+ 0.90 x [ 2,945.2 x 400.0 x ( 3,249.5 - 78.

5 ) ]

= 7358 kN.m > 7349 kN.m OK

Cek persyaratan tul. Min - max :

Tul min rmin = 0.0035 = 1.4/fy

 0.85    f `  600  r ' f ' 


rmax = 0.75   1 c  s 
Tul max
 f  600  f  f 
 y  y  y 

= 0.02725 + 0.00057 , r' = As'/bd = 0.0008

= 0.02782

Tul hasil analisis r = As /(bw x d) = 0.0016

r < rmin : pasang tulangan minimum

dan r < rmax : O.K.

Tul terpasang r = 4/3 r = 0.0022

Luas tulangan As = r . bw . d = 8508 mm


2

Jadi Tulangan Utama per meter 18 D 25 atau 1 D 25 - 67

Dipasang 20 D 25

Tulangan Geser :

Vu per meter Vu = 3687 kN

Faktor reduksi geser j = 0.75

Jumlah kaki tul geser n = 4

Luas tul geser Av = 804.2 mm2

vc  f c 'bw .d / 6 = 1/6 x sqrt(35.0) x 1,200.0 x 3,250 = 3844.9 kN

0.5vc = 1922.4 kN

v c  bw .d / 3 = 5144.7 kN

f c ' bw .d = 19224.3 kN
vc  .2
3

Vu / j = 4916 kN < 5145 Tul. Geser Minimum

Vs = Vu / j - Vc = 1071 kN

spasi tul geser, s = 804 mm Pasang Tul. Geser Minimum

Tulangan Geser Dipasang 4 D 16 @ 800

Dipasang 4 D16 - 200

2 . Momen dan Geser ultimate pada irisan 2 :

Mu = 2461 kNm

Vu = 3431 kN