 2001.2
D13 - 2 265.47 14 D14 2155.14
D13 - 3 398.2 15 D14 2309.08
D13 - 4 530.93 16 D14 2463.01
D13 - 5 663.66 17 D14 2616.95
D13 - 6 796.4 18 D14 2770.89
D13 - 7 929.13 19 D14 2924.83
D13 - 8 1061.86 20 D14 3078.77
D13 - 9 1194.59 21 D14 3232.71
D13 - 10 1327.33 22 D14 3386.64
D13 - 11 1460.06 23 D14 3540.58
D13 - 12 1592.79 24 D14 3694.52
D13 - 13 1725.52 25 D14 3848.46
D13 - 14 1858.26 26 D14 4002.4
D13 - 15 1990.99 1 D16 201.06
D13 - 16 2123.72 2 D16 402.12
D13 - 17 2256.45 3 D16 603.19
D13 - 18 2389.19 4 D16 804.25
D13 - 19 2521.92 5 D16 1005.31
D13 - 20 2654.65 6 D16 1206.37
D13 - 21 2787.38 7 D16 1407.44
D13 - 22 2920.12 8 D16 1608.5
D13 - 23 3052.85 9 D16 1809.56
D13 - 24 3185.58 10 D16 2010.62
D13 - 25 3318.32 11 D16 2211.69
D13 - 26 3451.05 12 D16 2412.75
D14 - 1 153.94 13 D16 2613.81
D14 - 2 307.88 14 D16 2814.87
D14 - 3 461.82 15 D16 3015.94
D14 - 4 615.75 16 D16 3217
D14 - 5 769.69 17 D16 3418.06
D14 - 6 923.63 18 D16 3619.12
D14 - 7 1077.57 19 D16 3820.19
D14 - 8 1231.51 20 D16 4021.25
D14 - 9 1385.45 21 D16 4222.31
D14 - 10 1539.38 22 D16 4423.37
D14 - 11 1693.32 23 D16 4624.44
D14 - 12 1847.26 24 D16 4825.5
D14 - 13 2001.2 25 D16 5026.56
D14 - 14 2155.14 26 D16 5227.62
D14 - 15 2309.08 1 D19 283.53
D14 - 16 2463.01 2 D19 567.06
D14 - 17 2616.95 3 D19 850.59
D14 - 18 2770.89 4 D19 1134.12
D14 - 19 2924.83 5 D19 1417.65
D14 - 20 3078.77 6 D19 1701.18
D14 - 21 3232.71 7 D19 1984.71
D14 - 22 3386.64 8 D19 2268.24
D14 - 23 3540.58 9 D19 2551.76
D14 - 24 3694.52 10 D19 2835.29
D14 - 25 3848.46 11 D19 3118.82
D14 - 26 4002.4 12 D19 3402.35
D16 - 1 201.06 13 D19 3685.88
D16 - 2 402.12 14 D19 3969.41
D16 - 3 603.19 15 D19 4252.94
D16 - 4 804.25 16 D19 4536.47
D16 - 5 1005.31 17 D19 4820
D16 - 6 1206.37 18 D19 5103.53
D16 - 7 1407.44 19 D19 5387.06
D16 - 8 1608.5 20 D19 5670.59
D16 - 9 1809.56 21 D19 5954.12
D16 - 10 2010.62 22 D19 6237.65
D16 - 11 2211.69 23 D19 6521.18
D16 - 12 2412.75 24 D19 6804.71
D16 - 13 2613.81 25 D19 7088.24
D16 - 14 2814.87 26 D19 7371.76
D16 - 15 3015.94 1 D22 380.13
D16 - 16 3217 2 D22 760.27
D16 - 17 3418.06 3 D22 1140.4
D16 - 18 3619.12 4 D22 1520.53
D16 - 19 3820.19 5 D22 1900.67
D16 - 20 4021.25 6 D22 2280.8
D16 - 21 4222.31 7 D22 2660.94
D16 - 22 4423.37 8 D22 3041.07
D16 - 23 4624.44 9 D22 3421.2
D16 - 24 4825.5 10 D22 3801.34
D16 - 25 5026.56 11 D22 4181.47
D16 - 26 5227.62 12 D22 4561.6
D19 - 1 283.53 13 D22 4941.74
D19 - 2 567.06 14 D22 5321.87
D19 - 3 850.59 15 D22 5702
D19 - 4 1134.12 16 D22 6082.14
D19 - 5 1417.65 17 D22 6462.27
D19 - 6 1701.18 18 D22 6842.4
D19 - 7 1984.71 19 D22 7222.54
D19 - 8 2268.24 20 D22 7602.67
D19 - 9 2551.76 21 D22 7982.81
D19 - 10 2835.29 22 D22 8362.94
D19 - 11 3118.82 23 D22 8743.07
D19 - 12 3402.35 24 D22 9123.21
D19 - 13 3685.88 25 D22 9503.34
D19 - 14 3969.41 26 D22 9883.47
D19 - 15 4252.94 1 D25 490.88
D19 - 16 4536.47 2 D25 981.75
D19 - 17 4820 3 D25 1472.63
D19 - 18 5103.53 4 D25 1963.5
D19 - 19 5387.06 5 D25 2454.38
D19 - 20 5670.59 6 D25 2945.25
D19 - 21 5954.12 7 D25 3436.13
D19 - 22 6237.65 8 D25 2927
D19 - 23 6521.18 9 D25 4417.88
D19 - 24 6804.71 10 D25 4908.75
D19 - 25 7088.24 11 D25 5399.63
D19 - 26 7371.76 12 D25 5890.5
D22 - 1 380.13 13 D25 6381.38
D22 - 2 760.27 14 D25 6872.25
D22 - 3 1140.4 15 D25 7363.13
D22 - 4 1520.53 16 D25 7854
D22 - 5 1900.67 17 D25 8344.88
D22 - 6 2280.8 18 D25 8835.75
D22 - 7 2660.94 19 D25 9326.63
D22 - 8 3041.07 20 D25 9817.5
D22 - 9 3421.2 21 D25 10308.38
D22 - 10 3801.34 22 D25 10799.25
D22 - 11 4181.47 23 D25 11290.13
D22 - 12 4561.6 24 D25 11781
D22 - 13 4941.74 25 D25 12271.88
D22 - 14 5321.87 26 D25 12762.75
D22 - 15 5702 1 D28 615.75
D22 - 16 6082.14 2 D28 1231.51
D22 - 17 6462.27 3 D28 1847.26
D22 - 18 6842.4 4 D28 2463.01
D22 - 19 7222.54 5 D28 3078.77
D22 - 20 7602.67 6 D28 3694.52
D22 - 21 7982.81 7 D28 4310.28
D22 - 22 8362.94 8 D28 4926.03
D22 - 23 8743.07 9 D28 5541.78
D22 - 24 9123.21 10 D28 6157.54
D22 - 25 9503.34 11 D28 6773.29
D22 - 26 9883.47 12 D28 7389.04
D25 - 1 490.88 13 D28 8004.8
D25 - 2 981.75 14 D28 8620.55
D25 - 3 1472.63 15 D28 9236.3
D25 - 4 1963.5 16 D28 9852.06
D25 - 5 2454.38 17 D28 10467.81
D25 - 6 2945.25 18 D28 11083.56
D25 - 7 3436.13 19 D28 11699.32
D25 - 8 2927 20 D28 12315.07
D25 - 9 4417.88 21 D28 12930.83
D25 - 10 4908.75 22 D28 13546.58
D25 - 11 5399.63 23 D28 14162.33
D25 - 12 5890.5 24 D28 14778.09
D25 - 13 6381.38 25 D28 15393.84
D25 - 14 6872.25 26 D28 16009.59
D25 - 15 7363.13
D25 - 16 7854
D25 - 17 8344.88
D25 - 18 8835.75
D25 - 19 9326.63
D25 - 20 9817.5
D25 - 21 10308.38
D25 - 22 10799.25
D25 - 23 11290.13
D25 - 24 11781
D25 - 25 12271.88
D25 - 26 12762.75
D28 - 1 615.75
D28 - 2 1231.51
D28 - 3 1847.26
D28 - 4 2463.01
D28 - 5 3078.77
D28 - 6 3694.52
D28 - 7 4310.28
D28 - 8 4926.03
D28 - 9 5541.78
D28 - 10 6157.54
D28 - 11 6773.29
D28 - 12 7389.04
D28 - 13 8004.8
D28 - 14 8620.55
D28 - 15 9236.3
D28 - 16 9852.06
D28 - 17 10467.81
D28 - 18 11083.56
D28 - 19 11699.32
D28 - 20 12315.07
D28 - 21 12930.83
D28 - 22 13546.58
D28 - 23 14162.33
D28 - 24 14778.09
D28 - 25 15393.84
D28 - 26 16009.59

Anda mungkin juga menyukai