backlogs - konsepnya kelebihan demand/demand yg gbs ditutupin trs dipindah kebln slanjutnya
$50/jam 1unit = 3,5 jam
1jam = 3,5
3,5jam = (3 x 50) + (0,5 x 50) = $175
overtime price vs subkontrak = lebi murah overtime
overtime awalnya diisi = jml hari x 10 karyawan aja
prod unit/hari = 20
max overtime
3,5 jam = 1 unit x 10 karyawan = 10 unit
8 H 17
9
8 17
litasan
ABEGI 22
ACFGI 17
ADFGI 21
ADHI 21
Jadi ekspektasi waktu untuk menyelesaikan proyek tersebut adalah 22 bulan.
waktu tersedia
kegiatan CC/bulan
waktu normal waktu crash
A 1 - -
B 4 2 500
E 6 4 150
G 7 5 200
I 4 2 150
CP N=0 N=1 N=2 N=3
ABEGI 22 21 20 19
ACFGI 17 16 15 15
ADFGI 21 20 19 19
ADHI 21 20 19 19
Act to crash - I I E
Cost to crash - $ 150,000,000 $ 300,000,000 $ 450,000,000
pinalti (>18) $ 400,000,000 $ 300,000,000 $ 200,000,000 $ 100,000,000
TC $ 5,900,000,000 $ 5,700,000,000 $ 5,500,000,000 $ 5,300,000,000
Jadi waktu optimal mengerjakan projkect tersebut adalah 22-3 hari = 19 bulan
TC = $5,300,000,000
pendapatan $ 8,000,000,000
$ 5,300,000,000
$ 2,700,000,000
N=4
18
15
18
18
E,D
$ 850,000,000
-
$ 5,350,000,000
DIK
D 7200
Cs 1000
Cc 8% dr nilai barang
c) ROP = LT x d + Z . Vd
D = 7200/2400 = 3 Z = 1,89
Lt = 5 + 2 = 7
158.9
d)
Q yg visible
Qvisible/2
SS
TABEL MRP
Minggu ke- -1 1 2 3 4 5 6
Item ID: Alpha Gross Requirement 300 1500
Level code: 0 Scheduled Receipts 200 400
On hand: 300 Projected On Hand 300 300 500 600 600 20
Lot Size: LFL Net Requirements 0 900
LT: 2 Planned Order Receipts 920
SS: 20 Planned Order Releases 920
Item ID: Betha Gross Requirement 500 500
Level code: 0 Scheduled Receipts
On hand: 400 Projected On Hand 400 400 400 400 150 150
Lot Size: LFL Net Requirements 100 350
LT: 2 Planned Order Receipts 250 500
SS: 150 Planned Order Releases 250 500
Item ID: D Gross Requirement 500 1000
Level code: 2 Scheduled Receipts 100 50
On hand: 100 Projected On Hand 100 200
Lot Size: LFL Net Requirements 250 1000
LT: 2 Planned Order Receipts 250 1000
SS: 0 Planned Order Releases 250 1000
Item ID: B Gross Requirement 250 1000 1840
Level code: 2/3 Scheduled Receipts
On hand: 1500 Projected On Hand 1500 1250 1250 250 210 210 210
Lot Size: 150 Net Requirements 0 1590
LT: 2 Planned Order Receipts 1800
SS: 150 Planned Order Releases 1800
RINGKASAN MRP:
item minggu unit
A -1 1100
2 1000
backlogs - konsepnya kelebihan demand/demand yg gbs ditutupin trs dipindah kebln slanjutnya
$50/jam 1unit = 3,5 jam
1jam = 3,5
3,5jam = (3 x 50) + (0,5 x 50) = $175
overtime price vs subkontrak = lebi murah overtime
overtime awalnya diisi = jml hari x 10 karyawan aja
prod unit/hari = 10
max overtime
3,5 jam = 1 unit x 10 karyawan = 10 unit