Anda di halaman 1dari 13

REKAPITULASI BIAYA PEKERJAAN

Pekerjaan
PENGOPERASIAN DAN PEMELIHARAAN WATER TREATMENT & INJECTION PLANT DI SP
SUNGAI GELAM JAMBI

Periode : 730 hari kalender

No. URAIAN PEKERJAAN BIAYA


1. UPAH PEKERJA -
2. PERLENGKAPAN KERJA -
3. PERALATAN KERJA ATK -
4. PERALATAN KERJA OPERASIONAL & ADMINISTRASI -
5. SEWA KENDARAAN (DENGAN DRIVER) -
6. SEWA BASE CAMP -
7. KEBUTUHAN CHEMICAL -
8. KEBUTUHAN SPARE PARTS WTIP -

GRAND TOTAL -
PEMBULATAN -
Terbilang :

0 rupiah.
ESTIMASI BIAYA PEKERJAAN

PENGOPERASIAN DAN PEMELIHARAAN WATER TREATMENT & INJECTION PLANT DI SP SUNGAI GELAM JAMBI

Periode : 730 hari kalender


No. Pekerjaan Minimum Rate Biaya (Rp) Durasi Total (Rp)
Pengoperasian & Pemeliharaan Water Treatment & Injection
1
Plant SP Sungai Gelam
Include :
1) UPAH PEKERJA
2) PERLENGKAPAN KERJA
3) PERALATAN KERJA ATK
1,000 BPD - Rp/barrel 730 Hari -
4) PERALATAN KERJA OPERASIONAL & ADMINISTRASI
5) SEWA KENDARAAN
6) SEWA BASE CAMP
7) KEBUTUHAN CHEMICAL
8) KEBUTUHAN SPARE PARTS

JUMLAH TOTAL -
DIBULATKAN -
Terbilang :
0 rupiah.
ESTIMASI UPAH PEKERJA
PENGOPERASIAN DAN PEMELIHARAAN WATER TREATMENT & INJECTION PLANT DI SP SUNGAI GELAM
JAMBI

Periode : 24 Bulan

JAMBI
SISTEM KERJA & KLASIFIKASI TENAGA KERJA
No. KOMPONEN UPAH/BULAN TENAGA KERJA NON SHIFT SHIFT 2 : 1 NON SHIFT
Asisten Ahli Lab &
Opr. I WIP (Raw Water) Pmk. Tk. I Instrument
WTIP

A Jumlah Tenaga Kerja Org 2 6 1


Upah Pokok Rp
Tunj.Atas Upah Pokok (TAUP) Rp
Upah Rp - - -
Masa Kerja thn 1.00 1.00 1.00
Lembur :
Tarif Lembur/Jam = 1/173 x Upah Rp - - -
Tarif Transport Lembur PP/hari Rp -
Tarif Uang Makan Lembur Rp -
Hari Lembur/Bulan Hari -
Jam Lembur/bulan (sudah konversi) Jam -
Dinas Luar :
Jumlah Dinas Luar/Orang/bulan hari -
Tarif Transport Dinas Luar / Km Km -
Tarif Dinas Luar / Hari hari -
Akomodasi / malam mlm -

UPAH (SATUAN DALAM BULANAN)


1 Upah = Upah Pokok + Tunj.Atas Upah Pokok (TAUP) Rp - - -
2 Tunjangan Kehadiran/hari Rp -
3 Jamsostek
JKK = 1,74 % x Upah Rp - - -
JK = 0.3% x Upah Rp - - -
JHT = 3.7% x Upah Rp - - -
JPK = 4% x Upah Rp - - -
4 Santuan Pengakhiran Hubungan Kerja (SPHK)
SPHK = 2 x 8,33% x Upah Rp - - -
5 Tunjangan Hari Raya Keagaman
THRK = 1/12 X Upah untuk setiap bulan. Rp - - -
6 Premi Shift
Shift 2:1 = 15% x Upah Pokok x Jam Kerja sebulan x 1/173 Rp - - -
7 Tunj.Restrukturisasi Pola Kerja Shift 2:1 Rp -
8 Extra Fooding (1.400 kalori)= @Rp. 12000 Rp -
9 Lembur :
KJK Shift 2:1 = 7,5 x 1/173 x Upah x hari masuk Rp - - -
Tarif Lembur Per Bulan = 1/173 x Upah x Jam lembur sebulan Rp - - -
Trans.Lembur = Tarif transport x hari lembur Rp - - -
Uang Makan Lembur = Tarif makan x hari lembur Rp - - -
10 Komp.Dinas Luar
Dinas Luar = Tarif Dinas Luar / Hari x Jumlah Dinas Luar/Orang/bulan - - -
Trans. Dinas Luar /km Rp. 350 Rp -
Akomodasi Rp - - -
B. TOTAL UPAH / ORG / BLN = 3 s/d 10 Rp - - -
C. TOTAL UPAH / 24 BLN = (A x B) x 24 Rp - - -
D. TOTAL UPAH 24 BLN = TOTAL C Rp -
E. PROFIT TENAGA KERJA Rp 0% -
F. TOTAL UPAH TENAGA KERJA Rp -
G. PERLENGKAPAN KERJA
1 Pakaian kerja lapangan 2 stel/th
2 Safety Shoes 1 psg/th
3 Topi keselamatan 1 pcs/th
4 Jas hujan 1 pcs/th
5 Ear plug 2 pcs/th
6 Sarung tangan cotton 24 psg/th
7 Sarung tangan kimia 12 psg/th - -
8 Chemical Googles 2 psg/th - -
9 Kacamata pelindung 2 psg/th
10 Masker gas dan chemical 1 psg/th
11 Celemek chemical 12 pcs/th - -
12 ID Card 1 pcs/th
Sub Total Perl. Kerja / 24 bulan - - -
13 Full body hardness 2 pcs
Jumlah Total Perlengkapan Kerja selama 24 bulan -
Stationary & Office Supplies

PENGOPERASIAN DAN PEMELIHARAAN WATER TREATMENT & INJECTION PLANT DI SP SUNGAI GELAM JAMBI

HARGA
NO. NAMA BARANG JML SATUAN SATUAN TOTAL
( Rp. ) ( Rp. )
1 Scientific Calculator 12 digit 1 pcs -
2 Amplop linen pendek "Jaya" No. 104 5 Doz -
3 Amplop Dinas Perusahaan 200 Pcs -
4 Buku KIY besar isi 100 Lbr 12 Bk -
5 Buku KIY besar isi 200 Lbr 12 Bk -
6 Buku KIY kecil isi 100 Lbr 12 Bk -
7 Buku KIY kecil isi 200 Lbr 12 Bk -
8 Kertas HVS A4 / 70 gram 24 Rim -
9 Kertas HVS A3 / 80 gram 1 Rim -
10 Tipp Ex Fluid (model pencil)/Correction pen 12 Pcs -
11 Hecmachine HD - 10 "Max" 3 Pcs -
12 Hecmachine HD - 50 "Max" 1 Pcs -
13 Lakban kain 5 cm hitam 6 Roll -
14 Ordner map folio 2 ring L-8 cm besar "Bambi" 24 Pcs -
15 Penghapus white board 4 Pcs -
16 Pisau cutter L-500 4 Pcs -
17 Binder clip ukuran 200 3 Doz -
18 Binder clip ukuran 155 3 Doz -
19 Binder clip ukuran 111 3 Doz -
20 Binder clip ukuran 107 3 Doz -
21 Binder clip ukuran 105 3 Doz -
22 Peraut pensil Angel - 5 4 Pcs -
23 Pensil B staedtler 43 Pcs -
24 Post It "warna kuning" sedang 10 Pkg -
25 Lem cair "O GLUE" 50cc 12 Pcs -
26 Perparator besar 2 lubang 4 Pcs -
27 Isolasi Karet warna bening / coklat OPP 2" 6 Roll -
28 Cello tip ukuran sedang 1" PANFIX 4 Roll -
29 Cello tip ukuran kecil ½" PANFIX 4 Roll -
30 Map Perusahaan 200 Pcs -
31 Cartridge dot matric 12 Pcs -

JUMLAH 24 bulan -
Rencana Kebutuhan Peralatan Kerja
Sarana Operasi & Kebutuhan Kantor
A. Sarana Operasi
JUMLAH /
NO. JENIS PERALATAN SATUAN HARGA SATUAN (Rp.) JUMLAH HARGA (Rp.)
(24 BULAN)

1 Flash light (gas proof) 2 pcs 0.00


2 Kotak tempat alat-alat (plate) 2 pcs 0.00
3 "82" piece Master tool set 1 set 0.00
4 Straigh handle pipe Wrech 2 pcs 0.00
5 Chain blok 5 ton 1 pcs 0.00
6 L key tool w/plastic holder (eklind) 1 pcs 0.00
7 Cuting Machine 14" 1 pcs 0.00
8 Jack stand 5 ton 1 pcs 0.00
9 Hand Grinda 4" 1 pcs 0.00
10 Hand Grinda 5" 1 pcs 0.00
11 Drill Machine 1 pcs 0.00
12 Toolkit 1 set 0.00
13 Welding Trafo + Welding Rod 1 lot 0.00
14 Tabung Nitrogen + isi 2 tbg 0.00
15 Tabung Oksigen + isi 2 tbg 0.00
16 Regulator Gas 2 pcs 0.00
17 Slogging Wrench (12 pcs/set) 1 set 0.00
18 Cuting Bros 4" 25 pcs 0.00
19 Blower 12" 1 pcs 0.00
20 Consumable (WD, Majun, etc) 1 lot 0.00

Jumlah A 0.00

B. Kebutuhan Kantor

NO. JENIS PERALATAN JUMLAH / HARGA SATUAN (Rp.) JUMLAH HARGA (Rp.)
SATUAN

Laptop
15.6-inch,FHD (1920 x 1080), Core i5
2.0 Ghz, 8 GB RAM, 512GB SSD, ,
1 Audio, WiFi, Win 11, Microsoft Office 1 unit 0.00
2022

2 - APAR SV-460C 4,6 kg 4 pcs 0.00


Jumlah B 0.00
Jumlah A + B 0.00
A
PERHITUNGAN TARIP SEWA KENDARAAN

- JUMLAH SEWA KENDARAAN : 1 (Satu) UNIT - LOKASI : WTIP SP SUNGAI GELAM


- JENIS ALAT : Mobil Pick Up Diesel - BIAYA SEWA / BULAN (Rp) : -
Isuzu Panther Pick Up (Termasuk biaya OPS)
Std Low Deck 2.5 M/T
2017 - KONDISI DAERAH : Sedang
- LAMA PEMAKAIAN : 24 Bulan - GAJI PENGEMUDI / BULAN (Rp) : -
PROFIT GAJI PENGEMUDI (Rp) : -
TOTAL UPAH PENGEMUDI (Rp) : -
- BBM / Bulan (10 lt / hari) (Rp) :

JUMLAH SEWA PER BULAN -

JUMLAH SEWA / 24 BULAN / unit -

PERLENGKAPAN KERJA
1. PAKAIAN KERJA LAPANGAN 2 Stel/Thn = Rp. -
2. SAFETY SHOES 1 Psg/Thn = Rp. -
3. JAS HUJAN 1 Pce/Thn = Rp. -
4. TANDA PENGENAL 1 Pce/Thn = Rp. -
5. SAFETY HELMET 1 Pce/Thn = Rp. -
TOTAL PERLENGKAPAN KERJA PER TAHUN = Rp. -

GRAND TOTAL (Rp) -


ANALISA BIAYA / UPAH SOPIR
PEKERJAAN :
PENGOPERASIAN DAN PEMELIHARAAN WATER TREATMENT & INJECTION PLANT DI SP SUNGAI GELAM
JAMBI

KLASIFIKASI TENAGA KERJA


NO KOMPONEN BIAYA D
S O P I R - I KRP

I. TARIF SATUAN / ORANG


1. JUMLAH TENAGA SOPIR A 1.00
2. TARIF UPAH POKOK / HARI B Rp. 0.00
3. TUNJANGAN ATAS UPAH POKOK C Rp. 0.00

II. TARIF UPAH / BULAN / ORANG


1. UPAH POKOK D Rp. 0.00
2. TUNJANGAN ATAS UPAH POKOK E Rp. 0.00
3. UPAH (D+E) F Rp. 0.00
4. Jamsostek G Rp. 0.00
5. Santuan Pengakhiran Hubungan Kerja (SPHK) H Rp. 0.00
6. Tunjangan Hari Raya Keagaman I Rp. 0.00
7. Premi Shift J Rp. 0.00
8. Tunj.Restrukturisasi Pola Kerja Shift 2:1 K Rp. 0.00
9. Extra Fooding (1.400 kalori)= @Rp. 12000 L Rp. 0.00
10. Lembur M Rp. 0.00
11. Komp.Dinas Luar N Rp. 0.00

UPAH / ORANG / BULAN O Rp. 0.00


PROFIT 0% P Rp. 0.00
TOTAL UPAH / ORANG / BULAN Q Rp. 0.00
ANALISA PERHITUNGAN SEWA KENDARAAN
Nama Mobil : Diesel Pick Up Std Flat Deck Brand New

Rumus Dasar :

S
Px 1-
n+1
x i x (1+ i) n
(1+i)
A=
(1+i) n - 1

PEHITUNGAN
KETERANGAN NOTASI NILAI TABEL
SEWA
SALVAGE VALUE
Bunga Bank / tahun 6.50% Tahun S
Margin/keuntungan mak 8% 0 100%
Bunga Bank / bulan i 0.00585 1 88%
Jangka Waktu Sewa (Bln) n 24 2 76%
Salvage Value S 76% 3 64%
(1 + i) 1.00585 4 52%
(1 + i) ^ n C1 1.150263359731 5 40%
(1 + i) ^ (n + 1) C2 1.156992400386
1 - S / C2 C3 0.343124466724
C3 * i * C1 C4 0.002308898486
C1 - 1 C5 0.150263359731
Faktor Sewa (F) C4/C5 0.015365678568

PERHITUNGAN SEWA

Nilai perolehan (P) Rp. 0.00

Rata-rata harga sewa/bln PxF Rp. 0.00

Harga mobil (HM) pd Usia PxS


1 - 12 bulan Rp. 0.00
13 - 24 bulan Rp. 0.00
25 - 36 bulan Rp. -

Asuransi All Risk 3.00 % x HM


1 - 12 bulan Rp. 0.00
13 - 24 bulan Rp. 0.00
25 - 36 bulan Rp. -
Rata-rata Asuransi/bln Rp. 0.00

Biaya Operasi: O x HM BIAYA OPERASI


1 - 12 bulan Rp. - Bulan O
13 - 24 bulan Rp. 0.00 1 - 12 0.44%
25 - 36 bulan Rp. - 13 - 24 0.53%
Rata-rata biaya ops/bln Rp. 0.00 25 - 36 0.65%

Total Biaya sewa/bln 0.00


ESTIMASI SEWA BASE CAMP
Spek Rumah : Tipe 70/100
PENGOPERASIAN DAN PEMELIHARAAN WATER TREATMENT & INJECTION PLANT
24 bln
DI SP SUNGAI GELAM JAMBI

PEHITUNGAN
KETERANGAN NOTASI NILAI TABEL
SEWA

PERHITUNGAN SEWA

Nilai sewa / thn (P) Rp.

Rata-rata harga sewa/bln P / 12 Rp. -

Biaya Operasional:
Rek. Telp / bulan Rp.
Rek. Listrik / bulan Rp.
Rek Air / bulan Rp.
Rata-rata biaya ops / bln Rp. -
Total Biaya sewa / bln -
Total Biaya sewa / 24 bulan -
DAFTAR KEBUTUHAN MATERIAL CHEMICAL
WTIP 1,000 BWPD

JML. KEBUTUHAN
NO. JENIS MATERIAL CHEMICAL TYPE HARGA SATUAN (Rp.) JUMLAH HARGA (Rp.) REMARKS
PER DAY PER 1 YEAR
1 DISSOLVED AIR FLOTATION
a. Coagulant Liquid 4.00 Ltr 1,460 Ltr -
b. Flocculant Liquid 2.00 Ltr 730 Ltr -
2 MEDIA FILTER
a. Silica Sand 2,660 Kg - 2 kali ganti / tahun

4 INJECTION UNIT
a. Biocide Liquid 2.00 Lt 730 Lt -
b. HCl Liquid
c. Oxygen Scavenger Liquid 2.00 lt 730 lt -
d. Corrosion Inhibitor Liquid 2.00 lt 730 lt -
e. Scale Inhibitor Liquid 2.00 Lt 730 Lt -

TOTAL -
DAFTAR KEBUTUHAN MATERIAL SPARE PARTS (1Tahun)
WITP 1,000 BWPD

QUANTITY
NO. NAMA PERALATAN BIAYA (Rp) TOTAL BIAYA (Rp) REMARKS

1 POMPA (TORISHIMA) SKIM TANK 1 lot - -


2 POMPA (TORISHIMA) FEED OIL 1 lot - -
3 POMPA (TORISHIMA) MULTI MEDIA FILTER 1 lot - -
4 POMPA (TORISHIMA) BACKWASH 1 lot - -
5 SUBMERSIBLE PUMP (TORISHIMA) 1 lot - -
6 DOSING PUMP 1 lot - -
7 PIPING, INSTRUMENT DAN LAIN-LAIN 1 lot - -

GRAND TOTAL - -
RINCIAN SPARE PART POMPA (TORISHIMA)
KEBUTUHAN PER 1 TAHUN

1 POMPA (TORISHIMA) SKIM TANK

Kebutuhan
No Description P/N Harga Satuan Total Biaya (Rp)
Per 1 Tahun
1 Shaft 0.5 pcs Rp -
2 Grooved Ball Bearing 2 pcs Rp -
3 Mech Seal Kit 2 pcs Rp -
4 Rewinding Elmot 4 kW 1 unit Rp -

TOTAL Rp -

2 POMPA (TORISHIMA) FEED OIL


Kebutuhan
No Description P/N Harga Satuan Total Biaya (Rp)
Per 1 Tahun
1 Shaft 0.5 pcs Rp -
2 Grooved Ball Bearing 2 pcs Rp -
3 Mech Seal Kit 2 pcs Rp -
4 Rewinding Elmot 1.1 kW 1 unit Rp -

TOTAL 0

3 POMPA (TORISHIMA) MULTI MEDIA FILTER

Kebutuhan
No Description P/N Harga Satuan Total Biaya (Rp)
Per 1 Tahun
1 Shaft 0.5 pcs Rp -
2 Grooved Ball Bearing 2 pcs Rp -
3 Mech Seal Kit 2 pcs Rp -
4 Rewinding Elmot 3 kW 1 unit Rp -

TOTAL Rp -

4 POMPA (TORISHIMA) BACKWASH

Kebutuhan
No Description P/N Harga Satuan Total Biaya (Rp)
Per 1 Tahun
1 Shaft 0.5 pcs Rp -
2 Grooved Ball Bearing 2 pcs Rp -
3 Mech Seal Kit 2 pcs Rp -
4 Rewinding Elmot 4 kW 1 unit Rp -

TOTAL Rp -

5 SUBMERSIBLE PUMP (TORISHIMA)

Kebutuhan
No Description P/N Harga Satuan Total Biaya (Rp)
Per 1 Tahun
1 Shaft 0.5 pcs Rp -
2 Casing Wear Ring 1 pcs Rp -
3 Mech Seal Kit 2 pcs Rp -
4 Rewinding Elmot 2.4 kW 1 pcs Rp -

TOTAL Rp -

6 DOSING PUMP

Kebutuhan
No Description P/N Harga Satuan Total Biaya (Rp)
RINCIAN SPARE PART POMPA (TORISHIMA)
KEBUTUHAN PER 1 TAHUN
No Description P/N Harga Satuan Total Biaya (Rp)
Per 1 Tahun
1 Grooved Ball Bearing 2 pcs Rp -
2 Mech Seal Kit 2 pcs Rp -
3 Rewinding Elmot 0.18 kW 2 pcs Rp -

TOTAL Rp -

7 PIPING, INSTRUMENT DAN LAIN-LAIN

Kebutuhan
No Description P/N Harga Satuan Total Biaya (Rp)
Per 1 Tahun
1 Gasket Set 1 lot Rp -
2 Pipe, Elbow, Knee 1 lot Rp -
3 Pressure Indicator 1 lot Rp -
4 Gate Valve various size 1 lot Rp -
5 Cartridge Filter (Parker 5 micron 20" length) F-001 20 pcs Rp -
6 Absorber Media T100-ABS 2 lot Rp -

TOTAL Rp -